Sunteți pe pagina 1din 35

ESSENTIAL DRUGS COMPANY LIMITED

395-397 TEJGAON INDUSTRIAL AREA DHAKA-1208, BANGLADESH

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LIMITED (3RD PLANT), GOPALGANJ, BANGLADESH VOLUME: 3 BILL OF QUANTITIES GENERATOR & SUBSTATION SCHEDULE-B2
September 2012

CONSULTANTS

Asia Pacific Consultants Pty Ltd

APC

ENVIRON STRUCTURE LTD. 86, Laboratory Road (Ground Floor), Dhanmondi, Dhaka-1205 Phone: +880-2-9660876, +880-2-9660851, email: esl_arch@yahoo.com

ABN 45 076 122 515 1265 Nepean Highway Cheltenham Victoria 3192 Australia

Also at: Sydney - Dhaka - Brno

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

1.0 1.1

Supply of 11KV AVR & By-pass Switch. Supply of 11KV Automatic Voltage Regulators according to NEMA and ANSIC57.12.31 or equivalent standards and shall meet latest requirements of BPDB/REB/DESA/DESCO. ( 1Set = 3 Nos.) Automatic Voltage Regulators shall be type tested 400A, 11KV, 3-phase/6.35KV, single phase in sealed tank design with digital Control panel, Ground clamps & standard accessories and as per following technical data/specification. Rated output : 264KVA Rated voltage : 11KV, 3-phase/6.35KV,1-phase Rated frequency : 50Hz Rated current : 328Amps Basic Insulation Level (BIL) : 95KV Rated range of regulation :+/-10% in 32steps of 0.625 % each Sealed tank design : Yes Cooling : Self Surge Protective device: 10KA, 9KV Temperature rise : Upto 65 degree C without increase the oxidation rate of Oil.

1 Set

/Set

Page-1 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

Provision for 220-240VAC, 50Hz test input voltage for testing of the voltage regulator with external power supply : Yes Micro-processor based control panel : Yes Non-PCB oil for the voltage regulator : Yes Accuracy class of regulator control panel : Class 1 Installation : Indoor/Outdoor Voltage Regulators shall be supplied with following spares : 6 Nos. Fuse 2 Nos. Position Indicator Glass 2 Nos. Oil Sight Gauge Glass 1no. 208KVA, 6.35KV, 1-phase, 50Hz, voltage regulator of above specification as spare. 1No. Digital control panel 1.2 Supply of sheet steel clad, dust & vermin proof, free standing, floor mounting, indoor type 11KV By-pass Switch panel boards model GH21D of self quenching, single phase, two position device LBS type with 20KA (1sec) and isolating or de-energizing of Auto Voltage Regulator as per following technical data/specification: ( 1Set=3Nos.) & Surge Arrester type 3EK7 Maximum design voltage : 15.5KV Basic Insulation Level (BIL) : 95KV

1 Set

/Set

Page-2 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

Rated Continuous Current : 630A Momentary ratings : Disconnect blades 40KA By-pass blade 30KA

1.3

SUPPLY OF 11KV SWITCHGEAR: Supply of sheet steel clad (14SWG) dust & vermin proof, free-standing, floor mounting type completely local factory assembled with heat proof painting, 11KV, 25KA, 50Hz, 3-phase indoor type high tension switchgear panel having 800Amps hard-drawn electrolytic copper busbars and comprising of the following components in accordance with NEMA /IEC/ VDE/BS/JIS standards (IEC298 or latest version) :

1 Set

/Set

1.3.1 Incomer feeder equipped with followings:a. 1- 630 Amps, 11KV, 50 Hz triple pole manual isolator and interlocked with earth switch rated at 2.1 KA at 3.0 seconds.

Page-3 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

b.

