Sunteți pe pagina 1din 2

Fibre Optic Splicing (External) SWMS - SafetyCulture

Page 1 of 2

My Account

View Cart

Email Us

1300 306 604


OHS Systems Work Method Statements Environmental OHS Audits Software OHS News

HOME > SAFE WORK METHOD STATEMENTS > FIBRE OPTIC SPLICING (EXTERNAL) SWMS

SWMS - Work Method Statement


Fibre Optic Splicing (External) SWMS
This SWMS includes: PPE Safety Notes Planning Preparation Pre-Operational Inspection Operation Maintenance Emergency ProceduresReview References

$79.95
PLUS GST

View Cart
Instant Download Delivery

Product Description

Product Reviews

Product Description
The External Fibre Optic Splicing Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the splicing/joining of fibre optic cabling. This Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System. It provides guidance on Fibre Optic cable splicing/ joining. This SWMS covers the planning and preparation of the activity and operation involved with repairing, splicing or building a new joint in fibre optic cabling adjacent to roads and, subsequent placement in a pit or manhole. This SWMS does not cover work carried out near or in a Confined Space. A dedicated SWMS addressing these items must be put in place if applicable and used in conjunction with this SWMS. It can be used as part of your WHS inductions, for Tool box talks or tender applications.

Product Details Minimum 16 page procedure Written by ex WHS inspectors Referenced Risk ratings before and after control measures MS Word format NOT PDF Task specific and site specific details easy to add Includes easy to complete boxes for Company details and project details Employee sign off section Re la t e d it e m s: Manual Handling Hazardous Manual Tasks

http://store.safetyculture.com.au/safe-work-method-statements/fibre-optic-splicing-exte... 9/03/2013

Fibre Optic Splicing (External) SWMS - SafetyCulture

Page 2 of 2

Fibre Optic - Termination Power Tools Traffic Management Plan LOTO Lock Out Tag Out Ope ra t ion: (e x t ra c t only) Ope ning pit s/m a nhole s. Ensure : If known confined space pit, utilise atmospheric testing prior to opening or entering. Ensure atmosphere in trench is monitored for contaminants as required. (Examples: Acidic gas, Carbon Monoxide, or flammable atmosphere). If pit contains water Use manhole/pit guard or other visual aid to exclude or warn pedestrians of open pit Do not leave pit unattended (always replace lid/cover before leaving) Gloves are worn Use correct lifting technique to remove lid Use lifting/access tool if possible (avoid using fingers under heavy lids) Be aware of dangerous animals (snakes, spiders etc.) Be aware of other services. Determine if space would be considered confined space Do not enter confined space without confined space permit (ensure dedicated SWMS in place for confined space entry) Do not work near potential confined space alone. I f ha za rdous m a t e ria ls ide nt ifie d during ope ra t ion e .g. a sbe st os. Ensure : All hazardous materials found reported Use competent person to verify type and quantity of hazardous material Conduct risk assessment and modify this SWMS or adopt separate specific SWMS where required to establish removal process.

We Accept:

ABOUT SSL CERTIFICATES

Fibre Optic Splicing (External) SWMS

$79.95
PLUS GST

View Cart
Instant Download Delivery

2012 Safety Culture | 1300 306 604

Terms and Conditions Privacy Policy About Us

http://store.safetyculture.com.au/safe-work-method-statements/fibre-optic-splicing-exte... 9/03/2013

S-ar putea să vă placă și