Subject Code : 908A Paper : Production management General Instructions: The student should submit this assignment in the

e handwritten form (not in the typed format). The student should submit this assignment within the time specified by the exam dept. The student should only use the Rule sheet papers for answering the questions. The student should attach this assignment paper with the answered papers. Failure to comply with the above Four Instructions would lead to rejection of assignment , Specific Instructions: There are four Questions in this assignment . The student should answer all the four questions . Marks allotted 100. Each question carries equal numbers (25 marks) unless specified explicitly.

Question 1 The gross requirements schedule for a product Z is given below. The management of the company believes in taking the advantage of Economic Order Quantity also and has decided on a EOQ for a product Z of 1000 units . The lead time to produce Z is four weeks . If the company believes in keeping a safety stock of 500 units of Z and if, at this moment, there are 700 items in stock , compute the MRP . Assume a lot for lot ordering. Week No 1 Requiremments 2 3 100 100 4 5 1200 6 7 8 9 1900 10 100

Suppose that the requirement schedule is the same as before and there are 700 units of Z on hand (as before) but, the company management is changing its procedures from keeping a safety stock to maintaining a safety time for production of Z. From the limited data given below , ccompute the changed MRP . Assume a lot for ordering , as ealier Question 2 a) what are i) pullsystem and ii)push system b) Distinguish between: i) Specification and Tolerance ii) Master scheduling and loading iii) Fabrication and process and Mental working process iv) Method study and time study v) Elevator and Conveyor

Question No 3

a) A workshop has 20 identical machines whose failure pattern is as below: Elapsed time (months) 1 2 3 4 5 6 No. of machines failed 4 3 3 3 3 4

It cost Rs. 150 attend to a broken-down machine. A maintenance contractor offers preventive maintenance of the machines and in return guarantees no failure of the machine for one year. He charges Rs. 450 per machine per year. Would you go for preventive maintenance contract? b) Distinguish between : (a) (b) (c) (d) (e) (f) Specification and Tolerance; Master scheduling and Loading; Fabrication process and Metal working process; Machine availability and Machine utilization; Method study and time study; Elevator and Conveyor.

Question No 4:
a) What do you mean by "Plant Shut Down"? Under what situations will you advise to resort to Plant Shut Down? b) A factory has three departments x, y and z to manufacture two products A and B. Department 'x' can produce parts for 7000 Units of A or parts for 12000 units of B per week, but cannot do both at the same time, through parts for some A and some B can produced. Similarly, department 'y' can produce 9000 parts for A or 5000 parts for B or combinations in between. Final assembly is undertaken in department 'z' with separate assembly lines for A and B with maximum capacities of 6000 and 4000 units respectively. Both lines can be operated at the same time. What is the optimal product mix?