1-630Amps, 11 KV, 25KA, 50Hz, motor operated /spring charged stored energy mechanism draw out type VCB,manual closing /tripping device for emergency operation, maximum service voltage 12KV, short circuit breaking capacity 25KA, 24/48/110V, DC (with out battery) or 110V, AC from PT operated shunt tripping coil, mechanically ON/OFF/TRIP indicator. 2-11KV, cast resin insulated double pole potential transformer having ratio 11000/110V, (open delta), burden 50VA, class 0.5 for metering protection. 1-6A, TP MCB for P.T secondary protection. 3-11KV, cast resin insulated dry type double core current transformer having ratio 400/5/5A, burden 1015VA, for metering first core of class 0.5M5 and second core protection of class 10 P10. 1-Ammeter having scale 0-400A with 4-way selector switch. 1-Voltmeter having scale 0-15 KV with 7-way selector switch.

c.

d. e.

f. g.

Page-4 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

h.

1-Triple pole solid state micro-processor operated self powered IDMT relay with 2(two) over current instantaneous element & short circuit and one earth fault protection element with standard setting having in-built power for tripping the circuit breaker. 3-Indicating lamps ON/OFF/TRIP. 1-Panel heater with thermostat. SUPPLY OF 11KV SWITCHGEAR: Supply of sheet steel clad (14SWG) dust & vermin proof, free-standing, floor mounting type completely local factory assembled with heat proof painting, 11KV, 25KA, 50Hz, 3-phase indoor type high tension switchgear panel having 800Amps hard-drawn electrolytic copper busbars and comprising of the following components in accordance with NEMA /IEC/ VDE/BS/JIS standards (IEC298 or latest version) : 1 Set /Set

i. j. 2.0 2.1

2.1.1 11KV INCOMER FEEDER:

Page-5 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

Incomer feeder equipped with followings:a. 1- 630 Amps, 11KV, 50 Hz triple pole manual isolator and interlocked with earth switch rated at 2.1 KA at 3.0 seconds. 1-630Amps, 11 KV, 25KA, 50Hz, motor operated /spring charged stored energy mechanism draw out type VCB,manual closing /tripping device for emergency operation, maximum service voltage 12KV, short circuit breaking capacity 25KA, 24/48/110V, DC (with out battery) or 110V, AC from PT operated shunt tripping coil, mechanically ON/OFF/TRIP indicator. 2-11KV, cast resin insulated double pole potential transformer having ratio 11000/110V, (open delta), burden 50VA, class 0.5 for metering protection. 1-6A, TP MCB for P.T secondary protection. 3-11KV, cast resin insulated dry type double core current transformer having ratio 400/5/5A, burden 1015VA, for metering first core of class 0.5M5 and second core protection of class 10 P10.

b.

c.

d. e.

Page-6 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

f. g. h.

1-Ammeter having scale 0-400A with 4-way selector switch. 1-Voltmeter having scale 0-15 KV with 7-way selector switch. 1-Triple pole solid state micro-processor operated self powered IDMT relay with 2(two) over current instantaneous element & short circuit and one earth fault protection element with standard setting having in-built power for tripping the circuit breaker. 3-Indicating lamps ON/OFF/TRIP. 1-Panel heater with thermostat. 2 Sets /Set

i. j.

1.1.2 11KV OUTGOING FEEDERS : Outgoing feeders equipped with followings:a. 1- 630 Amps, 11KV, 50 Hz triple pole manual isolator and interlocked with earth switch rated at 2.1 KA at 3.0 seconds.

Page-7 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

b.

1-630Amps, 11 KV, 25KA, 50Hz, motor operated /spring charged stored energy mechanism fixed type VCB,manual closing /tripping device for emergency operation, maximum service voltage 12KV, short circuit breaking capacity 25KA, 24/48/110V, DC (with out battery) or 110V, AC from PT operated shunt tripping coil, mechanically ON/OFF/TRIP indicator. 3-11KV, cast resin insulated dry type double core current transformer having ratio 150/5/5A, burden 1015VA, for metering first core of class 0.5M5 and second core protection of class 10 P10. 1-Ammeter having scale 0-200A with 4-way selector switch. 1-Triple pole solid state micro-processor operated self powered IDMT relay with 2(two) over current instantaneous element & short circuit and one earth fault protection element with standard setting having in-built power for tripping the circuit breaker. 3-Indicating lamps ON/OFF/TRIP.
Page-8 of 34

c.

d. e.

f.

