Name of Machine
Unit
Hire charges without diesel but with Provision for diesel per operational staff M.oil, Km/or per hr. (in liters) spares & lubricants 1300 0.3 per km
Idle charges
Dumpers 7-10 tonne capacity Hydraulic excavator/ loader likeJCB/Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity (a) upto 0.40 cum (b) above 0.40 & upto 0.75 cum (c) above 0.75 cum Karawha
Day
350
3 3
S.No.
Item Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (A) Machinary components (i) Use of hydraulic excavator & labour J.C.B. type excavator (0.40 cum Bucket capacity) hourly rate
Rate in Material
Total
Unit
Ref
P Hr P Hr P Hr
(ii)
Use of Dumpers & Hourly rate for Dumper Amount for Disel
162.50
P Hr P Hr P Hr
(a)
For the strata Soft/Loose soil (out put per hour) Machinary required as J.C.B. Dumper
70.00
Cum
919.50
1.00
No No
3.00 382.00 Total of (a) Total charges forn Machinary per hour with POL
S.No. ii
Basic Rate In Item Labour component for daily transportation of equipments to camp, disel storage, camp facilities, welfare & medical facilities @ 5% of total of (a) i.e. on
Rate in Material
Total
Unit
Ref
2065.50 iii Component for labour for excavation in bed sides, finishing & dressing for 10% of Quantity of per hour output ie. Of 70 cum = 7 cum
103.28
2/7 beldar required for 1 cum, therefore for 7 cum no of beldar required T&P and Labour welfare 3%+Sundaries1% contractor profit 10% = 14% on
2.0
135
270.00
No
270.00
14
Total Total rate for 70 cum of excavation = (a)+(b)+= Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on
2476.58
100.55 2577.13
Say (b) For the strata Hard / dense soil soil (out put per hour)
60.00
Cum
S.No. i
Rate in Material
Total
Unit
Ref
1.00
919.50
No No
3.00 @ 382.00 Total of (a) Total charges forn Machinary per hour with POL ii component for daily transportation of equipments to camp, disel storage, camp facilities, welfare $ medical facilities @ 5% of total of (a) i.e. on
1839.00 iii Component for labour for excavation in bed sides, finishing & dressing for 10% of Quantity of per hour output ie. Of 60 cum = 6 cum
91.95
1/3 beldar required for 1 cum, therefore for 6 cum no of beldar required = T&P and Labour welfare 3%+Sundaries1% contractor profit 10% I.e = 14% on
2.0
135
270.00
No
270.00
14
Total Total rate for 70 cum of excavation = (a)+(b)+= Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on
2238.75
90.89 2329.64
S.No.
Item
Basic Rate Rate in In Material Total Labour Therefore rate for per cum
Ref
Say (c) For the strata Hard / Dence soil soil (out put per hour) Machinary required as J.C.B. Dumper
40.00
Cum
1.00
919.50
No No
ii
2.00 @ 382.00 Total of (a) Total charges forn Machinary per hour with POL component for daily transportation of equipments to camp, disel storage, camp facilities, welfare $ medical facilities @ 5% of total of (a) i.e. on
1839.00 iii Component for labour for excavation in bed sides, finishing & dressing for 10% of Quantity of per hour output ie. Of 40 cum = 4 cum
91.95
5/8 beldar required for 1 cum, therefore for 4 cum no of beldar required = T&P and Labour welfare 3%+Sundaries1% contractor profit 10% = 14% i.e. on
2.5
135
337.50
No
337.50
14 Total
47.25 384.75
S.No.
Basic Rate Rate in In Material Total Item Labour Unit Total rate for 70 cum of excavation = (a)+(b)+= 2315.70 Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on 2315.70 94.02 2409.72 Therefore rate for per cum 60.24 60.00 Cum
Ref
Say Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect.
Analysis for excavation in different type of strata (A) (i) Machinary components Use of hydraulic excavator & labour Hitachi or L&T type excavator (0.75 cum Bucket capacity) hourly rate Hourly rate Amount for Disel
Per Hr P Hr P Hr
(ii)
162.50
162.50
P Hr
S.No.
Rate in Material
Unit P Hr P Hr
Ref
(a)
For strata Soft / Disintegrated rock (out put per hour) Machinary required as J.C.B. Dumper
45.00
Cum
1.00
1908.50
No No
2.00 @ 294.20 Total of (a) Total charges forn Machinary per hour with POL
ii
component for daily transportation of equipments to camp, disel storage, camp facilities, welfare $ medical facilities @ 5% of total of (a) i.e. on 2496.90 5 124.85 %
iii
Component for labour for excavation in bed sides, finishing & dressing for 10% of Quantity of per hour output ie. of 45 cum = 4.5 cum
1 beldar required for 1 cum, therefore for 4.5 cum no of beldar required = T&P and Labour welfare 3%+Sundaries1% contractor profit 10% = 14% on
4.5
135
607.50
No
607.50
14
S.No.
