Sunteți pe pagina 1din 25

Document Version 2.

TSSR
TECHNICAL SITE SURVEY REPORT
NCELL GSM Project
SITE ID (with candidate letter):
BHE-123 A

TSSR Revision Track


Revision Date Name Revision description

1 2 SITE SURVEY PARTICIPANTS:


SA (Subco) RF Planner (Subco) TRS Planner (Subco)CW Surveyor (Subco)HUAWEI Supervisor -

Mast/Saroj Yadav/9801122332 Mast/Saroj Yadav/9801122332 Mast/Saroj Yadav/9801122332 Mast/Saroj Yadav/9801122332 Daud Man Kumari Gurung
Approved date Rejected date

(Company, Name & Phone #, Signature)

(Company, Name & Phone #, Signature)

(Company, Name & Phone #, Signature)

(Company, Name & Phone #, Signature)

(Company, Name & Phone #, Signature)

Owner - (it is enough if signature is on the sketch)


(Company, Name & Phone #, Signature)

Checked by HUAWEI Name&Position&Signature: Received by NCELL:


(Name & Signature & Date) NOTE: NCELL should convey any objections in 48 hours otherwise the document is deemed as excepted.

Checked by NCELL Name&Position&Signature: Comments:

Approved date

Rejected date

Version: 2.0 Date: __________

TSSR TECHNICAL SITE SURVEY REPORT


Site ID: Region: Municipality/VDC: Site Address: Coordinates: BHE-123 A FWDR
Municipality
VDC

BHE-123 A

Site Name: City: Name:

Saraswati Gaun DAILEKH


Narayan Nagarpalika

Date: Phase:

30.01.2012

Phase 3

NARAYAN NAGARPALIKA -8, DAILEKH Latitude: Altitude:


Rooftop new shelter GF
modified room State / Governmental

28.83003 1379

Longitude: m
Greenfield indoor room existing shelter
Communal

81.70997

Site Type: Equipment room type:


Existing site

Existing tower / Chimney

Outdoor BTS Other


Private

Ownership Type: Site Contact Person Details:


Name Position
Mobile Phone Phone/Fax

Site Owner Contact Details:


Man Kumari Gurung 9841628153 9841628153
Name Position Mobile Phone Phone/Fax Legal address

Man Kumari Gurung 9841628153 9841628153

Permission from civil avaition Additional permits required Permit to be received from: Access to site Available Restriction of time or any other details:

YES YES

NO NO

NARAYAN NAGARPALIKA -8, DAILEKH

Week days

Saturday

Sunday

Appointment needed

Other:

_______

NO Location of Key: Directions to get to Site:


On Site

Off-Site

60 KM NORTH FROM SUKHET,NEAR PASHU PARIKSHAN KENDRA,NARAYAN NAGARPALIKA

Special access details:

SA

TSSR
TECHNICAL SITE SURVEY REPORT
Site ID:
BHE-123 A
BHE-123 A

Site Adress:
North: Equipment type:

NARAYAN NAGARPALIKA -8, DAILEKH 28.83003


Stack Wall

Coordinates:

East:
Pole

81.70997
Outdoor
Indoor

RF- Data GSM Network:

Sector1 Band (900 / 1800) Cell ID Structure / Pole allocation Length of pole No of TRX Antenna Type Azimuth (Degree) Centre height of antenna - AGL (m) Height Rooftop (m) Tilt (Electr) Tilt (Mech.) Feeder Length (m) Feeder type No. of feeder No. of E1 (Single Band-1E1, Dual Band-2E1) Comments and coverage targets 900 BHE-123A LATTICE 24M 3 DBXLH6565CVTM 40 21M N/A 4 2 34M OPTICAL 1
1 E1

Sector2 900 BHE-123B LATTICE 24M 3 DBXLH6565CVTM 110 21M N/A 2 0 34M OPTICAL 1
2 E1

Sector3 900 BHE-123C LATTICE 24M 3 DBXLH6565CVTM 230 21M N/A 2 0 34M OPTICAL 1

Remarks

TRS- Data Transmission:


Height of Antenna AGL (m) MW1 MW2 MW3 MW4 MW5
Can you see BSC or HUB Site:

MW

Pole

Antenna Size / Polarization

Azimuth (deg)

MW Configuration

Far End (Site 'B' ID)

Hop Distance (km) 5.6km

Capacity

frequency (GHz)

Feeder Length (m)

Feeder Type

24

0.6

184

23M

RTN605,1+0

BHE414

16 E1

18G

Yes

No

Any other sites:

Yes

No

Transmission equipments

Other site to be marked in panoramic photos! Far End Feasibility Information: Azimuth 4
Farend Type IDU space Photo

