REPBLICA DE CABO VERDE Power Transmission and Distribution System Development Project in six Island of Cape Verde

Lot 1 Rehabilitation, Reinforcement and Expansion of MV and LV Networks in Santiago, Fogo and Maio Islands
Bidding Documents Volume III Section VI. Technical Specifications and Drawings LOT1

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

General Requirements Scope of Supply

Section VI. Technical Specifications and Drawings

Table of Contents

Scope of work ................................................... 7


1. 1.1. 1.2. 1.3. 2. 2.1. 2.2.
2.2.1. 2.2.2. 2.2.3. 2.2.4. 2.2.5.

INTRODUCTION ................................................................................................................... 7 SANTIAGO ISLAND SCOPE ............................................................................................. 7 FOGO ISLAND SCOPE ................................................................................................... 10 MAIO ISLAND SCOPE ................................................................................................... 13 UNDERGROUND MV NETWORK SPECIFICATIONS ................................................... 15 SPECIFICATION OF MV CABLES ................................................................................ 15 MV CABLES AND COMMUNICATION NETWORKSUPPLY .................................... 18
MV cables with a cross section of 500 mm2 ......................................................................................18 MV cables with a cross section of 240 mm2 ......................................................................................18 MV cables with a cross section of 120 mm2 ......................................................................................20 MV cables with a cross section of 70 mm2 ........................................................................................21 Communication Network ..................................................................................................................22

Page 2 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.3.
2.3.1.

MV CABLES TRENCH .................................................................................................... 24


TRENCH WORKS ................................................................................................................................30

2.4. 2.5. 3.

CABLE ACCESSORIES ................................................................................................... 34 PLASTIC PROTECTION ................................................................................................ 35 DISTRIBUTION STATIONS, SWITCHING STATIONS AND SECONDARY

SUBSTATIONS ............................................................................................................................ 35 3.1.


3.1.1. 3.1.2. 3.1.3. 3.1.4. 3.1.5. 3.1.6. 3.1.7.

PALMAREJO 20 KV SUBSTATION ............................................................................. 35


General .............................................................................................................................................35 Specifications of the new 20 kV switchgear .......................................................................................37 MV/LV transformers .........................................................................................................................47 MV/LV transformers .........................................................................................................................48 AC and DC Auxiliary Voltages ............................................................................................................48 Earthing system.................................................................................................................................49 Civil works .........................................................................................................................................50

3.2.
3.2.1. 3.2.2. 3.2.3. 3.2.4. 3.2.5.

GAMBOA 20 KV SUBSTATION ................................................................................... 52


General .............................................................................................................................................52 Specifications of the new 20 kV switchgear .......................................................................................52 Earthing system.................................................................................................................................62 Power cable and control cable arrangement .....................................................................................62 Civil works .........................................................................................................................................62

3.3.

SWITCHING STATIONS ............................................................................................... 63


Page 3 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.3.1. 3.3.2. 3.3.3. 3.3.4. 3.3.5. 3.3.6. 3.3.7. 3.3.8. 3.3.9. 3.3.10. 3.3.11.

General .............................................................................................................................................63 Existing MV switchgear .....................................................................................................................66 The MV cubicle to supply and install .................................................................................................66 MV/LV Power Distribution Transformers ..........................................................................................72 LV distribution Fuse Boards ...............................................................................................................73 AC Panel Board..................................................................................................................................73 Rectifier / Battery / DC Switchboard .................................................................................................74 Lighting and Small Power ..................................................................................................................75 Earthing System ................................................................................................................................75 Safety Equipment .........................................................................................................................77 Civil Works....................................................................................................................................77

3.4.
3.4.1. 3.4.2. 3.4.3. 3.4.4. 3.4.5. 3.4.6. 3.4.7. 3.4.8. 3.4.9.

MV/LV SECONDARY SUBSTATIONS ......................................................................... 78


General .............................................................................................................................................80 MV Switchgear Specification .............................................................................................................81 Directional Fault Current Indicator for Uderground Network ............................................................84 MV/LV Power Distribution Transformer............................................................................................86 Transformer feeders..........................................................................................................................87 Low voltage distribution fuse board ..................................................................................................88 Civil Works ........................................................................................................................................94 Earthing Systems ...............................................................................................................................96 Accessories........................................................................................................................................98

Page 4 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4. 4.1. 4.2. 4.3.


4.3.1. 4.3.2. 4.3.3. 4.3.4. 4.3.5. 4.3.6. 4.3.7. 4.3.8. 4.3.9.

MV OVERHEAD NETWORK............................................................................................. 98 GENERAL ........................................................................................................................ 98 SCOPE OF WORK......................................................................................................... 100 EQUIPMENT SPECIFICATION .................................................................................. 104
Supporting structures - Poles ..........................................................................................................104 Cross arms.......................................................................................................................................106 Insulators ........................................................................................................................................107 Aerial Conductor Cables ..................................................................................................................108 Pole mounted secondary substation ...............................................................................................108 Earthings .........................................................................................................................................112 Lightening arresters ........................................................................................................................114 Outdoor air breaking switch ............................................................................................................114 Outdoor Load Break SwitchDisconnector with Remote Control Unit ...............................................114 Directional Fault Current Indicator for Overhead 20 kV Network ...............................................117

4.3.10.

4.4.
4.4.1. 4.4.2. 4.4.3.

OVERHEAD NETWORK CONSTRUCTIONS PROCEDURES................................. 120


Anchoring and erection of metallic structure ..................................................................................120 Foundations ....................................................................................................................................121 Conductor stringing and sagging .....................................................................................................125

5. 5.1.

LOW VOLTAGE NETWORK ........................................................................................... 128 SCOPE OF WORK......................................................................................................... 128

Page 5 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

5.2.
5.2.1. 5.2.2. 5.2.3. 5.2.4. 5.2.5. 5.2.6. 5.2.7.

LV NETWORK EQUIPMENT SPECIFICATION ....................................................... 131


Cables .............................................................................................................................................131 Supporting structures - Poles ..........................................................................................................134 Distribution Street Fuse Cabinet 230/400 V ....................................................................................135 Flush Mounted Fuse Cabinet 230/400 V ..........................................................................................138 Luminary for wood pole installation................................................................................................139 Street light poles and Luminary for underground networks ............................................................140 Energy meters .................................................................................................................................142

6. 6.1. 6.2. 6.3. 7. 7.1. 7.2. 7.3. 7.4.

SITE WORKS .................................................................................................................... 144 SUPPLY AND WORKS UNDER CONTRACTOR RESPONSIBILITY ..................... 144 PRELIMINARY MEASURES ....................................................................................... 144 SIGNALLING AND PROTECTION ............................................................................. 144 DRAWINGS ....................................................................................................................... 146 COMMON DRAWINGS ................................................................................................ 146 SANTIAGO DRAWINGS .............................................................................................. 147 FOGO DRAWINGS ....................................................................................................... 149 MAIO DRAWINGS........................................................................................................ 150

Page 6 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

SCOPE OF WORK 1. INTRODUCTION

The present specifications cover the equipment and works necessary to improve in Santiago, Fogo and Maio Island the installations hereafter:

1.1. SANTIAGO ISLAND SCOPE


Item Praia City Infrastructure Installation 1 New Palmarejo Distribution Station New Palmarejo Distribution Station in a new 40x12,5 m2 building, equipped with double bus bar switchgear, for physical separation between Generation and Distribution Installations - Praia City. All the generation units, namely diesel Power Station, Solar Power Station, TRC Power Station shall be connected to the Main Palmarejo Power station bus bar and all the MV network feeders and 20/60 kV Substation shall be connected to the new distribution station. As a main distribution station for all Santiago Island Network it is decided for the implementation of a double bus bar switchgear to decrease the risk of general black-out in case of bus bar failure and allow the maintenance operation. All the circuit breakers to be installed shall be controlled by efficient protections units and they shall be also prepared for remote control by Scada system. 2 Rehabilitation of Gamboa Distribution Station Full rehabilitation of Gamboa Distribution Station with replacement of the 25 years old switchgear by new single bus bar switchgear - Praia City. Gamboa Distribution Station shallcontinue being a extremely important point for operation and protection in hall Praia distribution network. The advanced age of the existing switchgear and its bad condition of exploitation request its rehabilitation by full replacement. All the circuit breakers to be installed will be controlled by efficient protections units and they will be also prepared for remote control by Scada system.

Page 7 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

New Achada Grande Switching Station in Praia City New Achada Grande Switching Station and its connection to Lem Ferreira Switching Station by two trunk line feeders (240 Al) - Praia City. This Achada Grande Switching Station and the two trunk lines connection in a loop will be the way to supply energy in a good condition to one of the most important and promising industrial and residential plateau of Praia City. All the incoming and outgoing cubicles shall be equipped with circuit breakers controlled by efficient protections units. They shall be also prepared for remote control by Scada system.

Reinforcement of interconnection between Gamboa Distribution Station and Sao Filipe Switching Station in Praia City The installation of one underground trunk line feeder with a 500 mm2 Aluminum cable between this two stations will permit a load flow up to 15 MVA between this tow areas of Praia city. The connection between this two stations in a near future has to be enough strong to permit the load flow in both sense and partial supplying Gamboa in emergency case, whenever the existing connection Palmarejo / Gamboa fails. At the same time the already existing 500 mm2 Aluminium cable connecting the new Wind Farm and Gamboa SS shall interrupted and redirected to the Sao Filipe Switching Station in order to enable the existence of two trunck lines between Gamboa and Sao Filipe.

Praia City MV Network Rehabilitation Rehabilitation of 11 MV/LV 25 years old and dilapidated secondary substation at Praia MV network by replacing MV switchgear and LV Fuseboard. - Praia City.

Extension of LV Networks with 70/35 mm2 ABC cables and rehabilitation by replacing of thin Cu bare conductors by overhead 70/35 mm2 ABC cables in 13 km - Praia City Inland Santiago Island Infrastructure Installation

Sao Jorge dos Orgos MV network upgrade and rehabilitation Upgrade from 10 kV to 20 kV and rehabilitation of dilapidated Sao Jorge dos Orgos 25 years old MV Network, including MV Overhead Lines and three MV/LV Secondary Substations, by replacing of MV Switchgear, Power transformer and

Page 8 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

LV Fuse board and new buildings - Sao Jorge dos Orgos City (Municipality).

Santa Cruz Municipality MV and LV Network rehabilitation Expansion and Rehabilitation of dilapidated Santa Cruz Municipality MV Network, including 1 km of new 70 mm2 Aluminum MV Underground Line installation, one new MV/LV secondary substation installation and three partial rehabilitation of MV/LV Secondary Substations, by replacing of MV Switchgear, LV Fuse board and new buildings. This Tasks includes also extension an rehabilitation of 11 km of LV overhead 70/35 mm2 ABC cable network

Tarrafal Municipality MV and LV Network extension and rehabilitation Expansion and Rehabilitation of dilapidated Tarrafal Municipality MV Network, including 3,8 km of new 70 mm2 Aluminum MV Underground Line installation, four new MV/LV secondary substation installation and one full rehabilitation of MV/LV Secondary Substations, by replacing of MV Switchgear, Transformer LV Fuse board and new buildings. This Tasks also includes extension an rehabilitation of 13 km of LV overhead 70/35 mm2 ABC cable network Power

10

Calheta Municipality MV Network rehabilitation and LV Network extension Rehabilitation of dilapidated Calheta City MV Network, including five partial rehabilitation of MV/LV Secondary Substations, by replacing of MV Switchgear, LV Fuse board and civil building rehabilitations. This Tasks also includes extension an rehabilitation of 11 km of LV overhead 70/35 mm2 ABC cable network

11

Extension of LV Networks with 70/35 mm2 ABC cables and rehabilitation by replacing of 13 km of thin Cu bare conductors by overhead 70/35 mm2 ABC cables in Praia City Monitoring and remote control of the Santiago Network

11

Scada system Installation A System Control and Data Acquisition (SCADA) will be installed for monitoring and remote control of the main distribution and switching station in all Santiago Island. With this installation it is expected to have a very efficient control and operation of all the system and a very significant reduction of energy outage time what means better service quality and better performance. The communication

Page 9 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

network shall be installed but Scadasytemand RTU are not included in the scope of supply. 13 Fault current indicator installation on underground Network Installation of 104 intelligent programmable fault current indicator for 10 to 24 kV underground network, with flashing lighting, over the doors of the existing Praia City MV/LV secondary substations to easily locate in witch section of a line between two S/S has occurred a phase to ground or phase to phase fault. With this equipments the energy outage in a MV network feeder, specially if it is a ring closed feeder, will be significantly reduced. At the same time all new MV

switchboard in the expanded or rehabilitated S/S will be equipped with this divice. 14 Fault current indicator installation on overhead Network Installation of 74 pole mounted fault current indicator for MV overhead lines, with flashing lighting, on the existing Santiago Island Overhead Network to easily locate in witch direction of the grid has occurred a phase to ground or phase to phase fault. The flashing lighting can be visible 2 or 3 km distance. With this equipments the energy outage in a MV network feeder will be significantly reduced. 15 OHL pole mounted load switch break disconnector installation 45 pole mounted load break switch disconnector, with remote control, will be strategically installed in all Santiago overhead network derivations in order to facilitate the operations and maintenance. With this equipments the energy outage in a MV network feeder will be significantly reduced. Rural Electrification 16 New Electrifications Extension of 45 km of MV 54,6 mm2 Aster cabel OHL to 33 rural villages of all Santiago Municipalities for electrification, with 27 pole mounted 50/100 kVA secondary substations and 73 km of low voltage network with 70 mm2 Aluminium overhead ABC cable to supply energy to more than 1300 families.

1.2. FOGO ISLAND SCOPE


Item MV/LV network reinforcement, expansion and rehabilitation

Page 10 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Fogo MV network upgrade to 20 kV - Trunk Line Sao Filipe Patim The existing line So Filipe / Patim / Genebra which supplies all Southern Sao Filipe Municipality Region and all Santa Catarina do Fogo Municipality was installed 42 years ago. Today it is a 16 mm2 cuprum conductor overhead line with concrete poles in a very advanced stage of degradation, operated on 15 kV. This line will be replaced by a combination of 2 km of 240 mm2 aluminum conductor underground cable with 9 km of 148 mm2 aster conductor overhead trunk line from Sao Filipe City to Patim Village, to be operated on 20 kV. From this trunk line a 3,5 km derivation with 54,6 mm2 aster conductor overhead line to Genebra and a derivation with 54,6 mm2 aster conductor overhead line to Monte Grande will replace the existing, also degraded lines. 7 MV/LV 50/100 kVA secondary substations along the feeder will be rehabilitated and upgraded do 20 kV. One new switching station in a 6x4 m2 masonry building will be installed at the end of the trunk line and it will be equipped with one circuit breaker incoming cubicle and 3 circuit breakers outgoing cubicles, controlled by efficient protections units (over current, phase to phase and phase to ground faults protection) to protect and operate the feeders to Genebra, Monte Grande and CovaFigueira in order to guarantee a very efficient operation in case of faults. The Switching station will also be prepared for future remote control from So Filipe Power Station.

Expansion and rehabilitation of Fogo MV Network To expand the MV network to new residential areas or to prevent the overload of some existing secondary substation and, in order to avoid the voltage drop in LV network 3,9 km of aluminum conductor 120 mm2 underground 12/20 kV cable and 6 new 250 kVA MV/LV secondary substations will be installed in several quarters of So Filipe and Mosteiros City. Two MV/LV secondary substations will completely rehabilitated including new masonry building. With the MV cable extension a close loop will be created in So Filipe City network in order to reduce the energy outage time in case of failures.

New Ponta Verde switching station A new switching station in a 6x4 m2 masonry building equipped with one circuit breaker incoming cubicle and 3 circuit breakers outgoing cubicles, controlled by

Page 11 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

efficient protections units (over current, phase to phase and phase to ground faults protection) will be installed at Ponta Verde, northern side of So Filipe Municipality, in order to guarantee a very efficient operation in case of faults upstream. The Switching station will also be prepared for future remote control from So Filipe Power Station. 4 LV Network rehabilitation and expansion Extension of LV Networks with 26 km of OHL 70/35 mm2 ABC cables and 6 km of UGL Al 50/95/185 mm2 and rehabilitation by replacing of 13 km of existing thin Cuprum bare conductors by overhead 70/35 mm2 aluminum ABC cables in several So Filipe City quarters and Mosteiros City. Installation of pole mounted load switch breaker in OHL and fault current indicators 5 Fault current indicator installation on underground Network Installation of 15 intelligent programmable fault current indicator for 10 to 24 kV underground network, with flashing lighting, over the doors of the existing Fogo MV/LV secondary substations to easily locate in which section of a line between two S/S has occurred a phase to ground or phase to phase fault. With this equipments the energy outage in a MV network feeder, especially if it is a ring closed feeder, will be significantly reduced. 6 Fault current indicator installation on overhead Network Installation of 22 pole mounted fault current indicator for MV overhead lines, with flashing lighting, on the existing Fogo Island Overhead Network to easily locate in which direction of the grid has occurred a phase to ground or phase to phase fault. The flashing lighting can be visible 2 or 3 km distance. With this equipments the energy outage in a MV network feeder will be significantly reduced. 7 OHL pole mounted load switch break disconnector installation 9 pole mounted load break switch disconnectorwith remote control will be strategically installed on the Fogo island overhead network derivations in order to facilitate the operations and maintenance. With this equipments the energy outage in a MV network feeder will be significantly reduced. Rural Electrification 8 New Electrifications Extension of 12 km of MV 54,6 mm2 Aster cable OHL to 11 rural villages of all Fogo Island Municipalities for electrification, with 9 pole mounted MV/LV 50/100

Page 12 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

kVA secondary substations and 23 km of low voltage network with 70 mm2 Aluminum overhead ABC cable, to supply energy to more than 257 families.

It is necessary to fence off the operating zone and post notices on prominent areas. Contractor shall prepare, submit and implement after approval by the Project Manager a Safety Management Plan, which shall include but not limited to:

1.3. MAIO ISLAND SCOPE


Item MV/LV network reinforcement, expansion and rehabilitation 1 Trunk line Torril Power Station / Morro The west coast of Maio Island is supplied by a 34,4 mm2 aster conductor overhead line, operated on 20 kV, which causes so many problems to the distribution services and to the Power station's generator sets due to the extremely aggressive environment and various design mistake and installation defects. The line route is in conflict with new plans for Maio airport expansion. Because of that and in order to increase the transmission capacity, it is decided to replace the existing line from the Power Station up to Morro Village, by a 10,5 km of 240 mm2 aluminum underground cable trunk line, which will supply all Maio City MV/LV secondary substations, along the way, in a ring system. A second circuit with 2,4 km of 120 mm2 aluminum underground cable will be installed in Maio city in order to create a closed loop in the city. A new switching station in a 6x4 m2 masonry building, equipped with one circuit breaker incoming cubicle and 3 circuit breakers outgoing cubicles, controlled by efficient protections units (over current, phase to phase and phase to ground faults protection) will be installed at Morro Village, in order to guarantee a more efficient operation in case of faults on the upstream network. The Switching station will also be prepared for future remote control from So Filipe Power Station. With this installations the transmission capacity along the promising Maio west coast increase up to 9 MVA Two new MV/LV secondary substation will be installed at Maio City new residential area according to the Municipality Urbanistic Development Plan.

Page 13 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Closing of Maio MV Ring A new 54,6 mm2 aster conductor overhead line, with silicone insulators, from FigueiraSeca Village to Alcatrs / PiloCo Villages, will be installed in order to implement a completely closed MV ring around all Maio Island. Two new MV/LV 50 kVA secondary substations will be installed in masonry buildings at Pilocao and Alcatrs.

Maio MV overhead line rehabilitation and upgrade 14 km of existing, and extremely dilapidated, overhead line will be rehabilitated with replacement of all glass insulators by silicone insulators, and it will be upgraded by replacement of the degraded 34,4 mm Aster conductor by 54 mm2 Aster conductor. Some structural poles and cross arms degraded by corrosion will also be replaced. The purpose of this rehabilitation is to avoid the high cost of the frequent outages for line cleaning and maintenance (today it has to be done every 2 month) which, with silicone insulators, is expectable to be no needed at least

for 7 to 10 years after installation. 5 pole mounted MV/LV secondary substations will be rehabilitated with

replacement by new ones in a masonry cabinet. 10 km of OHL from Torril Power Station to Figueira Dom Joo has not been included on the scope because it is located inside a environmental protected area. 4 New Pedro Vaz switching station A new switching station in a 6x4 m2 masonry building equipped with one circuit breaker incoming cubicle and 2 circuit breakers outgoing cubicles, controlled by efficient protections units (over current, phase to phase and phase to ground faults protection) will be installed at Pedro Vaz in order to guarantee a very efficient operation in case of faults upstream. The Switching station will also be prepared for future remote control from the Power Station. 5 LV Network rehabilitation and expansion The LV Networks in all Maio Island will be rehabilitated or extended in 9 km with 70/35 mm2 ABC cables. Installation of pole mounted load switch breaker in OHL and fault current indicators 6 Fault current indicator installation on overhead Network 10 pole mounted fault current indicator, with flashing lighting, will be installed on the MV overhead network to easily locate in which direction of the grid has

Page 14 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

occurred a phase to ground or phase to phase fault. The flashing lighting can be visible 2 or 3 km distance. With this equipments the energy outage in a MV network feeder will be significantly reduced. 7 OHL pole mounted load switch breaker installation 5 pole mounted load switch breakers with remote control will be strategically installed on the Fogo island overhead network derivations in order to facilitate the operations and maintenance. With this equipments the energy outage in a MV network feeder will be significantly reduced.

The scope of work includes the design, the supply, all the civil works and adaption supply and work for the installation, the connection to the existing equipment, the test and commissioning except where it is clearly written installed by ELECTRA

2.

UNDERGROUND MV NETWORK SPECIFICATIONS

2.1. SPECIFICATION OF MV CABLES


The cables to be supplied shall be single core, XPLE (IEC 60502-2) aluminium cables, with the characteristics of those used in and standardized for ELECTRA networks, type LXHIOV, 12/20 kV, in accordance with Portuguese standards, and which constitution is as follows: Conductor: Aluminium,circular, stranded compacted, conductor in accordance to IEC 60228, with the cross sections of70, 120,240or 500 mm2 as defined later on. Insulation: The insulation shall consist of one layer of extruded cross-linked poly-ethylene (XLPE) obtained by either peroxide dry curing or silane process according to IEC 60502. Conductor semi-conducting screen: This screen shall consist of a semi-conducting synthetic material, extruded by double extrusion process on the conductor and on insulation. It should be continuous, with a minimum thickness of 0.5mm, with no rough surfaces and keeping a close contact with the insulation. The semi-conducting screen shall withstand the temperature in the

Page 15 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

conductor and the admissible mechanical forces in the insulation, and shall have no detrimental effect on the conductor or on the insulation. Insulation semi-conducting screen: This screen shall consist in one of the following alternatives to be specified by the Bidders: A layer of the extruded semi synthetic semi-conducting material, bonded to the insulation, and it should be possible to separate it from the insulation without the aid of special tools. In this case triple extrusion is required. A semi-conducting coating plus plastic semi-conducting tape (non water absorbent) wound helically with superposition over it. Metallic screen: The metallic screen shall consist of a copper tape or a copper tape plus copper wires moulded to the cable and bonded to the over-sheet conjugated with a coating of hydroexpansive powder if the manufacturer deems it advisable. The construction of the metallic screen shall guarantee a perfect contact with the insulation semi-conducting screen to constitute an equipotential system and shall be considered stanch to water from the outer metallic screen. The dimensional characteristics shall be calculated in such a way as to ensure a permissible short circuit current of 1 kA during 1 second, without causing overheating in the close layers.

