FPRA & Site Star Installation Guide - PERU

David Torres June, 2010

For internal use 1 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

FPRA & Site Star Installation guide PERU

For internal use 2 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / cable entry plate removal

For internal use 3 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing plate 1

For internal use 4 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing plate 2

For internal use 5 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing FOAM 1

For internal use 6 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing inner plate 1

For internal use 7 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / removing inner plate 2

For internal use 8 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / cable entry

For internal use 9 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable entry installation

For internal use 10 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / battery shelf kits, cable entry and support rails

Side & top rails

Battery shelf kits

Cable entry

For internal use 11 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Battery cable routing

For internal use 12 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Battery cable routing- A/C ACpower

For internal use 13 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / PDA module overview


High-integrated power system Modularized design Flexible applications: load/battery configuration Variable AC power connection Control via the GUI IP54/55

For internal use 14 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

PDA description & functions


AC input distribution DC output distribution Battery control function: status test, LVD System supervisor: LCD/LED display, alarm indication Network connection

For internal use 15 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Delivery contents/ preparing installation

For internal use 16 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Preparing Installation / Test Equipment_tools


PC Multi-meter: FLUKE 170 or equivalent DC current clamp: FLUKE I410 or equivalent Rubber hammer Chisel Hydraulic crimping tool 13 mm torque wrench T10, 20, & 30 screwdrivers Cutting knife Protecting gloves & glasses.

For internal use 17 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Removing PDA from shelf

For internal use 18 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / General view of the PDA

For internal use 19 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / PDA front panel overview

For internal use 20 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Front panel LEDS overview

For internal use 21 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / rear cover removal

For internal use 22 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Rear internal layout


PDA rear cover

OVP DIN Rail

AC terminal block E D SPD ground clamp PDA earth cable OVP sensor connector AC ground clamp C B Rear cover Retention cable

Cable restraint F

For internal use 23 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / OVP

For internal use 24 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Configure the AC terminal block

3-

Single-phase 3-Y

For internal use 25 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Prepare the AC cable

Inserting the AC cable

Stripping the wires

For internal use 26 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / One Phase AC with OVP

OVP
L1 L2 L3 N

AC Terminal Block
1 2 3 4 5 6

PE

AC mains

For internal use 27 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Single-phase AC connection with the OVP

Set up the OVP

For internal use 28 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Single-phase AC connection with the OVP

Connecting the SPD and AC terminal block


For internal use 29 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

AC Terminal Block OVP


L1 L2 L3 N 1 2 3 4 5 6

PE

L1

L2

L3

AC Mains

For internal use 30 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

Connecting the OVP and AC terminal block


For internal use 31 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3Y AC connection with the OVP

For internal use 32 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3 AC connection with the OVP


AC Terminal Block OVP
L1 L2 L3 N 1 2 3 4 5 6

PE

L1

L2

L3

AC mains

For internal use 33 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation 3 AC connection with the OVP

For internal use 34 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Before routing the DC cables

For internal use 35 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Identifying the DC terminals

For internal use 36 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Configure the breakers

If connecting to separate load / battery blocks, the load / battery switch lever bar and the terminal short link have to be removed.
For internal use 37 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the DC cable

Inserting the cable through front panel

Securing into the clamp

For internal use 38 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Configuration of DC cables

Typical Parallel load Parallel battery

Load & return: Battery & return: Load grounding:


For internal use 39 Nokia Siemens Networks

35mm2 35mm2 25mm2

2 2 1

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the DC connection

Push the front panel back and secure it


For internal use 40 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the DC connection

For internal use 41 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Drawer layout

For internal use 42 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the temperature cable

Connect to J22

7 8 9 10
For internal use 43 Nokia Siemens Networks

TEM_GND Red TEM SENSE_IN White TEMP_VCC Black EARTH Cable screen

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Placing the temperature probe

The temperature probe should be put where might has the highest temperature
For internal use 44 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the alarm cable


3 4 5 6 7 8 9 10 11 12 13 14 ALARM_COM MAINS 1 ALARM_COM MAINS 2 ALARM_COM MAINS 3 ALARM_COM CRITICAL ALARM_COM MAJOR ALARM_COM MINOR

Connect Alarm Out cable to J22

For internal use 45 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the communication cable

Correctly grounding the cable shield is crucial to the electromagnetic compatibility (EMC) of the entire system.