Basic Rate In Item Labour Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on 3489.75
Rate in Material
Total
Unit
Ref
141.68 1547.48
Say
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 50 m and lift up to 1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect.
(i)
Machinary Component Use of hydraulic excavator & labour J.C.B. type excavator (0.750 cum Bucket capacity) hourly rate
P Hr P Hr P Hr
S.No. (ii)
iii
iv
ii
Basic Rate Rate in In Material Total Item Labour Unit Use of Dumpers & Hourly rate for Dumper 162.50 162.50 P Hr Amount for Disel 3.00 131.70 P Hr @ 43.90 Total hourly rate for one no of Dumper 294.20 P Hr Use of Tractor up to 75.00 75.00 P Hr 40 hp Amount for Disel 0.20 8.78 P Hr @ 43.90 Total hourly rate for one no of Tractor 83.78 P Hr Use of Karwa 60.00 60.00 P Hr Assuming per hour 70.00 Cum out put as cum Machinary required 60.00 as: J.C.B. 1.00 1568.28 no @ 1568.28 Dumper 3.00 882.60 no @ 294.20 Tractor up to 40 hp 1.00 83.78 no @ 83.78 Karawha 1.00 60.00 no @ 60.00 Total of (a) {Total charges for Machinary for 1 hr with POL} 2654.66 component for daily transportation of equipments to camp, disel storage, camp facilities, welfare& medical facilities 5% on 2654.66 5 132.73 %
Ref
iii
Component for labour for breaking of clods, sorting of grass, pebbles etc. & dressing for 10% of qty. of per hour output ie. 10 % of 70 cum =7 cum
S.No.
Basic Rate In Item Labour 1/2 beldar required for 1 cum, therefore for 7 cum no of beldar required=3.5 no 3.50 Mate Mistry 1/8 1/30 @ @ @
Rate in Material
Total
Unit
Ref
no no no
T&P and Labour welfare 3%+Sundaries1% contractor profit 10% I.e = 14% on
497.46
14
69.64 567.10
Total rate for 80 cum of excavation =i+ii+iii= Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on
3354.48
3354.48
4.06
136.19 3490.67
Say a. Extra charges for lead beyond 50m and upto 250 m. Extra charges for lead beyond 250m and upto 750m ( km)
4.10
Cum
b.
4.60 c. Add extra for each subsequent lead of 500m or part thereof beyond Km and up to 5 km
Cum
4.10
Cum
S.No. d.
Basic Rate In Item Labour Add extra beyond 5km for each subsequent km. or part there-of.
Rate in Material
Total
Unit
Ref
6.20
Cum
Compaction of earth or highly weathered strata 4 Irrigation anaylsis Chapter V Part "B" Item 20 a. By manually or plain roller. (density 90% of Proctor) Hire charges of Plain roller Tractor
0.022 0.022
@ @
75.00 600.00
Cum Cum
Labour welfare 2%+contractor profit 10% I.e = 12% on 14.85 12.00 1.78 16.63 Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on %
16.63
4.06
Cum
b.
By mechanical equipment such as sheep foot roller/ pneumatic tyred roller to obtain dry density of. (i) at least 98% of Standard Proctor's density
S.No.
Basic Rate In Item Labour Hire charges of Sheep foot roller 0.025 @ Tractor above 40 HP 0.025 @
Total 2.50
Unit Cum
Ref
600.00
15.00 17.50
Cum
Labour welfare 2%+contractor profit 10% I.e = 12% on 17.50 12 2.10 19.60 Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on %
19.60
4.06
(ii) at least 95% of Standard Proctor's density Hire charges of Sheep foot roller Tractor above 40 HP 0.023 0.023 @ @ 100.00 600.00 2.30 13.80 16.10 Labour welfare 2%+contractor profit 10% I.e = 12% on 16.10 12 1.93 18.03 Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on % Cum Cum
18.03
4.06
S.No. c.
Basic Rate In Item Labour Add extra over item No. 20 (b) for compaction in restricted area nearby structure or flanks by hand rammers or by pneumatic tampers.
Rate in Material
Total
Unit
Ref
20.00% d. Add extra over item No. 20 (b) Compaction of earth work by mechanically operated vibro compactor. 10.00% Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m Labour required for 1 cum Beldar for excavation Beldar for dressing 1/6 1/8 @ @ 135.00 135.00 22.50 16.88 39.38 T&P and Labour welfare 3%+Sundaries1% contractor profit 10% I.e = 14% on
Cum
Cum
no no
39.38
14
5.51 44.89
Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on
44.89
4.06
S.No.
Rate in Material
Total
Unit
Beldar for dreessing, ramming etc T&P and Labour welfare 3%+Sundaries1% contractor profit 10% I.e = 14% on
0.04
135.00
5.40
no
5.40
14
0.76 6.16
Income tax 2.06% + Sale tax 1.50% + Royalti 0.50% I.e = 4.06 % on
6.16
4.06
Sqm