- - - - Y - - Y -
Suction Bell Y Y
- - - - Y - - -
Shaft Y Y
Y Y Y - Y Y - Y
Impeller Y Y
Y - - - Y - Y -
Rotor - - - Y - - - - Y -
Fabricated Items Y Y
- - - Y
Y - - Y
CEP Y
Strainer
(a) Body Y Y - - - - Y* - - Y -
(b) Assembly Y**
Elect Items Tests as per relevant
portion of specification
Chemical/ Mechanical shall be one per heat/HT batch.
10% Random on Butt Welds
Pressure Containing Parts.
Performance Test on each Condensate Extraction Pump to determine the characteristic curve
(Head, Capacity, Efficiency & Power) at Design Speed and to ensure Compliance with design
requirements specified in the specification. Measurements shall be carried out at 0%,25%,
50%,65%, 80%, 100% and 125% of design flow with cold water.
NPSH (R) test shall be carried out on one Condensate Extraction Pump using cold water at
pump flows of 25%, 50%, 80%, 100% and 125% of Design Flow at Design Speed. This shall
be preferrably done at 1 % and 3% head break by Suction Throttling Procedure.
Vibration on all Condensate Extraction Pumps shall be measured in transverse, Horizontal
and Vertical Direction at all measuring points.
QUALITY ASSURANCE
E-3
CEP
PAGE
2 OF 2
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Noise Level on each Condensate Extraction pump shall be measured at a distance of 1.5
meter above floor level in elevation and 1 mtr horizontally from the nearest surface of the
equipment as per HIS. The measurement shall be taken at six points around the equipment for
each flow condition.
One Condensate Extraction Pump shall be dismantled for visual inspection after completion
of performance test and NPSH Test. For other Pumps strip down test shall be conducted only
in case abnormal performance such as Excessive Vibration, High noise, high bearing
temperature etc. is observed during performance test.
Note:
1) Quantum of In-Process Checks/ Tests is 100% until & unless specified otherwise.
2) Shop tests shall be conducted with soften Quality Water.
3) Bidder shall furnish details of proposed test procedures including test lay out, type and
level of accuracy of instruments, sample calculation etc.
4) Tests shall be done in accordance with latest edition of Hydraulic Instiute standard.
5) Tested Pump parameters shall be within following tolerances.
At design head : +10% of design capacity
At design capacity: +5% of design head (Under 152.4 meter)
+3 % of design head (for 152.4 meter and above)
* In case of fabricated construction
** One per type and size.
Results must show no minus tolerance with regard to flow and head.
No minus tolerance on efficiency or positive tolerance on power input at motor terminals shall
be allowed.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 4
POWER CYCLE HEATERS
AND DEAERATOR
QUALITY ASSURANCE
E-4
POWER CYCLE
HEATERS &
DE-AERATOR
PAGE
1 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
P
O
W
E
R
C
Y
C
L
E
H
E
A
T
E
R
S
&
D
E
-
A
E
R
A
T
O
R
1
.
0
0
.
0
0
D
E
A
E
R
A
T
O
R
S
:
T
E
S
T
S
/
C
H
E
C
K
S
C
O
M
P
O
N
E
N
T
S
/
A
C
T
I
V
I
T
Y
C h e m i c a l A n a l y s i s
M e c h . P r o p e r t i e s
I m p a c t
H a r d n e s s
F l a t t e n i n g
F l a r i n g
U T
R T
M P I
D P T
E d d y C u r r e n t
H e l i u m L e a k T e s t
S R
H T
H y d r a u l i c
P n e u m a t i c
D i m e n s i o n s
W P S / P Q R / W Q R / A p p .
P e r f o r m a n c e t e s t
M o c k u p T e s t
1
S
h
e
l
l
&
D
i
s
h
e
d
E
n
d
Y
Y
Y
Y
(
a
)
Y
(
g
)
Y
(
a
)
Y
(
e
)
2
F
a
b
r
i
c
a
t
i
o
n
/
W
e
l
d
i
n
g
Y
Y
a
)
E
d
g
e
P
r
e
p
a
r
a
t
i
o
n
/
F
i
l
l
e
t
W
e
l
d
Y
(
b
)
Y
(
b
)
b
)
B
u
t
t
J
o
i
n
t
s
/
B
r
a
n
c
h
W
e
l
d
i
n
g
Y
(
c
)
Y
(
c
)
Y
Y
Y
Y
(
d
)
Y
3
C
o
m
p
l
e
t
e
D
e
a
e
r
a
t
o
r
Y
Y
4
S
a
f
e
t
y
&
S
a
f
e
t
y
R
e
l
i
e
f
V
a
l
v
e
&
o
t
h
e
r
v
a
l
v
e
s
Y
Y
Y
(
f
)
Y
(
f
)
Y
(
f
)
Y
(
f
)
Y
Y
(
h
)
QUALITY ASSURANCE
E-4
POWER CYCLE
HEATERS &
DE-AERATOR
PAGE
2 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2
.
0
0
.
0
0
H
E
A
T
E
R
S
T
E
S
T
S
/
C
H
E
C
K
S
C
O
M
P
O
N
E
N
T
S
/
A
C
T
I
V
I
T
Y
C h e m i c a l A n a l y s i s
M e c h . P r o p e r t i e s
I m p a c t
H a r d n e s s
F l a t t e n i n g
F l a r i n g
U T
R T
M P I
D P T
E d d y C u r r e n t
H e l i u m L e a k T e s t
S R
H T
H y d r a u l i c
P n e u m a t i c
D i m e n s i o n s
W P S / P Q R / W Q R / A p p .
P e r f o r m a n c e t e s t
M o c k u p T e s t
1
T
u
b
e
S
h
e
e
t
Y
a
F
o
r
g
i
n
g
Y
Y
Y
Y
Y
Y
(
I
)
b
P
l
a
t
e
s
Y
Y
Y
Y
Y
Y
(
i)
c
C
l
a
d
i
n
g
Y
Y
Y
Y
Y
(
j)
2
S
h
e
l
l
P
l
a
t
e
s
Y
Y
Y
Y
3
F
e
e
d
N
o
z
z
l
e
M
a
n
h
o
l
e
f
o
r
g
i
n
g
Y
Y
Y
(
k
)
Y
(
l)
Y
(
k
)
Y
(
i)
Y
4
W
e
l
d
i
n
g
/
F
a
b
r
i
c
a
t
i
o
n
a
W
e
l
d
E
d
g
e
P
r
e
p
a
r
a
t
i
o
n
Y
(
b
)
Y
(
b
)
b
B
a
c
k
C
h
i
p
p
i
n
g
Y
(
b
)
Y
(
b
)
c
W
e
l
d
J
o
i
n
t
s
(
i
)
B
u
t
t
Y
(
c
)
Y
(
c
)
Y
Y
Y
Y
Y
(
i
i
)
F
i
l
l
e
t
Y
Y
Y
Y
Y
(
i
i
i
)
N
o
z
z
l
e
/
B
r
a
n
c
h
Y
(
c
)
Y
(
c
)
Y
Y
Y
Y
Y
(
i
v
)
T
u
b
e
t
o
t
u
b
e
s
h
e
e
t
Y
Y
Y
QUALITY ASSURANCE
E-4
POWER CYCLE
HEATERS &
DE-AERATOR
PAGE
3 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
T
E
S
T
S
/
C
H
E
C
K
S
C
O
M
P
O
N
E
N
T
S
/
A
C
T
I
V
I
T
Y
C h e m i c a l A n a l y s i s
M e c h . P r o p e r t i e s
I m p a c t
H a r d n e s s
F l a t t e n i n g
F l a r i n g
U T
R T
M P I
D P T
E d d y C u r r e n t
H e l i u m L e a k T e s t
S R
H T
H y d r a u l i c
P n e u m a t i c
D i m e n s i o n s
W P S / P Q R / W Q R / A p p .
P e r f o r m a n c e t e s t
M o c k u p T e s t
5
D
i
s
h
e
d
E
n
d
&
H
e
m
i
H
e
a
d
Y
Y
Y
Y
(
a
)
Y
(
b
)
Y
(
b
)
Y
Y
(
e
)
6
T
u
b
e
s
Y
Y
Y
(
q
)
Y
(
q
)
)
Y
Y
(
n
)
Y
Y
7
T
u
b
e
e
x
p
a
n
s
i
o
n
i
n
t
u
b
e
s
h
e
e
t
Y
(
o
)
8
C
o
m
p
l
e
t
e
H
e
a
t
e
r
Y
(
p
)
Y
3
.
0
0
.
0
0
R
E
M
A
R
K
S
F
O
R
D
E
A
E
R
A
T
O
R
S
A
N
D
H
E
A
T
E
R
S
(
a
)
A
f
t
e
r
f
o
r
m
i
n
g
o
f
p
l
a
t
e
s
.
F
o
r
d
i
s
h
e
d
e
n
d
a
n
d
H
e
m
i
h
e
a
d
.
(
b
)
D
P
T
m
a
y
b
e
u
s
e
d
a
s
a
n
a
l
t
e
r
n
a
t
e
t
o
M
P
I
.
(
c
)
U
T
/
R
T
t
o
b
e
d
e
c
i
d
e
d
a
c
c
o
r
d
i
n
g
t
o
c
o
n
f
i
g
u
r
a
t
i
o
n
/
a
c
c
e
s
s
i
b
i
l
i
t
y
.
(
d
)
(
i
)
F
o
r
p
l
a
t
e
s
(
i
i
)
F
o
r
w
e
l
d
i
n
g
(
i
i
i
)
F
o
r
w
a
l
l
t
h
i
c
k
n
e
s
s
(
e
)
I
n
c
l
u
d
i
n
g
w
a
l
l
t
h
i
c
k
n
e
s
s
(
f
)
(
i
)
1
0
0
%
R
T
/
U
T
s
h
a
l
l
b
e
c
a
r
r
i
e
d
o
u
t
o
n
b
o
d
i
e
s
,
b
o
n
n
e
t
s
,
n
o
z
z
l
e
a
n
d
s
t
e
m
o
f
v
a
l
v
e
s
o
f
H
P
h
e
a
t
e
r
.
(
i
i
)
1
0
0
%
D
P
T
/
M
P
I
o
n
m
a
c
h
i
n
e
d
s
u
r
f
a
c
e
s
o
f
v
a
l
v
e
b
o
d
y
,
b
o
n
n
e
t
,
s
t
e
m
,
d
i
s
c
&
s
p
r
i
n
g
s
.
(
g
)
O
u
t
e
r
s
u
r
f
a
c
e
(
D
i
s
h
e
d
e
n
d
K
n
u
c
k
l
e
P
o
r
t
i
o
n
)
(
h
)
I
n
c
l
u
d
i
n
g
-
S
e
a
t
l
e
a
k
a
g
e
-
R
e
l
i
e
v
i
n
g
C
a
p
a
c
i
t
y
-
p
o
p
p
i
n
g
t
e
s
t
a
t
s
e
t
a
n
d
b
l
o
w
d
o
w
n
p
r
e
s
s
u
r
e
(
i
)
I
n
c
l
u
d
e
o
v
a
l
i
t
y
o
f
h
o
l
e
s
,
s
u
r
f
a
c
e
f
i
n
i
s
h
a
n
d
s
i
z
e
o
f
h
o
l
e
s
.
(
j
)
F
o
r
c
l
a
d
d
i
n
g
b
o
n
d
a
n
d
c
l
a
d
i
n
g
t
h
i
c
k
n
e
s
s
d
u
r
i
n
g
b
o
n
d
c
h
e
c
k
a
n
d
a
f
t
e
r
d
r
i
l
l
i
n
g
(
k
)
F
o
r
f
e
e
d
n
o
z
z
l
e
(
p
i
p
e
s
)
(
l
)
F
o
r
f
o
r
g
i
n
g
s
(
m
)
A
f
t
e
r
b
e
n
d
i
n
g
a
l
s
o
(
n
)
D
i
m
e
n
s
i
o
n
t
o
i
n
c
l
u
d
e
w
a
l
l
t
h
i
n
n
i
n
g
(
o
)
B
o
t
h
t
u
b
e
a
n
d
s
h
e
l
l
s
i
d
e
.
A
f
t
e
r
H
y
d
r
o
t
e
s
t
d
r
y
i
n
g
a
n
d
n
i
t
r
o
g
e
n
f
i
l
l
i
n
g
t
o
b
e
d
o
n
e
.
(
p
)
A
s
p
e
r
t
h
e
c
o
d
e
.
(
q
)
F
o
r
H
P
H
e
a
t
e
r
&
G
l
a
n
d
s
t
e
a
m
c
o
o
l
e
r
s
t
h
e
s
t
a
t
u
r
o
y
r
e
q
u
i
r
m
e
n
t
s
a
s
p
e
r
I
B
R
t
o
b
e
e
n
s
u
r
e
d
a
n
d
t
o
b
e
c
e
r
t
i
f
i
c
a
t
i
o
n
o
r
i
g
i
n
a
l
t
o
b
e
f
u
r
n
i
s
h
e
d
a
s
p
e
r
I
B
R
s
t
a
t
u
t
o
r
y
r
e
q
u
i
r
e
m
e
n
t
s
.
N
o
t
e
:
(
1
)
Q
u
a
n
t
u
m
o
f
C
h
e
c
k
s
S
h
a
l
l
b
e
1
0
0
%
U
n
l
e
s
s
O
t
h
e
r
w
i
s
e
S
p
e
c
i
f
i
e
d
.
(
2
)
C
h
e
m
.
/
M
e
c
h
.
s
h
a
l
l
b
e
O
n
e
/
p
e
r
h
e
a
t
o
r
H
T
b
a
t
c
h
.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 5
BOILER FEED PUMP
QUALITY ASSURANCE
E-5
BOILER FEED
PUMPS
PAGE
1 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
BOILER FEED PUMP
1.00.00 BOILER FEED PUMPS & DRIVE TURBINE
BFP + BOOSTER PUMP+TURBINE
INPROCESS TESTS
TESTS
ITEM/
DESCRIPTION
C
h
e
m
i
c
a
l
A
n
a
l
y
s
i
s
M
e
c
h
a
n
i
c
a
l
P
r
o
p
.
H
e
a
t
T
r
e
a
t
m
e
n
t
R
u
n
o
u
t
U
.
T
.
R
.
T
.
D
.
P
.
T
.
M
.
P
.
I
.
B
a
l
a
n
c
i
n
g
F
.
A
.
T
.
T
.
H
y
d
.
T
e
s
t
I
n
c
l
u
s
i
o
n
R
a
t
i
n
g
P
r
.
D
r
o
p
D
i
m
e
n
s
i
o
n
s
C he mi c a l /
Mechani cal
shall be one
per heat/HT
batch
# On BFP
Impeller as
per ASTME
446 Level 2
*** In case of
F abr i cated
Construction
^ One per type
and size.
+ Type of NDE
& quantum
of check
shall be as
per relevant
code & pres-
sure class
++ Include body
& seat leak-
age test and
functional test
Note :
Quantum of
Checks/ Tests is
100% untill &
unless specified
otherwise.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
(A) BFP+BOOSTER
PUMP
(i) Barrel Casing Y Y
Y - Y - - Y - - Y - - -
(ii) Discharge Branch Y Y
Y - Y - - Y - - Y - - -
(iii) Casing Cover Y Y
Y - Y - - Y - - Y - - -
(iv) Suction Branch Y Y
Y - - - Y - - - Y - - -
(v) Diffuser Y Y
Y - - - Y - - - - - - -
(vi) Ring Section Y Y
Y - Y - Y - - - - - - -
(vii) Impller Y Y
Y - - Y#Y - Y - - - - -
(viii) Shaft Y Y
Y - Y - Y Y - - - Y - -
(ix) Rotor - - - Y - - - - Y - - - - -
(B) STRAINER
(I) Body Y Y - - - - Y***- - - Y - - -
(ii) Assembly - - - - - - - - - - - - Y
^
-
(C) GEAR BOX AND
HYDRAULIC
COUPLING
(i) Gear Y Y
Y - Y - Y Y - - - - - -
(ii) Pinions Y Y
Y - Y - Y Y - - - - - -
(iii) Shaft Y Y
Y - Y - Y Y - - - - - -
(iv) Casing Y Y
- - - - - - - - Y
(v) Wheels Y Y
Y - Y - Y Y - - - - - -
(vi) Assembled Rota- - - - - - - - - Y - - - - Y
ting Component
(D) RECIRCULATION Y Y
Y - Y+ - Y+ Y+- - Y++- - Y
VALVE
(F) DRIVE TURBINE Tests as per relevant portion of specification
QUALITY ASSURANCE
E-5
BOILER FEED
PUMPS
PAGE
2 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
FINAL TESTS
TESTS
ITEM/
DESCRIPTION
P
e
r
f
o
r
m
a
n
c
e
T
e
s
t
N
P
S
H
T
e
s
t
V
i
b
r
a
t
i
o
n
N
o
i
s
e
P
r
e
s
s
u
r
e
P
u
l
s
a
t
i
o
n
A
x
i
a
l
t
h
r
u
s
t
D
r
y
R
u
n
n
i
n
g
N
o
t
U
s
e
d
V
i
s
u
a
l
C
a
v
i
t
a
t
i
o
n
S
t
r
i
p
D
o
w
n
T
e
s
t
M
e
c
h
.
R
u
n
t
e
s
t
O
t
h
e
r
T
e
s
t
s REMARKS
1 2 3 4 5 6 7 8 9 10 11 12
BFP
^ (a) (b) (c) (c) I I
Y Y Y Y Y Y Y - Y Y Y Y
Booster Pump
^ (a) (b) I
Y Y Y Y - - Y - - Y - Y
Gear Box Y
- Y Y - - - - - - Y
-
HYD Coupling - - - - - - - - - - Y
s
E
f
f
i
c
i
e
n
c
y
B
y
s
e
p
a
r
a
t
i
o
n
o
f
l
o
s
s
e
s
Works running on generator
Y Y Y Y Y Y Y Y Y
Without Excitation, Open
Circuit & Short Circuit
with rated voltage &
current for Generator
Y
Works test on brush
less exciter
Y Y Y
PMG works test
Y Y Y
Full load for PMG &
convertor assembly
Y
Convertor assembly
Y
Static excitation system
Y Y
TESTS
ITEM/
COMPONENTS
/PROCESS
I
n
s
u
l
a
t
i
o
n
r
e
s
i
s
t
a
n
c
e
P
o
l
a
r
i
s
a
t
i
o
n
i
n
d
e
x
P
h
a
s
e
s
e
q
.
v
o
l
t
a
g
e
b
a
l
a
n
c
e
S
h
a
f
t
v
o
l
t
a
g
e
&
c
u
r
r
e
n
t
H
.
V
.
t
e
s
t
(
e
x
c
e
p
t
e
l
e
c
t
r
o
n
i
c
c
i
r
c
u
i
t
)
R
T
D
,
B
T
D
C
h
e
c
k
C
a
p
a
c
i
t
a
n
c
e
m
e
a
s
u
r
e
m
e
n
t
T
a
n
d
e
l
t
a
,
d
e
l
t
a
t
a
n
d
e
l
t
a
R
o
t
o
r
j
o
u
r
n
a
l
B
e
a
r
i
n
g
o
i
l
c
a
t
c
h
e
r
Works running
on generator
Y Y Y Y Y Y Y Y
On total wdg / phases at interval
0.2 Un for Generator
Y Y
Condition after dismantling Y Y
Works test on brush
less exciter
Y Y
PMG works test Y Y Y
Convertor assembly Y Y
Static excitation system Y Y
Y - Test Applicable
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-15
GENERATOR &
AUXILIARIES
PAGE
10 OF 10
FINAL ACCEPTANCE TEST GENERATOR/EXCITOR
TESTS
ITEM/
COMPONENTS
/PROCESS
S
e
a
l
r
i
n
g
s
,
l
i
n
e
r
s
W
i
n
d
i
n
g
O
v
e
r
h
a
n
g
V
i
b
r
a
t
i
o
n
m
e
a
s
u
r
e
m
e
n
t
N
o
l
o
a
d
L
o
a
d
c
h
a
r
a
c
t
e
r
i
s
t
i
c
s
C
h
a
r
a
c
t
e
r
i
s
t
i
c
s
o
f
s
e
a
r
c
h
c
o
i
l
,
q
u
a
d
,
a
x
i
s
A
s
p
e
r
a
p
p
l
i
c
a
b
l
e
s
t
a
n
d
a
r
d
V
i
s
u
a
l
&
d
i
m
e
n
s
i
o
n
P
a
r
t
i
a
l
d
i
s
c
h
a
r
g
e
Works running
on generator
Y
Y Y
Without EXC, OC & SC
with rated voltage &
current for Generator
On total wdg / phases at
interval 0.2 Un for Generator
Condition after dismantling
Y Y
Works test on brush
less exciter
Y Y Y Y
Y
PMG works test
Y Y
Full load for PMG &
convertor assembly
Convertor assembly
Static excitation system
Y
Y - Test Applicable
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 16
MOTORS
TANDA THERMAL POWER PROJECT
STAGE II (2X600 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION VI
PART-B
E-16
MOTORS
PAGE 1 OF 1
INDUCTION MOTOR & SYNCHRONOUS MACHINE
TESTS/CHECKS
TEMS/COMPONENTS
V
i
s
u
a
l
D
i
m
e
n
s
i
o
n
a
l
M
a
k
e
/
T
y
p
e
/
R
a
t
i
n
g
/
T
C
/
G
e
n
e
r
a
l
P
h
y
s
i
c
a
l
I
n
s
p
e
c
t
i
o
n
M
e
c
h
/
C
h
e
m
.
P
r
o
p
e
r
t
i
e
s
N
D
T
/
D
P
/
M
P
I
/
U
T
M
e
t
a
l
l
o
g
r
a
p
h
y
E
l
e
c
t
r
i
c
a
l
C
h
a
r
a
c
t
e
r
i
s
t
i
c
s
W
e
l
d
i
n
g
/
B
r
a
z
i
n
g
(
W
P
S
/
P
Q
R
)
H
e
a
t
T
r
e
a
t
m
e
n
t
M
a
g
n
e
t
i
c
C
h
a
r
a
c
t
e
r
i
s
t
i
c
s
H
y
d
r
u
a
l
i
c
/
L
e
a
k
/
P
r
e
s
s
u
r
e
T
e
s
t
T
h
e
r
m
a
l
C
h
a
r
a
c
t
e
r
i
s
t
i
c
s
R
u
n
o
u
t
D
y
n
a
m
i
c
B
a
l
a
n
c
i
n
g
A
l
l
t
e
s
t
s
a
s
p
e
r
I
S
-
3
2
5
/
I
S
-
4
7
2
2
/
9
2
8
3
V
i
b
r
a
t
i
o
n
O
v
e
r
s
p
e
e
d
T
a
n
d
e
l
t
a
,
s
h
a
f
t
v
o
l
t
a
g
e
&
p
o
l
a
r
i
s
a
t
i
o
n
i
n
d
e
x
t
e
s
t
Plates for stator frame, end shield, spider
etc.
Y Y Y Y Y
Shaft Y Y Y Y Y Y Y
Magnetic Material Y Y Y Y Y Y Y Y
Rotor Copper/Aluminium Y Y Y Y Y Y Y
Stator copper Y Y Y Y Y Y Y
SC Ring Y Y Y Y Y Y Y Y Y
Insulating Material Y Y Y Y Y
Tubes for Cooler Y Y Y Y Y Y Y
Sleeve Bearing Y Y Y Y Y Y Y
Stator/Rotor, Exciter Coils Y Y Y Y Y
Castings, stator frame, terminal box and
bearing housing etc.
Y Y Y Y Y Y
Fabrication & machining of stator, rotor,
terminal box
Y Y Y Y
Wound stator Y Y Y Y
Wound Exciter Y Y Y Y
Rotor complete Y Y Y Y Y
Exciter, Stator, Rotor, Terminal Box
assembly
Y Y Y
Accessories, RTD, BTD,CT, Brushes,
Diodes,Space heater, antifriction bearing,
cable glands, lugs, gaskets etc.
Y Y Y
Motor (IS 325 / 4722/ 9283) Y Y Y Y Y Y Y1
Note: 1. This is an indicative list of tests/checks. The manufacture is to furnish a detailed Quality Plan indicating the practices & Procedure followed along with
relevant supporting documents during QP finalization. However, No QP for LT motor up to 50KW.
2. Makes of all major bought out items will be subject to NTPC approval.
Y1 =for HT Motor / Machines only.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 17
LT SWITCHGEAR & BUS DUCT
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-17
LT SWITCHGEAR & BUS
DUCT
PAGE
1 OF 3
LT SWITCHGEAR
(MCC, PCC, ACDB, DCDB, FUSE BOARDS, LOCAL PUSH BUTTON STATION, LOCAL MOTOR
STARTERS)
ATTRI BUTES /
CHARACTERI S-
TI CS
ITEMS/
COMPONENTS/ SUB
SYSTEM ASSEMBLIY
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
&
T
C
D
i
m
e
n
s
i
o
n
s
&
F
i
n
i
s
h
E
l
e
c
t
r
i
c
a
l
p
r
o
p
e
r
t
i
e
s
M
e
c
h
a
n
i
c
a
l
P
r
o
p
e
r
t
i
e
s
C
h
e
m
i
c
a
l
p
r
o
p
e
r
t
i
e
s
F
u
n
c
t
i
o
n
a
l
&
O
p
e
r
a
t
i
o
n
a
l
F
e
a
t
u
r
e
s
a
s
p
e
r
N
T
P
C
S
p
e
c
.
I
t
e
m
t
o
c
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
S
t
a
n
d
a
r
d
s
P
r
e
t
r
e
a
t
m
e
n
t
a
s
p
e
r
I
S
6
0
0
5
P
a
i
n
t
S
h
a
d
e
,
A
d
h
e
s
i
o
n
,
T
h
i
c
k
n
e
s
s
&
F
i
n
i
s
h
F
u
n
c
t
i
o
n
a
l
C
h
e
c
k
s
M
i
l
l
i
-
v
o
l
t
d
r
o
p
T
e
s
t
I
R
H
V
I
R
T
e
s
t
D
e
g
r
e
e
o
f
P
r
o
t
e
c
t
i
o
n
R
o
u
t
i
n
e
t
e
s
t
a
s
p
e
r
N
T
P
C
s
p
e
c
A
l
l
R
o
u
t
i
n
e
t
e
s
t
s
a
s
p
e
r
N
T
P
C
s
p
e
c
.
&
I
S
Sheet Steel (IS : 513) Y Y Y Y Y
Aluminum Bus bar
Material
(IS : 5082)
Y Y Y Y Y Y
Copper Bus bar
Material
(IS : 613)
Y Y Y Y Y Y
Support Insulator Y Y Y Y Y
Air Circuit Breaker (IS:
13947)
Y Y Y Y Y Y Y
Energy Meters (IS :
13010, 13779 )
Y Y Y Y Y Y
Power & Aux.
Contactors
(IS : 13947)
Y Y Y Y Y
Protection & Aux.
Relays
(IS : 3231)
Y Y Y Y Y Y
Control & Selector
Switches
IS : 13947)
Y Y Y Y Y
CTs & PTs (IS 2705 /
3156)
Y Y Y Y
MCCB (IS : 13947) Y Y Y Y
Indicating Meters (IS :
1248)
Y Y Y Y Y Y
Indicating Lamps (IS :
13947)
Y Y Y Y Y
Air Break Switches
(IS : 13947)
Y Y Y Y Y
Control Terminal Blocks Y Y Y Y
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-17
LT SWITCHGEAR & BUS
DUCT
PAGE
2 OF 3
LT SWITCHGEAR
(MCC, PCC, ACDB, DCDB, FUSE BOARDS, LOCAL PUSH BUTTON STATION, LOCAL
MOTOR STARTERS)
ATTRI BUTES /
CHARACTERI
S-TI CS
ITEMS/
COMPONENTS/
SUB SYSTEM
ASSEMBLIY
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
&
T
C
D
i
m
e
n
s
i
o
n
s
&
F
i
n
i
s
h
E
l
e
c
t
r
i
c
a
l
p
r
o
p
e
r
t
i
e
s
M
e
c
h
a
n
i
c
a
l
P
r
o
p
e
r
t
i
e
s
C
h
e
m
i
c
a
l
p
r
o
p
e
r
t
i
e
s
F
u
n
c
t
i
o
n
a
l
&
O
p
e
r
a
t
i
o
n
a
l
F
e
a
t
u
r
e
s
a
s
p
e
r
N
T
P
C
S
p
e
c
.
I
t
e
m
t
o
c
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
S
t
a
n
d
a
r
d
s
P
r
e
t
r
e
a
t
m
e
n
t
a
s
p
e
r
I
S
6
0
0
5
P
a
i
n
t
S
h
a
d
e
,
A
d
h
e
s
i
o
n
,
T
h
i
c
k
n
e
s
s
&
F
i
n
i
s
h
F
u
n
c
t
i
o
n
a
l
C
h
e
c
k
s
M
i
l
l
i
-
v
o
l
t
d
r
o
p
T
e
s
t
I
R
H
V
I
R
T
e
s
t
D
e
g
r
e
e
o
f
P
r
o
t
e
c
t
i
o
n
R
o
u
t
i
n
e
t
e
s
t
a
s
p
e
r
N
T
P
C
s
p
e
c
A
l
l
R
o
u
t
i
n
e
t
e
s
t
s
a
s
p
e
r
N
T
P
C
s
p
e
c
.
