Sunteți pe pagina 1din 17

EARTH WORK :

p/l 230mm dry rubble packing under floors

NO Item
1.00
2.00
3.00
4.00
5.00

Rubble
Hard Murrum
Labour
Watering
Compaction

Add OH & Profit


Total

1
1
1
1
1

Const

Rate

Amount

1.25
0.30
1
1
1

495
350
188
2.00
4.00

618
105
188
2
4

0.23
0.15

917
0
917
211
137.61

0%

22

Cum
Sqm

PILING WORK :

No

Roundup
RATE

Description
1 Piledrillingwork

Unit
m

RATE
875

PileworkRig
2 transportationCharges

No.

8000

8000

hr

525

525

perday

2000

2000

Cum

2500

2500

3 RockCheislingcharges
IdealChargesfor
4 Pilework
5 Pile Breaking

875

RCC WORK :
PCC ( 1:3:6)
NO

ITEM
RMC M10
Shuttering material
Shuttering labour
Concrete Labour
T&P
Misc
TOTAL
Add OH & Profit
TOTAL

Rate Analysis

M10
Const
1
1
1
1
1
1

Const
1.00
0
0.00
1.00
1.00

Rate

Amount

3243
205
0
380
198

0%
cum

Page 1 of 17

3243
0
0
380
198
0
3821
0
3821

Windermere

RCC RMC
NO
21.00

ITEM

M 25
Const

Const

Rate

Amount

Pile work
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

RCC RMC
NO

ITEM

1.00
0.00
0.00
1.00
1.00

4185
205.00
0.00
55.00
198.00

4184.62
0.00
0.00
55.00
198.00
0.00
4438
0
4438

0%
cum

M 25
Const

Const

Rate

Amount

1.00 FOOTING
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

RCC RMC
NO

ITEM

1.00
0.00
0.00
1.00
1.00

4009
205
0
180
198

4009
0
0
180
198
0
4387
0
4387

0%

M 25
Const

Const

1.00
1.00
1.00
1.00
1.00
1.00

1.00
0.00
0.00
1.00
1.00

Rate

Amount

2.00 RAFT
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc
TOTAL
Add OH & Profit
TOTAL

Rate Analysis

4009
205
0
180
198

4009
0
0
180
198
0
4387
0
4387

0%

Page 2 of 17

Windermere

RCC RMC
NO

ITEM

M 40
Const

Const

Rate

Amount

4.00 Column
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

RCC RMC
NO
15.00

ITEM

5154.78
0.00
0.00
300.00
198.00
0.00
5653
0
5653

cum

M 40
Const

Const

Rate

Amount

Pardi 150 mm
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

RCC RMC
NO

ITEM

1.00
0.00
0.00
1.00
1.00

5155
205.00
0.00
300.00
198.00

5154.78
0.00
0.00
300.00
198.00
0.00
5653
0
5653

0%

M 35
Const

Const

Rate

Amount

Slab 200
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc
TOTAL
Add OH & Profit
TOTAL

Rate Analysis

5155
205.00
0.00
300.00
198.00

0%

RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

11.00

1.00
0.00
0.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00

1.00
0.00
0.00
1.00
1.00

4863
205.00
0.00
225.00
198.00

4862.75
0.00
0.00
225.00
198.00
0.00
5286
0
5286

0%

Page 3 of 17

Windermere

RCC RMC
NO

ITEM

M 25
Const

Const

Rate

Amount

6.00 Lintel
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

RCC RMC
NO
15.00

ITEM

1.00
0.00
0.00
1.00
1.00

4009
205.00
0.00
350.00
198.00

4009.12
0.00
0.00
350.00
198.00
0.00
4557
0
4557

0%

M 25
Const

Const

Rate

Amount

Pardi 150 mm
RMC
Shutt material
Shuttering Labour
Concrete Labour
T&P
Misc

1.00
1.00
1.00
1.00
1.00
1.00

TOTAL
Add OH & Profit
TOTAL

1.00
0.00
0.00
1.00
1.00

4009
205.00
0.00
300.00
198.00

4009.12
0.00
0.00
300.00
198.00
0.00
4507
0
4507

0%
Cum

SHUTERRING WORK :
P/L Reinforced Steel with Material
NO

Rate Analysis

ITEM

200.00
Const

Shuttering Material
Labour

1
1

ADD Profit & O.H.


