Saudi Temco Company

Client : Project:

ADC Energy Systems LLC KING SAUD UNIVERSITY ENDOWMENT DISTRICT COOLING PLANT IN RIYADH, KINGDOM OF SAUDI ARABIA (KSA) Project No.: ISTRICT COOLING INSTALLATION D DATE : 31/10/2012
COTRACT Progress
Qty Unit Unit Price (SR) Total (SR) Previous Progress This Month Progress (SR) Cumulative Progress (SR)

Billing

Description

MAJOR EQUIPMENT - PROCESS


1 CHILLERS Water Cooled Centrifugal Chiller Set, 2,330 TR, new Purchase Air Cooled Chillers 374 TR, New Purchase Chiller's Accessories Mobile Refrigerant Recovery Unit 1 Lot 35,000 35,000 4 8 item item 85,000 52,000 340,000 416,000 0% 50% 50% -

COOLING TOWERS Includes material offloading, preparation, installation, erection, field quality control testing, cleaning, demonstrations and basin trench lining as per specification (Section 15650 Part 3 - Execution). Cranage & Installation PUMPS Includes pumps offloading, mounting, support, assemblyand supervision as per specification (Section 15160 Part 3 - Execution). Chilled water Pumps-Primary 55kW Chilled Water Secondary Pumps 355kW Condenser Water Pumps 110kW Condenser makeup water pump Set 15kW each Air Cooled Pumps 15kW Sewage ejector pump 10kW Chilled water makeup system with Expansion tank (3000 L) 12kW

170,000 -

Lot

57,000

228,000

4 4 4 1 8 1 1

Item Item Item Item Item Item Lot

10,350 24,250 14,200 7,550 7,550 7,200 7,340

41,400 97,000 56,800 7,550 60,400 7,200 7,340

TOTAL (SAR)
4 FILTRATION Includes material offloading, installation, connection and assistant of commissioning of filtration system Side Stream Filtration System Industrial vacuum wet pump,filtration & piping 5 TES Tank Includes material supply installation of external piping, valves and connecting up to TES Tank end flanges as shown on drawings. External Piping & Connection CHEMICAL TREATMENT Includes chemical treatment for the plant process system during flushing and cleaning and after plant start up and commissioning Chemical for Condenser Water Chemical for chilled water Chemical for TES tank Equipment for condenser water, corrosion racks Equipment for chilled water, corrosion rack Accessories for water treatment equipment 7.1 Pipes & Fittings Includes supply pipe and fitting offloading, installation, pressure testing, cleaning of piping, flushing, cleaning & chemical treatment for plant piping systems and underground piping, cleaning refrigerant piping and pipe type schedules as per specification (Section 15060 Part 3 - Execution) Condenser Water Piping, fittings & Valves Chilled Water Piping, fittings & Valves Approximate quantity for guidance: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 1 1 1 1 1 1 Lot Lot Lot Lot Lot Lot 20,000 20,000 40,000 10,000 10,000 8,000 1 1 Set Set 25,000 12,500

1,296,690

25,000 12,500 -

Lot

18,000

18,000 20,000 20,000 40,000 10,000 10,000 8,000 -

1 1 112 46 96 6 24 77 100 66 65 177 106 72 8 16 2 5 24 24 8 6 6 6 3 2 128 32 32 4 6 18 56 76 28 12 10 5 2 4 4 8 4 4 4 4 4 2 2 1 2 8 8 1 4 8 8 1 5 8 4

Lot Lot mtr mtr mtr mtr mtr mtr mtr mtr mtr mtr mtr No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No

18,500 32,000 152 228 304 380 456 532 608 684 760 912 1,140 162 242 323 323 485 565 646 727 1,211 969 1,211 808 969 162 202 242 323 404 485 565 646 727 808 969 1,211 404 404 485 565 646 485 565 565 646 646 727 808 808 162 202 969 1,211 323 323 969 646 969 1,211

18,500 32,000 17,024 10,488 29,184 2,280 10,944 40,964 60,800 45,144 49,400 161,424 120,840 11,628 1,938 5,168 646 2,423 13,566 15,504 5,814 7,268 5,814 7,268 2,423 1,938 20,672 6,460 7,752 1,292 2,423 8,721 31,654 49,096 20,349 9,690 9,690 6,056 808 1,615 1,938 4,522 2,584 1,938 2,261 2,261 2,584 1,292 1,454 808 1,615 1,292 1,615 969 4,845 2,584 2,584 969 3,230 7,752 4,845

