Ref No. NS1-MCS (ARV)-EVN-S(DRI)-0804 Date: 18 October 2012 To: Attn to: CC: From: Vietnam Electricity Group Thermal Power Project Management Board No.2 Mr. Nguyen Xo Viet, Director of PMB2 Mr. Nguyen Tien Khoa, Vice Director of PMB2 J-Power/AF-Consult Switzerland Consortium Mr. Kiichiro Onoyama Marubeni Corporation Nghi Son 1 Site Office Tel : +84-37-8711501/502 Fax: +84-37-8711500 Tel : +84-38-3-240-051 Fax: +84-38-3-523-299

__________________________________________________________
Page(s): 1 + 21 Project: Nghi Son 1 Thermal Power Plant Construction Project

Subject: Documents Required for Inspection at site (MC Invoice No. 2PN07638)Steel Conduit Accessories

Dear Sirs, As the delivery inspection for following items are planned on: 20 October 2012, we are pleased to submit the documents required for inspection as attached. No. 1 Transmittal No. (Date)
Please find as attached.

Project Control No.

Drawing No.

Hence, we would like to request to dispatch your examining staffs to attend the Inspection. Your attention would be highly appreciated.

c.c.

Fuji Electric Marubeni Tokyo (B715) Marubeni HAN (HAMPOWR) Marubeni HCM (HCMPOWR) Marubeni NS1 Site

Nghi Son 1 TPP Construction Project (on behalf of Mr. Yasushi Matsumura, Project Manager)

Attachment:

i) Summary of Packing List, ii) Certificate of Arrival (Draft)

NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT, VIETNAM CONTRACT NO.: 010610/NS1-EVN-MC

Issue Status A: For Approval I: For Information AB: As Built Drawing C: Internal Design

Return Status A: Approved AC: Approved with Correction Indicated I: Information Only X: Returned for Correction

DRAWING / DOCUMENT LIST - Station Electrical

Project Control No. (NS1-)

Contractor Drawing Rev Rev No.

Drawing Title

Due Date

Rev. Target Date (Forecast Submission to EVN)

Issue Letter No Issue Issue Date (NS1-MCP(ARV)-) Status

Return Letter No

Return Date

Return Status

CaRs

18B-E-ARV-5021

NS1-AR-3346PX0935021

PVC Conduit and Accessories Specification for Communication System

EVN-D-2953

04 Jul 12

MC-5535

27 Jul 12

AC

3457

Printed: 10/18/2012

ARV 1 of 1

7597 Drawing List-ELE-ARV

VIETNAM ELECTRICITY THERMAL POWER PROJECT MANAGEMENT BOARD NO. 2 Address: No.2 Duy Tan Street, Hung Phuc Ward, Vinh City, Nghe An Province, Vietnam; Tel: +84 38 2 240 051; Fax: +84 38 3 523 299;
ORIGINAL

Ref. No. Date To Attn

: : : :

NS1-MCS(ARV)-EVN-S(DRI)-0804 30- October -2012 Marubeni Corporation Mr. Yasushi Matsumura, Project Manager

Certificate of Arrival
NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT THE DELIVERIES AT SITE IN JULY 2012

Name of Project Contractor Invoice No. Contract No. Dated

: : : : :

Nghi Son Thermal Power Plant Construction Project (I) Marubeni Corporation 010610/NS1-EVN-MC June 01, 2010

In accordance with conditions of the Contract, we, the undersigned, on behalf of EVN hereby certify the oversea manufactured equipment, and material has been delivered at site on July 2012 and confirmed with the relevant conditions of the Contract. The details of the delivered cargoes are described in the Attachment CONFIRMATION OF EQUIPMENT/ MATERIAL DELIVERED AT SITE This Certificate is used only for the purpose of calculating, invoicing, making payment under L/C in accordance with the payment terms stipulated in the above Contract. Best Regards,

Thermal Power Project Management Board No. 2

_______________________

Nguyen Xo Viet Director

VIETNAM ELECTRICITY THERMAL POWER PROJECT MANAGEMENT BOARD NO. 2 Address: No.2 Duy Tan Street, Hung Phuc Ward, Vinh City, Nghe An Province, Vietnam; Tel: +84 38 2 240 051; Fax: +84 38 3 523 299;

Ref No. Name of Project Contractor


Attachment

: : :

NS1-MCS(ARV)-EVN-S(DRI)- 0804 Nghi Son Thermal Power Plant Construction Project (I) Marubeni Corp oration

CONFIRMATION OF EQUIPMENT/ MATERIAL DELIVERED AT SITE


This is to confirm the completion of delivery to the NS1 Site of the cargo/material/equipment as per below: Date of Equipment Package Quantity Weight Dimension Delivered No. Description No/ Part Unit [packages] No [kg] LxWxH at the No: Site 1 2

Refer to Attached

3 Comment/ Conclusion (if any):

Confirmed by : Contractor: Marubeni Corporation Consultant: JPOWER/ AF Switzerland (Consortium) Owner: EVN/ Thermal Power Project Management Board No.2

Consult

Name: Date:

Name Date:

Name Date:

Name: Date:

Name Date:

Name Date:

Attachment : 1. Comment sheet 2. Inspection Attendees Sheet

NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT Attachment 1 COMMENT SHEET ON EQUIPMENT/ MATERIAL INSPECTION Equipment/Material Description Invoice No. Confirmation on Delivery to Site Ref. Letter No. No.

No.

Consultant / TPMB2 Comment

MC Reply / Explanation

Conclusion

Contractor: Marubeni Corporation

Consultant: JPOWER/ AF Switzerland (Consortium)

Consult

Owner: EVN/ Thermal Power Project Management Board No.2

Name: Date:

Name Date:

Name Date:

MARUBENI CORPORATION Marubeni Corporation Site Office Nghi Son 1 Thermal Power Plant Construction Project
Attachment 2 Inspection Attendees Sheet

INSPECTION ATTENDEES: INVOICE No: .. Date: ..

No 1 2 3

NAME

COMPANY

S-ar putea să vă placă și