Hydro-expansive layer: It shall consist of a tape applied upon the metallic shield, able to increase its volume in the presence of water, in order to ensure the tightness of the cable. If the copper shield and hydro-absorbent powder is used and ensure the tightness of the cable, the hydroexpansive tape may be dispensable. Over-sheath: The over-sheath shall consist of a compound, applied by an extrusion process, adequate to the rated cable temperatures, of polyvinyl chloride (PVC) coloured black, with anti-termite repellent, non-poisoning type, adequate for termite types OdontermusFormusanus and CoptotermesFrenchi. The chemical product used as repellent shall be stated by the Bidders. PVC characteristics shall comply with IEC 60502. The nominal thickness of the over-sheath shall be 3.0 mm and the maximum
Page 16 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

deviation in thickness, in any particular point, shall be not greater than 25% of the nominal value. The cables shall have the following main characteristics:
LXHIV 1x70 Conductor Material Cross section (mm2) Number ofwires Conductor screen Extruded semiMaterial conducting compound cross linked Nominal thickness (mm) Minimum thickness (mm) Insulation Material Nominal thickness (mm) Minimum thickness (mm) Insulation Screen Extruded semiMaterial conducting compound cross linked Nominal thickness (mm) Minimum thickness (mm) Bedding tape Semiconductive Material Nominal thickness Metallic screen Cooper tape + Material Section (mm2) Outer sheath Cooper Wire 16 Cooper tape + Cooper Wire 16 Cooper tape + Cooper Wire 16 Cooper tape + Cooper Wire 16 tape 0,13 Semiconductive tape 0,13 Semiconductive tape 0,13 Semiconductive tape 0,13 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 XLPE 5,5 4,85 XLPE 5,5 4,85 XLPE 5,5 4,85 XLPE 5,5 4,85 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 Extruded semiconducting compound cross linked 0,6 0,5 Aluminium 70 12 Aluminium 120 15 Aluminium 240 30 Aluminium 500 53 LXHIV 1x120 LXHIV 1x240 LXHIV 1x500

Page 17 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Material Colour Nominal thickness (mm) Minimum thickness (mm) Electric characteristics Cond. Resit. at 20C - /km Screen (20C) - /km

PVC Black 1,9 1,5

PVC Black 3,0 2,25

PVC Black 3,0 2,25

PVC Black 3,0 2,25

0,443 1,1

0,253 1,1

0.125 1.1

0,0605 1,1

2.2. MV CABLES AND COMMUNICATION NETWORKSUPPLY


2.2.1. MV cables with a cross section of 500 mm2

The total linear length of the necessary cable of 500 mm2 is 43.500 km. The bidders are requested to use a delivery length of 1000m per drum. The length in the table below is only given for information and includes already overlength for connection. The cables are to be installed as follows:

2.2.2.

MV cables with a cross section of 240 mm2

Page 18 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The total linear length of the necessary cable of 240 mm2 is 62 km. The bidders are requested to use a delivery length of 1500m per drum. The length in the table below is only given for information and includes already overlength for connection. The cables are to be installed as follows:

Page 19 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.2.3.

MV cables with a cross section of 120 mm2

The total linear length of the necessary cable of 120 mm2 is 18 km. The bidders are requested to use a delivery length of 1500m per drum. The length in the table below is only given for information and includes already overlength for connection. The cables are to be installed as follows:

Page 20 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.2.4.

MV cables with a cross section of 70 mm2

The total linear length of the necessary cable of 70 mm2 is 19 km. The bidders are requested to use a delivery length of 1500m per drum. The length in the table below is only given for information and includes already overlength for connection. The cables are to be installed as follows:

Page 21 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.2.5.

Communication Network

Page 22 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In Santiago island it shall be installed a Scada System for remote control of MV Network, namely all Distribution and Switching Stations. In order to enable the communication between the distribution stations, the switching stations and the Scada System to be located at Electras Gamboa Building a communications network must be installed. A 12Foptical fiber cablewill be used for underground installation to interconnect the stations as indicated in the table below.

Cable extremities

Drawing n

Length km

1 2 3

L. Ferreira SW/S Gamboa D/S Palmarejo PS

Ac. Grande SW/S S.Filipe SW/S Palmarejo DS

2.9 9 0,3

In Praia city some communication optical fiber cable are going to be installed during 2012 year by the already ongoing distribution project.

The communication cable will be installed in the same trenches as the MV Cables whenever the routs will be coincident. When the routs are not coincident the OPC shall be installed on its own trench. The cable will not be buried directly on the sand. It will be used anuPCV pipe for mechanical protection.

For the interconnection of the distribution and switching station in rural area as indicated in the table below it shall be used the ADSS optical fibre cable,selfsupportedfor overhead installation, using the poles of existing overhead MV network with the maximum span 250 meters. In this case the supply includes all the accessories for the, installations.

Cable extremities

Drawing n

Length km

1 2

Calheta 60/20 kVSS Calheta 60/20 kVSS

Tarrafal D/S StaCatarina D/S

22 16

Page 23 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Calheta 60/20 kVSS

Sta Cruz D/S

12

The Scada System and the RTU are not included on this scope.

The fiber cable will meet the requirement of standard IEC 60794-1 and the main characteristics shall be as indicated in the table below:

Type of Installation

Underground installation in uPVC pipe

Self supported for overhead installation in poles

Type Number of optical fibers Sub cable diameter Sub cable cover Outer cover Outer diameter Temperature range Permanent Traction (EDS) Working Traction (EDS)

Mono-mode 12 **** reinforced Black polyethylene 6,5 -30C to 60C *** kN *** kN

Mono-mode 12 *** reinforced Black polyethylene 13,8 -30C to 60C *** kN *** kN

2.3. MV CABLES TRENCH


There are eight types of trenches for the MV and communication cables:

Type IA - MV trench profile, 60 cm width, 120 cm deep, for one MV single core cable type, cross section up to 500 mm2, laid in a side by side arrangement, protected as defined in drawing no. 0.0.19 and it is used either for cable XHIOV 3x1x70, XHIOV 3x1x120, XHIOV 3x1x240 or for XHIOV 3x1x500.

Page 24 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Type IB - MV trench profile, 60 cm width, 120 cm deep, for one MV single core cable type, cross section up to 500 mm2, laid in a side by side arrangement, plus triple pipe for communication cable, protected as defined in drawing no. 0.0.19 and it is used either for cable XHIOV 3x1x70, XHIOV 3x1x120, 3x1x500. XHIOV 3x1x240 or for XHIOV

Type IIA - MV trench profile, 60 cm width, 120 cm deep, for two MV single core cable type, cross section up to 240 mm2,laid in parallel, both in trefoil arrangement, protected as defined in drawing no. 0.0.19 and it is used either for cable XHIOV 3x1x70, XHIOV 3x1x120 or for XHIOV 3x1x240.

Type IIB - MV trench profile, 60 cm width, 120 cm deep, for two MV single core cable type, cross section up to 240 mm2, laid in parallel, both in trefoil arrangement, plus triple pipe for communication cable, protected as defined in drawing no. 0.0.19 and it is used either for cable XHIOV 3x1x70, XHIOV 3x1x120 or for XHIOV 3x1x240.

Type IIC - MV trench profile, 90 cm width, 120 cm deep, for two MV single core cable type, cross section 500 mm2,laid in parallel, both in trefoil arrangement, protected as defined in drawing no. 0.0.19 and it is used for cable XHIOV 3x1x500.

Type IID - MV trench profile, 90 cm width, 120 cm deep, for two MV single core cable type, cross section 500 mm2,laid in parallel, both in trefoil arrangement, plus triple pipe for communication cable, protected as defined in drawing no. 0.0.19 and it is used for cable XHIOV 3x1x500.

Type IIIA - MV trench profile, 60 cm width, 120 cm deep, for road crossing as defined in the drawing 0.0.21.

Type IIIB - MV trench profile, 90 cm width, 120 cm deep, for road crossing as defined in the drawing 0.0.21

Page 25 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The individual trench lengths to be built are defined in the following tables where it is also mentioned the drawing where cable route is defined as well as trench type.

Trenches for cables inSantiago Islandare as follow:

Page 26 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Trenches for cables in Fogo Island are as follow:

Page 27 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Trenches for cables in Maio Island are as follow:

Page 28 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Page 29 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.3.1. 2.3.1.1.

TRENCH WORKS Trench Opening

Trench location and dimension are indicated in project drawing. Contractor will carry out their exact location with the assistance of the Project Manager. For payment purpose it will be considered onlythe trench dimensions indicated in the drawing with exception to modifications requested by the Project Manager.Any change from design must be approved before starting works. Trench dimensions must be confirmed and sign-off by the Project Manager or his representative before backfilling. Before excavating on concrete or asphalt pavements, the edges of trenches must be cut by a mechanical saw. Temporary equipment must be installed for pedestrians or vehicles. Caution has to be done to avoid flooding. Contractor must prevent excavated material, silt or debris into the drainage system located in roads and footways. Draining water fromgullies must not obstruct the drainage system. Building materials and/or waste from the excavation, deposited near the trench, must be protected with wood board along the trench. Contractor must evacuate excavated material, which is not suitable for backfilling, with no additional charge. Caution must be paid when excavation reaches the deep of 300 mm to avoid any damaging on underground network.Excavation must be carried out by hand near the underground facilities; machines could be used only on Project Manager or his representative approval. Trench shuttering must be used for the effective safety of people, protection of nearby buildings and to avoid trench collapse, where necessary.

Page 30 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.3.1.2.

Road crossing

It must be done with uPVC pipes embedded in reinforced concrete with ingredient ratio of 1:3:5, making layers - width with 20 cm deep and 50 cm length on the extremities.The total length of PVC pipes to be installed shall be calculated for the road crossing with two reserve pipes. Details are shown on the drawings n 0.0.21 For quotation purposes 3840 m of pipes shall be considered, becoming spares de non used pipes. Road occupation and period of work must be strictly followed for the trench crossing road. Temporary traffic signs must be installed during all the work.

2.3.1.3.

PVC pipe

Rigid uPVC pipes for cable protection, profiled to provide good mechanical protection of buried cables, must be used. The specification of the uPVC pipes shall be: Standards Diameter Wall thickness of pipe Length Colour (Grey) Material ISO 4422-2 110 mm 5.30 mm. 5.8 6.0 m. Permanent non-fading, colour resistant to chemical change. Non-toxic and non-corrosive uPVC. Not provide food source to micro/macro organisms and fungi. Resistant to chemical attack by a wide variety of substances such as acids, alkalis and oils; High resistant to fungus and bacterial attacks, ultraviolet radiation, rain and atmospheric conditions. Self-Extinguishing. 85 90

Resistance

Flammability Hardness - Shore D

Final check by the Project Manager team is needed before backfilling. Otherwise, the Employer could request to re-open up trench for checking. Contractor is responsible for any delay due to this reason.

Page 31 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.3.1.4.

Cable Installation, Trench Backfill and pavement

Unwinding of cables must be done with the drums placed on jacks or on special racks by means of an steel axle Rollers must be used to support cables. Cables must be pushed slowly and progressively using traction means with appropriate strength. Sharp edge, such as pipe entrance, must be protected in order not to damage the cable shielding during installation. Three (3) meters surplus in cable end must be reserved for interconnection and junction. Cable surplus in customer substations or primary substations or poles must be confirmed with the Project Manager or his representative.

Bending radius during cable installation must be greater than 30D, which D is the cable overall diameter, unless otherwise referred by the Project Manager or his representative.

Bending radius after cable installed must be greater that 15D, which D is the cable overall diameter, unless otherwise referred by the Project Manager or his representative.

Cable installation must be done under authorization and supervision of the Project Manager or his representative. Cable must be laid on minimum of 100 mm thickness, of fine sand or fine sifted soil, which fineness must be measured on a mesh of 1/16 Cable ends must be sealed until the moment of assembling termination or joint. Cables in same circuit in a trefoil arrangement should be tied up by plastic ties every 100 m. It must be left a gap of about 5 mmloosing in plastic tie, to avoid cable injury.

Cables must be covered at least 200 mm thickness of fine sand or fine sifted earth, which fineness on a wire mesh of 1/16. The filling shall be made in accordance with the drawings or as directed by the Project Manager or his representative.
Page 32 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Protection plates and warning tapes shall be installed as referred in the drawings n. 0.0.19 and 0.0.21. Trench must only be backfilled after Project Manageror his representative approval and with very fine soil. Contractor must show soil samples for examination if requiredby the Project Manager or his representative.Detail of sand information must be provided. Complete backfill shall begin after cable testing with good condition. Few compactions must be carried out during trench backfill with 200 mm thickness of fine sand or sifted soil. Compaction must be done by hand-rammer in the 200 mm layers on top of cable. Compaction on layer upper the signal plates could be done by hand-rammers or vibration roller. Compaction before paving could be done by hand-rammers or vibration roller. If fine sand or sifted soil could only be used for trench backfill compaction could be done in one time. Contractor could only start the pavement works after approval by the Project Manager or his representative. New pavement must be the same quality as before, and whole length must be uniform. Concrete used in the paving, if any, must be in the ratio of 1:2:4, except instructed by the Project Manager or his representative. New pavement must be cleaned afterwards. If water is used for cleaning, contractor should make sure no obstruction would make the drainage system block.

Sand bags must cover live cables in trench. Contractor workers shall use HV/MV Insulated Gloves when performing works near live cables. Contractor should request thee Employer to shut down the corresponding set of cable before re-locate MV cables as well as any cable junctions.

Page 33 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2.3.1.5.

Cable labelling

For MV cables identification anodized aluminium or laminated plastic are acceptable. Labels with 100x30mm on each phase shall have inscribed in Portuguese Language the cable number and phase designation (Cabo no. ......, Fase ......). Letters and figures, in black colour, shall be of 5 mm high. Labels shall be fixed by plastic rivets.

2.4. CABLE ACCESSORIES


The Bidders are requested to supply, for the MV cables 70 mm2, 120mm2, 240mm2 and 500mm2, all the necessary junction boxes, including cable connectors, according to the cables lengths above specified. Bidders shall pay attention to the bi-metallic connectors, necessary,in some cases,for the junction between Copper and Aluminium cables in the case of the a new single core XPLE Al 3x1x120 mm2 with an existing single core XPLE 3x 1x50 mm2 Cu or in the case of a new single core XPLE Al 3x1x240 mm2 with an existing single core XPLE 3x 1x95 mm2 Cu. The cable junctions shall be the heat shrinkable type, recommended by the cables maker and the supply shall include three spare kits of each type and cable size. Location of the undergrounded cable junction must be indicated on the as built documents. A special mark over the junction point has to be done on the pavement.

The contractor is also required to supply the terminations and connectors for all cables in accordance to the type of MV switchgears proposed for the Distribution Stations, Switching Stations or existents Secondary Substations, and in accordance to the Ring Main Units proposed or existing in the secondary substations. In what concerns the cable terminations to connect on the transformers MV bushings they shall be pre-molded elbow or straight type, with separable dead-break connectors, 24 kV, 250A according to IEC 60 502-4. For line feeder switchgear cable connection the elbow or straight typeconnectors shall be 24 kV system voltages and 400 A continuous current. The cable terminations supply shall include three spare kits of each type and cable size.
Page 34 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The wiring to perform the connection of the cables metallic screen to switchgears earth bars, shall be done with 35 mm2 coppercable, 0.6/1kV, PVC insulated, green/yellow colour and shall also be supplied the necessary connectors. To define the total length it is necessary to consider that, in case of the switchgears where toroidal CTs are requested for zero sequence protection, such earthing cable shall cross the CT before to be earthed.

2.5. PLASTIC PROTECTION


Heavy duty cable protection covers, manufactured from high impact recycled polyethylene sheet, 1000 x 300 x 12 mm, for mechanical protection of the buried cables, shall be supplied. They shall be yellow colourand havethe inscription ELECTRA- Cabos de 20 kV Perigo de Morte The total length of the covers shall be identical to the trenchtotal length,

Underground warning mesh, yellow colour, following BS EN 12613:2001, or equivalent, shall also be supplied with 1.2 times the length of the trenches, to be installed 20cm from the soil level along the trench. They shall have the inscription CUIDADO - CabosElctricospordebaixo

3.

DISTRIBUTION STATIONS, SWITCHING STATIONS AND SECONDARY SUBSTATIONS

3.1. PALMAREJO 20 KV SUBSTATION


3.1.1. General

A New Palmarejo20 kV Distribution Substation in a new40x12m2 building, equipped with double bus bar switchgear for Physical separation between Generation and Distribution Installations in Santiago System will be erected in a free area between

Page 35 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

northernborder of Palmarejo Power Station and the 20/60 kV Substation southern border.

All the generator units, namely diesel Power Station, Solar Power Station, will keep connected to the Main Palmarejo Power station Bus Bar and all the existing MV network feeders including the 20/60 kV Substation feeder, will be transferred to the new MV substation. As a future most important distribution station for all Santiago Island Network it is decided for the implementation of a double bus bar switchgear to decrease the risk of general black-out in case of bus bar failure and in order to allow the maintenance operation. All the circuit breakers to be installed will be controlled by efficient protections units and all the 20 kV system will be locally controlled and/or remotelyfrom scada control center. All information, apparatus status and measures Voltage, intensity and KWh will be transmitted to the control center and will be integrated in the future distribution scada. Scan period will be 50 milliseconds.

The connection between the Power Plant bus bar and the new substation bus bar will be made by five feeders with double aluminum cable 2x(3xLXHIV1x500) with 100 MVA total load capacity.

This scope of work includes the design of all building civil works,concrete trench civil works for new cable installation and existing cable transfer, the furniture and installation of the following metalclad cubicles and equipments:

4 Power Plant incoming feeder cubicles, rate current 1250 A 1 Outgoing 20/60 kV Substation feeder cubicles, rate current 1250 A 2 Outgoing 20/60 kV Substation feeder cubicles, rate current 630 A 9 outgoing network feeder cubicle, rate current 630 A One measurement cubicle for both bus bar One bus bar coupling 2500 A One auxiliary transformer cubicle
Page 36 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

One 250 kVA 20/0,41 kV transformer DC auxiliary pannels AC Auxiliary panels for lighting and small power

The drawing 7.1.51 gives the Site Plan of the new substation The drawing 7.0.07 gives the single line diagram of the new switchgear to install. The Main LV switch board will be according to the drawing 0.1.36

The contractor has to take in consideration that Palmarejo power station will never be shuted down and the energy outage in each feeder due to the works implementation, especially for network feeder cables transfer, has to be reduced to the minimum as possible.

3.1.2. 3.1.2.1.

Specifications of the new 20 kV switchgear General

The 20 kV switchgear shall be metalcladtype, air insulated, double busbar type, suitable for indoor installation, and shall be in accordance with IEC Standard No.60298.The switchgear shall be in accordance with the single line diagram drawing no 7.0.07.

The new switchgear shall have the following main characteristics: Rated Voltage Rated insulation level Rated lightning impulse withstand voltage to earth, between poles and across open switching device Across the isolating distance : 125 kV (peak) : 140 kV (peak) : 24kV

Rated 1 min. power frequency withstand voltage to earth, between poles and across open switching device : 50 kV (rms)

Page 37 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Across the isolating distance

: 60 kV (rms)

Rated normal current of main circuits: Busbar Outgoing feeder panels Incoming feeder panels :2500A :630A or 1250 A :1250 A : 25 kA : 3 sec. : 40 kA (peak)

- Rated short time withstand current - Rated duration of short circuit - Rated peak withstand current Degree of protection

The external enclosure, with closed front doors, shall comply with no less than IP4X, according to IEC N 60529 Internal partitions IP20 according to IEC standard No.60529

The equipment shall be dust-proof, rodent and insect proof. It shall be capable of operating in tropical and humid conditions. Electric heaters, controlled by thermostat and heater switch suitable for 220V-50Hz, shall be installed to prevent condensation, particularly when the equipment is out of service.

Cast iron shall not be used for any part which may be subjected to mechanical shock. Insulating materials shall have a high resistance to tracking.

The switchboards shall be suitable for mounting on the specified floor arrangement. All necessary foundation or fixing bolts shall be provided for all circuits and for specified spaces for future circuits and the cost included in the Tender Price.

All wiring compartments containing primary connections or equipment shall be enclosed in metal conduit or equivalent.

Complete protection by covers and partitions shall be provided against approach to live parts or contact with internal wiring parts to protection category IP 4X to IEC 60529. Interlock and safety equipment shall be provided to avoid any access to the
Page 38 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

live part of the cells or any wrong operation in any situation. The cubicles shall have 4 compartments segregated by metallic partition. Withdrawable circuit breaker in a movable truck Bus bar Medium voltage cable connection Low Voltage and protection equipment.

The circuit-breakers shall be mounted in moving portions with either horizontal or vertical isolation from the fixed busbars and outgoing circuit connections.

The circuit-breakers shall be connected to the busbars and feeder circuit through plug and socket type isolating devices. The devices shall be off load type but shall be suitable for operation whilst the busbars or feeder circuits are live. It shall be impossible to operate the isolating device if the circuit breaker is in the 'closed' position. Withdrawal of a circuit breaker shall not be possible unless it is the open position.

The main circuit isolating devices and all auxiliary circuit isolating devices shall be self-aligning and accessible for maintenance. The main isolating contacts shall be silver plated, self-cleaning and shall be mounted in porcelain or cast resin bushings.

The Withdrawable circuit breaker shall have 3 positions: In service (connected) In test Withdrawn

Interlock shall forbid the circuit breaker moving from or in service when it is close. Front doors must be lockable. Cubicles must be painted with an epoxy system dried in oven or at least with an equivalent painting system. Colour must be approved.

The automatic shutters for the plug-in contact are to be permanently marked with inscriptions "BARRAMENTO" to busbar side and "CABO" to cable side in the incoming and outgoing feeder cubicles.
Page 39 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Lighting feature 40W-220V-50Hz controlled by a door switch shall be installed inside each low voltage compartment. At least 2NO+2NC Auxiliary contacts shall be

provided per cubicle for the remote signaling of the withdrawable circuit breaker position.

