CHIYODA MALAYSIA SDN. BHD.

DATE : 17 NOVEMEBR 05 REV. : 1

CIVIL & STRUCTURAL ENGINEERING SECTION DESIGN PLAN

M3205-CS-DP-001 PAGE : 1 OF 5

PROJECT

EPCC OF PACKAGE 3 BULK DEPOT FACILITIES AND PACKAGE 4 LPG BOTTLING FACILITIES FOR INDEPENENT OIL TERMINAL PROJECT ASSAR CHEMICAL SDN. BHD. KUCHING, SARAWAK M3205

OWNER : LOCATION JOB NO.

: : :

1 0 Rev.

Issue for Execution Issue for Approval Description

17 Nov 05 17 Mar 05 Date

KS Gan KS Gan Originated KS Gan Reviewed Rama Approved

CHIYODA MALAYSIA SDN. BHD.

DATE : 17 NOVEMEBR 05 REV. : 1

CIVIL & STRUCTURAL ENGINEERING SECTION DESIGN PLAN

M3205-CS-DP-001 PAGE : 2 OF 5

SCOPE OF WORK BRIEF DESCRIPTION OF SCOPE OF WORK Civil & Structural Engineering Section of JV, between Chiyoda Malaysia Sdn Bhd & PPES Works ( Sarawak ) Sdn Bhd shall be responsible for the following activities that required for this project with regard to civil and structural work: Package 3 1. Preparation of Drawings for Buildings Administration Building Bulk Depot Guard House Jetty Guard House Additive Tank Shed Fire Water Pump Shed Product Pump Shed Tank Truck Loading Gantry Bulk Drivers Rest Area / Toilet / Surau E&I Distribution Shed Switchgear Room & Sesco Bulk Storage & Workshop Building HVAC & Plumbing / Sanitary Additive Drum Shed 2. Preparation of Drawings for General Civil Works and Foundations Standard Drawing Underground Composite Drawing Composite Piling Plan Pipe Support / Pipe Sleeper Details Road, Paving and Drainage Works Fencing Storage Tanks Foundations Road Culverts Foundation for Oily Water Separator & Associated Supports Misc. Supports and Foundations Pavement and Surfacing Drawings Preparation of Drawings for Structures Works Operating Platform

3.

CHIYODA MALAYSIA SDN. BHD.

DATE : 17 NOVEMEBR 05 REV. : 1

CIVIL & STRUCTURAL ENGINEERING SECTION DESIGN PLAN

M3205-CS-DP-001 PAGE : 3 OF 5

4.
5.

Pipe Rack / Pipe Bridges

6.

Preparation of Design Calculation Preparation of Construction Specifications Carry out circulate, review and comment on IDC Document

Package 4 1. Preparation of Drawings for Buildings Administration Building Guard House Filling Hall Air Compressor Shed Pump / Compressor Shed Truck Loading Bay LPG Workers Canteen / Toilet / Surau Switchgear and Generator Room Building HVAC & Plumbing / Sanitary 2. Preparation of Drawings for General Civil Works and Foundation Underground Composite Drawing Composite Piling Plan Pipe Support / Pipe Sleeper Details Road, Paving and Drainage Works Fencing Spherical Tanks Foundations Road Culverts Misc. Supports and Foundations Pavement and Surfacing Drawings Preparation of Drawings for Structures Works Operating Platform Pipe Rack / Pipe Bridges Preparation of Design Calculation Preparation of Construction Specifications Carry out circulate, review and comment on IDC Document

3.

4.
5.

6.

CHIYODA MALAYSIA SDN. BHD.

DATE : 17 NOVEMEBR 05 REV. : 1

CIVIL & STRUCTURAL ENGINEERING SECTION DESIGN PLAN

M3205-CS-DP-001 PAGE : 4 OF 5

ENGINEER IN CHARGE 1 The JVs C&S Consultant is Jurutera Jasa ( Sarawak ) Sdn Bhd. They shall be responsible for the overall C&S design work including coordination work with Aki-Media ( architectural work ) and Project Konsultant Malaysia ( plumbing, sanitary and HVAC work ). Jurutera Jasa ( Sarawak ) Sdn Bhd Tai Lee Yoon - Civil / Structure Engineer Hu Hiong Ho and others - Discipline Engineer Mr. Tai & Hu shall be responsible for all the work scope as mentioned above. A. 2 1. 2. 3. Chiyoda Malaysia Sdn Bhd Gan Kem Sing Lead Civil / Structure Engineer Lim Chin Chiat Discipline Engineer Saifuddin Bin Adnan Discipline Engineer Mr. Lim & Mr. Saifuddin shall be responsible for coordinating with Jurutera Jasa on works as mentioned above.

RESPONSIBILITIES 1. Discipline Engineer shall be responsible for: a. design verification and sign in all his outputs at CHECKED column as an indication that design verification has been performed. b. update his design input and output control sheet. c. ensuring the design changes requested by EM is incorporated in the output.

CHIYODA MALAYSIA SDN. BHD.

DATE : 17 NOVEMEBR 05 REV. : 1

CIVIL & STRUCTURAL ENGINEERING SECTION DESIGN PLAN

M3205-CS-DP-001 PAGE : 5 OF 5

2.

Lead of Civil / Structure shall be responsible for : a. to review all his discipline engineers output and sign on the column Engr b. assign any of his discipline engineers for a selected task which may not be described in this Section Design Plan.

3.

Civil / Structure Discipline Engineer at Chiyoda Malaysia Sdn Bhd shall be responsible for : a. Coordination work between Chiyoda Malaysia Sdn Bhd & C&S Consultant regarding loading data transfer and drawings review.

VERIFICATION, REVIEW AND APPROVAL STAGES The verification and review processes will be performed by discipline engineer and lead engineer during the following design stages when the outputs are ready for: 1. IFA Issue For Approval 2. IFC Issue For Construction DESIGN INPUT AND OUTPUT The following are attached 1. 2. Design Input Control Sheet Design Output Control Sheet