CS pipe Size:4" No of Pipes:19 CS pipe Size:6" No of Pipes:8 CS pipe Size:8" No of Pipes:17 CS pipe Size:10" No of Pipes:1 CS pipe Size:12" No of Pipes:4 CS pipe Size:14" No of Pipes:7 CS pipe Size:16" No of Pipes:9 CS pipe Size:18" No of Pipes:6 CS pipe Size:20" No of Pipes:6 CS pipe Size:24" No of Pipes:15 CS pipe Size:30" No of Pipes:9 cs elbow Size:4" cs elbow Size:6" cs elbow 45 Size:8" cs elbow 90 Size:8" cs elbow Size:12" cs elbow Size:14" cs elbow Size:16" cs elbow Size:18" cs elbow Size:20" cs elbow Size:24" cs elbow Size:30" cs elbow 45 Size:20" cs elbow 45 Size:24" cs flange Size:4" cs flange Size:5" cs flange Size:6" cs flange Size:8" cs flange Size:10" cs flange Size:12" cs flange Size:14" cs flange Size:16" cs flange Size:18" cs flange Size:20" cs flange Size:24" cs flange Size:30" CS reducer (concentric) Size:12*10" Cs reducer ( eccentric) Size:14*10" Cs reducer ( eccentric) Size:14*12" Cs reducer ( eccentric) Size:20*14" Cs reducer ( eccentric) Size:20*16" Cs reducer ( eccentric) Size:16*12" Cs reducer ( eccentric) Size:16*14"
Cs reducer ( eccentric) Size:18*14" Cs reducer ( eccentric) Size:18*16" CS reducer (concentric) Size:18*16" CS reducer (concentric) Size:20*18" CS reducer (concentric) Size:24*20" CS reducer (concentric) Size:30*20" CS reducer (concentric) Size:8*4" CS reducer (concentric) Size:8*5" cs reducing tee Size:24*20*24" cs reducing tee Size:30*24*30" cs reducing tee Size:8*4*8" cs reducing tee Size:8*6*8" cs tee Size:24" end cap Size:16" end cap Size:24" end cap Size:30"

Saudi Temco Company

Client : Project:

ADC Energy Systems LLC KING SAUD UNIVERSITY ENDOWMENT DISTRICT COOLING PLANT IN RIYADH, KINGDOM OF SAUDI ARABIA (KSA) Project No.: ISTRICT COOLING INSTALLATION D DATE : 31/10/2012
COTRACT Progress
Qty Unit Unit Price (SR) Total (SR) Previous Progress This Month Progress (SR) Cumulative Progress (SR)

Billing
-

Description

7.2 Valves Includes material offloading, installation and schedules of shut-off, balancing, check, sampling & vent clock and drain valves as per specification (Section 15100 Part 3 - Execution). A Modulating Butterfly Valves Modulating motorized butterfly valve 14" Location: Chillers B
Motorized Butterfly Valves

4 3 1 1 4 1 1 4 1 2

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

560 560 160 240 640 960 800 640 240 36

2,240 1,680 160 240 2,560 960 800 2,560 240 72

Motorized butterfly valve (on/off) 14" Location: Decoupler Motorized butterfly valve (on/off) 4" Location: Expansion Tank valves Motorized butterfly valve (on/off) 6" Location: fresh Water pumps Motorized butterfly valve (on/off) 16" Location: CDW Chiller Motorized butterfly valve (on/off) 24" Location: CDW Suction header Motorized butterfly valve (on/off) 20" Location: CDW Suction header Motorized butterfly valve (on/off) 16" Location: Cooling Tower Motorized butterfly valve (on/off) 6" Location: Blow Down Motorized butterfly valve (on/off) 6" Location: TSE Make up water pipes A 1 2 3 4 5 6 7 8 1 2 B 1 2 3 4 5 6
Manual Valve (LOW LEVEL VALVES)

