Comprehensive Project Profile


I. PROJECT DESCRIPTION 1.1 Project Title 1.2 Project Proponents 1.3 Project Type 1.4 Project Components1.4.1 Road Rehabilitation 1.4.2 1.5 Project Location: The proposed project is located in the twenty four (24) barangays of the municipality. II. PROJECT STATUS: : : : Rehabilitation of Farm To Market Roads (FMR) LGU-Sagbayan, Bohol CAPITAL FORMING PROJECT

This is a proposed project of the municipality to provide easy access of our farmers for product marketing. III. PROJECT JUSTIFICATION:

The municipality has an estimated 146 kilometers of Farm To market Roads linking all barangays. More than half of said roads are impassable by four wheels vehicle during rainy seasons due to its loose gravel and earth-filled. The farmers are compelled to transport their farm produced at high cost due to limited capacity of transport vehicles, which is usually though motor services. The existing road requires appropriate rehabilitation or filling-up of anapog to make it passable by any vehicles. The above-mentioned facts prompted the Municipality of Sagbayan to conceptualize the said project in the light of providing better service to our constituency particularly the farmers. The proposed concrete paving project will support to the Poverty Reduction Program of the municipality, particularly in providing access of farmers in marketing their farm produced and eventually increase productivity and improve peace and order situation.

IV.

PROJECT OBJECTIVES:

The overall goal of the project is to increase agricultural production to provide sufficiently supply of farm products and to upgrade substandard gravel road for safe and economical access, that is supportive to other basic services. 1. SECTORAL OBJECTIVES 1. Alleviate poverty 2. Improve the quality of life of farmers. 3. Increase income of Municipality and residents 4. Increase per capita income of farmers V. PROJECT FUNDING: : Twenty Four Million Pesos (P24,000,000.00) P24,000,000.00) :

Funds needed Funding Source V I.

PROJECT BENEFIT & COSTS 1. PROJECT BENEFICIARIES The beneficiaries of the project are the people of the municipality of Sagbayan and the traveling public in general. 2. SOCIAL BENEFITS The proposed project will provide the local farmers easy access to market their farm produced. The local government on the other hand, could facilitate whatever assistance desired by the barangay relative to the delivery of basic services and other social services appropriate in the area. Possible increase in income by the municipality could also mean improvement in the access to basic social services by the residents. 3. ECONOMIC BENEFITS The project will greatly encourage the people to engage in any business considering that good roads would reduce the cost of the maintenance of their vehicles and improve road safety of the people. There is no foreseen negative effect of the project in the area. 4. Social Cost The proposed project will not pose unwanted effects to the public. However, it reduces the pollution of the area cause by dusty road. 5. Economic Cost The project will not generate or create any harmful effect on the construction site. Instead, it will generate employment to the people of the municipality.

VII VII.

PROJECT IMPLEMENTATION 1. RESPONSIBLE AGENCIES The lead proponent for this project is the LGU of Sagbayan. 2. ADMINISTRATIVE FEASIBILITY The LGU of Sagbayan through its Municipal Engineer and the Municipal Project Monitoring Committee will oversee the implementation of the project in the area with the close supervision of the Local Chief Executive. Project monitoring will be regularly conducted. 3. Legal and Political Feasibility The project has no legal impediment for its implementation and does not generate or create any political objection from the community including those in the adjoining barangays and adjacent municipalities. 4. Environmental Clearance Environmental Clearance from the Department of Environment and Natural Resources (DENR) may not be obtain in this kind of project. 5. Social Acceptability

The proposed project does not generate any opposition from the people in the community and even its neighboring barangays. Instead, it is their long desire that this Farm to Market Road be concreted. Prepared by: Submitted by: MAXIMO G. LOMOSBOG MPDC RICARDO L. SUAREZ Municipal Mayor