CONSTRUCTION COST (PLINTH ARAE BASIS )

FOR BUILDING WORKS


Item

Biology Block
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
IT Block
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Service Corridor
Computational Biology Centre
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.

Specifications

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

Units

Plinth Area Plinth Area Rate


Rate (Rs./Sft)
(Rs./Sqm)

Breakup

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

450.00
675.00
150.00
75.00
300.00
90.00
0.00
90.00
37.50
135.00
45.00
60.00
75.00
45.00
2227.50

4844
7266
1615
807
3229
969
0
969
404
1453
484
646
807
484
23976.61

20%
30%
7%
3%
13%
4%
0%
4%
2%
6%
2%
3%
3%
2%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

425.00
500.00
150.00
75.00
300.00
100.00
0.00
125.00
50.00
50.00
45.00
60.00
25.00
45.00
1950.00

4575
5382
1615
807
3229
1076
0
1345
538
538
484
646
269
484
20989.63

22%
26%
8%
4%
15%
5%
0%
6%
3%
3%
2%
3%
1%
2%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

350.00
300.00
125.00
75.00
300.00
100.00
0.00
125.00
50.00
50.00
50.00
60.00
25.00
50.00
1660.00

3767
3229
1345
807
3229
1076
0
1345
538
538
538
646
269
538
17868.09

21%
18%
8%
5%
18%
6%
0%
8%
3%
3%
3%
4%
2%
3%
100%

CONSTRUCTION COST (PLINTH ARAE BASIS )


FOR BUILDING WORKS
Item
Centre for specialised services
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Admin and Mgmt Block
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Amenity Centre
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Other Utility Services
Structure

Specifications

RCC

Units

Plinth Area Plinth Area Rate


Rate (Rs./Sft)
(Rs./Sqm)

Breakup

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

425.00
450.00
150.00
75.00
300.00
90.00
0.00
113.00
38.00
38.00
45.00
60.00
23.00
45.00
1852.00

4575
4844
1615
807
3229
969
0
1216
409
409
484
646
248
484
19934.76

23%
24%
8%
4%
16%
5%
0%
6%
2%
2%
2%
3%
1%
2%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

188.00
150.00
75.00
45.00
75.00
30.00
0.00
0.00
38.00
0.00
45.00
0.00
23.00
45.00
714.00

2024
1615
807
484
807
323
0
0
409
0
484
0
248
484
7685.43

26%
21%
11%
6%
11%
4%
0%
0%
5%
0%
6%
0%
3%
6%
100%

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

350.00
600.00
150.00
75.00
150.00
100.00
0.00
75.00
45.00
30.00
45.00
25.00
25.00
50.00
1720.00

3767
6458
1615
807
1615
1076
0
807
484
323
484
269
269
538
18513.93

20%
35%
9%
4%
9%
6%
0%
4%
3%
2%
3%
1%
1%
3%
100%

RCC

Rs./Sft BUA

150.00

1615

27%

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

CONSTRUCTION COST (PLINTH ARAE BASIS )


FOR BUILDING WORKS
Item
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Services Apartments
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Apartments
Structure
Finishes
Electrical wiring & fixtures
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.
Commercial
Structure
Finishes
Electrical wiring & fixtures

Specifications

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

RCC

Units

Plinth Area Plinth Area Rate


Rate (Rs./Sft)
(Rs./Sqm)

Breakup

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

125.00
75.00
50.00
50.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
25.00
550.00

1345
807
538
538
538
0
0
0
0
0
0
269
269
5920.15

23%
14%
9%
9%
9%
0%
0%
0%
0%
0%
0%
5%
5%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

350.00
500.00
125.00
125.00
350.00
30.00
25.00
50.00
25.00
25.00
30.00
40.00
25.00
25.00
1725.00

3767
5382
1345
1345
3767
323
269
538
269
269
323
431
269
269
18567.75

20%
29%
7%
7%
20%
2%
1%
3%
1%
1%
2%
2%
1%
1%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

350.00
400.00
110.00
75.00
0.00
30.00
0.00
0.00
0.00
0.00
25.00
30.00
0.00
0.00
1020.00

3767
4306
1184
807
0
323
0
0
0
0
269
323
0
0
10979.19

34%
39%
11%
7%
0%
3%
0%
0%
0%
0%
2%
3%
0%
0%
100%

Rs./Sft BUA
Rs./Sft BUA
Rs./Sft BUA

450.00
700.00
175.00

4844
7535
1884

20%
31%
8%

CONSTRUCTION COST (PLINTH ARAE BASIS )


FOR BUILDING WORKS

Item
Plumbing / Sanitation
A/C
D.G./Backup
UPS
Stuctured Cabling
Intercom/EPABX
Automation / Security
Lifts
Sub-Station
Fire Alarm
Fire Fighting
Total Cost per Sft.

Specifications

Central A/C
100% incl. A/C
70% of Lighting load
LAN/ Datacom

Units
Rs./Sft BUA
Rs./Tonne
Rs./KVA
Rs./KVA
Rs./Sft. of BUA

Plinth Area Plinth Area Rate


Rate (Rs./Sft)
(Rs./Sqm)

Breakup

100.00
400.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00

1076
4306
538
538
538
538
538
538
538
538
538

4%
18%
2%
2%
2%
2%
2%
2%
2%
2%
2%

2275.00

24487.90

100%