Responsibilities & Duties

Qualified Planning Engineer (PMP, project management Professional) possessing experience in high and low end aspect of project management, operations and logistics, with an impressive list of projects to credit. Currently seeking a role to contribute accrued skills towards the achievement of mutually beneficial tangible growth objectives. Rami Al Haddads Specialties: Project planning and preparation of construction/engineering time schedule Using Primaver P5/P6 . Scheduling, Critical Path Mgmt, Target Setting & Achievement, Corporate Clientele Devpt. On-Site Eng Processes, Networking with Client Reps and Construction Supervisors. Claims planning, analysis and preparation. Team Building, Motivational, Analytical, HR, Interpersonal and Communication Skills Enthusiastic and committed to quality, efficiency & self advance.

Rami Al Haddads Experience

Sr Planning Engineer
Thales International Middle East (Privately Held; Construction industry) October 2009 Present (6 months) , Security/Operation Solution for 8 Story Car Park for Dubai Green Line Metro, AED72 Million, 8 Months. Duties and Responsibilities: * Establish project baseline and continuously monitor progress against it. * Update Project schedule with actual progress and evaluate variances. * Coordinating Sub-contractors activities with the Project Manager. * Implement and utilize the Project Control system. * Monitoring Project resources. * Monitoring deliverables. * Keep informed position on different project aspects. * Carry out periodic assessments and prepare progress reports. * Participate in the review and evaluation of claims for the determination of EOT entitlements. * Follow-up dispatch and monitor the action internally with Project team members. * Coordinate internal action plan to meet target dates. * Review and check reporting documents such as weekly & monthly progress, etc. * Preparing the data for the invoicing in coordination with the Financial Controller.

Sr Planning Engineer
Skelmore Trident Project Management Company (Construction industry) November 2007 September 2009 (1 year 11 months) Project(s): Deyaar Park, Downtown Jebel Ali Zone3, eight mix use residential and office towers, AED1.3 Billion, 4mo Enabling / 24mo Main. Mayfair Residency and Mayfair Tower, Business Bay - Dubai, two residential towers, AED324 Million, 2mo Enabling Works / 20mo Main Works Duties and Responsibilities: Establish and maintain progress monitoring and reporting procedures and maintain an informed position on all matters relating to site progress, shop drawing, procurement and resource allocation. Review the Contractor's project schedules for construction completeness of scope and logic, activity

duration, resource allocation and cost allocation. Monitor and report on job progress. Review and Evaluate claims for determination of extension of time entitlement and generate recommendations in claim analysis report Establish and maintain Project Risk Management Plan and updating the Risk Register Periodically. Prepare reports as requested commenting on all aspects of project progress making recommendations for improvement where appropriate. Maintain, Monitor and Update the Contractor's Shop Drawings submittal schedule and alert owner/engineer/contractor on possible delays. Maintain, Monitor and Update the Contractor's Material Submittal Schedule alert owner/engineer/contractor on possible delays.. Carry out weekly assessment of job progress and check the accuracy of the Contractor's Progress Reports. Attend Progress Meetings with Client, Engineer and Contractor.

Planning Unit Manager (PMO/HO)


Arrab Contracting Co. Ltd. (Construction industry) April 2007 December 2007 (9 months) Planning Unit Manager (PMO/HO) Duties and Responsibilities: * Leadership and Team Building for the Planning Unit as part of a project controls office. * Established and Maintained the Company's Project Controls Manual and Policies. * Established and maintained progress monitoring/reporting procedures and maintained an informed position on all matters relating to site progress, procurement of material, shop drawing status and manpower requirements. * Implemented Primavera P5 as a server/multiuser project scheduling and monitoring system. * Implemented of myPrimavera as a server/multiuser project status monitoring system for higher management. * Implemented Expedition as a server/multiuser contract management system. * Review project schedules for logic, duration, resource allocation scope thoroughness and activity attributes.