For internal use 46 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Putting back and secure the drawer

For internal use 47 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the PDA into case

For internal use 48 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the earth cable


System earth cable

PDA earth cable


For internal use 49 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the Ethernet cable

For internal use 50 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the rectifiers into case

For internal use 51 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the rectifiers

Connecting the power cable

Connecting the RS485 cable


For internal use 52 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Connecting the rectifiers

For internal use 53 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Recommended configuration of the cable through


cable gland

Option 1

Option 3

For internal use 54 Nokia Siemens Networks

Option 2
FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Insert the cable through cable gland

For internal use 55 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the cable glands with cables

For internal use 56 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing all the cables to the case

For internal use 57 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the AC cable with cable restraints

For internal use 58 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the PDA earth cable to case

Fix the PDA earth cable to the cable gland with cable tie so as not to block the LCD.
For internal use 59 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Exiting the alarm cable

The alarm cable is exiting from top of the case if required


For internal use 60 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Finishing the cables

For internal use 61 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the front and back cover

Front cover

Back cover

The FPRA is IP55 after installing the front and back cover

For internal use 62 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation FPRA General view after the installation


without conduit pipes

For internal use 63 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Fixing the two FPRA units

Stacking and fixing the two FPRA units


For internal use 64 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Paralleling the two drawers - RS-422 cables

J22 #1 11 1 2 3 4 5 6 12 Parallel cable #2 Parallel cable #1

J22 #2 12 4 5 6 1 2 3 11

For internal use 65 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Paralleling the two drawers

Parallel cable #2 Parallel cable #2

Parallel cable #1

Parallel cable #1

Drawer #1

Drawer #2

For internal use 66 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Paralleling the two drawers

For internal use 67 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / reccomended cable sizes

For internal use 68 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the two FPRA units

Installing the two FPRA units separately

For internal use 69 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the three drawers

J22 #1 11 1 2 3 4 5 6 12

Parallel cable #1

J22 #2 12 4 5 6 1 2 3 11

Parallel cable #2

Parallel cable #3

J22 #3
For internal use 70 Nokia Siemens Networks

11 1 2 3

6 12

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the three drawers

Parallel cable #1

Parallel cable #1

Parallel cable #3

Parallel cable #2

Parallel cable #3 Parallel cable #2 Drawer #1

1 Drawer #2

2 Drawer #3

For internal use 71 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Installing the three FPRA units

For internal use 72 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Interface with Site Star Cabinet

For internal use 73 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / 2 conduit PIPE (Battery Cables)

For internal use 74 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / 1 conduit Pipes (AC input & DC output to loads)


Alluminium plates

For internal use 75 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Conduit fix to FPRA

For internal use 76 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Final view

For internal use 77 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable Routing

Parallel cable

Alarms & communications AC Shelf 2

Battery string #3, alarms & temp sensor

DC to BTS Battery strings 1 & 2 AC Shelf 1

For internal use 78 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cable routing

For internal use 79 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Cabinet alarm routing

For internal use 80 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation / Alarm routing

For internal use 81 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Browser and control unit setup

Configure the setup environment

For internal use 82 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Change the CU IP-address


Via the LCD: change the CU IP-address into local IP range Via the GUI: Change the user PC IP-address to the CU IP range Connect to the CU via the GUI Change the CU IP to the local internet/intranet IP range Change the user PC IP-address back to the local internet/intranet IP range Connect the CU and user PC in the local internet/intranet via the GUI

For internal use 83 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation Change the CU IP-address via GUI

After changing the CU IP-address, need reconnect the CU manually


For internal use 84 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Installation GUI home page

For internal use 85 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning DC setup

Note: the battery voltage must be over 43Vdc.

