Sunteți pe pagina 1din 28

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVAX12- DC SUPERVISION RELAY ........................................................................................................... 2 MVAX31- TRIP CIRCUIT SUPERVISION ..................................................................................................... 3 MVAX11- TRIP RELAY SUPERVISION ........................................................................................................ 5 MVAW21- INTERPOSING RELAY ................................................................................................................ 6 MVTP11- CT SUPERVISION RELAY............................................................................................................ 8 MCAG14- bus differential RELAY................................................................................................................ 10 P122 O/C & E/F RELAY ........................................................................................................................... 12 LOCKOUT RELAY ...................................................................................................................................... 16 MVTP 31- CT SUPERVISION RELAY......................................................................................................... 17 MFAC34- HIGH IMPEDANCE DIFFERENTIAL RELAY .............................................................................. 18 CHECK SYNCHRONISING RELAY- KVAS100........................................................................................... 20 P120 SENSITIVE EARTH FAULT RELAY................................................................................................ 24 P921 VOLTAGE PROTECTION RELAY .................................................................................................. 26

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVAX12-- DC SUPERVIISIION RELAY MVAX12 DC SUPERV S ON RELAY


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
PICKUP / DROP OFF TEST:

Coil Resistance

Voltage (V) Pick up Drop off Expected <75% of Vx PU 25-40% of Vx - DO Pick up

Current (mA) Drop off Nominal -

Note: Coil Resistance: +/-10% of following values, For 48/54V ---- 2970 Ohms (2 contacts) or 1746 Ohms (4 contacts) For 110/125V ---- 10370 Ohms (2 contacts) or 7470 Ohms (4 contacts)
TIMING TEST:

Terminal No. 13 14

Contacts No.

Actual Operating Time (ms)

Actual Resetting Time (ms)

Expected Operating / Reset Time (ms) Operating time <20ms Resetting time >100ms

RELAY BURDEN AT RATED VOLTAGE:

Terminal No. 13 14

Voltage (V)

Current (mA)

Limits for Current 23mA for 48/54V 15mA for 110/125V

Burden (W)

Burden Limits 1.25W for 48/54V 1.9W for 110/125V

4. FUNCTIONAL TEST: Item Description 1 All output contacts resistance measured. 2 Flag operation checked. Test performed by Test witnessed by Checked

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh 3

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

Flag operation checked by fuse removal

MVAX31-- TRIIP CIIRCUIIT SUPERVIISIION MVAX31 TR P C RCU T SUPERV S ON


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
MEASURED TRIP SUPPLY VOLTAGE:

Voltage Measurement Test CB Status Relay Terminal s 13-14 1&2 Open 21-22 27-28 13-14 3 Close 21-22 27-28 4 Close 14-22 Voltage (V) Expected value (V) 48/54V 110/125V relay relay 13.6 - 14.2 13.6 - 14.2 36.5 - 42.7 27.1-28.5 0 36.5 - 37.7 27.9 29.4 27.9 29.4 31.3 38.8 55.8 58.9 0 31.3 38.8

Measured Resistance Between 14-22 (Ohms) Actual Expected (+/-10%)

3100 for 48/54V 7400 for 110/125V

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVAX31- TRIP CIRCUIT SUPERVISION


TEST 4 : WITH CB CLOSED CONDITION,
a) Short Rext2 terminals. Check CB doesnt trip b) Short the relay terminals 13-14. Check RL1 drops and flag, alarm contacts operate

TEST 5: WITH CB CLOSE CONDITION,


Initiate trip relay or short trip contacts. Check CB tripped, and RL1 doesnt drop

TEST 6: SUPERVISION CURRENT MEASUREMENT:


Sl. No. 1 2 3 CB Status Close Open Open Trip Relay Status Reset Reset Operate Supervision Current Thro Trip Coil

7. FUNCTIONAL TEST:
Item 1 2 3 Description All output contacts resistance measured. Flag operation checked. Flag operation checked by fuse removal Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVAX11-- TRIIP RELAY SUPERVIISIION MVAX11 TR P RELAY SUPERV S ON


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
PICKUP TEST:

Relay terminals 27-28 27-21

Pickup Voltage Current

Drop off Voltage Current

Current at Rate voltage

Note: typical current at rated voltage, At 48volts 24.1-29.5mA. At 110volts 11-13.4mA.


