Documente Academic
Documente Profesional
Documente Cultură
Points Change Threshold Change Name Change New Credit Sustainable Sites LEED 2009 28 Points CSv2.0 Required 1 5 1 6 2 3 2 1 1 1 1 1 1 1 1 10 Required 2 2 2 2 2 37 Required Required Required 3 to 21 3 5 7 9 11 13 15 17 19 21 4 2 2 3 3 2 13 Required 3 1 1 1 1 1 1 1 1 1 1 12 Required Required 1 1 1 1 1 1 1 1 1 1 1 1 Required 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Points CSv2.0 X 1 1 1 1 1 Points CSv2.0 was WEc3.1 Notes Previous Version Notes
Prereq 1 Credit 1 Credit 2 Credit 3 Credit 4.1 Credit 4.2 Credit 4.3 Credit 4.4 Credit 5.1 Credit 5.2 Credit 6.1 Credit 6.2 Credit 7.1 Credit 7.2 Credit 8 Credit 9
Construction Activity Pollution Prevention Site Selection Development Density & Community Connectivity Brownfield Redevelopment Alternative Transportation, Public Transportation Access Alternative Transportation, Bicycle Storage & Changing Rooms Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles Alternative Transportation, Parking Capacity Site Development, Protect or Restore Habitat Site Development, Maximize Open Space Stormwater Design, Quantity Control Stormwater Design, Quality Control Heat Island Effect, Non-Roof Heat Island Effect, Roof Light Pollution Reduction Tenant Design & Construction Guidelines
Yes
No
Water Efficiency
Prereq 1 Credit 1.1 Credit 1.2 Credit 2 Credit 3.1 Credit 3.2
Yes ? No
Water Use Reduction, 20% Reduction Water Efficient Landscaping, Reduce by 50% Water Efficient Landscaping, No Potable Use or No Irrigation Innovative Wastewater Technologies Water Use Reduction, 30% Reduction Water Use Reduction, 40% Reduction
threshold change from 20% to 30% threshold change from 30% to 40% Notes
Energy & Atmosphere Y Y Y Fundamental Commissioning of the Building Energy Systems Prereq 2 Minimum Energy Performance: 10% New Bldgs or 5% Existing Bldg Renovations Fundamental Refrigerant Management Credit 1 Optimize Energy Performance 12% New Buildings or 8% Existing Building Renovations 16% New Buildings or 12% Existing Building Renovations 20% New Buildings or 16% Existing Building Renovations 24% New Buildings or 20% Existing Building Renovations 28% New Buildings or 24% Existing Building Renovations 32% New Buildings or 28% Existing Building Renovations 36% New Buildings or 32% Existing Building Renovations 40% New Buildings or 36% Existing Building Renovations 44% New Buildings or 40% Existing Building Renovations 48% New Buildings or 44% Existing Building Renovations Credit 2 On-Site Renewable Energy Credit 3 Enhanced Commissioning Credit 4 Enhanced Refrigerant Management Credit 5.1 Measurement & Verification: Base Building Credit 5.2 Measurement & Verification: Tenant Submetering Credit 6 Green Power
Prereq 1 Prereq 3
? No
Required Required Threshold change 14% to 10% Required 1 to 8 1 lowest threshold was 10.5/3.5%, changed to 12/8 2 3 4 5 6 7 8 highest threshold was 35/28%, changed to 48/44 1 1 1 1 1 1 Points CSv2.0 Required 1 1 1 1 1 1 1 1 1 1 1 Points CSv2.0 Required Required 1 1 1 1 1 1 1 1 1 1 1 1 Notes Notes
Yes
Storage & Collection of Recyclables Building Reuse, Maintain 25% of Existing Walls, Floors & Roof Building Reuse, Maintain 50% of Existing Walls, Floors & Roof Building Reuse, Maintain 75% of Existing Walls, Floors & Roof Construction Waste Management, Divert 50% from Disposal Construction Waste Management, Divert 75% from Disposal Materials Reuse, 5% Recycled Content, 10% (post-consumer + pre-consumer) Recycled Content, 20% (post-consumer + pre-consumer) Regional Materials, 10% Extracted, Processed & Manufactured Regionally Regional Materials, 20% Extracted, Processed & Manufactured Regionally Certified Wood
Minimum IAQ Performance Environmental Tobacco Smoke (ETS) Control Outdoor Air Delivery Monitoring Increased Ventilation Construction IAQ Management Plan, During Construction Low-Emitting Materials, Adhesives & Sealants Low-Emitting Materials, Paints & Coatings Low-Emitting Materials, Carpet Systems Flooring Systems Low-Emitting Materials, Composite Wood & Agrifiber Products Indoor Chemical & Pollutant Source Control Controllability of Systems, Thermal Comfort Thermal Comfort, Design Daylight & Views, Daylight 75% of Spaces Daylight & Views Views for 90% of Spaces
LEED for Core and Shell 2009 with comparison Project Scorecard
Project Name: Project Address:
Yes Yes ? ? No No
Points Change Threshold Change Name Change New Credit LEED 2009 Innovation & Design Process 6 1 1 1 1 1 1 4 1 1 1 1 Points CSv2.0 1 1 1 1 X 1 Points CSv2.0 X X X X Previous Version Notes
Credit 1.1 Credit 1.2 Credit 1.3 Credit 1.4 Credit 1.5 Credit 2
Yes ? No
Innovation in Design: Provide Specific Title Innovation in Design: Provide Specific Title Innovation in Design: Provide Specific Title Innovation in Design: Provide Specific Title Innovation in Design: Provide Specific Title LEED Accredited Professional
Notes
Region Specific Environmental Priority: Region Defined Region Specific Environmental Priority: Region Defined Region Specific Environmental Priority: Region Defined Region Specific Environmental Priority: Region Defined
Not Certified
Project Totals (Certification Estimates) 110 Points Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points
LEED 2009 Point Distribution eb cs ci 26 26 28 21 10 14 10 11 35 35 37 37 14 10 13 14 15 15 12 17 6 6 6 6 4 4 4 4 100 110 100 110 100 110 100 110
average 25.00 11.20 35.40 12.80 15.60 6.00 4.00 100 110
LEED 2009 Point Distribution - % difference from average nc eb cs ci k-12 average ss 1.0 1.0 3.0 -4.0 -1.0 0.00 we -1.2 2.8 -1.2 -0.2 -0.2 0.00 ea -0.4 -0.4 1.6 1.6 -2.4 0.00 1.2 -2.8 0.2 1.2 0.2 0.00 mr eq -0.6 -0.6 -3.6 1.4 3.4 0.00 id 0% 0% 0% 0% 0% 0.00 re 0% 0% 0% 0% 0% 0.00