Total

0%

Rate
1
1

Amount

205
140

205
140

345
0
345

Page 4 of 17

Windermere

STEEL REINFORCEMENT :
P/L Reinforced Steel with Material
NO

ITEM
Steel
Binding Wire
Labour
Cutting Machine
Cover Block PVC
ADD Profit & O.H.
Total

200.00
Const

1
1
1
1
1

1.03
10
1
1
1

Rate

Amount

37000
45
3500
1359
100

38110
450
3500
1359
0
43419
0
43419
43.42

0%

2600

MASONRY WORK :
Fly Ash Bricks in Super Superstructure
Brick Size
230
0.24
200 Thk Masonary
NO
1
2
3
4
5

Item
Cement
Sand
Fly ash brick
Labour
Misc

Add OH & Profit


Total

200
0.21

Qty.

Unit

Rate

Amount

1
1
1
1
1

0.25
0.035
49
1
5.0

Bag
Cum
Nos
sqmt
Sqm

240
883
8.00
95
5.0

60
31
389
95
25

Sqm
Cum

600
0
600
2999

0%

230
0.24

150 Thk Masonary

1
2
3
4
5
6
7

Rate Analysis

48.6

Con

0.20

NO

80
0.09

150
0.16

80
0.09

48.6

Con

Qty.

Unit

Rate

Amount

Cement
Sand
Fly ash brick
Labour
Concrete
Steel
Misc / Scaffolding

1
1
1
1
1
1
1

0.22
0.03
49.00
1.00
0.0125
0.99
1.0

Bag
Cum
Nos
Sqm
Cum
Kg
Sqm

240
883
6.99
80
2478
37.00
3.5

53
27
342
80
0
0
0

Add OH & Profit


Total

0%
Sqm

502
0
502

Item

Page 5 of 17

Windermere

Fly Ash Bricks in Super Superstructure


Brick Size
230
0.24
110 Thk Masonary

80
0.09

48.6

Con

Qty.

Unit

Rate

Amount

Cement
Sand
Fly ash brick
Labour
Concrete
Steel
Misc / Scaffolding

1
1
1
1
1
1
1

0.15
0.03
49.00
1.00
0.01
0.94
1.00

Bag
Cum
Nos
Sqm
Cum
Kg
Sqm

240
2120
5.78
75
2449
37.00
4.0

36
64
283
75
27
35
0

Add OH & Profit


Total

0%
Sqm

519
0
519

NO
1
2
3
4
5
6
7

110
0.12

Item

Honey Comb Brick Work With Fly Ash Bricks in Super Superstructure
230
110
80
0.24
0.12
0.09
48.6
150 Thk Masonary
Con

Qty.

Unit

Rate

Amount

Cement
Sand
Fly ash brick
Labour
Misc / Scaffolding

1
1
1
1
1

0.07
0.01
22.50
1.00
1.0

Bag
Cum
Nos
Sqm
Sqm

240
883
5.78
80
4.0

18
9
130
80
0

Add OH & Profit


Total

0%
Sqm

236
0
236

NO
1
2
3
4
5

Item

PLASTERING WORK :
10mm Thk Cement Plaster
NO
1
2
3
4

Item
Cement
Sand
Neeru
Labour

Add OH & Profit


Total

Rate Analysis

Con

Qty.

Unit

Rate

Amount

Amount

1
1
1
1

0.12
0.015
0.10
1.00

Bag
Cum
Bag
Sqm

240
2120
55
85.00

29
32
6
85

29
32

Sqm

151
0
151

146
0
146

0%

Page 6 of 17

85

Windermere

12mm Thk Plaster


NO
1
2
3
4
5

Con

Qty.

