Chartered Engineer, BEE Certified Energy Auditor Panel Energy Auditor for MEDA, PCRA & IREDA. ANT L-II Certified Professional for LPT, UT, MT & RT
Date :-15/12/2011
Check for the looseness of lugging and rectify. 11 MLDB Incomer 1F5 75 Check for the looseness of nut & bolt and rectify. 12 MPDB 1F3 61 Check for the looseness of nut & bolt and rectify. 13 MPDB 2F1 135 Replace termination and check for harmonics. Need your immediate attention on this point. 14 MCC-06 3R3 High temperature 65.2 Check for the looseness of lugging on cable terminal and rectify. I hereby certify that the information is true to best of my knowledge and belief. For Details refer Annexure-I.
Shashibhushan S Agrawal
B.E.(Mech) Chartered Engineer, BEE Certified Energy Auditor (EA-1090)
Annexure- I
HVAC MCC-01 I/C 2F3
Incident Summary
Location Incident Date B Phase Bus Joint 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
65.6
Comments: Observed high temp. On B Phase Bus Joint. Check for the looseness of surface contact and rectify.
Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
106.9
Comments: Observed high temp. On B Phase Cable Terminal. Replace lugging. Need your immediate attention on this point
Incident Summary
Location Incident Date All Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
61.9
Comments: Observed high temp. On All Phase Cable Terminal. Check for the looseness of Lugging and rectify.
Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
100.9
Comments: Observed high temp. On Y Phase Cable Terminal. Replace lugging. Need your immediate attention on this point
Incident Summary
Location Incident Date R Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
102.4
Comments: Observed high temp. On R Phase Bus bar. Replace connector. Need your immediate attention on this point
Incident Summary
Location Incident Date Y Phase Bus bar 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
85.0
Comments: Observed high temp. On Y Phase Bus bar. Check for the looseness of surface contact and rectify.
Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
89.4
Comments: Observed high temp. On Y Phase Cable Terminal. Check for the looseness of Lugging, Nut & Bolt and rectify.
Incident Summary
Location Incident Date Y Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
89.4
Comments: Observed high temp. On Y Phase Cable Terminal. Check for the looseness of Lugging and rectify.
MCC-06 7F1
Incident Summary
Location Incident Date R Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
88.4
Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
57.1
Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of Lugging and rectify.
Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
75.2
Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of nut & bolt and rectify.
MPDB 1F3
Incident Summary
Location Incident Date B Phase Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
61.4
Comments: Observed high temp. On B Phase Cable Terminal. Check for the looseness of Nut & Bolt and rectify.
MPDB 2F1
Incident Summary
Location Incident Date N Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
135.2
Comments:
Observed high temp. On Neutral Cable Terminal. Replace termination and also check for harmonics. Need Your immediate attention on this point.
MCC-06 3R3
Incident Summary
Location Incident Date MPB Cable Terminal 14/12/2011
Analysis Tool
Ar1 0.95
Max Temp*
65.2
Comments: Observed high temp. On MPB Cable Terminals. Check for the looseness of Lugging and rectify.