Height
Now Connected

25

Antenna Size Max

0.6

Indoor OK Available

Outdoor NOT OK Unavailable

Lease Line Backbone Site Repeater

TR Comments:

NWP

BHE123-A(ITS FAR END BHE414)


Farend Tower height
30M

Layout diagram of the equipment placement at farend

FAREND IS PHASE-1 SITE /SPACE IS AVAILABLE FOR MW SPACE AVAILABILIT

PHOTOS FROM FAREND towards the surveyd Location Link direction site with A

provide clear photos ,should include the obstacles information ( trees , hills ) if

If possible photo should shows the farend locatioin or its nearby other's Tower photo to certainfy link will happen But for longer h

PHOTO OF THE BTS ROOM OF FAREND SITE SHOWING THE PLACE WHERE NEW EQUIPMENT AN

Photo depicted the space of Installation of DDF either in the RACK or mounted on Wall. Need to see any space available for Wa

provide clear photos ,should include the overall equipments installed on Tower, can ha

Photo depicted the persent condition of Tower provide clear photos for avialablity of MCB in farend sites.

HE414)
Space Availibilty
yes

Height at which MW antenna mounts


25m

ement at farend

R MW SPACE AVAILABILITY

Link direction site with Azimuth Azimuth nformation ( trees , hills ) if any

will happen But for longer hop link at least capture the photo in link direction

HERE NEW EQUIPMENT AND DDF IS TO BE KEPT

any space available for Wall Mount DDF

installed on Tower, can have many pics

on of Tower MCB in farend sites.

TSSR
TECHNICAL SITE SURVEY REPORT
BHE-123 A

Model Site Type:


MS1A MS1B MS1C
MS1D MS1E

Standard Application

Non-Standars Application, Site Design Drawings needed before CW start

MS1
ROOFTOP + Wall Mount ROOFTOP + 3M pole ROOFTOP + 4.5M pole ROOFTOP + 6M pole ROOFTOP + 9M pole on I Beam ROOFTOP + Ballast Mast 4.5m
MS7A MS7B

MS7
GF 12M Monopole + Steel GF 18M Monopole + Steel

MS1F

MS2

MS2
24M Greenfield Lattice
MS8

MS8
Flexible Solution +9m GF

MS3
MS3A MS3B

MS9
MS9

30M Greenfield Lattice 30M Greenfield Lattice

Existing greenfield Tower + Lease

MS4
MS4

40M Greenfield Lattice

MS5
MS5 MS6

50M Greenfield Lattice

MS6
60M Greenfield Lattice

Electricity info: Distance of single phase line from site:... m 40M Capacity/type/ distance of corresponding transformer from the site ............. KVA... Phase. m 50KV Distance of three phase line from site:..m 40m Capacity/type/ distance of corresponding transformer from the site ............. KVA... Phase. m Distance of 11 KV line from the site: m 350M Distance of 33 KV line from the site: m N/A

Pole needed:

Yes Yes

No No

No. of poles needed:1 If yes:


Road
River Building

Crossing needed:

Private land

Are there any Disturbances/ Obstactles during Line Extension/ Crossing:


Power Cable rout starts at by pass .. till

ELECTRIC POLE LT PANNEL ACDB BOX.

CW

TSSR
TECHNICAL SITE SURVEY REPORT
BHE-123 A

AC power needed (KW): Generator needed: Final AC power supply:

12
Yes No

Distance from the nearest point of tapping to the site ARIAL 40 m Generator space available:
380V Three Phase
Yes No

Transformer Needed: Main AC Current Fuses (A):

Yes

No

230V Single Phase

Any other comment regarding AC power supply: Power Source coodniate 3 Phase: 1 Phase: 11KV:
No

THE SAME POLE CONTAINING 11KV & THREE PHASE. Latitude:28.83016 Longitude:81.70957 Latitude:28.83016 Longitude:81.70957 Latitude:28.82834 Longitude:81.70941
230V Single Phase

Temporary power available:

Yes

If yes, available AC power: m

380V Three Phase

11kV Yes No

Distance to temporary power source:

Owner willingness to provide temporary power

Contact person details for temporary power connection: Tree cutting required:
Yes No

If yes,

No. of trees to be cut for power line extension No. of trees to be cut within plot area

______

_______
Overheaded Undegrounded

Rooftop Site Electricity Info: Space for transformer available:


Yes

New AC Power cable:


No

Space for Grounding available:

Yes

No

Existing New Shown in Sketch Grounding solution: Grounding cable size(mm2): If Generator needed is yes then it is confirmed with owner that there will be no problem in future to run DG

Yes Undergrounded

No

Greenfield Site electricity info: Existing AC power supply: Solar Site Info:
Yes no

New AC Power cable:


----------------> If Yes:

Overheaded Above Ground

Below Ground

Clearance towards south east direction for Sunlight:

Yes

No

Enough space for solar Panels installation as per design in south east direction of plot: If there is any shadow of Tree/Mountain/Building/Tower/Shelter on solar Panels in whole sunlight available time: Any other comment regarding Solar:
Yes No

If Greenfield Site: Tower type:


New lattice tower New monopole New guyed mast Existing structure Other

Height of tower (m):

24M
Clay, Mud or similar Sand/Gravel

Other:
Tarmac Concrete Other

Characteristics of site area: Other:

Soil investigation according to local requirements: Comments: Fence type needed for site: Chainlink

Yes

No

Fence Length (m):

41.8m

How far is site from the nearest motorable road(m): Backfilling is needed Permanent Road needed for access to site: Crane access possible:
Yes No Yes No

Heigth (m): Length (m):


Yes No

Yes

No

Lorry access possible:


NO HEAD LOAD

Any weight restriction to the site:

Yes

No

Head load needed: HL start: Latitude: HL finish Latitude: NO TRACTORABLE ROAD Yes Tractor load needed: TL start: Latitude: TL finish: Latitude:

Yes

No

If yes: Longitude: Longitude: If yes: Longitude: Longitude:

No

Any height/width restriction to the site:

Yes

No

Any parking restriction to the site:

Yes

No

Any over head power cables or other obstacles at the site:

Yes

No

To be investigated

Any undeground installation at the site:

Yes

No

To be investigated

CW

TSSR
TECHNICAL SITE SURVEY REPORT
BHE-123 A

IF Rooftop Site: Building Structure type: Height of tower (m): Height of rooftop above ground level (m): Is there elevator room on rooftop?: Elevator type:
Public
Good

Masonry

Reinforced Concrete

Steel

Other

How many floors in the build?:


Yes No

Weight limit of elevator (kg): Size of elevator (m) H W


Yes

Service
Average

None
Bad

D
No

Building condition:

rane access possible Head load needed: HL start: Latitude: HL finish: Latitude: Tractor load needed: TL start: Latitude: TL finish: Latitude:
Yes No

If yes: Longitude: Longitude: If yes: Longitude: Longitude:


Other

Yes

No

Antenna support type: Height of antenna support (m):

___ Pole

____m Guyed mast

Existing Structure
If other:

Describe wall and roof condition: Comments about roof construction: Rooftop penetrations needed: Floor penetrations needed: Wall penetrations needed: If Existing Structure Site: Antenna support type:
Lattice tower
Other:

Yes Yes Yes

No No No

Pylon

Chimney

RT existing

Water tower

TV tower

Other

Height of existing tower (m): Cable tray routes: Length of cable tray needed (m):
Comments about cable tray or ducting: 6m

Length of ducting needed (m):

Equipment room Details: Shelter location:


Roof Ground
Technical floor

Elevator room No

Other

Shelter ice-protection needed Equipment type:


Stack indoor

Yes

Stack outdoor

Wall indoor

Wall outdoor

Other

Equipment shelter camouflage needed: Details:

Yes

No

CW

Autocad Drawings

1 Square Correspond to:

Drawings Of: Top View

1050
750

1500
1085

1500

1300

1000

For Future Expansion

GUARD ROOM (optional)

PROPOSED SHELTER (FUTURE)

Minishelter (Battery & IDU)

TP48200A X3HO

For Future Expansion


600

2859

4400

7000

1300

24M-GBT TRIANGULAR TOWER

TSSR

1500 4000

E.pole LT Panel

3500 1500
1300
900 900

3000

3000

900

EP-1
4400

EP-2

EP-3

Septic Tank (Option)

1300

900 900
1300

900

TECHNICAL SITE SURVEY REPORT

*
28000

Scale: ______

*14500 *

*
DETAILS TOWER HT TOTAL AREA REQUIRED FOUNDATION SIZE TOWER C/C DG SIZE ODBTS SIZE (7.0X14.5)M (4400X4400)MM (2859X2859)MM (1500X2500)MM (1500X3100)MM

*
28 59

*
600
FENCE LENGTH
EP-1 EQUIPMENT EARTHING EP-2 LIGHTING PROTECTION EARTHING EP-3 NEUTRAL PROTECTION EARTHING

*
NGL 100mm gravel layer

*
905 905

*
3100

*
2500

_0,5__m

24M (TRI. ANGULAR)

DG

1500

41.8M (without Guard Room) 37.3M (with Guard Room)

3500 1500

Septic Tank (Option)

DG

900

1500

CW (Top)
GUARD ROOM (optional) E.pole LT Panel

1000

*
EP900

15

EP-3 NEUTRAL PROTECTION EARTHING

BHE-123 A

TSSR TSSR
TECHNICAL SITE SURVEY REPORT
BHE-123 A

Autocad Drawings

Drawings Of: Side View


1 Square Correspond to: _0,5__m Scale: ______

CW (Side)

TSSR
TECHNICAL SITE SURVEY REPORT
Hand sketch Drawings
BHE-123 A

Drawings Of: CW Layout & comments


1 Square Correspond to: ___m Scale: ______

Note: Here scanned handwritten sketch should be placed, signed by all representatives including owner. This is to acknowlige all parties on how the site will look like. Please, follow this strictly!

