6.0 Headpond
-Type -Size (L x W x H) -Detention time : : : Modified as outlet zone of desander 11 m x 5.0 m x 4.69 m 60 sec
9.0 Powerhouse
- Type - Clear Size - Number of Units : : : Surface 29 m x 10.6 m x 7.5 m (L x B x H) 2 Nos.
vi
Tinau-I Small Hydropower Project Palpa District - Type of Turbine - Rated Capacity : : Francis 1200 kW
10.0
: : :
11.0
12.0
Trashracks (A) Intake Trashrack: - Type - Number - Size (B x H) - Max.m Spacing of Bars - Inclination (B) Penstock Inlet Trashrack: - Type - Number - Size (B x H) - Max.m Spacing of Bars - Inclination
: : : : : : : : : : :
Inclined 2 Nos. 2 m x 1.0 m (clear opening of intake) 50 mm 15o to vertical Inclined. 1Nos. 2.2 m x 4.0 m 20 mm 15o with vertical Inclined.
vii
Tinau-I Small Hydropower Project Palpa District - Number - Size (B x H) - Max.m Spacing of Bars - Inclination : : : : 1Nos. 5.0 m X 2.95 m 25 mm 15o with vertical
13.0
Transmission Line & Grid Connection -Specification : -Type : -Length : Transformers Step-up Transformer - Rating - Specific.n Generator - Type - Specific.n - No. of Units - Speed - No of Pole Approach Road Existing To be Constructed
33 kV, 3 Phase, 50 Hz DOG ACSR Conductor 6.0 km from Tinau PH to Butwal substation.
14.0
: :
15.0
: : : : : : :
Synchronous, 3 Phase 1.41 MVA, 11000 V, 50 Hz, 0.85 pf 2 Nos. 750 RPM 8 Butwal- Palpa black topped road is 100 away from the Powerhouse site. Approx. 100 m of access road to PH site from Existing Butwal-Palpa road and about 3.5km access road from PH to Headworks should be constructed. NRs. 418.197 million US$ 1,572 per kW NRs. 3.72 per kWH 16.96 % 1.42 36 months
16.0
Total Cost of the Project Specific Project Cost Unit Energy Cost Internal Rate of Return (IRR) Benefit Cost Ratio (B/C Ratio) Construction Period
: : : : : :
These values are adopted from Nisi SHPP (3.5 Mw) for reff, as they are comparable to Sisa SHPP (3.89 Mw)
viii