All the cubicles shall be identified at front side and at rear side if they have rear access for 20 kV cables connection, with approved labels engraved with the cubicles number and the name of the feeder. Other labels can be required if necessary, as well as a mimic diagram to be placed at the instrument chamber door. All the

equipment shall be labeled with the scheme reference and a functional reference.

Next to 20 kV cable connections points, inscriptions with the phase colour and sequence (to be defined) shall be stated.

With the equipment for 20 kV switchgear, the contractor shall supply, in a suitable padlocked box, one set of operation and maintenance devices including special tools.

3.1.2.2.

20 kV Circuit breakers

Three-pole, indoor, vacuum or SF6 type circuit breakers, in accordance with IEC Standard No.60056 and with the following characteristics (others than those specified in 22.1.2.1):

The circuit breakers shall comply with the requirements of IEC 62271-100 and IEC 62271-200

Rated short circuit breaking current Rated normal current: o o Outgoing feeder panels Incoming feeder panels

: 25 kA (rms)

: 630 or 1250 A : 1250 A : 40 kA (peak)

Rated short circuit making current

Rated operating sequence: 0-3min.-CO-3min.-CO

Page 40 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Operating mechanism: The operating mechanism of the three poles of the circuit breaker shall be mechanically coupled. An approved mechanically controlled indicator shall be provided to show whether the circuit breaker is open or close and its closing spring is loaded or unloaded.

The circuit breakers shall be provided with a manual operating closing/opening device. Mechanical closing/opening device must be padlocked. When it is actuated, circuit breaker close control must be inhibited. The electrical tripping and closing of the circuit breakers shall operate between 70% and 110% of the rated supply voltage of 110 Vdc. A close and a trip push-buttons for mechanical control shall be provided for circuit breakers. After completed all closing operation, the spring shall be automatically reloaded. The rated supply voltage for motor spring chargers shall be 110Vdc + 10% - 30%. A mechanical operations counter shall be provided in the operating mechanism as well as hand-crank for manual spring charge.

If SF6 type circuit breakers are proposed, 1 set of necessary equipment for refilling and pressure testing shall be supplied by the contractor as well as a local supervision and remote signal of SF6 pressure fault

The circuit breakers of same current rating shall be interchangeable and a suitable interlock shall prevent the use of a circuit breaker with a current rating different of the rating current of the cubicle. The withdrawable circuit breaker can be locked by a padlock in the service position and in the withdrawn position.

Spare auxiliary switches 2NO+2NC for circuit breaker open and

spare auxiliary

switches 2NO+2NC for circuit breaker close shall be wired to the terminal blocks in instrument compartment
Page 41 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.1.2.3.

20 kV Earthingswitch and voltage divisors

A fast-closing earthing switch of the output shall be provided and shall be mechanically interlocked with the circuit breaker.The earthing switch can close when the circuit breaker is fully withdrawn, and when the earthing switch is closed, the 20 kV circuit breaker cannot be moved in service position. Rated current of the earthing switch Short time (3 sec) withstand current is 16 kA (rms) Rated short circuit making current is 40 kA (peak)

An approved mechanically operated indicator shall be provided to show whether the fuse switch is open or close The earthing switch shall have a mechanical hand control lockable with padlocks in both positions - open and close - which shall be permanently marked with labels "ABERTO to open position and LIGADO TERRA for close position.

A capacitor voltage divisor with a neon voltage indicator shall be provided on every phase. The indicator shall indicate the presence of voltage in the three phases of the cable side and shall be placed near the 20 kV earthing switch hand control or shall be integrated in the mimic diagram. 3.1.2.4. 20 kV Current transformers

All current transformers shall be in accordance with IEC 60185.Secondary windings of C.T. shall be earthed at one point only and the primary windings shall be capable of carrying the rated primary current for a period of 1 minute with the secondary winding circuit open. The output of each current transformer shall be calculated for protection and control system. The contractor shall submit the calculations for approval.

Page 42 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.1.2.5.

20 kV Voltage transformers

Each one of the incoming feeders shall have a set of 3 single phase voltage transformers with two secondary cores, in accordance with IEC 60186, and with the following characteristics:

Rated primary voltage Rated secondary voltage core No.1 core No.2 Rated secondary output core No.1 core No.2 Accuracy class: core No.2 core No.1 :3

: 20/3kV : 110/3V : 110/3V : 100VA : 60VA : 0.5

20 KV HRC fuses shall protect the voltage transformer. A resistor with a convenient value, connected with the delta connection of the secondary No.2must be used to inhibit ferro-resonances effects,

3.1.2.6.

Instrument compartment equipment

Local control and protective relays shall be housed in the LV compartment of every cubicle. All the facilities to allow future remote control and supervision from a PLC system shall be provided. The supply voltage for remote control shall be110V DC. Control and protection polarity of each panel shall be switched by the respective Local-Remote switch. For each panel four independent power supplies shall be provided as specified below: 110 V.d.c. for control and protection circuits; 110 V.d.c. or 24 Vd.c. for signaling circuits; 110 V.d.c. for circuit breaker motor spring loading; 220V-50Hz a.c. for heating and lighting;

Page 43 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Suitable two poles mini circuit breakers shall protect every circuit of every cubicle. They shall have 1NO+1NC auxiliary switch for the CB position "open" or "close". The power shall be supplied directly, for each bus section, from dc and ac auxiliary switchboards by four different two core cables and the wiring between the different cubicles of each bus section shall be fully insulated. A common supply and circuits for general alarms and supervision of control and signaling supply fault shall be provided. It shall also be provided all the equipment and wiring for the following systems: - Interlocking; - Control Voltage. The protective relay and trip circuit supervision relays, actuators, the indicator instrumentsalarm annunciators and the mimic diagram shall be on instrument compartment door. Semaphore position indicators for the earthing switches, discrepancy and control switches for the 20 kV circuit breakers and neon voltage indicators, shall be on the mimic diagram. Local alarm annunciators shall be provided in transparent windows with suitable inscriptions, steady illuminated by a lamp when the alarm or signal occurs and until to be reset by local operator. Local reset push button, and remote resetting circuit by future PLC system shall be provided per panel. Colour code shall be used to discriminate every circuit 110 V DC, 24 V DC and AC.

Further to the before specified the minimum equipment to be installed in each panel type, and the interlocking schemes and control expected shall be:

Outgoing Network Feeder Cubicles N 2,6,7,12,16 and18 1. One multifunctional meter to be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export; three-phased power factor on each phase;
Page 44 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

instantaneous U on each phase; instantaneous I on each phase; phase switch UU, UI and cos; frequency; succession of phases; displays phase diagram P,Q;

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality. The meter have to be able to register and store all the information for a period not less than 30 days and it has to be able to display maximum values..

2. The protective relays to be used shall be overcurrent and shortcircuit (50/51) for the three phases protection and an earth-fault (50N/51N) element using residual current arrangement from CTs phases or feed by a toroidal CT 100/1 A, around the three phase cables. In the wiring coming from CTs, terminal blocks shall be inserted giving the possibility to short circuit them and test the OC/EF relay. The trip order from de OC/EF relay must be wired in such a way, it can be switched from the trip coil of the circuit breaker to an external testing lamp. Incoming feeder cubicles
interconnection with Palmarejo Power Plant:Feeder Cubicles N 4,9,14 and 17 interconnection with Gamboa Power Plant: Feeder Cubicles N 3,8 and 13 interconnection with 20/60 kV Substation: Feeder Cubicles N 5,10 and 15

1. One multifunctional meter to be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export; three-phased power factor on each phase;

Page 45 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

instantaneous U on each phase; instantaneous I on each phase; phase switch UU, UI and cos; frequency; succession of phases; displays phase diagram P,Q;

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality. The meter have to be able to register and store all the information for a period not less than 30 days and it has to be able to display maximum values..

2. One directional overcurrent and shortcircuit relay (67) and one directional earth fault relay (67/N) for protection with convenient setting scales both for currents and tripping times shall constitute the protection of these two feeders; 3. A set of undervoltage (27), overvoltage (59) underfrequency (81U) overfrequency (81O) relay. The closing signal for the CB shall be controlled by a convenient synchronising scheme. The incoming feeders from Palmarejo Power Plant, Gamboa Power Plant and 20/60 kV Substation shall be operated in parallel.

The protection CTs wiring must be done in such a way that in the future, after an optical fibre cable be buried, it can be possible to introduce the longitudinal differential relay (87L) already existing in Palmarejo S/S.

3.1.2.7.

Earthing facilities and Earthing of metal parts

All metal parts including any relays, instruments, etc., mounted on the switchboard, shall be connected to a copper earth bar, which runs along the full length of the switchboard.

Page 46 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The cross-section of the bar shall be sufficient to carry the rated short-time withstand current of the switchgear for the time specified in the Schedule of Requirements. The frame of the draw-out circuit-breakers shall be connected to the earth bar through a substantial plug type contact arranged to make and maintain contact before the main isolating contacts make.

The earthing function shall form part of the integral design of the equipment. Full details of the method of earthing shall be submitted by the manufacturer. It shall not be possible to select an integral earthing position, close an earth switch or connect a portable earthing device unless the circuit-breaker is in the open position. When the circuit-breaker is being used for earthing, a locking facility shall be provided to prevent the breaker being opened by mechanical or electrical means. It shall be impossible to return to the normal service position without first having removed this locking facility.

3.1.3.

MV/LV transformers

One three phase auxiliary transformer, suitable for indoor installation, shall be provided to feed the a.c. auxiliary switchboard.The transformer shall have the following characteristics: Rated power : Rated voltage ratio : Rated frequency : Method of cooling : 100kVA or 250 KVA 20.000/410-231V 50Hz ONAN

Impedance voltage at 75C and at principal tapping : 4% Connection symbol : Tapping range : Tapping step : No. of tap positions : Maximum short circuit level at HV terminals : Insulation level: Dyn5 +5%, -5% 2.5% 5 500MVA

Page 47 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

- MV line terminal : LI 125 AC 50 - LV line terminal : AC 3 This transformer shall be oil immersed type with a no-load tap changer and it shall be provided with the convenient fitting and own protective devices. The high voltage and low voltage line terminals shall be fitted with cables terminationsbox. 3.1.4. MV/LV transformers

As a Main LV Voltage switchboard, to supply the AC SB for all needs of the building and the LV distribution network around installation a LVSB 1000 A type complying the specifications on chapter 22.4.6.1 shall be installed. 3.1.5. AC and DC Auxiliary Voltages

One specific AC 220/380 V switchboard, to be located in the S/S the control room, must be supplied from Main LV switchboard / auxiliary transformer. It must supply all the AC consumers of the 20 kV Distribution Station, including the S/S lighting, and supply also one rectifier able to feed one DC switchboard also dedicated to the S/S DC consumers and charge one 110V dc alkaline battery to be located in special room. Other battery and charger rated voltages can be offered depending on the control equipment proposed control and monitoring scheme. The bidders shall dimension those circuits and equipments taking in account an expansion of the needs in 25%. The detailed design of the AC auxiliary SB shall be performed by the contractor.

This rectifier 110V DC shall be suitable for a scheme of operation as following: Normally the charger supplies an alkaline battery 110V DC and the DCswitchboard of the substation. When the General Circuit Breaker of DC switchboard is opened the charger onlysupply the battery. When AC supply to charger fails, its internal DC circuits and the DC Switchboardwill be supplied by the battery.

Page 48 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

And for a mode of operation as following: Normally the Charger will run at automatic control but shall be possible, to selectto Manual control by a selector switch installed inside charger and labeled withprecaution indications for manual use next to selector switch and to thepotentiometer to regulate the output DC voltage in manual mode operation. At automatic operation it will be possible to select manually, both modes ofautomatic operation: floating and equalizing. Normally the charger will run at automatic floating operation supplying the loadcurrent up to its rated current and the battery will supply eventual peaks. If AC supply to charger fails for a time lag smaller than a time setted, when theAC supply return, the charger shall continue at floating operation. If AC supply 380/220V - 50Hz to charger fails for a time lag larger than a timesetted, when the AC supply return, the charger shall automatically begins atequalizing operation for a time proportional to the duration of AC supply fail.

UPS unit(s) must be supplied according to the proposed control scheme consumption.

3.1.6.

Earthing system

During the building works of the structures for equipment support and of the wire mesh fences aclosed underground earthing system shall be established in order to obtain a resistance less than 1(one) ohm. The earthing system shall be designed, using closed rings of a convenient earthing copper cable(with a cross section never less than 95mm2 in the main rings), buried 1 meter deep from soil surface level, in such away that each connection for metallic structure or piece ofequipment could be connected to earth even if one leg of the ring become damaged under thesoil. The contractor shall also submit with the civil drawings of the building, the convenient earthingsystem of the steel structures and its interconnections with the whole earthing system of the S/S.
Page 49 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

No metallic parts, other than earthing system conductors and connectors can be interposed in theearthing system circuits. Inside the building the earthing net shall also be made in copper cable both for connection of allthe metallic parts of the equipment and for connection of the auxiliary transformer neutral point. The zig-zag reactor neutral point must be earthed using an insulated LV, unarmoured, coppercable with, at least 95mm2, and its connection to the earthing system shall be made externally tothe building, on the underground earthing mesh, inside a protected visit concrete box. All the earthing system conductors shall be of electrolytic copper. Connectors and devices forfixing Earthing System Conductors shall be made of copper alloy and all the screws, nuts andwashers shall be in copper alloy or in stainless steel. Where dissimilar metals are in connection,approved means shall be provided for prevent electrochemical reaction and corrosion. Connections shall be kept as short and straight and well tight as possible to avoid increase theresistance of electric circuit and to be unaffected by vibrations.

3.1.7.

Civil works

A new 40x12,5m2building shall be erected. It will be able to house at least25 MV cubicles in one row and the following compartment: One special room for the neutral reactance and the auxiliaries transformer to be supplied, separated by a protection fence. One control room will house all the all the LV switchgear including the DC system except equipment for LV distribution. Classical transformer substation (PT) will be built to house the transformer and the LV distribution board. Transformer and LV board will be supplied and installed and connected by the contractor. There is direct entrance to this room and no common access with the 20 KV or 60 KV installations but an

emergency push-button for shut-down the 20 KV will be installed in the room.

Page 50 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

A meeting room about 50 m2 will be provided for commercial purpose. Entrance shall be done from outside of the substation without any access to the electrical installation.

A store room about 30 m2 will be provided. For sanitary installation one set of porcelain or stainless W.C and hand-basin will be provided for the commercial room. A 2m3 Water tank, piping and septic tank shall be installed.

Building light and small power shall be installed by the contractor as follow: The building shall have its own normal and emergency lighting systems in an adequateillumination level for the different rooms. The contractor shall pay particular attention to theillumination of the control room both in the front and in the back of the panels and on theoperators control table. Small power in all rooms shall also be installed in an adequate number of units, prepared forconnection of mono and three phase tools. One communication network shall also be installed for two incoming phone lines, being bothdirectly connected to phones on the control table. Air conditioning in MV Switchboard room and supervisor room.

The contractor has to submit forapproval the detailed design.

Page 51 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.2. GAMBOA 20 KV SUBSTATION


3.2.1. General

At the present moment Gamboa Substation is the main MV distribution station at Praia Network. It is equipped with 25 years old, 20 kV switchgear, extended with 4 Normafix cells through two transition cubicles.

The scope of work in GamboaSubstation is considering the replacement of all existing metalclad cubicles including the normafix ones by new ones. The furniture includes:

3 Palmarejo SS incoming feeder cubicles, rate current 630 A 16 outgoing network feeder, rate current 630 A Two measuring cubicle One bus bar coupling 1250 A One auxiliary transformer cubicle by circuit breaker 630 A

The Drawing 7.0.08 gives the single line diagram of existing switchgear and the single line diagram of the new switchgear to install. The drawing 7.1.52 gives the design of the existing building.

The contractor has to take in consideration that Gamboa is the most important distribution station and it has to keep working while the rehabilitation is running so a special plan and special installation has to be prepared for this purpose.

The contractor has also to transport the 4 last installed Normafix cubicles to Electra storage at MonteBabosa.

3.2.2.

Specifications of the new 20 kV switchgear

Page 52 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.2.2.1.

General

The 20 kV switchgear shall be metalclad type, air insulated, single busbar type, suitable for indoor installation, and shall be in accordance with IEC Standard No.60298. The switchgear shall be assembled in accordance with the single line diagram - drawing no. 7.0.08.

The new switchgear shall have the following main characteristics: Rated Voltage Rated insulation level Rated lightning impulse withstand voltage to earth, between poles and across open switching device Across the isolating distance : 125 kV (peak) : 140 kV (peak) : 24kV

Rated 1 min. power frequency withstand voltage to earth, between poles and across open switching device Across the isolating distance : 50 kV (rms) : 60 kV (rms)

Rated normal current of main circuits: Busbar Outgoing feeder panels Incoming feeder panels : 1600A : 630A : 630A : 16 kA (rms) : 3 sec. : 40 kA (peak)

- Rated short time withstand current - Rated duration of short circuit - Rated peak withstand current Degree of protection

Enclosures with closed front doors: IP30 according to IEC No.60529 Internal partitions IP20 according to IEC standard No.60529

The cubicles shall have 4 compartments segregated by metallic partition Withdrawable circuit breaker in a movable truck

Page 53 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Bus bar Medium voltage cable connection Low Voltage and protection equipment.

Interlock and safety equipment shall be provided to avoid any access to the live part of the cells or any wrong operation in any situation.

Withdrawable circuit breaker shall have 3 positions: In service (connected) In test Withdrawn

Interlock shall forbid the circuit breaker moving from or in service when it is close.

Front doors must be lockable. Cubicles must be painted with an epoxy system dried in oven or at least with an equivalent painting system. Colour must be approved.

The automatic shutters for the plug-in contact are to be permanently marked with inscriptions "BARRAMENTO" to busbar side and "CABO" to cable side in the incoming and outgoing feeder cubicles. Earthing bar of every cubicle must be interconnected together.

Anti-condensation heaters shall be provided in each panel controlled by thermostat and heater switch suitable for 220-50Hz.

Lighting feature 40W-220V-50Hz controlled by a door switch shall be installed inside each low voltage compartment. At least 2NO+2NC Auxiliary contacts shall be

provided per cubicle for the remote signalling of the withdrawable circuit breaker position.

All the cubicles shall be identified at front side and at rear side if they have rear access for 20 kV cables connection, with approved labels engraved with the cubicles number and the name of the feeder. Other labels can be required if necessary, as
Page 54 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

well as a mimic diagram to be placed at the instrument chamber door.

All the

equipment shall be labelled with the scheme reference and a functional reference.

Next to 20 kV cable connections points, inscriptions with the phase colour and sequence (to be defined) shall be stated.

With the equipment for 20 kV switchgear, the contractor shall supply, in a suitable padlocked box, one set of operation and maintenance devices including special tools.

3.2.2.2.

20 kV Circuit breakers

Three-pole, indoor, vacuum or SF6 type circuit breakers, in accordance with IEC Standard No.60056 and with the following characteristics (other than those specified in 2.3.1.1):

Rated short circuit breaking current Rated normal current: o o Outgoing feeder panels Incoming feeder panels

: 25 kA (rms)

: 630A : 630A : 40 kA (peak)

Rated short circuit making current

Rated operating sequence: 0-3min.-CO-3min.-CO

Operating mechanism: The operating mechanism of the three poles of the circuit breaker shall be mechanically coupled. An approved mechanically controlled indicator shall be provided to show whether the circuit breaker is open or close and its closing spring is loaded or unloaded.

The circuit breakers shall be provided with a manual operating closing/opening device. Mechanical closing/opening device must be padlocked. When it is actuated, circuit breaker close control must be inhibited.

Page 55 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The electrical tripping and closing of the circuit breakers shall operate between 70% and 110% of the rated supply voltage of 110 Vdc. A close and a trip push-buttons for mechanical control shall be provided for circuit breakers. After completed all closing operation, the spring shall be automatically reloaded. The rated supply voltage for motor spring chargers shall be 110Vdc + 10% - 30%. A mechanical operations counter shall be provided in the operating mechanism as well as hand-crank for manual spring charge.

If SF6 type circuit breakers are proposed, 1 set of necessary equipment for refilling and pressure testing shall be supplied by the contractor as well as a local supervision and remote signal of SF6 pressure fault

The circuit breakers of same current rating shall be interchangeable and a suitable interlock shall prevent the use of a circuit breaker with a current rating different of the rating current of the cubicle. The withdrawable circuit breaker can be locked by a padlock in the service position and in the withdrawn position.

Spare auxiliary switches 2NO+2NC for circuit breaker open and

spare auxiliary

switches 2NO+2NC for circuit breaker close shall be wired to the terminal blocks in instrument compartment

3.2.2.3.

20 kV Earthingswitch and voltage divisors

A fast-closing earthing switch of the output shall be provided and shall be mechanically interlocked with the circuit breaker.The earthing switch can close when the circuit breaker is fully withdrawn, and when the earthing switch is closed, the 20 kV circuit breaker cannot be moved in service position. Rated current of the earthing switch Short time (3 sec) withstand current is 16 kA (rms) Rated short circuit making current is 40 kA (peak)

Page 56 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

An approved mechanically operated indicator shall be provided to show whether the fuse switch is open or close The earthing switch shall have a mechanical hand control lockable with padlocks in both positions - open and close - which shall be permanently marked with labels "ABERTO to open position and LIGADO TERRA for close position.

A capacitor voltage divisor with a neon voltage indicator shall be provided on every phase. The indicator shall indicate the presence of voltage in the three phases of the cable side and shall be placed near the 20 kV earthing switch hand control or shall be integrated in the mimic diagram.

3.2.2.4.

20 kV Current transformers

All current transformers shall be in accordance with IEC 60185. Secondary windings of C.T. shall be earthed at one point only and the primary windings shall be capable of carrying the rated primary current for a period of 1 minute with the secondary winding circuit open. The output of each current transformer shall be calculated for protection and control system. The contractor shall submit the calculations for approval.

3.2.2.5.

20 kV Voltage transformers

Each one of the 2 incoming feeders shall have a set of 3 single phase voltage transformers with two secondary cores, in accordance with IEC 60186, and with the following characteristics:

Rated primary voltage Rated secondary voltage core No.1 core No.2 Rated secondary output core No.1 core No.2 Accuracy class: core No.2 core No.1 :3

: 20/3kV : 110/3V : 110/3V : 100VA : 60VA : 0.5

Page 57 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

20 KV HRC fuses shall protect the voltage transformer.

A resistor with a convenient value, connected with the delta connection of the secondary No.2 must be used to inhibit ferro-resonances effects,

3.2.2.6.

