Sunteți pe pagina 1din 3

IRRIGACIONES

Proyecto Irrigacin Ccorca

DISEO DE CANOAS
Proyecto :
Obras de Arte:

Irrigacin
Canoa

CUENCA
Area Total
Longitud
Cota Superior (C1)
Cota Inferior (C2)
C1 - C2
Area total
Longitud de la cuenca
Diferencia de niveles
Precipitacion Maxima

m2
413,764.77
1,220.00
3,960.00
3,734.10
225.90
0.41
1.22
0.23
0.00

km2
0.41
1.22
m
m
m
Km
Km
Km
mm

TIEMPO DE CONCENTRACION

Lc 3

tC 0.871*
C1 C2

tc =

0.385

2.115 hr

M(-) = 1/24

1/24

INTENSIDAD DE LA LLUVIA
Periodo de Retorno
T=

100.000 aos
M(+) = 1/14
t=
tc * 60
A
t=
126.925 min
Bt = `0.150485+0.542754*Lnt-0.15447*Lnt^2+0.0299766*Lnt^3-0.00298499*Lnt^4+0.000109265*Lnt^5
Bt =
0.884
Ln I (T) = `- 0.55465 * Ln t + Bt
PARAMETROS DE DISEO
Ln I (100) =
-1.802
Peso Volumetrico del Concreto
2400
I (100) =
0.165 mm/min
fy
4200
fc
175
Recubrim. ( r )
2.5
PRECIPITACION CRITICA
Pt =
I(T) * t
mm/t
Espesor losa (el)
0.15
Pt =
20.934 mm/16.70 hr
Para Flexin Sin Carga Axial: Fact. Reduc.()
0.9
Para esfuerzo cortante c/s torsin: Fact. Reduc.()
0.85
Def. Mx. aceptable en el C antes de la falla: (c)
0.003
DESCARGA MAXIMA DE 100 AOS
Q(T) = C * Pt * A / 3.6 * t
Coeficiente de deformacin del acero: (y)
0.0025
Q(T) =
0.853 m3/seg
Sobrecarga o Carga Viva por 1m de ancho: (W)
800
Altura til (d)
12.5
CALCULO DE LA DESCARGA MAXIMA
Cota
Cota
Dif.
Area
Longitud
Dif.
Tiempo
Area
Longitud
Intensidad de lluvia (para 100 aos)
Mayor
Menor
Niveles Cuenca
Concent.
Cuenca
Cotas
Nro
Prog
I (100)
(Km2)
(Km)
(Km)
(hr)
t (min)
(Bt)
Ln I (100)
(m2)
(m)
(m)
(m)
(Km)
mm/min
LINEA CONDUCCION TOTORA - CCORCA
2.12
-1.80
0.16
1
00+074
413,764.77
1,220.00
3,960.00
3,734.10
0.23
0.41
1.22
0.23
126.92
0.88
0.53
-1.03
0.36
2
00+204
23,600.19
207.15
3,772.00
3,731.13
0.04
0.02
0.21
0.04
31.62
0.88
0.27
-0.66
0.51
3
00+256
33,554.44
88.09
3,750.00
3,732.52
0.02
0.03
0.09
0.02
16.33
0.88
0.57
-1.08
0.34
4
00+280
44,054.53
219.68
3,773.00
3,733.43
0.04
0.04
0.22
0.04
34.26
0.88
0.43
-0.91
0.40
5
00+398
25,038.15
146.75
3,758.00
3,732.77
0.03
0.03
0.15
0.03
25.57
0.88
0.25
-0.62
0.54
6
00+410
32,154.54
84.72
3,752.00
3,732.69
0.02
0.03
0.08
0.02
15.03
0.88
0.51
-1.02
0.36
7
00+530
47,618.47
200.88
3,772.00
3,731.90
0.04
0.05
0.20
0.04
30.74
0.88
1.07
-1.42
0.24
8
00+830
112,364.00
371.50
3,778.00
3,740.55
0.04
0.11
0.37
0.04
64.21
0.88
0.26
-0.64
0.53
9
01+060
35,048.00
83.96
3,748.00
3,730.88
0.02
0.04
0.08
0.02
15.58
0.88
0.55
-1.05
0.35
10
01+407
67,008.44
325.32
3,875.00
3,730.00
0.15
0.07
0.33
0.15
32.71
0.88
0.26
-0.64
0.53
11
01+805
32,324.00
95.60
3,753.00
3,728.23
0.02
0.03
0.10
0.02
15.70
0.88
0.35
-0.80
0.45
12
01+850
34,267.97
193.76
3,825.00
3,728.13
0.10
0.03
0.19
0.10
21.00
0.88
0.74
-1.22
0.29
13
03+400
108,227.23
445.33
3,887.00
3,720.91
0.17
0.11
0.45
0.17
44.61
0.88
1.56
-1.63
0.20
14
08+962
359,548.98
883.12
3,900.00
3,711.64
0.19
0.36
0.88
0.19
93.72
0.88
0.71
-1.20
0.30
15
10+830
271,542.84
329.54
3,779.00
3,704.20
0.07
0.27
0.33
0.07
42.83
0.88
0.69
-1.18
0.31
16
11+830
84,274.76
363.80
3,812.00
3,703.23
0.11
0.08
0.36
0.11
41.57
0.88
1.38
-1.57
0.21
17
12+730
372,939.99
672.40
3,816.00
3,702.33
0.11
0.37
0.67
0.11
83.09
0.88
0.94
-1.35
0.26
18
14+020
87,673.37
486.24
3,756.00
3,639.11
0.12
0.09
0.49
0.12
56.53
0.88
0.21
-0.51
0.60
19
14+585
34,565.00
134.34
3,752.00
3,624.60
0.13
0.03
0.13
0.13
12.38
0.88
0.51
-1.02
0.36
20
14+790
202,291.13
302.99
3,752.00
3,616.20
0.14
0.20
0.30
0.14
30.90
0.88
0.91
-1.33
0.26
21
14+900
60,097.54
374.12
3,675.00
3,616.23
0.06
0.06
0.37
0.06
54.42
0.88
0.40
-0.88
0.42
22
15+160
267,876.00
234.56
3,723.00
3,599.60
0.12
0.27
0.23
0.12
23.85
0.88
Duracin de la tormenta