CW (Signed sketch)

TSSR
TECHNICAL SITE SURVEY REPORT
Drawings
BHE-123 A

Drawings Of: TI Layout & comments


1 Square Correspond to:
0 0 5 10 15

0.1 m
20

Scale: ______
30 25 35 40 45

10

15

20

25

30

35

40

45

50

55

TI or/and CW(indoor)

TSSR
TECHNICAL SITE SURVEY REPORT
Addidional information
BHE-123 A

Photos of Candidate:

Place of outdoor

Photos

TSSR
TECHNICAL SITE SURVEY REPORT
Addidional information
BHE-123 A

Temporary power source

3 phase supply power source

1 phase supply power source

HT line (Mention 11KV or 33KV)

Existing transformer location

Sector Photos

TSSR
TECHNICAL SITE SURVEY REPORT
Addidional information
BHE-123 A

View of Sector 1
30

View of Sector 2
120

View of Sector 3
240

Sector Photos

TSSR
TECHNICAL SITE SURVEY REPORT
Addidional information
BHE-123 A

PANORAMIC PHOTO

30

60

90

120

150

TSSR
TECHNICAL SITE SURVEY REPORT
BHE-123 A

ANTENNA
Antenna location Antenna type SPACE Requirement for Antenna installation Concrete Foundation for VSAT antenna Distance from VSAT antenna to any obstacle (fence,barbed wire) on satellite look angle(minimum 6m)
Greenfield 1.8m ANDREW 2m*2m Required (if Greenfield) Yes No Rooftop 2.4m ANDREW 3m*3m Not Required Other 2.4m PRODLINE 4m*4m

SATELLITE VISIBILITY
Antenna Elevation angle clearance(see ref fig1&2 below) Antenna Azimuth clearance Panoramic photos available Any rigid obstacle on the satellite look angle (solar panel, house, trees,hills,electrical poles,DG,shelter etc) Fig2. below Location of indoor VSAT equipments (modems/ups/inverter/charger/battery) Distance between VSAT antenna and Modem location(should be less than 22m) Feeder holes for 2 IF cables,1 power supply cable and 1 grounding cable from VSAT antenna to modem location Type of power Source Output power supply available
NEA AC

Yamal202 49 E
Yes Yes No

32-40 230-240 N

Yes Yes

No No

No

INDOOR ROOM

Shelter

Outdoor cabinet

Other

Yes

No

Yes

No

Solar DC

DG

Others

IF Indoor room/Shelter
Space available for installation of modem with 19"rack UPS/inverter with battery for VSAT equipment (supplied by) If NCELL For no Head load sites Space available for 7KVA UPS with charger 12V 20*100AH batteries(minimum 3m*2m) For long distance head load sites Space available for 1KVA UPS with 12V 2*100AH batteries(1m*1m) IF VENDOR AC voltage source with battery backup DC/AC converter with battery available, if DC source
Yes Vendor No NCELL

Yes Yes Yes Yes

No No No No

IF Outdoor cabinet/Others
Space available for installation of modem inside cabinet 2U (19") UPS/inverter with battery for VSAT equipment (supplied by) If NCELL Space available for 1KVA UPS with 12V 2*100 AH batteries IF VENDOR AC voltage source with battery backup DC/AC converter with battery available, if DC source
Yes Vendor Yes Yes No NCELL No No

Yes

No

Specification for Electrical Power Requirements


Modem Modem Type Electric Power Consumption Current Voltage BUC BUC type BUC electrical power consumption Voltage
IDIRECT RADYNE PARADISE

200W 5A/2.5A 110-240VAC/+24or+48DC


AMPLUS 10W

300W 3A 110-240VAC
AMPLUS 80W

200W 1.0-0.4A 110-240VAC


AGILIS 80W

140W 220VAC/-48VDC

850W 220VAC

500W 220VAC

Fig1. Reference for Antenna look angle(elevation angle of antenna)

Fig2. Reference for checking any obstable with in elevation of antenna

TSSR
TECHNICAL SITE SURVEY REPORT
Notes List Item 1 2 3 5 Notes Plot size is 28mx7. Required area is 7mx14.5m Fence lengtth is 41.8m. Guard room is optional.
BHE-123 A

Explanation: put comments if site requires non-standard solutions or in case if additional materials will be needed

S-ar putea să vă placă și