Instrument compartment equipment

Local control and protective relays shall be housed in the LV compartment of every cubicle. All the facilities to allow future remote control and supervision from a PLC system shall be provided The supply voltage for remote control shall be110V DC. Control and protection polarity of each panel shall be switched by the respective Local-Remote switch. For each panel four independent power supplies shall be provided as specified below: 110 V.d.c. for control and protection circuits; 110 V.d.c. or 24 Vd.c. for signalling circuits; 110 V.d.c. for circuit breaker motor spring loading; 220V-50Hz a.c. for heating and lighting;

Suitable two poles mini circuit breakers shall protect every circuit of every cubicle. They shall have 1NO+1NC auxiliary switch for the CB position "open" or "close". The power shall be supplied directly, for each bus section, from dc and ac auxiliary switchboards by four different two core cables and the wiring between the different cubicles of each bus section shall be fully insulated. A common supply and circuits for general alarms and supervision of control and signalling supply fault shall be provided. It shall also be provided all the equipment and wiring for the following systems: - Interlocking; - Control Voltage.

Page 58 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The protective relay and trip circuit supervision relays, actuators, the indicator instrumentsalarm annunciators and the mimic diagram shall be on instrument compartment door. Semaphore position indicators for the earthing switches, discrepancy and control switches for the 20 kV circuit breakers and neon voltage indicators, shall be on the mimic diagram. Local alarm annunciators shall be provided in transparent windows with suitable inscriptions, steady illuminated by a lamp when the alarm or signal occurs and until to be reset by local operator. Local reset push button, and remote resetting circuit by future PLC system shall be provided per panel. Colour code shall be used to discriminate every circuit 110 V DC, 24 V DC and AC.

Further to the before specified the minimum equipment to be installed in each panel type, and the interlocking schemes and control expected shall be: Outgoing Network FeederCubicles N 2,3,4,7,8,9,10,14,15,16,17,20,2 and 22 1. One multifunctional meter to be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export; three-phased power factor on each phase; instantaneous U on each phase; instantaneous I on each phase; phase switch UU, UI and cos; frequency; succession of phases;

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality.

Page 59 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The meter have to be able to register and store all the information for a period not less than 30 days and it has to be able to display maximum values..

2. The protective relays to be used shall be overcurrent and shortcircuit (50/51) for the three phases protection and an earth-fault (50N/51N) element using residual current arrangement from CTs phases or feed by a toroidal CT 100/1 A, around the three phase cables. In the wiring coming from CTs, terminal blocks shall be inserted giving the possibility to short circuit them and test the OC/EF relay. The trip order from de OC/EF relay must be wired in such a way, it can be switched from the trip coil of the circuit breaker to an external testing lamp.

Incoming feeder cubicles


Interconnection with PalmarejoDistribution Station:Feeder Cubicles N 6,11 and 18 Interconnection with So Filipe 60/20 kV Substation:Feeder Cubicles N 5 and 19

1. One multifunctional meter to be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export; three-phased power factor on each phase; instantaneous U on each phase; instantaneous I on each phase; phase switch UU, UI and cos; frequency; succession of phases;

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality.

Page 60 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The meter have to be able to register and store all the information for a period not less than 30 days and it has to be able to display maximum values.

2. One directional overcurrent and short-circuit relay (67) and one directional earth fault relay (67/N) for protection with convenient setting scales both for currents and tripping times shall constitute the protection of these two feeders; 3. A set of under voltage (27), overvoltage (59) under frequency (81U) over frequency (81O) relay. The closing signal for the CB shall be controlled by a convenient synchronizing scheme. The incoming feeders from Palmarejo Power Plant, Gamboa Power Plant and 20/60 kV Substation shall be operated in parallel. The protection CTs wiring must be done in such a way that, after dismantling the existing MV equipment, the contractor can transfer three sets of already existing longitudinal differential relay (87L)from the incoming Palmarejo Power Plant cubicle to the new cubicles.

3.2.2.7.

Earthing facilities and Earthing of metal parts

All metal parts including any relays, instruments, etc., mounted on the switchboard, shall be connected to a copper earth bar, which runs along the full length of the switchboard. The cross-section of the bar shall be sufficient to carry the rated short-time withstand current of the switchgear for the time specified in the Schedule of Requirements. The frame of the draw-out circuit-breakers shall be connected to the earth bar through a substantial plug type contact arranged to make and maintain contact before the main isolating contacts make.

The earthing function shall form part of the integral design of the equipment. Full details of the method of earthing shall be submitted by the manufacturer. It shall not be possible to select an integral earthing position, close an earth switch or connect a portable earthing device unless the circuit-breaker is in the open position. When the

Page 61 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

circuit-breaker is being used for earthing, a locking facility shall be provided to prevent the breaker being opened by mechanical or electrical means. It shall be impossible to return to the normal service position without first having removed this locking facility.

3.2.3.

Earthing system

The Contractor shall earthall thesupplied and existent equipment. The existing underground earthing system shall be improved in order to obtain a resistance less than 1(one) ohm. All metallic parts of the building shall be earthed. No metallic parts, other than earthing system conductors and connectors can be interposed in theearthing system circuits. Inside the building basement a new earthing net shall also be made in copper cable with, at least 95mm2, for connection of allthe metallic parts of the equipment. All the earthing system conductors shall be of electrolytic copper. Connectors and devices forfixing Earthing System Conductors shall be made of copper alloy and all the screws, nuts andwashers shall be in copper alloy or in stainless steel. Where dissimilar metals are in connection,approved means shall be provided for prevent electrochemical reaction and corrosion. Connections shall be kept as short and straight and well tight as possible to avoid increase theresistance of electric circuit and to be unaffected by vibrations.

3.2.4.

Power cable and control cable arrangement

The Contractor shall supply and install all necessary equipments, namely metallic cable ladder and accessories to provide a new arrangement for the existing MV power cables in the substation basement - cable galleries and the control cables according to the good practice.

3.2.5.

Civil works

Page 62 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Some improvement shall be made inside the building - first floor and basement namely new painting and wall treatment, water proofing of the basement and the roof, installation of insulated floor, access to the basement, doors replacement, lighting and small power installation upgrade, ventilation and air conditioning.

3.3. SWITCHING STATIONS


3.3.1. General

To fulfil the objective of this project, the following must be done:

In Santiago Island

1. Achada Grande Switching Station -(Single line diagram drawing number 7.1.17) Erection of new 8x5 m2 building according to the drawings n 0.0.09/10/11/12 Supply and installation of All MV switchgear equipment 1 MV/LV transformer 1 LV Fuses Board 1 Rectifier/ Batteries/DC switchboard Light and small power plugs Earthing circuit Safety equipment

In Fogo Island 1. Patim Switching Station (Single line diagram drawing number 8.1.08) Erection of new 6x4 m2 building according to the drawings n 0.0.05/06/07/08 Supply and installation of All MV switchgear equipment 1 MV/LV transformer

Page 63 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 LV Fuses Board 1 Rectifier/ Batteries/DC switchboard Light and small power plugs Earthing circuit Safety equipment (Single line diagram drawing number

2. Ponta Verde Switching Station 8.1.09)

Erection of new 6x4 m2 building according to the drawings n 0.0.05/06/07/08 Supply and installation of All MV switchgear equipment 1 MV/LV transformer 1 LV Fuses Board 1 Rectifier/ Batteries/DC switchboard Light and small power plugs Earthing circuit Safety equipment

3. Xaguate Switching Station (Single line diagram drawing number 8.1.10) Full rehabilitation of the existing building with new 4x4 m2 building according to the drawings n 0.0.01/02 Supply and installation of All MV switchgear equipment 1 MV/LV transformer 1 LV Fuses Board Light and small power plugs Earthing circuit Safety equipment (Single line diagram drawing number

4. CovaFigueira Switching Station 8.1.11)

Page 64 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Partial rehabilitation of existing building Supply and installation of MV equipment for extension of existing switchgear Light and small power plugs Earthing circuit Safety equipment

In MaioIsland

1. Morro Switching Station - (Single line diagram drawing number 6.1.17) Erection of new 6x4 m2 building according to the drawings n 0.0.05/06/07/08 Supply and installation of All MV switchgear equipment 1 MV/LV transformer 1 LV Fuses Board 1 Rectifier/ Batteries/DC switchboard Light and small power plugs Earthing circuit Safety equipment

2. Pedro Vaz Switching Station -(Single line diagram drawing number 6.1.18) Improvement of existing building Supply and installation of All MV switchgear equipment 1 Rectifier/ Batteries/DC switchboard Light and small power plugs Earthing circuit Safety equipment

3. Curralona Switching Station - (Single line diagram drawing number 6.1.16) Erection of new 4x4 m2 building according to the drawings n 0.0.01/02.

Page 65 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Supply and installation of All MV switchgear equipment 1 MV/LV transformer 1 LV Fuses Board Light and small power plugs Earthing circuit Safety equipment

3.3.2.

Existing MV switchgear

Today, ELECTRA is using, for this type of application, one modular, air insulated switchgear, following IEC 60298 and IEC 60129, with the following main data:

Rated Voltage: 24 kV Insulation level: - PF (50Hz/1min): - LI (1.2/50s) Busbar rated current: 630 A Rated short time withstand current: 16 kA, 3 (rms): Rated peak withstand current: 40 kA (peak) Degree of protection: - MV compartment: IP 65 - Mechanism compartment: IP2XC - Busbar, cable and fuse compartments: IP3X 50 kV (rms) : 125 kV (peak)

3.3.3. 3.3.3.1.

The MV cubicle to supply and install General

The system shall be composed of a set of reduced size modular cubicles, single or multifunctional, for different 24 kV power distribution configurations. The following main features shall be guaranteed:

Page 66 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The cubicles shall be full SF6 gas-insulation, providing protection against harsh environmental elements(including flooding), long service life and maintenance-free of life parts.

Full modularity and future extendibility in both sides using special plug in connecting sets; Internal arcs withstanding for personal protection, in accordance with IEC 60298 Small dimension and low weights for easier handling and installation Simple and safe operation The metal enclosure of the cubicles shall be made of galvanized steel plate, an shall be sturdy enough to prevent deformation and ensure protection under the expected operation condition.

The cable connectionsup to 240 mm2 shall be with Bushing / plug in IEC type terminals according to EN 50181 up to 200 A and up to 400 A. The front cover of each cubicles shall be properly interlocked to provide safe, convenient access to the cable terminals and fuse holder Each cubicle shall be equipped with a device witch continually will indicate voltage presence in the equipment

Every cubicle shall have: a separate low voltage compartment, closed by a door, where the control and protection equipment shall be installed. an heating resistance 220V- 50 Hz and controlled by thermostat in the MV compartment and LV compartment.

The following standards shall be applied: IEC 20298 - Metal enclosed switchgear for alternative current rated voltage over 1 kV and under 52 kV IEC 60265 - High voltage switches for rated voltage over 1 kV and under 52 kV IEC 60129 - Alternating current disconnectors and earthingdisconnectors

Page 67 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

IEC 62271 - 105 Alternating current switch-fuse combination IEC 62271-100 High voltage alternating current circuit breakesr.

3.3.3.2.

Circuit breaker protection functional feeder cubicle.

Equipped with Vacuum circuit breakers (IEC 60056): Rated voltage Rated current incoming feeder an bus bar: Breaking capacity: Making capacity: Rated operating sequence: 24 kV 630 A 16 kA (rms) 40 kA (peak) 0-3min-CO-3min-CO

The circuit breakers shall be provided with manual close/open device. One electrical tripping device and one electrical close device shall operate between the limits of 70% and 110% of the rated supply voltage of 24 V dc. One manual close and one manual trip push-buttons shall be provided. After the closing operation, the spring shall be automatically loaded. The rated voltage for spring motors shall be 24 V dc. Mechanical operations counter shall be provided on each circuit breaker. Two hand cranks, for manual spring charge shall be provided per station or one hand cranks for manual spring shall be provided per circuit breaker.

SF6 busbarswitch (IEC60129), 630 A, 16 kA (rms) 40 kA (peak), manually controlled and duly interlocked with the circuit breakers and with the earthing switch. Such switch shall be lockable by padlock both in open and in closed position.

Current transformers (IEC60185): Rated primary current: Rated secondary current: Accuracy class:
Page 68 of 150

50-100 A or 150-300 5A/5A 5 P15

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Rated output:

in

accordance relays

with and

the used

protection wiring.

Secondary windings of each CT shall be earthed at one point only and the primary winding will be capable of carrying the rated primary current for a period of one minute with the secondary open circuited.

Feeder earthing switch (IEC 60129): Rated short circuit making current: 40 kA peak

Manual control interlocked with the busbar switch. The earthing switch shall be lockable both in open and closed position by padlocks.

Voltage divisors Associated with low voltage capacitors and with neon voltage indicators for signaling cable voltage presence in the three phases.

Control and protection scheme: Each cubicle shall have a separate low voltage compartment where the local control and protection equipment shall be installed: terminal blocks, micro circuit breakers, protection for motor spring charge, control, protection and an OC/EF relay. All the facilities to allow future remote control and supervision from a PLC system shall be provided. The protective relays shall be: An overcurrent and shortcircuit (50/51) for the three phases protection an earth-fault (50N/51N) using residual current arrangement from CTs phases or feed by a toroidal CT 100/1 A, around the three outgoing cables. Terminal blocks shall be inserted in the wiring from CTs for the purpose of shortcircuit and the test of the OC/EF relay. The trip order from de OC/EF relay can be switched from the trip coil of the circuit breaker to an external testing lamp.
Page 69 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Each LV compartment shall be equipped with a multifunctional energy analyzer for voltage, current, energy, power, frequency and power factor measuring.

Lighting feature 40W-220V-50Hz controlled by a door switch shall be installed inside each low voltage compartment.

Labelling: The cubicles shall be identified with labels 60 x 120 written in Portuguese language with the designation of the S/S where the feeder is connected and the cable number. The open and close position of the circuit breaker shall also be labelled with the words ABERTO and FECHADO. The earthing switch hand control shall also be labelled with ABERTO and LIGADO TERRA for open and earthed respectively.

3.3.3.3.

Load break switch feeder cubicle.

Equipped with SF6 busbar load break switch (IEC 60129) 630 A, 16 kA(rms) 40 kA (peak), Manual controlled and interlocked with the earthing switch. Such switch shall be lockable by padlock in open and in closed position.

Cable earthing switch (IEC 60129): Rated short circuit making current: 40 kA peak Manual controlled and interlocked with the busbar disconnector. The earthing switch shall be lockable both in open and closed position by padlocks.

Voltage divisors Associated with low voltage capacitors and with neon voltage indicators for signaling cable voltage presence in the three phases.

Page 70 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Labelling The cubicles shall be identified with labels 60 x 120 written in Portuguese language with the designation of the S/S where the feeder is connected and the cable number. The earthing switches control shall also be labelled with ABERTO and LIGADO TERRA for open and earthed respectively.

3.3.3.4.

Transformer feeder cubicles

Equipped with SF6 load break switch - fuse combination, 630 A, 16 kA (rms) 40 kA (peak), manually controlled and interlocked with an earthing switch located downstream The fuses must be 20 A, 25 Aor 40 A (IEC 60282.1, IEC60420). The blow up of one fuse must trip the three phases of the load break switch. The switch shall be lockable by padlock both in open and in closed position. The cubicle shall be equipped by a 220 Vac trip coil to allow the switch disconnector to be automatically opened by an external signal, such as one sent by the transformer thermostat in case of overheating. Voltage divisors Associated with low voltage capacitors and with neon voltage indicators for signalling cable voltage presence in the three phases. Labelling The cubicles shall be identified with labels 60 x 120 written in Portuguese language with the designation of the transformer, when more than one in the S/S or just TRANSFORMADOR when only one in the S/S. The earthing switches hand control shall also be labelled with ABERTO and LIGADO TERRA for open and earthed respectively.

3.3.3.5.

Bus bar coupling cubicles

Equipped with SF6 busbar load break switch (IEC60129) 630 A, 16 kA (rms) 40 kA (peak), manually controlled.
Page 71 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Such switch shall be lockable by padlock both in open and in closed position.

3.3.3.6.

Measuring cubicles

Equipped with a set of 3 single phase voltage transformers in accordance with IEC 60186, and with the following characteristics:

Rated primary voltage Rated secondary voltage Rated secondary output Accuracy class:

: 20/3kV : 110/3V : 100VA : 0.5

20 KV HRC fuses shall protect the voltage transformer.

A resistor with a convenient value, connected with the delta connection of the secondary No.2 must be used to inhibitferro-resonances effects.

3.3.4.

MV/LV Power Distribution Transformers

One MV/LV indoor transformerfor each S/S, oil immersed type, hermetically sealed, with the following characteristics in accordance to IEC 60076: Rated power : Rated voltage ratio : Rated frequency : Method of cooling : 250 or 400 KVA 20.000-15000/410-236V 50Hz ONAN

Impedance voltage at 75C and at principal tapping : 4% Connection symbol : Tapping range : Tapping step : No. of tap positions : Maximum short circuit level at HV terminals :
Page 72 of 150

Dyn11 +5%, -5% 2.5% 5 500MVA

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Insulation level: - MV line terminal : LI 125 AC 50 - LV line terminal : AC 3

Maxaccepted load losses at rated power: Max accepted no load losses: Max accepted noise level: Painting:

**** W **** W 58 dB grey colour, RAL 7033

The transformers shall be provided with: the convenient fittings and its own protective devices which trip the CB : at least one thermometer with maximum indicator and an oil level indicator plug-in bushings on MV side 4 LV flag lugs and a metallic LV cable box for cables coming from the left or/and the right side of the transformer. A switch for the MV voltage 15 KV/ 20 KV: controlled externally without dismantling or removing anything. A tap changer 2 x 2.5%controlled externally without dismantling or removing anything 3.3.5. LV distribution Fuse Boards

One low voltage distribution fuse boards shall be installed in every substation. The LV distribution fuse board is designed for 630 kVA transformers. The general one line diagram is the represented in drawing no.01/28-4 and the construction drawing are no. 01/28-5. It shall include also the Public Lighting control and protection system and one photoelectric cell to be installed outdoor of the PT and the VV 2x1.5 mm2 cable to connect it to the fuse board.

3.3.6.

AC Panel Board

Page 73 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

An AC panelboard shall be provided and installed inside the building on the wall near the door. The panel shall be energized by theLV network by Electra and shall supply power to the AC auxiliaries of the station The AC panelboard shall house: A head differential Circuit Breaker 300milliamperes The feeder micro circuit breakers for every electrical equipment 2 spares micro circuit breakers Spare room for 6 future micro circuit breakers

Circuit breaker is magnetic-thermic type with opening/closing of the phase and of the neutral. 3.3.7. Rectifier / Battery / DC Switchboard

A metallic cubicle housing the rectifier, the batteries and the DC switchboard shall be provided and installed. It shall be energized from the AC panel board and generate the 24V DC for the equipment of the switching station. The cubicle shall have a protection IP 20 and shall be painted with an epoxy system similar to the other cubicle. Cautions shall be taken to avoid overheating of the indoor equipment. It shall have 2 compartments, each one close by a front door lockable with a triangle key; the lowest compartment shall house the battery. Two rectifiers in parallel shall be in the top compartment Each one is: Protected by a magneto thermic circuit breaker on the AC circuit Capable o to supply energy 24V DC to the entire substation and load batteries from 0 to full load in less than 12 hours o to maintain the DC at 24 V 10% with the AC supply and have on the front door (at least): a green led signalling the rectifier in service a red led signalling the rectifier in fault a red led signalling the AC supply missing a red led signalling battery fuses blow up (or battery CB open) Indication of the DC voltage

Page 74 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The circuit breakers to protect the DC circuits shall be housed in the top compartment. They are calibrated by the contractor in accordance with the equipment supplied. 2 spare circuit breakers shall be installed. All the interconnection with external equipment shall be done on a terminal block. DC circuit and AC circuit shall be segregated and must follow a colour code. Batteries Nickel Cadmium shall be housed in the bottom compartment. Capacity must be calculated for three O/C sequences of the 20 kV circuit breakers and keep all the control system in service during 6 hours without AC power. Protective device (fuse or CB) shall protect the battery from any over current.

3.3.8.

Lighting and Small Power

Shall be supplied and installed: two 40 W fluorescent lamps two a.c. 230V-50 Hz, (1ph + N + E), 25 A, IP 67, sockets one emergency lighting block above the door. The block has its own battery and its switch on automatically in case of AC outage. Capacity shall be for 2 hours without AC power. The VV connection with the AC panelboard.

3.3.9.

Earthing System

The protection earthing system is separated from the neutral earthing circuit and for both the earthing resistance shall be lower than 10 Ohms. The distance between any buried parts of the two systems cannot be less than 20 meters The standard earthing electrodes are electrolytic copper plates (1000x500x2.5mm) installed vertically, being the largest side horizontally located at 1 meter depth from soil surface. However earthing rods installed vertically, with the head at 1m depth, and paralleled with main electrode, can also be used in order to reduce earthing resistance.

Page 75 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.3.9.1.

Protection Earthing System

A ring of non insulated 50 mm2 copper conductor shall be buried at 1m deep all around the building and at 80 cm from the foundation. All the protective earthing rods shall be connected to this buried ring by a 50 mm2 conductor. The metallic structure of the building shall be also connected to the buried ring at least in two opposite location. The connections shall be made by welding process or by effective crimping process using cooper C connectors and adequate tools. A loop of the buried circuit is connected to a disconnectable connector (for earthing metering purposes) located on the wall inside the building near the door. From this connector, a ring of a copper conductor 50mm2 shall be installed on the wall inside the building. A 35mm2 copper conductor shall earth all the main equipment and metallic parts of the building. Transformer tank, cover and cable box, LV Distribution fuse board, MV RMU shall be connected at least at two opposite points. Flexible copper conductors 16 mm2 shall interconnect the door frame and the door with a loop large enough to avoid breakage. Reinforcement steel embedded in the floor must be also earthed by a 35 mm2 copper conductor.

3.3.9.2.

Transformer neutral Earthing System

One or more earthing electrodes must be connected directly to one disconnectable connector (for metering purposes) by insulated copper cable of 50mm2, 0.6/1kV, VV, which external sheath shall be black colour and the internal sheath shall be blue colour. The connecting cable must be buried 1 m deep and be mechanically protected by auPVC pipe of small diameter and strong wall. Transformer Neutral shall be connected to the disconnectable by an insulatedcopper cable of 50mm2, 0.6/1kV, VV

Page 76 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.3.10.

Safety Equipment

In each switching station it shall be installed: One wall board with instructions for first help, written in Portuguese language, to be observed in case of electrocuted people. One set of rubber gloves duly insulated for 24 kV; One insulated platform for 24 kV;

3.3.11. 3.3.11.1.

Civil Works Erection of New Buildings

The buildings should be able to house all the specified equipments and have some space for future expansion. For different switching stationsthe buildings are differently sized, 4x4m2 or4x6m2 or 5x8m2 drawings 0.0.01/02, and the guide designs are presented in the 0.0.09/10/11/12. The contractors are

0.00.05/06/07/08,

requested to revise and to present their own best proposal according to the definitive site plan and to submit for approval.