Unit

Rate

Amount

Amount

Cement
Sand
Neeru
Labour
GI Chiken Mesh

1
1
1
1
1

0.15
0.018
0.10
1.00
0.15

Bag
Cum
Bag
Sqm
Sqm

240
2120
55
85.00
102

36
38
6
85
15.23

36
38
85
15.23

Add OH & Profit


Total

0%
Sqm

180
0
180

174
0
174

Item

20mm Thk Double Coat Plaster


NO
1
2
3
4
5
6
7

Con

Qty.

Unit

Rate

Amount

Cement
Sand
WPC
Labour
Recon Fibre mesh
GI Chiken Mesh
Misc / Scaffolding

1
1
1
1
1
1
1

0.25
0.04
0.25
1.00
0.25
0.15
1.00

Bag
Cum
Bag
Sqm
Packet
Sqm
Sqm

240
2120
39
172
40.00
102
10

60
85
10
172
10
15.23
10.00

Add OH & Profit


Total

0%
Sqm

362
0
362

Item

Water Proof Plaster


20mm Thk Plaster
NO
1
2
3
4
5

Rate Analysis

Con

Qty.

Unit

Rate

Amount

Cement
Sand
WPC
Labour
Misc / Scaffolding

1
1
1
1
1

0.25
0.03
0.25
1.00
1.00

Bag
Cum
Bag
Sqm
Sqm

240
2120
39
151
5

60
53
10
151
5.00

Add OH & Profit


Total

0%
Sqm

279
0
279

Item

Page 7 of 17

Windermere

JOINARY WORK :

Main Door(D1-1200x2100 mm)-Shutter & Frame-Ply jamb (both veneer & melamine finish)
PLY JAMB WITH
MALAMINE POLISH

Size

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
1.20
5.40

4.20
1.20
5.40

Total
ADD Profit & O.H.
Total

0.200
0.200

0.150
0.150
5%

Item
18mm Ply
12mm Ply
2" x 1/2" Teakwood Patti
Vineer
Labour frame Making
Hardware
Moulding
Malamine Polish
Misc

30
1.2

5%

12mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 12mm Ply Wood

1
2
3
4
5
6
7
8
9

200.00
2.10 x

1
1
1
1
1
1
1
1
1

2.52

0.840
0.240
1.080
0.054
1.134

0.630
0.180
0.810
0.041
0.851

Qty

Unit

Rate

1.134
0.851
10.80
1.199
30%
1.00
10.80
2.09

Sqmt
Sqmt
Rmt
Sqmt
Lum
Lum
Rmt
Sqmt

538
377
29
430
1760
50
33
430
50

610
320
313
516
0
50
0
898
50

No
Sqm

2758
0
2758
1094

Rmt

511

0%

Amount

50 mm READY MADE FLUSH SHUTTER MALAMINE POLISH ON BOTH SIDE


2.00 DOOR D- 1
2.10
X
1.20
2.5
50 mm door shutter
2.08
1.16
2.42
Unit
Rate
Amount
Item
Qty
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Ready Made Flush Door


2" x 1/2" Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnetic Door Stopper
Eye Piece
Safty Chain
Mortise Lock
Malamine Polish
Labour Charges
Misc ( fevicol , nails etc)
Iron Mongry Cost
Total
ADD Profit & O.H.
Total

Rate Analysis

1
1
1
1
1
1
1
1
1
1
1
1
1
1

2.42
10.80
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.45
2.52
2.52
1.00

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum
Lum

1560
29
150
175
65
1000
100
100
100
1000
430
592
50
2500

3781
0
0
0
0
0
0
0
0
0
2347
1492
126
2500

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

10246
0
10246
4228
5322
13003

0%

Page 8 of 17

No
Sqm
Sqm
No

Windermere

P/F Main Door(D1 - 1200 x 2100 mm) - 2 Hour Fire Rating


PLY JAMB WITH
MALAMINE POLISH

Size

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
1.20
5.40

4.20
1.20
5.40

Total
ADD Profit & O.H.
Total

0.200
0.200

0.150
0.150
5%

Item
18mm Ply
12mm Ply
2" x 1/2" Teakwood Patti
Vineer
Labour frame Making
Hardware
Moulding
Malamine Polish
Misc

