Sunteți pe pagina 1din 17

ROCKS - Road Costs Knowledge System

Set of Sample Statistical Reports


Version 2.01, 09/09/02

The World Bank Roads and Highways Thematic Group

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Costs per Km Statistics (2000 US$/km)
Work Category Preservation Work Class Routine Work Type Routine Maintenance Average Minimum Maximum 2019 277 5580 St Dev. 1147 Count 47 Predominant Work Activity Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A 989 #N/A 2199 #N/A #N/A #N/A #N/A #N/A 110 522 15326 #N/A #N/A 277 #N/A 656 #N/A #N/A #N/A #N/A #N/A 51 323 1997 #N/A #N/A 1740 #N/A 5580 #N/A #N/A #N/A #N/A #N/A 205 876 65038 #N/A St Dev. #N/A 627 #N/A 1126 #N/A #N/A #N/A #N/A #N/A 49 195 14154 #N/A Count #N/A 7 #N/A 40 #N/A #N/A #N/A #N/A #N/A 12 6 127 #N/A

Periodic

Grading

247

51

876

229

18

Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing

15326 #N/A

1997 #N/A

65038 #N/A

14154 #N/A

127 #N/A

7802

1196

31962

5972

52

Fog Seal Rejuvenation Unsealed Preventive Treatment

8946 #N/A 4266

2805 #N/A 2009

15783 #N/A 6965

3614 #N/A 1141

18 #N/A 98

4266

2009

6965

1141

98

20309

4452

45277

10412

115

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

9780 18937 27039 #N/A 38095 68713 79989 118915 138703 #N/A #N/A #N/A #N/A #N/A #N/A 36068 #N/A 226685 252777 #N/A #N/A 150925 #N/A #N/A #N/A 378160 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 986311 #N/A #N/A #N/A #N/A 52176 #N/A 296466 314200 325150 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1256331 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4452 5295 10684 #N/A 12878 21021 27473 49003 73444 #N/A #N/A #N/A #N/A #N/A #N/A 10046 #N/A 20165 116358 #N/A #N/A 135964 #N/A #N/A #N/A 307222 #N/A #N/A 290776 #N/A #N/A #N/A #N/A

27520 38607 45277 #N/A 82320 126131 137961 241847 252349 #N/A #N/A #N/A #N/A #N/A #N/A 93207 #N/A 666219 431417 #N/A #N/A 161677 #N/A #N/A #N/A 424928 #N/A #N/A 670195 #N/A #N/A #N/A #N/A

5037 8011 9030 #N/A 16947 26707 26117 38922 44626 #N/A #N/A #N/A #N/A #N/A #N/A 23249 #N/A 129184 91563 #N/A #N/A 9606 #N/A #N/A #N/A 38871 #N/A #N/A 85186 #N/A #N/A #N/A #N/A #N/A 307474 #N/A #N/A #N/A #N/A 28122 #N/A 194788 161265 56225 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 369628 348569 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

27 38 50 #N/A 22 147 31 62 47 #N/A #N/A #N/A #N/A #N/A #N/A 24 #N/A 348 12 #N/A #N/A 6 #N/A #N/A #N/A 13 #N/A #N/A 22 #N/A #N/A #N/A #N/A #N/A 24 #N/A #N/A #N/A #N/A 14 #N/A 55 5 3 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 26 12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

64728

12878

126131

27614

169

116939

27473

252349

44017

140

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

215587

10046

666219

132543

384

Development

Improvement

Partial Widening

150925

135964

161677

9606

Partial Widening and Reconstruction

378160

307222

424928

38871

13

Widening

486930

290776

670195

85186

22

Widening and Reconstruction

986311

262532 1417778

307474

24

#N/A #N/A 262532 1417778 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 12592 #N/A 73470 92651 272527 #N/A #N/A #N/A #N/A #N/A 93205 #N/A 834428 469815 384392 #N/A #N/A #N/A #N/A #N/A

Upgrading

254319

12592

834428

194404

77

New Construction

New 1L Road

#N/A

#N/A

#N/A

#N/A

#N/A

New 2L Highway

1182918

572502 1875104

374738

38

#N/A #N/A #N/A #N/A 644786 1875104 572502 1515835 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

New 4L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

133251192.xls.ms_office - Cost per Km - All Regions

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Costs per M2 Statistics (2000 US$/m2)
Work Category Preservation Work Class Periodic Work Type Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Average Minimum Maximum 2.41 #N/A 0.29 #N/A 10.84 #N/A St Dev. 2.39 #N/A Count 127 #N/A Predominant Work Activity Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum 2.41 #N/A 0.29 #N/A 10.84 #N/A St Dev. 2.39 #N/A Count 127 #N/A

1.06

0.17

4.57

0.84

52

Fog Seal Rejuvenation Unsealed Preventive Treatment

1.11 #N/A 0.71

0.35 #N/A 0.33

2.10 #N/A 1.16

0.51 #N/A 0.19

18 #N/A 98

0.71

0.33

1.16

0.19

98

2.86

0.74

6.14

1.41

115

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete

1.53 2.61 3.77 #N/A 5.26 10.00 11.51 17.11 19.57 #N/A #N/A #N/A #N/A #N/A #N/A 5.15 #N/A 32.54 36.70

0.74 0.81 1.53 #N/A 1.84 3.00 3.92 7.00 10.49 #N/A #N/A #N/A #N/A #N/A #N/A 1.44 #N/A 2.88 16.62

4.59 5.29 6.14 #N/A 11.28 19.16 18.90 34.55 36.05 #N/A #N/A #N/A #N/A #N/A #N/A 13.32 #N/A 95.17 64.39

0.81 1.09 1.24 #N/A 2.47 3.95 3.74 5.55 6.33 #N/A #N/A #N/A #N/A #N/A #N/A 3.32 #N/A 18.77 13.96

27 38 50 #N/A 22 145 31 62 47 #N/A #N/A #N/A #N/A #N/A #N/A 24 #N/A 348 12

Asphalt Mix Resurfacing Rehabilitation Strengthening

9.37

1.84

19.16

4.11

167

16.69

3.92

36.05

6.22

140

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

30.96

1.44

95.17

19.25

384

133251192.xls.ms_office - Cost per m2 - All Regions

ROCKS - Road Costs Knowledge System


Scenario: Asia - Two Lane Roads Costs per Km Statistics (2000 US$/km)
Work Category Preservation Work Class Routine Work Type Routine Maintenance Average Minimum Maximum 791 656 927 St Dev. 192 Count 2 Predominant Work Activity Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A 927 #N/A 656 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 21141 #N/A #N/A 927 #N/A 656 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 11278 #N/A #N/A 927 #N/A 656 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 31005 #N/A St Dev. #N/A #DIV/0! #N/A #DIV/0! #N/A #N/A #N/A #N/A #N/A #N/A #N/A 13949 #N/A Count #N/A 1 #N/A 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2 #N/A