Kg/m3
Kg/cm2
Kg/cm2
cm
m

Kg/m
cm
Precip.
Critica
Pt
(mm/hr)

Desc.
Max.
Q(t)
(m3/seg)

20.93
11.27
8.40
11.68
10.26
8.09
11.13
15.45
8.22
11.44
8.25
9.39
13.14
18.29
12.90
12.73
17.33
14.60
7.42
11.16
14.36
9.94

0.853
0.105
0.216
0.188
0.126
0.216
0.216
0.338
0.231
0.293
0.212
0.192
0.398
0.877
1.023
0.323
0.973
0.283
0.259
0.913
0.198
1.396

Plan MERISS Inka - Unidad de Gestin Valles Interandinos

Proyecto Irrigacin Ccorca

DISEO DE CANOAS
PROYECTO:
Obras de Arte:

Irrigacin
Canoa

CARACTERISTICAS DEL CANAL


C.F.
Ancho
Altura
Canal
Canal
Canal
Nro
Prog
(Co)
(bc)
(hc)
msnm.
m.
m.
LINEA CONDUCCION TOTORA - CCORCA
1
00+074
3733.20
0.50
0.90
2
00+204
3730.23
0.50
0.90
3
00+256
3731.62
0.50
0.90
4
00+280
3732.53
0.50
0.90
5
00+398
3731.87
0.50
0.90
6
00+410
3731.79
0.50
0.90
7
00+530
3731.00
0.50
0.90
8
00+830
3739.65
0.50
0.90
9
01+060
3729.98
0.50
0.90
10
01+407
3729.10
0.50
0.90
11
01+805
3727.33
0.50
0.90
12
01+850
3727.23
0.50
0.90
13
03+400
3720.01
0.50
0.90
14
08+962
3710.74
0.50
0.90
15
10+830
3703.30
0.50
0.90
16
11+830
3702.33
0.50
0.90
17
12+730
3701.43
0.50
0.90
18
14+020
3638.21
0.20
0.90
19
14+585
3623.70
0.20
0.90
20
14+790
3615.30
0.20
0.90
21
14+900
3615.33
0.20
0.90
22
15+160
3598.70
0.20
0.90