30
1.2

5%

12mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 12mm Ply Wood

1
2
3
4
5
6
7
8
9

200.00
2.10 x

1
1
1
1
1
1
1
1
1

2.52

0.840
0.240
1.080
0.054
1.134

0.630
0.180
0.810
0.041
0.851

Qty

Unit

Rate

1.134
0.851
10.80
1.199
30%
1.00
10.80
2.09

Sqmt
Sqmt
Rmt
Sqmt
Lum
Lum
Rmt
Sqmt

538
377
29
430
1760
50
33
430
50

610
320
313
516
0
50
0
898
50

No
Sqm

2758
0
2758
1094

Rmt

511

0%

Amount

50 mm READY MADE FLUSH SHUTTER MALAMINE POLISH ON BOTH SIDE


2.00 DOOR D- 1
2.10
X
1.20
2.5
50 mm door shutter
2.08
1.16
2.42
Unit
Rate
Amount
Item
Qty
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Ready Made Flush Door


2" x 1/2" Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnetic Door Stopper
Eye Piece
Safty Chain
Mortise Lock
Malamine Polish
Labour Charges
Misc ( fevicol , nails etc)
Iron Mongry Cost
Total
ADD Profit & O.H.
Total

Rate Analysis

1
1
1
1
1
1
1
1
1
1
1
1
1
1

2.42
10.80
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.45
2.52
2.52
1.00

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum
Lum

4196
29
150
175
65
1000
100
100
100
1000
430
592
50
2500

10170
0
0
0
0
0
0
0
0
0
2347
1492
126
2500

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

16634
0
16634
6864
7958
19392

0%

Page 9 of 17

No
Sqm
Sqm
No

Windermere

P/F Main Door(D1 - 1500 x 2100 mm) - Shutter & Frame-Ply jamb (both veneer &
melamine finish)
PLY JAMB WITH
MALAMINE POLISH

Size

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
1.50
5.70

4.20
1.50
5.70

Total
ADD Profit & O.H.
Total

3.15

0.200
0.200

0.150
0.150
5%

Item
18mm Ply
12mm Ply
2" x 1/2" Teakwood Patti
Vineer
Labour frame Making
Hardware
Moulding
Malamine Polish
Misc

30
1.5

5%

12mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 12mm Ply Wood

1
2
3
4
5
6
7
8
9

200.00
2.10

1
1
1
1
1
1
1
1
1

0.840
0.300
1.140
0.057
1.197

0.630
0.225
0.855
0.043
0.898

Qty

Unit

Rate

1.197
0.898
11.40
1.265
30%
1.00
11.40
2.20

Sqmt
Sqmt
Rmt
Sqmt
Lum
Lum
Rmt
Sqmt

538
377
29
430
1857
50
33
430
50

644
338
331
545
0
50
0
948
50

No
Sqm

2905
0
2905
922

Rmt

510

0%

Amount

50 mm READY MADE FLUSH SHUTTER MALAMINE POLISH ON BOTH SIDE


2.00 DOOR D- 1
2.10
X
1.50
3.2
50 mm door shutter
2.08
1.46
3.05
Unit
Rate
Amount
Item
Qty
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Ready Made Flush Door


2" x 1/2" Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnetic Door Stopper
Eye Piece
Safty Chain
Mortise Lock
Malamine Polish
Labour Charges
Misc ( fevicol , nails etc)
Iron Mongry Cost
Total
ADD Profit & O.H.
Total

Rate Analysis

1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.05
11.40
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.86
3.15
3.15
1.00

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum
Lum

1560
29
150
175
65
1000
100
100
100
1000
430
592
50
2500

4756
0
0
0
0
0
0
0
0
0
2952
1865
158
2500

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

12230
0
12230
4012
4935
15135

0%

Page 10 of 17

No
Sqm
Sqm
No

Windermere

P/F Other Door - Shutter -Ready Made 35mm thick & Frame-Ply jamb (both Melamine
finish) D2 - 750 x 2100
PLY JAMB WITH
MALAMINE POLISH