&
I
S
Fuse (IS 13703) Y Y Y Y
Control
Transformer (IS :
12021)
Y Y Y Y Y Y
Push Buttons (IS :
4794)
Y Y Y Y Y
Transducer (IEC :
60688)
Y Y Y Y Y Y
MCB IS : 8828) Y Y Y Y Y
Breaker Handling
Trolley
Y Y Y Y Y Y
Synthetic Rubber
Gasket (IS : 11149)
Y Y Y Y Y
LT SWITCHGEAR
(IS : 8623 )
Y Y Y Y Y Y Y Y Y Y Y
Notes:
1. This is an indicative list of tests / checks. The manufacturer is to furnish a detailed Quality Plan
indicating the practice and procedure along with relevant supporting documents.
2. Makes of all major Bought Out Items will be subject to NTPC approval.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-17
LT SWITCHGEAR & BUS
DUCT
PAGE
3 OF 3
LT BUSDUCT
ATTRIBUTES ,
CHARACTERISTICS
ITEM, COMPONENTS,
SUB SYSTEM ASSEMBLY
D
i
m
e
n
s
i
o
n
&
S
u
r
f
a
c
e
F
i
n
i
s
h
M
a
k
e
,
T
y
p
e
,
R
a
t
i
n
g
&
T
C
E
l
e
c
t
r
i
c
a
l
P
r
o
p
e
r
t
i
e
s
M
e
c
h
a
n
i
c
a
l
P
r
o
p
e
r
t
i
e
s
C
h
e
m
i
c
a
l
P
r
o
p
e
r
t
i
e
s
I
t
e
m
t
o
c
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
I
S
W
P
S
A
p
p
r
o
v
a
l
,
W
e
l
d
e
r
Q
u
a
l
i
f
i
c
a
t
i
o
n
W
e
l
d
Q
u
a
l
i
t
y
C
h
e
c
k
(
D
P
t
e
s
t
&
x
-
r
a
y
T
e
s
t
)
P
a
i
n
t
S
h
a
d
e
,
T
h
i
c
k
n
e
s
s
,
A
d
h
e
s
i
o
n
&
F
i
n
i
s
h
T
i
g
h
t
n
e
s
s
b
y
T
o
r
q
u
e
m
e
a
s
u
r
e
m
e
n
t
E
l
e
c
t
r
i
c
a
l
C
l
e
a
r
a
n
c
e
s
G
a
l
v
a
n
i
z
i
n
g
T
e
s
t
a
s
p
e
r
I
S
2
6
2
9
/
2
6
3
3
/
4
7
5
9
I
R
H
V
I
R
T
e
s
t
P
h
a
s
e
S
e
q
u
e
n
c
e
C
h
e
c
k
D
e
g
r
e
e
o
f
P
r
o
t
e
c
t
i
o
n
r
o
u
t
i
n
e
t
e
s
t
a
s
p
e
r
N
T
P
C
s
p
e
c
.
Aluminum Sheets / Plates /
Strips / Flexibles / tubes
(IS : 5082 / 737)
Y Y Y Y Y Y Y
CRCA Flats / ISMC (IS
2062)
Y Y Y Y Y
Neoprene / Synthetic
Rubber Gaskets (IS 11149 /
3400)
Y Y Y Y
Rubber Bellows (IS : 3400) Y Y Y Y
Support Insulator Y Y Y Y
Galvanized Structure & GI
Earthing Flat
(IS : 2629 / 2633 / 4749 )
Y Y Y Y
Space Heater & Thermostat Y Y Y
LT Busduct (IS : 8623
PART 2)
Y Y Y Y Y Y Y Y Y Y Y
Notes:
1. This is an indicative list of tests / checks. The manufacturer is to furnish a detailed Quality Plan
indicating the practice and
procedure along with relevant supporting documents.
2. Makes of all major Bought Out Items will be subject to NTPC approval.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 18
LT POWER CABLES
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-18
L.T. POWER CABLES
PAGE
1 OF 3
L.T. POWER CABLES
(1.1 KV PVC & XLPE CABLES)
Attributes /
Characteristics
Item / Components /
Sub System Assembl y
M
a
k
e
,
R
a
t
i
n
g
,
T
y
p
e
&
T
C
D
i
m
e
n
s
i
o
n
/
s
u
r
f
a
c
e
f
i
n
i
s
h
M
e
c
h
a
n
i
c
a
l
P
r
o
p
e
r
t
i
e
s
C
h
e
m
i
c
a
l
C
o
m
p
o
s
i
t
i
o
n
E
l
e
c
t
r
i
c
a
l
P
r
o
p
e
r
t
i
e
s
S
p
a
r
k
T
e
s
t
H
o
t
s
e
t
t
e
s
t
(
X
L
P
E
)
L
a
y
l
e
n
g
t
h
/
S
e
q
u
e
n
c
e
A
r
m
o
u
r
c
o
v
e
r
a
g
e
,
C
r
o
s
s
o
v
e
r
,
l
o
o
s
e
n
e
s
s
,
G
a
p
b
e
t
w
e
e
n
t
w
o
a
r
m
o
u
r
w
i
r
e
/
s
t
r
i
p
S
e
q
u
e
n
t
i
a
l
m
a
r
k
i
n
g
/
s
u
r
f
a
c
e
f
i
n
i
s
h
/
c
a
b
l
e
l
e
n
g
t
h
T
e
n
s
i
l
e
s
t
r
e
n
g
t
h
,
e
l
o
n
g
a
t
i
o
n
b
e
f
o
r
e
&
a
f
t
e
r
a
g
e
i
n
g
o
f
i
n
s
u
l
a
t
i
o
n
&
o
u
t
e
r
s
h
e
a
t
h
T
h
e
r
m
a
l
S
t
a
b
i
l
i
t
y
o
f
i
n
s
u
l
a
t
i
o
n
a
n
d
o
u
t
e
r
s
h
e
a
t
h
*
A
n
t
i
t
e
r
n
i
t
e
t
r
e
a
t
m
e
n
t
o
n
w
o
o
d
e
n
d
r
u
m
s
C
o
n
s
t
r
u
c
t
i
o
n
a
l
/
r
e
q
u
i
r
e
m
e
n
t
a
s
p
e
r
N
T
P
C
S
p
e
c
.
R
o
u
t
i
n
e
a
n
d
a
c
c
e
p
t
a
n
c
e
t
e
s
t
a
s
p
e
r
R
e
l
e
v
a
n
t
S
t
a
n
d
a
r
d
a
n
d
N
T
P
C
s
p
e
c
i
f
i
c
a
t
i
o
n
F
R
L
S
T
e
s
t
Aluminum (IS-8130) Y Y Y Y Y
PVC Compound (IS-5831) Y Y Y Y
XLPE Compound(IS-7098 Part-
I)
Y Y Y Y Y
FRLS PVC Compound(IS-5831)
ASTM-D-2843/ ASTM-D-2863
IEC-754 Part-I
Y Y Y
Armour wire/strip (IS-3975) Y Y Y
Insulated Core Y Y Y Y
Laid up core Y Y
PVC Inner sheath Y
Armouring Y Y
Outer sheath Y Y Y Y Y
Finish cable (IS-1554 & 7098
Part-1)
ASTM-D-2843/ IS 10810 (Part- -
58)
IEC-754 Part-I
Swedish Chimney SS 4241475
for (F3 category)
Flammability test IEC-332 Part
3 Cat-B
Y Y Y Y Y Y Y
Y Y
Wooden drum (IS-10418) / Steel
drum
Y Y
Note: This is an indicative list of test/checks. The manufacturer is to furnish a detailed quality plan indicating the practice and
procedure along with relevant supporting documents.
2. Not applicable for XLPE insulation
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-18
L.T. POWER CABLES
PAGE
2 OF 3
ROUTINE TESTS
Routine tests shall be carried out on each drum of finished cables for all
types & sizes.
Following shall constitute routine tests:
1) Conductor Resistance test
2) High voltage test at room temperature
ACCEPTANCE TESTS
Following Acceptance tests shall be carried out for each type and size
of the cables on the cable drums selected at random as per sampling
plan mentioned in IS: 1554 Part 1 & IS 7098 Part-I
A) For Conductor
1) Annealing test For copper conductor only
2) Tensile test For aluminium conductor only
3) Wrapping test For aluminium conductor only
4) Resistance test
B) For Armour Wires / Formed Wires (If applicable)
1) Measurement of Dimensions
2) Tensile Tests
3) Elongation Test
4) Torsion Test For Round wires only
5) Wrapping Test
6) Resistance Test
7) Mass of Zinc coating test For G S wires / Formed wires
only
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-18
L.T. POWER CABLES
PAGE
3 OF 3
8) Uniformity of Zinc coating For G S wires / Formed wires
only
9) Adhesion test For G S wires / Formed wires
only
10) Freedom from defects
C) For PVC / XLPE insulation & PVC Sheath
1) Test for thickness
2) Hot set test For XLPE insulation only
3) Tensile strength & Elongation before ageing
D) For completed cables
1) Insulation resistance test (Volume resistivity method)
2) High voltage test at room temperature
E) Following tests shall be carried out and only one sample shall be taken
from each offered lot of all sizes for these tests:-
1) Tensile strength & elongation after ageing on PVC / XLPE insulation and
PVC outer sheath
2) Thermal stability test on PVC insulation and outer sheath
3) Oxygen index test on outer sheath
4) Smoke density rating test on outer sheath as per ASTM D 2843
5) Acid gas generation test on outer sheath as per IEC 754 (Part 1)
6) Flammability test as per IEC-332 - Part- 3 (Category- B) on completed
cable
7) Fire resistance test as per SS 4241475 (F3 Category) on completed cable
F) Following tests shall be carried on one length of each size of offered
lot:
1) Surface finish, length measurement, sequence of cores, armour coverage,
Gap between two consecutive armour wires / formed wires
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 19
LT CONTROL CABLES
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-19
L.T. CONTROL CABLES
PAGE
1 OF 3
L.T. CONTROL CABLES
(1.1 KV PVC CABLES)
Attributes /
Characteristics
Item / Components /
Sub System
Assembly
M
a
k
e
,
T
y
p
e
,
R
a
t
i
n
g
,
T
.
C
D
i
m
e
n
s
i
o
n
/
s
u
r
f
a
c
e
f
i
n
i
s
h
M
e
c
h
a
n
i
c
a
l
P
r
o
p
e
r
t
i
e
s
C
h
e
m
i
c
a
l
C
o
m
p
o
s
i
t
i
o
n
E
l
e
c
t
r
i
c
a
l
P
r
o
p
e
r
t
i
e
s
S
p
a
r
k
T
e
s
t
L
a
y
l
e
n
g
t
h
/
S
e
q
u
e
n
c
e
A
r
m
o
u
r
c
o
v
e
r
a
g
e
,
c
r
o
s
s
o
v
e
r
,
l
o
o
s
e
n
e
s
s
,
g
a
p
b
e
t
w
e
e
n
t
w
o
a
r
m
o
u
r
w
i
r
e
S
e
q
u
e
n
t
i
a
l
m
a
r
k
i
n
g
/
s
u
r
f
a
c
e
f
i
n
i
s
h
/
c
a
b
l
e
l
e
n
g
t
h
T
e
n
s
i
l
e
s
t
r
e
n
g
t
h
,
e
l
o
n
g
a
t
i
o
n
b
e
f
o
r
e
&
a
f
t
e
r
a
g
e
i
n
g
o
f
i
n
s
u
l
a
t
i
o
n
&
o
u
t
e
r
s
h
e
a
t
h
T
h
e
r
m
a
l
s
t
a
b
i
l
i
t
y
o
f
i
n
s
u
l
a
t
i
o
n
a
n
d
o
u
t
e
r
s
h
e
a
t
h
A
n
t
i
t
e
r
m
i
t
e
t
r
e
a
t
m
e
n
t
o
n
w
o
o
d
e
n
d
r
u
m
s
C
o
n
s
t
r
u
c
t
i
o
n
a
l
f
e
a
t
u
r
e
a
s
p
e
r
N
T
P
C
S
p
e
c
R
o
u
t
i
n
e
&
A
c
c
e
p
t
a
n
c
e
t
e
s
t
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
a
n
d
a
r
d
&
p
a
g
e
2
&
3
o
f
t
h
i
s
t
a
b
l
e
F
R
L
S
T
e
s
t
Copper Conductor
(IS-8130)
Y Y Y Y Y
PVC Compound (IS-
5831)
Y Y Y Y
FRLS PVC Compound
IS-5831
ASTM-D-2843/ IS
10810 (Part-58 )
IEC-754 Part-1
Y Y Y Y
Armour wire/strip (IS-
3975)
Y Y Y
Insulated Core Y Y Y Y
Laid up core Y Y
PVC Inner sheath Y
Armouring Y Y
Outer sheath Y Y Y Y Y
Finish cable (IS-1554-
1)
ASTM-D-2843/ IS
10810 (Part-58)
IEC-754 Part-1
Swedish Chimney: SEN
SS 424-1475 (F3
category)
Flammability test IEC-
332 Part-3 Cat-B
Y Y Y Y Y Y Y Y Y
Wooden drum (IS :
10418) / Steel drum
Y Y
1.Note : This is an indicative list of test/checks. The manufacturer is to furnish a detailed quality plan
indicating the Practice and procedure along with relevant supporting documents.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-19
L.T. CONTROL CABLES
PAGE
2 OF 3
CONTROL CABLE
ROUTINE TESTS
Routine tests shall be carried out on each drum of finished cables for all
types & sizes.
Following shall constitute routine tests:
1) Conductor Resistance test
2) High voltage test at room temperature
ACCEPTANCE TESTS
Following Acceptance tests shall be carried out for each type and size
of the cables on the cable drums selected at random as per sampling
plan mentioned in IS: 1554 Part 1
A) For Conductor
1) Annealing test For copper conductor only
2) Resistance test
B) For Armour Wires / Formed Wires ( If applicable )
1) Measurement of Dimensions
2) Tensile Tests
3) Elongation Test
4) Torsion Test For Round wires only
5) Wrapping Test
6) Resistance Test
7) Mass of Zinc coating test For G S wires / Formed wires only
8) Uniformity of Zinc coating For G S wires / Formed wires only
9) Adhesion test For G S wires / Formed wires only
10) Freedom from defects
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-19
L.T. CONTROL CABLES
PAGE
3 OF 3
C) For PVC insulation & PVC Sheath
1) Test for thickness
2) Tensile strength & Elongation before ageing
D) For completed cables
1) Insulation resistance test ( Volume resistivity method )
2) High voltage test at room temperature
E) Following tests shall be carried out and only one sample shall be taken
from each offered lot of all sizes for these tests:-
1) Tensile strength & elongation after ageing on PVC insulation and PVC
outer sheath
2) Thermal stability test on PVC insulation and outer sheath
3) Oxygen index test on outer sheath
4) Smoke density rating test on outer sheath as per ASTM D 2843
5) Acid gas generation test on outer sheath as per IEC 754 (Part 1)
6) Flammability test as per IEC-332 - Part- 3 ( Category- B ) on completed
cable
7) Fire resistance test as per SS 4241475 (F3 Category ) on completed cable
F) Following tests shall be carried on one length of each size of offered
lot:
1) Surface finish, length measurement, sequence of cores, armour coverage,
Gap between two consecutive armour wires / formed wires
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 20
CABLING, EARTHING, LIGHTNING
PROTECTION
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-20
CABLING, EARTHING
LIGHTNING
PROTECTION
PAGE
1 OF 1
CABLING, EARTHING, LIGHTNING PROTECTION
ATTRIBUTES /
CHARACTERISTICS
ITEMS/COMPONENTS /
SUB SYSTEMS
D
i
m
e
n
s
i
o
n
P
a
i
n
t
s
h
a
d
e
,
p
a
i
n
t
t
h
i
c
k
n
e
s
s
,
a
d
h
e
s
i
o
n
P
r
e
-
t
r
e
a
t
m
e
n
t
o
f
s
h
e
e
t
I
P
p
r
o
t
e
c
t
i
o
n
P
r
o
o
f
l
o
a
d
*
S
u
r
f
a
c
e
f
i
n
i
s
h
D
e
f
l
e
c
t
i
o
n
t
e
s
t
*
H
V
&
I
R
G
a
l
v
a
n
i
s
e
T
e
s
t
(
I
f
A
p
p
l
i
c
a
b
l
e
)
F
u
n
c
t
i
o
n
a
l
B
o
u
g
h
t
o
u
t
i
t
e
m
s
/
B
i
l
l
o
f
m
a
t
e
r
i
a
l
R
o
u
t
i
n
e
t
e
s
t
s
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
a
n
d
a
r
d
&
s
p
e
c
i
f
i
c
a
t
i
o
n
A
c
c
e
p
t
a
n
c
e
t
e
s
t
s
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
a
n
d
a
r
d
&
s
p
e
c
i
f
i
c
a
t
i
o
n
C
o
n
s
t
r
u
c
t
i
o
n
a
l
f
e
a
t
u
r
e
a
s
p
e
r
N
T
P
C
S
i
f
i
t
i
Cable glands(BS-6121) Y Y
Cable lug(IS-8309) Y Y
Lighting wire(IS-694) Y Y
Flexible conduits Y Y Y
Conduits(Galvanized &
Epoxy) IS-9537 & IS-
2629,2633 ,6745
Y Y Y Y Y
RCC Hume Pipe (IS-458) Y
Cable straight through joint
(VDE-0278)
Y Y Y
Cable Trays, & supports
system & accessories IS-
513, 2629,2633,6745
Y Y Y Y Y Y Y Y Y Y Y
Trefoil clamp Y Y
GI flats for earthing &
lighting protection (IS 2062,
2629, 6745,2633)
Y Y Y Y Y
GI wire (IS-280) Y Y
Fire Sealing System (BS
476)
Y Y Y
.Note:1.This is an indicative list of tests /checks. The manufacturer is to furnish a detailed Quality
Plan indicating the practice and procedure along with relevant supporting documents.
2. Make of all items will be subject to NTPC approval.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 21
LIGHTING
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-21
LIGHTING
PAGE
1 OF 1
LIGHTING
Item Components
Sub System
Assembly
Attributes
Characteristics
M
a
k
e
,
T
y
p
e
,
R
a
t
i
n
g
/
T
C
D
i
m
e
n
s
i
o
n
P
r
e
-
T
r
e
a
t
m
e
n
t
o
f
s
h
e
e
t
s
P
a
i
n
t
S
h
a
d
e
T
h
i
c
k
n
e
s
s
A
d
h
e
s
i
o
n
&
F
i
n
i
s
h
T
e
s
t
f
o
r
G
a
l
v
a
n
i
z
a
t
i
o
n
I
P
T
e
s
t
B
o
u
g
h
t
O
u
t
I
t
e
m
s
/
B
i
l
l
o
f
M
a
t
e
r
i
a
l
H
V
&
I
R
F
u
n
c
t
i
o
n
a
l
C
h
e
c
k
a
s
p
e
r
s
p
e
c
.
C
o
n
s
t
r
u
c
t
i
o
n
a
l
F
e
a
t
u
r
e
a
s
p
e
r
N
T
P
C
s
p
e
c
.
R
o
u
t
i
n
e
T
e
s
t
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
d
a
n
d
s
p
e
c
A
c
c
e
p
t
a
n
c
e
T
e
s
t
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
d
a
n
d
s
p
e
c
I
t
e
m
t
o
c
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
s
t
a
n
d
a
r
d
Luminaries (IS-10322
Part-5 Sec.1; IS- 2206)
Y Y Y Y
Y
Electronic Ballast Y
Y
Y Y
Lighting Wire (IS-694) Y
Y
Pole (IS-2713) Y Y Y
Y
Y
Lamps (IS-9800, IS-9974) Y Y Y
Switch Box/ J unction
Box/Receptacles/ Local
Push Button, Lighting
Panel / flame proof type
(IS-513, 2629, 2633,
4759, 6745, 2148)
Y Y Y Y Y Y Y Y Y Y Y Y
Cable Gland (BS-6121) Y Y Y
Cable Lug (IS-8309) Y Y Y
Flexible Conduit Y
Y
Lighting Transformer (IS-
1117, 11333)
Y Y Y
Epoxy & Galvanised
Conduit (IS-9537, 2629,
2633, 4759, 6745)
Y Y
Y
Y
Notes:
1. This is an indicative list of tests / checks. The manufacturer is to furnish a detailed Quality Plan
indicating the practice and procedure along with relevant supporting documents.
2. Make of all major Bought Out Items will be subject to NTPC approval.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 22
PASSENGER / SERVICE ELEVATORS
AND LIFTS
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE III (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-22
ELEVATORS
PAGE
1 OF 1
ELECTRICAL PORTION OF PASSENGER /
SERVICE ELEVATORS AND LIFTS
Items
Description
G
e
n
e
r
a
l
p
h
y
s
i
c
a
l
I
n
s
p
e
c
t
i
o
n
/
D
i
m
e
n
s
i
o
n
s
F
u
n
c
t
i
o
n
a
l
/
O
p
e
r
a
t
i
o
n
a
l
T
e
s
t
B
u
r
n
i
n
T
e
s
t
o
n
o
n
e
l
e
c
t
r
o
n
i
c
c
a
r
d
s
P
r
e
-
t
r
e
a
t
m
e
n
t
i
n
s
e
v
e
n
t
a
n
k
f
o
r
s
h
e
e
t
s
t
e
e
l
,
P
a
i
n
t
i
n
g
P
a
i
n
s
h
a
d
e
,
t
h
i
c
k
n
e
s
s
&
a
d
h
e
s
i
o
n
A
l
l
R
o
u
t
i
n
e
t
e
s
t
s
a
s
p
e
r
r
e
l
e
v
a
n
t
s
t
a
n
d
a
r
d
Electrical Motor IS 325 / IS 4722
Y Y Y
PLC (IEC 1131) Y Y Y Y
VVVF Panel Y Y Y Y Y Y
Note :
1) This is an indicative list of tests/checks. The manufacture is to furnish a
detailed Quality Plan indicating the practices & Procedure followed
alongwith relevant supporting documents during QP finalisation.
2) Make of all major Bought Out Items will be subject to NTPC approval.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 23
DISTRIBUTED DIGITAL CONTROL,
MONITORING & INFORMATION SYSTEM
(DDCMIS)
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
1 OF 10
1.00.00 REQUIREMENTS OF AUTHORISATION-TO-SHIP-TEST (ATST) FOR DDCMIS
1.01.00 (a) Authorization-to-ship-test (ATST) or Factory Acceptance Test (FAT) shall
include all required tests to fully demonstrate to Employers satisfaction that
each equipment/sub-system/system as well as software modules furnished
as per this specification as well as DDCMIS as a whole, fully meets the
functional, parametric and other requirements of this specification and
Employers approved drawings/documents under all operating regimes. The
parametric requirements shall be as per DDCMIS specifications. All tests
pertaining to Control System shall be applicable to SG-C&I, TG-C&I and
BOP-C&I also (wherever applicable).
(b) Contractor to note that ATST / FAT procedure given below in subsequent
clauses are only indicative in order to help the Contractor in understanding
the requirements and help him in submitting a detailed procedure based on
these guidelines meeting all the specification requirements. These
requirements are in addition to those stipulated against DDCMIS integrated
testing.
(c) The results of the following activities shall be made available to the
Employers representative before start of ATST / FAT.
(i) Implementation check of various applications including those based
on NTPC input, as per clause no 9.03.04, Part-C, GTR..
(d) Generally, the ATST / FAT shall be carried out with the equipment
earmarked for the particular project and unit. However, for the following item,
the testing can be carried out with similar / equivalent dummy equipment
fulfilling the following condition, subject to Employers approval.
SN ITEM CONDITION
1 LVS Testing of LVS functionalities can be done by using
monitors connected to the LVS Workstations.
Despatch of LVS can be allowed like a cat-III item, but
only after successful testing of functionalities as
indicated above.
2 LVS WS / OWS LVS WS / OWS for the first unit to be tested on the
target machines. In case the testing carries over to
next unit, dummy equipment may be used. Despatch
of LVS WS / OWS of subsequent units can be allowed
like a cat-III item, but only after successful testing of
first unit as indicated above.
3 MASTER CLOCK Can be directly despatched if alternate test set-up for
time synchronisation can be arranged.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
2 OF 10
4 NETWORK
COMPONENT
To be done with target machines only for first unit. In
case the testing carries over to next unit, dummy
equipment may be used. Despatch of network
components of subsequent units / station can be
allowed like a cat-III item, but only after successful
testing of functionalities as indicated above.
5 VARIOUS BUS
SYSTEM
CABLES
For FAT, the target Main system bus shall be used. In
case the testing carries over to next unit, dummy
equipment may be used.
1.01.01 The Authorisation-To-Ship-Test (ATST) shall include all reasonable exercises which
the combination of equipment and software can be expected to perform. These tests
shall be divided into, as a minimum, but not limited to the following categories:
(a) Pre power on checks / Power
failure auto-restart tests
(b) Power on check
(c) Hardware tests
(d) Functional tests To be done only for the first unit (in
case of a multi-unit project). Only
if, under any unavoidable situation,
some exception remains,
functional / parametric tests for
only those shall be done in
subsequent unit
(e) Parametric test ---- do ----
1.01.02 Pre power on checks
These tests shall include but not be limited to the following:
(a.) Visual Checks:
These tests will include checking of individual cubicles, peripherals, etc. for
damages; proper inspection of cubicles, internal cabling, tuning, door
arrangements, louvers, fans etc.
(b.) Hardware verification:
These tests will include verification of location of each card and module in
Control System, MMIPIS, master clock systems, etc. Verification of no. of
modules as per the approved BOM and corresponding layout drgs. on sub
system basis. Verification of spare capacity in the cubicle for installation of
new modules.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
3 OF 10
(c.) Verification of system technical documentation as per approved list.
(d.) Verification of degree of protection of various cabinets as per specifica-
tion.
1.01.03 Power on check / Power failure auto-restart tests
To observe the start up and automatic loading initialization of software when system
is energised. Verification of availability of all system functions automatically after
restoration of power after power failure to DDCMIS. Verification of restoration of all
data which was stored in the system at the time of power loss.
1.01.04 Hardware tests
These tests shall include but not be limited to the following tests:
(a.) Verification of healthiness of all modules e.g., I/O modules, controller
modules, processors, peripherals, etc.
(b.) System configuration:
(1.) Verification of system configuration with reference to approved
configuration diagrams including verification of controller
configuration, group/ sub-group segregation; grouping of controllers
both for CLCS & OLCS , communication controller, I/O redundancy,
verification of multiple measurement scheme, MMIPIS configuration,
etc.
(2.) Verification of features of complete DDCMIS like on line removal of
I/O and controller modules, etc. in line with specification
requirements.
(3.) Verification of spare capacity w.r.t. spare wired-in space in
cabinets/ cubicles, terminal blocks, peripherals, etc. in line with spec.
requirements as stipulated under scope of work.
(c.) Simulation of inputs:
To verify conversion calculations, scan rates, operators functions,
corrections of calculations. For simulation of inputs for I/O modules, this
test will be carried out for 10% of each type of modules or min. 1 no. of
each type, whichever is more.
(d.) Accuracy test:
Accuracy for analog inputs/output shall be demonstrated for each type of
analog input/output. The No. of samples shall be decided during detailed
engineering.
(e.) Demonstration of the manual and auto switchover from master to standby
system bus, controllers, I/Os, processors etc.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
4 OF 10
(f.) Diagnostics Tests:
Complete on-line diagnostic tests on MMIPIS, individual peripherals,
Control System, programmer stations, etc.
1.01.05 Functional Tests
The following tests shall be carried out on Contractors DDCMIS.
(a.) Functional tests of CLCS:
(1.) Verification of proper signal acquisition, conditioning and
distribution.
(2.) Verification of proper realisation of controller functions like bumpless
transfer from auto to manual and vice versa (as stated above),
functional checking of bias circuit (wherever provided), etc.
(3.) Verification of response of control system by simulating changes in
the system inputs by using mathematical modelling of the process for
control loops like CCS, fuel flow control, air flow control, furnace draft
control, feed water control, SH/RH temperature control, etc., in line
with the approved ATST procedure
(4.) Sample verification of availability of all automatic CLCS functions
without HMIPIS.
(5.) Sample verification of availability of all CLCS functions within one
Functional Group without System Bus.
(b.) Functional tests of OLCS:
(1.) Verification of proper signal acquisition, conditioning and
distribution.
(2.) Verification of proper realisation of logic functions, sequence control
functions, running of complete start up program sequence in all
modes of operation, shut down program, etc.
(3.) Verification of logic computation in controller by simulating inputs.
(4.) Sample verification of availability of all automatic OLCS functions
without HMIPIS.
(5.) Sample verification of availability of all OLCS functions within one
Functional Group without System Bus.
(c.) Functional tests for MMIPIS
(1.) Verification of all types of displays, logs including their formats,
bar graphs, X-Y plots etc. availability of all operator functions.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
5 OF 10
(2.) Verification of event generation and handling capabilities of
MMIPIS processors by simulating various types of events/data and
observing associated event sequence display and alarm signalling
boxes.
(3.) Calculations:
All calculations shall be tested on sample basis to demonstrate that
these are in accordance with the specification and Employers
inputs as applicable. The Contractor shall prepare all tests cases for
calculations for proper verification for the features required for each
type of computations.
(4.) Checking historical storage and retrieval functions including long
term storage.
(5.) Testing of initialization and loading of configuration data,etc.
