Sunteți pe pagina 1din 3

MARY HATCH, AIA, LEED AP BD + C

North Topsail Beach, NC 28460/ Maintain Dallas Residence 214-930-2969 hatch.mary.m@gmail.com http://www.Linkedin.com/in/maryhatch Vision/Mission Statement: Project Architect/ Manager/ Designer with significant experience in creative and analytical architectural and interior architecture design development and strong cross-disciplinary collaboration coordinating and communication skills, written,verbal and visual, for interiors and shell building of multi-phased projects. Known for my ability to professionally and effectively interact with clients and city officials, consult with engineers and interior designers to ensure project completion within client specifications; documentation and report writing with great attention to detail. Strong ability to use AutoCAD and Revit "BIM" and on large complex projects; managed and trained staff on Revit. Recognized for freehand sketching abilities. Able to successfully incorporate branding in designs and construction documents. Education: * Bachelor of Science in Architecture, University of Texas at Arlington, 1975 * Continuing Education: National University - DSA - School Project Inspector Overview * Project Management: Allied Schools - Online course completed * Registered Architect, State of Texas (Ability to Seek Reciprocity Required in other States) * Registered Interior Designer, State of Texas * LEED AP BD+C

Registration:

Software Programs:

* Drafting Software: Revit 2009 BIM (3 yrs), Revit 2012 BIM, AutoCAD 2009(10 + yrs), MicroStation (1 yr), Google SketchUp * Project coordination: Projnet, CostWorks * Office Suite Software: Excel, Word, Outlook and PowerPoint (test scores in 90's) * Graphic/ Website Development: Expression, Photoshop, PowerPoint, QuickBooks, FrontPage _________________________________________________________________________________________________ Work Experience: Parsons; Client - Mid-Atlantic OICC MCI East, Camp Lejeune, NC August 2012 - Current Architect Specialist * Client representative for Parsons and for Mid Atlantic OICC MCI East * Creating constructability reports accessing Projnet. * Successfully obtaining Government Background check clearance. * Reviewing and creating MicroSoft Excel cost estimates by accessing current pricing in CostWorks of $3 mil dollar construction projects to be sure that they conform with government regulations and standards and Sustainable Design for LEED Criteria. Parsons; Client - Department of Defense, Blue Grass Army Depot, KY April - August 2012 Project Designer * Client representative for Parsons and for the DOD at Blue Grass Army Depot * Project design and creating construction documents in MicroStation Version 7/ Architect program, of a medical facility. Parsons; Client - Fort Worth Corp of Engineers, Ft Worth, TX March 2011 - April 2012 Project Designer * Client representative for Parsons and for Fort Worth Corp of Engineers * Developing design concepts and criteria, using freehand sketches, creative problem solving utilizing MicroStation V8i and Revit 2012 BIM; presenting these designs directly to the client and team. * Conduct architectural research including an online/ hand out survey/ oversee reporting results in access excel format, * Reviewing and complying with IBC Codes, DOD, Army Regulations Government Criteria and OSD Standards. * Successfully obtaining Government Background check clearance. * Developing agenda, detailed meeting minutes for 56 member FDT team including ACSIM, the Army and IMCOM. * Coordinating budgets with the Cost estimators for the Corp of Engineers. * Participating in a week long Washington D.C. Value Engineering Session with consultant Engineers, Corp of Engineers, Army LTC, Furnishings, Headquarters Building Funding and Management and Pentagon officials including Sustainable Design for LEED criteria. * Site Visits to existing Army, Navy and Air Force and College Dormitory site facilities evaluating previous project successes about storage, security, privileges and amenities. * Created and maintained MRSI UEPH SharePoint website with project history including Microsoft excel reports, meeting minutes, manuals and proclamations from government and civic agencies to support the project designs.