Size

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
0.75
4.95

18mm Ply
3" x 1/2" Teakwood Patti
2" x 1/2" Teakwood Patti
Labour frame Making
Hardware
Moulding
Malamine polish
Misc

Total
ADD Profit & O.H.
Total

2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

Rate Analysis

30
0.75

0.150
0.150
5%

Item
1
2
3
4
5
6
7
8
9
10

150.00
2.10

Qty
1
1
1
1
1
1
1
1

Unit

0.780
Sqmt
4.950
Rmt
9.900
Rmt
30%
Lum
1.00
Lum
9.90
Rmt
1.07
Sqmt
1.00 L.S.

Rate
538
43
29
918
50
33
430
50

1.58

0.630
0.113
0.743
0.037
0.780

Amount
419
211
287
0
50
0
459
50

No
Sqm

1477
0
1477
938

Rmt

298

0%

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
0.75
2.08
0.714
Item
Qty

1.58
1.49
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Malamine polish
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
430
484.00
50.00

1999
0
450
0
0
0
100
0
0
600
1440
762
79

Total
ADD Profit & O.H.
Total

0%

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

5430
0
5430
3448
4385
6907

1.49
9.90
3.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
3.34
1.58
1.58

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Page 11 of 17

Sqm

Amount

1150.00

No
Sqm
Sqm
No

Windermere

P/F Other Door - Shutter -Ready Made 35mm thick & Frame-Ply jamb (both Melamine
finish) D3 - 900 x 2100
PLY JAMB WITH OIL
PAINT

Size

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
0.90
5.10

18mm Ply
3" x 1/2" Teakwood Patti
2" x 1/2" Teakwood Patti
Labour frame Making
Hardware
Moulding
Malamine Polish
Misc

Total
ADD Profit & O.H.
Total

2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

Rate Analysis

30
0.9

1.89

0.150
0.150
5%

Item
1
2
3
4
5
6
7
8
9
10

150.00
2.10

Qty
1
1
1
1
1
1
1
1

0.803
5.100
10.200
30%
1.00
10.20
1.07
1.00

Unit

Rate

Sqmt
Rmt
Rmt
Lum
Lum
Rmt
Sqmt
L.S.

538
43
29
945
50
33
430
50

0.630
0.135
0.765
0.038
0.803

Amount
432
217
296
0
50
0
459
50

No
Sqm

1504
0
1504
796

Rmt

295

0%

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
0.90
2.08
0.864
Item
Qty

1.89
1.80
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Malamine Polish
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
430
484.00
50.00

2419
0
450
0
0
0
100
0
0
600
1742
915
95

Total
ADD Profit & O.H.
Total

0%

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

6321
0
6321
3344
4140
7825

1.80
10.20
3.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
4.05
1.89
1.89

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Page 12 of 17

Sqm

Amount

1150.00

No
Sqm
Sqm
No

Windermere

P/F Other Door - Shutter -Ready Made 35mm thick & Frame-Ply jamb (both Melamine
finish) D4 - 1200 x 2100
PLY JAMB WITH OIL
PAINT

Size

150.00
2.10

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
1.20
5.40

18mm Ply
3" x 1/2" Teakwood Patti
2" x 1/2" Teakwood Patti
Labour frame Making
Hardware
Moulding
Malamine Polish
Misc

Total
ADD Profit & O.H.
Total

2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

Rate Analysis

1.2

2.52

0.150
0.150
5%

Item
1
2
3
4
5
6
7
8
9
10

30

Qty
1
1
1
1
1
1
1
1

Unit

0.851
Sqmt
5.400
Rmt
10.800
Rmt
30%
Lum
1.00
Lum
10.80
Rmt
1.07
Sqmt
1.00 L.S.

Rate
538
43
29
1001
50
33
430
50

0.630
0.180
0.810
0.041
0.851

Amount
458
230
313
0
50
0
459
50

No
Sqm

1560
0
1560
619

Rmt

289

0%

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
1.20
2.08
1.164
Item
Qty

2.52
2.42
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Malamine Polish
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
430
484.00
50.00