(6.) Verification of all programmers stations functions for MMIPIS and
Control System, as well as for documentation facility as specified.
(7.) For SER function, verification of resolution of SOE inputs, time
synchronisation with master clock, data base modification, SOE
report, printout, off-line & on line diagnostic features etc. For this
purpose a test-simulator to generate sequences of 1 ms resolution for
100 points distributed in different panels shall be made available
during testing.
(8.) Testing of each peripheral viz., monitors CRTs, printers, optical disks,
hard disk drive, floppy drive, etc.
(9.) Testing of power supply system to DDCMIS, tolerance of DDCMIS
w.r.t. voltage & frequency limits as specified, performance of DDCMIS
with power supply break as specified .(One sample of each type)
(10.) Verification of switchover of main processor/controller to stand by
processor/controller.
(11.) Testing of time synchronisation function of system time of DDCMIS
(Control System, HMIPIS & Systems on LAN). In case it is not
possible to bring the master clock procured under this package, then
signal generator with stable source, capable of generating all required
type of synchronizing signal to be arranged by Contractor.
(12.) Testing of the Station LAN shall be carried out with unit-1 testing. It
will cover one unit DDCMIS and at least 2 other DDCMIS systems, as
well as two client PCs and one third party PLC (either actual or
simulated to be organised by Employer).
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
6 OF 10
1.01.06 Parametric tests
Following tests shall be carried out to test Contractors DDCMIS w.r.t.
specification requirements.
(a.) For control system (CLCS+OLCS): (on two most heavily loaded Functional
group)
(1.) CPU loading
(2.) Cycle time/controller reaction time.
(3.) Memory spare capacity
(b.) For MMIPIS
(1.) CPU loading
(2.) Spare duty cycle
(3.) Spare memory capacity
(c.) Spare duty cycle for system bus
(d.) Various display response time
(e.) System accuracy
(f.) Demonstration of system reliability
(g.) Display update time on OWS LVS
Verification of availability of all system functions automatically after restoration of
power after power failure to DDCMIS. Verification of restoration of all data which
was stored in the system at the time of power loss.
1.01.07 The Contractor shall submit a detailed ATST procedure for Employers approval
during detailed engineering stage based on the above guidelines. The ATST pro-
cedure to be submitted by the Contractor shall be detailed and exhaustive enough
such that Employer is satisfied that all the DDCMIS System specification
requirements and features are being tested andthe system meets these
requirements. The test results obtained shall be properly documented by the
Contractor and furnished in the Employer approved format as decided during
detailed engg. And submitted in the requisite no. of copies with all annexures
irrespective of the fact that Employers representative was present during the tests.
1.01.08 The following minimum criteria shall be followed during all tests:
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
7 OF 10
1.02.00 Integrated Test Set-Up
For integrated testing of the total DDCMIS system, the Contractor shall employ a
test set-up, which will be capable of generating I/O signals in a requisite manner. It is
preferable to adopt soft signal simulating device to avoid / minimise the cumbersome
process of physical connection of I/Os through potentiometers, switches, Lamps/
LEDs etc. The exact configuration/ set-up shall be as finalised during detailed
engineering
1.02.01 The Contractor is to submit Authorisation-To-Ship-Test (ATST) procedure as a part
of Draft QA Programme fully meeting the intent and requirements of above and
other applicable clauses of this specification. Since, the exact definition & extent /
parameters of ATST can be finalised only when the engineering of DDCMIS has
been finalised to a great extent, it is required that the detailed draft ATST procedure
be submitted by the Contractor at a later date as intimated by the Employer during
engineering stage for Employers comment and finalisation. Contractor shall
incorporate all modifications, additions/ deletions to the ATST procedure as
indicated by the Employer. The ATST shall be conducted as per Employer approved
procedure for ATST which will be included in the approved QA Programme. The
Employer reserves the right to ask the Contractor to conduct any other test also
during the ATST which may be required to fully satisfy the Employer regarding full
compliance with specification requirements. Contractor shall conduct all such tests
also within the quoted lumpsum price for this contract.
1.02.02 The results of all ATS Tests shall be properly documented by the Contractor and
submitted to Employer in requisite number of copies with all annexures.
1.02.03 Following the tests, if in the opinion of the Employer, the system has not been
adequately manufactured, programmed, tested or debugged the Contractor shall
make good all deficiencies including system parametric specifications of display
response time, processor duty cycle, SOE resolution, etc., and re-run the test to fully
satisfy the Employer regarding full compliance with specification requirements and
requisite quality standards.
1.02.04 The system shall not be shipped without approval of Employer in writing.
1.02.05 Upon successful completion of Authorisation-To-Ship Test, the Employer will provide
the Contractor with a written authorisation for shipment of the system equipment to
the project site.
1.02.06 All final documentation as per requirement of this specification shall be available at
the time of Authorisation-To-Ship-Test and this shall be dispatched alongwith the
equipment in required number of copies.
1.02.07 Contractor shall note that no payments towards dispatch of equipment and
subsequent activities shall be due and payable to the Contractor till the Contractor is
able to successfully demonstrate to Employers satisfaction that the DDCMIS and
parts thereof fully meet the Authorisiation-To-Ship Test requirements.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
8 OF 10
DISTRIBUTED DIGITAL CONTROL MONITORING & INFORMATION SYSTEM
(DDCMIS)
TESTS
ITEMS
R
e
v
i
e
w
o
f
m
a
j
o
r
d
e
s
i
g
n
f
e
a
t
u
r
e
/
i
m
p
l
e
m
e
n
t
a
t
i
o
n
c
h
e
c
k
P
r
e
P
o
w
e
r
o
n
C
h
e
c
k
(
R
)
D
i
m
e
n
s
i
o
n
s
,
l
a
y
o
u
t
,
M
a
k
e
o
f
c
o
m
p
o
n
e
n
t
s
,
E
l
e
c
t
r
o
n
i
c
e
a
r
t
h
i
n
g
(
R
)
S
i
g
n
a
l
f
l
o
w
c
h
e
c
k
i
n
t
h
e
C
u
b
i
c
l
e
s
(
R
)
I
n
t
e
r
n
a
l
c
a
b
l
i
n
g
/
W
i
r
i
n
g
(
R
)
T
u
n
i
n
g
(
R
)
D
o
o
r
A
r
r
a
n
g
e
m
e
n
t
L
o
c
k
i
n
g
(
R
)
L
o
u
v
e
r
s
,
F
a
n
s
,
w
i
r
e
m
e
s
h
(
R
)
H
V
/
I
R
o
n
w
i
r
e
d
p
a
n
e
l
s
(
R
)
P
a
i
n
t
S
h
a
d
e
,
T
h
i
c
k
n
e
s
s
I
l
l
u
m
i
n
a
t
i
o
n
(
R
)
H
a
r
d
w
a
r
e
a
s
p
e
r
B
O
M
(
R
)
S
p
a
r
e
C
a
p
a
c
i
t
y
i
n
C
a
b
i
n
e
t
F
o
r
N
e
w
M
o
d
u
l
e
s
(
R
)
S
y
s
t
e
m
c
o
n
f
i
g
u
r
a
t
i
o
n
a
s
p
e
r
a
p
p
r
o
v
e
d
d
o
c
u
m
e
n
t
s
(
R
)
C
u
r
r
e
n
t
/
P
o
w
e
r
C
o
n
s
u
m
p
t
i
o
n
(
A
)
P
o
w
e
r
S
u
p
p
l
y
v
a
r
i
a
t
i
o
n
e
f
f
e
c
t
(
A
)
m
s
r
e
s
o
l
u
t
i
o
n
,
t
i
m
e
s
t
a
m
p
i
n
g
,
v
i
e
w
a
n
d
p
r
i
n
t
i
n
g
o
f
S
O
E
l
o
g
(
R
)
.
DDCMIS
Integrated
System
Y Y Y Y Y Y Y
DDCMIS
CUBICLES
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
MMI
Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Master Clock
Y Y Y Y Y Y Y Y Y Y Y
Programmer
Station
Y Y Y Y
Peripherals
Y Y
Sequence of
Event
Y Y Y
R-Routine Test A- Acceptance Test Y Test applicable
Note: 1) Detailed procedure of Environmental Stress Screening test shall be as per
Quality Assurance Programme in General Technical Conditions.
2) This is an indicative list of tests/checks. The manufacturer is to furnish a
detailed quality plan indicating the Practices and Procedure adopted
alongwith relevant supporting documents.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
9 OF 10
DISTRIBUTED DIGITAL CONTROL MONITORING & INFORMATION SYSTEM
(DDCMIS)
TESTS
ITEMS
H
e
a
l
t
h
i
n
e
s
s
o
f
a
l
l
m
o
d
u
l
e
s
(
R
)
H
e
a
l
t
h
i
n
e
s
s
,
f
u
n
c
t
i
o
n
a
l
c
h
e
c
k
f
o
r
P
e
r
i
p
h
e
r
a
l
s
(
R
)
V
e
r
i
f
i
c
a
t
i
o
n
o
f
S
y
s
t
e
m
c
o
n
f
i
g
u
r
a
t
i
o
n
(
R
)
O
n
L
i
n
e
R
e
m
o
v
a
l
o
f
I
/
O
m
o
d
u
l
e
s
.
(
R
)
O
n
l
i
n
e
r
e
m
o
v
a
l
o
f
c
o
n
t
r
o
l
l
e
r
m
o
d
u
l
e
s
(
R
)
A
c
c
u
r
a
c
y
&
r
e
p
e
a
t
a
b
i
l
i
t
y
t
e
s
t
o
f
a
n
a
l
o
g
c
a
r
d
s
(
R
)
E
n
v
i
r
o
n
m
e
n
t
a
l
S
t
r
e
s
s
S
c
r
e
e
n
i
n
g
t
e
s
t
(
R
)
D
i
a
g
n
o
s
t
i
c
t
e
s
t
s
.
(
R
)
S
i
m
u
l
a
t
i
o
n
o
f
i
n
p
u
t
s
(
R
)
F
u
n
c
t
i
o
n
a
l
t
e
s
t
s
(
s
i
g
n
a
l
a
c
q
u
i
s
i
t
i
o
n
,
c
o
n
d
i
t
i
o
n
i
n
g
d
i
s
t
r
i
b
u
t
i
o
n
c
o
n
t
r
o
l
l
e
r
f
u
n
c
t
i
o
n
s
)
v
e
r
i
f
i
c
a
t
i
o
n
s
o
f
l
o
o
p
/
l
o
g
i
c
f
u
n
c
t
i
o
n
s
.
B
u
m
b
l
e
s
t
r
a
n
s
f
e
r
o
f
A
/
M
s
t
a
t
i
o
n
r
e
s
p
o
n
s
e
t
i
m
e
o
f
l
o
o
p
s
(
A
)
T
h
i
c
k
n
e
s
s
(
R
)
R
e
s
p
o
n
s
e
t
i
m
e
f
o
r
d
i
s
p
l
a
y
s
(
A
)
V
e
r
i
f
i
c
a
t
i
o
n
o
f
D
i
s
p
l
a
y
s
L
o
g
s
,
F
o
r
m
a
t
,
g
r
a
p
h
s
,
A
c
c
u
r
a
c
y
o
f
M
a
s
t
e
r
c
l
o
c
k
s
y
s
t
e
m
(
R
)
C
h
e
c
k
f
o
r
b
r
i
g
h
t
n
e
s
s
,
s
h
a
r
p
n
e
s
s
,
c
o
l
o
r
/
c
o
n
t
r
a
s
t
a
d
j
u
s
t
m
e
n
t
s
,
l
a
m
p
l
i
f
e
c
o
u
n
t
e
r
(
R
)
DDCMIS
Integrated
System
Y Y Y Y Y Y
DDCMIS
CUBICLES
Y Y Y Y Y Y Y Y Y Y
MMI
Y Y Y Y Y Y Y Y Y Y Y
Master Clock
Y Y Y Y Y
Programmer
Station
Y Y Y
Peripherals
Y Y Y
Large video
screen
Y Y Y Y Y Y
R-Routine Test A- Acceptance Test Y Test applicable
Note: 1) Detailed procedure of Environmental Stress Screening test shall be as
per Quality Assurance Programme in General Technical Conditions.
2) This is an indicative list of tests/checks. The manufacturer is to furnish a
detailed quality plan indicating the Practices and Procedure adopted
alongwith relevant supporting documents.
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-23
DDCMIS
PAGE
10 OF 10
DISTRIBUTED DIGITAL CONTROL MONITORING & INFORMATION SYSTEM
(DDCMIS)
TESTS
ITEMS
C
a
l
c
u
l
a
t
i
o
n
s
(
R
)
E
v
e
n
t
h
a
n
d
l
i
n
g
S
0
E
,
a
l
a
r
m
f
u
n
c
t
i
o
n
s
(
R
)
H
i
s
t
o
r
i
c
a
l
L
o
n
g
t
e
r
m
S
t
o
r
a
g
e
&
r
e
t
r
i
e
v
a
l
f
u
n
c
t
i
o
n
s
(
R
)
R
e
d
u
n
d
a
n
c
y
o
f
C
o
n
t
r
o
l
l
e
r
(
R
)
R
e
d
u
n
d
a
n
c
y
o
f
P
r
o
c
e
s
s
o
r
(
R
)
R
e
d
u
n
d
a
n
c
y
o
f
P
o
w
e
r
S
u
p
p
l
y
(
R
)
S
p
a
r
e
M
e
m
o
r
y
C
a
p
a
c
i
t
y
(
R
)
C
P
U
L
o
a
d
i
n
g
D
u
t
y
C
y
c
l
e
(
R
)
R
e
d
u
n
d
a
n
c
y
o
f
S
y
s
t
e
m
B
u
s
(
R
)
C
R
T
u
p
D
a
t
e
T
i
m
e
(
R
)
P
o
w
e
r
F
a
i
l
u
r
e
A
u
t
o
R
e
s
t
a
r
t
(
R
)
S
y
s
t
e
m
A
c
c
u
r
a
c
y
(
A
)
E
n
g
i
n
e
e
r
s
/
P
r
o
g
r
a
m
m
i
n
g
f
u
n
c
t
i
o
n
s
(
A
)
R
e
d
u
n
d
a
n
c
y
o
f
o
t
h
e
r
d
e
v
i
c
e
s
a
s
d
e
f
i
n
e
d
o
n
T
i
m
e
s
y
n
c
h
r
o
n
i
z
a
t
i
o
n
(
A
)
DDCMIS
Integrated
System
Y Y Y Y Y Y Y Y Y Y Y Y Y Y
CLCS & OLCS
Y Y Y Y Y Y Y Y
MMI
Y Y Y Y Y Y Y Y Y Y Y Y
Master Clock
Y Y
Programmer
Station
Y Y
R-Routine Test A- Acceptance Test Y Test applicable
Note: 1) Detailed procedure of Environmental Stress Screening test shall be as
per Quality Assurance Programme in General Technical Conditions.
2) This is an indicative list of tests/checks. The manufacturer is to furnish
a detailed quality plan indicating the Practices and Procedure adopted
alongwith relevant supporting documents.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 24
MAIN EQUIPMENT RELATED CONTROL
AND INSTRUMENTATION SYSTEM
QUALITY ASSURANCE
E-24
MAIN EQP
INST SYS
PAGE
1 OF 1
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
MAIN EQUIPMENT RELATED CONTROL AND
INSTRUMENTATION SYSTEM
TG RELATED SPECIFIC INSTRUMENTATION & CONTROL
TESTS
ITEMS
TURBO SUPERVISORY/VIBRATION
MONITORING SYSTEM
Proximeter Y Y
Accelerometer Y Y
LVDT Y
Monitor Y Y*
Overal system Y Y Y Y Y
R-Routine Test A- Acceptance Test Y - Test applicable
Note: 1) Detailed procedure of Enviromental Stress Screening test shall be as per Quality
Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a detailed
quality plan indicating the Practices and Procedure adopted along with relevant
supporting documents.
* applicable for monitor electronics.
L
i
n
e
a
r
i
t
y
(
R
)
F
r
e
q
u
e
n
c
y
R
e
s
p
o
n
s
e
(
R
)
C
a
l
i
b
r
a
t
i
o
n
w
i
t
h
s
i
m
u
l
a
t
e
d
o
u
t
p
u
t
(
R
)
S
p
e
c
t
r
u
m
(
H
a
r
m
o
n
i
c
A
n
a
l
y
s
i
s
(
A
)
P
r
e
d
i
c
t
i
v
e
A
n
a
l
y
s
i
s
F
u
n
c
t
i
o
n
s
(
A
)
S
t
o
r
a
g
e
&
C
o
m
p
a
r
a
t
i
v
e
a
n
a
l
y
s
i
s
o
f
v
i
b
r
a
t
i
o
n
(
A
)
G
e
n
e
r
a
t
i
o
n
/
a
n
a
l
y
s
i
s
o
f
p
l
o
s
(
A
)
S
i
m
u
l
a
t
i
o
n
t
e
s
t
&
g
e
n
e
r
a
t
i
o
n
o
f
o
p
e
r
a
t
o
r
g
u
i
d
a
n
c
e
(
A
)
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 25
MEASURING INSTRUMENTS
(PRIMARY AND SECONDARY)
QUALITY ASSURANCE
E-25
MEAS. INST.
PAGE
1 OF 2
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
MEASURING INSTRUMENTS (PRIMARY AND SECONDARY)
TESTS
ITEMS
1. PR Gauge (IS-3624) Y Y Y Y Y
2. Temp. Gauge (BS-5235) Y Y Y Y Y
3. Pr./D.P.Switch(BS-6134) Y Y Y Y Y Y
4. Electronic Transmitter(IEC-770) Y Y Y Y Y Y
5. Temp. Switch Y Y Y Y Y Y
6. Recorder(IS-9319/ANSI C-39.4) Y Y Y Y Y Y
7. Vertical indicators Y Y Y Y Y
8. Digital Indicators Y Y Y Y Y
9. Integrators Y Y Y Y
10. Electrical Metering Instrument
(IS-1248) Y Y Y Y Y Y
11. Transducer (IEC-688) Y Y Y Y Y Y
12. Thermocouples (ANSI-MC-96.1) Y Y Y Y Y Y
13. RTD (IEC-751) Y Y Y Y Y Y
14. Thermowell Y Y Y Y Y
R-Routine Test A- Acceptance Test Y - Test applicable
Note: 1) Detailed procedure of Environmental Stress screening test shall be as per Quality
Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a detailed
quality plan indicating the Practices and Procedure adopted alongwith relevant
supporting documents.
D
i
m
e
n
s
i
o
n
s
(
R
)
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
(
R
)
P
r
o
c
e
s
s
/
E
l
e
c
t
r
i
c
a
l
c
o
n
n
e
c
t
i
o
n
(
R
)
C
a
l
i
b
r
a
t
i
o
n
(
R
)
T
e
s
t
a
s
p
e
r
s
t
a
n
d
a
r
d
(
R
)
I
n
s
u
l
a
t
i
o
n
R
e
s
i
s
t
a
n
c
e
(
R
)
I
B
R
C
e
r
t
i
f
i
c
a
t
i
o
n
(
i
f
a
p
p
l
i
c
a
b
l
e
)
(
R
)
H
y
d
r
o
T
e
s
t
(
R
)
M
a
t
e
r
i
a
l
T
e
s
t
c
e
r
t
i
f
i
c
a
t
e
QUALITY ASSURANCE
E-25
MEAS. INST.
PAGE
2 OF 2
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TESTS
ITEMS
15. Cold junction compensation Y Y Y Y Y
box
16. Orifice plate (BS-1042) Y Y Y Y* Y Y** Y** Y Y** Y
17. Flow nozzle (BS-1042) Y Y Y Y* Y Y Y Y Y Y
18. Impact head type element Y Y Y Y Y
19. Level transmitter/float type Y Y Y Y Y Y Y Y
switch
20. Flue Gas analyser Y Y Y Y
21. Dust emission monitors Y Y Y Y
* Calibration to be carried out on
one flow element of each type
and size if calibration carried
out as type test same shall not
be repeated.
** If applicable
R-Routine Test A- Acceptance Test Y - Test applicable
Note: 1) Detailed procedure of Environmental Stress screening test shall be as per Quality
Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a detailed
quality plan indicating the Practices and Procedure adopted alongwith relevant
supporting documents.
D
i
m
e
n
s
i
o
n
s
(
R
)
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
(
R
)
P
r
o
c
e
s
s
/
E
l
e
c
t
r
i
c
a
l
c
o
n
n
e
c
t
i
o
n
(
R
)
C
a
l
i
b
r
a
t
i
o
n
(
R
)
R
e
q
u
i
r
e
m
e
n
t
a
s
p
e
r
s
t
a
n
d
a
r
d
(
R
)
W
P
S
a
p
p
r
o
v
a
l
(
A
)
N
o
n
-
d
e
s
t
r
u
c
t
i
v
e
t
e
s
t
i
n
g
(
R
)
C
a
l
c
u
l
a
t
i
o
n
f
o
r
a
c
c
u
r
a
c
y
(
R
)
I
n
s
u
l
a
t
i
o
n
R
e
s
i
s
t
a
n
c
e
(
R
)
I
B
R
C
e
r
t
i
f
i
c
a
t
i
o
n
a
s
a
p
p
l
i
c
a
b
l
e
(
R
)
H
y
d
r
o
t
e
s
t
(
R
)
M
a
t
e
r
i
a
l
t
e
s
t
c
e
r
t
i
f
i
c
a
t
e
(
A
)
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 26
POWER SUPPLY SYSTEM
QUALITY ASSURANCE
E-26
POWER SUPPLY
PAGE
1 OF 2
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ELECTRIC POWER SUPPLY SYSTEM
ATTRIBUTRES/
CHARACTERISTICS
ITEMS/COMPONENTS
SUB-ASSEMBLY
BATTARY CHARGER
Rectifier Transformer (IS:2026) Y Y Y Y
Electronic Components Y Y
including Potentiometer
(Vernier Type)
PCB & Electronic Cards Y Y
19" standard racks for Y Y
electronic cards
Control & Selector Switches Y Y Y
(IS : 6875)
Indicating Meters (IS : 1248 ) Y Y Y
Indicating Lamps (IS: 13947) Y Y Y
Air Break Switches / Fuses Y Y Y
(IS : 13947 / 13703)
Control Terminal Blocks Y Y
(IS :13947)
Control Transformer Y Y Y
(IS : 12021)
Push Buttons (IS : 4794) Y Y Y
MCB (IS : 8828) Y Y Y
PVC insulated Copper control Y Y
wires (IS : 694)
Sheet Steel (IS : 513) Y Y Y Y
Synthetic Rubber Gaskets Y Y Y
Annunciator Y Y Y
Battery Charger Y Y Y Y Y Y Y Y Y
Not es: 1. Detailed procedure of Enviromental Stress Screening test shall be as per Quality Assurance
Programme in General Technical Conditions
2. This is an indicative list of tests / checks. The manufacturer is to furnish a detailed Quality
Plan indicating the Practice and procedure along with relevant supporting documents.
3. Makes of all major Bought Out Items will be subject to NTPC approval.
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
&
F
i
n
i
s
h
C
h
e
m
i
c
a
l
&
M
e
c
h
a
n
i
c
a
l
T
e
s
t
s
S
h
e
e
t
S
t
e
e
l
P
r
e
t
r
e
a
t
m
e
n
t
&
P
a
i
n
t
i
n
g
p
r
o
c
e
s
s
c
h
e
c
k
s
C
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
S
t
a
n
d
a
r
d
D
i
m
e
n
s
i
o
n
a
l
c
h
e
c
k
a
n
d
P
a
i
n
t
s
h
a
d
e
,
t
h
i
c
k
n
e
s
s
,
a
d
h
e
s
i
o
n
&
F
i
n
i
s
h
c
h
e
c
k
s
C
o
m
p
l
e
t
e
p
h
y
s
i
c
a
l
e
x
a
m
i
n
a
t
i
o
n
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
a
l
f
e
a
t
u
r
e
s
o
f
B
a
t
t
e
r
y
C
h
a
r
g
e
r
a
s
p
e
r
N
T
P
C
s
p
e
c
i
f
i
c
a
t
i
o
n
T
e
m
p
e
r
a
t
u
r
e
R
i
s
e
T
e
s
t
D
y
n
a
m
i
c
R
e
s
p
o
n
s
e
T
e
s
t
R
i
p
p
l
e
C
o
n
t
e
n
t
T
e
s
t
,
L
o
a
d
L
i
m
i
t
e
r
&
A
n
n
u
n
c
i
a
t
o
r
&
A
V
R
O
p
e
r
a
t
i
o
n
T
e
s
t
O
p
e
r
a
t
i
o
n
a
l
&
F
u
n
c
t
i
o
n
a
l
C
h
e
c
k
s
H
V
&
I
R
T
e
s
t
B
u
r
n
-
I
n
T
e
s
t
a
t
5
0
o
C
f
o
r
4
8
h
r
s
D
e
g
r
e
e
o
f
P
r
o
t
e
c
t
i
o
n
T
e
s
t
a
s
p
e
r
N
T
P
C
S
p
e
c
.
QUALITY ASSURANCE
E-26
POWER SUPPLY
PAGE
2 OF 2
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
POWER SUPPLY SYSTEM
TESTS
ITEMS
UPS/CONVERTER
(IEC-146 PT-4) Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
VOLTAGE STABILISER Y Y Y Y Y Y Y Y
LEAD ACID BATTERY
(TUBLAR)-IS-1651 Y
LEAD ACID BATTERY
(PLANTE)-IS-1652 Y
NICKEL CADMIUM BATTERY
(IS-10918/IEC-623) Y
R-Routine Test A- Acceptance Test Y - Test applicable
* Transfer time and Over shoot /under shoot during load & system transfer shall be recorded.
Note: 1) Detailed procedure of Environmental Stress Screening test shall be as per
Quality Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a detailed
quality plan indicating the Practices and Procedure adopted alongwith relevant
supporting documents.
V
i
s
u
a
l
/
d
i
m
e
n
s
i
o
n
/
r
a
t
i
n
g
/
P
a
i
n
t
A
d
h
e
s
i
o
n
/
T
h
i
c
k
n
e
s
s
(
R
)
G
e
n
e
r
a
l
a
r
r
a
n
g
e
m
e
n
t
/
B
O
M
/
m
a
k
e
o
f
c
o
m
p
o
n
e
n
t
s
/
M
i
m
i
c
E
f
f
i
c
i
e
n
c
y
,
r
e
g
u
l
a
t
i
o
n
(
R
)
I
n
p
u
t
v
o
l
t
a
g
e
v
a
r
i
a
t
i
o
n
(
A
)
O
u
t
p
u
t
v
o
l
t
a
g
e
a
n
d
f
r
e
q
u
e
n
c
y
a
d
j
.
r
a
n
g
e
(
A
)
P
r
e
m
i
l
i
n
a
r
y
l
i
g
h
t
l
o
a
d
t
e
s
t
(
R
)
L
o
a
d
t
r
a
n
s
f
e
r
r
e
t
r
a
n
s
f
e
r
t
e
s
t
(
R
)
*
A
C
i
n
p
u
t
f
a
l
i
u
r
e
a
n
d
r
e
t
u
r
n
t
e
s
t
(
R
)
P
a
r
a
l
l
e
l
o
p
e
r
a
t
i
o
n
a
n
d
c
u
r
r
e
n
t
d
i
v
i
s
o
n
(
R
)
R
e
l
a
t
i
v
e
h
a
r
m
o
n
i
c
c
o
n
t
e
n
t
(
R
)
R
e
s
t
a
r
t
w
i
t
h
P
R
I
A
.
C
a
n
d
b
a
t
t
e
r
y
(
s
e
p
a
r
a
t
e
l
y
)
(
R
)
S
y
s
t
e
m
t
r
a
n
s
f
e
r
a
n
d
r
e
t
r
a
n
s
f
e
r
(
R
)
*
A
s
y
n
c
h
r
o
n
o
u
s
t
r
a
n
s
f
e
r
(
R
)
R
i
p
p
l
e
c
o
n
t
e
n
t
(
R
)
L
o
a
d
l
i
m
i
t
e
r
o
p
e
r
a
t
i
o
n
(
R
)
I
R
/
H
V
(
R
)
T
e
s
t
s
a
s
p
e
r
s
t
a
n
d
a
r
d
&
s
p
e
c
i
f
i
c
a
t
i
o
n
(
R
)
&
(
A
)
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 27
PROCESS CONNECTION AND PIPING
QUALITY ASSURANCE
E-27
PCP
PAGE
1 OF 1
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
P
R
O
C
E
S
S
C
O
N
N
E
C
T
I
O
N
A
N
D
P
I
P
I
N
G
T
E
S
T
S
I
T
E
M
S
L
o
c
a
l
I
n
s
t
r
u
m
e
n
t
e
n
c
l
o
s
u
r
e
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
L
o
c
a
l
i
n
s
t
r
u
m
e
n
t
s
r
a
c
k
s
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
J
u
n
c
t
i
o
n
B
o
x
Y
Y
Y
Y
*
Y
Y
Y
G
a
u
g
e
B
o
a
r
d
Y
Y
Y
Y
Y
Y
Y
Y
Y
I
m
p
u
l
s
e
p
i
p
e
s
a
n
d
t
u
b
e
s
Y
Y
Y
Y
Y
S
o
c
k
e
t
w
e
l
d
f
i
t
t
i
n
g
s
A
N
S
I
B
-
1
6
.