Metallic ventilation louvers, doors and trench covers must be hot deep galvanized. The contractor has to submit for final approval the detailed.

3.3.11.2.

Preparatory and Erection Works of MV and MV/LV installations were existing buildings need rehabilitation

For the switching stations to be rehabilitated the contractor shallinstall outside, near the existing stations, temporary safe containerized switching stations to where the existing MV and LV cables will be transferred during the works. Once the works are finalized and the equipment tested, the MV and LV cables shall be transferred to the rehabilitated station.

Page 77 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Bidders are requested to propose a comprehensive description about the way they plan to do these works and the time schedule. Bidders shall include in their price the temporary use of the necessary equipment for this type of solution. Bidders may also propose alternative solutions. The cables transfer will be made by the contractor in closed cooperation with ELECTRA staff.

The dismounting of the existing equipment and its transportation to ELECTRA Stores are included in the contractor scope of works.

3.4. MV/LV SECONDARY SUBSTATIONS


In Portuguese language secondary substations are normally called Postos de Transformao or PTs and we will use also this name in the specification. For the new PTs it will be necessary to supply the equipment and build new buildings to install the equipment.Some PTs needs to be rehabilitated or upgraded to 20 kV by replacement of MV switchboard or distribution transformer or both of them. The civil rehabilitation of the buildings is also considerate. To fulfil the objective of this project, the following must be done:

In Santiago Island

Page 78 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Page 79 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In FogoIsland

In MaioIsland

3.4.1.

General

The MV/LV secondary substation is composed by:

Page 80 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

one ring main unit with two line feeder and one transformer feeder or one unit with one line feeder and one transformer feeder. one transformer with a rated power of 160, 250, 400 or 630 kVA; one LV distribution fuse board, sized for 250 A (160kVA transformers) or 1000 A (630 kVA transformers, with 6 fuses tri-blocks for outgoing LV cables and incorporating also two three phase (six single phase) public lighting outgoing protection fuse bases.

one lighting and small power switchboard

The single line diagram of the ring main units is represented in drawing no. 0.1.28 The secondary substation building design,including the equipment layout in the building, the earthing circuit, the lighting and small power system installation shall be standardized for two models depending on the municipal authorities site implant definitions: 4x4 square type represented in the drawing no. 0.0.01/02 Hexagonal type represented in the drawing no. 0.0.03/04

The metallic ventilation louvers, the door and the trench covers details are represented in the drawing no. 0.0.18. The LV fuse board and equipment disposition is represented in drawing 0.1.35 for 250 A (transformer up to 160 kVA) and 0.0.36 for 1000 A (transformer 250 up to 630 kVA).

3.4.2. 3.4.2.1.

MV Switchgear Specification General

The system shall be composed of a set of reduced size modular cubicles, single or multifunctional, for different 24 kV power distribution configurations. The following main features shall be respected:

Page 81 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The cubicles shall be full SF6 gas-insulation, providing protection against harsh environmental elements (including flooding), long service life and maintenance-free of life parts.

Full modularity and future extendibility in both sides using special plug in connecting sets; Internal arcs withstanding for personal protection, in accordance with IEC 60298 Small dimension and low weights for easier handling and installation Simple and safe operation The metal enclosure of the cubicles shall be made of galvanized steel plate, an shall be sturdy enough to prevent deformation and ensure protection under the expected operation condition.

The cable connections up to 240 mm2 shall be with Bushing / plug in IEC type terminals according to EN 50181 up to 200 A and up to 400 A. The front cover of each cubicles shall be properly interlocked to provide safe, convenient access to the cable terminals and fuse holder Each cubicle shall be equipped with a device witch continually will indicate voltage presence in the equipment

Every cubicle shall have: a separate low voltage compartment, closed by a door, where the control and protection equipment shall be installed. an heating resistance 220V- 50 Hz and controlled by thermostat in the MV compartment and LV compartment.

The following standards shall be applied: IEC 20298 - Metal enclosed switchgear for alternative current rated voltage over 1 kV and under 52 kV IEC 60265 - High voltage switches for rated voltage over 1 kV and under 52 kV IEC 60129 - Alternating current disconnectors and earthingdisconnectors

Page 82 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

IEC 62271 - 105 Alternating current switch-fuse combination IEC 62271-100 High voltage alternating current circuit breakesr.

The main electrical characteristics of the Ring main Units are: Rated Voltage: 24 kV Insulation level: - PF (50Hz/1min) - LI (1.2/50s) Busbar rated current Rated short time (3 sec) withstand current Rated peak withstand current : 50 kV (rms)

: 125 kV (peak) : 630 A : 16 kA, (rms): : 40 kA (peak)

3.4.2.2.

Equipment for line feeders function

SF6 busbar load break switch (IEC60129), 630 A, 16 kA(rms) 40 kA (peak), manually controlled and mechanically interlocked with the earthing switch. It shall be lockable by padlock both in open and in closed position. Feeder earthing switch (IEC 60129): Rated short time (3 sec) current 16 kA (rms) Rated short circuit making current: 40 kA peak

Feeder earthing switch (IEC 60129): Rated short circuit making current: 40 kA peak Mechanically interlocked with the busbar switch. Lockable by padlocks in both position open and close.

Capacitor Voltage divisors They are connected on the 3 phases with neon indicators for signaling voltage presence in the three phases.

Labeling: The cubicles shall be identified with labels 60 x 120 written in Portuguese language with the designation of the S/S where the feeder is connected and the

Page 83 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

cable number. The earthing switches shall also be labelled with ABERTO and LIGADO TERRA for open and earthed respectively.

3.4.2.3.

Equipment on transformer protection cubicles:

SF6 load break fuse-switch, 200 A, 16 kA (rms) 40 kA (peak), manually controlled and mechanically interlocked with an earthing switch located downstream the fuses. The fuses rating must be 20 A, 25 A or 40 A (IEC 60282.1, IEC 60420) when the transformers rated power is respectively 250, 400 or 630 kVA,. The fusion of one fuse must trip the three phases of the switch. The switch shall be lockable by padlock in both position open and close. Earthing switch (IEC 60129): Rated short circuit making current: 40 kA peak Mechanically interlocked with the busbar switch. Lockable by padlocks in both position open and close.

Voltage divisors associated with low voltage capacitors and with neon voltage indicators for signaling cable voltage presence in the three phases.

Labeling: The cubicles shall be identified with labels 60 x 120 written in Portuguese language with the designation of the transformer, when there is more than one in the S/S or just TRANSFORMADOR when only one in the S/S. The earthing switches shall also be labelled with ABERTO and LIGADO TERRA respectively for open and close position. 3.4.3. Directional Fault Current Indicator for Uderground Network

Each new secondary substation, installed in a masonry building or in a PUC,as well as those to be rehabilitated shall be equipped with a self poweredintelligent directional fault-current indicator for 10-24kv underground cable networks, located in one of the ring cables.

Page 84 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The cable fault indicator shall be able to locate short-circuit /Phase To Phase (PTP)and earth faults/PhaseTo Earth (PTG) in underground cable distribution networks, with isolated or impedance earthed neutral. The indicators shall be placed at substations, Ring Main Units or any installation where exists a cable termination and access to capacitive test points for measuring the phase voltage.

Upon detecting a fault in the cable, the indicator gives off an intermittent red or green light-flash (LED). One LED flashing indicating an earth-fault and both LED flashing indicating a short-circuit fault. External indication units for mounting outside the station over the door of the building shall be supplied. The colours of the LED will also indicate direction to the fault location for earth-faults with reference to the busbar where the indicator is situated. The line fault indicator shall be equipped with an internal relay-card, giving the possibility for connection to the communication devices for the following four different relay-outputs to an RTU: Transient Fault in red direction Transient Fault in green direction Permanent Fault in red direction Permanent Fault in green direction

The housing of external indicator shall be in poly carbonate body (PC) / ABS, front cover transparent Poly Carbonate/ABS, UV resistant, mechanical strength IK o9 (6J impact) IP-55.

This equipment shall be installed in one of the line cubicle of all MV switchboard to be supplied for the secondary substation. In Praia City Network the earth fault indicator shall be installed also in all existing Secondary substation where no rehabilitation is expected as indicated in the following table

Page 85 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.4.4.

MV/LV Power Distribution Transformer

One MV/LV indoor transformerfor each S/S, oil immersed type, hermetically sealed, with the following characteristics in accordance to IEC 60076:

Rated power Rated voltage ratio

: 160 or 250 or 400 or 630 kVA : 20000/410V or 20000-15000/410 V

Rated frequency

: 50Hz

Page 86 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Method of cooling Impedance voltage at 75C and at main tap Connection vector group Tap range Tap step No. of tap positions Maximum short circuit level at HV terminals Insulation level: MV line terminal LV line terminal Max accepted load losses at rated power Max accepted no load losses Max accepted noise level (IEC 60551) Painting

: ONAN : 4% : Dyn5 : +5%, -5% : 2.5% :5 : 500MVA

: LI 125 AC 50 : AC 3 : ***** W : *** W : 58 dB : grey colour, RAL 7033

The transformers shall be provided with: the convenient fittings and its own protective devices which trip the CB: at least one thermometer with maximum indicator and an oil level indicator plug-in bushings 200A-24kV on MV side 4 LV flag lugs A switch for the MV voltage 15KV/20KV: controlled externally without dismantling or removing anything. A tap changer 2 x 2.5%. ; controlled externally without dismantling or removing anything 3.4.5. Transformer feeders

The MV cable standardized to connect the RMU protection cubicle and the Transformer plug in bushings shall be the ELECTRA standardized aluminium, XLPE (IEC 60502-2), single core cable, 1x120 mm2 type.

Page 87 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Pre-molded type connector with separable dead-break connector, 24 kV, 250A according to IEEE 386-2001 shall be connectedto the transformers MV bushing,

The cables standardized to perform the connection between LV transformer bushings and LV Distribution fuse board are single core, copper, non armoured, 0.6/1 kV, XV 95mm2cable, or single core aluminum, non armoured 0,6/1 kV, LXV 240 mm2 cable in accordance to IEC 60502-2.

For 160 kVA transformers the connection shall be done through one cable per phase and one cable for neutral.

For 250 kVA, 400 kVA and 630 kVA transformers the connection shall be done through four cables per phase and two cables for the neutral according to the 1000 A LV Fuse board to be supplied so that in case of future transformer upgrade it shall not be necessary to replace the already existing cable connection. The connectors to be used in both extremities of the cables must be crimpable, tined copper, sized in accordance the characteristics of the LV bushings and of the LV incoming load break switch terminals.

3.4.6.

Low voltage distribution fuse board

According to the rate current there shall be two type of LV switchboard: LV Switchboard 1000 A LV Switchboard 250 A

3.4.6.1.

LV switchboard 1000 A

The 1000 A LV distribution switchboard is designed for 250, 400 and 630 kVA transformer stations. It shall be metal enclosed, self-ventilated, floor mountedfreestanding typeor wall mounted, rated voltage 690 V ac, service voltage 230/400 V ac, frequency 50 Hz, assembled on factory according to single line diagram represented in drawing no.0.1.36.The electrical assembly includes:
Page 88 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 four-pole circuit breaker equipped with magnetic and thermal relays with a rated current of 1000 A, being the thermal relay adjustable between 0,6 and 1 x In;

6 three-pole fuse(NHO1) for simultaneously opening, rated current 250 A, equipped with 160 A fuse; 1 three-pole fuse(NHO1) for simultaneously opening, rated current public lighting circuit; 1 bi-pole circuit breaker equipped with instantaneous differential relay, rated current 25 A and 300 mA of sensibility; One public lighting scheme including twelve single-pole 32A circuit breaker supplied by one three-pole 50 A fuse breaker above defined, and controlled by one three-pole 63 A contactor able to answer the following functions: OffAutomatic-Manual; The automatic control of the public lighting will be made of a photoelectric cell and an hourly switch or an electric clock with 100 hours of running reserve and two NO/NF contacts; The supply of each Distribution Fuse Board includes one photo-electric cell to be installed outside the PT and the VV 2x1.5 mm2 cable to connect it to the fuse board. 50 A, for

copper busbar 50 x 10 mm (phases) and 50 x 5 (neutral), rated current 1000 A, rated short-time withstand current 30 kA, 1 sec; the earthing connector necessary to connect the neutral coming from the transformer and an earthing isolated cable of 50mm2, witch other end is connected to neutral earthing electrode of the substation;

all the accessories for making proper connections of the equipment including the metallic parties to earthing system and connectors where it can be possible to earth the metallic shields of LV cables;

protection fuses for the measuring equipment; the equipment for LV measuring, as described: 3 CTs 1000/5 A classe 1; 3 ampere meters 0-1000 A; 1 voltmeter 0-500 V, with a switch for 7 positions;

Page 89 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 Energy for the total active and reactive load (asymmetric load); 1 kWh meter for public lighting (asymmetric load):

The energy metering system in the transformer / LV switchboard feeder and the metering system in the street lighting circuit shall be done, each one, by a ACE SL7000 Meter Series - Smart energy meter from Actaris or equivalent. Both meter shall be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export three-phased power factor on each phase instantaneous U on each phase instantaneous I on each phase phase switch UU, UI and cos frequency succession of phases displays phase diagram P,Q

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality. Local- and remote-reading ports and external telephone modem have to be supplied from the meter.

The meters shall have the following electrical characteristics: Rated voltage Rated direct current Rated CTs connection current Network type Accuracy for direct connection Accuracy for transformer connected Frequency
Page 90 of 150

3x57,7/100V up to 3x240/415V auto ranging In 5 A, Imax 120 A Ib 1A, Imax 10A 4 wire Class1 Class 0,2 50 Hz

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Standards Communications

IEC 61036, IEC 60687 IR-Port, 2RS485 DLM-Cosem, Protocol

The following accessories shall be supplied: Communications External telephone modem Cabling for external communications devices IR-reading device for connection to PC Configuration/Calibration Customer software for consumption monitoring Utility software for configuration Utility software for calibration Installation tools Transformer ratio labels Sealing kit Documentation Test certificate User guide Installation manual

3.4.6.2.

LV Switchboard 250 A

This switchboard is designed to be installed in Pole mounted transformer station or inside a masonry building of a transformer station, rated power 50 or 100 or 160 kVA. Therefore the marshalling cabinet shall be outdoor type, with a degree of protection IP-443, made of polyester in order to support the corrosion effects but also it must be resistant to the UVR. It shall be rated voltage 690 V ac, service voltage 230/400 V ac, frequency 50 Hz, assembled on factoryaccording to single line diagram represented in drawing n .0.1.35 .For Pole mounted installation, the marshalling cabinet shall be equipped with all the accessories necessary to erect the cabinet on the pole. The electrical assembly includes:
Page 91 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 four-pole circuit breaker equipped with magnetic and thermal relays with a rated current of 250 A, being the thermal relay adjustable between 0,6 and 1 x In;

4 four-pole circuit breaker equipped with magnetic and thermal relays with a rated current of 125 A, being the thermal relay adjustable between 0,6 and 1 x In;

1 bi-pole circuit breaker equipped with instantaneous differential relay, with a rated current of 25 A and 300 mA of sensibility; One public lighting scheme including eight single-pole 32A circuit breaker supplied by one three-pole circuit breaker and controlled by one three-pole contactor able to answer the following functions: Off-Automatic-Manual; the automatic control of the public lighting will be made of an photoelectric cell and an hourly switch or an electric clock with 100 hours of running reserve and two NO/NF contacts;

copper busbar, rated current 250 A (2A/mm2) short-time withstand current 21 kA, 1 sec the earthing connector necessary to connect the neutral coming from the transformer and an earthing isolated cable of 50mm2, witch other end is connected to neutral earthing electrode of the substation.

all the accessories for making proper connections of the equipment including the metallic parties to earthing system and connectors where it can be possible to earth the metallic shields of LV cables.

heating resistance with 60 W protected against accidental contacts. The marshalling cabinet shall be prepared in its lower side to accept the connection of the mentioned incoming cable from the transformer, the four outgoing aerial bundled cables 4 x70 + 2x16 mm2 and the earthing wires.

The equipment for LV measuring, as described : 3 CTs 250/5 A classe 1; 3 ampere meters 0-250 A; 1 voltmeter 0-500 V, with a switch for 7 positions; 1 Energy for the total active and reactive load (asymmetric load);
Page 92 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 kWh meter for public lighting (asymmetric load):

The energy metering system in the transformer / LV switchboard feeder and the metering system in the street lighting circuit shall be done, each one, by a ACE SL7000 Meter Series - Smart energy meter from Actaris or equivalent. Both meter shall be able to measure and display the following parameters: active, reactive and apparent energy and power, three-phased on each phase, import and export three-phased power factor on each phase instantaneous U on each phase instantaneous I on each phase phase switch UU, UI and cos frequency succession of phases displays phase diagram P,Q

The meters information shall be readable online through a dedicated communications port in order to allow user to monitor and control energy consumption, energy quality and service quality. Local- and remote-reading ports and external telephone modem have to be supplied from the meter.

The meters shall have the following electrical characteristics: Rated voltage Rated direct current Rated CTs connection current Network type Accuracy for direct connection Accuracy for transformer connected Frequency Standards
Page 93 of 150

3x57,7/100V up to 3x240/415V auto ranging In 5 A, Imax 120 A Ib 1A, Imax 10A 4 wire Class1 Class 0,2 50 Hz IEC 61036, IEC 60687

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Communications

IR-Port, 2RS485 DLM-Cosem, Protocol

The following accessories shall be supplied: Communications External telephone modem Cabling for external communications devices IR-reading device for connection to PC Configuration/Calibration Customer software for consumption monitoring Utility software for configuration Utility software for calibration Installation tools Transformer ratio labels Sealing kit Documentation Test certificate User guide Installation manual

3.4.7. 3.4.7.1.

Civil Works PUC (Poste UrbanoCompacto) or Stainless Steel Compact substation

This substation shall be totally manufactured in stainless steel, protected against corrosion and resistant to the most aggressive environments, it shall have a special ventilation system preventing condensation and highly flexible internal space distribution (Capacity for one transformer from 250kVA up to 630 kVA, one RMU and one LV Switchboard, it shall be easy to transport and to assemble, reduced installation protected. area (1500x3200mm), reduced maintenance and anti-vandalism

Page 94 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

All the equipment shall have the same specification above described. The transformer / LV switchboard feeder shall be for 1000 A. The stainless housing shall be installed on a concrete base exceeding the limits of the metallic housing at 15 cm. The detailed design of the concrete base shall be provided by thecontractor.

3.4.7.2.

Masonry building

The buildings shall be a standard type represented in the respective drawing. The metallic ventilation louvers, the door and the trench covers details are represented in the drawing no. 0.0.18. The structure of the buildingfoundations, pillars, beams and a roof shall be made in vibrated reinforced concrete. All the reinforcement bars of these elements must be firmly tied at their junctions. Reinforcementsteel bars shall be firmly electrically interconnected and shall be earthed at two opposite points. The steel reinforcement of the roof slab shall be at 1.5 cm from the bottom and those of the beams and pillars at 2 cm from the surface. Load on the roof slab is 2,0kN/m2 for calculation. The formworks shall be strong enough for the vibration without loss of concrete and shall be removed only after 14 days from the concrete pouring. The walls shall be based on the foundation of basaltic rock with mortar of cement/sand T1:5. Theyshall be at least 0,6m X 0,6 m, in an opened trench. The foundations of pillars in reinforced concrete shall be calculated for permissible tensions of the soil, equal or superior to 1MPa. The indoor trenches for cables shall be built simultaneously with the foundations in masonry of E20 concrete blocks, and mortar cement/sand in a proportion of 1:4 The walls shall be built with concrete blocks thickness of 20 cmand mortar cement/sand in a proportion of 1:4. PVC pipes with a diameter of 160 mm, both for cables entrance shall be properly located and tied before being embedded in the concrete. The steel shall be A400 and the concrete B20 type.

Page 95 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The concrete mixing water must be controlled in proportional doses in relation to cement 0,6 - 0,8. The proportion cement/sand/gravel of the concrete one is of 1:2: 4, with an average of 300 kg of cement per cubic meter.The gravel must be dia20-30 mmexempt of dust. Sand and aggregate from the seashore and salted water are forbidden.

Finishing The substation roof shall be waterproof to prevent water leakage into the substation. Walls and roof shall be surfacing with a mortar of cement/ sand and painted with one coat of liquid prepolymer sealing and three finishing coats of white color acrylic resin (gloss finish). Floor shall be painted with one coat of polyurethane sealer and two coats of gray color epoxy dust proof coating. A screed concrete made with cement/sand 1:3 shall be poured on the floor slab and the screed shall be surfaced for asmooth finishing.A steel welded mesh, 100x300mm; made of 3.8 mm steel rods shall inserted 2 cm deep in the screed.Before the pouring, the wire mesh shall be welded to non insulated 35mm2 copper conductors in five different rods at least. These cablesshall be connected to the earthing protection system of the MV RMU and of the LV Fuse Distribution board respectively. The doors and louvers must be hot deep galvanized and the lock of the door shall be the standard ELECTRA type. In the right side of the door, a standard label with the symbol of ELECTRA the indication of High Voltage/Danger written in Portuguese language Alta Tenso/ Perigo de Morte and the number of the secondary substation shall be installed.

Before the cables installation, pipe entrance shall be close by a wood board. Afterthe cables are laid and connected, pipes shall be sealed with mastic or paper/cement in order to inhibit entrance of any animal.

3.4.8.

Earthing Systems

Page 96 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The protection earthing system is separated from the neutral earthing circuit. The earthing resistance shall be lower than 10 Ohms for each one. The distance between any buried parts of the two systems cannot be less than 20 meters. The standard earthing electrodes are electrolytic copper plates (1000x500x2.5mm) installed vertically, being the larger side horizontally placed at a deep from surface of 1 meter. However earthing rods installed vertically, with the head at 1m deep, and paralleled with main electrode, can also be used in order to reduce earthing resistance. The details design of the earthing systems for different models of secondary substations and switching stations are indicated in the common civil

0.0.02/04/06/08/10/12/14/16. 3.4.8.1. Protection Earthing System

A ring of non insulated 50 mm2 copper conductor shall be buried at 1m deep all around the building and at 80 cm from the foundation. All the protective earthing rods shall be connected to this buried ring being by a 50 mm2 conductor. The metallic structure of the building shall be also connected to the buried ring at least in two points. The connections shall be made by welding process or by effective crimping process using cooper C connectors and adequate tools. A loop of the buried circuit is connected to a disconnectable connector (for earthing metering purposes) located on the wall inside the building near the door. From this connector, a ring of a copper conductor 50mm2 shall be installed on the wall inside the building. A 35mm2 copper conductor shall earth all the main equipment and metallic parts of the building. Transformer tank, cover and cable box, LV Distribution fuse board, MV RMU shall be connected at least at two opposite points. Flexible copper conductors 16 mm2 shall interconnect the door frame and the door with a loop large enough to avoid breakage. Reinforcement steel embedded in the floor must be also earthed by a 35 mm2 copper conductor.