SUPERVISION CURRENT MEASUREMENT:

Sl. No. 1 2

trip RELAY STATUS Reset Operate

mvax11 Relay Status

Supervision Current Thro Trip relay

4. FUNCTIONAL TEST:
Item 1 2 3 Description All output contacts resistance measured. Flag operation checked. Flag operation checked by fuse removal Test performed by Test witnessed by Approved by Date of test Checked

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVAW21-- IINTERPOSIING RELAY M V A W 2 1 NT E R P O S N G R E L A Y


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type R Ext Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
PICKUP / DROP OFF TEST:

Test without external resistor (if available).


Coil Coil- A Coil- B
TIMING TEST:

Relay Terminal s 1314 27-28

Voltage (V) Pick up Drop off Operative range 37.5-60V with 0 Ohm pilot resist. Pick up

Current (mA) Drop off Nominal >25 PU >15 - DO

Test with external resistor (if available) and apply rated voltage.
Coil Coil - A Coil- B
RELAY BURDEN AT RATED VOLTAGE:

Contacts No.

Actual Operating Time (ms)

Actual Resetting Time (ms)

Expected Operating / Reset Time (ms) P/U-Typ. 50ms for 0 Ohm pilot resist. P/U-Typ. 80ms for 200-Ohm pilot resist. >35 for Reset Burden (W) Burden Limits 3.7 W at 54V

Coil Coil - A Coil- B

Voltage (V)

Current (mA)

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

4. FUNCTIONAL TEST: Item 1 2 3 Description All output contacts resistance measured. Flag operation checked. Final measured loop resistance of pilot connected to relay (max 200 ohms) Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVTP11-- CT SUPERVIISIION RELAY MVTP11 CT SUPERV S ON RELAY


1. GENERAL DATA AND INFORMATION:
Circuit. Panel No. Make: Frequency Flag type Setting Range Model no: Aux. supply No of contacts R phase Sl.no Y phase Sl.no B phase Sl.no

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 5 6 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check the tightness of all connections. Check ferrules. Check apparatus lists. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
PRELIMINARY TEST:

FUNCTION Test Switch Isolation Checked CT Bus Shorting Contacts Checked


RELAY BURDEN:

Condition No operation Operation

Relay DC voltage R Y B

Relay DC current R Y B

Burden Y

Note: For 48/54 V burden operation/no operation = 1.3/4.86W For 110/125V burden operation/ no operation = 3.0 / 4.37W.

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVTP11- CT SUPERVISION RELAY


PICKUP TEST;

Voltage Setting (V) 2 3 5 9

R Pick up (V) Drop off (V) DO/PU Ratio Pick up (V)

Y Drop off (V) DO/PU Ratio Pick up (V)

B Drop off (V) DO/PU Ratio

Note: Pickup voltage +/-5% Vs. Drop off/ Pickup ratio >85% after 3 sec delay. TIMING TEST:
Phase R Y B
FINAL SETTING:

Contacts No.

Actual Operating time at 2xVs

Expected operating time 3 +/-5% 3 +/-5% 3 +/-5%

(s)

Relay final current setting:


PICKUP TEST:

Voltage Setting (v)

R Pick up (V) Drop off (V) DO/PU Ratio Pick up (V)

Y Drop off (V) DO/PU Ratio Pick up (V)

B Drop off (V) DO/PU Ratio

FUNCTIONAL TEST:

Item 1 2 3

Description All contacts checked. All output contacts resistance measured. Flag operation checked.

Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MCAG14-- BUS DIIFFERENTIIAL RELAY MCAG14 BUS D FFERENT AL RELAY


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type No. of Contacts Designation Model No. Aux. Voltage R phase Slno. Y phase Slno. B phase Slno.