1
1
Y
Y
Y
Y
Y
C
o
m
p
r
e
s
s
i
o
n
f
i
t
t
i
n
g
s
Y
Y
Y
Y
Y
Y
I
n
s
t
r
u
m
e
n
t
v
a
l
v
e
s
&
V
a
l
v
e
m
a
n
i
f
o
l
d
s
Y
Y
Y
Y
Y
C
o
p
p
e
r
t
u
b
i
n
g
s
A
S
T
M
B
7
5
Y
Y
Y
*
-
a
p
p
l
i
c
a
b
l
e
f
o
r
p
a
i
n
t
e
d
j
u
n
c
t
i
o
n
b
o
x
e
s
.
N
o
t
e
:
R
-
R
o
u
t
i
n
e
T
e
s
t
A
-
A
c
c
e
p
t
a
n
c
e
T
e
s
t
Y
-
T
e
s
t
a
p
p
l
i
c
a
b
l
e
N
o
t
e
:
T
h
i
s
i
s
a
n
i
n
d
i
c
a
t
i
v
e
l
i
s
t
o
f
t
e
s
t
s
/
c
h
e
c
k
s
.
T
h
e
m
a
n
u
f
a
c
t
u
r
e
r
i
s
t
o
f
u
r
n
i
s
h
a
d
e
t
a
i
l
e
d
q
u
a
l
i
t
y
p
l
a
n
i
n
d
i
c
a
t
i
n
g
t
h
e
P
r
a
c
t
i
c
e
s
a
n
d
P
r
o
c
e
d
u
r
e
a
d
o
p
t
e
d
a
l
o
n
g
w
i
t
h
r
e
l
e
v
a
n
t
s
u
p
p
o
r
t
i
n
g
d
o
c
u
m
e
n
t
s
.
V i s u a l
G A , B O M , L a y o u t o f c o m p o n e n t
& c o n s t r u c t i o n f e a t u r e
D i m e n s i o n
P a i n t S h a d e / t h i c k n e s s
F l a t t e n i n g , f l a r i n g , h y d r o t e s t , h a r d n e s s
c h e c k a s p e r A S T M s t a n d a r d ( A )
C o m p o n e n t R a t i n g s
W i r i n g
M a k e , M o d e l , T y p e , R a t i n g
I R & H V
R e v i e w o f T C f o r
i n s t r u m e n t / d e v i c e s ( R )
A c c e s s a b i l i t y o f T B s / D e v i c e s
I l l u m i n a t i o n , g r o u n d i n g
T u b i n g
L e a k / H y d r o t e s t ( A )
C h e m i c a l / p h y s i c a l p r o p e r t i e s o f m a t e r i a l ( A )
P r o o f p r e s s u r e t e s t , D i s m a n t l i n g & r e a s s e m b l y
t e s t , H y d r u l i c i m p u l s e a n d v i b r a t i o n t e s t ( R )
T e s t s a s p e r s t a n d a r d s & s p e c i f i c a t i o n
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 28
INSTRUMENTATION CABLES
CLAUSE NO.
QUALITY ASSURANCE
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
E-28
INSTRUMENTATION
CABLES
PAGE
1 OF 1
INSTRUMENTATION CABLE
TESTS
ITEMS
C
o
n
d
u
c
t
o
r
R
e
s
i
s
t
a
n
c
e
&
(
A
)
H
i
g
h
V
o
l
t
a
g
e
&
(
A
)
I
n
s
u
l
a
t
i
o
n
R
e
s
i
s
t
a
n
c
e
&
(
A
)
C
o
n
s
t
r
u
c
t
i
o
n
a
l
d
e
t
a
i
l
,
d
i
m
e
n
s
i
o
n
s
(
A
)
O
u
t
e
r
-
S
h
e
a
t
h
e
/
c
o
r
e
m
a
r
k
i
n
g
,
e
n
d
s
e
a
l
i
n
g
(
A
)
T
h
e
r
m
a
l
S
t
a
b
i
l
i
t
y
(
A
)
+
V
i
s
u
a
l
,
S
u
r
f
a
c
e
f
i
n
i
s
h
(
A
)
+
E
l
e
c
t
r
i
c
a
l
P
a
r
a
m
e
t
e
r
s
*
*
(
A
)
+
P
e
r
s
u
l
p
h
a
t
e
T
e
s
t
(
A
)
+
O
v
e
r
a
l
l
/
C
o
v
e
r
a
g
e
/
C
o
n
t
i
n
u
i
t
y
(
A
)
S
w
i
d
e
s
h
c
h
i
m
n
e
y
T
e
s
t
(
S
S
-
4
2
4
1
4
7
5
)
(
A
)
+
+
F
R
L
S
T
e
s
t
*
(
A
)
+
+
T
e
n
s
i
l
e
&
E
l
o
n
g
a
t
i
o
n
b
e
f
o
r
e
&
a
f
t
e
r
a
g
i
n
g
(
A
)
+
+
V
o
l
.
R
e
s
i
s
t
i
v
i
t
y
.
a
t
r
o
o
m
&
E
l
e
v
a
t
e
d
T
e
m
p
.
(
A
)
+
+
S
p
a
r
k
t
e
s
t
r
e
p
o
r
t
r
e
v
i
e
w
1. Instrument cable
twisted and shielded
Conductor(IS-8130) Y Y Y
Insulation(VDE-207) Y Y Y Y Y Y
Pairing/Twisting Y Y Y
Shielding Y Y Y
Drain wire Y Y Y Y Y
Inner Sheath Y Y Y Y Y Y
Outer Sheath Y Y Y Y Y Y
Over all cable Y Y Y Y Y Y Y Y Y
Cable Drums(IS-
10418)
Y Y
Note : High Temp. cables shall be subjected to tests as per VDE-207(Part-6) Compensating
cables shall be checked for Thermal EMF/Endurance test as per IS 8784.
Note : This is an indicative list of tests/checks. The manufacture is to furnish a detailed Quality
Plan indicating his practice & Procedure along with relevant supporting documents during QP
finalization for all items.
Note : - Routine Test A - Acceptance Test Y - Test Applicable
Note : Sampling Plan for Acceptance test shall be as per IS 8784 (As applicable)
* FRLS Tests: Oxygen / Temp Index ( ASTM D-2863), Smoke Density Rating ( ASTM D
2843), HCL Emission ( IEC-754-1)
** Characterisitic Impedence, Attenuation, Mutual Capacitance, Cross Talk ( As applicable)
+ Sample size will be One No. of each size/type per lot.
++Sample size will be One No. sample for complete lot offered irrespective of size/type.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 29
CONTROL VALVES
QUALITY ASSURANCE
E-29
CONTROL VALVES
AND ACTUATORS
PAGE
1 OF 1
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CONTROL VALVES AND ACTUATORS
CONTROL VALVE ACTUATORS AND ACCESSOIRES
TESTS
ITEMS
CONTROL VALVE AND
ACTUATOR
Overall Y Y Y Y Y Y Y Y Y
Body Y Y Y Y Y Y Y
Bonnet Y Y Y Y
Trim Y Y Y*
Pneumatic actuator Y Y Y
R- Routine Test A - Acceptance Test Y - Test Applicable
Y* - UT on spindle dia >= 40 mm.
Note : 1) Detailed procedure of Environmental Stress Screening test shall be as per
Quality Assurance Programme General Technical Conditions
2) This is an indicative list of tests/checks. The manufacture is to furnish a detailed
Quality Plan indicating his practice & Procedure along with relevant supporting
documents during QP finalisation for all item.
M
a
k
e
,
m
o
d
e
l
,
t
a
g
(
R
)
D
i
m
e
n
s
i
o
n
S
u
r
f
a
c
e
f
i
n
i
s
h
H
e
a
t
T
r
e
a
t
m
e
n
t
M
a
t
e
r
i
a
l
T
e
s
t
C
e
r
t
i
f
i
c
a
t
e
s
I
B
R
C
e
r
t
i
f
i
c
a
t
e
s
H
y
d
r
a
u
l
i
c
T
e
s
t
U
T
/
R
a
d
i
o
g
r
a
p
h
y
f
o
r
>
9
0
0
l
b
r
a
t
i
n
g
M
P
I
/
D
P
P
r
e
s
s
u
r
e
R
e
s
i
s
t
a
n
c
e
S
e
a
t
l
e
a
k
a
g
e
T
i
m
i
n
g
O
p
e
n
/
C
l
o
s
e
L
i
n
e
a
r
i
t
y
/
H
y
s
t
e
r
i
s
i
s
F
u
n
c
t
i
o
n
a
l
T
e
s
t
,
r
e
v
i
e
w
f
o
r
m
a
k
e
a
n
d
T
C
o
f
a
c
c
e
s
s
o
r
i
e
s
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 30
ELECTRIC ACTUATORS
QUALITY ASSURANCE
E-30
ELECTRIC
ACTUATOR
PAGE
1 OF 1
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ELECTRICAL ACTUATORS WITH INTEGRAL STARTER
TEST/ATTRIBUTES
CHARACTERISTICS
ITEM/COPONENT/
SUB SYSTEM
ASSEMBLY/TESTING
ELECTRICAL ACTUATOR
WITH INTEGRAL
STARTER(IS-9334)
Motor Y Y Y Y Y
Final Testing Y Y Y Y Y Y Y Y Y Y Y Y Y
Note: 1) Detailed procedure of Environmental Stress Screeing test shall be as per Quality
Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a detailed
quality plan indicating the practices and procedure adopted along with relevant
supporting documents.
- Routine Test (A) - Acceptance Test Y - Test applicable
R
P
M
N
o
L
o
a
d
C
u
r
r
e
n
t
I
R
&
H
V
T
e
s
t
M
o
u
n
t
i
n
g
D
i
m
e
n
s
i
o
n
A
l
l
r
o
u
t
i
n
e
T
e
s
t
a
s
p
e
r
S
t
a
n
d
a
r
d
&
S
p
e
c
i
f
i
c
a
t
i
o
n
C
o
r
r
e
c
t
P
h
a
s
e
S
e
q
u
e
n
c
e
O
p
e
r
a
t
i
o
n
&
S
e
t
t
i
n
g
o
f
l
i
m
i
t
S
w
i
t
c
h
/
T
o
r
q
u
e
S
w
i
t
c
h
S
t
a
l
l
T
o
r
q
u
e
/
C
u
r
r
e
n
t
(
A
)
H
a
n
d
W
h
e
e
l
o
p
e
r
a
t
i
o
n
/
A
u
t
o
d
e
c
l
u
t
c
h
f
u
n
c
t
i
o
n
(
A
)
F
u
n
c
t
i
o
n
o
f
A
u
x
.
l
i
k
e
P
o
t
e
n
t
i
o
m
e
t
e
r
,
s
p
a
c
e
h
e
a
t
e
r
,
p
o
s
i
t
i
o
n
i
n
d
i
c
a
t
o
r
E
P
T
o
u
t
p
u
t
G
r
e
a
s
e
l
e
a
k
a
g
e
L
o
c
a
l
/
R
e
m
o
t
e
(
O
p
e
n
-
S
t
o
p
-
C
l
o
s
e
)
O
p
e
r
a
t
i
o
n
S
a
f
e
t
y
c
h
e
c
k
(
S
i
n
g
l
e
p
h
a
s
i
n
g
,
P
h
a
s
e
c
o
r
r
e
c
t
i
o
n
,
T
r
i
p
p
i
n
g
e
t
c
.
)
(
A
)
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
E - 31
AUXILIARY PLANT CONTROL
QUALITY ASSURANCE
E-31
AUX. PLANT
CTRL
PAGE
1 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
C
O
N
T
R
O
L
A
N
D
I
N
S
T
R
U
M
E
N
T
A
T
I
O
N
F
O
R
P
L
A
N
T
A
U
X
I
L
I
A
R
Y
S
Y
S
T
E
M
S
P
R
O
G
R
A
M
M
A
B
L
E
L
O
G
I
C
C
O
N
T
R
O
L
L
E
R
T
E
S
T
S
I
T
E
M
S
1
.
P
L
C
P
a
n
e
l
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
2
.
C
o
n
t
r
o
l
D
e
s
k
W
i
t
h
P
L
C
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
o
t
e
:
1
)
D
e
t
a
i
l
e
d
p
r
o
c
e
d
u
r
e
o
f
E
n
v
i
r
o
n
m
e
n
t
a
l
S
t
r
e
s
s
S
c
r
e
e
n
i
n
g
t
e
s
t
s
h
a
l
l
b
e
a
s
p
e
r
Q
u
a
l
i
t
y
A
s
s
u
r
a
n
c
e
P
r
o
g
r
a
m
m
e
i
n
G
e
n
e
r
a
l
T
e
c
h
n
i
c
a
l
C
o
n
d
i
t
i
o
n
s
2
)
T
h
i
s
i
s
a
n
i
n
d
i
c
a
t
i
v
e
l
i
s
t
o
f
t
e
s
t
/
c
h
e
c
k
s
.
T
h
e
m
a
n
u
f
a
c
t
u
r
e
r
i
s
t
o
f
u
r
n
i
s
h
a
d
e
t
a
i
l
e
d
q
u
a
l
i
t
y
p
l
a
n
i
n
d
i
c
a
t
i
n
g
t
h
e
P
r
a
c
t
i
c
e
a
n
d
P
r
o
c
e
d
u
r
e
a
l
o
n
g
w
i
t
h
r
e
l
e
v
a
n
t
s
u
p
p
o
r
t
i
n
g
d
o
c
u
m
e
n
t
s
.
*
A
p
p
l
i
c
a
b
l
e
f
o
r
P
L
C
Y
-
T
e
s
t
A
p
p
l
i
c
a
b
l
e
,
-
R
o
u
t
i
n
e
T
e
s
t
(
A
)
-
A
c
c
e
p
t
a
n
c
e
T
e
s
t
V i s u a l
G A , B O M , L a y O u t o f c o m p o n e n t s
D i m e n s i o n s
P a i n t S h a d e / T h i c k n e s s / A d h e s i o n
A l i g n m e n t o f S e c t i o n
C o m p o n e n t R a t i n g / M a k e / T y p e
W i r i n g
I R & H V
R e v i e w o f T C f o r i n s t r u m e n t s / D e v i c e s / R e c o r d e r s ,
I n d i c a t o r s / M o s a i c I t e m s / T r a n s d u c e r s
A c c e s s i b i l i t y o f T B S / D e v i c e s
I l l u m i n a t i o n
F u n c t i o n a l C h e c k f o r C o n t r o l E l e m e n t , A n n u n c i a t i o n
M i m i c
T e s t a s p e r I E C 1 1 3 1 *
T e s t a s p e r S t d & ( A )
QUALITY ASSURANCE
E-31
AUX. PLANT
CTRL
PAGE
2 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ATTRIBUTES/
CHARACTERISTICS
ITEMS/COMPONENTS/
SUB-ASSEMBLY
BATTARY CHARGER
Rectifier Transformer
(IS:2026) Y Y Y Y
Electronic Components
including Potentiometer
(Vernier Type) Y Y
PCB & Electronic Cards Y Y
19" standard racks for
electronic cards Y Y
Control & Selector Switches
(IS : 6875) Y Y Y
Indicating Meters (IS : 1248 ) Y Y Y
Indicating Lamps (IS: 13947) Y Y Y
Air Break Switches / Fuses
(IS : 13947 / 13703 ) Y Y Y
Control Terminal Blocks
(IS :13947) Y Y
Control Transformer
(IS : 12021) Y Y Y
Push Buttons (IS:4794) Y Y Y
MCB (IS : 8828) Y Y Y
PVC insulated Copper
control wires (IS : 694 ) Y Y
Sheet Steel ( IS : 513 ) Y Y Y Y
Synthetic Rubber Gaskets Y Y Y
Annunciator Y Y Y
Battery Charger Y Y Y Y Y Y Y Y Y
Notes: 1. Detailed procedure of Environmental Stress Screening test shall be as per
Quality Assurance Programme in General Technical Conditions
2. This is an indicative list of tests / checks. The manufacturer is to furnish a
detailed Quality Plan indicating the Practice and procedure along with relevant
supporting documents.
3. Makes of all major Bought Out Items will be subject to NTPC approval.
M
a
k
e
,
M
o
d
e
l
,
T
y
p
e
,
R
a
t
i
n
g
&
F
i
n
i
s
h
C
h
e
m
i
c
a
l
&
M
e
c
h
a
n
i
c
a
l
T
e
s
t
s
S
h
e
e
t
S
t
e
e
l
P
r
e
t
r
e
a
t
m
e
n
t
&
P
a
i
n
t
i
n
g
p
r
o
c
e
s
s
c
h
e
c
k
s
C
o
n
f
o
r
m
t
o
r
e
l
e
v
a
n
t
S
t
a
n
d
a
r
d
D
i
m
e
n
s
i
o
n
a
l
c
h
e
c
k
a
n
d
P
a
i
n
t
s
h
a
d
e
,
t
h
i
c
k
n
e
s
s
,
a
d
h
e
s
i
o
n
&
F
i
n
i
s
h
c
h
e
c
k
s
C
o
m
p
l
e
t
e
p
h
y
s
i
c
a
l
e
x
a
m
i
n
a
t
i
o
n
f
o
r
c
o
n
s
t
r
u
c
t
i
o
n
a
l
f
e
a
t
u
r
e
s
o
f
B
a
t
t
e
r
y
C
h
a
r
g
e
r
a
s
p
e
r
N
T
P
C
s
p
e
c
i
f
i
c
a
t
i
o
n
T
e
m
p
e
r
a
t
u
r
e
R
i
s
e
T
e
s
t
D
y
n
a
m
i
c
R
e
s
p
o
n
s
e
T
e
s
t
R
i
p
p
l
e
C
o
n
t
e
n
t
T
e
s
t
,
L
o
a
d
L
i
m
i
t
e
r
&
A
n
n
u
n
c
i
a
t
o
r
&
A
V
R
O
p
e
r
a
t
i
o
n
T
e
s
t
O
p
e
r
a
t
i
o
n
a
l
&
F
u
n
c
t
i
o
n
a
l
C
h
e
c
k
s
H
V
&
I
R
T
e
s
t
B
u
r
n
-
I
n
T
e
s
t
a
t
5
0
^
C
f
o
r
4
8
h
r
s
D
e
g
r
e
e
o
f
P
r
o
t
e
c
t
i
o
n
T
e
s
t
a
s
p
e
r
N
T
P
C
S
p
e
c
.
QUALITY ASSURANCE
E-31
AUX. PLANT
CTRL
PAGE
3 OF 3
CLAUSE NO.
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
POWER SUPPLY SYSTEM
TEST
ITEMS
UPS/CONVERTER
(IEC-146 PT-4) Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
VOLTAGE STABILISER Y Y Y Y Y Y Y Y
LEAD ACID BATTERY
(TUBLAR)-IS-1651 Y
LEAD ACID BATTERY
(PLANTE)-IS-1652 Y
NICKEL CADMIUM
BATTERY
(IS-10918/IEC-623) Y
R-Routine Test A- Acceptance Test Y - Test applicable
* Transfer time and Over shoot /under shoot during load & system transfer shall be
recorded.
Note: 1) Detailed procedure of Environmental Stress Screening test shall be as per
Quality Assurance Programme in General Technical Conditions
2) This is an indicative list of tests/checks. The manufacturer is to furnish a
detailed quality plan indicating the Practices and Procedure adopted alongwith
relevant supporting documents.
V
i
s
u
a
l
/
d
i
m
e
n
s
i
o
n
/
r
a
t
i
n
g
/
P
a
i
n
t
A
d
h
e
s
i
o
n
/
T
h
i
c
k
n
e
s
s
(
R
)
G
e
n
e
r
a
l
a
r
r
a
n
g
e
m
e
n
t
/
B
O
M
/
m
a
k
e
o
f
c
o
m
p
o
n
e
n
t
s
/
M
i
m
i
c
E
f
f
i
c
i
e
n
c
y
,
r
e
g
u
l
a
t
i
o
n
(
R
)
I
n
p
u
t
v
o
l
t
a
g
e
v
a
r
i
a
t
i
o
n
(
A
)
O
u
t
p
u
t
v
o
l
t
a
g
e
a
n
d
f
r
e
q
u
e
n
c
y
a
d
j
.
r
a
n
g
e
(
A
)
P
r
e
m
i
l
i
n
a
r
y
l
i
g
h
t
l
o
a
d
t
e
s
t
(
R
)
L
o
a
d
t
r
a
n
s
f
e
r
r
e
t
r
a
n
s
f
e
r
t
e
s
t
(
R
)
*
A
C
i
n
p
u
t
f
a
l
i
u
r
e
a
n
d
r
e
t
u
r
n
t
e
s
t
(
R
)
P
a
r
r
a
l
e
l
o
p
e
r
a
t
i
o
n
a
n
d
c
u
r
r
e
n
t
d
i
v
i
s
o
n
(
R
)
R
e
l
a
t
i
v
e
h
a
r
m
o
n
i
c
c
o
n
t
e
n
t
(
R
)
R
e
s
t
a
r
t
w
i
t
h
P
R
I
A
.
C
a
n
d
b
a
t
t
e
r
y
(
s
e
p
a
r
a
t
e
l
y
)
(
R
)
S
y
s
t
e
m
t
r
a
n
s
f
e
r
a
n
d
r
e
t
r
a
n
s
f
e
r
(
R
)
*
A
s
y
n
c
h
r
o
n
o
u
s
t
r
a
n
s
f
e
r
(
R
)
R
i
p
p
l
e
c
o
n
t
e
n
t
(
R
)
L
o
a
d
l
i
m
i
t
e
r
o
p
e
r
a
t
i
o
n
(
R
)
I
R
/
H
V
(
R
)
T
e
s
t
s
a
s
p
e
r
s
t
a
n
d
a
r
d
&
s
p
e
c
i
f
i
c
a
t
i
o
n
(
R
)
&
(
A
)
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PRE-COMMISSIONING AND
COMMISSIONING
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 1 OF 22
PRE-COMMISSIONING ACTIVITIES, COMMISSIONING OF FACILITIES AND INITIAL
OPERATIONS
1.00.00 GENERAL
1.01.00 The pre-commissioning and commissioning activities including Guarantee tests, checks and
initial operations of the equipment furnished and installed by the Contractor shall be the
responsibility of the Contractor as detailed in relevant clauses in Technical Specification. The
Contractor shall provide, in addition, test instruments, calibrating devices, etc. and labour
required for successful performance of these operations. If it is anticipated that the above
test may prolong for a long time, the Contractor's workmen required for the above test shall
always be present at Site during such operations.
1.02.00 It shall be the responsibility of the Contractor to provide all necessary temporary
instrumentation and other measuring devices required during start-up and initial operation of
the equipment systems which are installed by him. The Contractor shall also be responsible
for flushing & initial filling of all oils & lubricants required for the equipment furnished and
installed by him so as to make such equipment ready for operation. The Contractor shall be
responsible for supplying such flushing oil and other lubricants unless otherwise specified
elsewhere in these specifications & documents.
1.03.00 The Contractor upon completion of installation of equipments and systems, shall conduct
precommissioning and commissioning activities, to make the facilities ready for sustained
safe, reliable and efficient operation. All precommissioning/ commissioning activities
considered essential for such readiness of the facilities including those mutually agreed and
included in the Contractors quality assurance programme as well as those indicated in
clauses elsewhere in the technical specifications shall be performed by the Contractor.
2.00.00 TESTING / COMMISSIONING SCHEDULE
The Contractor shall submit to the Employer, his testing/ commissioning schedules for
various equipments/ systems covered under the contract, for approval, at least 18 months
before the actual commissioning of the equipment/ systems.
The testing/ commissioning schedule is required to be of a standard format in order to
maintain consistency of presentation, content and reporting. The list of documents and
commissioning checks to be submitted and their content details shall be agreed upon during
preaward discussions.
The list of model commissioning documents viz. standard checklists, testing/ commissioning
schedules, commissioning tests and checks and the details regarding contents of testing/
commissioning schedule are indicated in this chapter. These schedules are indicative only.
(i) Testing Schedules & Commissioning Schedules.
(ii) Standard Checklist of Items.
(iii) Commissioning Test and checks
(iv) Brief write-up on Contents of Testing Schedule.
Procedures/ Schedule shall be approved by the Employer.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 2 OF 22
3.00.00 PRECOMMISSIONING & COMMISSIONING ACTIVITIES
3.01.00 General
The pre-commissioning activities including some of the important checks & tests for certain
major equipment/ systems (as a minimum) are described below, although it is the
Contractor's responsibility to draw up a detailed sequential & systematic list of checks / tests
and various activities / procedures connected with pre-commissioning of the complete
facilities with all systems, sub-systems and equipment supplied and installed by him and get
the same approved by the Employer.
3.02.00 DEMONSTRATION DURING COMMISSIONING
The following test shall be demonstrated during commissioning. Bidder has to furnish the
procedure and get the approval of employer.
3.02.01 Start-up, Loading, Unloading and Shutdown Capabilities (For Turbine Generator)
(i) Unit Start Up
Start-up time (upto full load), and loading capabilities for the Turbine Generator
together for cold start conditions (greater than 36 hours shutdown), warm start
conditions (between 8 and 36 hours shutdown) and hot start conditions (less than 8
hours shutdown) as indicated by the Contractor in the offer and accepted by the
EMPLOYER shall be demonstrated, ensuring that the various turbine operational
parameters like vibration, absolute and differential expansion, eccentricity and
steam-metal temperature mismatch etc. are within design limits.
(ii) Sudden Total Loss of External Load
On occasions, the steam turbine generator unit may experience sudden total loss of
all external load. Under these conditions, the steam turbine generator unit shall not
trip for reasons attributable to the contractor but shall continue to be in operation
under the control of its speed governor to supply power for the plant auxiliary load
with HP-LP bypass in operation while staying within the agreed limits of steam to
metal temperature mismatch, exhaust hood temperature, absolute and differential
expansion, vibration and eccentricity. The same shall be demonstrated. Further, the
provisions of Part-B, Section-VI, shall also be complied with.
(iii) Steam Metal Temperature Mismatch Limitation
The steam-metal temperature differential for cold, warm and hot start up , loading /
unloading and shutdown conditions shall be within the permissible limits indicated by
the Bidder in the offer and accepted by the Employer.
3.02.02 Turbine Generator Set Capability
The steam turbine generator unit shall be capable of delivering at generator terminals the
output as indicated by the BIDDER in the heat balances submitted alongwith his bid, under
the following conditions.
(a) Maximum continuous output at generator terminals corresponding to both strings of
HP heaters out of operation, under rated steam conditions, at a condenser pressure
of 77 mm of Hg (Abs) and 3% make up.
NOTE: While conducting the tests of (a) above the condenser pressure measurement shall
be done at 300mm above the top row of condenser tubes.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 3 OF 22
3.02.03 Turbine Auxiliaries
(i) H.P./L.P. Bypass Capabilities
The HP & LP Bypass system should satisfy the following functional requirements
under automatic interlock action. It should come into operation automatically under
the following conditions :
(a) Generator circuit breaker opening.
(b) HP - IP stop valves closing due to turbine tripping.
(c) Sudden reduction in demand to house load.
Under all these conditions, while passing the required steam flows as per the
relevant heat balances, the condenser should be able to swallow the entire steam
without increasing the exhaust hood temperature and condenser pressure beyond
the maximum permissible value indicated by the BIDDER in his offer and accepted
by the EMPLOYER. The same shall be demonstrated.
(ii) Steam Condensing Plant for main turbine
(a) Temperature of condensate, at outlet of condenser, shall not be less than
saturation temperature corresponding to the condenser pressure at all loads.
(b) Oxygen content in condensate, at hotwell outlet, shall not exceed 0.015 CC
per litre over the entire load range and shall be determined according to
calorimetric Indigo - Carmine method.
(c) Air leakage in the condenser under full load condition shall not exceed more
than 50% of design value taken for sizing the condenser air evacuation
system.
(d) When one half of the condenser is isolated, condenser shall be capable of
taking at least 60% T.G. load under EMCR conditions.
(e) The capacity of each vacuum pump in free dry air under standard conditions
at a condenser pressure of 25.4 mm Hg (abs) and sub cooled to 4.17 deg.C
below the temperature corresponding to absolute suction pressure shall not
be less than 30 SCFM. Correction curves for establishing the capacity at site
conditions shall also be furnished.
(f) The air and vapour mixture from air cooling zone of condenser shall be 4.17
deg.C below the saturation temperature corresponding to 25.4 mm Hg (abs)
suction pressure. Correction curves for establishing the same at site
conditions shall also be furnished.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 4 OF 22
(iii) Steam Condensing Plant for drive turbine condenser (if envisaged)
(a) Temperature of condensate, at outlet of condenser, shall not be less than
saturation temperature corresponding to the condenser pressure at all loads.
(b) Air leakage in the condenser under full load condition shall not exceed more
than 50% of design value taken for sizing the condenser air evacuation
system.
(c) The capacity of each vacuum pump in free dry air under standard conditions
at a condenser pressure of 25.4 mm Hg (abs) and sub cooled to 4.17 deg.C
below the temperature corresponding to absolute suction pressure shall be
demonstrated. Correction curves for establishing the capacity at site
conditions shall also be furnished.
(d) The air and vapour mixture from air cooling zone of condenser shall be 4.17
deg.C below the saturation temperature corresponding to 25.4 mm Hg (abs)
suction pressure. Correction curves for establishing the same at site
conditions shall also be furnished.
(iv) Feed water heaters & Deaerator
(a) TTD's and DCA's of feed water heaters in line with 660 MW heat rate
guarantee heat balance shall be demonstrated.