Espesor
Canal
(ec)
m.

Caudal
Quebrada
Qmax
m3/s

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.853
0.105
0.216
0.188
0.126
0.216
0.216
0.338
0.231
0.293
0.212
0.192
0.398
0.877
1.023
0.323
0.973
0.283
0.259
0.913
0.198
1.396

Tipo

Ancho
Canoa
(B)
m.

Espesor
Sardinel
(es)
m.

Pend.
Canoa
(S)
%

Rug.
Canoa
(n)

Tirante
Canoa
(Y)
m

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

1.00
0.30
0.40
0.40
0.30
0.50
0.40
0.60
0.50
0.60
0.40
0.40
0.60
1.20
1.00
0.60
1.20
0.60
0.60
1.20
0.40
1.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06

0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017
0.017

0.21
0.14
0.18
0.16
0.16
0.15
0.18
0.17
0.15
0.16
0.18
0.17
0.19
0.19
0.24
0.17
0.20
0.15
0.14
0.19
0.17
0.30

CARACTERISTICAS DE LA CANOA
Altura
Ancho
Luz
Sardinel
Total
Libre
(hs)
(Bt)
m
m.
m.
0.35
0.25
0.30
0.30
0.30
0.25
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.30
0.30
0.30
0.25
0.30
0.30
0.40

1.30
0.60
0.70
0.70
0.60
0.80
0.70
0.90
0.80
0.90
0.70
0.70
0.90
1.50
1.30
0.90
1.50
0.90
0.90
1.50
0.70
1.30

0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.20
0.20
0.20

Luz
Eficaz
(Le)
m.

Long alero
Agua Arriba
(L1)
m.

Long alero
Agua Abajo
(L2)
m.

Ancho
Agua Arriba
(B1)
m.

Ancho
Agua Abajo
(B2)
m.

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.20
1.30
1.30
1.00
1.00
1.00
1.00
1.00

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20

2.20
1.80
1.80
2.20
2.00
1.50
2.20
3.00
1.80
2.00
2.00
2.00
2.00
2.00
2.00
1.80
2.00
2.00
2.00
2.00
2.00
1.80

1.80
1.80
1.80
1.80
1.80
1.80
1.80
2.00
1.80
1.80
1.80
2.00
1.80
1.80
2.10
1.80
1.80
1.80
1.80
1.80
1.80
1.80

DISEO POR RESISTENCIA ULTIMA


Metrado de cargas
Muerta
Ultima
WD
WU
Kg/m.
Kg/m.
LINEA CONDUCCION TOTORA - CCORCA
1
360.00
1980.00
00+074
2
108.00
1602.00
00+204
3
144.00
1656.00
00+256
4
144.00
1656.00
00+280
5
108.00
1602.00
00+398
6
180.00
1710.00
00+410
7
144.00
1656.00
00+530
8
216.00
1764.00
00+830
9
180.00
1710.00
01+060
10
216.00
1764.00
01+407
11
144.00
1656.00
01+805
12
144.00
1656.00
01+850
13
216.00
1764.00
03+400
14
432.00
2088.00
08+962
15
360.00
1980.00
10+830
16
216.00
1764.00
11+830
17
432.00
2088.00
12+730
18
216.00
1764.00
14+020
19
216.00
1764.00
14+585
20
432.00
2088.00
14+790
21
144.00
1656.00
14+900
22
360.00
1980.00
15+160
Nro