Periodic

Grading

#N/A

#N/A

#N/A

#N/A

#N/A

Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing

21141 #N/A

11278 #N/A

31005 #N/A

13949 #N/A

2 #N/A

4042

4042

4042

#DIV/0!

Fog Seal Rejuvenation Unsealed Preventive Treatment

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

11010

4452

31762

7480

26

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

8818 16674 17172 #N/A 30063 69463 84210 96626 129199 #N/A #N/A #N/A #N/A #N/A #N/A 53334 #N/A 244362 252777 #N/A #N/A 156339 #N/A #N/A #N/A 378160 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 1007825 #N/A #N/A #N/A #N/A 49793 #N/A 244759 314200 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1007049 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4452 5295 13146 #N/A 15421 21021 27473 61885 100705 #N/A #N/A #N/A #N/A #N/A #N/A 53334 #N/A 20165 116358 #N/A #N/A 149719 #N/A #N/A #N/A 307222 #N/A #N/A 290776 #N/A #N/A #N/A #N/A

27520 31762 28191 #N/A 44448 126131 137961 144360 210219 #N/A #N/A #N/A #N/A #N/A #N/A 53334 #N/A 626659 431417 #N/A #N/A 161677 #N/A #N/A #N/A 424928 #N/A #N/A 670195 #N/A #N/A #N/A #N/A

5408 13618 7351 #N/A 9299 28260 32689 21858 42058 #N/A #N/A #N/A #N/A #N/A #N/A #DIV/0! #N/A 141283 91563 #N/A #N/A 5016 #N/A #N/A #N/A 38871 #N/A #N/A 85186 #N/A #N/A #N/A #N/A #N/A 300004 #N/A #N/A #N/A #N/A 33698 #N/A 189209 161265 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 306346 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

19 3 4 #N/A 7 81 8 20 6 #N/A #N/A #N/A #N/A #N/A #N/A 1 #N/A 52 12 #N/A #N/A 4 #N/A #N/A #N/A 13 #N/A #N/A 22 #N/A #N/A #N/A #N/A #N/A 17 #N/A #N/A #N/A #N/A 4 #N/A 18 5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 6 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

66329

15421

126131

29246

88

99453

27473

210219

31493

34

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

242977

20165

626659

133899

65

Development

Improvement

Partial Widening

156339

149719

161677

5016

Partial Widening and Reconstruction

378160

307222

424928

38871

13

Widening

486930

290776

670195

85186

22

Widening and Reconstruction

1007825

273268 1417778

300004

17

#N/A #N/A 273268 1417778 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 18664 #N/A 73470 92651 #N/A #N/A #N/A #N/A #N/A #N/A 86731 #N/A 725369 469815 #N/A #N/A #N/A #N/A #N/A #N/A

Upgrading

228735

18664

725369

184522

27

New Construction

New 1L Road

#N/A

#N/A

#N/A

#N/A

#N/A

New 2L Highway

1007049

736765 1515361

306346

#N/A #N/A #N/A #N/A 736765 1515361 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

New 4L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

133251192.xls.ms_office - Cost per Km - Asia

ROCKS - Road Costs Knowledge System


Scenario: Asia - Two Lane Roads Costs per M2 Statistics (2000 US$/m2)
Work Category Preservation Work Class Periodic Work Type Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Average Minimum Maximum 3.39 #N/A 1.61 #N/A 5.17 #N/A St Dev. 2.51 #N/A Count 2 #N/A Predominant Work Activity Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum 3.39 #N/A 1.61 #N/A 5.17 #N/A St Dev. 2.51 #N/A Count 2 #N/A

0.58

0.58

0.58

#DIV/0!

Fog Seal Rejuvenation Unsealed Preventive Treatment

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

1.70

0.74

4.59

1.08

26

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete

1.45 2.34 2.41 #N/A 3.87 10.39 12.54 15.27 18.12 #N/A #N/A #N/A #N/A #N/A #N/A 7.62 #N/A 35.36 36.70

0.74 0.88 1.87 #N/A 2.20 3.00 3.92 10.31 14.39 #N/A #N/A #N/A #N/A #N/A #N/A 7.62 #N/A 2.88 16.62

4.59 4.35 4.03 #N/A 5.15 19.16 18.90 24.06 28.80 #N/A #N/A #N/A #N/A #N/A #N/A 7.62 #N/A 85.84 64.39

0.91 1.80 1.08 #N/A 0.96 4.29 4.68 4.10 5.53 #N/A #N/A #N/A #N/A #N/A #N/A #DIV/0! #N/A 20.54 13.96

19 3 4 #N/A 7 81 8 20 6 #N/A #N/A #N/A #N/A #N/A #N/A 1 #N/A 52 12

Asphalt Mix Resurfacing Rehabilitation Strengthening

9.88

2.20

19.16

4.49

88

15.13

3.92

28.80

4.71

34

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

35.18

2.88

85.84

19.55

65

133251192.xls.ms_office - Cost per m2 - Asia

ROCKS - Road Costs Knowledge System


Scenario: Africa - Two Lane Roads Costs per Km Statistics (2000 US$/km)
Work Category Preservation Work Class Routine Work Type Routine Maintenance Average Minimum Maximum 2280 277 5580 St Dev. 1265 Count 22 Predominant Work Activity Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A 926 #N/A 2678 #N/A #N/A #N/A #N/A #N/A 205 684 15759 #N/A #N/A 277 #N/A 1252 #N/A #N/A #N/A #N/A #N/A 205 491 1997 #N/A #N/A 1740 #N/A 5580 #N/A #N/A #N/A #N/A #N/A 205 876 65038 #N/A St Dev. #N/A 741 #N/A 1105 #N/A #N/A #N/A #N/A #N/A #DIV/0! 273 14803 #N/A Count #N/A 5 #N/A 17 #N/A #N/A #N/A #N/A #N/A 1 2 112 #N/A