(b) Difference between saturation temperature of steam entering the deaerator
and temperature of feed water leaving deaerator.
(v) Condensate Extraction Pumps
(a) Each CEP set shall be capable of delivering flow & total dynamic head
corresponding to runout point as specified.
(b) The vibration, noise level and parallel operation of any two of the three
pumps shall be demonstrated.
(vi) Drip Pumps (if envisaged)
(a) Each drip pump shall be capable of delivering flow & total dynamic head
corresponding to design point as specified.
(b) The vibration and noise level shall be demonstrated.
(vii) Boiler feed pumps
(a) Each boiler feed pump set shall be capable to deliver flow and total dynamic
head corresponding to runout point as specified elsewhere.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 5 OF 22
(b) The vibration, noise level and parallel operation of any two of the three
pumps shall be demonstrated as per specification requirements.
(c) Cold start up / hot start up of the unit using TDBFP with motive steam from
auxiliary steam header.
3.02.04 Balance Pumps, Blowers, Fans, Compressors and rotating equipment.
a) The vibration, noise level and parallel operation, wherever applicable, of the pumps,
blowers, fans, compressors and rotating equipment shall be demonstrated.
b) Pumps, blowers, fans, compressors and rotating equipment shall be capable of
delivering flow and head corresponding to design point as specified.
3.02.05 Pre-commissioning & Commissioning acti vities requiring approval of the employer:
(a) Hydraulic Test for STG integral piping, heat exchangers, condenser tubes &
condenser, equipment cooling water system pipes and associated equipment etc.
shall be done. The hydraulic test of other piping system as per statutory requirement
and specified elsewhere shall also be carried out. All equipment needed for the tests
shall be furnished by the Contractor.
(b) Oil flushing of lube oil system, control & jacking oil system, etc. for turbines shall be
done. Entire flushing oil requirement & refilling with fresh oil and other consumables
along with flushing equipment shall be met by the Contractor.
(c) High Pressure/Low Pressure (HP/LP) bypass tests, vacuum tightness test as per
approved procedures shall be done by the Contractor after arranging & lining up of
all the necessary equipment by him.
(d) Steam blowing & chemical cleaning, as applicable of integral piping of the turbo-
generator, Low pressure piping, Power cycle piping & other piping in the scope of the
Contractor shall be done by the Contractor.
(e) Steam blowing & chemical cleaning, as applicable of integral piping of CEP sets &
other piping in the scope of the Contractor shall be done by the Contractor.
(f) All tests and activities pertaining to the CEP and its drive as per manufacturer's
recommendations and as given in the chapter and covered in the specification.
(g) Steam blowing & chemical cleaning, as applicable of integral piping of Drip Pump
sets & other piping (if applicable) in the scope of the Contractor shall be done by the
Contractor.
(h) All tests and activities pertaining to the Drip Pump and its drive (if applicable) as per
manufacturers recommendations and as given in the chapter and covered in the
specification.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 6 OF 22
(i) Hydraulic Test for heat exchangers and associated equipment etc. shall be done.
The hydraulic test of other piping system as per statutory requirement and specified
elsewhere shall also be carried out. All equipment needed for the tests shall be
furnished by the Contractor.
(j) Steam blowing & chemical cleaning, as applicable of integral piping of the Heaters &
other components in the scope of the Contractor shall be done by the Contractor.
(k) All tests and activities pertaining to the Heater as per manufacturer's
recommendations and as given in the chapter and covered in the specification.
(l) Hydraulic test for equipments and associated system shall be done. The hydraulic
test of other piping systems as per statutory requirement and specified elsewhere
shall also be carried out. All equipment needed for test shall be furnished by the
contractor.
(m) Oil flushing of lube oil system, control & jacking oil system, for BFP sets shall be
done. Entire flushing oil requirement & refilling with fresh oil and other consumables
alongwith flushing equipment shall be met by the Contractor.
(n) Steam blowing & chemical cleaning, as applicable of integral piping of BFP sets &
other piping in the scope of the Contractor shall be done by the Contractor.
(o) All tests and activities pertaining to the BFP and its drive as per manufacturer's
recommendations and as given in the chapter and covered in the specification.
(p) Hydraulic Test for all low and high pressure piping, equipment cooling water system
pipes and associated equipment etc. shall be done as per statutory requirement and
specified elsewhere shall be carried out. All equipment needed for the tests shall be
furnished by the Contractor.
(q) All tests and activities pertaining to the Generator and Excitation as per
manufacturer's recommendations and covered in the specification.
(r) All tests and activities pertaining to the Generator Auxiliaries viz Primary water
system, Seal oil system, Gas system etc., as per manufacturer's recommendations
and covered in the specification.
(q) Any other pre-commissioning checks/ tests and activities as described below and
also those mutually agreed between the Contractor & the Employer shall be
undertaken by
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 7 OF 22
CONTROL & INSTRUMENTATION SYSTEM REQUIREMENTS
3.02.06 For STG integral controls the following requirement shall be demonstrated.
3.02.07 The offered control system shall meet the requirement of initial pressure at turbine inlet as
per the requirement of IEC-45-1 or equivalent as defined under mechanical sections of the
specification. In order to realize the stipulated process requirement of TG systems, that will
be realized by interaction with employer procured control system, Bidder will provide all
required data and necessary interfaces so that Integrated Plant operation and control can be
seamlessly realized by the employer.
3.02.08 Further the Contractor DDCMIS and Employers BOP C&I part of DDCMIS shall be properly
integrated to achieve total plant operation. All required interfacing requirements shall be
provided by the Contractor for enabling this integration of the total plant C&I and achieving
the performance requirements. Tests in this regard shall be carried out at site by the
Employer to verify the integrated performance of the total plant C&I. In case during these
tests or otherwise it is observed that the behaviour/response of Contractor's system (drives
actuators/valves etc.) is not satisfactory/acts as a limitation/restriction in achieving the
permissible limits, the Contractor shall carry out all required modifications, rectification etc. in
his systems without any price repercussions whatsoever so that the permissible limits can be
achieved. Contractor shall depute his experts for associating in the above tests and also for
carrying out the necessary modifications, rectification etc. in Contractor's equipment and
Control systems.
3.02.09 In case the Contractor feels that some specific requirements are to be met by the BOP C&I
contractors, then the same has to be clearly brought out in the offer. (For example the loop
reaction time is specified as 500 millisec. in BOP C&I specification).
3.02.10 Contractor shall meet system performance and parametric requirement follows -
3.02.11 On the bidders supplied DDCMIS system, the following parametric tests shall also be
conducted under worst case loading conditions (details of worst case loading shall be as
agreed during detailed engineering.)
(i) For control system
- CPU loading, Cycle time/controller reaction time
(ii) For MMIPIS
- CPU loading, spare duty cycle, Memory Spare Capacity (if applicable as per
standard practice of bidder)
(iii) Spare duty cycle for system bus (if applicable as per standard practice of bidder)
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 8 OF 22
(iv) Various display response time
(v) System accuracy
(vi) Display update time
3.02.12 For the parametric test, the following requirements shall be met
(i) Processor Spare Duty Cycle (Free Time)
- Under worst case loading of MMIPIS and system bus each MMIPIS
processor shall have 40% free time when measured over any two second
period and 50% free time when measured over any one minute period. (if
applicable as per standard practice of bidder)
- Under worst case loading conditions of control system, control system
processor shall have 20% free time when measured over any one minute
period.
- The Bidder shall furnish all necessary data to fully satisfy the Employer that
the processor spare duty cycle figures quoted by the Bidder are realistic and
based on configuration and computation capability of the offered system and
these shall be actually achieved in the fully implemented system as
commissioned at project site.
System Bus Spare Duty Cycle (Free Time) (ii)
The system bus shall have min. 50% free time during the worst case loading
conditions of control system, MMIPIS and the system Bus, measured over any 2
seconds interval. (if applicable as per standard practice of bidder)
(iii) Response Time
(a) Display:
The time from mouse click or last button pressed to the commencement of the
requested display under the worst case loading conditions shall not be worse than
the following:
All control related displays 2 sec
Point Details Display(single point) 1-2 secs
Bar chart display (20 points, current data) 2-3 secs.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 9 OF 22
Operator guide/plant start-up guide message display
(full screen of alphanumeric information and a
maximum of ten numbers of dynamic data items)
1-2 secs.
Plant mimic display of fair complexity with a minimum
of 120 numbers of dynamic data items e.g., values,
macros, line segment, etc.
2-3 secs.
Group review display (current values of twenty points) 2-3 secs.
X-Y plot display (2 X-Y- plots and a single display
requiring both historical as well as current data)
3-4 secs.
X-T plot display (Trend of 6 analog points and a single
display requiring both historical as well as current
data)
3-4 secs.
Plant Summary display (e.g., bad point summary, limit
check removed point summary. Assume the whole
data base search is required and the summary display
contains ten points only).
3-4 secs.
(b) Command:
The response time for screen update, after the execution of the control command,
from the time the command is issued (for example command to start a motor to the
time the screen is updated) shall be within two seconds (excluding the drive
actuation time).
(iv) System Accuracy Requirements
The overall system accuracy from signal input terminals to output presentation on
display and printers shall meet process requirement as agreed during detailed
engineering.
(v) Display Updated Rates
All displays shall be updated at least every two seconds.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 10 OF 22
3.03.00 LIST OF TEST / ACTIVITIES TO BE PERFORMED ON TG & AUXILIARY
(BUT NOT LIMITED TO THE FOLLOWING)
A) TESTING SCHEDULES
1. TURBINE ON BARRING GEAR
2. BEARING AND J ACKING OIL INITIAL CIRCULATION
3. HP BYPASS SYSTEM
4. LP BYPASS SYSTEM
5. GOVERNOR OIL CONTROL SYSTEM
6. VACUUM RAISING PLANT
7. CONDENSER & COLTCS SYSTEM
8. CENTRAL OIL PURIFICATION PLANT
9. HYDRAULIC TEST PROCEUDRE FOR
A) LUB OIL SYSTEM
B) CONTROL OIL & J ACKING OIL SYSTEM
C) GENERATOR SEAL OIL SYSTEM
D) GENERATOR STATOR WATER SYSTEM
E) GENERATOR GAS SYSTEM (Alternatively, pneumatic test with
suitable leak detection method shall also be acceptable subject to
owners approval)
F) HEATERS
10. OIL FLUSHING OF LUB OIL SYSTEM
11. OIL FLUSHING OF CONTROL & J ACKING OIL SYSTEM
12. OIL FLUSHING OF GENERATOR SEAL OIL SYSTEM
13. ALKALI FLUSHING FOR CONDENSATE SYSTEM
14. HP/ LP BYPASS SYSTEM
15. CONDENSER FLOOD TEST
16. CONDENSER VACUUM TIGHTNESS TEST
17. STEAM BLOWING OF GLAND SEAL PIPE LINES, AUX. STEAM PIPELINE
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 11 OF 22
18. CEP
19. Drip Pump (if applicable)
20. HEATER
21. DEAERATOR
22. BFP
23. BEARING AND J ACKING OIL INITIAL CIRCULATION
24. GOVERNOR OIL CONTROL SYSTEM
25. HYDRAULIC TEST PROCEDURE FOR
A) LUB OIL SYSTEM
B) CONTROL OIL & J ACKING OIL SYSTEM
C) WATER SYSTEM
D) HEAT EXCHANGERS
26. OIL FLUSHING OF LUB OIL SYSTEM
27. OIL FLUSHING OF CONTROL & J ACKING OIL SYSTEM
28. STEAM BLOWING OF GLAND SEAL PIPE LINES, AUX. STEAM PIPELINE
29 HT MOTORS
B) COMMISSIONING SCHEDULE
1. Turbine Gland sealing system for Main Turbine
2. HP-LP Bypass system
3. Turbine Initial Run up for Main Turbine
4. Lube Oil / Governing Oil System for Main Turbine
5. LP HEATERS
6. HP HEATERS
7. DEAERATOR STEAM OPERATION
8. Turbine Gland sealing system for BFP turbine
9. Turbine Initial Run up for BFP turbine
10. Lube Oil / Governing Oil System for BFP turbine
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 12 OF 22
11. Generator and excitation system
12. Generator seal oil system
13. Generator stator water system
14. Generator gas system
C) COMMISSIONING TESTS/CHECKS
1. Test running of all pumps
2. Condenser vacuum test, feed water heater operational tests for establishing
correct cascaded flow, heater water levels etc. & checking of all parameters
as per approved heat balance diagrams.
3. Test for HP/LP bypass valves operation & their control system.
4. Test for operation of governing control system for turbines.
5. Standard commissioning tests and procedures as per Contractor's practice
for steam turbine generator and other equipment / auxiliaries within the
Contractor's scope of work.
6. Checks on operation of all individual control loops in the turbine generator
control system.
7. Checks on correct functioning of the Turbine Protection System (TPS),
Turbine Supervisory Control System (TSCS) for main turbine, Automatic
Turbine Run-up System (ATRS), Automatic Testing of Turbine (ATT).
8. Standard commissioning tests and procedures as per Contractor's practice
for CEP and other equipment / auxiliaries within the Contractor's scope of
work.
9. Checks on operation of all individual control loops in the CEP control system.
10. Standard commissioning tests and procedures as per Contractors practice
for Drip Pump (if applicable) and other equipment / auxiliaries within the
Contractors scope of work.
11. Checks on operation of all individual control loops in the Drip Pump control
(if applicable) system.
12. Feed Water Heater operational test for establishing correct cascaded flow,
heater water levels and checking of all parameters as per approved heat
balance diagram
13. Standard commissioning tests and procedures as per Contractor's practice
for heaters and deaerator and other equipment / auxiliaries within the
Contractor's scope of work.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 13 OF 22
14. Checks on operation of all individual control loops in the heater and
deaerator control system.
15. Test for operation of governing control system for BFP turbines.
16. Standard commissioning tests and procedures as per Contractor's practice
for BFP and other equipment / auxiliaries within the Contractor's scope of
work.
17. Checks on operation of all individual control loops in the BFP control system.
18. Checks on correct functioning of the BFP Turbine for Turbine Protection
System (TPS), Turbine Supervisory Control System (TSCS) for main turbine,
Automatic Turbine Run-up System (ATRS), Automatic Testing of Turbine
(ATT).
19. Calibration tests of orifice, flow nozzles, instruments and control equipment
to the extent included in these specifications.
20. Checks on operation of all rotating equipments to ascertain level of noise
and vibration
21. Checks on operation of all static equipments to ascertain level of noise and
vibration
22. Standard commissioning tests and procedures as per manufacturers
practice for Generator, Excitation and its auxiliaries within the Contractors
scope of work.
3.04.00 Chemical Cleaning of Pressure Parts
Complete chemical cleaning procedure, the scheme and layout including parameters of the
pumps, size of tanks, materials of construction, the rate of consumption and total
requirements of steam and water for such cleaning process shall meet the approval of the
Employer.
The Contractor shall furnish all labour, materials such as the required chemicals and other
consumables, all equipment such as acid transfer and acid circulating pumps complete with
drive motors, acid storage and acid mixing tanks, all temporary piping, valves and specialities
and local instruments for pressure, temperature and flow measurements and any other items
needed to carry out the process. All equipment required for chemical cleaning shall be
supplied by the contractor.
The Employer will arrange to supply Raw water and Demineralised water required for the
cleaning operations at the Terminal Point's as indicated elsewhere, in the specification.
The Contractor shall take care to dispose off the used chemicals and the effluents from the
cleaning operations, after neutralisation, meeting all the statutory regulations and in a
manner acceptable to the Project Manager and which would comply with the norms of the
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 14 OF 22
State Pollution Control Board. This include construction of suitable neutralization pit,
channels, disposal equipments etc.
The Contractor shall specifically make all necessary arrangements for prevention of any fire
accidents, explosions etc. during the performance of the chemical cleaning operations.
The Contractor shall ensure that during the cleaning process the procedure adopted shall be
such as to consume minimum demineralized water.
All equipment needed for such preservation including the nitrogen cylinders, interconnecting
piping and any regulating equipment for N2 cap and other preservatives shall be provided by
the Contractor and the same shall also become the property of the Employer after completion
of the chemical cleaning.
The Contractor shall provide adequate safety and protective equipment for all his employees
and ensure that they are worn at all times of danger. Specialised treatment equipment (such
as required for first aid when using hydrofluoric acid) must be provided at the place of
handling acid. An acid cleaning report and log of each cleaning must be provided by the
Contractor to the Employer, immediately after the cleaning operation.
3.05.00 Steam Blowing
Steam blowing of various pipelines shall be carried out by the Contractor as per
requirements/scope of work of this specification. In addition if any other piping, not
specifically mentioned in the scope of the Contractor and is also required to be steam blown,
the Contractor shall also to perform steam blowing of these additional piping during steam
blowing operation.
The Contractor shall give recommended procedures, method of blowing and scheme for
steam blowing indicating clearly additional system, if any, to be cleaned by steam blowing
and furnish data/ write-up/ layouts/ drawings to that effect to the Employer for the Employer's
approval.
The Contractor shall furnish his recommendations regarding use of various test equipments
and instruments and termination/acceptance criteria for steam blowing, which in any case
shall meet the steam turbine-generator requirements.
The systems which should be ready and operational before steam blowing and are in the
scope of the Contractor shall be made ready/operational by the Contractor by the scheduled
date for starting of steam blowing.
For equipments/components installed on high pressure boiler external piping, such as
various thermowells, flow meter, control valves, HP/LP Bypass valves etc., the Contractor
shall comply with guidelines to be followed during steam blowing, with respect to removal /
blanking / replacement of such items their internals etc. by spool pieces as given by the
respective manufacturer/sub-contractor.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 15 OF 22
Supply of all such spools (as above) and/or blanks, temporary piping and supports etc. as
required, cutting / welding / edge preparation and rewelding required for blanking, temporary
piping connection and/or for replacements by spool pieces shall be the responsibility of the
Contractor. After steam blowing removal of spool pieces & temporary piping and
reinstallation of various components, shall also be the responsibility of the Contractor.
The Contractor shall ensure successful and timely completion of steam blowing of all
systems and will render all help/services as required including:
(i) Services of test/operating personnel/supervisors.
(ii) Extending all cooperation during erection, pre-commissioning of plant and equipment
to be made ready and operational before starting steam blowing.
(iii) Extending all cooperation for interface engineering of equipments/components of
temporary system required for steam blowing operation.
(iv) Contractor's engineers shall be available for all coordination meetings arranged by
the Employer for finalising the details of temporary system for steam blowing.
3.06.00 Balance of Plant equipment & systems
All pre-commissioning tests & activities as indicated above and elsewhere in the technical
specification shall be performed by the Contractor.
3.07.00 Commissioning of Facilities
3.07.01 General
Upon completion of precommissioning activities/test the Contractor shall initiate
commissioning of facilities. During commissioning the Contractor shall carryout system
checking and reliability trials on various parts of the facilities.
Contractor shall carry out these checks/tests at site to prove to the Employer that each
equipment of the supply complies with requirements stipulated and is installed in accordance
with requirements specified. Before the plant is put into initial operation the Contractor shall
be required to conduct test to demonstrate to the Employer that each item of the plant is
capable of correctly performing the functions for which it was specified and its performance,
parameters etc. are as per the specified/approved values. These tests may be conducted
concurrently with those required under commissioning sequence.
The Contractor shall finalise the protocol of check lists, after erection of the system and
equipment, as per International Codes/Standard with the Employer.
The Contractor shall furnish requisite no. of copies of procedures and list of start up,
precommissioning, commissioning and initial operation tests for Employer's approval.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 16 OF 22
The Contractor shall also demonstrate the performance of all C&I equipment, the tests on
main equipment or prior to that as the case may be.
Other tests shall be conducted, if required by the Employer, to establish that the plant
equipments are in accordance with requirements of the specifications.
4.00.00 Initial Operation
Upon completion of system checking/tests as per clause 4.01.00 and 4.02.00 above and as a
part of commissioning of facilities, complete plant/facilities shall be put on initial operation for
a period of thirty (30) days or 720 hours as stipulated in General Technical Requirements.
5.00.00 The Contractor shall conduct all the commissioning tests and undertake commissioning
activities pertaining to all other auxiliaries and equipments including all Electrical & C&I
equipment/systems not specifically brought out above but are within the scope of work and
facilities being supplied & installed by the Contractor and follow the guidelines indicated
above or elsewhere in these technical specifications (Section-VI).
6.00.00 COMMISSIONING SPARES
6.01.00 It will be the responsibility of the Contractor to provide all commissioning spares including
consumable spares required for initial operation till the Completion of Facilities. The
Contractor shall furnish a list of all commission-ing spares within 60 days from the date of
Notification of Award and such list shall be reviewed by the Employer and mutually agreed to.
However. such review and agreement will not absolve the Contractor of his responsibilities
to supply all commissioning spares so that initial operation do not suffer for want of
commissioning spares. All commissioning spares shall be deemed to be included in the
scope of the Contract at no extra cost to the Employer.
6.02.00 These spare will be received and stored by the Contractor atleast 3 months prior to the
schedule date of commencement of initial operation of the respective equipment and utilised
as and when required. The unutilised spares and replaced parts, if any, at the end of
successful completion of guarantee tests shall be the property of the Contractor and he will
be allowed to take these parts back at his own cost with the permission of Employer.
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 17 OF 22
7.00.00 STANDARD CHECKLIST
7.01.00 MECHANICAL
7.01.01 COMMISSIONING/ TESTING ESSENTIAL PRE-REQUISITE
A) VALVES
1. MANUALLY OPERATED VALVE
2. ELECTRICALLY OPERATED VALVE
3. PNEUMATICALLY ACTUATED VALVE
4. HYDRAULICALLY ACTUATED VALVE
5. SAFETY VALVE
6. ELECTROMATIC RELIEF VALVE
7. STEAM TRAP
8. BUTTERFLY VALVE (ELECTRICALLY OPERATED)
9. BUTTERFLY VALVE (MANUALLY OPERATED)
10. BUTTERFLY VALVE (FOUR WAY - ELECTRICAL)
11. NON-RETURN VALVE (INCLUDING HYDRAULIC/PNEUMATIC QCNRVS)
12. THREE WAY CONTROL VALVE
13. RELIEF VALVE
14. DIFFERENTIAL PRESSURE REGULATING VALVE
15. FLOAT OPERATED VALVES
B) TANKS AND PRESSURE VESSELS
1. TANKS (METAL) UPTO 20 M
3
2. TANKS (LARGE STORAGE)
3. PRESSURE VESSEL (BELOW 17 BARS)
4. AIR RECEIVER
5. PRESSURE VESSEL - ACCESS DOOR
C) PUMPS
1. PUMP - LOW PRESSURE CENTRIFUGAL
(MOTOR DRIVEN)
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 18 OF 22
2. PUMP - UPTO 350 HP (260 KW)
3. PUMP - SUMP INSTALLATION
4. GEAR PUMP/ SCREW PUMP
D) PIPE WORK SYSTEM
1. STEAM SERVICES
2. WATER SERVICES
3. OIL/ FIRE RESISTANT FLUID SYSTEM
4. AIR SERVICES (COMPRESSOR)
5. HIGH PRESSURE SERVICES
6. CONSTANT LOAD SUPPORT
7. SPRING SUPPORTS
8. PF COAL
9. HANGERS AND OTHER SUPPORTS
E) STRAINER AND FILTER
1. STRAINER/ FILTER BASKET TYPE
2. STRAINER ROTARY (LOW PRESSURE)
3. FILTER & STRAINERS CENTRIFUGAL SEPARATORS
4. FILTER & STRAINER Y-TYPE
5. FILTER & STRAINER (PLATE TYPE)
6. PURIFIER
7. FILTER - COMPRESSED AIR LINE
F) HEAT EXCHANGER
1. HEAT EXCHANGER (GENERAL)
2. HEAT EXCHANGER - OIL/ WATER
3. ROTARY AIR HEATER
G) FANS & COMPRESSORS
1. FANS - NON-PRESSURE LUBRICATED
2. FANS - AXIAL FLOW PRESSURE LUBRICATED
3. COMPRESSORS GENERAL
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 19 OF 22
H) DAMPERS & GATES
1. MANUALLY OPERATED DAMPER
2. PNEUMATICALLY OPERATED DAMPER
3. ELECTRICALLY OPERATED DAMPER
4. MANUALLY OPERATED GATES
5. PNEUMATICALLY OPERATED GATE
6. ELECTRICALLY OPERATED GATE
I) CRANES AND ELEVATORS
1. AUXILIARY OVERHEAD CRANE
2. TRAVEL SUPPORT STRUCTURE FOR CRANE
3. LONG TRAVEL & CROSS TRAVERSE MOTION OF CRANE
4. MAIN AUX. HOIST MOTION (CRANE)
5. CRANE, ELECTRIC HOIST
J) POWER TRANSMISSION
1. POWER TRANSMISSION GEAR BOX
2. BEARINGS
3. FLUID COUPLINGS
7.02.00 ELECTRICAL
1. D.C. MOTOR
2. HV SQUIRREL CAGE INDUCTION MOTOR
3. 415 V SQUIRREL CAGE INDUCTION MOTOR
4. MOTOR OPERATED ACTUATORS
5. LT SWITCHGEARS/MCC
(I.) STANDARD CHECLISTS FOR ALL TYPES OF RELAYS USED IN
SWITCHGEARS PROTECTION SYSTEM
(II.) PT CARRIAGE AND CUBICLES
(III.) CABLE/BUS DUCT/BUS BARS
(IV.) CONTRACTOR MODULE
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 20 OF 22
(V.) SWITCH FUSE MODULE
(VI.) MASTER PANEL OF LUBE OIL PANEL
(VII.) FEEDER PANEL OF LUBE OIL PANEL
(VIII.) SPACE HEATER AND CABLE MODULE
(IX.) HT CIRCUIT BREAKER
(X.) 415 V CIRCUIT BREAKER
6. POWER CABLE
7. AUXILIARY CABLE
8. D.C. CABLE
9. EXPLOSION PROOF ELECTRICAL EQUIPMENT
10. J UNCTION BOX
11. CONTROL TRANSFORMER MODULE
12. BRUSH GEAR ASSEMBLY
13. AUX. CONTROL AND RELAY PANEL DESK
14. INDICATING INSTRUMENT
15. RECORDING INSTRUMENT
16. INTEGRATING INSTRUMENT
7.03.00 CONTROL & INSTRUMENTATION
1. CONDUCTIVITY ANALYSING EQUIPMENT INCLUDING TEST PROCEDURES
2. PH ANALYSER INCLUDING TEST PROCEDURE
3. SILICA ANALYSER
4. LEVEL SWITCH (FLOAT ACTUATED)
5. LEVEL SWITCH (ELECTRODE TYPE)
6. LEVEL SWITCH DISPLACED ACTUATED)
7. TRANSMITTER (FLOAT OPERATED PNEUMATIC OUTPUT) INCLUDING
TESTING PROCEDURE
8. LEVEL INDICATOR (FLOAT/PULLEY TYPE)
9. LOCAL TEMPERATURE INDICATORS INCLUDING TEST PROCEDURE
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 21 OF 22
10. RESISTANCE THERMOMETER ELEMENT INCLUDING TEST PROCEDURE
11. THERMOCOUPLE ELEMENT AND CONNECTING CABLE
12. THERMOCOUPLE AND RESISTANCE THERMOMETER CONVERTOR/
TRANSMITTER INCLUDING TEST PROCEDURES.
13. TEMPERATURE SWITCH/THERMOSTAT INCLUDING TEST PROCEDURES
14. COLD J UNCTION BOXES
15. ZENER BARRIER
16. O2 ANALYSER
17 O2 IN HYDROGEN INCLUDING TEST PROCEDURES
18. PRESSURE AND VACUUM GAUGE
19. PRESSURE AND VACUUM SWITCH INCLUDING TEST PROCEDURE
20. DIFFERENTIAL PRESSURE TRANSMITTER INCLUDING TEST PROCEDURE
21. DIFFERENTIAL PRESSURE SWITCH INCLUDING TEST PROCEDURE.
22. FLOW INDICATOR (VARIABLE AREA)
23. ORIFICE PLATE
24 TURBINE FLOW TRANSMITTER
(A.) FLOW SWITCH
(B.) WEIR
(C.) NOZZLE
(D.) FLOW INDICATOR (PNEUMATIC INPUT) INCLUDING TEST
PROCEDURE
(E.) FLOW INTEGRATOR (PNEUMATIC INPUT) INCLUDING TEST
PROCEDURE
(F.) FLOW INDICATOR (FLOAT OPERATED) INCLUDING TEST PROCEDURE
(G.) VENTURI (FLUID)
(H.) FLOW SWITCH (MAGNETIC TYPE)
(I.) AVERAGING INLET
(J .) LIMIT SWITCHES
(K.) TURBINE SUPERVISORY MEASURING SYSTEM
CLAUSE NO.
