De S. No.

Drawing Volume Drawing Title

1 D0301 2 D1304 3 D1304 4 D1304 5 D0201

D 0301 Installation drawing of GT ST UT D 1304 CABLE LAYOUT DRAWING OF 400kV SWITCHYARD D 1304 CABLE LAYOUT DRAWING OF 400kV SWITCHYARD D 1304 CABLE LAYOUT DRAWING OF 400kV SWITCHYARD Installation of 400 KV Switchyard

6 D1308

CABLE LAYOUT DRAWING OF CHEMICAL WATER SYSTEM

7 T0602

Structures of 400 KV Switchyard

8 T0602

Structures of 400 KV Switchyard

D0505, 9 D0608, D1101

INSTALLATION AND ORDER DWG OF 415V WATER SUP SYSTEM & WIRING AND ORDER DWG OF 220V DC SYSTEM FOR MAIN BUILDING & INSTALLATION DRAWING OF MAIN POWER BUILDING SLIDE WIRING CABLE LAYOUT DRAWING OF CHEMICAL WATER SYSTEM & Construction drawing of service water and portable water basins Structures of 400 KV Switchyard INSTALLATION AND CONNECTION DRAWING OF SWITCHYARD

D1308, 10 S5303

11 T0602

12 D0901

13 D0902

Lighting and Grounding Protection of MPH

Design Modifications Reason for Modification SEPCO Submitted 31.08.2011 12.11.2011 25.11.2011 25.11.2011 30.11.2011

Terminal Clamp Provided Codes / Nomenclature changed Inconsistent with civil dwg T0602. Cable trench near NCB changed to 1000x1000mm. This is in line with T0602. Inconsistent with dwg D0201 (Only Nomenclature changed) Modification of T - Clamp for outgoing line connection with ACSR Moose Conductor of PGCIL

Specification for No. 21 changed and quantity for no. 22 reduced from 33 to 10. Also cable trays (two nos) 30.11.2011 inside 1000x1000mm trench made as single.

08.12.2011

Changes in outgoing switchyard design. Wave trap added. Foundation of CT Terminal Box added. New foundation SJ-9 added for wave trap. Cable trench added and elevation of cable trench changed.

25.12.2011

Unit 4 cancelled (for D0505). Change in wiring (D1101). Modification in DC motor control box according to manufacturer. (D0608)

27.12.2011

For D1308, changes due to unit 4.

31.12.2011

This design modification superseeds letter 0897. Same modification as written above in no. 8.

31.12.2011

04.01.2011

Earth mat extra SEPCO claim

19.01.2012

Design Modifications SEPCO Letter No. DCPL Reply DCPL Letter No. & Reamrks

LE-TALW-TALST-TSPLX-11-0603 LE-TALW-TALST-TSPLX-11-0776 LE-TALW-TALST-TSPLX-11-0820 LE-TALW-TALST-TSPLX-11-0821 LE-TALW-TALST-TSPLX-11-0836 regarding modification of T-connector for 400kv switchyard outgoing line LE-TALW-TALST-TSPLX-11-0833 LE-TALW-TALST-TSPLX-11-0852-Regarding embedded parts of switchyard cable trench and construction method of cable trench from NCB to switchyard LE-TALW-TALST-TSPLX-11-0897-regarding submitting switch yard design modification

17.10.2011 LOT.No.1673 dtd 17.10.11

LE-TALW-TALST-TSPLX-11-0901

LE-TALW-SEPC1-TSPLX-11-0985

02.01.2011 (Approved by A.K.B by e-mail)

LE-TALW-TALST-TSPLX-11-0917-Regarding Submitting the Latest Switch yard Design Modification LE-TALW-TALST-TSPLX-12-0014-Regarding Design modification of D0901

04.01.2011

(A.K.B by e-mail: Plain PCC not acceptable. To do RCC Trench)

LE-TALW-TALST-TSPLX-12-0065-Regarding Design modification of D1202

TSPL Reply

TSPL Letter No. & Remarks

18.10.2011 22.11.2011

TSPL_EPC_SEPCO_TECH_2835 TSPL_EPC_SEPCO_TECH_3055

13.01.2011

TSPL_EPC_SEPC_TECH_3264 (TSPL Reply wave trap foundations SJ-9 for all three phases.)

23.01.2011

TSPL_EPC_SEPCO_TECH_3297