Product End-of-Life Disassembly Instructions

Product Category: Notebooks and Tablet PCs Marketing Name / Model [List multiple models if applicable.] HP Slate 2

Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE). 1.0 Items Requiring Selective Treatment 1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable. Quantity of items Item Description Notes included in product Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA) Batteries Mercury-containing components Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm Cathode Ray Tubes (CRT) Capacitors / condensers (Containing PCB/PCT) Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height External electrical cables and cords Gas Discharge Lamps Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above) Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner Components and waste containing asbestos EL-MF877-00 Template Revision B PSG instructions for this template are available at EL-MF877-01 Page 1 Include the cartridges, print heads, tubes, vent chambers, and service stations. With a surface greater than 10 sq cm All types including standard alkaline and lithium coin or button style batteries For example, mercury in lamps, display backlights, scanner lamps, switches, batteries Includes background illuminated displays with gas discharge lamps 1 1 2

Components, parts and materials containing refractory ceramic fibers Components, parts and materials containing radioactive substances 2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description Tool Size (if applicable) Description #1 Motor-screw-driver + Description #2 Motor-screw-driver * Description #3 Motor-screw-driver - Description #4 Description #5 3.0 Product Disassembly Process 3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment: 1. 2. 3. 4. 5. 6. 7. 8. Follow steps described in Disassembly instruction (file attached). If parts can be removed without using a tool, remove it first. Use correct screwdriver and torque value before unlock the screw

3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).

EL-MF877-00 Template Revision B PSG instructions for this template are available at EL-MF877-01

Page 2

MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY


MODEL : Akashi 2.0
Sub-assembly name: Document No.: Written by: Date: Akashi 2.0 FA DIS ASSY Akashi 2.0 FA DIS ASSY 2011/09/19 Revision: Page: 0.1 1

A. Current station version list Station 1 2 3 Ver. 0.1 0.1 0.1 Station 8 9 10 Ver. 0.1 0.1 0.1 Station 15 16 17 Ver. 0.1 0.1 0.1 Station Ver.

4
5 6 7

0.1
0.1 0.1 0.1

11
12 13 14

0.1
0.1 0.1 0.1

18
19 20 21

0.1
0.1 0.1 0.1

B. Version Modify list


Revision 0.1 Date 2011/09/19 Station ALL Content SOP Ver. 0.1 Design

Alicia Chien

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name 4 : Disassemble Housing 2 Ver. : 0.1

Station :
Date

1(1/1)

: 2011/09/19

Step
1. Disassemble Housing (PN:6070B0427802), and put it in the material box. Disassemble Housing in order (Fig.1), the details see Fig.2 and Fig.3. Slide the power button to the mark lock. (Fig.4)

3 Step 1

Fig.1

Fig.2 Step 4

Fig.4

Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Loosen screws Ver. : 0.1

Station :
Date

2(1/1)

: 2011/09/19

Step
1. Put the tablet on the lock screw fixture. 2. Loosen screws--M2*2.5(6052B0120801)*4. (Fig.1) Front Fig.1 3. Loosen screws- M2*2.5(6052B0120801) *2. (Fig.2)

Back

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Electric cross screwdriver (Low speed) Lock screw fixture

Qty Holding fixture list (holding fixture standard) Qty 1 1

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Pull FFC & disassemble TPCB and BTCB Ver. : 0.1

Station :
Date

3(1/1) : 2011/09/19

Step
1. Pull out the Sensor FFC & LCDS cable. (Fig.1/Fig.2/Fig.3) 2. Disassemble panel set and BTCB completely. 3. Put panel set & LCDS cable in material box.

Fig.1

Fig.2

Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Rip gaskets Ver. : 0.1

Station :
Date

4(1/1) : 2011/09/19

Step
1. Rip the acid tape on Power/B. (Fig.1) 2. Rip the gasket * 2 and sponge *1. (Fig.2)

3. Rip the gasket on CR/B. (Fig.3)

Fig.1

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Fig.3

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP Name : Rip gaskets Station :
Ver. : 0.1 Date 5(1/1) : 2011/09/19

Step
1. Rip the gasket * 3 on battery. (Fig.1) 2. Rip the gasket on docking CNTR bracket. (Fig.2) 3. Rip the gasket on Power/B. (Fig.3)

2 1

Fig.1

Fig.3

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Pull FFC & Cable Ver. : 0.1

Station :
Date

6(1/1) : 2011/09/19

Step
1. Rip AL Foil. (Fig.1) 2. Pull out the USB/B FFC ,Home/B FFC from left to right. (Fig.2)

Fig.1

Fig.2

USB/B FFC

Home/B FFC

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Pull FFC & Cable Ver. : 0.1

Station :
Date

7(1/1) : 2011/09/19

Step
1. Pull out the CR/B , MIC/B, Volume/B, FFC from left to right. (Fig.1) 2. Rip the acid tape * 2. (Fig.2)

