Documente Academic
Documente Profesional
Documente Cultură
TABLE OF CONTENTS
1. INTRODUCTION ........................................................................................1
2.
BACKGROUND .........................................................................................2
3.
3.1
3.1.1 Precautionary Measures ........................................................................................4 3.1.2 Procedures for Controlling Exposed Asbestos Products...............................................4 3.2 3.3 ASBESTOS WASTE MANAGEMENT POST DEVELOPMENT.......................................6 MANAGEMENT RESPONSIBILITIES ........................................................................6
4.
REFERENCES............................................................................................7
FIGURE
1 POSSIBLE LOCATION OF ASBESTOS DUMPS
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
1.
INTRODUCTION
In the event that any dumps containing asbestos product are encountered, measures need to be put in place to ensure they are handled appropriately to prevent the release of airborne fibres both in the short and long term. This Asbestos Waste Management Plan (AWMP) outlines measures to prevent the release of asbestos fibres whilst handling and relocating contaminated material during the remediation phase, and in the long term after development. The AWMP focuses on management practices for visible asbestos waste products such as lagging or asbestos cement. The management of trace asbestos fibres (not visible to the naked eye) is addressed along with other contaminants in the Waste Management Plan.
Page 1
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
2.
BACKGROUND
Asbestos products were widely used on the Workshops in the form of insulation such as in lagging and brake linings and fibre cement construction materials. Up until the 1970s asbestos products were mostly co-disposed into the waste fill material in an uncontrolled manner with large amounts of asbestos products dumped at specific locations. Within Helena West three specific areas were identified in the initial site audit (BBG, 1994) as potential dumps containing asbestos products, these are shown on Figure 1 and are: West of Coal Dam; Turntable Pit; and Waste Fill Embankment.
At the west of the coal dam, a 0.2ha triangular pit excavated to a depth of 2m in 1979 was used for the disposal of thermal and acoustic blankets from steam trains. Two separate investigations of the area: Helena Precinct Waste Fill Detailed Site Investigation (ENV, 2002) and Environmental Investigations, Midland Railway Workshops, Western Sector (Egis, 1999) could not identify the presence of asbestos waste. Canvas drop sheets were uncovered but found to contain fibreglass resin rather than asbestos products. The old locomotive turntable pit which covered an area of 400m2 and a depth of 2m was filled with thermal and acoustic asbestos products. Two separate investigations of the area: Helena Precinct Detailed Site Investigation (ENV, 2003) and Environmental Investigations, Midland Railway Workshops (Egis, 1998) could not identify the presence of asbestos waste. The location of the turntable was initially identified as west of the coal dam, however its location was determined from aerial photograph overlay to be southeast of the Engine Test Facility. The location of the turntable was discovered during site investigations but found to be backfilled with fill sand and clay rather than asbestos waste. A <500m2 portion of the waste fill embankment south of the Asbestos Removal Shed was used for the disposal of thermal and acoustic asbestos. This part of the embankment was investigated during the Helena Precinct Waste Fill Detailed Site Investigation (ENV, 2002). Asbestos fibres were detected in the general area, however no visible products or a specific dump were encountered.
Page 2
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
The potential asbestos dump locations will be clearly outlined to the Remediation Contractor prior to earthworks in case smaller dumps are encountered which were not found during the investigation phase. Asbestos dumps (AD) are not likely to be encountered in the proposed area of excavation based on the testwork performed to date. The waste fill embankment will be covered, so that specific dump location will not be excavated at all. Although not observed during site investigations, the potential exists for small AD to be situated within other parts of the site. During site remedial activities, a large volume of this soil will be excavated and AD may be encountered. In order to minimise the potential for asbestos release from exposure and removal of any AD, particular contingency measures have been prepared which are described in the following sections.
Page 3
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
3.
3.1
Where fibrous asbestos is encountered (as opposed to asbestos cement products) the site must be registered with Worksafe. The removal of fibrous asbestos must be conducted by a licensed asbestos removalist, under the
Page 4
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
authority and with the involvement of Worksafe who will determine the appropriate PPE. Where asbestos cement products have been encountered, the following measures must be undertaken to remove the asbestos: Only personnel with the appropriate PPE and training will be allowed to work inside the AD exclusion zone. The minimum protective equipment worn for personnel will be disposable coveralls and a personal air-purifying respirator; The asbestos will be placed by hand into plastic bags that are impermeable to asbestos dust in accordance with the Guidelines for Acceptance of Solid Waste to Landfill (DEP, 2001). The bags will be appropriately signed according to Australian Standard AS 1319 Safety Signs for the Occupational Environment and placed into leak proof containers. Earthmoving machinery will endeavour to minimise ground disturbance, dust generation and asbestos breakage. Material will be sprayed with low pressure water as it is loaded into the bags; A decontamination facility is to be provided for personnel in direct contact with the asbestos to ensure safe removal of their PPE Material from the AD will be disposed off-site to a landfill licensed to accept asbestos wastes in accordance with the Environmental Protection Controlled Waste Regulations (DEP, 2001); Trucks will be washed down before leaving the site in the designated washdown area (details in the Waste Management Plan). Used disposable coveralls and masks are to be removed prior to exiting the exclusion zone and placed in bags for disposal along with the other asbestos waste; and Asbestos fibres will be continuously monitored during all earthwork activities in this zone. Additional monitoring at the boundary of the AD exclusion zone will be performed to ensure personnel working outside of the AD exclusion zone have not been exposed to levels in excess of the capacity of their PPE. General asbestos monitoring will be performed at the boundary of the exclusion zone (see Dust and Air Quality Management Plan).
Page 5
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
3.2
3.3
MANAGEMENT RESPONSIBILITIES
Page 6
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
4.
REFERENCES
BBG, (1994). Midland Railway Workshops Site Environmental Audit, August 1994. DEP, (2001). Guidelines for Acceptance of Solid Waste to a Landfill. DEP, (2001). Environmental Protection Controlled Waste Regulations. Egis, (1999). Environmental Investigations, Midland Railway Workshops, Western Sector. January 1999. Egis, (1998). Environmental Investigations, Midland Railway Workshops. November 1998. ENV, (2003). Detailed Site Investigations, Helena West, Midland Railway Workshops. March 2003. ENV, (2002). Detailed Site Investigations, Helena Precinct Waste Fill, Midland Railway Workshops. September, 2002. NOHSC, (1992). Health (Asbestos) Regulations. National Occupational Health and Safety Council. Standards Australia. AS 1319. Safety Signs for the Occupational Environment.
Page 7
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
FIGURES
ENVProjects:2003P:2003P JOBS:MRA:SECTOR 7-13 Helena:03.013 Helena West EMP:REPORTS:03.013RP002Asb Plan FINAL copy
AREA H1A
Flood Plain
Waste Fill
LEGEND
Potential Dump Sites
50m
100m
Title:
Client: Scale:
Date: 12/6/03
Drawn by: KW