3260
0
600
0
0
0
100
0
0
600
2347
1220
126

Total
ADD Profit & O.H.
Total

0%

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

8252
0
8252
3275
3894
9812

2.42
10.80
4.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
5.45
2.52
2.52

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Page 13 of 17

Sqm

Amount

1300.00

No
Sqm
Sqm
No

Windermere

Double Leaf D9 - 1500 x 2100 ( Pump room , Gym , Passage in podium , Lobby )
PLY JAMB WITH OIL
PAINT

Size

150.00
2.10

18mm Ply
Vertical Post
Horizontal Post
Total
Westage
Net 18mm Ply Wood

4.20
1.50
5.70

18mm Ply
3" x 1/2" Teakwood Patti
2" x 1/2" Teakwood Patti
Labour frame Making
Hardware
Moulding
Malamine polish
Misc

Total
ADD Profit & O.H.
Total

2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

Rate Analysis

1.5

3.15

0.150
0.150
5%

Item
1
2
3
4
5
6
7
8
9
10

30

Qty
1
1
1
1
1
1
1
1

Unit

0.898
Sqmt
5.700
Rmt
11.400
Rmt
30%
Lum
1.00
Lum
11.40
Rmt
1.07
Sqmt
1.00 L.S.

Rate
538
43
29
1057
50
33
430
50

0.630
0.225
0.855
0.043
0.898

Amount
483
243
331
0
50
0
459
50

No
Sqm

1616
0
1616
513

Rmt

283

0%

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
1.50
2.08
1.464
Item
Qty

3.15
3.05
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Malamine polish
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
430
484.00
50.00

4100
0
1200
0
0
0
200
0
0
600
2952
1525
158

Total
ADD Profit & O.H.
Total

0%

Rate including Ply frame & Shutter


Rate including Ply frame & Shutter

10733
0
10733
3407
3920
12349

3.05
11.40
8.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
6.86
3.15
3.15

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Page 14 of 17

Sqm

Amount

2000.00

No
Sqm
Sqm
No

Windermere

P/F Flush Doors Without Frame (Toilet door) - Shutter -Ready Made 35mm thick with oil
Paint finish D3-750 x 2100
2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
0.75
2.08
0.714
Item
Qty

1.58
1.49
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Oil Painting
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
65.00
323.00
50.00

Total
ADD Profit & O.H.
Total

0%

1.49
9.90
3.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
3.34
1.58
1.58

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Amount
1999
0
450
0
0
0
100
0
0
600
217
509
79

1150.00

3954
0
3954 No
2511 Sqm

P/F Flush Doors Without Frame (Toilet door) - Shutter -Ready Made 35mm thick with oil
Paint finish D6-800 x 2100
2.00

1
2
3
4
5
6
7
8
9
10
11
12
13

Rate Analysis

35 mm FLUSH SHUTTER PAINTED ON BOTH SIDE


DOOR D- 2
2.10
X
0.80
2.08
0.764
Item
Qty

1.68
1.59
Rate

Ready Made Flush Door


Lipping Patti
Hinges
Aldrop
Tower Bolt
Handle
Magnet Door Stoper
Eye Piece
Safty Chain
Mortise Lock
Oil Painting
Labour Charges
Misc ( fevicol , nails etc)

1
1
1
1
1
1
1
1
1
1
1
1
1

1345.00
30.19
150.00
175.00
65.00
100.00
100.00
70
50
600.00
65.00
323.00
50.00

Total
ADD Profit & O.H.
Total

0%

1.59
10.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.58
1.68
1.68

Sqm
Rmt
nos
nos
nos
nos
nos
nos
nos
nos
Sqm
Sqm
Lum

Amount
2139
0
450
0
0
0
100
0
0
600
233
543
84

1150.00

4149
0
4149 No
2469 Sqm

Page 15 of 17

Windermere

P/F 2 Hour Fire rating doors with frame for Staircase


FIRE Purpose Doors
(2 Hr Rated)