Periodic

Grading

524

205

876

337

Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing

15759 #N/A

1997 #N/A

65038 #N/A

14803 #N/A

112 #N/A

7433

1196

31962

6599

39

Fog Seal Rejuvenation Unsealed Preventive Treatment

8212 #N/A 4266

2805 #N/A 2009

15783 #N/A 6965

4472 #N/A 1141

6 #N/A 98

4266

2009

6965

1141

98

22798

10684

40669

9036

25

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

12525 21308 25049 #N/A 37215 62374 110721 144966 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 35317 #N/A 201943 #N/A #N/A #N/A 135964 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1160071 #N/A #N/A #N/A #N/A 51293 #N/A 310774 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1023351 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

11542 14077 10684 #N/A 12878 22737 80790 49003 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 10046 #N/A 74906 #N/A #N/A #N/A 135964 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

13063 34192 40669 #N/A 57721 112438 129640 241847 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 93207 #N/A 510994 #N/A #N/A #N/A 135964 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

853 7616 9057 #N/A 17488 25407 23546 55565 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 23472 #N/A 111990 #N/A #N/A #N/A #DIV/0! #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 241817 #N/A #N/A #N/A #N/A 31492 #N/A 170009 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 513512 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

3 5 17 #N/A 7 20 4 10 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 23 #N/A 65 #N/A #N/A #N/A 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2 #N/A #N/A #N/A #N/A 7 #N/A 28 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

55851

12878

112438

25856

27

135182

49003

241847

50231

14

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

158393

10046

510994

121602

88

Development

Improvement

Partial Widening

135964

135964

135964

#DIV/0!

Partial Widening and Reconstruction

#N/A

#N/A

#N/A

#N/A

#N/A

Widening

#N/A

#N/A

#N/A

#N/A

#N/A

Widening and Reconstruction

1160071

989081 1331061

241817

#N/A #N/A 989081 1331061 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 12592 #N/A 92962 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 93205 #N/A 834428 #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Upgrading

258878

12592

834428

184978

35

New Construction

New 1L Road

#N/A

#N/A

#N/A

#N/A

#N/A

New 2L Highway

1023351

660243 1386459

513512

#N/A #N/A #N/A #N/A 660243 1386459 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

New 4L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

133251192.xls.ms_office - Cost per Km - Africa

ROCKS - Road Costs Knowledge System


Scenario: Africa - Two Lane Roads Costs per M2 Statistics (2000 US$/m2)
Work Category Preservation Work Class Periodic Work Type Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Average Minimum Maximum 2.47 #N/A 0.29 #N/A 10.84 #N/A St Dev. 2.50 #N/A Count 112 #N/A Predominant Work Activity Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum 2.47 #N/A 0.29 #N/A 10.84 #N/A St Dev. 2.50 #N/A Count 112 #N/A

0.99

0.17

4.57

0.93

39

Fog Seal Rejuvenation Unsealed Preventive Treatment

0.68 #N/A 0.71

0.35 #N/A 0.33

1.05 #N/A 1.16

0.36 #N/A 0.19

6 #N/A 98

0.71

0.33

1.16

0.19

98

3.25

1.53

5.74

1.26

25

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete

1.87 3.02 3.56 #N/A 5.32 8.77 15.63 20.61 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 5.05 #N/A 29.77 #N/A

1.65 2.01 1.53 #N/A 1.84 3.25 11.54 7.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1.44 #N/A 10.70 #N/A

2.16 4.88 5.74 #N/A 8.25 15.40 18.52 34.55 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 13.32 #N/A 85.17 #N/A

0.27 1.10 1.27 #N/A 2.50 3.39 3.18 7.91 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 3.35 #N/A 18.43 #N/A

3 5 17 #N/A 7 20 4 10 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 23 #N/A 65 #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

7.88

1.84

15.40

3.50

27

19.19

7.00

34.55

7.15

14

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

23.30

1.44

85.17

19.29

88

133251192.xls.ms_office - Cost per m2 - Africa

ROCKS - Road Costs Knowledge System


Scenario: Latin America and Caribbean - Two Lane Roads Costs per Km Statistics (2000 US$/km)
Work Category Preservation Work Class Routine Work Type Routine Maintenance Average Minimum Maximum 1879 695 5193 St Dev. 1047 Count 21 Predominant Work Activity Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A 1368 #N/A 1904 #N/A #N/A #N/A #N/A #N/A 102 441 10702 #N/A #N/A 1368 #N/A 695 #N/A #N/A #N/A #N/A #N/A 51 323 4268 #N/A #N/A 1368 #N/A 5193 #N/A #N/A #N/A #N/A #N/A 166 591 22253 #N/A St Dev. #N/A #DIV/0! #N/A 1067 #N/A #N/A #N/A #N/A #N/A 40 111 5470 #N/A Count #N/A 1 #N/A 20 #N/A #N/A #N/A #N/A #N/A 11 4 13 #N/A

Periodic

Grading

192

51

591

167

15

Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing

10702 #N/A

4268 #N/A

22253 #N/A

5470 #N/A

13 #N/A

9850

4353

15346

7773

Fog Seal Rejuvenation Unsealed Preventive Treatment

9850 #N/A #N/A

4353 #N/A #N/A

15346 #N/A #N/A

7773 #N/A #N/A

2 #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

22762

5917

44794

9928

45

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

11787 19782 28944 #N/A 45893 78768 #N/A 124904 135790 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 177205 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 756720 #N/A #N/A #N/A #N/A 67736 #N/A 384741 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

6970 5917 11748 #N/A 29289 33505 #N/A 67592 108916 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 36974 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