TECHNICAL REQUIREMENTS
TANDA THERMAL POWER PROJECT
STAGE II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION-VI
PART-B
PRE-COMMISSIONING
AND COMMISSIONING
PAGE 22 OF 22
(L.) POSITION MEASUREMENT AND INDICATION INCLUDING TEST
PROCEDURES
(M.) TACHOMETER
(N.) VIBRATION MEASUREMENT
(O.) DIGITAL INDICATOR
(P.) MOVING COIL INDICATOR INCLUDING TEST PROCEDURE
(Q.) RECORDER INCLUDING TEST PROCEDURE
(R.) FLAME SCANNER
(S.) ELECTRICAL AUTO MANUAL CONTROL STATION
(T.) PUSH BUTTON MODULE
(U.) ALARM ANNUNCIATOR EQUIPMENT INCLUDING TEST PROCEDURE
(V.) TEST PROCEDURE FOR ELECTRONIC MODULES OF DDCMIS
(W.) THERMO CONTROL VALVE
(X.) TEST PROCEDURE FOR ADJ USTMENT OF MODULATING
CONTROLLER - PID TERMS
(Y.) TEST PROCEDURE INDICATING CONTROLLER-ELECTRICAL INPUT
AND PNEUMATIC OUTPUT
Note: The items which are not part of this specification may be considered as not
applicable.
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - C T - C T - C T - C T - C
SECTION - VI
TECHNICAL SPECIFICATION
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - C T - C T - C T - C T - C
SECTION - VI
TECHNICAL SPECIFICATION
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
(This document is meant for the exclusive purpose of bidding against this
Package and shall not be transferred, reproduced or otherwise used for
purposes other than that for which it is specifically issued).
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TABLE OF CONTENTS
PART SECTION NO. TITLE
SCOPE OF SUPPLY & SERVICES
A Project Synopsis
A A-1 Provenness
A Essential Data
A Phased Manufacturing Program
A A-2 General
A A-3 Turbine Generator and Auxiliaries
A A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Unit
A A-6 Low Pressure Piping System
A A-7 (NOT USED)
A A-8 Hydrogen Generation Plant
A A-9 Service Elevators
A A-10 Power Cycle Piping
A A-11 Other Cranes and Hoists
A B-1 Electrical System/Equipment
A IIC-01 Control and Instrumentation System
A D-1 Civil Works
A Terminal Points & Exclusions
A Functional Guarantees & Liquidated Damages
A Spares
TECHNICAL REQUIREMENTS
MECHANICAL
B A-1 Operating Capability of Plant
B A-2 Layout
B A-3 Turbine Generator and Auxiliaries
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Plant
B A-6 Low Pressure Piping System
B A-7 (NOT USED)
B A-8 Hydrogen Generation Plant
B A-9 Service Elevators
B A-10 Power Cycle Piping
B A-11 Other Cranes and Hoists
ELECTRICAL
B B-1 Generator and Auxiliaries
B B-2 Motors
B B-3 L.T. Power Cables
B B-4 L.T. Control Cables
B B-5 Cabling Earthing Lighting and Protection
B B-6 Electric Actuators with Integral Straters
B B-7 Lighting
B B-8 L.T. Switchgear
CONTROL & INSTRUMENTATION (C&I)
B IIIC-01 Basic Design Criteria
B IIIC-02 Distributed Digital Control, Monitoring & Information System
(DDCMIS)
B IIIC-03 Main Equipment Related Control and Instrumentation System
B IIIC-04 Measuring Instruments (Primary and Secondary)
B IIIC-05 Electrical Power Supply System
B IIIC-06 Process Connection and Piping
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B IIIC-07 Instrumentation and Power Supply Cable
B IIIC-08 Control Valve and Actuators
B IIIC-09 Plant Auxiliary System
B IIIC-10 Type Test Requirements
CIVIL
B D-1 Civil Works
QUALITY INSURANCE (QA)
B E-1 Steam Turbine Generator & Auxiliaries
B E-2 Condenser on Line Tube Cleaning System
B E-3 Condensate Extraction Pump
B E-4 Power Cycle Heaters & De-aerator
B E-5 Boiler Feed Pump
B E-6 Turbine Hall EOT Crane
B E-7 Equipment Cooling Water System
B E-8 Condensate Polishing Unit
B E-9 Low Pressure Piping System
B E-10 (NOT USED)
B E-11 Hydrogen Generation Plant
B E-12 Service Elevators
B E-13 Power Cycle Piping
B E-14 Other Cranes and Hoists
B E-15 Generator and Auxiliaries
B E-16 Motors
B E-17 LT Switchgear
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B E-18 LT Power Cables
B E-19 LT Control Cables
B E-20 Cabling
B E-21 Lighting
B E-22 Passenger/Service Elevators & Lifts
B E-23 Distributed Digital Control, Monitoring & Information System (DDCMIS)
B E-24 Main Equipment Related Control and Instrumentation System
B E-25 Measuring Instruments (Primary and Secondary)
B E-26 Power Supply System
B E-27 Process Connection and Piping
B E-28 Instrumentation Cables
B E-29 Control Valves
B E-30 Electrical Actuators
B E-31 Auxiliaries Plant Control
B Pre-Commissioning and Commissioning
C GENERAL TECHNICAL REQUIREMENT
D ERECTION CONDITIONS OF CONTRACT
E TENDER DRAWING
F NOT USED
G TECHNICAL DATA SHEET
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - C
GENERAL TECHNICAL REQUIREMENTS
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
GENERAL TECHNICAL REQUIREMENTS
PART - C
CONTENTS
------------------------------------------------------------------------------------------------------------------------------
Clause No. Description Page No.
------------------------------------------------------------------------------------------------------------------------------
1.00.00 Introduction 1
2.00.00 Brand Name 1
3.00.00 Base Offer & Alternate Proposals 1
4.00.00 Completeness of Facilities 1
5.00.00 Rules, Regulations, Codes & Standards 2
6.00.00 Equipment Functional Guarantee 5
7.00.00 Design of Facilities / Maintenance
& Availability Considerations 5
8.00.00 Documents, Data and Drawings to
be Furnished by Contractor 6
9.00.00 Quality Assurance Programme 23
10.00.00 Pre-commissioning and Commissioning Facilities 34
11.00.00 Guarantee Tests 37
12.00.00 Taking Over 38
13.00.00 Training of Employer's Personnel 38
14.00.00 Safety Aspects During Construction and Erection 40
15.00.00 Noise Level 40
16.00.00 Packaging and Transportation 40
17.00.00 Electrical Enclosure 41
18.00.00 Instrumentation and Control 41
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
------------------------------------------------------------------------------------------------------------------------------
Clause No. Description Page No.
------------------------------------------------------------------------------------------------------------------------------
19.00.00 Electrical Noise Control 42
20.00.00 Instrument Air System 42
21.00.00 Tapping Points for Measurements 42
22.00.00 Electronic Module/Component Details (Not Used) 43
Annexure - I 44
Annexure - II 47
Annexure - III 60
Annexure - IV 61
Annexure - V 62
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
1 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
GENERAL TECHNICAL REQUIREMENTS
1.00.00 INTRODUCTION
This part covers technical requirements which will form an integral part of the
Contract. The following provisions shall supplement all the detailed technical
requirements brought out in the Technical Specifications and the Technical
Data Sheets.
2.00.00 BRAND NAME
Whenever a material or article is specified or described by the name of a
particular brand, manufacturer or vendor, the specific item mentioned shall be
understood to be indicative of the function and quality desired, and not
restrictive, other manufacturer's products may be considered provided sufficient
information is furnished to enable the Employer to determine that the products
proposed are equivalent to those named.
3.00.00 BASE OFFER & ALTERNATE PROPOSALS
The Bidder's proposal shall be based upon the use of equipment and material
complying fully with the requirements specified herein. It is recognized that
the Contractor may have standardized on the use of certain components,
materials, processes or procedures different than those specified herein.
Alternate proposals offering similar equipment based on the manufacturer's
standard practice may also be considered, provided the base offer is in line
with technical specifications and such proposals meet the specified design
standards and performance requirement and are acceptable to the Employer.
Sufficient amount of information for justifying such proposals shall be furnished
to Employer alongwith the bid to enable the Employer to determine the
acceptability of these proposals.
4.00.00 COMPLETENESS OF FACILITIES
4.01.00 Bidders may note that this is a contract inclusive of the scope as indicated
elsewhere in the specification. Each of the plant shall be engineered and
designed in accordance with the specification requirement. All engineering and
associated services are required to ensure that a completely engineered plant
is provided.
4.02.00 All equipments furnished by the Contractor shall be complete in every respect,
with all mountings, fittings, fixtures and standard accessories normally provided
with such equipment and/or those needed for erection, completion and safe
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
2 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
operation & maintenance of the equipment and for the safety of the operating
personnel, as required by applicable codes, though they may not have been
specifically detailed in the respective specifications, unless included in the list
of exclusions.
All same standard components/ parts of same equipment provided, shall be
interchangeable with one another.
4.03.00 For the C&I systems, the Contractor shall be required to provide regular
information about future upgrades and migration paths to the Employer.
5.00.00 RULES, REGULATIONS, CODES & STANDARDS
5.01.00 In addition to the codes and standards specifically mentioned in the relevant
technical specifications for the equipment / plant / system, all equipment parts,
systems and works covered under this specification shall comply with all
currently applicable statutory regulations and safety codes of the Republic of
India, NTPC rules / codes of practices as well as of the locality where they
will be installed, including the following:
(a.) Indian electricity act
(b.) Indian electricity rules
(c.) Indian Explosives Act
(d.) Indian Factories Act and State Factories Act
(e) Indian Boiler Regulations (IBR)
(f.) Regulations of the Central Pollution Control Board, India
(g.) Regulations of the Ministry of Environment & Forest (MoEF),
Government of India
(h) Pollution Control Regulations of Department of Environment, Government
of India
(i.) State Pollution Control Board.
(j.) Rules for Electrical installation by Tariff Advisory Committee (TAC).
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
3 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(k.) Building and other construction workers (Regulation of Employment and
Conditions of services) Act, 1996
(l.) Building and other construction workers (Regulation of Employment and
Conditions of services) Central Rules, 1998
(m.) Explosive Rules, 1983
(n.) Petroleum Act, 1984
(o.) Petroleum Rules, 1976,
(p.) Gas Cylinder Rules, 1981
(q.) Static and Mobile Pressure Vessels (Unified) Rules, 1981
(r.) Workmen's Compensation Act, 1923
(s.) Workmen's Compensation Rules, 1924
(t.) NTPC Safety Rules for Construction and Erection
(u.) NTPC Safety Policy
(v.) Any other statutory codes / standards / regulations, as may be
applicable.
5.02.00 Unless covered otherwise in the specifications, the latest editions (as
applicable as on date of bid opening), of the codes and standards given below
shall also apply:
(a) Bureau of Indian Standards (BIS)
(b.) J apanese Industrial Standards (J IS)
(c.) American National Standards Institute (ANSI)
(d.) American Society of Testing and Materials (ASTM)
(e.) American Society of Mechanical Engineers (ASME)
(f.) American Petroleum Institute (API)
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
4 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(g.) Standards of the Hydraulic Institute, U.S.A.
(h.) International Organisation for Standardization (ISO)
(i.) Tubular Exchanger Manufacturer's Association (TEMA)
(j.) American Welding Society (AWS)
(k.) National Electrical Manufacturers Association (NEMA)
(l.) National Fire Protection Association (NFPA)
(m.) International Electro-Technical Commission (IEC)/European Norm (EN)
(n.) Expansion J oint Manufacturers Association (EJ MA)
(o.) Heat Exchange Institute (HEI)
5.03.00 Other International/ National standards such as DIN, VDI, BS, GOST etc. shall
also be accepted for only material codes and manufacturing standards, subject
to the Employer's approval, for which the Bidder shall furnish, adequate
information to justify that these standards are equivalent or superior to the
standards mentioned above. In all such cases the Bidder shall furnish
specifically the variations and deviations from the standards mentioned else
where in the specification together with the complete word to word translation
of the standard that is normally not published in English.
5.04.00 As regards highly standardized equipments such as Steam Turbine and
Generator, National /International standards such as J IS, DIN, VDI, ISO, SEL,
SEW, VDE, IEC & VGB shall also be considered as far as applicable for
Design, Manufacturing and Testing of the respective equipment. However, for
those of the above equipment not covered by these National / International
standards, established and proven standards of manufacturers shall also be
considered.
5.05.00 In the event of any conflict between the codes and standards referred to in
the above clauses and the requirement of this specification, the requirement of
Technical Specification shall govern.
5.06.00 Two (2) English language copies of all-national and international codes and/or
standards used in the design of the plant, equipment, and structural works
shall be provided by the Contractor to the Employer within two calendar
months from the date of the Notification of Award.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
5 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5.07.00 In case of any change in codes, standards & regulations between the date of
bid opening and the date when vendors proceed with fabrication, the Employer
shall have the option to incorporate the changed requirements or to retain the
original standard. It shall be the responsibility of the Contractor to bring to the
notice of the Employer such changes and advise Employer of the resulting
effect.
6.00.00 EQUIPMENT FUNCTIONAL GUARANTEE
6.01.00 The functional guarantees of the equipment under the scope of the Contract is
given elsewhere in the technical specification.These guarantees shall
supplement the general functional guarantee provisions covered under General
Conditions of Contract.
6.02.00 Liquidated damages for shortfall in meeting functional guarantee(s) during the
performance and guarantee tests shall be assessed and recovered from the
Contractor as specified elsewhere in this specification.
7.00.00 DESIGN OF FACILITIES/ MAINTENANCE & AVAILABILITY
CONSIDERATIONS
7.01.00 Design of Facilities
All the design procedures, systems and components proposed shall have
already been adequately developed and shall have demonstrated good reliability
under similar conditions elsewhere.
The Contractor shall be responsible for the selection and design of appropriate
equipments to provide the best co-ordinated performance of the entire system.
The basic requirements are detailed out in various clauses of the Technical
Specifications. The design of various components, assemblies and
subassemblies shall be done so that it facilitates easy field assembly and
dismantling. All the rotating components shall be so selected that the natural
frequency of the complete unit is not critical or close to the operating range
of the unit.
7.02.00 Maintenance and Availability Considerations
Equipment/facilities offered shall be designed for high availability, low
maintenance and ease of maintenance. The Bidder shall specifically state the
design features incorporated to achieve high degree of reliability/ availability and
ease of maintenance. The Bidder shall also furnish details of availability
records in the reference plants stated in his experience list.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
6 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Bidder shall state in his offer the various maintenance intervals, spare parts
and man-hour requirement during such operation. The intervals for each type
of maintenance namely inspection of the turbine and equipments, inspection of
the steam path and the minor and major overhauls shall be specified in terms
of running hours, clearly defining the spare parts and manhour requirement for
each stage.
Lifting devices i.e. hoists and chain pulley jacks, etc. shall be provided by the
contractor for handling of any equipment or any of its part having weight in
excess of 500 Kgs during erection and maintenance activities.
Lifting devices like lifting tackles, slings, etc. to be connected to hook of the
hoist / crane shall be provided by the contractor for lifting the equipment and
accessories covered under the specification.
8.00.00 DOCUMENTS, DATA AND DRAWINGS TO BE FURNISHED BY
CONTRACTOR
8.01.00 Bidders may note that this is a contract inclusive of the scope as indicated
elsewhere in the specification. Each of the plant and equipment shall be fully
integrated, engineered and designed to perform in accordance with the
technical specification. All engineering and technical services required ensuring
a completely engineered plant shall be provided in respect of mechanical,
electrical, control & instrumentation, civil & structural works as per the scope.
Each main and auxiliary equipment/item of the plant including instruments shall
be assigned a unique tag number. The assignment of tag numbers shall be
in accordance with KKS system. In all drawings/documents/data sheet etc.
KKS tag number of the equipment/item/instrument etc. shall be indicated.
The Contractor shall furnish engineering data/drgs. in accordance with the
schedule of information as specified in Technical Specification and data sheet.
8.02.00 The number of copies/prints/CD-ROMs/manuals to be furnished for various
types of documents is given in Annexure-I
8.03.00 The documentation that shall be provided by the Contractor is indicated in the
various sections of specification. This documentation shall include but not be
limited to the following :
(a.) BASIC ENGINEERING DOCUMENTATION
Prior to commencement of the detailed engineering work, the Contractor
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
7 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
shall furnish a Plant Definition Manual within 12 weeks from the date of
the Notification of Award. This manual shall contain the following as a
minimum:
i. System description of all the mechanical, electrical, control &
instrumentation & civil systems.
ii. Technology scan for each system / sub-system & equipment.
iii. Selection of appropriate technology / schemes for various
systems/ subsystems including techno-economic studies between
various options.
iv. Optimization studies including thermal cycle optimization.
v. Sizing criteria of all the systems, sub-systems including various
piping systems/ equipments/ structures/ equipment foundations
alongwith all calculations justifying and identifying the sizing and
the design margins.
vi. Schemes and Process & Instrumentation diagrams for the
various systems/ sub-system with functional write-ups.
vii. Operation Philosophy and the control philosophy of the
equipments / system covered under the scope.
viii. General Layout plan of the power station incorporating all
facilities in Contractor's as well as those in the Employer's
scope. This drawing shall also be furnished in the form of CD-
ROMs to the Employer for engineering of areas not included in
Contractor's scope.
ix. Basic layouts and cross sections of the TG building (various
floor elevations), and other areas included in the scope of the
Contractor.
x. Documentation in respect of Quality Assurance System as listed
out elsewhere in this specification.
xi. The successful bidder shall furnish within three (3) weeks from
the date of Notification of Award, a list of contents of the Plant
Definition Manual (PDMs) including techno-economic studies,
which shall then be mutually discussed & finalised with the
Employer.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
8 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(b) DETAILED ENGINEERING DOCUMENTS
i. General layout plan of the station.
ii. Layouts, general arrangements, elevations and cross-sections
drawings for all the equipment and facilities of the plant.
iii. Flow diagrams, Process & Instrumentation Diagrams alongwith
write-up and system description.
iv. Start-up curves for turbine, for various start-ups, viz. cold, warm
and hot start-up.
v. Piping isometric, composite layout and fabrication drawings.
vi. Piping engineering diagrams, pipe and fittings schedules, valve
schedules, hanger and support schedules, insulation schedules.
vii. Technical data sheets for all bought out and manufactured
items. Contractor shall use the NTPC specifications as a base
for placement of orders on their sub-vendors.
viii. Detailed design calculations for components, system/sub-system,
piping etc., wherever applicable including sizing calculations for
all auxiliaries as per criteria specified elsewhere in specification.
ix. Transient, hydraulic and thermal stress analysis of piping and
system wherever applicable & input and output data alongwith
stress analysis isometrics showing nodes.
x. Thermal cycle information (heat balance diagrams, condenser
and heat exchanger thermal calculations etc.).
xi. Characteristic Curves/ Performance Correction Curves. Hydraulic
& Mechanical design calculations for condensers & heaters.
xii. Comprehensive list of all terminal points which interface with
Employer's facilities giving details of location, terminal pressure,
temperature, fluid handled & end connection details, forces,
moments etc.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
9 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xiii. Power supply single line diagram, block logics, control
schematics, electrical schematics, etc.
xiv. Protection system diagrams and relay settings.
xv. Interconnection diagrams.
xvi. Cable routing plan.
xvii. Instrument schedule, measuring point list, I/O list, Interconnection
& wiring diagram, functional write-ups, installation drawings for
field mounted instruments, logic diagrams, control schematics,
wiring and tubing diagrams of panels and enclosures etc.
Drawings for open loop and close loop controls (both hardware
and software). Motor list and valve schedule including type of
actuator etc.
xviii. Alarm and annunciation list and alarms & trip set points.
xix. Sequence and protection interlock schemes.
xx. Type test reports and power system stability study report.
xxi. Control system configuration diagrams.
xxii. Detailed DDCMIS system manuals
xxiii. Detailed flow chart for digital control system.
xxiv. Mimic diagram layout, Assignment for other application engg.
xxv. Civil & Structural works drawings and documents for all
structures, facilities, foundations, underground and overground
works and super-structural works as included in the scope of
the Bidder.
xxvi. Model study reports wherever applicable.
xxvii. Functional & guarantee test procedures and test reports.
xxviii. Documentation in respect of Quality Assurance System as listed
out elsewhere in this specification.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
10 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xxix. Documentation in respect of commissioning as listed out
elsewhere in this specification.
xxx. The Contractor while submitting the above documents / drawings
for approval / reference as the case may be, shall mark on
each copy of submission the reference letter alongwith the date
vide which the submissions are made.
8.03.01 INSTRUCTION MANUALS
The Contractor shall make first submission of instruction manual for all the
equipments covered under the Contract as per agreed Engineering Information
schedule. The Instruction manuals shall contain full details required for erection,
commissioning, operation and maintenance of each equipment. The manual
shall be specifically compiled for this project. After finalization and approval of
the Employer the Instruction Manuals shall be submitted as indicated in
Annexure-I. The Contract shall not be considered to be completed for
purposes of taking over until the final Instructions manuals have been supplied
to the Employer. The Instruction Manuals shall comprise of the following.
(a.) Erection Manuals
The erection manuals shall be submitted atleast three (3) months prior
to the commencement of erection activities of particular equipment/
system. The erection manual should contain the following as a
minimum.
a) Erection strategy.
b) Sequence of erection.
c) Erection instructions.
d) Critical checks and permissible deviation/tolerances.
e) List of tool, tackles, heavy equipments like cranes, dozers, etc.
f) Bill of Materials
g) Procedure for erection.
h) General safety procedures to followed during erection/installation.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
11 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
i) Procedure for initial checking after erection.
j) Procedure for testing and acceptance norms.
k) Procedure / Check list for pre-commissioning activities.
l) Procedure / Check list for commissioning of the system.
m) Safety precautions to be followed in electrical supply distribution
during erection
(b.) Operation & Maintenance Manuals
i. The operating and maintenance instructions together with
drawings (other than shop drawings) of the equipment, as
completed, shall be in sufficient detail to enable the Employer to
operate, maintain, dismantle, reassemble and adjust all parts of
the equipment. They shall give a step by step procedure for all
operations likely to be carried out during the life of the plant /
equipment including, operation, maintenance, dismantling and
repair including periodical activities such as chemical cleaning of
the generator. Each manual shall also include a complete set
of drawings together with performance/rating curves of the
equipment and test certificates wherever applicable. The contract
shall not be considered to be completed for purposes for taking
over until these manuals have been supplied to the Employer.
ii. If after the commissioning and initial operation of the plant, the
manuals require any modification / additions / changes, the
same shall be incorporated and the updated final instruction
manuals shall be submitted to the Employer for records.
iii. A separate section of the manual shall be for each size/ type of
equipment and shall contain a detailed description of construction
and operation, together with all relevant pamphlets and drawings.
iv. The manuals shall include the following :
a) List of spare parts along with their drawing and
catalogues and procedure for ordering spares.
b) Lubrication Schedule including charts showing lubrication
checking, testing and replacement procedure to be carried
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
12 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
daily, weekly, monthly & at longer intervals to ensure
trouble free operation.
c) Where applicable, fault location charts shall be included
to facilitate finding the cause of mal operation or break
down.
v. Detailed specifications for all the consumables including lubricant
oils, greases, chemicals etc. system/equipment/assembly/sub-
assembly - wise required for the complete plant.
vi. On completion of erection, a complete list of bearings /
equipment giving their location, and identification marks etc.
shall also be furnished to the Employer indicating lubrication
method for each type/category of bearing.
8.03.02 PLANT HANDBOOK
The Contractor shall submit to the Employer a preliminary plant hand book
preferably in A-4 size sheets which shall contain the design and performance
data of various plants, equipments and systems covering the complete project
including
1. Design and performance data.
2. Process & Instrumentation diagrams.
3. Single line diagrams.
4. Sequence & Protection Interlock Schemes.
5. Alarm and trip values.
6. Performance Curves.
7. General layout plan and layout of main plant building and auxiliary
buildings
8. Important Do's & Don't's
The plant handbook shall be submitted within twelve (12) months from the
date of award of contract. After the incorporation of Employer's comments, the
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
13 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
final plant handbook complete in all respects shall be submitted three (3)
months before start-up and commissioning activities.
8.03.03 Project Completion Report
The Contractor shall submit a Project Completion Report at the time of
handing over the plant.
8.03.04 DRAWINGS
(a.) All the plant layouts shall be made in computerised 3D modelling
system. The Employer reserves the right to review the 3D model at
different stages during the progress of engineering. The layout drawings
submitted for Employer's review shall be fully dimensioned and
extracted from 3D model after interference check.
(b.) All documents submitted by the Contractor for Employer's review shall
be in electronic form (soft copies) along with the desired number of
hard copies as per Annexure-I. The soft copies shall be uploaded by
the vendors in c-folder, a web based system of NTPC ERP, for which
a username and password will be alloted to the new vendor by NTPC.
Similarly, the vendor can download the drawings / documents, approved
/ commented by NTPC , through above site.
The soft copies of identified drawings / documents shall be in pdf
format, whereas the attachements / reply to the submitted document(s)
can be in .doc, .xls, .pdf, .dwg or .std formats.
(c.) Final copies of the approved drawings alongwith requisite number of
hard copies shall be submitted as per Annexure-I.
(d.) NOT USED.
(e.) All documents/text information shall be in latest version of MS Office
and MS Excel as applicable.
(f.) All drawings submitted by the Contractor including those submitted at
the time of bid shall be in sufficient detail indicating the type, size,
arrangement, weight of each component for packing and shipment, the
external connection, fixing arrangement required, the dimensions required
for installation and interconnections with other equipments and materials,
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
14 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
clearance and spaces required between various portions of equipment
and any other information specifically requested in the drawing
schedules.
(g.) Each drawing submitted by the Contractor (including those of
subvendors) shall bear a title block at the right hand bottom corner
with clear mention of the name of the Employer, the system
designation, the specifications title, the specification number, the name
of the Project, drawing number and revisions. If standard catalogue
pages are submitted the applicable items shall be indicated therein. All
titles, notings, markings and writings on the drawing shall be in English.
All the dimensions should be in metric units.
(h.) The drawings submitted by the Contractor (or their subvendors) shall
bear Employer's drawing number in addition to contractor's (their sub-
vendor's) own drawing number. Employer's drawing numbering system
shall be made available to the successful bidder so as to enable him
to assign Employer's drawing numbers to the drawings to be submitted
by him during the course of execution of the Contract.
(i.) The Contractor shall also furnish a "Master Drawing List" which shall be
finalized during post bid discussions and shall be duly integrated with
approved PERT network. Master Drawing List shall be a comprehensive
list of all drawings/ documents/ calculations envisaged to be furnished
by him during the detailed engineering to the Employer. Such list
should clearly indicate the purpose of submission of these drawings i.e.
"FOR APPROVAL" or "FOR INFORMATION ONLY".
(j.) Similarly, all the drawings/ documents submitted by the Contractor during
detailed engineering stage shall be marked "FOR APPROVAL" or "FOR
INFORMATION" prior to submission.
Further, space shall be identified on each drawing for approval stamp
and electronic signature.
(k.) The furnishing of detailed engineering data and drawings by the
Contractor shall be in accordance with the time schedule for the
project. The review of these documents/ data/ drawings by the
Employer will cover only general conformance of the data/ drawings/
documents to the specifications and contract, interfaces with the
equipments provided by others and external connections & dimensions
which might affect plant layout. The review by the Employer should
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
15 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
not be construed to be a thorough review of all dimensions, quantities
and details of the equipments, materials, any devices or items indicated
or the accuracy of the information submitted. The review and/ or
approval by the Employer / Project Manager shall not relieve the
Contractor of any of his responsibilities and liabilities under this contract.
(l.) After the approval of the drawings, further work by the Contractor shall
be in strict accordance with these approved drawings and no deviation
shall be permitted without the written approval of the Employer.
(m.) All manufacturing, fabrication and execution of work in connection with
the equipment / system, prior to the approval of the drawings, shall be
at the Contractor's risk. The Contractor is expected not to make any
changes in the design of the equipment /system, once they are
approved by the Employer. However, if some changes are necessitated
in the design of the equipment/system at a later date, the Contractor
may do so, but such changes shall promptly be brought to the notice
of the Employer indicating the reasons for the change and get the
revised drawing approved again in strict conformance to the provisions
of the Technical Specification.
(n.) Drawings shall include all installations and detailed piping layout
drawings. Layout drawings for all piping of 65 mm and larger diameter
shall be submitted for review/ approval of Employer prior to erection.
Small diameter pipes shall however be routed as per site conditions in
consultation with site authority / representative of Employer based on
requirements of such piping indicated in approved / finalized Flow
Scheme / Process & Instrumentation Diagrams and/or the requirements
cropping up for draining & venting of larger diameter piping or otherwise
after their erection as per actual physical condition for the entire scope
of work of this package.
(o.) Assessing & anticipating the requirement and supply of all piping and
equipment shall be done by the contractor well in advance so as not
to hinder the progress of piping & equipment erection, subsequent
system charging and its effective draining & venting arrangement as
per site suitability.
(p.) As Built Drawings
After final acceptance of individual equipment / system by the
Employer, the Contractor will update all original drawings and
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
16 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
documents for the equipment / system to "as built" conditions and
number of coppies as per Annexure-I.
(q.) Drawings must be checked by the Contractor in terms of its
completeness, data adequacy and relevance with respect to Engineering
schedule prior to submission to the Employer. In case drawings are
found to be submitted without proper endorsement for checking by the
Contractor, the same shall not be reviewed and returned to the
Contractor for re-submission. The contractor shall make a visit to site
to see the existing facilities and understand the layout completely and
collect all necessary data / drawings at site which are needed as an
input to the engineering. The contractor shall do the complete
engineering including interfacing and integration of all his equipment,
systems & facilities within his scope of work as well as interface
engineering & integration of systems, facilities, equipment & works
under Employer's scope and submit all necessary drawings/
documents for the same.
