Documente Academic
Documente Profesional
Documente Cultură
A leading independent LNG midstream company; 35+ years experience in LNG sector. Bermudan corporate headquarters with offices with branch offices in Oslo, Singapore, and Tulsa. Fleet of 13 vessels (10 LNGCs and 3 FSRUs). Developed worlds first FSRU based on the conversion of an existing LNGC.
Golar Mazo- On 18 Yr. Charter to Pertamina
The group is split between two companies: Golar LNG (GLNG) and Golar LNG Energy (GOL).
25+ year history in Indonesia and committed to grow: Golar Spirit; Golar Mazo; West Java FSRU development.
Export Manifold Seawater pumps for pumping seawater to regas trains in order to heat up the LNG
2
Source: Golar LNG Energy
S H U T T L E T A N K E R
FUEL GAS
L N G
METERING
GAS HEATER
GAS COMPRESSOR
HIPPS
LNG VAPORISERS
LNG
SUCTION DRUM
VAPOUR
LNG LNG
INTANK PUMPS
METERING
C U S T O M E
R
El Power T/G
Golar FSRU
FWD Machinery Space
Seawater cooling system Turbo Generators Freshwater cooling system Firewater Pump Electrical equipment room
Source: Golar LNG Energy
Picture / Picture of and copyright: Shell Source: Golar LNG/ Energycourtesy copyright Petrobras
FSRUs a more cost-effective way to meet low demand or to grow into LNG than traditional land based terminal Can be relocated if demand is not sustainable over the long-term Reduced permitting challenges
(MMtpa)
300.0
250.0
200.0
150.0
Reduced financing requirement; no need to build storage tank(s) Quicker to develop than and cost competitive with land-based facilities For suppliers low-cost option to access new markets
6
100.0
50.0
OECD
Non-OECD
Source: Wood Mackenzie
Escobar
Bahia Blanca
Golar Operational / Committed Other Industry Operational / Committed Locations where further projects have been proposed Source: Golar LNG Energy
800
600 400 200 0 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020
SITING
DEFINITION
SUPPORT
The Gas Offtaker Commitment underpins project; Willingness to pay international LNG prices
Siting of Vessel
Operational
Operational
Operational
Conversion Pending
1981 Built / 129,000 m3 Moss Containment 2.5 bcm / year Near Shore (Existing Pier)
1977 Built / 125,000 m3 Moss Containment 5.0 bcm / year Offshore Side by Side LNG transfer
Moss Containment
4.9 bcm / year Near Shore (New Pier) Side by side LNG transfer HP arms on pier Open Loop
Gas manifold
Open Loop
10
4th FSRU - Golars 4(West Java) Khannur th FSRU - Khannur (West Java)
Key Components
Moss Containment 5.0 bcm / year Offshore Side by Side LNG transfer Open Loop
12
Moss Containment
5.0 bcm / year Offshore Side by Side LNG transfer
Open Loop
Suction Drum
Mooring Hooks Export Manifold Minimum Send Out Compressor Metering Turbo Generators Seawater Discharge High Integrity Protective Pressure System (HIPPS) Chain Stoppers High Voltage Switchboard Diesel Driven Fire pump
14
Source: Golar LNG Energy
Seawater Pumps