Case Study 6
The data was collected three months before the condensing rotating machine failed
148 MW Generator in US
Case Study 8 Signal (PD and 6 pulse) was collected from HFCT installed on the tank ground of Transformer. This signal(PD and 6 pulse) transmitted from the generator side.
Inspection Findings
Case Study 9
Warning level of PD was collected from HFCT installed on the tank ground of Transformer. This PD transmitted from the generator and shot down the generator for maintenance
Inspection Findings
After service
Case Study 12
Final DGA Test Acetylene 3 ppm Methane 1259 ppm Ethane 163 ppm Ethylene 7 ppm Hydrogen 27123 ppm ABB Internal Inspection B phase core shifted due to through faults/winding telescoping f lt / i di t l i
Case Study 14
Final DGA Test Methane 532 ppm Ethane 363 ppm Ethylene 13 ppm y g 1,140 ppm ( , pp (From last year 08 Hydrogen was at 964) y y g ) Hydrogen
Case Study 15 220 KV GIS Test Results: Data collected with iGMS_P8 iGMS P8
Case Study 16 220 KV GIS Test Results: Data collected with iGMS_P8 _