(r.) The Contractor shall submit adequate prints of drawing / data /
document for Employer's review and approval. The Employer shall
review the drawings and return soft copy to the Contractor authorizing
either to proceed with manufacture or fabrication, or marked to show
changes desired. When changes are required, drawings shall be re-
submitted promptly, with revisions clearly marked, for final review. Any
delays arising out of the failure of the Contractor to submit/rectify and
resubmit in time shall not be accepted as a reason for delay in the
contract schedule.
(s.) All engineering data submitted by the Contractor after final process
including review and approval by the Project Manager/ Employer shall
form part of the contract documents and the entire works covered
under these specification shall be performed in strict conformity with
technical specifications unless otherwise expressly requested by the
Project Manager in writing.
8.04.00 ENGINEERING INFORMATION SUBMISSION SCHEDULE
During post bid discussions a Detailed Engineering Information Submission
Schedule / Master Drawing List duly integrated with approved PERT network
shall be tied up with the Employer. For this, the bidder shall furnish a detailed
list of engineering information alongwith the proposed submission schedule.
This list would be a comprehensive one including all engineering data /
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
17 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
drawings / information for all bought out items and manufactured items. The
information shall be categorised into the following parts.
(a.) Information that shall be submitted for the approval of the Employer
before proceeding further, and
(b.) Information that would be submitted for Employer's information only.
The Master Drawing List (MDL) shall be updated periodically and submitted to
the Employer, highlighting the changes made in the MDL.
The schedule should allow adequate time for proper review and incorporation
of changes/ modifications, if any, to meet the contract without affecting the
equipment delivery schedule and overall project schedule. The early
submission of drawings and data is as important as the manufacture and
delivery of equipment and hardware and this shall be duly considered while
determining the overall performance and progress.
8.05.00 ENGINEERING PROGRESS AND EXCEPTION REPORT
8.05.01 The Contractor shall submit every month an Engineering progress and
Exception Report giving the status of each engineering information including
(a.) A list of drawings/engineering information which remains unapproved for
more than four (4) weeks after the date of first submission.
(b.) Drawings which were not submitted as per agreed schedule.
8.05.02 The draft format for this report shall be furnished to the Employer within four
(4) weeks of the award of the contract, which shall then be discussed and
finalised with the Employer.
8.06.00 TECHNICAL CO-ORDINATION MEETING
8.06.01 The Contractor shall be called upon to organise and attend monthly Design/
Technical Co-ordination Meetings (TCMs) with the Employer/Employer's
representatives and other Contractors of the Employer during the period of
contract. The Contractor shall attend such meetings at his own cost at NEW
DELHI / NOIDA or at mutually agreed venue as and when required and fully
co-operate with such persons and agencies involved during the discussions.
8.06.02 The Contractor should note that Time is the essence of the contract. In order
to expedite the early completion of engineering activities, the Contractor shall
submit all drawings as per the agreed Engineering Information Submission
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
18 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Schedule.The drawings submitted by the Contractor will be reviewed by the
Employer as far as practicable within three (3) weeks from the date of receipt
of the drawing .The comments of the Employer shall then be discussed
across the table during the above Technical Co-ordination Meeting (s) wherein
best efforts shall be made by both sides to ensure the approval of the
drawing.
8.06.03 The Contractor shall ensure availability of the concerned experts / consultants/
personnel who are empowered to take necessary decisions during these
meetings. The Contractor shall be equipped with necessary tools and facilities
so that the drawings/documents can be resubmitted after incorporating
necessary changes and approved during the meeting itself.
8.06.04 Should any drawing remain unapproved for more than six (6) weeks after it's
first submission, this shall be brought out in the monthly Engineering Progress
and Exception Report with reasons thereof.
8.06.05 Any delays arising out of failure by the Contractor to incorporate Employer's
comments and resubmit the same during the TCM shall be considered as
a default and in no case shall entitle the Contractor to alter the Contract
completion date.
8.07.00 DESIGN IMPROVEMENTS
The Employer or the Contractor may propose changes in the specification of
the equipment or quality thereof and if the parties agree upon any such
changes the specification shall be modified accordingly.
If any such agreed upon change is such that it affects the price and schedule
of completion, the parties shall agree in writing as to the extent of any
changing the price and/or schedule of completion before the Contractor
proceeds with the change. Following such agreement, the provision thereof,
shall be deemed to have been amended accordingly.
8.08.00 EQUIPMENT BASES
A cast iron or welded steel base plate shall be provided for all rotating
equipment which is to be installed on a concrete base, unless otherwise
specifically agreed to by the Employer. Each base plate which support the unit
and its drive assembly, shall be of a neat design with pads for anchoring the
units, shall have a raised lip all around, and shall have threaded drain
connections.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
19 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.09.00 PROTECTIVE GUARDS
Suitable guards shall be provided for protection of personnel on all exposed
rotating and/or moving machine parts. All such guards shall be designed for
easy installation and removal for maintenance purpose.
8.10.00 LUBRICANTS, SERVO FLUIDS AND CHEMICALS
8.10.01 The Bidder's scope includes all the first fill and one year's topping,
requirements of consumables such as oils, lubricants including grease, servo
fluids, gases and essential chemicals etc. Consumption of all these
consumables during the initial operation and final filling after the initial operation
shall also be included in the scope of the Bidder. Bidder shall supply a
quantity not less than 10% of the full charge of each variety of lubricants,
servo fluids, gases, chemicals etc. used which is expected to be utilised
during the first year of operation. This additional quantity shall be supplied in
separate Containers.
8.10.02 As far as possible lubricants marketed by the Indian Oil Corporation shall be
used. The variety of lubricants shall be kept to a minimum possible.
Detailed specifications for the lubricating oil, grease, gases, servo fluids, control
fluids, chemicals etc. required for the complete plant covered herein shall be
furnished. On completion of erection, a complete list of bearings/ equipment
giving their location and identification marks shall be furnished to the Employer
alongwith lubrication requirements.
8.11.00 Lubrication
8.11.01 Equipment shall be lubricated by systems designed for continuous operation.
Lubricant level indicators shall be furnished and marked to indicate proper
levels under both standstill and operating conditions.
8.12.00 Material of Construction
8.12.01 All materials used for the construction of the equipment shall be new and
shall be in accordance with the requirements of this specification. Materials
utilised for various components shall be those which have established
themselves for use in such applications.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
20 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.13.00 RATING PLATES, NAME PLATES & LABELS
8.13.01 Each main and auxiliary item of plant including instruments shall have
permanently attached to it in a conspicuous position, a rating plate of non-
corrosive material upon which shall be engraved manufacturer's name,
equipment, type or serial number together with details of the ratings, service
conditions under which the item of plant in question has been designed to
operate, and such diagram plates as may be required by the Employer.
8.13.02 Each item of plant shall be provided with nameplate or label designating the
service of the particular equipment. The inscriptions shall be approved by the
Employer or as detailed in appropriate section of the technical specifications.
8.13.03 Such nameplates or labels shall be of white nonhygroscopic material with
engraved black lettering or alternately, in the case of indoor circuit breakers,
starters, etc. of transparent plastic material with suitably coloured lettering
engraved on the back. The name plates shall be suitably fixed on both front
and rear sides.
8.13.04 Items of plant such as valves, which are subject to handling, shall be provided
with an engraved chromium plated nameplate or label with engraving filled with
enamel. The name plates for valves shall be marked in accordance with MSS
standard SP-25 and ANSI B 16.34 as a minimum.
8.13.05 Hanger/ support numbers shall be marked on all pipe supports, anchors,
hangers, snubbers and restraint assemblies. Each constant and variable spring
support shall also have stamped upon it the designed hot and cold load which
it is intended to support. Suitable scale shall also be provided to indicate load
on support/hanger.
8.13.06 Valves, steam traps and strainers shall be identified by Employer's tag number
of a metal tap permanently attached to non pressure parts such as the yoke
by a stainless steel wire. The direction of flow shall also be marked on the
body.
8.13.07 Safety and relief valves shall be provided with the following :
(a.) Manufacturer's identification.
(b.) Nominal inlet and outlet sizes in mm.
(c.) Set pressure in Kg/cm (abs).
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
21 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(d.) Blowdown and accumulation as percentage of set pressure.
(e.) Certified capacity in Kg of saturated steam per hour or in case of
liquid certified capacity in litres of water per minute.
8.13.08 All such plates, instruction plates, etc. shall be bilingual with Hindi inscription
first, followed by English. Alternatively, two separate plates one with Hindi and
the other with English inscriptions may be provided.
8.13.09 All segregated phases of conductors or bus ducts, indoor or outdoor, shall be
provided with coloured phase plates to clearly identify the phase of the
system
8.14.00 TOOLS AND TACKLES
The Contractor shall supply with the equipment one complete set of all special
tools and tackles and other instruments required for the erection, assembly,
disassembly and proper maintenance of the plant and equipment and systems
(including software). These special tools will also include special material
handling equipment, jigs and fixtures for maintenance and calibration /
readjustment, checking and measurement aids etc. A list of such tools and
tackles shall be submitted by the Bidder alongwith the offer.
The price of each tool / tackle shall be deemed to have been included in the
total bid price. These tools and tackles shall be separately packed and sent
to site. The Contractor shall also ensure that these tools and tackles are not
used by him during erection, commissioning and initial operation. For this
period the Contractor should bring his own tools and tackles. All the tools
and tackles shall be of reputed make acceptable to the Employer.
8.15.00 WELDING
8.15.01 If the manufacturer has special requirements relating to the welding procedures
for welds at the terminals of the equipments to be performed by others the
requirements shall be submitted to the Employer in advance of
commencement of erection work.
8.16.00 COLOUR CODE FOR ALL EQUIPMENTS/ PIPINGS/ PIPE SERVICES
8.16.01 All equipment/ piping/ pipe services are to be painted by the Contractor in
accordance with Employer's standard colour coding scheme, which will be
furnished to the Contractor during detailed engineering stage.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
22 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.17.00 PROTECTION AND PRESERVATIVE SHOP COATING
8.18.00 PROTECTION
All coated surfaces shall be protected against abrasion, impact, discoloration
and any other damages. All exposed threaded portions shall be suitably
protected with either metallic or a nonmetallic protection device. All ends of all
valves and pipings and conduit equipment connections shall be properly sealed
with suitable devices to protect them from damage. The parts which are likely
to get rusted, due to exposure to weather, should also be properly treated and
protected in a suitable manner. All primers/paints/coatings shall take into
account the hot humid, corrosive & alkaline, subsoil or overground
environment as the case may be. The requirements for painting specification
shall be complied with as detailed out in Part-A & B of the Technical
Specification.
8.19.00 PRESERVATIVE SHOP COATING
All exposed metallic surfaces subject to corrosion shall be protected by shop
application of suitable coatings. All surfaces which will not be easily accessible
after the shop assembly, shall be treated beforehand and protected for the life
of the equipment. All surfaces shall be thoroughly cleaned of all mill scales,
oxides and other coatings and prepared in the shop. The surfaces that are
to be finish-painted after installation or require corrosion protection until
installation, shall be shop painted as per the requirement covered in the
relevant part of the Technical Specification.
Transformers and other electrical equipments if included shall be shop finished
with one or more coats of primer and two coats of high grade resistance
enamel. The finished colors shall be as per manufacturer's standards, to be
selected and specified by the Employer at a later date.
8.19.01 Shop primer for all steel surfaces which will be exposed to operating
temperature below 95 degrees Celsius shall be selected by the Contractor
after obtaining specific approval of the Employer regarding the quality of primer
proposed to be applied. Special high temperature primer shall be used on
surfaces exposed to temperature higher than 95 degrees Celsius and such
primer shall also be subject to the approval of the Employer.
8.19.02 All other steel surfaces which are not to be painted shall be coated with
suitable rust preventive compound subject to the approval of the Employer.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
23 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.19.03 All piping shall be cleaned after shop assembly by shot blasting or other
means approved by the Employer. Lube oil piping or carbon steel shall be
pickled.
8.19.04 Painting for Civil structures shall be done as specified under technical
requirements on civil works in relevant part of this specifications.
9.00.00 QUALITY ASSURANCE PROGRAMME
9.01.00 The Contractor shall adopt suitable quality assurance programme to ensure
that the equipment and services under the scope of contract whether
manufactured or performed within the Contractor's works or at his sub-
contractor's premises or at the Employer's site or at any other place of work
are in accordance with the specifications. Such programmes shall be outlined
by the Contractor and shall be finally accepted by the Employer/authorised
representative after discussions before the award of the contract. The QA
programme shall be generally in line with ISO-9001.A quality assurance
programme of the contractor shall generally cover the following:
(a.) His organisation structure for the management and implementation of
the proposed quality assurance programme
(b.) Quality System Manual
(c.) Design Control System
(d.) Documentation and Data Control System
(e.) Qualification data for bidder's key personnel.
(f.) The procedure for purchase of materials, parts, components and
selection of sub-contractor's services including vendor analysis, source
inspection, incoming raw-material inspection, verification of materials
purchased etc.
(g.) System for shop manufacturing and site erection controls including
process, fabrication and assembly.
(h.) Control of non-conforming items and system for corrective actions and
resolution of deviations.
(i.) Inspection and test procedure both for manufacture and field activities.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
24 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(j.) Control of calibration and testing of measuring testing equipment.
(k.) System for Quality Audits.
(l.) System for identification and appraisal of inspection status.
(m.) System for authorising release of manufactured product to the
Employer.
(n.) System for handling, storage and delivery.
(o.) System for maintenance of records, and
(p.) Quality plans for manufacturing and field activities detailing out the
specific quality control procedure adopted for controlling the quality
characteristics relevant to each item of equipment/component.
9.02.00 GENERAL REQUIREMENTS - QUALITY ASSURANCE
9.02.01 All materials, components and equipment covered under this specification shall
be procured, manufactured, erected, commissioned and tested at all the
stages, as per a comprehensive Quality Assurance Programme. An indicative
programme of inspection/tests to be carried out by the contractor for some of
the major items is given in the respective technical specification which shall
be finalised giving due consideration to the manufacturer's standard and
proven practices being followed. This is, however, not intended to form a
comprehensive programme as it is the contractor's responsibility to draw up
and implement such programme duly approved by the Employer. The detailed
Quality Plans for manufacturing and field activities shall be drawn up by the
Bidder and will be submitted to Employer for approval. Schedule of finalisation
of such quality plans will be finalised before award. Monthly progress reports
on MQP/FQP submission/approval shall be furnished on enclosed format No.
QS-01-QAI-P-02/F1.
9.02.02 Manufacturing Quality Plan will detail out for all the components and
equipment, various tests/inspection, to be carried out as per the requirements
of this specification and standards mentioned therein and quality practices and
procedures followed by Contractor's/ Sub-contractor's/ sub-supplier's Quality
Control Organisation, the relevant reference documents and standards,
acceptance norms, inspection documents raised etc., during all stages of
materials procurement, manufacture, assembly and final testing/performance
testing. The Quality Plan shall be submitted on electronic media through c-
folders, a web based system of NTPC ERP in addition to hard copy, for
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
25 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
review and approval. After approval the same shall be submitted in compiled
form on CD-ROM.
9.02.03 Field Quality Plans will detail out for all the equipment, the quality practices
and procedures etc. to be followed by the Contractor's "Site Quality Control
Organisation", during various stages of site activities starting from receipt of
materials/equipment at site.
9.02.04 The Bidder shall also furnish copies of the reference documents/plant
standards/acceptance norms/tests and inspection procedure etc., as referred in
Quality Plans along with Quality Plans. These Quality Plans and reference
documents/standards etc. will be subject to Employer's approval without which
manufacturer shall not proceed. These approved documents shall form a part
of the contract. In these approved Quality Plans, Employer shall identify
customer hold points (CHP), i.e. test/checks which shall be carried out in
presence of the Employer's Project Manager or his authorised representative
and beyond which the work will not proceed without consent of Employer in
writing. All deviations to this specification, approved quality plans and
applicable standards must be documented and referred to Employer along with
technical justification for approval and dispositioning.
9.02.05 No material shall be despatched from the manufacturer's works before the
same is accepted, subsequent to predespatch final inspection including
verification of records of all previous tests/inspections by Employer's Project
Manager/Authorised representative and duly authorised for despatch by
issuance of Material Despatch Clearance Certificate (MDCC).
9.02.06 All material used for equipment manufacture including casting and forging etc.
shall be of tested quality as per relevant codes/standards. Details of results
of the tests conducted to determine the mechanical properties; chemical
analysis and details of heat treatment procedure recommended and actually
followed shall be recorded on certificates and time temperature chart. Tests
shall be carried out as per applicable material standards and/or agreed details.
9.02.07 The contractor shall submit to the Employer Field Welding Schedule for field
welding activities in the enclosed format No.: QS-01-QAI-P-02/F2. The field
welding schedule shall be submitted to the Employer along with all supporting
documents, like welding procedures, heat treatment procedures, NDT
procedures etc. at least ninety days before schedule start of erection work at
site.
9.02.08 All welding and brazing shall be carried out as per procedure drawn and
qualified in accordance with requirements of ASME Section IX/BS-4870 or other
International equivalent standard acceptable to the Employer.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
26 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
All welding/brazing procedures shall be submitted to the Employer or its
authorised representative for approval prior to carrying out the welding/brazing.
9.02.09 All brazers, welders and welding operators employed on any part of the
contract either in Contractor's/sub-contractor's works or at site or elsewhere
shall be qualified as per ASME Section-IX or BS-4871 or other equivalent
International Standards acceptable to the Employer.
9.02.10 Welding procedure qualification & Welder qualification test results shall be
furnished to the Employer for approval. However, where required by the
Employer, tests shall be conducted in presence of Employer/authorised
representative.
9.02.11 For all IBR pressure parts and high pressure piping welding, the latest
applicable requirements of the IBR (Indian Boiler Regulations) shall also be
essentially complied with. However, for other piping system ASME B31.1 or
other relevant code as applicable shall be followed. Similarly, any other
statutory requirements for the equipment/systems shall also be complied with.
On all back-gauged welds MPI/LPI shall be carried before seal welding.
9.02.12 Unless otherwise proven and specifically agreed with the Employer, welding of
dissimilar materials and high alloy materials shall be carried out at shop only.
9.02.13 No welding shall be carried out on cast iron components for repair.
9.02.14 All the heat treatment results shall be recorded on time temperature charts
and verified with recommended regimes.
9.02.15 All non-destructive examination shall be performed in accordance with written
procedures as per International Standards, The NDT operator shall be
qualified as per SNT-TC-IA (of the American Society of non-destructive
examination) / EN / Equivalent. NDT shall be recorded in a report, which
includes details of methods and equipment used, result/evaluation, job data
and identification of personnel employed and details of co-relation of the test
report with the job.
All plates of thickness above 40mm & all bar stock/Forging above 40mm dia
shall be ultrasonically tested. For pressure parts, plate of thickness equal to or
above 25mm shall be ultrasonically tested.
9.02.16 The Contractor shall list out all major items/ equipment/ components to be
manufactured in house as well as procured from sub-contractors (BOI). All the
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
27 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
sub-contractor proposed by the Contractor for procurement of major bought out
items including castings, forging, semi-finished and finished components/
equipment etc., list of which shall be drawn up by the Contractor and finalised
with the Employer, shall be subject to Employer's approval. The contractor's
proposal shall include vendor's facilities established at the respective works,
the process capability, process stabilization, QC systems followed, experience
list, etc. along with his own technical evaluation for identified sub-contractors
enclosed and shall be submitted to the Employer for approval within the
period agreed at the time of pre-awards discussion and identified in "DR"
category prior to any procurement. Monthly progress reports on sub-contractor
detail submission / approval shall be furnished on enclosed on format no. QS-
01-QAI-P-02/F1. Such vendor approval shall not relieve the contractor from any
obligation, duty or responsibility under the contract.
9.02.17 For components/equipment procured by the contractors for the purpose of the
contract, after obtaining the written approval of the Employer, the contractor's
purchase specifications and inquiries shall call for quality plans to be submitted
by the suppliers. The quality plans called for from the sub-contractor shall
set out, during the various stages of manufacture and installation, the quality
practices and procedures followed by the vendor's quality control organisation,
the relevant reference documents/standards used, acceptance level, inspection
of documentation raised, etc. Such quality plans of the successful vendors
shall be finalised with the Employer and such approved Quality Plans shall
form a part of the purchase order/contract between the Contractor and sub-
contractor. With in three weeks of the release of the purchase orders /
contracts for such bought out items /components, a copy of the same without
price details but together with the detailed purchase specifications, quality plans
and delivery conditions shall be furnished to the Employer on the monthly
basis by the Contractor along with a report of the Purchase Order placed so
far for the contract.
9.02.18 Employer reserves the right to carry out quality audit and quality surveillance of
the systems and procedures of the Contractor's or their sub-contractor's quality
management and control activities. The contractor shall provide all necessary
assistance to enable the Employer carry out such audit and surveillance.
9.02.19 The contractor shall carry out an inspection and testing programme during
manufacture in his work and that of his sub-contractor's and at site to ensure
the mechanical accuracy of components, compliance with drawings,
conformance to functional and performance requirements, identity and
acceptability of all materials parts and equipment. Contractor shall carry out
all tests/inspection required to establish that the items/equipment conform to
requirements of the specification and the relevant codes/standards specified in
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
28 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
the specification, in addition to carrying out tests as per the approved quality
plan.
9.02.20 Quality audit/surveillance/approval of the results of the tests and inspection will
not, however, prejudice the right of the Employer to reject the equipment if it
does not comply with the specification when erected or does not give complete
satisfaction in service and the above shall in no way limit the liabilities and
responsibilities of the Contractor in ensuring complete conformance of the
materials/equipment supplied to relevant specification, standard, data sheets,
drawings, etc.
9.02.21 For all spares and replacement items, the quality requirements as agreed for
the main equipment supply shall be applicable.
9.02.22 Repair/rectification procedures to be adopted to make the job acceptable shall
be subject to the approval of the Employer/ authorised representative.
9.02.23 Environmental Stress Screening
All solid state electronic system / equipment / sub assembly shall be free
from infant mortile components. For establishing the compliance to this
requirement, the contractor / sub - contractor should meet the following.
1) The Contractor / Sub - contractor shall furnish the established
procedure being followed for eliminating infant mortile components. The
procedure followed by the Contractor / Sub - contractor should be
substantiated along with the statistical figures to validate the procedure
being followed. The necessary details as required under this clause
shall be furnished at the stage of QP finalization.
Or
In case the Contractor / Sub - contractor do not have any established
procedure to eliminate infant mortile components then two or 10%
which ever is less, most densely populated Panels shall be tested for
Elevated Temperature Cycle Test as per the following procedure.
Elevated Temperature Test Cycle
During the elevated temperature test which shall be for 48 hours, the
ambient temperature shall be maintained at 50 C. The equipment shall
be interconnected with devices and kept under energized conditions so
as to repeatedly perform all operations it is expected to perform in
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
29 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
actual service with load on various components being equal to those
which will be experienced in actual service.
During the elevated temperature test the cubicle doors shall be closed
(or shall be in the position same as they are supposed to be in the
field) and inside temperature in the zone of highest heat dissipating
components / modules shall be monitored. The temperature rise inside
the cubicle should not exceed 10 C above the ambient
temperature at 50 C.
In case of any failure during the test cycle, the further course of action
should be mutually discussed for demonstrating the intent of the above
requirement.
2) Burn in Test Cycle
The test shall be conducted on all the panels fully assembled and
wired including the panels having undergone the above mentioned
elevated temperature test.
The period of Burn in Test Cycle shall be 120 hrs and process shall
be similar to the elevated temperature test as above except that the
temperature shall be reduced to the ambient temperature prevalent at
that time.
During the above tests, the process I/O and other load on the system
shall be simulated by simulated inputs and in the case of control
systems; the process which is to be controlled shall also be
simulated. Testing of individual components or modules shall not be
acceptable.
During the Burn in Test the cubicle doors shall be closed (or shall be
in the position same as they are supposed to be in the field) and
inside temperature in the zone of highest heat dissipating components
/ modules shall be monitored. The temperature rise inside the cubicle
should not exceed 10 C above the ambient temperature.
The Contractor / Sub-contractor shall carry out routine test on 100% item
at contractor / sub-contractor's works. The quantum of check / test for
routine & acceptance test by employer shall be generally as per criteria
/ sampling plan defined in referred standards. Wherever standards have
not been mentioned quantum of check / test for routine / acceptance test
shall be as agreed during detailed engineering stage.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
30 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
9.03.00 QA DOCUMENTATION PACKAGE
The Contractor shall be required to submit the QA Documentation in two hard
copies and two CD ROMs, as identified in respective quality plan with tick (9)
mark.
9.03.01 Each QA Documentation shall have a project specific Cover Sheet bearing
name & identification number of equipment and including an index of its
contents with page control on each document.
The QA Documentation file shall be progressively completed by the Supplier's
sub- supplier to allow regular reviews by all parties during the manufacturing.
The final quality document will be compiled and issued at the final assembly
place of equipment before despatch. However CD-Rom may be issued not
later than three weeks.
9.03.02 Typical contents of QA Documentation is as below:-
(a.) Quality Plan
(b.) Material mill test reports on components as specified by the specification
and approved Quality Plans.
(c.) Manufacturer / works test reports/results for testing required as per
applicable codes and standard referred in the specification and approved
Quality Plans.
(d.) Non-destructive examination results /reports including radiography
interpretation reports. Sketches/drawings used for indicating the method
of traceability of the radiographs to the location on the equipment.
(e.) Heat Treatment Certificate/Record (Time- temperature Chart)
(f.) All the accepted Non-conformance Reports (Major/Minor) / deviation,
including complete technical details / repair procedure).
(g.) CHP / Inspection reports duly signed by the Inspector of the Employer
and Contractor for the agreed Customer Hold Points.
(h.) Certificate of Conformance (COC) wherever applicable.
(i.) MDCC
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
31 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
9.03.03 NOT USED.
9.03.04 Similarly, the contractor shall be required to submit two sets (two hard copies
and two CD ROMs), containing QA Documentation pertaining to field activities
as per Approved Field Quality Plans and other agreed manuals/ procedures,
prior to commissioning of individual system.
9.03.05 Before despatch / commissioning of any equipment, the Supplier shall make
sure that the corresponding quality document or in the case of protracted
phased deliveries, the applicable section of the quality document file is
completed. The supplier will then notify the Inspector regarding the readiness
of the quality document (or applicable section) for review.
(a.) If the result of the review carried out by the Inspector is satisfactory, the
Inspector shall stamp the quality document (or applicable section) for release.
(b.) If the quality document is unsatisfactory, the Supplier shall endeavor to
correct the incompleteness, thus allowing to finalize the quality
document (or applicable section) by time compatible with the
requirements as per contract documents. When it is done, the quality
document (or applicable section) is stamped by the Inspector.
(c.) If a decision is made for despatch, whereas all outstanding actions
cannot be readily cleared for the release of the quality document by
that time, the supplier shall immediately, upon shipment of the
equipment, send a copy of the quality document Review Status signed
by the Supplier Representative to the Inspector and notify of the
committed date for the completion of all outstanding actions &
submission. The Inspector shall stamp the quality document for
applicable section when it is effectively completed. The submission of
QA documentation package shall not be later than 3 weeks after the
despatch of equipment.
9.03.06 TRANSMISSION OF QA DOCUMENTATION
On release of QA Documentation by Inspector, one set of quality document
shall be forwarded to Corporate Quality Assurance Department and other set
to respective Project Site of Employer.
For the particular case of phased/part derivatives of equipment, the complete
quality document of that particular equipment to the Employer shall be issued
not later than 3 weeks after the date of the last delivery of equipment.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
32 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
9.04.00 Proj ect Manager' s Supervi si on
9.04.01 To eliminate delays and avoid disputes and litigation, it is agreed between the
parties to the Contract that all matters and questions shall be referred to the
Project Manager and without prejudice to the provisions of 'Arbitration' clause
in Section GCC of Vol.I, the Contractor shall proceed to comply with the
Project Manager's decision.
9.04.02 The work shall be performed under the supervision of the Project Manager.
The scope of the duties of the Project Manager pursuant to the Contract, will
include but not be limited to the following:
(a.) Interpretation of all the terms and conditions of these documents and
specifications:
(b.) Review and interpretation of all the Contractor's drawing, engineering
data, etc:
(c.) Witness or his authorised representative to witness tests and trials
either at the manufacturer's works or at site, or at any place where
work is performed under the contract :
(d.) Inspect, accept or reject any equipment, material and work under the
contract:
(e.) Issue certificate of acceptance and/or progressive payment and final
payment certificates
(f.) Review and suggest modifications and improvement in completion
schedules from time to time, and
(g.) Supervise Quality Assurance Programme implementation at all stages
of the works.
9.05.00 INSPECTION, TESTING AND INSPECTION CERTIFICATES
9.05.01 The word 'Inspector' shall mean the Project Manager and/or his authorised
representative and/or an outside inspection agency acting on behalf of the
Employer to inspect and examine the materials and workmanship of the works
during its manufacture or erection.
9.05.02 The Project Manager or his duly authorised representative and/or an outside
inspection agency acting on behalf of the Employer shall have access at all
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
33 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
reasonable times to inspect and examine the materials and workmanship of
the works during its manufacture or erection and if part of the works is being
manufactured or assembled on other premises or works, the Contractor shall
obtain for the Project Manager and for his duly authorised representative
permission to inspect as if the works were manufactured or assembled on the
Contractor's own premises or works.
