Sunteți pe pagina 1din 2

37660 Federal Register / Vol. 66, No.

139 / Thursday, July 19, 2001 / Notices

DEPARTMENT OF DEFENSE contains over 30 years of lignite fuel for likely to include, but will not be limited
these purposes. to: The effects of mining activities on
Department of the Army, Corps of Based upon current mining the mine’s neighbors and nearby
Engineers technologies and costs and the current communities; streams, wetlands, surface
rate of mining, the Sandow Mine will water quantity and quality, groundwater
Intent To Prepare an Environmental reach the end of its useful life in quantity and quality, geologic resources,
Impact Statement (EIS) on an approximately five years. The primary vegetation, fish and wildlife, threatened
Application for a Department of the purpose of Alcoa’s proposed Three Oaks and endangered species, soils, prime
Army Permit Under Section 404 of the Mine is to continue to provide to farmland, noise, light, aesthetics,
Clean Water Act by Alcoa Inc. for provide a long-term source of energy to historic and pre-historic cultural
Construction and Operation of the allow the continued operation of resources, socioeconomics, land use,
Three Oaks Surface Lignite Mine in Lee Alcoa’s Rockdale aluminum smelter. public roads, and air quality.
and Bastrop Counties, TX Alcoa has stated that, to serve this 5. Cooperating Agencies: At this time,
AGENCY: U.S. Army Corps of Engineers, purpose, the energy source must meet no other federal or state agencies are
DoD. the following criteria: (1) Generate, or be expected to be cooperating agencies in
used to generate, sufficient amounts of preparation of the EIS. However,
ACTION: Notice of intent. electricity, (2) be delivered to the numerous federal and state agencies,
SUMMARY: The U.S. Army Corps of smelter at a total cost that is stable, including the U.S. Office of Surface
Engineers, Fort Worth District (USACE), predictable, and low enough to sustain Mining, the U.S. Environmental
intends to prepare an Environmental the economic viability of the smelter, (3) Protection Agency, the U.S. Fish and
Impact Statement (EIS) to assess the be available on a secure, firm, and Wildlife Service, the Railroad
environmental, social, and economic continuous basis over a 30 year period, Commission of Texas, the Texas Natural
effects of issuance of a Department of and (4) be available for use when the Resource Conservation Commission, the
the Army permit under Section 404 of existing Sandow Mine is no longer a Texas Parks and Wildlife Department
the Clean Water Act for discharges of source of economically-recoverable are expected to be involved in the
dredged and fill material into waters of lignite reserves (five years). preparation of, and provide comments
the United States associated with the The USACE has received an on, the EIS.
application for a Department of the 6. Additional Review and
proposed construction and operation of
Army permit under Section 404 of the Consultation: Compliance with other
a surface lignite mine. In the EIS, the
Clean Water Act from Alcoa to construct federal and state requirements that will
USACE will assess potential impacts
and operate the proposed mine. In be addressed in the EIS include, but will
associated with a range of alternatives.
accordance with the National not be limited to, state water quality
FOR FURTHER INFORMATION CONTACT: For Environmental Policy Act (NEPA) of
further information and/or questions certification under Section 401 of the
1969 (42 U.S.C. 4321 et seq.) the USACE
about the proposed action and EIS, Clean Water Act, compliance with the
has determined that issuance of such a
please contact Ms. Jennifer Walker, Railroad Commission of Texas
permit may have a significant impact on
Regulatory Project Manager, by letter at regulations regarding surface coal
the quality of the human environment
Regulatory Branch, CESWF–PER–R, mining, protection of water quality
and, therefore, requires the preparation
U.S. Army Corps of Engineers, P.O. Box under the Texas Pollutant Discharge
of an EIS.
17300, Fort Worth, Texas 76102–Texas 2. Alternatives: Alternatives available Elimination System, protection of air
76102–0300 or by telephone at (817) to the USACE are to: (1) Issue the quality under the Texas Air Quality Act,
978–7547. Department of the Army permit; (2) protection of endangered and threatened
SUPPLEMENTARY INFORMATION: issue the Department of the Army species under Section 7 of the
1. Description of the Proposed Project: permit with special conditions; or (3) Endangered Species Act, and protection
The applicant, Alcoa, Inc. (Alcoa), deny the Department of the Army of cultural resources under Section 106
proposes to construct and operate the permit. Alternatives available to Alcoa of the National Historic Preservation
Three Oaks Lignite Mine in Lee and include: (1) Constructing and operating Act.
Bastrop Counties, Texas. The Three the new Three Oaks Mine as proposed 7. Availability of the Draft EIS: The
Oaks Mine lands are in the Brazos and by Alcoa; (2) constucting and operating Draft EIS is projected to be available by
Colorado River basins in east central the new Three Oaks Mine as proposed April 2002. A public hearing will be
Texas. The mine would be located to by Alcoa, with modifications; (3) conducted following the release of the
recover lignite from the Wilcox lignite developing or acquiring other energy Draft EIS.
belt, and would be located adjacent to sources, including purchasing power Dated: July 12, 2001.
the Alcoa Sandow Mine, which lies from the electrical grid, converting the Gordon M. Wells,
immediately to the Northeast of the existing power plants to utilize western Colonel, Corps of Engineers, District Engineer.
proposed mine near Rockdale, in Milam coal, or converting to the use of natural [FR Doc. 01–18013 Filed 7–18–01; 8:45 am]
and Lee Counties, Texas. The Sandow gas; or (4) no action. BILLING CODE 3710–20–M
Mine has been operated by Alcoa since 3. Scoping and Public Involvement
the early 1950s. Process: A public meeting (open house
Alcoa currently intends to supply format) to gather information on the
approximately 6 million tons per year of scope of the EIS, including the issues to DEPARTMENT OF EDUCATION
lignite to electric power generation be addressed in detail in the document
plants owned by Alcoa and TXU that will be conducted on August 21, 2001, Arbitration Panel Decision Under the
supply power to the Alcoa Rockdale form 3 to 9 p.m at the American Legion Randolph-Sheppard Act
Aluminum Smelter. A portion of the Hall located oin the south side of U.S. AGENCY: Department of Education.
electricity generated by TXU is Highway 77, one mile south of U.S. ACTION: Notice of arbitration panel
distributed over the TXU electric grid. Highway 290, in Giddings, Texas. decision under the Randolph-Sheppard
At a rate of 6 million tons per year, 4. Significant Issues: Issues to be
Act.
Alcoa estimates that the proposed mine given significant analysis in the EIS are