Page 97 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

3.4.8.2.

Transformer Neutral Earthing System

One or more earthing electrodes must be connected directly to one disconnectable connector (for metering purposes) by copper cable 1x50mm2, 0.6/1kV, VV (Double insulating core), which external sheath shall be black colour and the internal sheath shall be blue colour. The connecting cable must be buried 1 m deep and be mechanically protected by auPVC pipe of small diameter and strong wall. Transformer Neutral shall be connected to the disconnectable device on the wall inside the building by an insulatedcopper cable of 50mm2, 0.6/1kV, VV. 3.4.9. Accessories

In the secondary substation it shall be installed: One wall board protected, with instructions for first help, written in Portuguese language, to be observed in case of electrocuted people. One set of rubber gloves duly insulated for 24 kV; One slightly raised platform insulated for 24 kV; Onefireextinguisher extintor de incendios de CO2 de 5 kg Placa indicativa de perigo de morte Quadro de medio de resistncia de terra

The civil works rehabilitation to be doneareas follows: After execution of the preparatory works it will be necessary: Remove of the existing masonry cells and repair walls internally and externally. Substitute the existing door and ventilation louvers, adopting the present standard equipment for PTs when possible;

4.

MV OVERHEAD NETWORK

4.1. GENERAL

Page 98 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

For rural electrification in all Santiago, Fogo and Maio Islandsthe existing MV Overhead network shall be extended, rehabilitated and /or upgraded. The designs are completely performed and they shall be described in the text, drawings and pole maps.

The new overhead MV lines will be three phase type, as the existing ones, and shall be implemented using 54,6mm2 Aster cable for pine type insulator or 148 mm2 aster cable for suspension type insulator in 10 or 12 meters wooden polesin case of straight line poles and 12 meters metallic towers in case of angle or end of line.

Silicone line poste stand-off insulator and silicone long-rod Insulators shall be used in all new overhead lines.

The cross arms shall be Sheet-arch type for pin type or for suspension type following the French standard (NappeVoute).

The secondary substation in all rural electrification shall be mainly pole mounted type.

The topographic profile and plan view of all MV line route and mechanical data calculations made by Electra Staff are given in the respective drawings. The contractor is requested to verify and confirm all the calculation. The geographical co-ordinates of each pole of the lines shall be provided to the contractor by the employer.

In what concerns the identification of the 20 kV line, each supporting structure shall be identified by one anodized aluminium label, with a convenient size to be read from soil and with the following text written in Portuguese language: ELECTRA / Linha 20 kV no. .. / Apoio no. i. (the line numbers will be indicated later on).

The contractor has to supply and install all the equipments.

Page 99 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4.2. SCOPE OF WORK


The total linear length of the Aster 54,6 mm2 overhead network for rehabilitation and rural electrification in the three island shall be 88,4 km and the total linear length of the aster 148 mm2 overhead network shall be 7,5 km.

The OH network in each island shall be installed as indicated in the following tables:

Santiago Island

Page 100 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Page 101 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Fogo Island

Page 102 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Maio Island

Page 103 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4.3. EQUIPMENT SPECIFICATION


4.3.1. 4.3.1.1. Supporting structures - Poles Wood poles

The wood poles shall follow the French Standard NF C67-100 or at least equivalent one. The poles shall have a circular cross-section and a conic profile with 12 mof total length. The trees used may have characteristics of adult wood.The poles shall be treated with efficient product according to the characteristics of the original trees in order to preserve its longevity, but the preservative shall not reduce significantly the dielectric strength of the wood. The poles shall have a right axis.It is not acceptable that the line between the centres of the cross sections limiting its useful length can come outside the pole anywhere along its total length. The pole portion to be under grounded must be prepared to offer resistance to rain water penetration, with recourse to reinforced treatment, namely to be painted on its underground portion and until 20 cm out of soil with an adequate thickness of bituminous. According to the mechanical strength, two types of poles can be used: 1. Wood pole12 meters (type S325 or similar)

Page 104 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

maximum horizontal force at 0.25m from top: 3.25 kN minimal diameter on top (d) - 19 cm minimal diameter 1 m far from the bottom (D) - 26/28 cm 2. Wood pole 12 meters ( type S 550 or similar) maximum horizontal force at 0.25m from top: 5.5kN minimal diameter on top (d) - 23 cm minimal diameter 1 m far from the bottom (D) 30.5/33cm

The measurement of the two diameters(d et D) shall be done after final surface planning. In some cases it is adopted the solution of double poles and in other cases are foreseen H wooden structures (porticos) witch legs can be made of single poles or double poles and using X steel braces to connect both legs.

When double poles (geminated) are used, the union of both poles shall be done using hot deep galvanized bolts, according to the French Standards each 2,5metrs as indicated in the drawing n 0.0.24. It is requested in each pole the permanent inscription of suppliers name; impregnation treatment used year of fabrication; total height (m); maximum horizontal force;

These inscriptions shall be made on a support resistant to the impregnation material. 4.3.1.2. Metallic towers

For the strong angles and end of lines the metallic structures to support the line will be steel, hot deep galvanized, lattice type or polygonal towers, sized as mentioned on the Poles Map, which design and mechanical calculation is responsibility of the contractor. Galvanizing shall be made by immersion in a zinc tank, where Zn purity shall be not less than 98.5%, and which temperature shall be between 450 and 460 C. The towers shall be painted on its underground portion and until 20 cm out of soil
Page 105 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

with an adequate thickness of bituminous painting, adherent to galvanized structure, to give the tower a better corrosion protection. As indicated in the different pole mapsthe following metallic towers will be used: 4.3.2. Metallic simple tower 12m / 16 kN Metallic simple tower 12m / 20 kN Metallic simple tower 12m / 25 kN Metallic simple tower 12m / 32 kN Metallic simple tower 12m / 40 kN Cross arms

The cross arms must be metallic hot deep galvanized by immersion in a zinc tank, where Zn purity shall be not less than 98.5%, and which temperature shall be between 450 and 460 C. According to the EDF Software Camelia, used for the mechanical calculations of the lines the cross arms shall be the following type or equivalent:

For pine type insulator, 54,6 mm2Aster cable line on the straight line poles: Sheet-arch type cross arms NVR 1 NVR 2 For suspension line, 148 mm2 Aster cable on the straight line poles: Sheet-arch type cross arms for area with strong wind NW2 70x70 NW2 90x90 For angle poles and end line poles in both 54,6 and 148 mm2 Aster cable it shall be used the following cross arms:

Single tube cross arm "X" type beams: NA2X 2500 D or equivalent Single tube cross arm "X" type beams: NA3X 4000 D or equivalent Single tube cross arm "X" type beams: NA3X 6300 D or equivalent Single tube cross arm "Y" type beams: NA3Y12.500 S or equivalent Single tube cross arm "Z" type beams: NA3Z20.000 D or equivalent
Page 106 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Single tube cross arm "X" type beams: NA4X 6300 D or equivalent Single tube cross arm "X" type beams: NA4X 16000 D or equivalent Single tube cross arm "X" type beams: NA5X 16000 D or equivalent Single tube cross arm "X" type beams: NA6X 20000 D or equivalent

4.3.3.

Insulators

All the insulator shall be silicone type in order to resist the very pollutant environment in all Cap Verde island:

The insulator has to be manufactured withelectrical grade corrosion resistant epoxy rod. Thematerials used has to be the highest quality and routinely tested to ensure the maximumperformance characteristics.The fittings has to be machined from EN8 or cast frommalleable cast iron and hot dip galvanized inaccordance with ISO1461. The sheds has to be manufactured using high-pressureinjection molding techniques to create a smoothsurface reducing the amount of pollution trap. Standards The post stand-off insulator shall be manufactured in accordance to IEC 61952 and the long-rod Insulators shall be manufactured in accordance toIEC 61109 & IEC 62217. A quality processes shall be implemented as per ISO 9001:2000.

Post stand-off insulator characteristic


Lightning Impulse Withstand Voltage (kV) 1 min Power frequency withstand (wet) (kV) Minimum Arcing Distance(mm) Minimum Creepage Distance (mm) Specified cantilever load (kN) Maximum Design Cantilever load (kN)

250

112

350

1118

12,5

The pin insulators shall be equipped with adequate bolts for mounting on the cross arms. Long rod insulator characteristic

Page 107 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 min Power frequency withstand (wet) (kV)

Arcing Distance (mm)

Minimum Creepage Distance (mm)

Specified Mechanical load (kN)

121

380

1200

70

The string accessories shall be able to support fault currents of 1 kA - 1 second and an ultimate strength of 70 kN.The current density on accessories can never be higher than 70 A/mm2.

4.3.4.

Aerial Conductor Cables

The conductor cables shall be ASTER 54.6 mm2 and ASTER 148 mm2 with the main characteristics as follow:
Characteristics
Commercial Designation Conductor material Nominal Section (mm2) Overall Diameter (mm) Numberofaluminiumwires Wire diameter (mm) Ultimate strength (KN) Linear Weight (kg/Km) Elasticicity modulus (N/mm2) Linear temperature expansion coefficient (/C) DC electrical resistance at 20 C (ohm/Km)

ASTER CABELE 54,6

ASTER CABELE 148

Aster 54.6mm

Aster 148 mm2 Aluminum Alloy Wires 148 mm2 15,75 19 3,15 48,12 406,5 60000 23,0E-06 0,2239

Aluminum Alloy Wires 54.6 9,45 7 3.15 17,73 149 62000 23,0E-06 0.603

4.3.5.

Pole mounted secondary substation

For the electrification of rural villages, the bidders are requested to offer the price for the completely supply and installation of pole mounted secondary substation for 50 or 100 kVA. Each secondary MV/LV substation is composed by: One metallic tower One outdoor air breaking switch
Page 108 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

One MV/LV transformer One LV switchboard three lightening arresters Earthing System One set of Line / Transformer connections One set of Transformer / LV switchboard connections

4.3.5.1.

Scope of work

The pole mounted secondary substation shall be installed in the three island as indicated in the following tables:

Santiago Island

Page 109 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Fogo Island

Page 110 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4.3.5.2.

Pole

The pole must be steel made, lattice type,hot deep galvanized, with 12 meters of total length,being the maximum horizontal strength force at 0,25 m from the top 16kN. With the pole shall be supplied all the accessories necessaries to support the transformer. The metallic tower for pole mounted transformer will follow the same specification as the line metallic tower, in chapter 23.3.1.2.

4.3.5.3.

MV/LV transformer

One three phase transformer, outdoor, pole mounted type, with the vector group Dyn5, oil insulated and with it shall be supplied the accessories for connection of the HV (bimetallic) and LV cables.The accessories for the erection of the transformer on the pole as well as those for support the lightening arresters must also be included in the supply. Electrical characteristics: -rated power: - primary voltage - secondary voltage - short circuit voltage at75C - no load losses : 380 W>/ >200 W - load losses :1800W > / >1200 W : 100 kVA or 50 kVA : 20 2x2,5 % kV : 410/236 V :4%

All the external transformer coverage shall be made of special hot deep galvanized steel plate with a special marine protective paint in order to ensure the anticorrosion protection in an extremely aggressive environment.

4.3.5.4.

LV switchboard

The LV switchboard shall be 250 A types, according to the specifications above described on chapter 22.4.6.2.

Page 111 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4.3.5.5.

Electric connection between transformer and MV line

The MV OH lines will be made of ASTER 54,6 mm2 conductors, or ASTER 148 mm2. The connection between the line and the transformer HV bushing insulators and with the lightening arresters shall use the same 54,6 Aster conductor type.

4.3.5.6.

Electric connection between transformer and LV Switchboard

This connection will be made of a XLPE copper cable 3x95+50 mm2 type, for protected inside a light grey PVC pipe with 75 mm of diameter, which top shall be equipped with a curvature inhibiting rain water penetration. The supply shall include 14 m of cable and 10 m of PVC pipe for each distribution substation.

4.3.5.7.

Earthing System

The protection earthing system is separated from the neutral earthing circuit. The earthing resistance shall be lower than 10 Ohms for each one.The distance between any buried parts of the two systems cannot be less than 20 meters The standard earthing electrodes are electrolytic copper plates (1000x500x2.5mm) installed vertically, being the larger side horizontally placed at a deep from surface of 1 meter. However earthing rods installed vertically, with the head at 1m deep, and paralleled with main electrode, can also be used in order to reduce earthing resistance. The supply shall be according to chapter 22.3.6.3 4.3.6. 4.3.6.1. Earthings Earthing of Cross Arms

The cross arms as well as other metallic structures, like X brace structures, shall be earthed through an insulated 0.6/1 kv copper cable with a cross section of 35 mm2,protected 0.20 m under soil surface and 2.50 m above soil surface by an adequateextruded uPVC cable protection fixed to the pole by stainless steel bands.

Page 112 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

4.3.6.2.

Earthing of Metallic Towers

The contractor will supply and install all rods, counterpoises, cables, connectors and accessories that may be necessary for grounding the structures. Grounding rods should be solid high conductivity copper complying with ANSI UL 467 norm, or equivalent. Rods should have a circular section and a minimum diameter of 1.59cm, a minimum length of 1.8m and should have pointed ends. Rods will be supplied with their respective connectors and shall be 1 for each metallic simple tower, and one for each leg of the metallic portico towers, placed on one external corner of the excavation pits. Grounding conductor shall be high hardness copper 35 mm2, insulated 06/1kV Where metallic towers foundations are built in frequented public spaces, one ring of non insulated 35 mm2 cooper cable shall be performed at rod head level interconnecting the rod or rods in de case of metallic portico towers, running 1 m distant from the structure(s). At points where electrical resistance is higher than 20 ohms, the Contractor, in coordination with the Project Manager will determine the type of counterpoise to be installed. The Contractor will make available an extension of at least 2m of 35 mm2 copper conductor to connect counterpoises outside the foundation. Counterpoises will be installed within ditches at least 80cm deep, and covered with earth.

4.3.6.3.

Earthing of Pole Mounted Secondary Substations

The earthing electrodes will be made of a copper plates with 1000x500x2 mm, connected each one to an isolated earthing copper conductor with 20m and a device to give the possibility to proceed on earth measurements. The supply shall include, for each substation: two copper plates 1000 x 500 x 2 mm 2 x 20 m of LV insulated copper conductor with 50 mm2 earth measuring devices

Page 113 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

6 copper compression connectors for the 50 mm2 copper cable with a bolt hole of 1/2 hard brass bolts 1/2 with two 30x30x2 mm square copper washers, one nut and one back nut (to bolting the copper connectors on the copper plates)

4 hard brass bolts with two round brass washers, one nut and one back nut t fix the cooper cable on the earthing measuring device. 2 x 5 m of non insulated 50 mm2 cooper cable.

4.3.7.

Lightening arresters

Every pole mounted transformer shall be protected against atmospheric surge by one lightning arrester, 24 kV - 5 kA per phase and all the transition from overhead line to underground cable shall be protected by one lightning arrester, 24 kV - 10 kA per phase. Lightening arresters earthing shall be done through dedicated 35 mm2, earthing isolated 0.6/1 kV cable connected to a dedicated earthing rod. Earthing cable shall be protected 0.20 m under soil surface and 2.50 m above soil surface by an adequate stainless steel pipe fixed to tower by stainless steel U bolts. 4.3.8. Outdoor air breaking switch

Electrical specification: Rated voltage: 36 kV Rated current: 100 A Breaking capacity: 50 A Closing capacity: 6.3 kArms

The air breaking switches must be supplied with all the accessories necessaries to its proper erection on the metallic poles, as well as their mechanical manual control.

4.3.9.

Outdoor Load Break SwitchDisconnector with Remote Control Unit

Page 114 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In order to guarantee the quality of electrical service, by reducing the power outages, the duration of outages bidders are requested to specify and quote the supply and installation of load break switch-disconnectortype PM6 from Schneider or equivalent to be mounted on metallic or wood poles as indicated in poles map and tables hereafter.

The load break switch-disconnectorshall be manufactured in accordance to IEC 60265-1, IEC 62271-102, IEC60694, IEC 60529, IEC 62271-200 IEC 60815. A quality production processes has to be implemented as per ISO 9001:2000.

The disconnector switch breaking chamber and the SF6 gas shall be inside a compact external enclosure. The risk of any gas leakage has to be reduced. The enclosure has to be sealed and meets pressurized sealed system.

The external enclosure shall be made of a stainless steel, without any additional protective coating, to give a smooth, clean, self-cleaning and aerated surface that should be highly resistant to corrosion.

The casing has to be connected to earth in order to avoid the possibility of dangerous leakage current to pass between the terminal on one side and the terminal on the other side when the device is on the open position. No additional disconnector shall be necessary to guarantee the insulation distance.

The disconector switch shall be equipped with 6 silicone connectors enabling connection of the MV line using a non insulated cable.

The general electrical characteristics shall be the following: Rated voltage: 24 kV Rated current: 400 A Breaking capacity: 400 A Closing capacity: 31,5 kA rms

Page 115 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The load switch breaker shall be equipped with a manual-electrical control unit. The manual equipment control and operation shall be made using a rod system with mechanical locking to block the OPEN-CLOSED positions. In order to avoid the possibility of being operated by someone from outside of the company.

The electrical switching and control mechanism shall be located inside an independent enclosure combined with the disconector switch breaking device. The basic mechanism involves an opening-closing system activated by a spring for switching operations to take place independently of the operator switching speed.

The control unit shall be EASERGY TYPE T200P from Schneider or equivalent to be pole-mounted outdoors, in a stainless steel casing. The unit shall comprise the following components:

A cradle for all electronic modules Switch connection module CPU and the local control indication module RTU communication module Battery power supply charger module

A battery A supply transformer with its protection device Free space to install a radio or a modem

A outdoor voltage transformer shall be necessary in order to provide the auxiliary power supply to power the control unit charging device, including the radio and its electronic circuit boards needed for independent operation of all equipment. The voltage transformer shall give the necessary voltage presence and absence signals in order to carry out on the disconnector function and setting by remote control.

A three single phase lightning arrester of Zinc Oxid Type 24 kV, 5 kA, on each side of the disconnector shall be installed on an appropriated support frame to protect the equipment from overvoltage resulting from atmospheric condition.
Page 116 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The load break switch disconnectors shall be installed as indicated in the following tables: Santiago Island

Fogo Island

Maio Island

4.3.10.

Directional Fault Current Indicator for Overhead 20 kV Network

Page 117 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In some specific points of the MV 20 kV three phase overhead networks it shall be installed a intelligent directional fault-current indicator. The line fault indicator shall be able to locate short-circuit /Phase To Phase (PTP)and earth faults/PhaseTo Earth (PTG) in overhead line distribution networks with isolated or impedance earthed neutral.

Upon detecting a fault on the line, the indicator gives off an intermittent red or green light-flash(LED). One LED flashing indicating an earth-fault and both LED flashing indicating an short-circuitfault. Xenon flash shall be supplied. The colours of the LED will also indicate direction to the fault location for earth-faults.

The line fault indicator shall be equipped with an internal relay-card, giving the possibility for connection to the communication devices of the following four different relay-outputs to an RTU: Transient Fault in red direction Transient Fault in green direction Permanent Fault in red direction Permanent Fault in green direction

The housing and bracket material of the fault indicator shall be: Body&Brakett: Poly Carbonate (PC) with glass reinforcement Topcap&Display unit: Transparent Poly Carbonate, UV resistant Mechanical strength IK o9 (6J impact) Flame retardant grades: (V-0 UL ) 750 oC

The fault indicator shall be powered by lithium battery giving some 7-10 years battery lifetime in normal service equivalent to more than 500 hours of flashing capacity When the unit is activated The battery have to be fitted with a connector for simple replacement.

The indicators shall be placed at strategic locations along the line such as after branching points and sectionalisers as indicated in the tables hereafter. They shall
Page 118 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

be mounted on the pole, 4-5 meters below the conductors, by means of screws or wrapping-bands. Live line mounting have to be done safely, easily and rapidly.

The current fault indicators shall be installed as indicated in the following tables

In Santiago Island

In Fogo Island

Page 119 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In Maio Island

4.4. OVERHEAD NETWORK CONSTRUCTIONS PROCEDURES


4.4.1. Anchoring and erection of metallic structure

a) Assembly and erection of structures will take place only after inspecting and selecting all elements at the site, and verifying that they comply with plans and drawings in order to detect any missing element. Erection of structures may only take place after two weeks after pouring concrete for the foundations. b) In no circumstances shall defective or bent pieces be mounted; if the Contractor discovers any such defects, immediate notice should be given to the Project Manager, without whose approval no corrections or modifications are to take place. c) Step bolts will be provided to inspect the structure. Anti-escalation devices will be installed on the structure, immediately below the first step bolt. d) Signaling. All structures will be clearly identified through two numeration signals and two danger signals. Structures at the departure from or arrival to the

Page 120 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

substations will have signals indicating the relative location of phases on the structure.

4.4.2.

Foundations

The Poles Map indicates the minimum required foundation size for each pole according to Camelia software, used for the mechanical calculation. In the case of metallic structures the contractor has also to present and to follow the manufactors foundation datas. The foundations for line metallic towers or pole mounted secondary substation metallic towers and for strong angles wood poles are to be concrete filled. In the case of wood poles, when in alignment, it is foreseen the use of rock and compacted earth layers as mentioned in the Common drawing 0.0.22 e 0.0.23. However, the contractor shall perform an investigation of soil mechanics in order to adopt the better solution according to the requirements, and to determine its quality relative to expected stresses, and to assess the amount of material to be removed and the consequent expected volumes of concrete and rock.

4.4.2.1.

Concrete foundation works

The foundation massifs will be constructed in simple or reinforced concrete according to the soil characteristics and the contract includes the supply of materials and equipment, and the pouring, finishing and curing of concrete in accordance with approved plans and specifications. Indicative specifications for materials used in foundations works a) Cement: concrete shall be produced with Portland cement following ASTM norm C-150, or equivalent. Cement used in the works will be adequately

packed and stored to protect it from humidity. Cement stored for over two months, or which may have partially set, may not be used for the works. b) Aggregates used for concrete should comply with ASTM norm C-33, or equivalent, for concrete aggregates. Other aggregates that do not comply with
Page 121 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

this may be used, but prior consent from the Employer must be requested, and assurance should be provided that they comply with the required resistance and durability. Particular aggregate conditions include the following: b1) Sand, which should consist of hard, dense, durable clay-free and dirt-free grain; a maximum 5% should pass through US Standard No. 200, or equivalent, sift; inadequate substances should not exceed 7%; sand should be graded and when sift tested it must exhibit an ASTM C-33, or equivalent, degree of fineness; b2) Thick aggregate; gravel or equivalent (crushed rock) should have a maximum size of two cm. Aggregate should be roughly round or cubed and must be free of particles. It must be strong, hard and free of dust, clay,

organic material or other materials. b3) Additives to improve mixture specifications may be used, but must be approved by the Employer; in reinforced concrete applications, the use of calcium chloride or other corrosive substances will not be allowed. b4) Water used for concrete or mortar as well as water used during the curing period must be clean and free of impurities such as oils, salts, alkaline substances, or organic material. c) Concrete mixture will consist of Portland cement, water, and rocky aggregates, both fine and coarse. The contractor will provide samples of the mixtures to be used in the works, including sets of concrete cylinders to be tested 7, 14 and 28 days after mixing according to ASTM, or equivalent, procedures. Approval of test material does not imply the acceptance of concrete works, nor does it exempt the contractor from complying with specifications and plans. d) Concrete will be classified according to its resistance to compression 28 days after mixing, as follows:

Reinforced concrete: minimum resistance of 210kg/cm2 Simple concrete: 140kg/cm2

Page 122 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Cyclopean concrete: 100kg/cm2 with aggregates of up to 20cm


diameter e) Steel: reinforcing steel will consist of steel rods complying with ASTM norm A615, or equivalent.

