Procedure ID no 0473/05
DOCUMENT CONTROL
Managed by: Phil OLoughlin Contact person: Voula Panayotopoulos Contact position: Director, Health and Safety Services Contact number: 8226 0949 Responsible position: Executive Director Human Resource & Workforce Development Approved by: Chief Executive Date approved: 11 September 2011 Next review date: 10 September 2014 Version: 1 File number: 0462/05 Status: FINAL Security classification: Health and Safety Services
20/04/11
Page 1-9
CONTENTS
1. TITLE...............................................................................................................................3 2. PURPOSE .......................................................................................................................3 3. SCOPE ............................................................................................................................3 4. OBJECTIVES ..................................................................................................................3 5. PROCEDURE DETAIL ....................................................................................................4 5.1 INTRODUCTION OF PLANT TO DECS SITES.....................................................5 5.2 REMOVAL / DISPOSAL OF PLANT FROM DECS SITES.....................................6 5.3 HIRE, LEASE OR LOAN OF PLANT .....................................................................6 5.4 PLANT MAINTENANCE........................................................................................6 6. ROLES AND RESPONSIBILITIES .................................................................................7 7. MONITORING, EVALUATION AND REVIEW ................................................................7 8. DEFINITIONS AND ABBREVIATIONS...........................................................................8 9. ASSOCIATED DOCUMENTS .........................................................................................9 10. REFERENCES ..............................................................................................................9
REVISION RECORD
Date Version Revision description
29/4/10
H&SS consultation
20/04/11
Page 2-9
1. TITLE
Plant Management Procedure.
2. PURPOSE
This procedure will provide direction and assistance to site managers and employees for the development of safe systems for the use of plant by: 2.1 Complying with relevant legislation, Australian Standards and codes of practice on plant management, and the South Australian Public Sector Code of Practice for Crown Self-Insured Employers. Complying with the DECS Standards for Plant (Part A and Part B). Complying with the DECS Risk Management Policy. Complying with the DECS Occupational Health, Safety & Welfare and Injury Management Policy. Satisfying the requirements of the Safety and Wellbeing in the Public Sector 2010-2015 Strategy (SWIPS).
3. SCOPE
This procedure applies to all DECS activities where plant is used.
4. OBJECTIVES
4.1 4.2 4.3 4.4 To develop and facilitate best practice plant management procedures. To reduce the incidence of workplace injury and illness. To assist site managers to identify, implement and review plant management measures. To satisfy the requirements of internal and external audits.
20/04/11
Page 3-9
5. PROCEDURE DETAIL
PLANT MANAGEMENT FLOWCHART
Site manager identifies the items of plant and places them in their Plant Register.
The hazards associated with plant and operation processes are identified.
20/04/11
Page 4-9
5.1
5.1.2
5.1.3
5.1.4
Control measures consistent with the Hierarchy of Controls are to be identified, and plans are made to implement the controls, in order to eliminate or minimise the risks (see DECS Hazard Management Procedure). Space is to be used appropriately, and plant stored safely and securely. Assessments of risk should consider the frequency and intensity of use, the skill of the operators and working environment, including: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) Any system of work associated with the use of the plant. Work spaces and work height. Work and floor surfaces. Lighting. Weather and heat. Access and egress. Underground cables and overhead powerlines. Level of tidiness.
5.1.5 5.1.6
5.1.7
Plant purchased for use in sites shall comply with the DECS Standards for Plant (Part A and Part B) or be subject to a risk assessment. Sheet, Gen 5 - Acquisition of Plant.
5.1.8 Plant shall be acquired in accordance with the directions described in the DECS Fact
5.1.9 The installation of plant at departmental sites is to be undertaken according to the DECS Standards for Plant (Part A and Part B) and the DECS Guidelines for the Safe Use of Machinery document.
5.1.10 Plant shall be commissioned by a competent person, and in a manner consistent with any advice or directions provided by the manufacturer or supplier. 5.1.11 Items of plant which require registration, such as large pressure vessels, must be identified and registered with SafeWork SA.
20/04/11
Page 5-9
5.2
5.3
(iii)
5.4
5.4.1
PLANT MAINTENANCE
Plant shall be maintained according to the manufacturers requirements and / or according to the DECS maintenance schedules, and accurate records kept of that maintenance.
5.4.2 Plant should be isolated before maintenance commences. Where plant is isolated for maintenance, and is either partially or totally shut down, it must not be capable of being re-energised such that a hazardous situation arises. 5.4.3 Plant should be routinely inspected for hazards and records of inspections kept.
20/04/11
Page 6-9
EMPLOYEE
7.2 7.3
20/04/11
Page 7-9
HIERARCHY OF CONTROLS
SITE MANAGER
PLANT
20/04/11
Page 8-9
9. ASSOCIATED DOCUMENTS
As a guide, records must be retained, in accordance with the following table:
Description of Record
Registers of equipment acquired.
Records relating to agency compliance with mandatory standards or statutory requirements relating to equipment and stores. Includes proof of compliance.
Authority Number: 3.21.1 2006/GDS15(V7) TEMPORARY : Destroy 5 years after action completed Authority Number: 3.34.2 2006/GDS15(V7) TEMPORARY : Destroy 5 years after action completed
Records relating to inventories of equipment and stores. Includes reports, lists, etc.
Authority Number: 3.59.1 2006/GDS15(V7) TEMPORARY : Destroy 3 years after last action
Authority Number: 3.67.4 2006/GDS15(V7) TEMPORARY : Destroy 5 years after last action
Records relating to hazard identification and risk assessment of foreseeable hazards in agency workplaces. Includes measures taken to eliminate or control risks
Authority Number: 2006/GDS15(V7) : 11.92.1 TEMPORARY - Retain until 2040, retention subject to a review at that date Authority Number: 2006/GDS15(V7) : 15.102.2 TEMPORARY Destroy 30 years after action completed.
Records relating to the provision of training and induction programs to agency staff and volunteers on OH&S matters. Includes hazard awareness training relevant to specific workplace conditions. Also includes training for managers on their OH&S responsibilities.
10. REFERENCES
DECS Hazard Management Procedure DECS Risk Management Policy DECS Standards for Plant (Part A and Part B) General Disposal Schedule 15, 7th Edition, Effective 14 November 2006 to 30 June 2011. Occupational Health, Safety and Welfare (OHS&W) Act 1986, Section 19 Duties of employers. Occupational Health, Safety and Welfare (OHS&W) Act 1986, Section 21 Duties of workers. Occupational Health, Safety and Welfare (OHS&W) Regulations 2010, Part 3 Plant. Plant and Equipment Risk Management, Victorian Department of Education and Early Childhood Development Department. Safety and Wellbeing in the Public Sector 2010 - 2015 Strategy, Department of the Premier and Cabinet, Public Sector Workforce Relations.
20/04/11
Page 9-9