16590 38607 44794 #N/A 82320 121070 #N/A 223749 199799 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 574952 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4231 8301 8731 #N/A 19764 22111 #N/A 37920 28580 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 95090 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 343870 #N/A #N/A #N/A #N/A 13192 #N/A 270636 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

5 21 19 #N/A 8 26 #N/A 20 9 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 45 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 4 #N/A #N/A #N/A #N/A 2 #N/A 8 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

71033

29289

121070

25565

34

128282

67592

223749

35148

29

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

177205

36974

574952

95090

45

Development

Improvement

Partial Widening

#N/A

#N/A

#N/A

#N/A

#N/A

Partial Widening and Reconstruction

#N/A

#N/A

#N/A

#N/A

#N/A

Widening

#N/A

#N/A

#N/A

#N/A

#N/A

Widening and Reconstruction

756720

262532 1056388

343870

#N/A #N/A 262532 1056388 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 58408 #N/A 132049 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 77064 #N/A 812265 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Upgrading

321340

58408

812265

273591

10

New Construction

New 1L Road

#N/A

#N/A

#N/A

#N/A

#N/A

New 2L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

133251192.xls.ms_office - Cost per Km - L. America

ROCKS - Road Costs Knowledge System


Scenario: Latin America and Caribbean - Two Lane Roads Costs per M2 Statistics (2000 US$/m2)
Work Category Preservation Work Class Periodic Work Type Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Average Minimum Maximum 1.76 #N/A 0.71 #N/A 3.71 #N/A St Dev. 0.91 #N/A Count 13 #N/A Predominant Work Activity Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum 1.76 #N/A 0.71 #N/A 3.71 #N/A St Dev. 0.91 #N/A Count 13 #N/A

1.39

0.67

2.10

1.01

Fog Seal Rejuvenation Unsealed Preventive Treatment

1.39 #N/A #N/A

0.67 #N/A #N/A

2.10 #N/A #N/A

1.01 #N/A #N/A

2 #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

3.11

0.81

6.14

1.36

45

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete

1.61 2.68 3.96 #N/A 6.43 10.97 #N/A 17.18 18.60 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 25.14 #N/A

0.95 0.81 1.61 #N/A 4.01 4.79 #N/A 9.26 14.92 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 8.79 #N/A

2.27 5.29 6.14 #N/A 11.28 16.58 #N/A 31.96 27.37 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 78.76 #N/A

0.58 1.13 1.20 #N/A 2.93 3.06 #N/A 5.38 3.92 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 12.39 #N/A

5 21 19 #N/A 8 25 #N/A 20 9 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 45 #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

9.87

4.01

16.58

3.58

33

17.62

9.26

31.96

4.95

29

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

25.14

8.79

78.76

12.39

45

133251192.xls.ms_office - Cost per m2 - L. America

ROCKS - Road Costs Knowledge System


Scenario: Eastern Europe and Middle East - Two Lane Roads Costs per Km Statistics (2000 US$/km)
Work Category Preservation Work Class Routine Work Type Routine Maintenance Average Minimum Maximum 1808 1808 1808 St Dev. #DIV/0! Count 1 Predominant Work Activity Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A #N/A #N/A 1808 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1808 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1808 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A St Dev. #N/A #N/A #N/A #DIV/0! #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Count #N/A #N/A #N/A 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Periodic

Grading

#N/A

#N/A

#N/A

#N/A

#N/A

Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

9206

5158

13350

2497

10

Fog Seal Rejuvenation Unsealed Preventive Treatment

9206 #N/A #N/A

5158 #N/A #N/A

13350 #N/A #N/A

2497 #N/A #N/A

10 #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

24019

8481

45277

10151

15

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

#N/A 14675 30248 #N/A #N/A 57698 71741 117194 142071 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 244525 #N/A #N/A #N/A 144230 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A 8481 20861 #N/A #N/A 25877 35775 87849 73444 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 62807 #N/A #N/A #N/A 144230 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A 21635 45277 #N/A #N/A 108476 103651 150197 252349 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 666219 #N/A #N/A #N/A 144230 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A 4608 7611 #N/A #N/A 25180 18419 19052 49938 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 134288 #N/A #N/A #N/A #DIV/0! #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #DIV/0! #N/A #N/A #N/A #N/A #DIV/0! #N/A #DIV/0! #N/A 56225 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 344925 348569 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

#N/A 6 9 #N/A #N/A 17 19 11 31 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 180 #N/A #N/A #N/A 1 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1 #N/A #N/A #N/A #N/A 1 #N/A 1 #N/A 3 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 17 12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

57698

25877

108476

25180

17

115679

35775

252349

48793

61

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

244525

62807

666219

134288

180

Development

Improvement

Partial Widening

144230

144230

144230

#DIV/0!

Partial Widening and Reconstruction

#N/A

#N/A

#N/A

#N/A

#N/A

Widening

#N/A

#N/A

#N/A

#N/A

#N/A

Widening and Reconstruction

1191419 1191419 1191419

#DIV/0!

#N/A #N/A #N/A 1191419 1191419 1191419 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 36762 #N/A 120360 #N/A 325150 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1381873 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 36762 #N/A 120360 #N/A 272527 #N/A #N/A #N/A #N/A #N/A 36762 #N/A 120360 #N/A 384392 #N/A #N/A #N/A #N/A #N/A

Upgrading

226515

36762

384392

143861

New Construction

New 1L Road

#N/A

#N/A

#N/A

#N/A

#N/A

New 2L Highway

1233728

572502 1875104

384602

29

#N/A #N/A #N/A #N/A 644786 1875104 572502 1515835 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

New 4L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Highway

#N/A

#N/A

#N/A

#N/A

#N/A

New 4L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

New 6L Expressway

#N/A

#N/A

#N/A

#N/A

#N/A

133251192.xls.ms_office - Cost per Km - Europe

ROCKS - Road Costs Knowledge System


Scenario: Eastern Europe and Middle East - Two Lane Roads Costs per M2 Statistics (2000 US$/m2)
Work Category Preservation Work Class Periodic Work Type Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Average Minimum Maximum #N/A #N/A #N/A #N/A #N/A #N/A St Dev. #N/A #N/A Count #N/A #N/A Predominant Work Activity Regravelling Concrete Pavement Preventive Treatment Average Minimum Maximum #N/A #N/A #N/A #N/A #N/A #N/A St Dev. #N/A #N/A Count #N/A #N/A