4.4.2.2. a)

Construction procedures: Concrete Specifications

Excavation of foundations: before pouring concrete, excavations must be finished; any damage after acceptance must be repaired by the Contractor using acceptable procedures.

b)

Mixtures: proportions must be those previously approved in the design plans. Changes in cement, aggregates, or proportions thereof require the Employers authorization. Mixture time, after components are put into the mixer, shall not be less than 1.5 minutes. Concrete should be mixed in quantities that allow for its immediate pouring.

c)

Concrete pouring should not produce segregation of materials or displacement of reinforcing steel. The mixture should not be poured from heights above 1.5m.

d)

Vibration. All concrete should be compacted using mechanical vibrators, with the exception of small structures subject to minor loads. Vibration should be uniformly applied to the mixture, and should be stopped before it causes segregation or mortars. Vibrators shall not be in contact with reinforcing steel.

e)

Curing. Concrete surfaces should be cured with water or with an approved waterproofing agent. Water curing should extend to seven days, during which time all surfaces must be kept damp. Waterproofing should be applied as soon as setting water has evaporated.

f)

Finishing. Top concrete surfaces should end in a diamond point shape to allow drainage.

g)

Trials during construction. Consistency of concrete mixture supplied should be controlled using a slump test for each batch. During each pouring, the

Page 123 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Contractor will provide three sample cylinders taken from different batches. The Contractor will test the sample after 28 days in accordance with norms mentioned previously. h) Tolerances. Admissible tolerances for the acceptance of concrete works on site are: Thickness: -1 to +2cm Upper limits: +1cm Covering thickness: +/- 10% of that indicated on the drawings Spacing of rods: +/- 2cm For pre-fabricated elements, tolerances are 1/5 of those for on-site concrete. i) Repairs. Concrete repairs must be performed by expert personnel. The

Contractor will correct imperfections within 24 hours of having dismantled the frames, where fractures, holes or other defects are apparent.

4.4.2.3. a)

Construction procedures for foundations

Foundations shall in principle be concrete and comprise the following types: concrete footing with anchor bolts, concrete foundation with embedded structure, or rock anchors if conditions allow them.

b)

Excavation.

This task comprises all excavations contemplated in the

drawings, as well as all additional works necessary to guarantee the stability of slopes, the preparation of surfaces and all controls necessary to put the foundations in place. It will be the Contractors responsibility to excavate

according to drawings; excess excavation should be filled up with approved material. Inadequate material at the foundation level shall be excavated and replaced by selected material or simple concrete. The Contractor shall not finish the excavation to the foundation level until ready to pour the concrete. Waste material shall be disposed of according to procedures defined by the Project Manager. This also applies to the use and handling of explosives. c) Compacted fillings. This task involves filling and compacting for the

foundations, leveling them with materials from the excavation or from other
Page 124 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

sources and following drawing dimensions. Material used should be free of roots, construction waste or other organic material.

4.4.3. a)

Conductor stringing and sagging The Contractor is responsible for supplying, classifying, storing, controlling, transporting to site and correctly installing line conductors, clamps, trusses, vibration dampers, insulators, and all other accessories required for putting the new lines in service, and its satisfactory operation according to approved designs and drawings.

b)

The Contractor shall provide a suitable means of communication, such as an adequate telephone system or radio transmitter and receivers for use by crews during stringing and sagging operations. The communication system used shall be subject to the Project Manager approval.

c)

The Contractor may not pursue stringing operations in bad weather conditions, i.e. under rain or during electrical storms. If bad weather develops during stringing operations, work should be immediately suspended and restarted as soon as atmospheric conditions are back to normal.

d)

The Contractor will propose the method and equipment to be used for stringing conductor wires. Before initiating the stringing, the Contractor will allow the Project Manager to examine the equipment, showing calibration certificates for all equipment requiring prior calibration.

e)

Prior to initiating the stringing, all protective equipment and temporary structures should be in place. The Contractor is responsible for all measures required to protect the conductor during stringing.

f)

Stringing will be executed using best practices. Conductors must be handled with care. Conductors shall neitherbe trampled on nor run over by vehicles. Each reel shall beexamined and the wire inspected for cuts, kinks, or other injuries. Injured portions shall be cut out and the conductor spliced. The conductors shall be kept clean and shall not be allowed to contact the ground,

Page 125 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

guard structures or any object which in the opinion of the Project Manager may cause abrasion or damage to the conductors. The Contractor shall

continuously inspect the conductor as it leaves the reel. If nicks or scratches are detected, the stringing operation shall be stopped until the blemish is smoothed with fine sandpaper or emery paper. If any broken aluminum

strands are found, splice rods shall be installed in accordance with the manufacturers recommendation. If more than three broken aluminum strands are found within any 300m section of cable, the cable section containing the broken strands will be cut out and a full tension splice installed. Any damaged wire, resulting from the Contractors negligence, shall be repaired or replaced at his expense. The conductors shall be pulled over suitable rollers or

stringing blocks properly mounted on the pole or crossarm if necessary to prevent binding while stringing. g) Conductors shall be sagged in accordance with the conductor manufacturer's recommendations. All conductors shall be sagged evenly. The air temperature at the time and place of sagging shall be determined by a certified thermometer. The sag of all conductors after stringing shall be in accordance with the employers representative instructions. During stringing, conductor sag should be at least 20% above the values indicated in the sagging charts. Conductors shall hang in the Stringing blocks not less than two (2) hours nor more than 48 hours before it is brought up to final sag. h) The shield wire shall be sagged in accordance with the stringing data for each shield wire. Stringing sag and tension data for expected conditions will be approved by the Project Manager. No minus tolerances from the sag data will be allowed and the plus tolerance shall be two percent of the stringing sag, but not to exceed 10cm. Tension tolerances shall be within those values for

tension calculated and shown on the data sheets supplied that correspond to the respective sag tolerances for the condition of concern. i) The Contractor shall submit to the Project Manager for review, prior to the starting of his stringing operations, the procedure to be followed in stringing, sagging, and clipping-in of the shield wires. This procedure will be such that

Page 126 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

the shield wires shall hang in the Stringing blocks a minimum of 24 hours before bringing up to final sag. After the 24 hour period has elapsed, the shield wires shall be brought up to sag and clipped in within four (4) days. Wires remaining in the blocks for more than 4 days shall be subject to inspection and possible replacement at the Contractors expense if distortion of the conductor, at the discretion of the Project Manager, has occurred. j) The method and procedures used to string low tension spans or slack spans to substation structures shall be such that the conductor is not permitted to contact the ground or any object which may cause damage or otherwise adversely affect the conductor. The method selected by the Contractor is subject to the review and approval of the Project Manager prior to beginning installation. k) When stringing and sagging from angle structures, the Contractor shall develop procedures that will compensate for structure deflections. All angle poles and dead-end structures shall be plumbed straight or properly raked, as specified in the applicable structure erection specification, after all shield wires have been brought up to their proper sag-tension position and before clipping in or dead-ending the shield wires. Swingout type angle structures shall be clipped-in before at least the adjacent structures are clipped-in. l) Conductors shall be spliced and dead-ended. There shall be not more than one splice per conductor in any span and splices shall be located at least 3.5m from the conductor support. Splices shall be installed in accordance with the manufacturer's specifications and recommendations. All conductors shall be cleaned thoroughly by wirebrushing before splicing or installing connectors or clamps. A suitable inhibitor shall be used before splicing or applying connectors over aluminum conductor. m) No splices will be permitted in spans over main lines of roads, or over communication lines. In other spans, only one splice per span will be

permitted on each wire, and this splice shall not be located closer than 15m to any structure. Splices shall not be pulled through stringing sheaves or sagging blocks.
Page 127 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

n)

Connectors and hot-line clamps suitable for the purpose shall be installed as shown on the drawings and also in accordance with the manufacturer's specifications and recommendations. On all hot-line clamp installations, the clamp and jumper shall be installed so that they are permanently bonded to the load side of the line, allowing the jumper to be de-energized when the clamp is disconnected.

5.

LOW VOLTAGE NETWORK

In the rural villages of Santiago and FogoIslands to be electrified for first time a new four wires low voltage, 230/400 V, overhead distribution network will be installed wherever a new secondary substation is installed. In the already electrified urban areas, near the new secondary substations or near the existing ones the LV networks shall be expanded and/or reinforced. The overhead network shall be made with self supportedAerial Bundled, aluminium Cable in 8 or 10 meters wood poles. In urban areas self supportedAerial Bundled, aluminium Cable in 8 or 10 meters wood poles and underground cables connecting street fuse cabinets and wall mounted fuse cabinets shall be installed. The trenches for underground cable installation are indicated in the Drawing n 0.0.20 All existing bare conductor shall be replaced by ABC cables. As drop cable to connect the consumers to the grid it shall be used the new XS type and the antitheft coaxial cable.

5.1. SCOPE OF WORK


In rural electrification the contractor is requested to design all LV distribution network following Electras guides and/or recommendation and submit the detailed single line diagrams to the employers representative for approval.

In case of expansion and/or reinforcement of existing LV Network in urban areas the design shall be performed by employer and all single line diagrams will be gradually
Page 128 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

supplied to the contractor before starting the works according to his implementation schedule.

It is foreseen the installation, extension and/or reinforcement of the following networks:

In Santiago Island

Page 129 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In Fogo Island
Page 130 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

In Maio Island

5.2. LV NETWORK EQUIPMENT SPECIFICATION


5.2.1. 5.2.1.1. Cables Non armored cable

Page 131 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The cables shall have at least the following main characteristics:


VV2x2,5 Type of cable Standard Voltage (kV) Conductor Material Section (phase)-mm2 Section (neutral)-mm2 Number of wires per cond. Forma Insulation Material PVC PVC PVC PVC 2xBlack/Marron Colour Nominal thickness (mm) Outer sheath Material Colour Nominal thickness (mm) Electric characteristics Cond. Resit. at 20C - /km 7,41 7,41 1,83 1,83 PVC Black 1,8 PVC Black 1,8 PVC Black 1,8 PVC Black 1,8 Black/Cyan 0,8 Black/Cyan/Ground 0,8 Black/Cyan 1 Cyan 1 Cupper 2,5 2,5 1 circular Cupper 2,5 2,5 1 circular Cupper 10 10 multi circular Cupper 10 10 multi circular VV 60502-1 0,6/1 VV3x2,5 VV 60502-1 0,6/1 VV2x10 VV 60502-1 0,6/1 VV 4x10 VV 60502-1 0,6/1

5.2.1.2.

Armored cable for underground installation


LVAV4x50 LVAV 4x95 LVAV 60502-1 0,6/1 Aluminium 95 95 multi sectorial PVC LVAV3x185+50 LVAV 60502-1 0,6/1 Aluminium 185 95 multi sectorial PVC

Type of cable Standard Voltage (kV) Conductor Material Section (phase)-mm2 Section (neutral)-mm2 Number of wires per cond. Form Insulation Material

LVAV 60502-1 0,6/1 Aluminium 50 50 multi sectorial PVC

Page 132 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2xBlack/Brown Colour Nominal thickness (mm) Mat. metallic armour ass Nominal thickness Metallic armour Helicoidally Material Minimum thickness Outer sheath Material Colour Nominal thickness (mm) Electric characteristics Cond. Resit. at 20C - /km 0,64 Iron tape 0,2 PVC Black 2 Cyan 1,4 PVC 1,2

2xBlack/Brown Cyan 1,6 PVC 1,3

2xBlack/Brown Cyan 2 PVC 1,5

Helicoidally Iron tape 0,5 PVC Black 2,4

Helicoidally Iron tape 0,5 PVC Black 2,7

0,32

0,164

5.2.1.3.

Self-supportedAerial Bundled Cable for overhead network


LXS4x70+2x16 LXS4x35+16 LXS 60502-1 0,6/1 Aluminium 2,5 2,5 16 multi circular XPLE Black 1,6 multi circular XPLE Black 1,2 multi circular XPLE Black 1,2 XS4x6 XS 60502-1 0,6/1 Cupper 6 6 XS2x6 XS 60502-1 0,6/1 Cupper 6 6

Type of cable Standard Voltage (kV) Conductor Material Section (phase cond.)-mm2 Section (neutral cond.)-mm2 Section (Lighting cond)-mm2 Number of wires per cond. Forma Insulation Colour Nominal thickness (mm) Electric characteristics Cond. Resit. at 20C - /km

LXS 60502-1 0,6/1 Aluminium 70 70 16 multi circular XPLE Black 1,8

0,443

0,868

3,08

3,08

Page 133 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

5.2.1.4.

Anti-theft Cable

Cable concentric, anti-theft, 0,6/1 kV, for public LV network distribution, and consumer drop. The phasesconductors shall be in electrolytic bare cupper wires, stringing class 2(rigid), insulation in XLPE 90C,colours black, natural and red, filling with uPVC compound and the neutral conductor shall be in electrolytic bare cupper wires applied helically, concentric to phases with a polyester tape separator applied over the conductor, insulation in XLPE black colour. 5.2.2. 5.2.2.1. Supporting structures - Poles Wood poles

The wood poles shall follow the French Standard NF C67-100 or at least an equivalent one. The poles shall have a circular cross-section and a conic profile with 8 and 10 m of total length. The trees used may have characteristics of adult wood. The poles shall be treated with creosote or other efficient product according to the characteristics of the original trees in order to preserve its longevity, but the preservative shall not reduce significantly the dielectric strength of the wood. The poles shall have a right axis. It is not acceptable that the line between the centres of the cross sections limiting its useful length can come outside the pole anywhere along its total length. The pole portion to be undergrounded must have be prepared to offer resistance to rain water penetration, with recourse to reinforced treatment, namely to be painted on its underground portion and until 20 cm out of soil with an adequate thickness of bituminous. According to the mechanical strength, two types of poles can be used: 1. Wood pole 08/10 meters (type S325 or similar) - maximum horizontal force at 0.25m from top: 3.25 kN - minimal diameter on top (d) - 19 cm - minimal diameter 1 m far from the bottom (D) - 25 cm

Page 134 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

2. Wood pole 08/10 meters (type S 550 or similar) - maximum horizontal force at 0.25m from top: 5.5 kN - minimal diameter on top (d) - 23 cm - minimal diameter 1 m far from the bottom (D) 29 cm

The measurement of the two diameters (d et D) shall be done after final surface planning.

In some cases it is adopted the solution of double poles. When double poles (geminated) are used, the union of both poles shall be done using hot deep galvanized bolts, according to the French Standards each 2,5metrs.

It is requested in each pole the permanent inscription of: suppliers name; impregnation treatment used ( according to French Standard, or equivalent ); year of fabrication; total height (m); maximum horizontal force;

Such inscriptions shall be made in a support made in material resistant to the impregnation material.

5.2.3.

Distribution Street Fuse Cabinet 230/400 V

The distribution Street Fuseboard Cabinet, 400/230 V shall be readyfor erection on a concrete base or to be embedded It shall have two parts: A removable enclosure which shall house the equipment and which is fixed on a basis structure. A basis structure embedded or based on a concrete base.

Page 135 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The following equipment shall be inside the enclosure: triphase+ neutral copper busbars for 400A. The busbars shall have 20 MVA three phase short circuit capacity. 2 triphasefuses holder size 2 located in the middle and 4 fuses holders size 00. The triphase fuses are disconnectableall together. 12 fuses size 00-160 A 6 fuses size 2-250 A 8 bimetallic compression lugs for two cables LVAV 3x185+95 mm2 shall be bolted on the busbars and the neutral bar with stainless bolts. 24 bimetallic compression lugs for cables LVAV 4x50shall be bolted on the outgoing phase connector and the neutral bar. 1earthing terminal block for earthing purposes and earthing of the cables shielding. 1 fusehandle for installation and extraction of the 3 fuses all together. The fixing bolts of the cabinet

The cabinet enclosureshall be in accordance with IEC standard 62208 and shallbe IP 54-11 It ismade with an insulating material, fire self-extinguishing, resistant and to the local climate, especially to the saline atmosphere and the ultraviolet radiation. Natural air cooling shall avoid any condensation or overheating. It shall have approximately the following sizes: height 875mm; front width 800mm; depth360 mm .

All the indoor equipment shall be boltedon a steel plate hot-galvanized or with an equivalent corrosion treatment which resists to the saline atmosphere. This steel plate shall be bolted on the basis structure in order to allow a fast removal and replacement of the top enclosure without disconnecting the circuit which remains live. Door shall have a large opening at least 120 and be removable without any tool. It shall have an efficient lock by a triangle key (to be supplied). Means to keep documents A4 shall be inside the enclosure.
Page 136 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

The basis structure is made in polyester with a mechanical resistance IK10 and shall have the same size than the enclosure. All the fixation bolts shall be supplied.

Page 137 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

5.2.4.

Flush Mounted Fuse Cabinet 230/400 V

Flush-mounted fuse cabinets, 400/230 V, shall be supplied for the building connection. The enclosure shall be IP 41made in a moulded insulating material, fire self extinguishing, resistant to local climate, in particular to saline air and ultraviolet radiation, the mechanical resistance will be IK10. The door shall be equipped with an efficient lock to be operated by a triangle key.Closing and locking devices must be captive to be not lost. The size shallbe: height 420mm, front width 285mm and depth 180mm

It shall be equipped with; 3 fuse holders, size 00, for phase protection, and one neutral connecting bar 3 blade fuses type gl40 A 8 Bimetallic compression lugs and stainless bolts for the connection of 2 cables LVAV 4x50mm (bottom) 6 cuprum compression lugs and stainless bolts for the connection of 2 cables VAV 4x10mm2 2 cables glands for 2 cables LVAV 3x50+25 on the cabinet bottom. 1 cables gland for 1 cables VAV 4x10mm2 on the cabinet top 1earthing terminal block for earthing purposes and earthing of the cables shielding.

Page 138 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

1 handle to install or to remove the fuse on its support if needed.

5.2.5.

Luminary for wood pole installation

Luminary for wood pole mounting for 220 V, HP sodium lamps 70 W and 150W , with polycarbonate prismatic diffuser type, having the optic compartment one protection degree IP 66 and auxiliary compartment one protection degree IP 43 . The luminary shall be fuse protected, be compensated for 0.9 power factor. The cable connection between ABC line and auxiliary compartment will be a VV 2x2.5 mmcable. The length is 2.5 meters.
Page 139 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Luminary shall be installed on the pole with a convenient arm as shown on the drawing hereunder (only for example) and fixed on the wood pole witha stainless strap. Anti rust primer marine coat paint

Tube 42

H 1250

20

5.2.6.

Street light poles and Luminary for underground networks

The Street Light Polesshall be steel made, quality at least S275 JR EN 100 25 2, hot deep galvanized, according EN ISO 146, with anti rust primer marine coat useful

paint,once forming without slip joint, section taper round, conical profile,

height 10 m, fixation in the soil by burial, horizontal 150 W Lighting fixation on the pole with a curve support, 1,75m length witch can be single or double as indicated in the pictures below.On the underground portion and until 50 cm out of soil the poles

Page 140 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

shall be painted with an adequate thickness of bituminous painting, adherent to galvanized structure. The supply includes a triphase cable connection boxe with fuse. The contractor have to ensure that the support pipe d = 60 mm shallbe proper for the installation of the 150 W luminary to be supplied on this scope.

Page 141 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

d = 60 mm / L1 = 1750 mm / R= 500 mm / H = 10 m

5.2.7.

Energy meters

Supply of residential, sealable, static, single phase, single rate, active energy meters, with direct readings in kWh, equipped of reinforced case covers able to support penetration of metallic heated needles (with the objective to stop the operation of the electromechanical kWh register). The meters shall have the accuracy class1, be accurate for the frequency range of 50 Hz 5% IEC 62053-25. Single phase active energy meters 220 V (-20%, +15%), 5 (60) A Single phase active energy meters 220 V (-20%, +15%), 10 (60) A and shall follow IEC 62052-11 and

Supply, of commercial and industrial, sealable, static, single rate, active and reactive energy meters, with direct readings in kWh and kVArh, equipped of reinforced case covers able to support penetration of metallic heated needles (with the objective to stop the operation of the electromechanical kWh register). The meters shall have the
Page 142 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

accuracy class1, be accurate for the frequency range of 50 Hz 5% and shall follow IEC 62052-11 and IEC 62053-25. Three phase active and reactive energy meters, four wires, 3x220/380V (-20%,+15%), 5 (60) A Three phase active and reactive energy meters, four wires, 3x220/380 V (-20%,+15%); 10 (60) A The three phase active and reactive energy meters shall be equipped with a monthly maximum active power demand indicator, readable by the client, with an integration period of 15 minutes.

Page 143 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

6.

SITE WORKS

6.1. SUPPLY AND WORKS UNDER CONTRACTOR RESPONSIBILITY


The Contractor will take the responsibility for the supplies and works mentioned in the specification and priced in the price schedules, where the installation services price must include the following: Signaling and protection in the working areas. The use of all tools, machinerys, scaffolding, equipment and whatever else necessary to carry out the contract jobs. Installation of temporary passageways for pedestrian beside the trenches. Supply and installation of iron plates with 1 (25,4mm) thickness on road crossings. Pumping of water from flooded trenches/ditches. Request the Project Manager team, with at least 48 hours notice, for access to ELECTRA premises.

6.2. PRELIMINARY MEASURES


Before starting the burying works, the Contractor must request from employer information regarding the undergrounded facilities networks (electricity cables, water and sewage pipes), telecommunication, etc).

6.3. SIGNALLING AND PROTECTION


Contractor must install barriers and warning according to ELECTRA and government requirements. All work area including trenches and crossroads must be duly protected, restricted and signalized, thus avoiding any accidents from the pedestrian and the traffic.
Page 144 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

Protection must be carried out with barriers accepted by the Project Manager. Contractor must take care of the day and night signals with no addition charge. All working area must be signalized by yellow illuminated devices, and must be visible from 30 meters. Signaling lights must be fixed on barriers. flashingLamp must be installed in both trench ends. The signaling devices must be maintained until completion of the job. On public roads the Contractor must use warning, directional and temporary traffic signs with the colors and dimensions standardized by government and in good conditions.

