Scope of work
Evaluate all the options to assist with management of overall water make
Clean water separation Non-freedraining areas Minimising the dirty water make Options other than treatment; irrigation and evaporation, supply to others Treatment
Baseline case
Optimus, Bothashoek, Pullenshope, Zevenfontein, Kromdraai
Rehabilitation backlog addressed close to closure (last 5 years) Rehabilitation delayed where future mining is to occur
Kwagga
Rehabilitation is concurrent (currently only a small backlog)
PDF created with pdfFactory Pro trial version www.pdffactory.com
Graph of Mining water make with dewatering - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
50000
45000
40000
30000
25000
20000
15000
Total mine water mak e
10000
Mine water make with other point source inflows (to workings) Mine water make with all dewatering and other inflows
5000
0
07 09 11 13 15 17 19 21 23 25 20 20 20 20 20 20 20 20 20 20 20 27
Year analysed
Graph of water make versus usage - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
30000
25000
Total mine water make with dewatering and other inflows
20000
15000
10000
Residual surplus
Targetted usage
5000
Usage obtained
0
2 00 7 2 00 9 2 01 1 2 01 3 2 01 5 2 01 7 2 01 9 2 02 1 2 02 3 2 02 5 2 02 7
Net surplus /defic it
Year analysed
Uses = Plant (around 6Ml/day?) Graph of water make versus usage - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
50000
Water use
40000
30000
20000
10000
Residual surplus
0
2 00 7 2 00 9 2 01 1 2 01 3 2 01 5 2 01 7 2 01 9 2 02 1 2 02 3 2 02 5 2 02 7
Targetted usage
Usage obtained
Graph of Mining water make with dewatering - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
14000
12000
8000
6000
4000
2000
Storage in old workings (residual = water from Kwagga North) Dust suppression usage = 1600m3/day total? Reduces at 2013, but can also pump to Kwagga Central.
09 11 13 15 17 19 21 23 25 20 20 20 20 20 20 20 20 20
Mine water make with other point source inflows (to workings) Mine water make with all dewatering and other inflows
0
07 20 20 27
Year analysed
Graph of water make versus usage - Optimum Water Treatment Plant ; Analysis period from 2007 ;Kwagga Analysis for the Water Treatment Plant
14000
12000
10000
8000
6000
4000
Total mine water mak e with dewatering and other inflows Targetted us age
2000
Usage obtained
0
20 0 7 20 0 9 20 1 1 20 1 3 20 1 5 20 1 7 20 1 9 20 2 1 20 2 3 20 2 5 20 2 7 20 2 9 20 3 1 20 3 3 20 3 5 20 3 7 20 3 9 20 4 1 20 4 3 20 4 5 20 4 7
Net surplus/deficit
2500
Klipbank
Graph of water make versus usage - Klipbank Water Make ; Analysis period from 2007 ;EMPR analysis
2000
1500
1000
Total mine water make with dewatering and other inflows Targetted usage
500
Usage obtained
0
2 00 7 2 00 9 2 01 1 2 01 3 2 01 5 2 01 7 2 01 9 2 02 1 2 02 3 2 02 5 2 02 7
Net surplus /defic it
Year analysed
Graph of water make versus usage - Eikeboom Water Balance ; Analysis period from 2007 ;EMPR analysis
3000
Eikeboom
2500
2000
1500
Total mine water make with dewatering and other inflows Targetted usage
1000
500
Usage obtained
0
2 00 7 2 00 9 2 01 1 2 01 3 2 01 5 2 01 7 2 01 9 2 02 1 2 02 3 2 02 5 2 02 7
Net surplus /defic it
Year analysed
Option assessment
Refer to mind mapping
Water reduction
R 1 2.0 0 Kromd raa i Rehab R 1 0.0 0 Bo tha shoe k Rehab Pullenshope Reh ab W ater T rea tme nt Plant R 8.0 0 Cost per m3/20years
Ze venfontein non-freed raining R 4.0 0 Both ashoe k can al Kwa gga clean wate r
De Gro otte Rie tpa n W e st Ban k can al R 2.0 0 Zeven fo ntein Cle an catchm ent East Bank cana l extensio n