1.32

0.74

1.91

0.36

10

Fog Seal Rejuvenation Unsealed Preventive Treatment

1.32 #N/A #N/A

0.74 #N/A #N/A

1.91 #N/A #N/A

0.36 #N/A #N/A

10 #N/A #N/A

#N/A

#N/A

#N/A

#N/A

#N/A

3.37

1.16

6.04

1.39

15

Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete

#N/A 2.07 4.24 #N/A #N/A 8.12 10.21 16.04 20.24 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 34.82 #N/A

#N/A 1.16 2.98 #N/A #N/A 3.45 5.11 9.76 10.49 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 11.11 #N/A

#N/A 2.96 6.04 #N/A #N/A 15.50 14.81 21.46 36.05 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 95.17 #N/A

#N/A 0.63 0.99 #N/A #N/A 3.71 2.65 3.13 7.12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 19.12 #N/A

#N/A 6 9 #N/A #N/A 16 19 11 31 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 180 #N/A

Asphalt Mix Resurfacing Rehabilitation Strengthening

8.12

3.45

15.50

3.71

16

16.36

5.11

36.05

6.99

61

Concrete Pavement Restoration

#N/A

#N/A

#N/A

#N/A

#N/A

Reconstruction

34.82

11.11

95.17

19.12

180

133251192.xls.ms_office - Cost per m2 - Europe

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Average Costs per Km per Cost Type (2000 US$/km)
Work Type Routine Maintenance Grading Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Asphalt Mix Resurfacing Strengthening Concrete Pavement Restoration Reconstruction Partial Widening Partial Widening and Reconstruction Widening Widening and Reconstruction Upgrading New 1L Road New 2L Highway New 4L Highway New 6L Highway New 4L Expressway New 6L Expressway Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Fog Seal Rejuvenation Unsealed Preventive Treatment Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway Estimate 1497 265 28096 #N/A 8578 4607 20799 75102 120078 #N/A 211635 153422 378160 0 1081793 283932 #N/A 1117428 #N/A #N/A #N/A #N/A #N/A 525 #N/A 1674 #N/A #N/A #N/A #N/A #N/A 110 522 28096 #N/A 9334 #N/A 4607 12195 17906 26772 #N/A 42016 80806 87633 111881 141700 #N/A #N/A #N/A #N/A #N/A #N/A 93207 #N/A 210382 281349 #N/A #N/A 153422 #N/A #N/A #N/A 378160 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1081793 #N/A #N/A #N/A #N/A 50723 #N/A 316090 301423 384392 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1117428 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Contract 2768 0 13404 #N/A 8745 4224 15963 50903 112433 #N/A 190247 135964 0 486930 1040138 220325 #N/A 1262273 #N/A #N/A #N/A #N/A #N/A 1740 #N/A 2837 #N/A #N/A #N/A #N/A #N/A 0 0 13404 #N/A 9385 #N/A 4224 8359 15487 24675 #N/A 34828 54476 80947 114695 134005 #N/A #N/A #N/A #N/A #N/A #N/A 34142 #N/A 208715 244879 #N/A #N/A 135964 #N/A #N/A #N/A 0 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 1040138 #N/A #N/A #N/A #N/A 54549 #N/A 239566 333364 272527 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1262273 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Actual 2338 108 9389 #N/A 5752 4116 27444 70640 115698 #N/A 248111 155897 0 0 640142 262284 #N/A 1157435 #N/A #N/A #N/A #N/A #N/A 1541 #N/A 2869 #N/A #N/A #N/A #N/A #N/A 108 0 9389 #N/A 7487 #N/A 4116 0 23064 32371 #N/A 0 70640 73519 134885 135892 #N/A #N/A #N/A #N/A #N/A #N/A 32536 #N/A 264642 227845 #N/A #N/A 155897 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 640142 #N/A #N/A #N/A #N/A 51442 #N/A 341153 0 318531 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1271929 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Predominant Work Activity

133251192.xls.ms_office - Cost Type

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Average Costs per Km per Cost Source (2000 US$/km)
Work Type Routine Maintenance Grading Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Asphalt Mix Resurfacing Strengthening Concrete Pavement Restoration Reconstruction Partial Widening Partial Widening and Reconstruction Widening Widening and Reconstruction Upgrading New 1L Road New 2L Highway New 4L Highway New 6L Highway New 4L Expressway New 6L Expressway Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Fog Seal Rejuvenation Unsealed Preventive Treatment Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway Section 2229 496 16021 #N/A 7943 4266 18098 63147 115531 #N/A 224975 149930 384072 486930 1090091 261362 #N/A 1194210 #N/A #N/A #N/A #N/A #N/A 1727 #N/A 2429 #N/A #N/A #N/A #N/A #N/A 116 876 16021 #N/A 9734 #N/A 4266 8071 15859 26000 #N/A 34828 67192 78182 119628 141340 #N/A #N/A #N/A #N/A #N/A #N/A 34315 #N/A 238729 252777 #N/A #N/A 149930 #N/A #N/A #N/A 384072 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 1090091 #N/A #N/A #N/A #N/A 57743 #N/A 281524 314200 325150 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1291554 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Program 1983 216 11610 #N/A 6896 0 21680 66807 118761 #N/A 188559 155897 307222 0 467412 239669 #N/A 1108391 #N/A #N/A #N/A #N/A #N/A 694 #N/A 2167 #N/A #N/A #N/A #N/A #N/A 110 451 11610 #N/A 7372 #N/A 0 12266 19514 27855 #N/A 42016 70742 85183 118364 134456 #N/A #N/A #N/A #N/A #N/A #N/A 44830 #N/A 194610 0 #N/A #N/A 155897 #N/A #N/A #N/A 307222 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 467412 #N/A #N/A #N/A #N/A 48000 #N/A 329866 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1108391 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Predominant Work Activity