1.20

Panic lath Briton 378E


with Mortise Lock(ML
100P), Half cylinder @
SS D handle 254 mm
with rose (Briton 379 E)
Automatic Door button
914mm
Door closer (Dorma
TC68)

Rate

1
1
1
1
1

2.52
4.00
2.00
1.00
2.30

3100.00
187.00
1735.00
1950.00
125.00

7812
748
0
0
0

1.00

3777.00

3777

1.00

2975.00

1.00

1300.00

Total Material Cost


Excise
Sale TAX Against c Form
Octeria
Toat material Cost
Labour
Misc
Packing
Total
ADD Profit & O.H.
Total
For Size 20

2.00

2.52

Qty

Item
Basic Rate
Butt Hinges
Sash Lock with SS Handl
Vision Pannel
MISC Tape to Vision Pan

2.10

Amount

12337
781
262
401

10.00%
2%
3%

1
1
1

1
1
1

13782
1000
500
150

1000
500
150

15432
0
15432
6124
25720

0%

2.10

4.20

Per No
Sqm
6124

FABRICATION WORK :
GI ROLLING Shutter 18 gage MS
Size

3.00
Item

Shutter cost
Bearing Req
Top Cover
Centre Lock
Patti / Rod
Mechanical Gear
Painting
Electric motor
Total Material Cost
Add for SALE TAX
Transport
Total
ADD Profit & O.H.
Total

Rate Analysis

2.40
Rate

Qty
1
1
1
1
1
1
1
1

8.98
6.00
3.15
1.00
3.00
1.00
16.20
1.00

Sqmt
Nos
Nos

Nos
Sqmt
Nos

0%
1
0%

Page 16 of 17

2260
270
279
470
902
4500
50
30000

7.20
Amount
20286

0
810
0
21096
0
393
21488
0
21488
2984

Per No
Sqm

Windermere

M.S.Railing
L
D
No
Size
3.00
0.90
M
1 no. - 50 mm dia horz + 12 mm dia horz - 1 no. & 50 mm dia vertical
Vertical Pipe50 mm
0.9
3
Top Horz Pipe50 mm
3
1
Horizontal 12mm Bars
3
3
Sr. No

Description
1
2
3
4
5
6
7

Vetical Pipe 50 mm
Top Horz Pipe 50 mm
Horizontal 12 mm Bars
Base Plate
Bend
Labour
Painting

1
1
1
1
1
1
1

Total
ADD Over head & Profit
Total=

0%

Qty

Unit

Rate

Amount

14
15
8
0.66
2.00
1698
3

Kg
Kg
Kg
Kg
Nos
%
Rmt

45
45
45
45
100
50%
100

620
689
360
30
200
849
300

Rmt

3046
0
3046
1015

M.S.Ladder
Sr.No.
1.00
2.00
3.00
4.00
5.00

Length
Particular
M.S. AN GLE < 50X50X6
PIPE 40 MM
M.S.Rod
Painting
Labour

3.00
1.00
1.00
1.00
1.00
1.00

Rmt
Const
6.00
8.00
4.95
1.00

Total
ADD Profit & O.H.
Total

Wt
4.50
3.61
1.58

Qty.
27.00
28.88
7.8
1.0
25%

Amount
Rate
40.00
1080.00
45.00
1299.60
37.00
289.38
700.00
700.00
3368.98
842.2
4211
0
4211
1403.74

0%

P/L Structural Steel with Material


NO

ITEM
Steel
Painting
Hot dip galvanizing & Tra
Labour
Nut Bolt
ADD Profit & O.H.
Total

Rate Analysis

Const
1
1
1
1
1

1.05
1
1
1
1

Rate

Amount

40000
2600
17000
10000
500

42000
2600
10000
500
55100
0
55100 M.T
55.10 Kg

0%

Page 17 of 17

Windermere