The Gantt chart is used to show the span of time consumed in every process during system development in the
proposed system
Durati
ID Task Name Start Finish
on
Problem Definition 11/19/20 12/12/20
1 23
on 07 07
2/18/200
2 Feasibility Study 1/7/2008 42
8
4/25/200
3 System Analysis 3/4/2008 52
8
6/24/200
4 Detailed Design 5/6/2008 49
8
5 Implementation 7/1/2008 8/1/2008 31
6 Planning Phase 8/5/2008 9/1/2008 27