133251192.xls.ms_office - Cost Source

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Average Costs per Km per Year (2000 US$/km)
Work Type Routine Maintenance Grading Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Asphalt Mix Resurfacing Strengthening Concrete Pavement Restoration Reconstruction Partial Widening Partial Widening and Reconstruction Widening Widening and Reconstruction Upgrading New 1L Road New 2L Highway New 4L Highway New 6L Highway New 4L Expressway New 6L Expressway Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Fog Seal Rejuvenation Unsealed Preventive Treatment Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway 1994 1472 430 6901 #N/A 0 0 23152 76042 124669 #N/A 177750 0 0 0 0 169615 #N/A 1386459 #N/A #N/A #N/A #N/A #N/A 0 #N/A 1472 #N/A #N/A #N/A #N/A #N/A 0 430 6901 #N/A 0 #N/A 0 0 16813 31605 #N/A 0 76042 0 119592 144979 #N/A #N/A #N/A #N/A #N/A #N/A 55075 #N/A 194600 199322 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 169615 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1386459 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1995 1062 0 37278 #N/A 0 0 33352 93804 136023 #N/A 210218 0 0 0 509864 137855 #N/A 932408 #N/A #N/A #N/A #N/A #N/A 316 #N/A 1808 #N/A #N/A #N/A #N/A #N/A 0 0 37278 #N/A 0 #N/A 0 0 29693 40669 #N/A 0 93804 80790 133744 173896 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 211846 182550 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 509864 #N/A #N/A #N/A #N/A 41231 #N/A 331103 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 932408 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1996 1810 332 12303 #N/A 6238 0 19212 79479 121299 #N/A 219928 145930 0 0 0 208020 #N/A 1003039 #N/A #N/A #N/A #N/A #N/A 754 #N/A 2514 #N/A #N/A #N/A #N/A #N/A 80 501 12303 #N/A 4105 #N/A 0 14159 20131 30695 #N/A 55158 81156 129433 124369 109557 #N/A #N/A #N/A #N/A #N/A #N/A 43557 #N/A 236833 205553 #N/A #N/A 145930 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 60217 #N/A 281921 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1003039 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1997 1408 353 9739 #N/A 11167 4342 22652 57400 115572 #N/A 219258 0 0 0 578622 398477 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A 1408 #N/A #N/A #N/A #N/A #N/A 91 876 9739 #N/A 11167 #N/A 4342 9841 18180 31337 #N/A 37982 64681 79444 105651 159416 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 220707 170729 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 578622 #N/A #N/A #N/A #N/A 35058 #N/A 587228 0 384392 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1998 2066 108 13567 #N/A 11369 4424 28529 71549 116844 #N/A 218759 0 384072 0 940186 304946 #N/A 1112544 #N/A #N/A #N/A #N/A #N/A 0 #N/A 2066 #N/A #N/A #N/A #N/A #N/A 108 0 13567 #N/A 11369 #N/A 4424 0 23876 31438 #N/A 0 71549 87526 132739 156228 #N/A #N/A #N/A #N/A #N/A #N/A 50387 #N/A 223502 342078 #N/A #N/A 0 #N/A #N/A #N/A 384072 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 940186 #N/A #N/A #N/A #N/A 36762 #N/A 349643 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1112544 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1999 2699 0 9087 #N/A 9589 4594 15769 51217 78224 #N/A 208200 0 0 0 1090250 183492 #N/A 1177418 #N/A #N/A #N/A #N/A #N/A 0 #N/A 2699 #N/A #N/A #N/A #N/A #N/A 0 0 9087 #N/A 8532 #N/A 4594 0 0 15769 #N/A 44641 53409 84616 49003 81873 #N/A #N/A #N/A #N/A #N/A #N/A 34181 #N/A 221729 385275 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1090250 #N/A #N/A #N/A #N/A 54549 #N/A 236834 0 272527 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1177418 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2000 2707 0 21736 #N/A 7267 3941 18302 69419 95824 #N/A 225361 144230 0 0 1154716 227501 #N/A 1117574 #N/A #N/A #N/A #N/A #N/A 1727 #N/A 2847 #N/A #N/A #N/A #N/A #N/A 0 0 21736 #N/A 9150 #N/A 3941 12970 12895 22153 #N/A 28400 79674 64352 117522 106093 #N/A #N/A #N/A #N/A #N/A #N/A 24583 #N/A 235037 0 #N/A #N/A 144230 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1154716 #N/A #N/A #N/A #N/A 58556 #N/A 229293 301423 318531 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1305005 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2001 2491 108 12284 #N/A 3553 3552 14219 49930 129828 #N/A 238872 0 0 486930 1192090 285955 #N/A 1680033 #N/A #N/A #N/A #N/A #N/A 1368 #N/A 3613 #N/A #N/A #N/A #N/A #N/A 108 0 12284 #N/A 0 #N/A 3552 8955 22924 28016 #N/A 31486 52026 77553 110210 158708 #N/A #N/A #N/A #N/A #N/A #N/A 35049 #N/A 298820 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 1192090 #N/A #N/A #N/A #N/A 0 #N/A 276473 333364 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1680033 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2002 0 0 11534 #N/A 0 3453 25083 62384 138142 #N/A 148369 0 307222 0 0 0 #N/A 1420967 #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 11534 #N/A 0 #N/A 3453 0 0 25083 #N/A 0 62384 0 138142 0 #N/A #N/A #N/A #N/A #N/A #N/A 23628 #N/A 397851 0 #N/A #N/A 0 #N/A #N/A #N/A 307222 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1420967 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2003 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 2004 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Predominant Work Activity

