Document Title: Protective Coating Specification Job No. : 3344-00GC/GN/CON-EPC2-00 Contractor Document No.: IMT-PL-SP-008/D0 Client Document No. :
334430-001-ED-PL-SP-0008-A0

Page 1 Of 3

Protective Coating Specification


Revision Index
Page Page 0 X X X 1 2 3 4 5 0 1 2 3 4 5 Page 0 1 2 3 4 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

ISSUED FOR
REVIEW APPROVAL INFORMATION

4 3 2 1 0 Rev.

2/5/2013 Date Description

M.Mansouri Prepared By

F.Badavi Checked By Contractor

M.Motamedi Approved By

Approved By Client

Date

N.I.O.E.C


OLOOMBONYAN

IMAM TAGHI PUMP STATION INCREASING CAPACITY


DARYA PALA ENG. CO.

Document Title: Protective Coating Specification Job No. : 3344-00GC/GN/CON-EPC2-00 Contractor Document No.: IMT-PL-SP-008/D0 Client Document No. :
334430-001-ED-PL-SP-0008-A0

Page 2 Of 3

SCOPE
This specification covers the minimum requirements for Pipeline Protective Coating of Imam Taghi Pump Station - Increasing Capacity" Project.

DEFENITIONS
For the purpose of this specification, the following definitions shall apply: COMPANY/CLIENT NATIONAL IRANIAN OIL ENGINEERING AND CONSTRUCTION COMPANY (N.I.O.E.C.) CONTRACTOR The firm whose tender has been accepted by the COMPANY, which is consortium of Hirbodan/Oloom Bonyan Co. ENGINEER The representative of the COMPANY who is entrusted with inspection of works which is Darya Pala Eng. Co. PURCHASER The party entering into a contract or agreement to purchase commodity ,which is consortium of Hirbodan/ Oloom Bonyan Co. SUPPLIER/VENDOR The vendor/ supplier/ manufacturer of commodity. MANUFACTURER INSPECTOR The party that manufactures the commodity. The representative of the COMPANY or PURCHASER who is entrusted with inspection of commodity , production records, observance of production operations and quality control tests.

N.I.O.E.C


OLOOMBONYAN

IMAM TAGHI PUMP STATION INCREASING CAPACITY


DARYA PALA ENG. CO.

Document Title: Protective Coating Specification Job No. : 3344-00GC/GN/CON-EPC2-00 Contractor Document No.: IMT-PL-SP-008/D0 Client Document No. :
334430-001-ED-PL-SP-0008-A0

Page 3 Of 3

SUPPLEMENT TO IPS
The following point to the IPS standard is considered to cover the requirements of this project:

NO CHANGE

ATTACHMENT
IPS-M-TP-321 IPS-M-TP-310 material standard for primers (ditch and yard) to be used with cold-applied inner layer material standard for cold-applied laminated plastic pipes original edition IPS-M-TP-311 material standard for cold-applied laminated plastic tape as outer-layer tape for tape coating system of buried steel pipes tape as inner-layer tape for tape coating system of buried steel