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

g. 3.0 3.1

1-Panel heater with thermostat. SUPPLY OF 2500KVA TRANSFORMERS : Supply of 2500KVA dry type, cast resin insulated power transformer shall be complying generally with IEC726, VDE0532, etc. of following specifications: Voltage ratio: 11000/415V. Type of cooling : AN 3-Phase, 50Hz, Vector Group DYn-11. Impedance volt: 6%~8% Terminal : HT & LT to be brought out in separate terminals. HT suitable for XLPE/PVC cable of maximum 185mm2 and L.T suitable for BBT connection. Type of loading: Distribution. Tapping +/-2.5%, +/-5%, -7.5% of constant KVA output on H.V. Off-load manually operated tap changer. 2 Sets /Set

Page-9 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

Permissible average winding temperature rise 100deg.K on the high voltage side & 100deg.K on the low voltage side. Provision for radial fans for power increase. With noise reduction supporting blocks. Temperature sensors with alarm & tripping system. Mounted on wheels and fitted with all necessary accessories. 4.0 4.1 SUPPLY OF L.T. PANELS: Sheet steel clad, free standing, floor mounting Low Tension cubical type switchgear according to IEC4391 for 415V, 3-Phase, 4-Wire, 50Hz operation complete with all wiring accessories, hard drawn electrolytic copper busbars of appropriate ratings & equipped with the followings : 2 Sets /Set

4.1.1 L.T. PANEL-2 & 6 : Incoming :

Page-10 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

1X4000A, 100KA, TP motorised ACB with micro processor based selectively operating built-inadjustable overload, adjustable short circuit protection, ON-OFF & Trip indicating auxiliary contacts & having provisions for BBT connections & having Electrical Interlocking facilities. 3-Current Transformer ratio: 4000/5A, with adequate accuracy and burden. 3 nos. Ammeter (0-4000A) 1-Volt meter with selector switch 1-Push button ON,OFF. 3-Indicating lamps ON/OFF/TRIP. 4.1.2 L.T. PANEL-4 & 5 : Incoming : 2 Sets /Set

Page-11 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

1X5000A, 100KA, TP motorised ACB with micro processor based selectively operating built-inadjustable overload, adjustable short circuit protection, ON-OFF & Trip indicating auxiliary contacts & having provisions for BBT connections & having Electrical Interlocking facilities. 3-Current Transformer ratio: 5000/5A, with adequate accuracy and burden. 3 nos. Ammeter (0-5000A) 1-Volt meter with selector switch 1-Push button ON,OFF. 3-Indicating lamps ON/OFF/TRIP. (LT-3 & LT-4 shall act as automatic C.O.S) 4.1.3 L.T. PANEL-4 (BUS COUPLER) : BUS COUPLER : 1X5000A, 100KA, TP motorised ACB with micro processor based built-in-adjustable overload, adjustable short circuit protection, ON-OFF & Trip indicating auxiliary contacts.
Page-12 of 34

1 Set

/Set

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

1-Push button ON,OFF. 3-Indicating lamps ON/OFF/TRIP. 4.1.4 LT-7 (NON ESSENTIAL PANEL) ; Outgoing: 1X2500A, 80KA, TP motorised ACB with micro processor based built-in-adjustable overload, adjustable short circuit protection, ON-OFF & Trip indicating auxiliary contacts. 1X1200A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X1000A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X800A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X630A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X400A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X300A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases.
Page-13 of 34

1 Set

/Set

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

2X250A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X200A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X160A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 1X100A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X63A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 4.1.5 LT-1(ESSENTIAL PANEL) ; Outgoing: 1X2500A, 80KA, TP motorised ACB with micro processor based built-in-adjustable overload, adjustable short circuit protection, ON-OFF & Trip indicating auxiliary contacts. 2X1000A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X800A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 1 Set /Set