Prog

Momento Flextor
Esfuerzos Cortantes (ACI)
MA = MB
MAB
VA = VB
Kg-m.
Kg-m.
Kg.
139.43
112.81
116.61
116.61
112.81
120.41
116.61
124.22
120.41
124.22
116.61
116.61
124.22
147.03
118.80
124.22
147.03
73.50
73.50
87.00
69.00
82.50

239.01
193.38
199.90
199.90
193.38
206.42
199.90
212.94
206.42
212.94
199.90
199.90
212.94
252.05
203.66
212.94
252.05
126.00
126.00
149.14
118.29
141.43

1673.10
1353.69
1399.32
1399.32
1353.69
1444.95
1399.32
1490.58
1444.95
1490.58
1399.32
1399.32
1490.58
1764.36
1425.60
1490.58
1764.36
882.00
882.00
1044.00
828.00
990.00

As(min)
cm2.
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75

Diseo por Esfuerzos


Flexionantes
a
Mv
Kg-m.
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06
1.06

1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83
1696.83

Refuerzo principal

Acero de reparticin

MAB<MV

As
cm2.

S (3/8")
cm.

Ref. 3/8" @
cm.

AsT
cm2.

S (3/8")
cm.

Ref. 3/8" @
cm.

Vc
Kg/cm2

Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!

3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75
3.75

18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93
18.93

17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
17.50
18.50
19.50
20.50
21.50
22.50
23.50

3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13
3.13

22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72
22.72

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00

5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62
5.62

Verificacin
Esfuerzo Cortante
Vc
(VA=VB)<VC
Kg.
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78
7027.78

Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!
Bien!

Plan Meriss Inka


Unidad de Gestin Valles Interandinos

Anexo 5.1 Obras Civiles

METRADOS DE CANOAS
Proyecto :
Obra de Arte :

CANOAS

CAJA DE CANAL
Nro

Prog

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

00+074
00+204
00+256
00+280
00+398
00+410
00+530
00+830
01+060
01+407
01+805
01+850
03+400
08+962
10+830
11+830
12+730
14+020
14+585
14+790
14+900
15+160

Ancho

Altura

Esp.

bc
(m)
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.20
0.20
0.20
0.20
0.20

hc
(m)
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

ec
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15

Demolicion Estructuras Existentes


Nro
Prog
Elem Veces Largo
1.00
256.00
P1
2.00
1.50
F1
1.00
1.50
2.00
530.00
P1
2.00
1.50
F1
1.00
1.50
3.00 1850.00
P1
2.00
3.30
F1
1.00
3.30

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

Estribos
Ancho Altura
a
h
(m)
(m)
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40
0.25
0.40

Losa
Ancho Long.
Bt
Le
(m)
(m)
1.30
1.30
0.60
1.30
0.70
1.30
0.70
1.30
0.60
1.30
0.80
1.30
0.70
1.30
0.90
1.30
0.80
1.30
0.90
1.30
0.70
1.30
0.70
1.30
0.90
1.30
1.50
1.30
1.30
1.20
0.90
1.30
1.50
1.30
0.90
1.00
0.90
1.00
1.50
1.00
0.70
1.00
1.30
1.00

Ancho
0.15
0.30
0.15
0.30
0.15
0.90

Altura Parcial
0.25
0.11
0.15
0.07
0.25
0.11
0.15
0.07
0.40
0.40
0.15
0.45

Total

Unidad

0.18

M3

0.18

M3

0.84
1.20

M3
M3

Tipo

Esp
el
(m)
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

CANOA
Sardinel
Altura Esp.
hs
es
(m)
(m)
0.35 0.15
0.25 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.25 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.35 0.15
0.30 0.15
0.30 0.15
0.30 0.15
0.25 0.15
0.30 0.15
0.30 0.15
0.40 0.15

