Sunteți pe pagina 1din 5

B.

Tech Computer Science and Engineering


IV Year I-Semester
CASETOOLS AND SOFTARE TESTING LAB RECORD BOOK

NAME: G.SHIVA PRASAD Roll No.: 09E21A0530

Department of Computer Science and Engineering

VIDYA VIKAS
INSTITUTE OF TECHNOLOGY
(2011-13)

Part I CASE TOOLS

Part II COMPILER DESIGN

Part II SOFTWARE TESTING

CT & ST Lab Objectives & Outcomes


Following the lab the student should be able to:
OBJECTIVES OF THE LAB 1 .Documenting user requirements using the UML notation 2. Description of the various components of UML 3. The use of Use Cases AIMS OF UML 1. Models helps us to visualize a system as it is or an as we want it to be. 2. Models permit us to specify the structure or behavior of a system. 3. Models gives us a template guides us in constructing a system. 4. Models document the decisions we have made.
REQUIREMENTS Hardware and Software required: 1. A working computer system with either Windows or Linux 2. Rational Rose Software or Visual Paradigm Software

SOFTWARE TESTING
OBJECTIVES OF THE LAB
1. Testing is a process of executing a program with the intent of finding an error. 2. A good test case is one that has a high probability of finding an as yet undiscovered error. 3. A successful test is one that uncovers an as yet undiscovered error.

REQUIREMENTS Server System configuration : 128 MB of RAM , 500 MB of free disk space, Win NT
server, Win 2K server, IIS 5.0, MS Access / Oracle 7.x,8.x,9 / MS SQL Server Client System configuration : 64 MB of RAM , 10 MB of free disk space, Win 95 / 98 / NT / 2K / XP, IE 5 ,

INDEX
S.No. I Introduction 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 2 2.1 Part - A : Case Tools Use Case Diagram. Class Diagram. Sequence Diagram. Collaboration Diagram. State Chart Diagram Activity Diagram. Component Diagram Deployment Diagram . Part - B : Software Testing Write a c program to demonstrate the working of the fallowing constructs: i) dowhile ii) whiledo iii) if else iv) switch v) for Loops in C language Write a C program for matrix multiplication fails Introspect the cause for Its failure and write down the possible reasons for its failure. Take any system (e.g. ATM system) and study its system specifications and report the various bugs. Write the test cases for any known application (e.g. banking application) Create a test plan document for any application ( Library Management System) Study of Any Testing Tool (Win Runner) Study of Any Bug Tracking Tool (Bugzilla) Study of Any Test Management Tool (Test Director) Study of any open source testing tool (Test Link) References 19 24 28 32 35 39 40 42 Content Page No. 1 DATE SIGN

43

2.2

57

2.3 2.4 2.5 2.6 2.7 2.8 2.9

62 63 64 66 74 81 84

S-ar putea să vă placă și