Page-14 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

7X630A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X400A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 2X300A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X250A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 1X200A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 3X100A, 50KA, TP MCCB with built in adjustable overload & adjustable short circuit releases. 5.0 SUPPLY OF 1500KVAR AUTOMATIC PFI PLANT:

Page-15 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

5.1

Supply of 1500KVAR automatic PFI plant of following 415 volt, 3-phase, 50Hz. power factor improvement plant complete with TP busbars and earth block, micro processor controlled auto power factor correction relay with digital PFI reading display, capacitor bank, contactor, fuse, etc. locally factory assembled in 14SWG sheet steel clad dust & vermin proof, free standing, floor mounting, epoxy resin powder coat painted cabinet, contactors, capacitor bank, relays, discharge resistor, fuse etc. shall comply NEMA/IEC/VDE /BS /JIS standard. 3nos. 415V, 3200A hard drawn electrolytic copper busbar.

2 Sets /Set

1-12 steps digital power factor correction relay with in-built power factor meter.
1-25KVAR TP Power capacitor bank, rated 415V, 50Hz with built in/separate discharge coil for connection directly with line through fuse. 1-25KVAR TP Power capacitor bank, rated 415V, 50Hz with built in/separate discharge resistor.

Page-16 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

3-50KVAR TP Power capacitor bank, rated 415V, 50Hz with built in/separate discharge resistor. 1-100KVAR TP Power capacitor bank, rated 415V,50Hz with built in/separate discharge resistor. 6-200KVAR TP Power capacitor bank, rated 415V,50Hz with built in/separate discharge resistor. 1 Nos. - 415V, 40 Amps, 50Hz. Auto TP magnetic contactor with AC3 duty. 3 Nos. - 415V, 80 Amps, 50Hz. Auto TP magnetic contactor with AC3 duty. 1 No. - 415V, 160 Amps, 50Hz. Auto TP magnetic contactor with AC3 duty. 6 Nos. - 415V, 300 Amps, 50Hz. Auto TP magnetic contactor with AC3 duty. 6 Nos.-415V, 50 Amps HRC fuses with base. 9 Nos.-415V, 100 Amps HRC fuses with base. 3 Nos.-415V, 200 Amps HRC fuses with base. 18 Nos.-415V, 400 Amps HRC fuses with base.

1-Auto/Manual selector switch.


6.0 SUPPLY OF BUSBAR TRUNKING SYSTEM :
Page-17 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

6.1

Supply of imported Type Tested Assembly (TTA) 4000A TP+N+E of low impedance, low reactance, totally enclosed, Busbar Trunking system from reputed manufacturer and conforming to IEC-439-1&2 as per specification and drawing with all necessary bends, closed type transformer connection units, distribution board(LT) connection units, fixing brackets etc. for connecting transformer No.-1 secondary terminals with LT panel-1 (BBT-1) & connecting transformer No.-2 secondary terminals with LT panel-5 (BBT-2).

2 Lots /Lot

Page-18 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

6.2

Supply of imported Type Tested Assembly (TTA) 5000A TP+N+E of low impedance, low reactance, totally enclosed, Busbar Trunking system from reputed manufacturer and conforming to IEC-439-1&2 as per specification and drawing with all necessary bends, closed type transformer connection units, distribution board(LT) connection units, fixing brackets etc. for connecting Syn. Gen. panel with LT panel-2 (BBT-3) & connecting Syn. Gen. panel with LT panel-4 (BBT-4). CABLE WORKS: Supply & installation of 1C-185mm2 XLPE /NYSEYFGbY 11KV cable having ISO9001 certificate in cable trench/PVC pipes for connecting the 11KV switchgear & transformer H T terminal including termination of connection at both ends with heat shrink termination kit as per drawing and specification.