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 5 6 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. Relay CT shorting function checked. Test switch checked for correct function. Stabilizing resistors final setting value. CHECKED

3. ELECTRICAL TESTS:
3.1 PICKUP / DORP OFF TEST:

Current setting (A)

Red phase Pickup (A) Drop out (A)

Actual operating current Yellow phase Pickup (A) Drop out (A)

Blue phase Pickup (A) Drop out (A)

Limits

Plug removed

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MCAG14- BUS DIFFERENTIAL RELAY


3.2 OPERATING TIME TEST:

Setting current (A)

Injected current (A) 5 x current setting 2 x current setting

Measured operating time in msec Red phase Yellow phase Blue phase

Limits <25 30 ms <30 ms

3.3 RELAY FINAL SETTING TEST: 3.3.1 PICKUP TEST:

Current setting (A)

Red phase Pickup (A) Drop out (A)

Actual operating current Yellow phase Pickup (A) Drop out (A)

Blue phase Pickup (A) Drop out (A)

Limits

3.3.2 OPERATING TIME TEST:

Setting current (A)

Injected current (A) 5 x current setting

Measured operating time in msec Red phase Yellow phase Blue phase

Limits

<25 30 ms

4. FUNCTIONAL TESTS:
Item 1 2 3 Description All output contacts resistance measured. Flag operation checked. Check metrosil non-linear resistors connection Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P122 O//C & E//F RELAY P 1 2 2 O C & E F RE L A Y


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Diagram no. Frequency Rated voltage No of logic Inputs: Designation Serial No. Model No. Aux. Voltage Firmware no. Rated current: No of outputs:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of display. CT shorting function checked. CHECKED

3. ELECTRICAL TESTS:
3.1. RELAY SETTING:

Final relay setting retrieved through MICOM S1 software and printout attached.
3.2. RELAY DC BURDEN TEST:

Terminal

Voltage (V)

Current (mA) Quiescent Output Operated

Burden (W) Quiescent Output Operated

Nominal Burden (W) Quiescent <3W Max <6W

3.3. OPTO INPUT CHECK:

(Energize only one OPTO INPUT at a time with relay rated OPTO input voltage CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal) V DC Applied Terminal No. OPTO Status of OPTO Function assigned for Remarks Input No. INPUT OPTO INPUT +Ve Terminal -Ve Terminal No. No. OPTO-1 22 24 OPTO-2 26 28 OPTO-3 17 19

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P122 O/C & E/F RELAY


3.4. OUTPUT RELAY TEST:

Output Relay No. WD RL1 RL2 RL3 RL4 RL5 RL6

Output Contact No. 36-35 (N.C) / 36-37 (N.O) 2-4 (N.C) / 2-6 (N.O) 8-10 (N.C) / 8-12 (N.O) 14 16 18 20 13 57

Output relay status

Contact Operation check

Actual Assignment of Relays

Remarks

3.5. CURRENT INPUT TEST:

Phase A B C N

Injected current (A)

Applied CT ratio

Displayed current

% Error

Remarks

3.6. OVER CURRENT ELEMENT (50/51): 3.6.1. CURRENT SENSITIVITY TEST: Element

Current setting

Pickup current A B C A

Drop off current B C

Accuracy
+/- 2%Is for DT 1.1Is+/- 2% for IDMT

I>

I>>

+/- 2%Is for DT

I>>>

+/- 2%Is for DT

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P122 O/C & E/F RELAY


3.6.2. OVER CURRENT TIMING TEST: Element

Curve/ Time

ph
A

Actual operating time 2xIs 5xIs 10xIs

Expected operating time 2xIs 5xIs 10xIs

LED indication

I>

B C A -

I>>

B C A

I>>>

B C

Note: Typical accuracy for operating time: DT: +/- 2% or 30..50ms IDMT: +/- 5% or 30.50ms
3.7. EARTH FAULT ELEMENT (50N/51N): 3.7.1. CURRENT SENSITIVITY TEST:

Element Ie> Ie>> Ie>>>

Current setting

Pickup current

Drop off current

Accuracy +/- 2%Ies for DT 1.1Ies+/- 2% for IDMT +/- 2%Ies for DT +/- 2%Ies for DT

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P122 O/C & E/F RELAY


3.7.2. TIMING TEST:

Element

Curve/ Time

Actual Operating time 2xIes 5xIes 10xIes

Expected Operating time 2xIes 5xIes 10xIes

LED Indication

Ie> Ie>> Ie>>> Note: Typical accuracy for operating time: DT: +/- 2% or 30..50ms IDMT: +/- 5% or 30.50ms -

3.8. FUNCTIONAL TEST:

Item 1

Description Outputs relay & LED operation as per the configuration.

Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

L O CKO U T RE L A Y L O CKO U T RE L A Y
1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. CHECKED

3. ELECTRICAL TESTS:
PICKUP TEST:

Coil Coil - T
TIMING TEST:

Relay Terminals G-B

Pickup Voltage (V)

Pick up Current (mA)

Coil resistance

Coil Coil - T

Contacts No.

Actual Operating Time (ms)

Expected Operating Time (ms)

RELAY BURDEN AT RATED VOLTAGE:

Coil Coil - A 4. FUNCTIONAL TEST: Item 1 2 3

Voltage (V)

Current (mA)

Burden (W)

Burden Limits

Description All output contacts resistance measured. Flag operation checked. Operation at 60% of lower relay nominal rated voltage

Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MVTP 31-- CT SUPERVIISIION RELAY MVTP 31 CT SUPERV S ON RELAY


1. GENERAL DATA AND INFORMATION:
Circuit. Panel No. Make: Frequency Flag type Serial no: Model no: Aux. supply No of contacts Setting Range

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 5 6 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check the tightness of all connections. Check ferrules. Check apparatus lists. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
RELAY BURDEN:

Condition No operation Operation

Relay DC voltage

Relay DC current

Burden

Remarks

Note: For 48/54 V burden operation/no operation = 1.3/4.86W For 110/125V burden operation/ no operation = 3.0 / 4.37W.
PICKUP TEST;

Voltage Setting (V) 2 3 5 9

R Pick up (V) Drop off (V) DO/PU Ratio Pick up (V)

Y Drop off (V) DO/PU Ratio Pick up (V)

B Drop off (V) DO/PU Ratio

Note: Pickup voltage +/-5% Vs. Drop off/ Pickup ratio >85% after 3 sec delay.

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

MFAC34-- HIIGH IIMPEDANCE DIIFFERENTIIAL RELAY MFAC34 H GH MPEDANCE D FFERENT AL RELAY


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Flag Type Designation Serial No. Model No. Frequency: No. of Contacts Setting Range:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 5 6 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. Relay CT shorting function checked. Test switch checked for correct function. Stabilizing resistors final setting value. CHECKED

3. ELECTRICAL TESTS:
PICKUP / DORP OFF TEST:

Injection done including METROSIL resistor.


R Voltage setting (V) Pickup current (mA) Pickup voltage (V) Dropof f voltage (V) Pickup current (mA) Y Pickup voltage (V) Dropof f voltage (V) Pickup current (mA) B Pickup voltage (V) Dropof f voltage (V) Pickup current limit (mA) 18-20 18-20 18-23 19-28 20-39 24-60 33-95

25 50 75 100 125 150 175

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh Plug remove

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

33-95

Note: pickup voltage +/- 10% setting ,D/O and P/U ratio >50%.