Transiciones de Entrada y Salida


Ancho
Long. Aguas
Long. Aguas
B1
B2
L1
L3
L5
L2
L4
L6
(m) (m) (m) (m) (m) (m) (m) (m)
2.20 1.80 1.50 1.37 0.72 1.20 1.13 0.48
1.80 1.80 1.50 1.30 0.65 1.20 0.94 0.29
1.80 1.80 1.50 1.33 0.68 1.20 0.97 0.32
2.20 1.80 1.50 1.20 0.55 1.20 0.97 0.32
2.00 1.80 1.50 1.24 0.59 1.20 0.94 0.29
1.50 1.80 1.50 1.41 0.76 1.20 1.01 0.36
2.20 1.80 1.50 1.20 0.55 1.20 0.97 0.32
3.00 2.00 1.50 0.90 0.25 1.20 0.97 0.32
1.80 1.80 1.50 1.35 0.70 1.20 1.01 0.36
2.00 1.80 1.50 1.33 0.68 1.20 1.04 0.39
2.00 1.80 1.50 1.27 0.62 1.20 0.97 0.32
2.00 2.00 1.50 1.27 0.62 1.20 0.89 0.24
2.00 1.80 1.50 1.33 0.68 1.20 1.04 0.39
2.00 1.80 1.50 1.45 0.80 1.20 1.16 0.51
2.00 2.10 1.50 1.41 0.76 1.20 1.07 0.42
1.80 1.80 1.50 1.37 0.72 1.20 1.04 0.39
2.00 1.80 1.50 1.45 0.80 1.20 1.16 0.51
2.00 1.80 1.50 1.33 0.68 1.20 1.04 0.39
2.00 1.80 1.50 1.33 0.68 1.20 1.04 0.39
2.00 1.80 1.50 1.45 0.80 1.20 1.16 0.51
2.00 1.80 1.50 1.27 0.62 1.20 0.97 0.32
1.80 1.80 1.50 1.45 0.80 1.20 1.13 0.48

Excavacion
Cano
Estribo
a
(m3)
(m3)
0.13
0.13
0.06
0.06
0.07
0.07
0.07
0.07
0.06
0.06
0.08
0.08
0.07
0.07
0.09
0.09
0.08
0.08
0.09
0.09
0.07
0.07
0.07
0.07
0.09
0.09
0.15
0.15
0.13
0.12
0.09
0.09
0.15
0.15
0.09
0.09
0.09
0.09
0.15
0.15
0.07
0.07
0.13
0.13
2.08
2.02

Encofrados
Alero Canoa Sardinel Aleros
(m3)
0.57
0.52
0.52
0.57
0.54
0.48
0.57
0.68
0.52
0.55
0.54
0.57
0.55
0.55
0.59
0.52
0.55
0.55
0.55
0.55
0.54
0.53
12.10

(m2)
0.65
0.30
0.35
0.35
0.30
0.40
0.35
0.45
0.40
0.45
0.35
0.35
0.45
0.75
0.65
0.45
0.75
0.18
0.18
0.30
0.14
0.26
8.81

(m)
2.21
1.69
1.95
1.95
1.95
1.69
1.95
1.95
1.95
1.95
1.95
1.95
1.95
1.95
2.04
1.95
1.95
1.50
1.30
1.50
1.50
1.90
40.68

(m2)
4.59
3.51
4.05
4.05
4.05
3.51
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.05
4.59
4.05
4.05
4.05
3.51
4.05
4.05
5.13
89.64

Estribo
CC f'c=140
(m3)
0.26
0.12
0.14
0.14
0.12
0.16
0.14
0.18
0.16
0.18
0.14
0.14
0.18
0.30
0.26
0.18
0.30
0.18
0.18
0.30
0.14
0.26
4.16