2 Lots /Lot

7.0 7.1

150 M

/M

Page-19 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

This rate is inclusive of trench/ sheet steel cable tray making, pit making, brick cable cover, sheet steel trench cover necessary 125mm dia C-class PVC/GI pipes for road crossing etc. as per shown in the drawings.
7.2

Supply & installation of 3C-240mm2 XLPE /NYSEYFGbY, 11KV cable from reputed manufacturer's having ISO9001 certified company & BSTI approved in cable trench/ pipes for connecting the 11KV line of DESCO/ DPDC with 11KV switchgears & the transformer H.T terminal with H.T switchgear including termination of connection at both ends with heat shrink termination kit as per drawing & specification.

150 M

/M

Page-20 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

7.3

Supply & installation of LT cable of following sizes & LT Cable from reputed manufacturer's having ISO9001 certified company & BSTI approved in cable trench/ pipes for connecting in trench/PVC pipe/tray including termination of connection at both ends as per drawing & specification. This rate is inclusive of cable glands etc. as per site requirements & as shown in the drawings. 1500 M 200 M /M /M

7.3.1 1C-300mm2 XLPE 7.3.2 1C-400mm2 XLPE 8.0 8.1 CABLE TRAY/LADDER: Supply and installation of cable tray/ ladder made of 18SWG galvanized sheet steel/angle bar, flat bar of necessary hangers, supports, cover junction box, hangers, clamps, bends, nuts, bolts, washer & all other accessories as per drawing, specifications & direction of the Engr-in-charge.

8.1.1 600mm width, 80mm-depth 8.1.2 400mm width, 80mm-depth

100 M 20 M

/M /M

Page-21 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

9.0 9.1

Installation of 11 KV Automatic Voltage Regulators and By-pass Switch Installation, testing & commissioning of 11KV Automatic Voltage Regulators and By-pass Switch as detailed in item no. 1.0 including carrying the equipment, making necessary civil foundation, supply & fixing of 11 kV pole and cross-arm, 11 kV cable termination, equipment earthing and all necessary fittings, fixings, accessories as required and as per per direction of the Engineer-in-charge. 1 /Set /Set

10.0 INSTALLATION OF H.T. GEAR: 10.1 Installation, testing & commissioning of sheet steel clad, dust and vermin proof floor mounted and free standing type HT switchgear as detailed in item no. 2.0 including carrying the equipment, making the necessary foundation & all necessary fittings, fixings, accessories as required and all direction of the Engineer-in-charge. 11.0 INSTALLATION OF 2500KVA TRANSFORMER: 4 Sets /Set

Page-22 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

11.1 Installation, testing & commissioning of 2500KVA transformer as detailed in item no. 3.0 including carrying the equipment, making the necessary foundation, repair the foundation during carrying and all necessary fittings, fixings, accessories as required & all direction of the Engr-in-charge. 12.0 INSTALLATION OF L.T PANEL : 12.1 Installation, testing & commissioning of Low Tension Cubicle type switchgear type metal enclosed detailed in item no. 4.0 suitable for 415V, 3-phase, 4-wire, 50hz, operation complete with all wiring, gutter space for maximum size cable & entrance suitable for both top and bottom entry. All metal parts must be bonded to suitable ground points.The item including carrying the equipment, making the necessary foundation, trench making with cover & all necessary fittings, fixings, accessories per required and all direction of the Engineer-in-charge.

2 Sets /Set

7 Sets /Set

13.0 INSTALLATION OF 1500KVAR AUTOMATIC PFI PLANT:

Page-23 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

13.1 Installation, testing & commissioning of 1500KVAR Automatic PFI plant as detailed in item no. 5.0 with necessary Interconnections with the L.T panel including carrying the equipment, making the necessary foundation, trench making with cover & all necessary fittings, fixings, accessories required as per drawings, specifications and direction of the Engineerin-charge. 14.0 INSTALLATION OF BUSBAR TRUNKING: 14.1 Installation, testing & commissioning of 4000A TP+N+E / 5000A TP+N+E Busbar Trunking System with all its accessories as detailed in items no. 6.1 & 6.2 as per specifications, manufacturers drawings & direction of the Engineer-in- charge.