VerDate 11<MAY>2000 17:33 Jul 18, 2001 Jkt 194001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\19JYN1.SGM pfrm07 PsN: 19JYN1
Federal Register / Vol. 66, No. 139 / Thursday, July 19, 2001 / Notices 37661

SUMMARY: Notice is hereby given that on implementing regulations in 34 CFR GSA to provide a vending facility at the
December 26, 2000, an arbitration panel part 395. Roybal Building to the SLA so that it
rendered a decision in the matter of A summary of the facts is as follows: could place a qualified blind vendor
California Department of Rehabilitation On August 3, 1993, the SLA and GSA pursuant to the Act. Additionally, the
v. General Services Administration entered into a permit agreement to SLA’s original blind vendor had the
(Docket No. R–S/99–1). This panel was establish a vending facility, including right to continue to operate the
convened by the U.S. Department of vending machines, at the Roybal relocated vending facility.
Education pursuant to 20 U.S.C. 107d– Building, 255 East Temple Street, Los The violations of the Act and the
1(b) upon receipt of a complaint filed by Angeles, California. The SLA assigned a regulations by GSA caused both the SLA
petitioner, the California Department of permanent vendor to this location with and the blind vendor to suffer damages.
Rehabilitation. the participation and approval of GSA. The damages to the SLA include loss of
FOR FURTHER INFORMATION: A copy of the Initially the services provided at the revenue generated from the blind
full text of the arbitration panel decision Roybal building consisted primarily of vendor, which amounts to 6 percent of
may be obtained from George F. vending machines, but in 1996 GSA the net proceeds of the blind vendor.
Arsnow, U.S. Department of Education, remodeled its lobby area to construct a The SLA is also entitled to a fair market
400 Maryland Avenue, SW., room 3230, larger facility that provided customers rental for its equipment during the time
Mary E. Switzer Building, Washington, with coffee and various other food it was being used by GSA.
DC 20202–2738. Telephone: (202) 205– items. After completing the remodeling Finally, the panel instructed GSA that
9317. If you use a telecommunications of the vending facility, GSA cancelled it had 30 days from the date of the
device for the deaf (TDD), you may call the 1993 permit and issued a new panel’s decision to provide the SLA
the TDD number at (202) 205–8298. permit to the SLA to operate the with evidence of the blind vendor’s lack
Individuals with disabilities may remodeled facility in the lobby. It was of qualifications to operate the Roybal
obtain this document in an alternative the position of GSA that the newer Building vending facility; otherwise,
format (e.g., Braille, large print, remodeled facility constituted a new GSA would be liable for damages to the
audiotape, or computer diskette) on facility that warranted the SLA to blind vendor. The panel ruled that the
request to the contact person listed in conduct a selection process for a vendor damages would be the difference
the preceding paragraph. to manage the remodeled facility. between what he had been able to earn
Conversely, the SLA took the position and what the private concessionaire
Electronic Access to This Document: that GSA had no right to cancel the 1993 earned during the transition period
You may view this document, as well vending permit and that the remodeled when the SLA was not managing the
as all other Department of Education facility was not a new facility within the Roybal Building vending facility, plus
documents published in the Federal meaning of State rules and regulations interest.
Register, in text or Adobe Portable that would provide for a new vendor The views and opinions expressed by
Document Format (PDF) on the Internet selection process. the panel do not necessarily represent
at the following site: www.ed.gov/ The SLA alleged that the real issue the views and opinions of the U.S.
legislation/FedRegister. focused on GSA’s complaint that the Department of Education.
To use PDF you must have Adobe vendor, who had been providing service
prior to the remodeling of the vending Dated: July 16, 2001.
Acrobat Reader, which is available free
at this site. If you have questions about facility, was considered by GSA to be Francis V. Corrigan,
using PDF, call the U.S. Government unqualified and unacceptable to manage Deputy Director, National Institute on
Printing Office (GPO), toll free, at 1– the remodeled vending facility. The Disability and Rehabilitation Research.
888–293–6498; or in the Washington, SLA further alleged that GSA demanded [FR Doc. 01–18072 Filed 7–18–01; 8:45 am]
DC, area at (202) 512–1530. that the SLA initiate a selection process BILLING CODE 4000–01–U

