Sunteți pe pagina 1din 2

SERVICE

BULLETIN
NUMBER: DATE: MODEL: SB-264-003 1/20/03 CX, CH, CV, CL, RD, RB

(Also applies to Mack Trucks Australia)

AIR CONDITIONER COMPRESSOR MOUNTING ARRANGEMENT


On CH, CX, CV, CL, RD and RB model chassis equipped with air conditioning and an E-Tech engine, or an ASET AI or AMI engine manufactured prior to January 13, 2003, the bolt that secures the air conditioner compressor support bracket to the exhaust manifold may loosen in service. To ensure integrity of the air conditioning compressor mounting arrangement, the existing air conditioner compressor mounting bracket-to-timing cover bolt and the support bracket-to-exhaust manifold bolt must be replaced with studs and torque prevailing nuts whenever the timing cover has been removed from the engine. To facilitate this repair, the replacement studs and nuts have been included in the Cam/Lifter Replacement kits. Refer to the following illustration and table for stud and nut part numbers.
1

Figure 1 Air Conditioner Compressor Mounting Arrangement Key 1 2 3 Qty. 1 1 2 Part No. 107AM5025 107AM5012 191AM3 Description Stud, M10 x 1.5 x 62 mm, timing cover Stud, M10 x 1.5 x 37 mm, exhaust manifold Flange nut, prevailing torque, M10 x 1.5

SB-264-003 Page 1 of 2
SERVICE PUBLICATIONS, ALLENTOWN, PA 18105 MACK TRUCKS, INC. 2003

Installation Procedures 1. Secure the chassis for service, apply the parking brakes and block the wheels to prevent the vehicle from moving. 2. Open the hood. 3. Loosen the two bolts that secure the air conditioner compressor mounting bracket to the cylinder head. 4. Remove and discard the existing mounting bolt and flat washer that secures the air conditioner compressor mounting bracket to the engine timing cover (refer to the figure 1 above). 5. Apply Loctite 242 to stud-end threads of mounting stud (part No. 107AM5025), then install into the engine timing cover until it bottoms in the mounting hole. 6. Ensure that the mounting ear of the bracket is seated squarely on the timing cover boss, then install nut (part No. 191AM3) and tighten until snug. 7. Tighten the two mounting bracket-to-cylinder head bolts until snug. 8. Tighten the mounting bracket-to-timing cover nut to 48 lb-ft (65 Nm), then tighten the two mounting bracket-to-cylinder head bolts to 63 lb-ft (85 Nm). 9. Remove and discard the existing mounting bolt that secures the air conditioner compressor-to-exhaust manifold support bracket to the manifold. 10. Apply Loctite 242 to the stud-end threads of mounting stud (part No. 107AM5012), then install into the exhaust manifold until bottoming in the mounting hole. 11. Install nut (part No. 191AM3) on the stud and tighten to 48 lb-ft (68 Nm). The labor code and maximum labor allowance for this operation are as follows:
264 1A 01 80 ............................................................ 0.2 hr. Time allowed to replace existing air conditioner mounting bracket and support bracket bolts with studs and torque prevailing nuts. Does not include take-charge time.

SB-264-003 Page 2 of 2

S-ar putea să vă placă și