133251192.xls.ms_office - Year

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Average Costs per Km per Terrain (2000 US$/km)
Work Type Routine Maintenance Grading Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Asphalt Mix Resurfacing Strengthening Concrete Pavement Restoration Reconstruction Partial Widening Partial Widening and Reconstruction Widening Widening and Reconstruction Upgrading New 1L Road New 2L Highway New 4L Highway New 6L Highway New 4L Expressway New 6L Expressway Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Fog Seal Rejuvenation Unsealed Preventive Treatment Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway Flat 2194 0 30716 #N/A 9656 3722 24569 0 106428 #N/A 235495 0 0 0 0 239906 #N/A 1367863 #N/A #N/A #N/A #N/A #N/A 0 #N/A 2194 #N/A #N/A #N/A #N/A #N/A 0 0 30716 #N/A 9656 #N/A 3722 0 14861 29423 #N/A 0 0 72611 108857 133573 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 232857 370876 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 232158 92651 325150 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1367863 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Rolling 2876 0 31340 #N/A 10639 4511 12970 0 141886 #N/A 371777 156486 0 0 1160071 396942 #N/A 0 #N/A #N/A #N/A #N/A #N/A 1727 #N/A 3163 #N/A #N/A #N/A #N/A #N/A 0 0 31340 #N/A 10639 #N/A 4511 12970 0 0 #N/A 0 0 91905 241847 0 #N/A #N/A #N/A #N/A #N/A #N/A 93207 #N/A 402730 0 #N/A #N/A 156486 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1160071 #N/A #N/A #N/A #N/A 0 #N/A 389914 442625 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Hilly Mountainous 1916 #N/A 0 #N/A 21773 #N/A #N/A #N/A 0 #N/A 4077 #N/A 0 #N/A 0 #N/A 0 #N/A #N/A #N/A 0 #N/A 144230 #N/A 0 #N/A 0 #N/A 0 #N/A 332971 #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 1916 #N/A #N/A #N/A #N/A #N/A 0 0 21773 #N/A 0 #N/A 4077 0 0 0 #N/A 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 0 #N/A #N/A 144230 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 405815 296548 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A (blank) 1760 247 9748 #N/A 7172 3535 20014 64728 117216 #N/A 193986 145930 378160 486930 970514 202711 #N/A 1075034 #N/A #N/A #N/A #N/A #N/A 694 #N/A 1944 #N/A #N/A #N/A #N/A #N/A 110 522 9748 #N/A 7036 #N/A 3535 9657 19286 26714 #N/A 38095 68713 88455 117861 134456 #N/A #N/A #N/A #N/A #N/A #N/A 33584 #N/A 212983 213411 #N/A #N/A 145930 #N/A #N/A #N/A 378160 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 970514 #N/A #N/A #N/A #N/A 52176 #N/A 280767 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1126210 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Predominant Work Activity

133251192.xls.ms_office - Terrain

ROCKS - Road Costs Knowledge System


Scenario: All World Regions - Two Lane Roads Average Costs per Km per World Region (2000 US$/km)
South America 1837 152 10268 #N/A 15346 0 22317 73810 122822 #N/A 181263 0 0 0 656830 264449 #N/A 0 #N/A #N/A #N/A #N/A #N/A 1368 #N/A 1865 #N/A #N/A #N/A #N/A #N/A 97 426 10268 #N/A 15346 #N/A 0 11787 19095 29049 #N/A 44583 83552 0 115528 135790 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 181263 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 656830 #N/A #N/A #N/A #N/A 67736 #N/A 362806 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Central America 2127 354 13088 #N/A 4353 0 24663 67796 145170 #N/A 132944 0 0 0 1056388 439628 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A 2127 #N/A #N/A #N/A #N/A #N/A 147 457 13088 #N/A 4353 #N/A 0 0 21499 30991 #N/A 49822 72931 0 145170 0 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 132944 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1056388 #N/A #N/A #N/A #N/A 0 #N/A 439628 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A North America Caribbean South Asia #N/A 0 791 #N/A 0 0 #N/A 0 31005 #N/A #N/A #N/A #N/A 0 4042 #N/A 0 0 #N/A 21229 20054 #N/A 33505 86980 #N/A 179644 105194 #N/A #N/A #N/A #N/A 329773 285241 #N/A 0 156339 #N/A 0 378160 #N/A 0 0 #N/A 0 1035464 #N/A 307822 66670 #N/A #N/A #N/A #N/A 0 851594 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 0 #N/A 0 0 0 21229 #N/A 0 33505 0 179644 0 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 329773 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 307822 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 927 #N/A 656 #N/A #N/A #N/A #N/A #N/A 0 0 31005 #N/A 0 #N/A 0 0 22364 18514 #N/A 37592 88956 92316 101432 170957 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 285241 0 #N/A #N/A 156339 #N/A #N/A #N/A 378160 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1035464 #N/A #N/A #N/A #N/A 44267 #N/A 111478 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 851594 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A East Asia & Pacific 0 0 11278 #N/A 0 0 8857 57669 91252 #N/A 199392 0 0 486930 800530 248993 #N/A 1317961 #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 11278 #N/A 0 #N/A 0 8818 5295 13146 #N/A 28809 60761 27473 90752 108320 #N/A #N/A #N/A #N/A #N/A #N/A 53334 #N/A 173361 252777 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 486930 #N/A #N/A #N/A #N/A #N/A 800530 #N/A #N/A #N/A #N/A 55319 #N/A 252599 314200 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1317961 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A East & Southern Africa 2414 684 28914 #N/A 8680 4306 19871 99112 132241 #N/A 294821 0 0 0 1160071 341279 #N/A 0 #N/A #N/A #N/A #N/A #N/A 1345 #N/A 2660 #N/A #N/A #N/A #N/A #N/A 0 684 28914 #N/A 8680 #N/A 4306 13017 24441 0 #N/A 0 99112 104415 153111 0 #N/A #N/A #N/A #N/A #N/A #N/A 73197 #N/A 326481 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 1160071 #N/A #N/A #N/A #N/A 23825 #N/A 378627 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A West Africa 1922 205 9004 #N/A 7290 3535 23530 52390 138122 #N/A 128076 135964 0 0 0 161026 #N/A 1023351 #N/A #N/A #N/A #N/A #N/A 296 #N/A 2735 #N/A #N/A #N/A #N/A #N/A 205 0 9004 #N/A 7276 #N/A 3535 11542 16609 25049 #N/A 37215 58292 129640 139536 0 #N/A #N/A #N/A #N/A #N/A #N/A 31710 #N/A 167756 0 #N/A #N/A 135964 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 62281 #N/A 205910 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1023351 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A North Africa 0 0 0 #N/A 0 0 19208 64042 203306 #N/A 103710 0 0 0 0 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 0 #N/A 0 0 19208 0 #N/A 0 64042 0 203306 0 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 103710 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Middle East 1808 0 0 #N/A 0 0 0 104708 142631 #N/A 241021 144230 0 0 0 120360 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A 1808 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 0 #N/A 0 0 0 0 #N/A 0 104708 0 137269 147993 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 241021 0 #N/A #N/A 144230 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 120360 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Former Eastern Soviet Europe Union Europe 0 1808 0 0 0 0 0 0 0 #N/A #N/A #N/A 0 0 9656 0 0 0 19208 0 26640 64042 104708 0 203306 142631 99474 #N/A #N/A #N/A 103710 241021 245057 0 144230 0 0 0 0 0 0 0 0 0 0 0 120360 253053 #N/A #N/A #N/A 0 0 1233728 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 0 #N/A 0 0 19208 0 #N/A 0 64042 0 203306 0 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 103710 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 1808 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 0 #N/A 0 0 0 0 #N/A 0 104708 0 137269 147993 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 241021 0 #N/A #N/A 144230 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 0 #N/A 120360 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 0 0 #N/A 9656 #N/A 0 0 14861 31688 #N/A 0 0 72611 0 124844 #N/A #N/A #N/A #N/A #N/A #N/A 0 #N/A 245057 0 #N/A #N/A 0 #N/A #N/A #N/A 0 #N/A #N/A 0 #N/A #N/A #N/A #N/A #N/A 0 #N/A #N/A #N/A #N/A 36762 #N/A 0 0 325150 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1381873 1023858 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