For internal use 86 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning Check the status

Check the data via the GUI or LCD

For internal use 87 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Commissioning Set up the parameters

Each FPRA has already been calibrated before the shipment


For internal use 88 Nokia Siemens Networks FPRA & Site Star Installation PERU / David Torres/ June, 2010

Export/Import Conf.BIN file

For internal use 89 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Maintenance
Checking the connector seal Checking the cable connectors Checking the screws Checking the rectifier fans Replacing the OVP module, when this is necessary Updating the system firmware

For internal use 90 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Alarm definition CLARO PERU


MAINS 1 (Alarm 16)
REC AC UVP ( POR CADA MODULO)

MAINS 2 (Alarm 15)


REC GENERAL ERROR REC SENSOR FAIL REC NORM. TEMP HIGH REC NORM TEMP LOW REC EXCEP TEMP HIGH REC EXCEP TEMP LOW REC ELEMENT LOSS REC OTP REC FAN FAILURE REC AC OVP REC DC OVP (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO)

MAINS 3 (ALARM 14)


CU/PDU BATT TEST FAIL PDA OVP (POR CADA FPRA) (POR CADA FPRA)

CRITICAL (ALARM 13)


BATT LOW VOLTAGE CU/PDUCIRCUIT BREAKER 1 CU/PDUCIRCUIT BREAKER 2 CU/PDUCIRCUIT BREAKER 3 CU/PDUCIRCUIT BREAKER 4 CU/PDUCIRCUIT BREAKER 5 CU/PDU LVD ALARM REC DC OVP (POR CADA FPRA) (POR CADA FPRA) (POR CADA FPRA) (POR CADA FPRA) (POR CADA FPRA) (POR CADA FPRA) (POR CADA FPRA) (POR CADA MODULO)

MAJOR (ALARM 12)


CU/PDU BATT TEMP. LOW CU/PDU BATT TEMP. HIGH REC POWER LIMIT (POR CADA MODULO) (POR CADA MODULO) (POR CADA MODULO)

Alarma de puerta : Directa a la BTS (ALARM 1)


voltaje flotacion por celda=2.27 @ 25c carga 1/10 de la capacidad por 10 horas por numero de bancos Se dejan los jumpers entre los puertos de load y entre los puertos de battery.

La alarma CLU failure del gabinete Site Star se cablea en serie con la alarma 14 Alarma de Fan de Site Star en serie con alarma 12 Alarma de compresor de Site Star en serie con alarma 12

For internal use 91 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Alarm definition CLARO PERU (Cont)


Alarmas asignadas al FPRA J11 RELAY 1 RELAY 2 RELAY 3 RELAY 4 RELAY 5 RELAY 6 PIN 3 Y 4 PIN5 Y 6 PIN7 Y 8 PIN 9 y 10 PIN 11 Y 12 PIN 13 y 14 N# ALARMA 16 15 14 13 12

Alarma de Sensor de Temperatura color de cable Rojo Blanco negro tierra J22 PIN 7 PIN 8 PIN 9 PIN 10

For internal use 92 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Best Practices
While connecting the AC or DC cables into the FPRA system, make sure the power switches are at the OFF position All cables have to pass the cable glands via their indicated holes before connecting into the system While inserting the cable from the front panel, be careful not to destroy the waterproof All the screws must be tightened using proper screwdrivers with appointed torques Note the AC terminal block configuration for different AC mains types The battery/load breaker switch lever bar and the corresponding clamp short link should be removed when supporting different battery/load. After finishing the AC or DC cables connection, user is recommended to test at the cable inputs to ensure no short exists

For internal use 93 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010

Best Practices

While commissioning with a battery input, make sure the battery voltage is over 43Vdc before connecting to the system While removing the PDA from the case, the AC mains must be switched off, but battery could also be on to power the system Before install a OVP to the system, the AC mains must be switched off The IP rating (IP54) is no longer guaranteed while connecting the Ethernet cable

For internal use 94 Nokia Siemens Networks

FPRA & Site Star Installation PERU / David Torres/ June, 2010