Design Associates International, Dallas, TX December 2009 - July 2010 Project Architect, Project Manager, Facilities Manager * Coordinated bond package mandates for K-12 and presented status updates to clients and consultants on Nine (9) Dallas Independent School District (DISD) Bond projects that included office, maintenance and school buildings. * Reviewed and supervised the work of other team architects to work on the projects that I was working on and to assist them so that they would work on other DISD Bond packages similar to the projects that I was working on. * Government Background check clearance. * Accurately documented additional client requests from the Jacobs and Aecom Project managers, school principals and managers with amendments to the original Bond scope. * Field survey assessments of existing conditions of DISD schools and support buildings to determine completed work that was in the scope of work. * Modified the cost estimates with the consultant to include the changes in priorities and updated bond package drawings. * Created budgets and descriptive reports based on shifts in prioritizing items based on budgetary restraints and conditions of properties. This included HVAC systems, roof renovations, systems controls, site drainage, lighting & acoustical concerns. * Produced budgets working closely with the project manager/owner's consultant fees/ project scope budgets/ schedule. * Designed an IT high tech computer office for the University of North Texas department within a historical Downtown Dallas building with a gated communications server room and met with City of Dallas building code officials. Morris Architects, Los Angeles, CA March 2008 - September 2008 Project Architect, Associate * Worked closely on a Hospitality hotel project with a 10 member staff and three project managers on the GardenWalk Hotel Project, Anaheim, CA on one of the two 11 story towers with 466 rooms, with 36,000 sq ft meeting rooms, $4.5 million dollar project with coordinated designs of the adjacent tower and existing retail area. * Coordinated with engineers, consultants, architectural staff and city officials including designs of the mechanical systems for ventilation of the equipment in the garage with structural, industrial laundry, restaurants kitchen and a built-up pool deck on the existing mall building roof. * Reviewed exiting requirements plan using Revit (BIM) model and coordinated with RAS specialists to provide correct exiting door sizes and building exit routes. * Integrated Kay Lang and Associates interior designs into the Revit (BIM) model including a grand stair in the lobby, paneled ceilings, decorative wall treatments for the meeting rooms and guest rooms illustrating Disney franchiser branding on the exterior and interior of project. * Participated in monthly meeting presentations that included12 consultants, franchiser and owners, and developed meeting reports that ensured successful project development. * Space planning of amenity center with laundry and exercise room. Friedmutter Group, Newport Beach, CA May 2006 - February 2008 Project Architect/ Interior Project Architect * Worked closely with a 20+ member team on a Revit BIM model of the Cosmopolitan Las Vegas Casino project plans, sections, elevations and details of a complex multi-function building including an underground parking garage, hi-rise 50 story condo tower, hi-rise 50 story hotel, with complex ceilings, swimming pool on the upper deck, and a theatre. - $3.9 billion, 3,000 condo-hotel rooms, 150,000 sq ft of convention and meeting spaces, 75,000 sq ft casino, 300,000 sq ft retail, restaurant and entertainment space, 1,800 seat theatre. Project opened in 2009. * Created Revit families and sweeps of interior tile wainscot and trim finishes, ceiling, lighting and toilet fixtures. * Managed the coordination of designs from two interiors groups, Dougall Design Associates and Deusing and Partners on the special treatments for casinos, restrooms, hotel lobby, and retail corridors and applied Accessibility codes. * Managed and trained three interiors personnel in Revit to create room names, Finish schedules and molding sweeps. * Produced Quechan Casino, CA Revit model; created models of theme restaurants with ornate bars, rounded irregular shapes for coved lighting conditions and Revit modeled seating booths. * Created markups for India outsourced Revit "Bim" drawings of lighting, security cameras, air diffuser and exhaust plans. * Created freehand sketch of designs for Harrah's new casino elevator door panels, and designs for new lighting fixtures. * Created color board and selected finishes for Harrah's Indiana lobby remodel. Wilson & Associates, Dallas, TX April 2005 - November 2005 Interior Project Architect * Worked closely on a high end residential interiors project with two interior designers creating AutoCAD presentations of $100 million+, 50,000 sq ft + palace in Dubai created for approval by the Sheika including ornate moldings in every room, panel designs and intricate ceiling coves, ornate paneling of multiple majli for entertaining, mural designs on the walls and ceilings of indoor swimming pools, ornate column capital design, encased decorative beams and vaulted ceilings at grand entry with two curved grand stairways that had pilaster decorated storefront with a view to the exterior courtyard, vaulted colonnade with perimeter columns and walkway at exterior courtyard, decorative lighting sconces and chandeliers in bedrooms, proportionately paneled walls for the entire palace, audio visual consultant studies for five step theatre speaker

and video design, elaborate vaulted entrances at the main public areas and interconnecting corridors. * Created Ritz Carlton Restaurant and lobby hand rendered AutoCAD preliminary design presentation for WA designer. Nelson, Dallas, TX November 2003 - October 2005 Project Architect/ Interior Project Architect * Space planning and programming and produced AutoCAD Banking construction documents of 5 high profile Bank of America Wealth Management offices with $500,000 + 9,000 SF office and approximately 20 tenant finish out projects. * Created Gensler Branding design of Reception area millwork designs for desks, coffee and promotional folders. * Drafted AutoCAD and collaborated with the Philadelphia office for a new bank project building; $700,000 + 5,400 SF * Coordinated tenant finish out projects with in-house MEP Nelco staff including all lighting, kitchen equipment, millwork lighting, computer and load requirement rooms, and training equipment including video, screens and projectors Professional Organizations: * AIA, Wilmington, NC Chapter Participated in: '11 Advocacy Day, Austin, TX - AIA Dallas, TX 2010 & 2011 Dallas Home Tour Volunteer - AIA Dallas, TX 2009 LA Home Tour Volunteer, Los Angeles - AIA Los Angeles, CA *USGBC, Triangle Chapter, NC Participated in: 2011 Advocacy Day, Austin, TX with North Texas Chapter, Dallas, TX

S-ar putea să vă placă și