A.1 Manual valves for CHW process Isolating manual butterfly valve 14" P.P discharge Isolating manual butterfly valve 14" TES tank Isolating manual butterfly valve 14" Chillers Isolating manual butterfly valve 20" Acc Chillers Isolating manual butterfly valve 16" Acc Chillers Isolating manual butterfly valve 6" Acc Chillers Isolating manual butterfly valve 24" Basket Strainer Isolating manual butterfly valve 4" Expansion Tank valves Isolating manual butterfly valve 16" CDWp discharge Isolating manual butterfly valve 6" TSE Make up water pipes
Manual Valve (HIGH LEVEL VALVES WITH CHAINWHEEL)

4 3 5 2 2 24 4 1 4 1

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

560 560 560 800 640 240 960 720 640 240

2,240 1,680 2,800 1,600 1,280 5,760 3,840 720 2,560 240

A.2 Manual valves and accessories for CDW process

B.1 Manual valves for CHW process Isolating manual butterfly valve 14" P.P suction Isolating manual butterfly valve 14" Decoupler Isolating manual butterfly valve 24" header Isolating manual butterfly valve 30" header Isolating manual butterfly valve 6" fresh Water pumps Isolating manual butterfly valve 8" HVAC 5 2 1 1 2 2 Nos Nos Nos Nos Nos Nos 560 560 960 1,200 240 320 2,800 1,120 960 1,200 480 640 -

B.2 Manual valves for CDW process 1 2 3 4 5 6 7 8 9 C Isolating manual butterfly valve 16" CDWp Isolating manual butterfly valve 24" CDW Header Isolating manual butterfly valve 16" CDW Header Isolating manual butterfly valve 16" CDW Chiller Isolating manual butterfly valve 16" CDW Suction header Isolating manual butterfly valve 6" Blow Down Isolating manual butterfly valve 12" SFU Isolating manual butterfly valve 8" Drain pipes Isolating manual butterfly valve 6" TSE Make up water pipes
ACCESSORIES

5 1 1 5 1 2 2 2 1

Nos Nos Nos Nos Nos Nos Nos Nos Nos

640 960 640 640 640 240 480 320 240

3,200 960 640 3,200 640 480 960 640 240

C.1 Accessories for CHW process 1 2 3 4 5 6 7 8 9 10 Flexible Connector 12" P.P Flexible Connector 16" P.P Non return valve ( check valve ) 14" P.P Non return valve ( check valve ) 18" S.P Grooved coupler 14" Chillers Grooved coupler 16" Chillers Flexible Connector 6" Acc Chillers Flexible Connector 4" Acc Chillers Non return valve ( check valve ) 6" Acc Chillers Non return valve (check valve) 1.5" Expansion Tank valves 8 8 4 4 8 8 8 8 8 1 Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 480 640 560 720 560 640 240 160 240 240 3,840 5,120 2,240 2,880 4,480 5,120 1,920 1,280 1,920 240 -

170,000

C.2 Manual OF accessories for CDW process 1 2 3 4 Flexible Connector 14" CDWp Non return valve (check valve) 16" CDWp Flexible Connector 20" Cooling Tower Grooved coupler 18" Chillers 8 4 4 8 Nos Nos Nos Nos 560 640 800 720 4,480 2,560 3,200 5,760 -

TOTAL (SAR)
8 Testing & Commissioning Complete System Flushing & Chemical Cleaning of Internal Piping Water filling of internal plant excluding external network Water filling of TES Tanks Testing & Commissioning - Mechanical Testing & Commissioning - Electrical Testing & Commissioning - Control 9 Mechanical Works - Process Chemical Treatment Unit Protective Painting Chilled Water makeup system with Expansion Tank Condenser makeup Water System Blowdown Water System Mechanical System Insulation for Equipment & piping Mechanical System protective Cladding for Equipment & piping. Hydrotesting of Pipework Monorail for Chillers, manual hoist Monorails for Pumps, manual hoist Mechanical Identification 1 1 1 1 1 1 1 1 1 1 1 Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot Lot 22,000 12,500 73,500 65,000 12,500 115,000 75,000 12,500 22,000 15,500 45,000 1 1 1 1 1 1 Lot Lot Lot Lot Lot Lot 125,000 75,000 35,000 35,000 35,000 35,000

1,171,538
125,000 75,000 35,000 35,000 35,000 35,000

22,000 12,500 73,500 65,000 12,500 115,000 75,000 12,500 22,000 15,500 45,000

TOTAL (SAR)
GRAND TOTAL (SAR)

810,500
3,278,728