Fig.1 Fig.2

CR/B

MIC/B

Volume/B

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Disassemble SPK Ver. : 0.1

Station :
Date

8(1/1) : 2011/09/19

Step
1. Loosen SPK screw * 4 form right to left. (Fig.1) 2. Pull out the SPK cable from M/B CNTR. (Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Disassemble WWAN Ver. : 0.1

Station :
Date

9(1/1) : 2011/09/19

Fig.1

Step
1. Rip the gasket marked in red. (Fig.1) 2. Rip the gasket on red cable. (Fig.2)

3. Disassemble WWAN antenna. (Fig.3)


4. Loosen WWAN screw * 2. (Fig.4)

Fig.2

Ignore above procedures for the sku w/o WWAN

Fig.3 Fig.4

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 1. Disassemble WLAN antenna. (Fig.1) : Loosen CR/B screws Ver. : 0.1

Station :
Date

10(1/1) : 2011/09/19

Step

2. Loosen Card Reader/B screw * 2, and put the CR/B in material box. (Fig.2)

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble WLAN card Ver. : 0.1

Station :
Date

11(1/1) : 2011/09/19

Step
1. Loosen WLAN card screw * 2, and put the WLAN card in material box. (Fig.1) 1

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble SSD Ver. : 0.1

Station :
Date

12(1/1)

: 2011/09/19

Step
1. Loosen SSD screw * 2, and put the SSD in material box. (Fig.1) 1 2. Pull out the Power/B cable. (Fig.2) 2

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Loosen M/B screws Ver. : 0.1

Station :
Date

13(1/1)

: 2011/09/19

Step
1. Loosen M/B screw * 4. (Fig.1) 2. Take out the COVER,PHONE,JACK. (Fig.2)

2 3 4

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Loosen M/B screws Ver. : 0.1

Station :
Date

14(1/1)

: 2011/09/19

Step
1. Loosen Docking CNTR BRKT screw * 2. (Fig.1) 2. Loosen M/B screw * 2. (Fig.2)

Fig.1 1 2

Fig.2
1 2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble M/B Ver. : 0.1

Station :
Date

15(1/1) : 2011/09/19

Step
1. Disassemble the battery CNTR from M/B, take out the battery and then put it in material box. (Fig.1)

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP Name : Disassemble Home/B, antenna
Fig.1

Station :
Ver. : 0.1 Date

16(1/1) : 2011/09/19

Step

For the sku with WWAN


1. Rip the WWAN(MAIN) antenna. (Fig.1)

For the sku w/o WWAN


2. Take out the dummy. (Fig.2) 3. Loosen Home/B screw * 2, put the Home/B in material box. (Fig.3)

Fig.2

Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble Volume/ B Ver. : 0.1

Station :
Date

17(1/1) : 2011/09/19

Step
1. Loosen Volume/B screw * 1. (Fig.1)

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Disassemble USB/B Ver. : 0.1

Station :
Date

18(1/1) : 2011/09/19

Step
1. Loosen camera screw * 1. (Fig.1) 2. Loosen USB/B screw * 2, put the USB/B in material box. (Fig.2) 3. Put the USB cover in material box. (Fig.3) Fig.1

2 Fig.2

Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble WWAN(AUX) antenna Ver. : 0.1

Station :
Date

19(1/1) : 2011/09/19

Step
1. Rip the gasket. (Fig.1) 2. Disassemble WWAN(AUX) antenna. (Fig.2)

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Disassemble WLAN cable Ver. : 0.1

Station :
Date

20(1/2) : 2011/09/19

Step
1. Disassemble WLAN ,BT cable. (Fig.1)

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name Fig.1 : Disassemble M/B Ver. : 0.1

Station :
Date

20(2/2) : 2011/09/19

Step
1. Loosen battery screw * 1, take out the MIC/BPower/BWWAN(AUX), put the battery in material box. (Fig.1) 2. Take out the label tray, put it in material box. (Fig.2)

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

Standard Operation Procedure


Document No. : Akashi 2.0 FA DIS ASSY SOP
Name : Disassemble WLAN antenna Ver. : 0.1

Station :
Date

21(1/1) : 2011/09/19

Step
1. Loosen WLAN (MAIN) screw * 1, take out the antenna. (Fig.1)

2. Disassemble WLAN (AUX) antenna. (Fig.2)


3. Put the BTCB in material box.

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.


Holding fixture list (holding fixture standard)

Qty Holding fixture list (holding fixture standard) Qty 1

Electric cross screwdriver

Tabulator Alicia Chien

Issue department NPSU-SE

S-ar putea să vă placă și