MFAC34- HIGH IMPEDANCE DIFFERENTIAL RELAY


OPERATING TIME TEST:

Setting voltage (V)

Applied voltage 2xsetting (V)

Measured operating time in msec R Y B

Limits Between 15-30 msec (Max. to min. setting respectively) (Refer graph)

4. FINAL SETTING TESTS:


PICKUP / DORP OFF TEST:

R Voltage setting (V) Pickup current (mA) Pickup voltage (V) Dropof f voltage (V) Pickup current (mA)

Y Pickup voltage (V) Dropof f voltage (V) Pickup current (mA)

B Pickup voltage (V) Dropof f voltage (V)

Opearate current limits (mA)

Note: pickup voltage +/- 10% setting ,D/O and P/U ratio >50%.
OPERATING TIME TEST:

Setting voltage (V)

Applied voltage 2xsetting (V)

Measured operating time in msec R Y B

Remarks Between 15-30 msec (Max. to min. setting respectively) (Refer graph)

5. FUNCTIONAL TESTS:
Item 1 2 3 Description All output contacts resistance measured. Flag operation checked. Check metrosil non-linear resistors connection Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

CHECK SYNCHRONIISIING RELAY-- KVAS100 CHECK SYNCHRON S NG RELAY KVAS100


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Dwg & Sh No. Rated frequency Designation Serial No. Model No. Aux. Voltage No. of Contacts

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of case. CHECKED

3. ELECTRICAL TESTS:
3.1. MEASUEMENTS CHECK:

Voltage Input Bus voltage Line voltage


3.2. OPTO INPUT TEST:

Injected Voltage

Relay setting VT Ratio

Relay display Voltage

Error

Opto Input No. L0 L1 L2 L3 L4 L5 L6 L7

DC Applied Terminal No. +Ve Terminal No. 46 48 50 45 47 49 51 53 -Ve Terminal No. 52 52 52 55 55 55 55 55

Opto Input Results

Function assigned for Opto Input

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

CHECK SYNCHRONISING RELAY- KVAS100


3.3. OUTPUT RELAY TEST:

Output Relay No. WD RL-0 RL-1 RL-2 RL-3 RL-4 RL-5 RL-6 RL-7

Function assigned for output

Output Relay Terminal No.

Output Relay Results by test mode

Remarks

3.1. RELAY SETTING:

Parameters CSS VT ratio CSS slip freq CSS V.B/ L Live CSS Under voltage

setting

Parameters CSS phase angle CSS Synch timer CSS V.B/L Dead CSS Diff. voltage

setting

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

CHECK SYNCHRONISING RELAY- KVAS100


3.2. TEST/COMMISSIONING: 3.2.1. PHASE ANGLE TESTS:

Inject Bus and line voltage with Equal magnitude/ frequency/ angle. Vary the phase angle of Line or bus voltage and monitor the Check Synch OK output. Positive Angle Negative Angle Phase Setting Phase Element Pickup Drop off Pickup Drop off (Degrees) (Degrees) (Degrees) (Degrees) (Degrees) CSS Phase Angle Note: Accuracy---- setting +1or -3
3.2.2. SLIP FREQUENCY TESTS:

Inject Bus and line voltage with Equal magnitude/ frequency/ angle. Vary the frequency of Line or bus voltage and monitor the Check Synch OK output. Slip Setting (Hz) Fast Pickup(Hz) Slow Pickup(Hz)

Slip Element CSS Slip Frequency


3.2.3 SLIP TIMER TESTS:

- Inject Bus and line voltage with Equal magnitude/ frequency and angle out of synchronism. - Change the angle of Bus voltage same as Line voltage (so that Check Synch OK outputs). - Measure the time between angle change and Check Synch OK output. Timer Setting Actual Time Timer Type (Sec) (Sec) CSS Slip Timer
3.2.4 VOLTAGE ELEMENT TESTS:

A.UNDER VOLTAGE ELEMENT: Inject Bus and line voltage with Equal magnitude above the U/V setting / frequency/ angle. Decrease the Line or bus voltage until Check Synch OK output resets (U/V Pick up) and increase back until Check Synch OK output pick up (U/V drop off). Voltage Element Line Under voltage Bus Under voltage Setting (V) Pick up (V) Drop off (V)

