Documente Academic
Documente Profesional
Documente Cultură
L
high-pressure LNG pump product vaporizer
Odorizer CNG dispenser lorry driven by LNG
Larger civil works, area, building, operation, maintenance, noise, electricity consumption 100%
Open air installation, Cold end exchange 4 hours, electricity consumption 11%
Dedicated LNG storage tank design Low energy consumption in comparison with CNG machines - LNG submerged pump - HP piston pump (up to 350 bar) High pressure ambient air vaporizers - no mowing parts = no maintenance - no energy consumption, heated by ambient air only CNG buffer & CNG dispenser are the same as atnormal CNG fueling station LNG pump skid: - continuously submerged pump in cold liquid = instant start - flow rate 190lit/min = very short refueling time of buses/trucks LNG Dispenser MID approved flow meter/system
Page 4
4 60 000 liter storage, 6 LNG Weights & Measures dispensers 3 CNG dispensers Full system redundancy pumps and control panels Fire & Gas detection 200 vehicles 24h / 7h busy window operation (city fleet of vehicles) Largest refuse fueling facilities in North America
Specification:
Shipbuilder Incat, Hobart, Tasmania, Australia Fast Ferry 153 cars, 1000 passangers Length of ship 99 m Empty weight 450 tons max. weight 1100 tons Max. speed 53 knots (100 km/hr) Propulsion: turbines GE LM2500, 27 MW each waterjets Wrtsil Dual-fuel engines (LNG, nafta)
Page 10
Ferry
Storage tank: 2x HT 500 m3 (total 1000 m3 gross volume) Cryogenic pump: 1700 liter/min VIP: DN150; 100 meters (under the ground) Refilling of the ships (e.g. BergensFjord Norway 2x 125 m3) Frequency of filling of ships every night !
VIP interconnecting piping (bellow roadway) Filling module
CONCLUSIONS
LNG is rapidly becoming more available. Sourcing for Central Europe from liquefiers in Poland from marine terminals Ecological and economical solution LCNG stations can improve CNG fueling infrastructure