2 Sets /Set

4 Lots /Lot

Page-24 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

The rate should be enclosed of all require installation materials for this item including the cost of connecting cables, necessary civil works line cutting & breaking of walls/columns /ceiling/floor, mending the same with plastering & painting (approved colour) as per instruction of the Engineer-in-charge. (The rate should be enclosed of all require installation materials for this item) 15.0 FIRE EXTINGUISHER: 15.1 Supply and installation of wall mounted 6Kg. Fire Extinguisher type BCEF complete with charge and fixing accessories at the location shown on the drawing as per specification and direction of the Engineer-in charge. 16.0 EARTHING SYSTEM: 10 Set /Set

Page-25 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

16.1 Supply and installation of 38.10mm dia GI pipe earth electrode having 6.35mm dia holes across the dia at 305mm interval securedly bonded with washer, nuts, bolts etc. sunk upto a depth to attain a earth resistance of minimum 1(one) ohm (for each electrode) including blind socket for water pouring facility etc. complete as per direction of the Engineer-in-charge.

11 Sets /Set

16.2 Construction of 600X600X600mm earth inspection pit with R.C.C cover as per drawing & instruction of the Engineer-in-charge. 16.3 Supply & installation of solid copper wire earthing lead 2X2/0 SWG in 38mm dia G.I. pipe and termination of connections at both ends as per drawing & specifications.

11 Sets /Set

170 M

/M

Page-26 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

16.4 Supply & installation of following sizes cable from Eastern Cable/Paradise/BRB cable or its equivalent manufacturers having ISO9001 certificate for grounding the neutral of transformers & generators, equipments to required sizes Equi-potential bars including G.I pipe & termination of connection with termination kits at both ends as per direction of the Engineer-in-charge. 16.1.11C-400mm2 NYY for neutral of transformer 16.1.21C-300mm2 NYY for Equi-potential bar to various equipments 16.1.3Equi-potential earth bar (100mm X 10mm X 600mm) with all other facilities for cable connection. 17.0 SUPPLY OF 2200KVA DIESEL GENERATOR SETS : 100 M 120 M /M /M

6 Sets /Set

Page-27 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

17.1 Supply of 2200KVA (Prime Power rating), 415V, 3Phase diesel generator sets, generator control panels, master control with auto paralleling, auto synchronizing, auto load sharing panel, auto load demand, cooling tower, 3nos. 4000A 4P ACB, digital Ammeter & voltmeter with selector switch, auxiliary relays, hospital type silencer, main storage fuel tank for three days operation, daily fuel tank, 400RT-3nos. and all other accessories as per drawing, specification & direction of the Engineer-in-charge.

3 Sets /Set

17.2 Supply & installation of local made whole room sound

1 Set

/Set

proof system to house 3x2200KVA Generator sets with service entrance door, fresh air inlet & hot air discharge outlet fans(as requried) , noise level 85dBA @ 1 m in free field. 18.0 SUPPLY OF GENERATOR SYNCHRONIZING PANEL:

Page-28 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

18.1 Sheet steel clad, free standing, floor mounting Low Tension cubical type switchgear according to IEC4391 for 415V, 3-Phase, 4-Wire, 50Hz operation complete with all wiring accessories, hard drawn electrolytic copper busbars of appropriate ratings & equipped with the followings : 18.1.1 GENERATOR SYNCHRONIZING PANEL: Incoming : 3X4000A, 100KA, TP motorised ACB with micro processor based selectively operating built-inadjustable overload, adjustable short circuit protection indicating auxiliary contacts. 1-Push button ON,OFF. 3-Indicating lamps ON/OFF/TRIP. Outgoing: 2X5000A, 100KA, TP ACB with built in adjustable overload & adjustable short circuit protection, ONOFF-TRIP indicating auxiliary contacts & having provisions for BBT connections. 1-Push button ON,OFF.
Page-29 of 34