Note: The official version of this document for a new vendor to manage the
is the document published in the Federal remodeled vending facility only after
Register. Free Internet access to the official the facility had been remodeled.
edition of the Federal Register and the Code Following the cancellation of the 1993 DEPARTMENT OF ENERGY
of Federal Regulations is available on GPO permit and the SLA’s refusal to place
Access at: http://www.access.gpo.gov/nara/ another vendor at the facility, GSA Environmental Management Site-
index.html. awarded a contract to a private Specific Advisory Board, Oak Ridge
SUPPLEMENTARY INFORMATION: Pursuant concessionaire to operate the Roybal Reservation
to section 6(c) of the Randolph- vending facility. AGENCY: Department of Energy.
Sheppard Act (the Act), 20 U.S.C. 107d–
Arbitration Panel Decision ACTION: Notice of open meeting.
2(c), the Secretary publishes in the
Federal Register a synopsis of each The panel, after considering all of the SUMMARY: This notice announces a
arbitration panel decision affecting the evidence, ruled that GSA violated the meeting of the Environmental
administration of vending facilities on Act and implementing regulations. GSA Management Site-Specific Advisory
Federal and other property. had no authority to unilaterally cancel Board (EM SSAB), Oak Ridge. The
the vending permit agreement signed in Federal Advisory Committee Act (Pub.
Background 1993 between itself and the SLA, since L. 92–463, 86 Stat. 770) requires that
This dispute concerns the alleged there was no evidence of public notice of these meeting be
improper termination by the General noncompliance by the SLA with its announced in the Federal Register.
Services Administration (GSA) of a terms. GSA’s issuance of a new permit
DATES: Friday, August 3, 2001—3:30
vending permit held by the California in 1996 was simply an updated version
Department of Rehabilitation, the State p.m.–9 p.m.
of the original permit agreement
licensing agency (SLA), at the Roybal Saturday, August 4, 2001—8 a.m.–4
between GSA and the SLA in 1993.
Building in Los Angeles, California, The panel further stated that the new p.m.
pursuant to the provisions of the Act (20 1996 permit, which essentially ADDRESSES: Rothchild’s, 8807 Kingston
U.S.C. 107 et seq.) and the upgraded the 1993 permit, obligated Pike, Knoxville, TN.

VerDate 11<MAY>2000 17:33 Jul 18, 2001 Jkt 194001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\19JYN1.SGM pfrm07 PsN: 19JYN1