SHASHIBHUSHAN AGRAWAL

Chartered Engineer, BEE Certified Energy Auditor Panel Energy Auditor for MEDA, PCRA & IREDA. ANT L-II Certified Professional for LPT, UT, MT & RT

Ref:- Sample/Thermal Imaging

Date :-15/12/2011

Important Observations with Recommendations


S No. 1. 2. 3. 4. 5. 6. 7 8 9. 10. Location Name HVAC MCC-01 I/C 2F3 HVAC MCC-01 I/C 4F1MPCB O/G HVAC MCC-01 Incomer 6F1 . HVAC MCC-01 6F1 HVAC MCC-02 LHS Panel I/C 1F6 HVAC MCC-02 LHS Panel I/C 2F6 MCC-06 6R2 Star/Delta LHS MCC-06 6R2 Star/Delta RHS MCC-06 7F1 MLDB Incomer 2F6 Observations B Phase bus bar joint B Phase cable terminal All Phase cable terminal Y phase cable terminal R Phase cable terminal Y phase bus bar joint Y phase cable terminal Y phase cable terminal R phase cable B phase cable terminal B phase cable terminal B phase cable terminal Ne cable terminal Max. Temp. in C 66 107 62 101 102 68 89 89 88 57 Recommendations Check for the looseness of surface contact and rectify. Replace lugging. Need your immediate attention on this point. Check for the looseness of lugging and rectify. Replace lugging. Need your immediate attention on this point. Replace lugging and connector. Need your immediate attention on this point. Check for the looseness of surface contact and rectify. Check for the looseness of lugging, nut & bolt and rectify. Check for the looseness of lugging and rectify. Replace cable.

Check for the looseness of lugging and rectify. 11 MLDB Incomer 1F5 75 Check for the looseness of nut & bolt and rectify. 12 MPDB 1F3 61 Check for the looseness of nut & bolt and rectify. 13 MPDB 2F1 135 Replace termination and check for harmonics. Need your immediate attention on this point. 14 MCC-06 3R3 High temperature 65.2 Check for the looseness of lugging on cable terminal and rectify. I hereby certify that the information is true to best of my knowledge and belief. For Details refer Annexure-I.

Shashibhushan S Agrawal
B.E.(Mech) Chartered Engineer, BEE Certified Energy Auditor (EA-1090)

Annexure- I
HVAC MCC-01 I/C 2F3

Incident Summary
Location Incident Date B Phase Bus Joint 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
65.6

Comments: Observed high temp. On B Phase Bus Joint. Check for the looseness of surface contact and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

HVAC MCC-01 I/C 4F1MPCB O/G

Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
106.9

Comments: Observed high temp. On B Phase Cable Terminal. Replace lugging. Need your immediate attention on this point

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

HVAC MCC-01 Incomer 6F1

Incident Summary
Location Incident Date All Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
61.9

Comments: Observed high temp. On All Phase Cable Terminal. Check for the looseness of Lugging and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

HVAC MCC-01 6F1

Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
100.9

Comments: Observed high temp. On Y Phase Cable Terminal. Replace lugging. Need your immediate attention on this point

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

HVAC MCC-02 LHS Panel I/C 1F6

Incident Summary
Location Incident Date R Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
102.4

Comments: Observed high temp. On R Phase Bus bar. Replace connector. Need your immediate attention on this point

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

HVAC MCC-02 LHS Panel I/C 2F6

Incident Summary
Location Incident Date Y Phase Bus bar 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
85.0

Comments: Observed high temp. On Y Phase Bus bar. Check for the looseness of surface contact and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MCC-06 6R2 Star/Delta LHS

Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
89.4

Comments: Observed high temp. On Y Phase Cable Terminal. Check for the looseness of Lugging, Nut & Bolt and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MCC-06 6R2 Star/Delta RHS

Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
89.4

Comments: Observed high temp. On Y Phase Cable Terminal. Check for the looseness of Lugging and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MCC-06 7F1

Incident Summary
Location Incident Date R Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
88.4

Comments: Observed high temp. On R Phase Cable. Replace loop cable.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MLDB Incomer 2F6

Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
57.1

Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of Lugging and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MLDB Incomer 1F5

Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
75.2

Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of nut & bolt and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MPDB 1F3

Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
61.4

Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of Nut & Bolt and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MPDB 2F1

Incident Summary
Location Incident Date N Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
135.2

Comments:
Observed high temp. On Neutral Cable Terminal. Replace termination and also check for harmonics. Need Your immediate attention on this point.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________

MCC-06 3R3

Incident Summary
Location Incident Date MPB Cable Terminal 14/12/2011

Analysis Tool
Ar1 0.95

Max Temp*
65.2

Comments: Observed high temp. On MPB Cable Terminals. Check for the looseness of Lugging and rectify.

Action Taken________________________________________ Fault Rectified on ____________________________________ Fault Rectified by ____________________________________