1 Set

/Set

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

3-Indicating lamps ON/OFF/TRIP. 19.0 INSTALLATION OF 2200KVA D.G SETS : 19.1 Installation,testing & commissioning of 22000KVA Generator diesel generator set with all its accessories as detailed in item no. 17.1 i.e. batteries, battery charger & control panel. This item shall also include carrying of equipment, necessary foundation works, isolating pad, trench making with cover, supply of control cables , cable lugs, PIB insulating tapes, exhaust system(silencer extension), PVC tapes & all other necessary accessories for commissioning as per site conditions, as per drawing, specifications and instructions of the Engineer-in-charge. 3 Sets /Set

20.0 INSTALLATION OF GENERATOR SYNCHRONIZING PANEL:

Page-30 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

20.1 Installation, testing & commissioning of Low Tension Cubicle type switchgear type metal enclosed detailed in item no. 18.0 suitable for 415V, 3-phase, 4-wire, 50hz, operation complete with all wiring, gutter space for maximum size cable & entrance suitable for both top and bottom entry. All metal parts must be bonded to suitable ground points.The item including carrying the equipment, making the necessary foundation, trench making with cover & all necessary fittings, fixings, accessories per required and all direction of the Engineer-in-charge.

1 Set

/Set

Page-31 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

21.0 Miscellaneous charges for obtaining H.T power from PDB/REB including supply fittings, fixing of 11KV ghtning arrester & dropout fuse and others accessories as required for bringing 11KV power from PDB/REBs cable/overhead line with necessary connections with H.T switch gear including taking permission for commissioning from Electrical licensing Board of Bangladesh, Fire Brigade & permission for road cutting from concerned Department /authority and mending good the damages after laying the cable. The security money & Licencing Board fee, Fire Brigade fees and Pourashava charges will be directly paid to Bangladesh Bank Treasury on submission of deposit slip/city corporation cost memo by the Contractor. The contractor will not include in this item the amount of security deposit, H.T Metering fees & Licencing Board fee.

1 Lot /Lot

Page-32 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

The contractor shall be responsible for communicating with Pourashava, Fire Brigade department & Licencing Board in time and shall submit application forms for commissioning and complete all other formalities on behalf of Client till the sub-station is commissioning and handed over to the Client.

22

15KW ON-GRID TIE SOLAR SYSTEM


90 Set /Set

22.1 Poly-Crystaline Solar Panel Maximum Peak Power (Wp)-180 W Nominal Voltage (Vmp)-34.8 V Nominal Current (Imp)-4.89 A Open Circuit Voltage (Voc)-43.5 V Short Circuit Current (Isc)-5.3 A Solar Cell -60 Operating Temperature -45 2C 22.2 Inverter (Grid Tied PV Inverter)

Page-33 of 34

ESTABLISHMENT OF ESSENTIAL DRUGS COMPANY LTD.(3RD PLANT) INCLUDING CONSTRUCTION,SUPPLY,ERECTION, TESTING, COMMISSIONING AND VALIDATION OF THE PHARMACEUTICAL PLANT AT GOPALGANJ ON TURNKEY BASIS
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 2NOS. 2500KVA SUB-STATION EQUIPMENTS FOR "EDCL" AT GOPALGANJ

Schedule No.B2 - Plant and Mandatory Spare Parts Supplied from Abroad including Installation and other Services Supply of Plant and Mandatory Spare Parts (Foreign Currency in __) Unit Rate CFR Total Price CFR Installation, Commissioning, Validation and Other Services Unit Price
Local Currency Portion Foreign Currency Portion

Sl. No.

Description of Items

Countr y of Qty Unit Origin

Total Price
Local Currency Portion Foreign Currency Portion

Output Power 15KW,380 V AC ,50 2 Hz , 1 Modified Sine Wave and input Voltage Range (Max Voc) 475V DC. Max DC Current 68A with Under/Over Voltage & Frequency Protection & Communication RS232 / RS485 with operating Software including EMI / RFI Filter . 22.3 Metering Unit & Other Connection DC Operating Meter AC 3 Ph direct Meter Mechanical Structure Monitoring Through PC Cable, Nut, Screw 1 1 L/S 1 L/S

Set

/Set

Set Set L/S Set L/S

/Set /Set /Set /Set /Set TOTAL TK.