METRADOS
Concreto
Aleros
Canoa Sardinel
f'c=175
Losa Trans. Aleros
(m3)
(m3)
(m3)
(m3)
(m3)
0.25
0.07
0.22
0.17
0.28
0.12
0.05
0.11
0.14
0.20
0.14
0.06
0.12
0.14
0.24
0.14
0.06
0.11
0.15
0.24
0.12
0.06
0.10
0.14
0.24
0.16
0.05
0.14
0.13
0.20
0.14
0.06
0.11
0.15
0.24
0.18
0.06
0.07
0.16
0.24
0.16
0.06
0.14
0.14
0.24
0.18
0.06
0.15
0.15
0.24
0.14
0.06
0.12
0.14
0.24
0.14
0.06
0.11
0.14
0.24
0.18
0.06
0.15
0.15
0.24
0.29
0.06
0.26
0.16
0.24
0.23
0.06
0.22
0.17
0.28
0.18
0.06
0.16
0.15
0.24
0.29
0.06
0.26
0.16
0.24
0.14
0.05
0.15
0.15
0.24
0.14
0.04
0.15
0.15
0.20
0.23
0.05
0.26
0.16
0.24
0.11
0.05
0.12
0.14
0.24
0.20
0.06
0.23
0.15
0.32
3.80
1.22

f'c=175
(m3)
0.67
0.45
0.51
0.50
0.48
0.48
0.50
0.47
0.53
0.55
0.51
0.50
0.55
0.66
0.66
0.55
0.66
0.55
0.51
0.66
0.51
0.70
12.16

Fierro
Frotachado
Canoa
Aleros
Canoa Sardinel
3/8" 3/8" Losa Sardinel Losa Aleros
(kg)
(kg)
(m)
(m)
(m)
(m)
11.44
3.96
1.69
1.30
1.48
2.70
5.28
2.83
0.78
1.04
0.71
2.16
6.16
3.39
0.91
1.17
0.83
2.43
6.16
3.39
0.91
1.17
0.73
2.43
5.28
3.39
0.78
1.17
0.67
2.43
7.04
2.83
1.04
1.04
0.95
2.16
6.16
3.39
0.91
1.17
0.73
2.43
7.92
3.39
1.17
1.17
0.50
2.43
7.04
3.39
1.04
1.17
0.94
2.43
7.92
3.39
1.17
1.17
1.03
2.43
6.16
3.39
0.91
1.17
0.79
2.43
6.16
3.39
0.91
1.17
0.73
2.43
7.92
3.39
1.17
1.17
1.03
2.43
13.20
3.39
1.95
1.17
1.72
2.43
10.56
3.65
1.56
1.20
1.44
2.70
7.92
3.39
1.17
1.17
1.06
2.43
13.20
3.39
1.95
1.17
1.72
2.43
6.09
2.61
0.90
0.90
1.03
2.43
6.09
2.18
0.90
0.80
1.03
2.16
10.15
2.61
1.50
0.90
1.72
2.43
4.74
2.61
0.70
0.90
0.79
2.43
8.80
3.48
1.30
1.10
1.50
2.97
171.33 70.86 25.32 24.39
23.14 53.73

04.03
CANOAS
04.03.001
Demolicin de Estructuras de Riego
04.03.002
Excavacin Roca Suelta con Equipo
04.03.003
Fierro doblado y colocado
04.03.004
Encofrado y Desencofrado de Obras de Arte Estndar (mantenim. y limpieza) - Madera Corriente - Mayor a 3,500 msnm
04.03.005
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte stndar - Mas de 3,500 msnm
04.03.006
Solado de Piedra Asentada en CS: f'c=140 kg/cm2, e = 0.30 m
04.03.007
CC f'c=140 Kg/cm2 + 30% piedra mediana - masivo - Mas de 3,500 msnm
04.03.008
Tarrajeo con mortero cemento/arena 1:3 + Impermeabilizante, hasta e = 1"

1.20
16.20
242.19
139.13
17.18
35.76
4.16
126.58

m3
m3
kg
m2
m3
m3
m3
m2

Enrrocado
(m2)
1.72
1.51
1.52
1.68
1.59
1.40
1.68
2.03
1.53
1.62
1.60
1.67
1.62
1.64
1.75
1.53
1.64
1.62
1.62
1.64
1.60
1.55
35.76

S-ar putea să vă placă și