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

CHECK SYNCHRONISING RELAY- KVAS100


B. DIFFERENTIAL VOLTAGE ELEMENT: Inject Bus and line voltage with Equal magnitude / frequency/ angle. Decrease the Line or bus voltage until Check Synch OK output resets (U/V Pick up) and increase back until Check Synch OK output pick up (U/V drop off). Diff. Voltage Element setting: Bus Voltage Line Voltage Voltage Element High (+U) P/U Bus Line C. DEAD LINE/ LIVE BUS MONITOR: V line value CSS V.B/L Dead -2V CSS V.B/L Dead+2V CSS V.B/L Dead-2V V bus Value CSS V.B/L Live+2V CSS V.B/L Live+2V CSS V.B/L Live-2V Actual DLLB output operation Expected DLLB output operation Operate Reset Reset D/O Low-U) P/U D/O High (+U) P/U D/O Low-U) P/U D/O

D. LIVE LINE/ DEAD BUS MONITOR: V line value CSS V.B/L Live+2V CSS V.B/L Live+2V CSS V.B/L Live-2V V bus Value CSS V.B/L Dead -2V CSS V.B/L Dead+2V CSS V.B/L Dead-2V Actual LLDB output operation Expected LLDB output operation Operate Reset Reset

E. DEAD LINE/ DEAD BUS MONITOR: V line value CSS V.B/L Dead -2V CSS V.B/L Dead+2V CSS V.B/L Dead-2V V bus Value CSS V.B/L Dead -2V CSS V.B/L Dead-2V CSS V.B/L Dead+2V Actual DLDB output operation Expected DLDB output operation Operate Reset Reset

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P120 SENSIITIIVE EARTH FAULT RELAY P120 SENS T VE EARTH FAULT RELAY
1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Diagram no. Frequency Rated voltage No of logic Inputs: Designation Serial No. Model No. Aux. Voltage Firmware no. Rated current: No of outputs:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 4 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of display. CT shorting function checked. CHECKED

3. ELECTRICAL TESTS:
3.1. RELAY SETTING: Final relay setting retrieved through MICOM S1 software and printout attached. 3.2. RELAY DC BURDEN TEST: Terminal Voltage (V) Current (mA) Quiescent Output Operated Burden (W) Quiescent Output Operated Nominal Burden (W) Quiescent <3W 3.3. CURRENT INPUT TEST: Injected current Phase (A) N 3.4. OPTO INPUT CHECK: (Energize only one OPTO INPUT at a time with relay rated OPTO input voltage CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal) V DC Applied Terminal OPTO No. Status of OPTO Function assigned for Remarks Input No. INPUT OPTO INPUT +Ve Terminal -Ve Terminal No. No. OPTO-1 22 24 OPTO-2 26 28 Max <6W

Applied CT ratio

Displayed current

% Error

Remarks

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P120 EARTH FAULT RELAY


3.5. OUTPUT RELAY TEST: Output Relay No. WD RL1 RL2 RL3 RL4 Output Contact No. 36-35 (N.C) / 36-37 (N.O) 2-4 (N.C) / 2-6 (N.O) 8-10 (N.C) / 8-12 (N.O) 14 16 18 20 Output relay status Contact Operation check Actual Assignment of Relays Remarks

3.6. EARTH FAULT ELEMENT (50N/51N):


3.6.1. CURRENT SENSITIVITY TEST:

Element Ie> Ie>> Ie>>>

Current setting

Pickup current

Drop off current

Accuracy +/- 2%Ies for DT 1.1Ies+/- 2% for IDMT +/- 2%Ies for DT +/- 2%Ies for DT

3.7.2. TIMING TEST:

Element Ie> Ie>> Ie>>>

Curve/ Time

Actual Operating time 2xIes 5xIes 10xIes

Expected Operating time 2xIes 5xIes 10xIes

LED Indication

Note: Typical accuracy for operating time: DT: +/- 2% or 30..50ms IDMT: +/- 5% or 30.50ms
3.8. FUNCTIONAL TEST:

Item 1

Description Outputs relay & LED operation as per the configuration.

Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P921 VOLTAGE PROTECTIION RELAY P921 VOLTAGE PROTECT ON RELAY


1. GENERAL DATA AND INFORMATION:
Circuit Ref. Panel No. Make Diagram no. Frequency Rated voltage No of logic Inputs: Designation Serial No. Model No. Aux. Voltage Firmware no. Rated current: No of outputs:

2. MECHANICAL CHECKS AND VISUAL INSPECTION:


ITEM 1 2 3 DESCRIPTION Inspect for any physical damage or defects. Verify connections as per approved drawings. Check that serial no. of relay matching with serial no. of display. CHECKED

3. ELECTRICAL TESTS:
3.1. RELAY SETTING: Final relay setting retrieved through MICOM S1 software and printout attached. 3.2. RELAY DC BURDEN TEST: Terminal Voltage (V) Current (mA) Quiescent Output Operated Burden (W) Quiescent Output Operated Nominal Burden (W) Quiescent <3W 3.3. VOLTAGE INPUT TEST: Phase A,B,C 3.4. OPTO INPUT CHECK: (Energize only one OPTO INPUT at a time with relay rated OPTO input voltage CAUTION!! -Check RATED OPTO INPUT VOLTAGE before apply voltage to OPTO Input terminal) V DC Applied Terminal No. OPTO Status of OPTO Function assigned for Remarks Input No. INPUT OPTO INPUT +Ve Terminal -Ve Terminal No. No. OPTO-1 22 24 OPTO-2 26 28 Applied voltage (V) Applied VT ratio Measured voltage AN/AB AN/ BC CN/ CA % Avg. Error Remarks Max <6W

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P921 VOLTAGE PROTECTION RELAY


3.5. OUTPUT RELAY TEST: Output Relay No. WD RL1 RL2 RL3 RL4 Output Contact No. 36-35 (N.C) / 36-37 (N.O) 2-4 (N.C) / 2-6 (N.O) 8-10 (N.C) / 8-12 (N.O) 14 16 18 20 Output relay status Contact Operation check Actual Assignment of Relays Remarks

3.6. UNDER VOLTAGE ELEMENT (27): Protection Mode: P-P/ P-N


3.6.1. VOLTAGE SENSITIVITY TEST:

Element

Voltage setting

Pickup Voltage AN/AB BN/BC CN/ CA

Drop off Voltage AN/AB BN/BC CN/ CA

Accuracy +/- 2%Vs for DT 0.95Vs+/- 2% for IDMT +/- 2%Vs for DT +/- 2%Vs for DT

V< V<< V<<<

3.6.2. TIMING TEST:

Element V< V<< V<<<

Time setting

Actual Operating time

Expected Operating time

LED Indication

Note: Typical accuracy for operating time: DT: +/- 2% or 20ms IDMT: +/- 5% or 40ms

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

EPS Ltd, Riyadh

Customer Location Contractor Site test record

SEC -EOA DAMMAM AL TOUKHI RELAY TEST

Contract # Project EPS Job # Doc. Ref.

FARAS POWER PLANT PE0863

P921 VOLTAGE PROTECTION RELAY


3.7. OVER VOLTAGE ELEMENT (59): Protection Mode: P-P/ P-N
3.7.1. VOLTAGE SENSITIVITY TEST:

Element

Voltage setting

Pickup Voltage AN/AB BN/BC CN/ CA

Drop off Voltage AN/AB BN/BC CN/ CA

Accuracy +/- 2%Vs for DT 1.1Vs+/- 2% for IDMT +/- 2%Vs for DT +/- 2%Vs for DT

V> V>> V>>>

3.6.2. TIMING TEST:

Element V> V>> V>>>

Time setting

Actual Operating time

Expected Operating time

LED Indication

Note: Typical accuracy for operating time: DT: +/- 2% or 20ms IDMT: +/- 5% or 40ms

3.8. FUNCTIONAL TEST:

Item 1

Description Outputs relay & LED operation as per the configuration.

Checked

Test performed by

Test witnessed by

Approved by

Date of test

s
Name Signature

SEC-EOA

SEC-EOA

S-ar putea să vă placă și