Planner/Scheduler
Al Arrab Contracing Co. Ltd. (Construction industry) July 2005 April 2007 (1 year 10 months) Planning Unit at HO) Duties and Responsibilities: * Preparing construction/recovery time schedule. * Manpower and equipment planning and resource loading on schedule. * Preparing project's cash flow (Cost estimates /Invoicing). * Preparing engineering schedules including material/procurement and shop drawing/design Plans. * Preparing Engineering/Construction progress S-Curve. * Monitoring/Updating progress of the construction and engineering activities. * Preparing periodic progress reports.

Project(s): * Construction of Chiller Plant, King Faisal University (Al Hasa), SR90 Million, 15 Months. * Construction of Garden Palace Private Project, Private Projects, SR260 Million, 2 years. * Construction of Dependent Schools; SR50 Million, 2 years * Umm Al-Qura University Campus, Ministry of Higher Education. SR255 Million, 3 years * Bin Seadan Real Estate - Head Office Building at Riyadh, Private Projects, SR34 Million, 20 Months. * Extension of diary processing plant (2) (Nadec/Harad), Private Projects, SR20 Million, 10 Months. * Patriot Missile Maintenance Workshop, Ministry of Defense and Aviation, SR33 Million, 2 years * 12 Kitchen Renovation at King Faisal Military Base/Hafr Al Batin, Ministry of Defense and Aviation, SR13.5 Million, 1 year * Control Building, Gulf Countries Interconnection Authority, (Awarded Tender, USD5 Million), 1 years * Jeddah Seventeen Housing Unit, Jeddah Naval Base, SR37 Million, 1 year * Jubail Naval Barracks Project, Saudi Naval Forces, SR33 Million, 1 year * Artawiah Extension Phase 5, General Directorate of Military Works, SR18Million, 6 Months

Planner/Scheduler
Al Arrab Contracting Co. Ltd (Construction industry) January 2005 May 2005 (5 months) Project: Construction of Office Park and Laboratory, Al Khafji Joint Operations Oil Co., SR240 Million, 4 years Duties and Responsibilities: * Leading a team to deliver project Scheduling/Planning Requirements. * Preparing and updating the mobilization schedule. * Preparing the Baseline Construction Schedule including: Construction Activities Material Submittals/Approvals including Identification and Scheduling Long Lead and Major Items Shop Drawings and Engineering Submittals/Approval. * Preparing the cost account hierarchy acceding to BOQ. * Estimating manpower and equipment use and resource loading the schedule. * Producing Progress S-Curves for Construction and Engineering. * Preparation of the weekly and monthly progress report for the client.

Site Engineer
Al Arrab Contracting Co. Ltd (Construction industry) September 2004 December 2004 (4 months) Project: Al Qassim Vocational Training Center NCO Barracks Complex, Ministry of Defense and Aviation, SR32 Million, 6 Months Duties and Responsibilities: * Supervised the construction works for the Sewer Lift Station and the Sewer Treatment Plant. * Followed up maintenance works for Phase 1: "Renovation of existing NCO Accommodation". * Followed up and reported site progress.

Project Engineer
Al Arrab Contracting Co. Ltd (Construction industry) January 2004 September 2004 (9 months) Project: Al Qassim Royal Accommodation Additional Works Maintenance; Ministry of Defence and Aviation Duties and Responsibilities: * Inspected and quantified damages; including: Roof heat & water Insulation,

floor (tiled/plain conc.) settlements, wall cracking, gypsum ornament damage, gypsum-board false-ceiling cracks ... at the Reception Hall, VIP and Main Villas. * Identified causes, proposed solutions, placed material and equipment orders. * Assembled and supervised work team, and handled handing over works for the consultant.

Site Engineer
Al Arrab Contracting Co. Ltd (Construction industry) August 2002 July 2004 (2 years ) Project: Buraydah City Sewerage Networks and Pumping Stations Construction; Ministry of Water; SR100 Million; 4 years Duties and Responsibilities: * Supervised the Technical Dept, Duties Included: Invoicing, Planning,Tracking, Quantity Surveying, CAD, and following up excavation permits issuance with local authorities. * Supervised the Manhole Fabrication Workshop. * Assembled and supervised the manhole finishing team. * Supervised the onset of works for Al Badaieh Sewer Network Project.