Sequence of work for M&E installation

Relocations work to make site ready Item No 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Work description Re arranging of basement transformer room to allow for 4th transformer to come in Purchasing of new transformer Installation of new transformer at the basement Purchasing of main HT panel Installation of main HT panel at the basement Purchasing of new HT cable Laying of new HT cable from CEB room to basement HT cable connection to the new HT panel we ek

Construction of new building Mo


nth s we ek

Relocation after new building constructed

Disconnection of existing system and connection of new HT cable at CEB end and connection of 1.9 new HT panel to the system in basement (Generators will run during this stage ) 2.1 2.2 2.3 2.4 2.5 2.6 2.7 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 Purchasing of remote radiators Temporary installation of remote radiator Temporay piping to the remote radiator Connection changing to remote radiator from cooling tower at the generator side Shifting of remote radiator to the final location Final piping to the remote radiator Final pipe connection to the new remote radiator system Purchasing of new cables for main generator outgoing and Ansana club Purchasing of terminal boxes for connections at new and existing path Excavation of trench for new cable route Relaying of generator's power and control cables in new route Fixing of terminal boxes near the cable tunnel and connection of new cables Relaying of ansana club generator's power and control cables in new route Connection of new cable on generator end and connection of existing cable at terminal box ends Purchasing of additional cables and devices for BMS relocation Relocation of BMS control panel to the new electrical control room Removing of existing cable and cable trays from generator room Construction of new electrical control room near the existing boilers Manufacturing of SMDB-new for proposed electrical room Installation of SMDB-new at proposed electrical room with terminations Relaying of breeze bar cable from SMDB-new Relaying of Pool lighting cable from SMDB-new Relaying of Pool area garden lighting cable from SMDB-new Relaying of Pool pump panel cable from SMDB-new Relaying of main cooling tower panel cable from SMDB-new Relaying of boiler main panel cable from SMDB-new Relaying of diesel pump panel cable from SMDB-new Relaying of furnas oil transfer pump panel cable from SMDB-new Relaying of Health club exhaust fan panel cable from SMDB-new

2d

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9

Shifting of garden water pump to the temporary location Temporary piping to the garden water pumps Shifting of garden water pump panel to temporary location and connection to the SMDB-new Shifting of fish pond pump to the temporary location Temporary piping to the fish pond pumps Shifting of fish pond pump panel to temporary location and connection to the SMDB-new Shifting of deep well pump to the temporary location Temporary piping to the deep well pumps Shifting of deep well pump panel to temporary location and connection to the SMDB-new

6.1 Dismantling of 350RT x 2 generator cooling towers and stored them in the space given 6.2 Removing of piping of generator cooling tower system 6.3 6.4 6.5 6.6 6.7 6.8 6.9 6.10 Re- installation of 350RT x 2 cooling tower at the roof top of new building for AC system Purchasing of new 1000RT cooling tower Installation of new cooling tower at the RT of new building Condenser water piping from GF to RT of new building Connection of new condenser water line to the main at GF Dismantling of all AC cooling towers at the GF and shifting them to the RT of new building Piping to the each cooling towers at RT Connection of piping to the each cooling towers at RT

7.1 MEP installation of the new building 8.1 8.2 8.3 8.4 8.5 8.6 8.7 Shifting of boiler-2 to the temperary location Shifting of all boiler-2 accessories to the temporary location including piping Shifting of boiler-1 to the final location at new building Shifting of all boiler-1 accessories to the final location at new building including piping Fabrication and installation of new condenser water tank at new boiler location Shifting of boiler-2 to the final location at new building Shifting of all boiler-2 accessories to the final location at new building including piping