Sample construction specification Here we have provided a few sample pages from a full construction specification document that

building designers and architects produce for clients. 1.1 LICENCE The Contractor and all Sub-contractors are to be licensed as required by law. 1.2 CONDITIONS OF CONTRACT The Contract is to be carried out in accordance with the standard form of contract agreement General Conditions of Contract (AS2124-1992) issued by the Standards Association of Australia. 1.3 GOODS & SERVICES TAX All material and labour costs and the Contractor's margin are to include applicable Goods & Services Tax (GST). 1.4 COMPLETION DATE Tenderers are to advise with their price a period of construction of the new building and this may be taken into account in assessing the most suitable contractor for the work. 1.5 VISIT SITE The Contractor and all Sub-contractors are to visit the site of the works to acquaint themselves with all conditions relating to their work. No claims arising from neglect of this procedure will be admitted by the Supervisor. 1.6 SITE INSTRUCTIONS All variations to the Contract will be conveyed to the Contractor by the Supervisor by letter or in site note form. No variations are to proceed without authorisation. The Contractor is to advise any cost increases and extensions of the construction period which may be caused by any variations to the Contract prior to proceeding with variation work. Naging close tayo ng Basta lng, Minahal kita ng Basta lang. Kaya hindi ko hahayaang mawala ka sakin ng Basta na lang
Kaya kitang PASAYAHIN sa paraang kaya ko .. Pero hindi kita kayang SAKTAN kahit alam ko kung paano.. Kapag INLOVE ka nkakalimutan mo ng MAGANDA ka.. kasi... KAHIT SA PANGET NAGSESELOS KA! american:what are you eating? filipino:an apple.. american:do you know in america only poor who eat the apple.. filipino:what you are eating? american:banana.. filipino:do you know here in Philippines only monkey eating a banana Boy: Ikaw yung babae na sumira sa PANGARAP ko. Girl: Huh?! Ano bang pangarap mo? Boy: Pangarap kong maging SINGLE habang-buhay Isang araw sa mcdo girl:isang chocolate sundae nga. crew: ma'am 25 pesos po girl:*nagbigay ng 100 pesos* crew: ma'am meron po ba kayong 5 pesos? girl: para kang ex-bf ko, binigay ko na nga lahat ng meron ako. nagkulang pa din ako? crew: (na-gets) ma'am hindi ko naman po sinabing nagkulang ka, minsan humihingi lang kami ng konting halaga para masuklian ka namin ng buo. Sana I.D. nalang kita, para kung sakaling mawala ka, .... Alam nilang akin ka.

8.1 EXTENT OF WORK Work under this Part comprises the installation complete of all waste and stormwater drainage, sanitary plumbing, hot and cold water service, grey water system and installation of all sanitary fixtures and fitments. 8.2 GENERALLY Carry out the whole of the soil and waste water drainage in strict accordance with this Specification, the regulations of the relevant Local Government Ordinance(s), Council By-Laws and any specific requirements of the Local Inspector. The whole of the work under this Part is to be carried out by or under direct supervision of a fully licensed Plumber and Drainer. After inspection, testing and approval, cover pipe runs by back-filling with sand to a minimum 75 mm depth above the pipe collars before placing the remaining depth of approved filling material. All existing drainage lines, disturbed, damaged and/or altered during the construction of the new building shall be made good, as required. Drawings showing hydraulic services show the general layout and are diagrammatic only. The Contractor is to prepare detailed layouts of services in conjunction with other trades, and to approval of the Local inspector.

S-ar putea să vă placă și