Sunteți pe pagina 1din 6

DRIVING TEST

3G Test case No. Test Equipment Test Item Procedure

TEMs

AMR Short Call

UE1 (UMTS mode) call UE2 (Dual Mode), duration 60 seconds, wait time: 10 seconds

2 3 4

TEMs TEMs

AMR Short Call Coverage for Viettel (UMTS)

UE (UMTS mode) call 100117, duration 20 seconds, wait time: 10 seconds

PROBE+Scanner (ROHDE & SCHWARZ Scanning TSML-W) PROBE + Datacard HSPA Download (UMTS mode) Active the HSPA in UMTS mode. Download a file from FTP server (20MB), after finish the test will be repeat until finish the whole test route MOS test (Mobile to Mobile) 2G

5 6

PROBE

Voice MOS

Test case Measurement Tool No.

Test Item Voice - Short Call Voice - Short Call IDLE Voice MOS

Procedure MS1 call MS2 , duration 60 seconds, wait time: 10 seconds MS call 100117, duration 20 seconds, wait time: 10 seconds MOS test (Mobile to Mobile)

7 8 10 9

TEMs TEMs TEMS PROBE

STATIONARY TEST
No. 1 2 3 4 PSD_RTT HSDPA_RTT PSD call setup time/HSDPA call setup time HSPA+ Max/Everage Throughput Test case

1. After optimziation, VNP&HW will use NEMO to test MOS, the average MOS must be higher than 3.0 2. After optimization, HW will do 3 operators benchmarking. Test procedure and route must be agreed by bo

DRIVING TEST
3G KPI Items UE_TX_Power Handover Success Rate (Inter RAT, Intra Frequency, Inter Frequency) CS_Quality (DL) Drop call rate Call setup time Call setup success rate in contract - stationary test Team1 Remark Test Team

CPICH Ec/Io CPICH RSCP Pilot Polution ratio HSDPA Access Successful Rate HSDPA Drop Rate HSDPA_ Ave_Throughput Average MOS 3 2G KPIs Drop Call Rate Handover Success Rate Call Setup Success Rate

VNP support provide 1 scanner Team5 Not in contract Team2 Drive test route and procedures must be agreed by both Vinaphone and Vendor Remark

Team3

Test Team

Contract: The Test method choose UE call PSTN

Team4

Average MOS 3

Additional requirement Drive test route and procedures must be agreed by both Vinaphone and Vendor

Team5

NARY TEST

must be higher than 3.0 ure and route must be agreed by both VNP and HW

Test case No.

Test Equipment TEMs

Type 3G

Test Item 3G ARM short call

TEMs

2G

2G AMR short call

TEMs

3G

3G ARM short call

Scanner (ROHDE & SCHWARZ TSML-W)

3G

Scanning 3 operators

Datacard

3G

HSPA Download (VNP)

2 probes

3G

3G Voice MOS (VNP)

TEMS

3G

3G AMR Short Call

8 9 10

TEMS

2G

2G Voice - Short Call

TEMS

2G

Idle mode

2 Probe

2G

2G Voice MOS (VNP)

11

2 Probes

2G

2G Voice MOS (Viettel)

Operator Viettel

Procedure UE (UMTS mode) Call CSSR 18008198, 20s, wait time CDR 10s SHOSR

KPI Items

Remark KPIs for benchmark

Test Team

Vinaphone

MS call 900, duration 20 seconds, wait time: 10 seconds

Rxlev (sub) C/I Rxqual CSSR CDR HOSR KPIs for benchmark

Team 1

Vinaphone

UE (UMTS mode) call 900, CSSR duration 20 seconds, wait CDR time: 10 seconds SHOSR CPICH Ec/Io

VNP + VMS + Viettel

CPICH RSCP Pilot Polution ratio HSDPA Access Successful Rate HSDPA Drop Rate

KPIs for benchmark and Post optimization

Team5

Vinaphone

Active the HSPA in UMTS mode. Download a file from FTP server (20MB), KPIs for post optimization after finish the test will be repeat until finish the HSDPA_ Ave_Throughput whole test route Call setup time CDR UE1 (UMTS mode) call CSSR UE2 (UMTS mode), duration 60 seconds, wait Average MOS 3 time: 10 seconds UE_TX_Power SHOSR CS_Quality (DL)

Team2

Vinaphone

KPIs for post optimization

Team3

VMS

UE (UMTS mode) call 900, CSSR duration 20 seconds, wait CDR time: 10 seconds SHOSR MS call 900, duration 20 seconds, wait time: 10 seconds CSSR CDR HOSR Rxlev full MS1 call MS2 , duration 60 MOS seconds, wait time: 10 seconds MOS CSSR Mobile to Mobile CDR HOSR

KPIs for benchmark

VMS

KPIs for benchmark

Team 4

Vinaphone

KPI for post-optimization KPIs for benchmark and Post optimization

Vinaphone

Team 2

Viettel

KPIs for benchmark

Team 5

Car 1 Car 2

Equipment per sub TEMS Probe Scanner Datacard Engineer

Number

5 6 1 1 5 or 6 (depends on type of scanner)

S-ar putea să vă placă și