Analysis of water make for Optimum (excluding Kwagga) for different rehabilitation options
50 000 45 000 40 000 35 000 30 000 25 000 20 000 15 000 10 000 5 000 0
20 07 20 13 20 19 20 25
m3 per day
Year
Analysis of water make for Optimum (excluding Kwagga) - net water make after use for different rehabilitation options
4000 0
3500 0
3000 0
2500 0
2000 0 W ate r Make (base case) W ate r Make (reh ab 1) W ate r Make (reh ab 2) W ate r Make (reh ab 3) m3 per day after use after use after use after use
1500 0
1000 0
500 0
0
20 07 20 13 20 19 20 25
-500 0
-1000 0 Year
Water reduction
R 1 2.0 0 Kro mdraai Reh ab R 1 0.0 0 Pullenshope Reha b Bothash oek Reh ab R 8.0 0 Cost per m3/20years
1300m3/d
R 6.0 0 Office Are a Zevenfontein Re hab Op timus Reha b Ze venfontein non-freed raining R 4.0 0 Both ashoe k can al Kwagga clean water R 2.0 0 De Grootte Rietp an Zeve nfontein Clean ca tchment R0 500 10 00 15 00 20 00 25 00 300 0 350 0 Water volume (m3/day) W est Bank canal East Bank cana l extensio n
West bank canal, rehab Optimus West, other clean catchments 15Ml/day plant
Ditto above, but increase rehabilitation to allow surplus from Kwagga to be managed at Optimum 15Ml/day plant
Graph of Mining water make with dewatering - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
50000
45000
40000
30000
25000
20000
15000
Total mine water mak e
10000
Mine water make with other point source inflows (to workings) Mine water make with all dewatering and other inflows
5000
0
07 09 11 13 15 17 19 21 23 25 20 20 20 20 20 20 20 20 20 20 20 27
Year analysed
Graph of water make versus usage - Optimum Water Treatment Plant ; Analysis period from 2007 ;EMPR analysis
50000
40000
30000
20000
Total mine water make with dewatering and other inflows Targetted usage
10000
0
2 00 7 2 00 9 2 01 1 2 01 3 2 01 5 2 01 7 2 01 9 2 02 1 2 02 3 2 02 5 2 02 7
Usage obtained
West bank canal, rehab Optimus West, other clean catchments 15Ml/day plant
Ditto above, but increase rehabilitation to allow surplus from Kwagga to be managed at Optimum 15Ml/day plant Provide storage at Kwagga plus increased usage (irrigation or XCSA option) 15Ml/day plant
2007/08 a problem
Discussion
Water reduction measures Divert clean water around voids Cost = R0,9m
Water reduction measures Rehabilitate the site; backfilling of pits DME Cost for rehabilitation = R6,7m Probable cost (2 to 3million m3, R10 to R12/m3 haul), R31million. Option to backfill with Coal Slurry Level spoils, and place PS ash above the water table
PDF created with pdfFactory Pro trial version www.pdffactory.com
Water reduction measures Rehabilitation backlog; total cost = R90 million; available = R71million De Grootte Rietpan; R0,6 to R0,8million West Bank Canal; R10 to R15million
Water reduction measures Rehabilitation backlog; total cost = R93 million; available = R40million. May be that available is closer to R80million. Localised non-freedraining areas; R0,6 to R0,8million Clean catchments ; R0,3 to R0,5million
Water reduction measures Rehabilitation backlog; total cost = R119 million; available = R72million. Relocate secondary canals; R1 to R1,5million (needed as mining progresses, currently minor issue) East bank canal and shaping of rehabilitated areas ; R6million
PDF created with pdfFactory Pro trial version www.pdffactory.com
Kromdraai
Water levels look to be close to decant, but no detailed levels or decant levels as yet Still to model this pit
Kwagga South
Issues
Secondary water collection downstream of main highwall cut-off Provide dirty water containment at loading area Main issue is where to store the water See notes later