Contractor must repaint the horizontal traffic signs and re-install the supports and vertical traffic signs, railings and metallic barriers in the same locations with good condition after work completion with no additional charge.

Page 145 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

7.

DRAWINGS

7.1. COMMON DRAWINGS


Common Drawings N Designation Civil drawings 0.0.01 Secondary substation 4x4 (1of2) 0.0.02 Secondary substation 4x4 (2of2) 0.0.03 Secondary substation Hexagonal (1of2) 0.0.04 Secondary substation Hexagonal (2of2) 0.0.05 Switching station 4x6 (Type A) (1of2) 0.0.06 Switching station 4x6 (Type A) (2of2) 0.0.07 Switching station 4x6 (Type B) (1of2) 0.0.08 Switching station 4x6 (Type B) (2of2) 0.0.09 Switching station 5x8 (Type A) (1of2) 0.0.10 Switching station 5x8 (Type A) (2of2) 0.0.11 Switching station 5x8 (Type B) (1of2) 0.0.12 Switching station 5x8 (Type B) (2of2) 0.0.13 Switching station 5x10 (Type A) (1of2) 0.0.14 Switching station 5x10 (Type A) (2of2) 0.0.15 Switching station 5x10 (Type B) (1of2) 0.0.16 Switching station 5x10 (Type B) (2of2) 0.0.17 Dimensions and equipment location - PUC up to 630 kVA 0.0.18 Door and metalic louvers 0.0.19 MV Trench profile 0.0.20 LV Trench profile 0.0.21 MV / LV Trench profile for street crossing 0.0.22 Foundation for wood pole (single) (8, 10, 12) 0.0.23 Foundation for wood pole (twin) (8, 10, 12) 0.0.24 Twin pole (geminate poles) 0.0.25 Pole anchoring and counter pole top fitting slope 0.0.26 Pole guying MV / LV 0.0.27 Fixation and detail of assembly wooden structures (prticos) 0.0.28 Crossarms for pin type insulator 0.0.29 Crossarms for suspension lines (NW) 0.0.30 Crossarms for string insulator Single line Diagram (Switchboard) 0.1.31 Single line Diagram MV switchboard - Type 1 (RMU) 0.1.32 Single line Diagram MV switchboard - Type 2 (1 SD + 1 FSD) 0.1.33 Single line Diagram MV switchboard - Type 3 (1 DI + 1 FSD) 0.1.34 Single line Diagram MV switchboard - Type 4 (3 SD + 1 FSD) 0.1.35 Single line Diagram MV cubicles (FSD ; SD ; CB ) 0.1.36 Straight line pole mounted 0.1.37 Dead end pole mounted 0.1.38 Single line Diagram for LV Switchboard 250 A 0.1.39 Single line Diagram for LV Switchboard 1000 A A4 A4 A4 A4 A3 A3 A3 A3 A3 W/S W/S W/S W/S W/S W/S W/S W/S W/S Common 0.1.31.pdf Common 0.1.32.pdf Common 0.1.33.pdf Common 0.1.34.pdf Common 0.1.35.pdf Common 0.1.36.pdf Common 0.1.37.pdf Common 0.1.38.pdf Common 0.1.39.pdf Paper Format A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A3 A1 A2 A4 A3 A3 A3 A3 A3 A3 A3 A4 A4 A3 Scale Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 Esc : 1:50 W/S W/S File Name Common 0.0.01.pdf Common 0.0.02.pdf Common 0.0.03.pdf Common 0.0.04.pdf Common 0.0.05.pdf Common 0.0.06.pdf Common 0.0.07.pdf Common 0.0.08.pdf Common 0.0.09.pdf Common 0.0.10.pdf Common 0.0.11.pdf Common 0.0.12.pdf Common 0.0.13.pdf Common 0.0.14.pdf Common 0.0.15.pdf Common 0.0.16.pdf Common 0.0.17.pdf Common 0.0.18.pdf

Esc : 1:2000 Common 0.0.19.pdf Esc : 1:2000 Common 0.0.20.pdf Esc : 1:2000 Common 0.0.21.pdf W/S W/S W/S W/S W/S W/S W/S W/S W/S Common 0.0.22.pdf Common 0.0.23.pdf Common 0.0.24.pdf Common 0.0.25.pdf Common 0.0.26.pdf Common 0.0.27.pdf Common 0.0.28.pdf Common 0.0.29.pdf Common 0.0.30.pdf

Page 146 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

7.2. SANTIAGO DRAWINGS


LOT 1 / Santiago List of Drawings N Designation Paper Format A2 A2 A2 A2 A2 A2 A2 A1 A1 A1 A1 A1 A1 A2 A3 A2 A2 A1 A1 A1 A1 A2 A2 A2 A1 A1 A2 A2 A2 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A2 A2 A2 A1 A1 A2 A2 Scale W/S W/S W/S W/S W/S W/S W/S W/S 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 W/S W/S File Name Santiago 7.0.01.pdf Santiago 7.0.02.pdf Santiago 7.0.03.pdf Santiago 7.0.04.pdf Santiago 7.0.05.pdf Santiago 7.0.06.pdf Santiago 7.0.07.pdf Santiago 7.0.08.pdf Santiago 7.1.09.pdf Santiago 7.1.10.pdf Santiago 7.1.11.pdf Santiago 7.1.12.pdf Santiago 7.1.13.pdf Santiago 7.1.14.pdf Santiago 7.1.15.pdf Santiago 7.1.16.pdf Santiago 7.1.17.pdf

7.0.01 General Plan of Santiago Island with Intervention areas 7.0.02 Single Line Diagram of Praia MV Network (Existing) 7.0.03 Single Line Diagram of Santiago Inland MV Network (Existing) 7.0.04 Single Line Diagram of Praia MV/HV Network (After PTDSD Project) 7.0.05 Single Line Diagram of Santiago Inland MV/HV Network (After PTDSD Project) 7.0.06 Single Line Diagram of Palmarejo Substation (Existing) 7.0.07 Single Line Diagram of Palmarejo Distribution Station 7.0.08 Single Line Diagram of Gamboa Substation (existing and future) 7.1.09 MV Underground line route Gamboa SS / Achada So Filipe 60/20kV SS 1/3 7.1.10 MV Underground line route Gamboa SS / Achada So Filipe 60/20kV SS 2/3 7.1.11 MV Underground line route Gamboa SS / Achada So Filipe 60/20kV SS 3/3 7.1.12 MV Underground line route Achada Lem Ferreira / Achada Grande Trs MV Underground line route Tarrafal Sw. ST. / A. Baixo and Tarrafal Power 7.1.13 Station / M. Iria II 7.1.14 MV Underground line route Cho Bom /Perdigoto and OHL/Cabea Carreira 7.1.15 MV Underground line route Achada Fatima II 7.1.16 Single Line Diagram of So Filipe Switching Station 7.1.17 Single Line Diagram of Achada Grande Trs Switching Station 7.2.18 Route And Profile of Fontes Almeida / Mitra OHL 1/2 7.2.19 Route And Profile of Fontes Almeida / Mitra OHL 1/2 7.2.20 Route And Profile of Joo Teves and Varzea Igreja OHL(Upgrading do 20 kV) 1/2 7.2.21 Route And Profile of Joo Teves and Varzea Igreja OHL(Upgrading do 20 kV) 1/2 7.2.22 Route And Profile of Mercado Orgos OHL(Upgrading to 20 kV) 7.2.23 Route And Profile of Longueira OHL 7.2.24 Route And Profile of Palho OHL 7.2.25 Route And Profile of Boca Larga and Montanhinha OHL (1/2) 7.2.26 Route And Profile of Boca Larga and Montanhinha OHL (2/2) 7.2.27 Route And Profile of Montanha OHL 7.2.28 Route And Profile of Pedra Tcheu OHL 7.2.29 Route And Profile of Joo Bom OHL 7.2.30 Route and profile of Achada Carreira, Bimbirim and Gamxemba OHL-1/3 7.2.31 Route and profile of Achada Carreira, Bimbirim and Gamxemba OHL-2/3 7.2.32 Route and profile of Achada Carreira, Bimbirim and Gamxemba OHL-3/3 7.2.33 Route and profile of Mato Brasil / Achada Lagoa OHL-1/2 7.2.34 Route and profile of Mato Brasil / Achada Lagoa OHL-2/2 7.2.35 Route and profile of Cho da Silva and Maria Pereira OHL-1/3 7.2.36 Route and profile of Cho da Silva and Maria Pereira OHL-2/3 7.2.37 Route and profile of Cho da Silva and Maria Pereira OHL-3/3 7.2.38 Route and profile of Achada BelBel OHL 7.2.39 Route and profile of Monte Negro OHL 7.2.40 Route and profile of Boca Ribeira / Achada Garote OHL 7.2.41 Route and profile of Hortel / ChaCha OHL 7.2.42 Route and profile of Leites / Burbur OHL 7.2.43 Route and profile of Lm Rua OHL 7.2.44 Route and profile of Charco and Achada Leite OHL -1/2 7.2.45 Route and profile of Charco and Achada Leite OHL -2/2 7.2.46 Route And Profile of Santana / (Pole 57) Belm OHL -1/2 7.2.47 Route And Profile of Santana / (Pole 57) Belm OHL -2/2

1:500/1:2500 (V/H) Santiago 7.2.18.pdf 1:500/1:2500 (V/H) Santiago 7.2.19.pdf 1:500/1:2500 (V/H) Santiago 7.2.20.pdf 1:500/1:2500 (V/H) Santiago 7.2.21.pdf 1:500/1:2500 (V/H) Santiago 7.2.22.pdf 1:500/1:2500 (V/H) Santiago 7.2.23.pdf 1:500/1:2500 (V/H) Santiago 7.2.24.pdf 1:500/1:2500 (V/H) Santiago 7.2.25.pdf 1:500/1:2500 (V/H) Santiago 7.2.26.pdf 1:500/1:2500 (V/H) Santiago 7.2.27.pdf 1:500/1:2500 (V/H) Santiago 7.2.28.pdf 1:500/1:2500 (V/H) Santiago 7.2.29.pdf 1:500/1:2500 (V/H) Santiago 7.2.30.pdf 1:500/1:2500 (V/H) Santiago 7.2.31.pdf 1:500/1:2500 (V/H) Santiago 7.2.32.pdf 1:500/1:2500 (V/H) Santiago 7.2.33.pdf 1:500/1:2500 (V/H) Santiago 7.2.34.pdf 1:500/1:2500 (V/H) Santiago 7.2.35.pdf 1:500/1:2500 (V/H) Santiago 7.2.36.pdf 1:500/1:2500 (V/H) Santiago 7.2.37.pdf 1:500/1:2500 (V/H) Santiago 7.2.38.pdf 1:500/1:2500 (V/H) Santiago 7.2.39.pdf 1:500/1:2500 (V/H) Santiago 7.2.40.pdf 1:500/1:2500 (V/H) Santiago 7.2.41.pdf 1:500/1:2500 (V/H) Santiago 7.2.42.pdf 1:500/1:2500 (V/H) Santiago 7.2.43.pdf 1:500/1:2500 (V/H) Santiago 7.2.44.pdf 1:500/1:2500 (V/H) Santiago 7.2.45.pdf 1:500/1:2500 (V/H) Santiago 7.2.46.pdf 1:500/1:2500 (V/H) Santiago 7.2.47.pdf

Page 147 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

LOT 1 / Santiago List of Drawings N Designation 7.2.48 Route and Profile of P1(57) Belm, Tronco and Pico Leo OHL 1/3 7.2.49 Route and Profile of P1(57) Belm, Tronco and Pico Leo OHL 2/3 7.2.50 Route and Profile of P1(57) Belm, Tronco and Pico Leo OHL 3/3 7.1.51 MV Underground line route Palmarejo Power Station / New Palmarejo 20 kV Distribution Station 7.1.52 Gamboa Distribution Station Building 7.3.53 Areas for Rehabilitation and Expansion of LV Network in Praia City 7.3.54 Areas for Rehabilitation and Expansion of LV Network in Ribeira Grande 7.3.55 Areas for Rehabilitation and Expansion of LV Network in Orgos (1/2) 7.3.56 Areas for Rehabilitation and Expansion of LV Network in Orgos (2/2) 7.3.57 Areas for Rehabilitation and Expansion of LV Network in So Domingos 7.3.58 Areas for Rehabilitation and Expansion of LV Network in Tarrafal (1/2) 7.3.59 Areas for Rehabilitation and Expansion of LV Network in Tarrafal (2/2) 7.3.60 Areas for Rehabilitation and Expansion of LV Network in Santa Cruz Paper Scale File Name Format A1 1:500/1:2500 (V/H) Santiago 7.2.48.pdf A1 A1 A1 A1 A1 A1 A2 A1 A2 A2 A1 A1 1:500/1:2500 (V/H) Santiago 7.2.49.pdf 1:500/1:2500 (V/H) Santiago 7.2.50.pdf 1:500 1:100 1:10000 1:2500 1:2500 1:2500 1:2500 1:2500 1:2500 1:2500 Santiago 7.1.51.pdf Santiago 7.1.52 Santiago 7.3.53.pdf Santiago 7.3.54.pdf Santiago 7.3.55.pdf Santiago 7.3.56.pdf Santiago 7.3.57.pdf Santiago 7.3.58.pdf Santiago 7.3.59.pdf Santiago 7.3.60.pdf

Page 148 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

7.3. FOGO DRAWINGS


LOT 1 / Fogo List of Drawings N Designation 8.0.01 PTDSD Project Acting areas in Fogo Island 8.0.02 Implantation of Fogo MV Network (Includes ORET and PTDSD Project) 8.0.03 Single line Diagram of Fogo MV Network (Includes ORET and PTDSD Project) 8.1.04 MV Underground line route Achada S Filipe / Fonte Aleixo 8.1.05 MV Underground line route Fonte Aleixo / Patim OHL 8.1.06 MV Underground line route Congresso / Xaguate 8.1.07 MV Underground line route Mosteiros Trs II 8.1.08 Single Line Diagram of Patim Switching Station 8.1.09 Single Line Diagram of Ponta Verde Switching Station 8.1.10 Single Line Diagram of Xaguate Switching Station 8.1.11 Single Line Diagram of Cova Figueira Switching Station 8.2.12 Route and profile of So Filipe / Patim OHL-1/5 8.2.13 Route and profile of So Filipe / Patim OHL-2/5 8.2.14 Route and profile of So Filipe / Patim OHL-3/5 8.2.15 Route and profile of So Filipe / Patim OHL-4/5 8.2.16 MV supply feeder Route of S.Filipe Patim OHL Derivations Profiles 5/5 8.2.17 Route and profile of Patim / Socorro OHL-1/2 8.2.18 Route and profile of Patim / Socorro OHL-2/2 8.2.19 Route and profile of Cidreira OHL 8.2.20 Route and profile of Achada Fora OHL 8.2.21 Route and profile of Cabea Fundo OHL - 1/3 8.2.22 Route and profile of Cabea Fundo OHL - 2/3 8.2.23 Route and profile of Cabea Fundo OHL - 3/3 8.2.24 Route and profile of M. Gonalves Cutelo Capado OHL - 1/3 8.2.25 Route and profile of M. Gonalves Cutelo Capado OHL - 2/3 8.2.26 Route and profile of M. Gonalves Cutelo Capado OHL - 3/3 8.2.27 Route and profile of Forno OHL 8.2.28 Route and profile of Patim / Monte Grande OHL - 1/2 8.2.29 Route and profile of Patim / Monte Grande OHL - 2/2 8.3.30 So Filipe City General View 8.3.31 So Filipe LV Network diagram 1/5 (Xaguate) 8.3.32 So Filipe LV Network diagram 2/5 (Down Town) 8.3.33 So Filipe LV Network diagram-Street Lighting 3/5 (Down Town) 8.3.34 So Filipe LV Network diagram 4/5 (Achada So Filipe) 8.3.35 So Filipe LV Network diagram 5/5 (Congresso) Paper Format A2 A2 A2 A2 A2 A2 A2 A3 A3 A3 A3 A1 A1 A1 A1 A1 A1 A1 A1 A1 A2 A1 A1 A1 A1 A2 A3 A1 A2 A2 A2 (Exten.) A2 A2 A2 A2 Scale W/S W/S W/S 1:2000 1:2000 1:2000 1:2000 W/S W/S W/S W/S File Name Fogo 8.0.01.pdf Fogo 8.0.02.pdf Fogo 8.0.03.pdf Fogo 8.1.04.pdf Fogo 8.1.05.pdf Fogo 8.1.06.pdf Fogo 8.1.07.pdf Fogo 8.1.08.pdf Fogo 8.1.09.pdf Fogo 8.1.10.pdf Fogo 8.1.11.pdf

1:500/1:2500 (V/H) Fogo 8.2.12.pdf 1:500/1:2500 (V/H) Fogo 8.2.13.pdf 1:500/1:2500 (V/H) Fogo 8.2.14.pdf 1:500/1:2500 (V/H) Fogo 8.2.15.pdf 1:500/1:2500 (V/H) Fogo 8.2.16.pdf 1:500/1:2500 (V/H) Fogo 8.2.17.pdf 1:500/1:2500 (V/H) Fogo 8.2.18.pdf 1:500/1:2500 (V/H) Fogo 8.2.19.pdf 1:500/1:2500 (V/H) Fogo 8.2.20.pdf 1:500/1:2500 (V/H) Fogo 8.2.21.pdf 1:500/1:2500 (V/H) Fogo 8.2.22.pdf 1:500/1:2500 (V/H) Fogo 8.2.23.pdf 1:500/1:2500 (V/H) Fogo 8.2.24.pdf 1:500/1:2500 (V/H) Fogo 8.2.25.pdf 1:500/1:2500 (V/H) Fogo 8.2.26.pdf 1:500/1:2500 (V/H) Fogo 8.2.27.pdf 1:500/1:2500 (V/H) Fogo 8.2.28.pdf 1:500/1:2500 (V/H) Fogo 8.2.29.pdf 1:5000 1:2000 1:2000 1:2000 1:2000 1:2000 Fogo 8.3.30.pdf Fogo 8.3.31.pdf Fogo 8.3.32.pdf Fogo 8.3.33.pdf Fogo 8.3.34.pdf Fogo 8.3.35.pdf

Page 149 of 150

PTDSD Project: Part I - Rehabilitation, Reinforcement and Expansion of MV and LV Networks LOT1 and LOT2

Vol III, lot 1 Technical Specification and Drawings

7.4. MAIO DRAWINGS


LOT 1 / Maio List of Drawings N Designation 6.0.01 General Plan of Maio Island with Intervention areas 6.0.02 Single Line Diagram of Maio MV Network (Existing) 6.0.03 Single Line Diagram of Maio MV Network (After PTDSD Project) 6.0.04 Single Line Diagram of Torril Substation (Existing) 6.1.05 MV Underground line route Torril Power Station / Ponta Preta and C Formao 6.1.06 MV Underground Line route in Porto Ingls City (DownTown) expansion Area 6.1.07 MV Underground line route Farol / Fontona 6.1.08 MV Underground line route Fontona / Aeroporto 6.1.09 MV Underground line route Aeroporto / Curralona 6.1.10 MV Underground line route Curralona / Morro 6.1.11 MV Underground line route Curralona / Bela Vista 6.1.12 MV Underground line route Morro / Calheta OHL 6.1.13 MV Underground line route Morro OHL / Calheta /Morrinho OHL 6.1.14 MV Underground line route Calheta OHL / Morrinho S/S 6.1.15 Single Line Diagram of Fontona Switching Station 6.1.16 Single Line Diagram of Curralona Switching Station 6.1.17 Single Line Diagram of Morro Switching Station 6.1.18 Single Line Diagram of Pedro Vaz Switching Station 6.2.19 Route and profile of Figueira Seca / Alcatrs OHL-1/3 6.2.20 Route and profile of Figueira Seca / Alcatrs OHL-2/3 6.2.21 Route and profile of Figueira Seca / Alcatrs OHL-3/3 6.3.22 Line Route of Morro / Morrinho OHL to be Rehabilitaded 1/2 6.3.23 Line Route of Morro / Morrinho OHL to be Rehabilitaded 2/2 6.3.24 Line Route of Pedro Vaz / Alcatraz OHL to be Rehabilitaded 1/2 6.3.25 Line Route of Pedro Vaz / Alcatraz OHL to be Rehabilitaded 2/2 6.4.26 Porto Ingls LV Network diagram (Zona Fontona) - (1/4) 6.4.27 Porto Ingls LV Network diagram (Farol Cemitrio) - (2/4) 6.4.28 Porto Ingls LV Network diagram (Ponta Preta) - (3/4) 6.4.29 Porto Ingls LV Network diagram (Torril) - (4/4) 6.4.30 Morro LV Network diagram 6.4.31 Calheta LV Network diagram 6.4.32 Morrinho LV Network diagram 6.4.33 Cascabulho LV Network diagram 6.4.34 Pedro Vaz LV Network diagram 6.4.35 Alcatraz LV Network diagram 6.4.36 Pilo Co LV Network diagram Paper Forma A2 A2 A2 A3 A2 A2 A2 A1 A1 A2 A2 A2 A2 A3 A3 A3 A3 A3 A1 A1 A1 A1 A1 A1 A1 A2 A2 A2 A2 A2 A1 A3 A3 A3 A3 A3 Scale W/S W/S W/S W/S 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 1:2000 W/S W/S W/S W/S File Name Maio 6.0.01.pdf Maio 6.0.02.pdf Maio 6.0.03.pdf Maio 6.0.04.pdf Maio 6.1.05.pdf Maio 6.1.06.pdf Maio 6.1.07.pdf Maio 6.1.08.pdf Maio 6.1.09.pdf Maio 6.1.10.pdf Maio 6.1.11.pdf Maio 6.1.12.pdf Maio 6.1.13.pdf Maio 6.1.14.pdf Maio 6.1.15.pdf Maio 6.1.16.pdf Maio 6.1.17.pdf Maio 6.1.18.pdf

1:500/1:2500 (V/H) Maio 6.2.19.pdf 1:500/1:2500 (V/H) Maio 6.2.20.pdf 1:500/1:2500 (V/H) Maio 6.2.21.pdf 1:2500 1:2500 1:2500 1:2500 1:2000 1:2000 1:2000 1:2000 1:2000 1:1500 1:2000 1:1000 1:1500 1:1000 1:1000 Maio 6.3.22.pdf Maio 6.3.23.pdf Maio 6.3.24.pdf Maio 6.3.25.pdf Maio 6.3.26.pdf Maio 6.3.27.pdf Maio 6.3.28.pdf Maio 6.3.29.pdf Maio 6.3.30.pdf Maio 6.3.31.pdf Maio 6.3.32.pdf Maio 6.3.33.pdf Maio 6.3.34.pdf Maio 6.3.35.pdf Maio 6.3.36.pdf

Page 150 of 150