Work Type

Routine Maintenance Grading Gravel Resurfacing Concrete Pavement Preventive Treatment Bituminous Pavement Preventive Treatment Unsealed Preventive Treatment Surface Treatment Resurfacing Asphalt Mix Resurfacing Strengthening Concrete Pavement Restoration Reconstruction Partial Widening Partial Widening and Reconstruction Widening Widening and Reconstruction Upgrading New 1L Road New 2L Highway New 4L Highway New 6L Highway New 4L Expressway New 6L Expressway Routine Maintenance 1L Road Routine Maintenance Unsealed 2L Highway Routine Maintenance Block 2L Highway Routine Maintenance Bituminous 2L Highway Routine Maintenance Concrete 2L Highway Routine Maintenance Bituminous > 2L Highway Routine Maintenance Concrete > 2L Highway Routine Maintenance Bituminous Expressway Routine Maintenance Concrete Expressway Light Grading Heavy Grading Regravelling Concrete Pavement Preventive Treatment Fog Seal Rejuvenation Unsealed Preventive Treatment Slurry Seal or Cape Seal Single Surface Treatment Double Surface Treatment Triple Surface Treatment Asphalt Overlay < 40 mm Asphalt Overlay 40 to 59 mm Asphalt Overlay 60 to 79 mm Asphalt Overlay 80 to 99 mm Asphalt Overlay > 99 mm Mill and Replace Bonded Concrete Overlay Unbounded Concrete Overlay Concrete Slab Replacement Concrete Slab Repair Concrete Diamond Grinding Reconstruction Unsealed Reconstruction Block Reconstruction Bituminous Reconstruction Concrete Partial Widening to Unsealed 2L Partial Widening to Block 2L Partial Widening to Bituminous 2L Partial Widening to Concrete 2L Partial Widening to Unsealed 2L and Reconstruction Partial Widening to Block 2L and Reconstruction Partial Widening to Bituminous 2L and Reconstruction Partial Widening to Concrete 2L and Reconstruction Widening Adding Bituminous 1L Widening Adding Bituminous 2L Widening Adding Bituminous 4L Widening Adding Concrete 1L Widening Adding Concrete 2L Widening Adding Concrete 4L Widening Adding Bituminous 1L and Reconstruction Widening Adding Bituminous 2L and Reconstruction Widening Adding Bituminous 4L and Reconstruction Widening Adding Concrete 1L and Reconstruction Widening Adding Concrete 2L and Reconstruction Widening Adding Concrete 4L and Reconstruction Upgrading Unsealed to Unsealed 2L Highway Upgrading Unsealed to Block 2L Highway Upgrading Unsealed to Bituminous 2L Highway Upgrading Unsealed to Concrete 2L Highway Upgrading Block to Bituminous 2L Highway Upgrading Block to Concrete 2L Highway New Unsealed 1L Road New Block 1L Road New Bituminous 1L Road New Concrete 1L Road New Unsealed 2L Highway New Block 2L Highway New Bituminous 2L Highway New Concrete 2L Highway New Bituminous 4L Highway New Concrete 4L Highway New Bituminous 6L Highway New Concrete 6L Highway New Bituminous 4L Expressway New Concrete 4L Expressway New Bituminous 6L Expressway New Concrete 6L Expressway

Predominant Work Activity

133251192.xls.ms_office - World Region

ROCKS - Road Costs Knowledge System


Scenario: All World Regions Road Work Cost Details (% of Road Work Cost)
Mobilization (%): Demolition and Site Clearance (%): Earthworks (%): Drainage,P Works,Culv.&Min. Bridges (%): Major Bridges and Structures (%): Accesses and Junctions (%): Pavement Courses (%): Shoulder Works (%): Line Markings and Signs (%): Environment (%): Dayworks (%): Other (%): Contingencies (%): Taxes (%): Total (%): Labor (%): Materials (%): Equipment (%): Total (%): Foreign Currency (%): Land Acquisition (%): Resettlement (%): Land Acquisition & Resettlement (%): 2.8% 1.7% 5.2% 5.2% 2.5% 0.1% 54.7% 8.1% 6.5% 0.1% 0.9% 1.0% 4.6% 6.6% 100.0% 14.3% 37.8% 47.8% 100.0% 4.9% 4.6% 3.0% 12.3%

Drainage and Protective Works(%): Culverts and Minor Bridges (%): Surface (%): Subbase and Base (%): Subbase (%): Base (%):

3.4% 2.5% 38.9% 15.9% 3.1% 9.3%

Other Additional Road Agency Costs (% of Road Work Cost)


Design (%): Supervision (%): 5.7% 7.4%