9.05.03 The Contractor shall give the Project Manager/Inspector ten (10) working days
written notice of any material being ready for testing. Such tests shall be to
the Contractor's account except for the expenses of the Inspector's. The
Project Manager/Inspector, unless the witnessing of the tests is virtually waived
and confirmed in writing, will attend such tests within ten (10) working days of
the date on which the equipment is noticed as being ready for test/inspection
failing which the contractor may proceed with test which shall be deemed to
have been made in the inspector's presence and he shall forthwith forward to
the inspector duly certified copies of test reports in two (2) copies.
9.05.04 The Project Manager or Inspector shall within ten (10) working days from the
date of inspection as defined herein give notice in writing to the Contractor, or
any objection to any drawings and all or any equipment and workmanship
which is in his opinion not in accordance with the contract. The Contractor
shall give due consideration to such objections and shall either make
modifications that may be necessary to meet the said objections or shall
inform in writing to the Project Manager/Inspector giving reasons therein, that
no modifications are necessary to comply with the contract.
9.05.05 When the factory tests have been completed at the Contractor's or sub-
contractor's works, the Project Manager /Inspector shall issue a certificate to
this effect ten (10) working days after completion of tests but if the tests are
not witnessed by the Project Manager /Inspectors, the certificate shall be
issued within ten (10) working days of the receipt of the Contractor's test
certificate by the Project Manager /Inspector. Project Manager /Inspector to
issue such a certificate shall not prevent the Contractor from proceeding with
the works. The completion of these tests or the issue of the certificates shall
not bind the Employer to accept the equipment should it, on further tests after
erection be found not to comply with the contract.
9.05.06 In all cases where the contract provides for tests whether at the premises or
works of the Contractor or any sub-contractor, the Contractor, except where
otherwise specified shall provide free of charge such items as labour, material,
electricity, fuel, water, stores, apparatus and instruments as may be reasonably
demanded by the Project Manager /Inspector or his authorised representatives
to carry out effectively such tests on the equipment in accordance with the
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
34 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Contractor and shall give facilities to the Project Manager/Inspector or to his
authorised representative to accomplish testing.
9.05.07 The inspection by Project Manager / Inspector and issue of Inspection
Certificate thereon shall in no way limit the liabilities and responsibilities of the
Contractor in respect of the agreed Quality Assurance Programme forming a
part of the contract.
9.05.08 To facilitate advance planning of inspection in addition to giving inspection
notice as specified at clause no 9.05.03- of this chapter, the Contractor shall
furnish quarterly inspection programme indicating schedule dates of inspection
at Customer Hold Point and final inspection stages. Updated quarterly
inspection plans will be made for each three consecutive months and shall be
furnished before beginning of each calendar month.
9.05.09 All inspection, measuring and test equipment used by contractor shall be
calibrated periodically depending on its use and criticality of the test/
measurement to be done. The Contractor shall maintain all the relevant
records of periodic calibration and instrument identification, and shall produce
the same for inspection by NTPC. Wherever asked specifically, the contractor
shall re-calibrate the measuring/test equipment in the presence of Project
Manager / Inspector.
9.06.00 ASSOCIATED DOCUMENT FOR QUALITY ASSURANCE PROGRAMME:
9.06.01 List of items requiring Quality Plan & Sub-supplier approval.
Format No. QS-01-QAI-P-01/F3-R0
9.06.02 Status of Quality Plan and Sub-supplier approval
Format No. QS-01-QAI-P-02/F1-R0
9.06.03 Field Welding Schedule Format No.: QS-01-QAI-P-02/F2-R0
9.06.04 Manufacturing Quality Plan Format No.: QS-01-QAI-P-09/F1-R0
9.06.05 Field Quality Plan Format No.: QS-01-QAI-P-09/F2-R0
The above formats are enclosed as Annexure-III to VII
10.00.00 PRE-COMMISSIONING AND COMMISSIONING FACILITIES
(a.) As soon as the facilities or part thereof has been completed
operationally and structurally and before start-up, each item of the
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
35 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
equipment and systems forming part of facilities shall be thoroughly
cleaned and then inspected jointly by the Employer and the Contractor
for correctness of and completeness of facility or part thereof and
acceptability for initial pre-commissioning tests, commissioning and start-
up at Site. The list of pre-commissioning tests to be performed shall
be as mutually agreed and included in the Contractor's quality
assurance programme as well as those included elsewhere in the
Technical Specifications.
(b.) The Contractor's pre-commissioning/ commissioning/start-up engineers,
specially identified as far as possible, shall be responsible for carrying
out all the pre-commissioning tests at Site. On completion of inspection,
checking and after the pre-commissioning tests are satisfactorily over,
the commissioning of the complete facilities shall be commenced during
which period the complete facilities, equipments shall be operated
integral with sub-systems and supporting equipment as a complete
plant.
(c.) All piping system shall be flushed, steam blown, air blown as required
and cleanliness demonstrated using acceptable industry standards.
Procedures to accomplish this work shall be submitted for approval to
the Employer six months prior to the respective implementations. The
Employer will approve final verification of cleanliness. DM water/steam
required for the above purpose (as per employer approved procedure)
shall be provided by the Employer free of charge as per mutually
agreed schedule.
(d.) The time consumed in the inspection and checking of the units shall
be considered as a part of the erection and installation period.
(e.) The check outs during the pre - commissioning period should be
programmed to follow the construction completion schedule. Each
equipment/system, as it is completed in construction and turned over to
Employer's commissioning (start-up) Engineer(s), should be checked out
and cleaned. The checking and inspection of individual systems should
then follow a prescribed commissioning documentation [SLs (Standard
Check List) / TS (Testing Schedule) / CS (Commissioning Schedule)]
approved by the Employer.
(f.) The Contractor during initial operation and performance testing shall
conduct vibration testing to determine the 'base line' of performance of
all plant rotating equipment. These tests shall be conducted when the
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
36 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
equipment is running at the base load, peak load as well as lowest
sustained operating condition as far as practicable.
(g.) Contractor shall furnish the commissioning organization chart for review
& acceptance of employer at least eighteen months prior to the
schedule date of synchronization of 1st unit. The chart should contain:
(1.) Biodata including experience of the Commissioning Engineers.
(2.) Role and responsibilities of the Commissioning Organisation
members.
(3.) Expected duration of posting of the above Commissioning
Engineers at site.
10.02.00 Initial Operation
a) On completion of all pre-commissioning activities / tests and as a part
of commissioning the complete facilities shall be put on 'Initial
Operation' during which period all necessary adjustments shall be made
while operating over the full load range enabling the facilities to be
made ready for the Guarantee Tests.
b) The 'Initial Operation' of the complete facility as an integral unit shall be
conducted for 720 continuous hours. During the period of initial
operation of 720 hours, the unit shall operate continuously at full rated
load for a period not less than 72 hours.
c) The Initial Operation shall be considered successful, provided that each
item/ part of the facility can operate continuously at the specified
operating characteristics, for the period of Initial Operation with all
operating parameters within the specified limits and at or near the
predicted performacne of the equipment/ facility.
d) The Contractor shall intimate the Employer about the commencement of
initial operation and shall furnish adequate notice to the Employer in
this respect.
e) Any loss of generation due to constraints attributable to the Employer
shall be construed as Deemed Generation.
In the event of test interruptions as a result of Force Majeure or
Employer-Caused-Delay during Initial Operation test, where.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
37 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(i) The total cumulative interrupted time during the test is more
than twenty-four (24) hours.
(ii) The total number of interruptions during the test is more
than four (4).
The test shall not be deemed a successful Initial Operation Test.
The interrupted test resulting from Force Majeure or Employer-Caused-
Delay shall be extended by an amount of time equal to the cumulative
length of the interruptions, including time to return to steady-state
operation; the test data for the period of interruptions shall be excluded
from analysis; and the test data that were collected both before and
after the interruptions shall be included in the analysis.
f) An Initial Operation report comprising of observations and recordings of
various parameters to be measured in respect of the above Initial
Operation shall be prepared by the Contractor. This report, besides
recording the details of the various observations during initial operation
shall also include the dates of start and finish of the Initial Operation
and shall be signed by the representatives of both the parties. The
report shall have sheets, recording all the details of interruptions
occurred, adjustments made and any minor repairs done during the
Initial Operation. Based on the observations, necessary modifications/
repairs to the plant shall be carried out by the Contractor to the full
satisfaction of the Employer to enable the latter to accord permission
to carry out the Guarantee tests on the facilities. However, minor
defects which do not endanger the safe operation of the equipment,
shall not be considered as reasons for with holding the aforesaid
permission.
(g) Grid Restriction
Any loss in generation in terms of power (KW) or energy (KWH) during
Initial operation Test due to grid restrictions shall be treated as deemed
generation. however, the total cumulative deemed generation shall not
exceed 5% of the total generation during the test period failing which
the test shall be extended to limit the deemed generation to 5% of the
total generation.
11.00.00 GUARANTEE TESTS
a) The final test as to prove the Functional Guarantees shall be
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
38 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
conducted at Site by the Contractor in presence of the Employer. The
contractor's Commissioning, Start-up Engineer shall make the unit ready
to conduct such test. Such test will be commenced, within a period
of t hr ee (3) mont hs after the successful completion of Initial
Operations. Any extension of time beyond the above three (3) months
shall be mutually agreed upon.
b) These tests shall be binding on both the parties of the Contract to
determine compliance of the equipment with the functional guarantee.
c) For performance/ demonstration tests instrumentations, of accuracy
class, to the approval of the Employer shall be used. The numbers
and location of the instruments shall be as per the specified test
codes. In addition the values of parameters shall be logged from the
information system provided under Employer's Distributed Digital Control
Monitoring and Information system. Test will be conducted at specified
load points.
d) Any special equipment, tools and tackles required for the successful
completion of the Guarantee Tests shall be provided by the Contractor,
free of cost.
e) The Guarantee tests and specific tests to be conducted on equipments
have been brought out in detail elsewhere in the specification.
12.00.00 TAKING OVER
Upon successful completion of Initial Operations and all the tests, other than
Guarantee Tests conducted to the Employer's satisfaction, the Employer shall
issue to the Contractor a Taking over Certificate as a proof of the final
acceptance of the equipment. Such certificate shall not unreasonably be with
held nor will the Employer delay the issuance thereof, on account of minor
omissions or defects which do not affect the commercial operation and/or
cause any serious risk to the equipment. Such certificate shall not relieve the
Contractor of any of his obligations which otherwise survive, by the terms and
conditions of the Contract after issuance of such certificate.
13.00.00 TRAINING OF EMPLOYER' S PERSONNEL
13.01.00 The scope of service under training of Employer's engineers shall include a
training module in the areas of Operation & Maintenance.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
39 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Such training should cover the following areas as a minimum in order to
enable these personnel to individually take the responsibility of operating and
maintaining the power station in a manner acceptable to the Employer:
(a.) Training for TG and related equipments.
(b.) TG related C&I system like turbine supervisory system (TSS) etc.
(c.) DDCMIS as detailed in Part-B
(d.) Training for Electric Power Supply systems
(e.) Training for power cycle piping/critical piping.
13.02.00 The scope of services under training shall also necessarily include training of
Employer's Engineering personnel covering a training module of upto 23 man
months. This shall cover all disciplines viz, Mechanical, Electrical, C&I, & QA
etc. and shall include all the related areas like Design familiarization, training
on product design features and product design softwares of major equipment
and systems, engineering, manufacturing, erection, commissioning, training on
operating features of equipment, quality assurance and testing, plant visits and
visits to manufacturer's works, exposure to various kinds of problems which
may be encountered in fabrication, manufacturing, erection, welding etc. An
indicative module of the training requirement of Employer's Engineering
personnel is attached as Annexure-II.
13.03.00 Bidder shall furnish in his offer, details of training module(s) covering above
requirements which shall be subject to Employer's approval. Consolidated
training period included above (i.e. 35 and 23 man months respectively for
O&M and Engineering) is indicative only. Owner reserves the right to
reappropriate the training period between O&M and engineering depending upon
the details of training module proposed by the Bidder.
13.04.00 Exact details, extent of training and the training schedule shall be finalised
based on the Bidder's proposal within two (2) months from placement of
award.
13.05.00 In all the above cases, wherever the training of Employer's personnel is
arranged at the works of the manufacturer's it shall be noted that the lodging
and boarding of the Employer's personnel shall be at the cost of Bidder. The
Bidder shall make all necessary arrangements towards the same.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
40 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
13.06.00 Take off prices (product wise) should be indicated by the Bidder in the Bid
Proposal Sheets. Employer reserves the right to include or exclude these
item(s) during placement of Award.
13.07.00 For training purpose one (1) man month implies 30 working days (excluding
all intervenning holidays) per person.
14.00.00 SAFETY ASPECTS DURING CONSTRUCTION AND ERECTION
In addition to the requirements given in Erection Conditions of Contract (ECC)
the following shall also cover:
(a.) Working platforms should be fenced and shall have means of access.
(b.) Ladders in accordance with Employer's safety rules for construction
and erection shall be used. Rungs shall not be welded on columns. All
the stairs shall be provided with handrails immediately after its erection.
15.00.00 NOISE LEVEL
The equivalent 'A' weighted sound pressure level measured at a height of 1.5
m above floor level in elevation and at a distance of one (1) metre
horizontally from the nearest surface of any equipment / machine, furnished
and installed under these specifications, expressed in decibels to a reference
of 0.0002 microbar, shall not exceed 85 dBA except for
(a.) Safety valves and associated vent pipes for which it shall not exceed
105 dBA.
(b.) Regulating drain valves in which case it shall be limited to 90 dBA.
(c.) TG unit in which case it shall not exceed 90 dBA.
(d.) For HP-LP bypass valves and other intermittantly operating control
valves, the noise level shall be within the limit of 90 dBA.
16.00.00 PACKAGING AND TRANSPORTATION
All the equipments shall be suitably protected, coated, covered or boxed and
crated to prevent damage or deterioration during transit, handling and storage
at Site till the time of erection. While packing all the materials, the limitation
from the point of view of the sizes of railway wagons available in India should
be taken account of. The Contractor shall be responsible for any loss or
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
41 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
damage during transportation, handling and storage due to improper packing.
The Contractor shall ascertain the availability of Railway wagon sizes from the
Indian Railways or any other agency concerned in India well before effecting
despatch of equipment. Before despatch it shall be ensured that complete
processing and manufacturing of the components is carried out at shop, only
restricted by transport limitation, in order to ensure that site works like grinding,
welding, cutting & preassembly to bare minimum. The Employer's Inspector
shall have right to insist for completion of works in shops before despatch of
materials for transportation.
17.00.00 ELECTRICAL ENCLOSURE
All electrical equipments and devices, including insulation, heating and ventilation
devices shall be designed for ambient temperature and a maximum relative
humidity as specified elsewhere in the specification,
18.00.00 INSTRUMENTATION AND CONTROL
All instrumentation and control systems/ equipment/ devices/ components,
furnished under this contract shall be in accordance with the requirements
stated herein, unless otherwise specified in the detailed specifications.
18.01.00 All instrument scales and charts shall be calibrated and printed in metric units
and shall have linear graduation. The ranges shall be selected to have the
normal reading at 75% of full scale.
All scales and charts shall be calibrated and printed in Metric Units as follows:
a) Temperature - Degree centigrade (deg C)
b) Pressure - Kilograms per square centimetre (Kg/cm2).
Pressure instrument shall have the unit suffixed
with 'a' to indicate absolute pressure. If nothing is
there, that will mean that the indicated pressure is
gauge pressure.
c) Draught - Millimetres of water column (mm wc).
d) Vacuum - Millimeters of mercury column (mm Hg) or water
column (mm Wcl).
e) Flow (Gas) - Tonnes/ hour
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
42 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
f) Flow (Steam) - Tonnes/ hour
g) Flow (Liquid) - Tonnes / hour
h) Flow base - 760 mm Hg. 15 deg.C
i) Density - Grams per cubic centimetre.
18.02.00 All instruments and control devices provided on panels shall be of
miniaturized design, suitable for modular flush mounting on panels with front
draw out facility and flexible plug-in connection at rear.
18.03.00 NOT USED.
19.00.00 ELECTRICAL NOISE CONTROL
The equipment furnished by the Contractor shall incorporate necessary
techniques to eliminate measurement and control problems caused by electrical
noise. Areas in Contractor's equipment which are vulnerable to electrical noise
shall be hardened to eliminate possible problems. Any additional equipment,
services required for effectively eliminating the noise problems shall be
included in the proposal. The equipment shall be protected against ESD as per
IEC-61000-2. Radio Frequency interference (RFI) and Electro Magnetic
Interference (EMI) protection against hardware damage and control system
mal-operations/errors shall be provided for all systems as per EN-50082-2
(1995).
20.00.00 INSTRUMENT AIR SYSTEM
The instrument air supply system as supplied by the Contractor for various
pneumatic control & instrumentation devices like pneumatic actuators, power
cylinders, E/P converters, piping / tubing etc. shall be as per the details
furnished elsewhere.
Each pneumatic instrument shall have an individual air shut - off valve. The
pressure regulating valve shall be equipped with an internal filter, a 50 mm
pressure gauge and a built-in filter housing blow down valve.
21.00.00 TAPPING POINTS FOR MEASUREMENTS
Tapping points shall include probes, wherever applicable, for analytical
measurements and sampling.
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
43 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
For direct temperature measurement of all working media, one stub with
internal threading of approved pattern shall be provided along with suitable plug
and washer. The Contractor will be intimated about thread standard to be
adopted.
The following shall be provided on equipment by the Contractor. The standard
which is to be adopted, will be intimated to the Contractor.
(a.) Temperature test pockets with stub and thermowell
(b.) Pressure test pockets
22.00.00 NOT USED
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
44 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ANNEXURE-1
---------------------------------------------------------------------------------------------------------------------------------------
S.NO. DESCRIPTION OF DOCUMENTS NO OF PRINTS NO. OF CD-ROMs
---------------------------------------------------------------------------------------------------------------------------------------
1. PLANT DEFINITION MANUAL- 2 sets 4 CD-ROMs
2. Drawings "FOR APPROVAL"
i) Layout drawings / P&IDs 6 2 CD - ROMs
ii) Other drawings 2 2 CD - ROMs
3. Drawings "FOR INFORMATION" 2 2 CD - ROMs
4. Drawings "FINAL DRAWING" 15 4 CD-ROMs
5. Drawings "AS BUILT " 15 4 CD-ROMs
6 DATASHEETS, DESIGN
CALCULATIONS, PURCHASE
SPECIFICATIONS, etc. and
Other type of documents
i) For Approval 2 2 CD - ROMs
ii) FINAL 15 4 CD-ROMs -
iii) Analysis reports of equip- 2 2 CD - ROMs
ments/ piping/ structures
components/ systems
employing software
packages as detailed
in the specifications
7. Erection manual "1st Submission" 4 Sets 2 CD - ROMs
8 Erection manual "FINAL" 4 Sets 4 CD ROMs
9 Operation & Maintenance 4 2 CD - ROMs
manual "1st submission"
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
45 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
---------------------------------------------------------------------------------------------------------------------------------------
S.NO. DESCRIPTION OF DOCUMENTS NO OF PRINTS NO. OF CD-ROMs
---------------------------------------------------------------------------------------------------------------------------------------
10 Operation & Maintenance 4 Sets 4 CD-ROMs
manual "FINAL"
11 Plant Hand Book "1st Submission" 4 Sets 2 CD ROMs
12 Plant Hand Book "FINAL" 4 Sets 4 CD ROMs
13 Commissioning and Performance 4 Sets 2 CD-ROMs
Procedure manual "1st Submission"
14 Commissioning and Performance
Procedure manual "FINAL" 4 Sets 4 CD ROMs
15 Performance and Functional 4 Sets 4 CD ROMs
GURANTEES TEST REPORT
16 Project completion report 15 4 CD ROMs
17 QA programme including Organi- 1 1 CD ROM
sation for implement-ation and
QA systemmanual (with revision-
servicing)
18 Vendor details in respect of pro- 1 1 CD ROM
posed vendors including contractor's
evaluation report.
19 Manufacturing QPs, Field QPs,
Field welding schedules and their
reference documents like test
procedures, WPS, PQR etc.
(i) For review/comment 2 2 CD-ROMs
(ii) For final approval 2 2 CD ROMs
CLAUSE NO. GENERAL TECHNICAL REQUIREMENTS
GENERAL TECHNICAL
REQUIREMENTS
PAGE
46 OF 64
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
---------------------------------------------------------------------------------------------------------------------------------------
S.NO. DESCRIPTION OF DOCUMENTS NO OF PRINTS NO. OF CD-ROMs
---------------------------------------------------------------------------------------------------------------------------------------
20 Welding Manual, HeatTreatment
Manuals, Storage & preservation
manuals
1st Submission 4 Sets 2 CD ROMs sets
Final 4 sets 4 CD ROMs
21 QA Documentation Packagefor
items / equipmentmanufactured
and and despatched to site 2 sets 4 CD ROMs
22 QA Documentation Package for
field activities on equipment /
systems at site 2 sets 4 CD ROMS
---------------------------------------------------------------------------------------------------------------------------------------
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
47 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TURBINE
GENERATOR AND Turbine cycle optimization and turbine Familiarization of power Manufacturing processes
IT'S INTEGRAL performance in off design condition. plants of various makes of of turbine
AUXILIARIES turbines for super critical
units
Rotor design and strength calculation Collection of data for Assembly of turbine
analysis of availability
of turbines
Rotor dynamic behavior studies wrt Comparative studies for Testing of turbines
natural frequency, critical speed, integral systems of turbine
vibration etc.
Blade profile/root design and blade O&M history/problems Product development in
strength design, blade vibration related to turbine process
analysis
Casing & diaphragm design Failure analysis Future plan for
technology induction
Labyrinth seal selection & design for R&D work in progress
different turbine configurations
Selection of turbine type (i.e. Tandem
vs cross compounding, separate
HP/IP vs combined HP/IP, material
of construction etc.)
Design principle for Up rating/down
rating of existing design/ modules for
the specific project.
ANNEXURE - II
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
48 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Selection of nos., type and arrangement
of bearings, load calculation on
bearings, bearing oil flow calculation
Selection, design and control principle
for Turbine governing system
Performance calculation
Steam path audit
Layout principle of various equipment's
of TG and its integral system
Latest technological advancements
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 45 10 10
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Boiler Feed Techno-economic syudies for Selection Familiarization of power Manufacturing process of
Pumps of BFP Configuration and its drive plants of various makes various components of
of feed pumps for super BFP
critical units
Criteria for selection of boiler Feed Data collection of BFP Assembly of BFP
Pump parameters parameters and
configuration
Rotor design, strength calculation and Collection of data for Testing, capabilities of
rotor dynamic behavior studies wrt analysis of availability of BFP at works wrt
critical speed, vibration etc BFP performance, NPSH,
thermal shock, dry run,
visual cavitation, string
test, axial thrust
measurement
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
49 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Impeller design and its hydraulic O&M history/problems Product development in
behavior related to BFP process
Role of critical para- meters such as Comparative studies for Future plan for techno-
NPSH(R), Suction specific speed, various types of BFP& its logy induction
running clearances, speed etc. in features
design of feed pumps
Material selection of BFP components R&D work in progress
Guiding factors for selection of BFP
seals
Computation of axial thrust under
various flows
Performance calculation
Transient analysis in pump suction
piping wrt NPSH margin
Latest technological trends in BFP
design
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 20 5 10
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Condenser Selection of condenser type and its Comparative studies of Manufacturing process of
optimization wrt temp rise across salient features various components of
condenser, pressure drop in condenser, condenser Assembly
surface area etc.
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
50 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Techno economic studies for Selection Collection of data for Testing capability at
of condenser tube material and other analysis of availability of works
parts depending on water quality Condenser
Condenser support selection & design O&M history/problems Product development in
related to condenser process
Sizing of condenser w.r.t. super Future plan for techno-
critical units logy induction
Latest technological trends in R&D work in progress
condenser arrangement and design
Condenser vacuum system design
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 10 5 5
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Feed Thermal and mechanical design Comparative studies of Manufacturing process of
Regenerative calculation of heaters salient features various components of
Equipment's heaters
Basis of selecting horizontal/vertical Analysis of data Assembly
heaters
Selection of TTD and DCAs for various O&M history/problems Testing capability at
heaters, and their effect on turbine heat related to heaters works
rate
Configuration of HP heaters (2x50% Product development in
v/s100% capacity process
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
51 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Sizing criteria for De- aerator/Heaters Future plan for techno-
logy induction
Selection of tube & tube sheet material R&D work in progress
of heaters
Latest technological trends in heaters
design
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 15 10 10
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
3-dimensional CFD model develop ment and validation
CFD modeling of design data for steam turbine, BFP,
CEP, condenser, heaters etc.
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 20
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
52 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CONTROL &
INSTRUMENTATION
DDCMIS*-Man Hardware & Software organization of Operational feedback
Machine Interface - the system
Hardware &
Operating System Basis of selection of H/W memory
sizing
Operating system features, interface
with other system, openness & inter-
operability
Upgradability
System testing features
Trouble shooting and fault analysis
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 16 5
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DDCMIS*-Man Specific system customisation Operation feedback
Machine Interface
System Various system
Engineering & Application Modules & interface with OS
Software
Database organisation & development
Development of mimics
Other application like calculations,
logs historical storage functionalities
& use
Trouble shooting and fault analysis
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 40 5
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
53 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DDCMIS* - Control Basic design features for system & its Operation feedback Manufacturing processes
System Hardware modules special attention to
handling of the modules
System capabilities & system design Maintenance facilities
techniques
Communication with MMI & other
system
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 20 3 10
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DDCMIS*-Control Database structure Organisation & Operational feedback System integration &
system Application interface between application program System capabilities
Software & database testing
Application for implementation of
Control functions
Study of standard algorithms &
development of new algorithms
Trouble shooting and fault analysis
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 12 2 4
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DDCMIS* - Control General description of closed loop Specific operational
Loop Study controls of thermal power plant feedback
Critical analysis of few control loops
e.g., TSCS Stress Control etc.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 4 2
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
54 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DDCMIS* - EHTC, Basic design concept & features Operational feedback Manufacturing procedure
Turbine stress & precautions
control system, for handling
Turbine protection the system
system & ATRS
Logics of turbine stress control system System testing facilities
Implementation of fail safe philosophy
in turbine protection system
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 10 2 3
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DDCMIS-operator Use of the system at work+at Site
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 4
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
24 V DC System Theory & design features
Manufacturing/assembly process
Testing methodology
Trouble shooting and fault analysis
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 5
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Turbo supervisory Theory & design features
system Trouble shooting and fault analysis
Use of the system at site
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 5
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Wherever "DDCMIS" is indicated, it will mean TG C&I part of DDCMIS, which is in Contractor's Scope .
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
55 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(ELECTRICAL)
GENERATOR (a) Design aspects of the - Operational feed back (a) Manufacturing
following areas process for
- Insulation system - Familarisation with - Core
different sub-systems
- Cooling medium & arrangement - Winding bars
- Winding & core support systems - Assembly
b) Design aspects of assciated (b) Testing facilities
auxiliary systems
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 30 15 15
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Generator Design features of various sub-systems - Operational feed back - Manufacturing
Excitation process & testing
System facilities for various
including AVR. equipment of
excitation system
Exciter - Familiarisation with
various equipment
functioning at reference
plants
PMG
Transformer
Controllers & different limiters etc.
PSS & associated system studies
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 30 15 15
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
56 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Integral Actuators a) Basic design philosophy of integral Manufacturing
actuator process & testing
facilities for various
b) Design aspects of wiring diagram equipment of actuators
c) Type and range of application of
integral actuators
d) Operation and selection of integral
actuator to various type of loads
e) Methods of fault diagnose system.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 2 1 1
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CRITICAL PIPING Design familiarization for critical piping Familiarization with feed Cold Setting of spring
& POWER CYCLE of supercritical Plant back (in super critical hanger
PIPING plant) on failure analysis
and vibration analysis of
piping.
Optimization study for sizing including Study of Feed back Cyclic tests carried on
pressure drop calculation and selection regarding hanger setting spring hangers.
of single or double lead together with stretegies and practice
employers engineers
Design and stress analysis of lines Cyclic tests carried on
with Expansion J oints together with expansion joints
employers engineers
Design and stress analysis of piping Manufacturing process of
systems with two phase flow involving critical piping components
employers engineers and appreciation of their
testing fracilities at shop
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
57 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Transient analysis and optimum sizing
of feed suction piping together with
employers engineers.
Static and dynamic analysis of critical
piping including siesmic and other
occassional load analysis (safety valve
blowing condition). A joint activity
together with employers engineers.
Study and collection of data pertaining
to special welding requirements (pre
and post weld heat treat ment and
electrode selection criteria etc.) of
materials used in high temp piping
system.
Study and collection of data on special
requirements in case of welding
dissimilar metals and electrode
selection criteria
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 45 10 10
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
QUALITY
ASSURANCE &
INSPECTION
QA SYSTEM & Integrated QA Management System for Operating feed backs: z Appreciation of
PROGRAMME enhanced reliability of equipments. implementation of QA
Programmes in
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
58 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
z QA system in design, procurement, z Co-relation of reliability various manufaturing,
manufacturing, installation and and performance of the assembly and
operation of the equipments/ equipment with testing activities.
systems. implementation of QA
system. z Appreciation of
developmental
z QA system for developing and z Appreciation of use of activities for new
establishing new processes and structured Engg./QA processess and
vendors. documentation during vendors
Operational phase of
z System of structured document- plant and during RLA z System of pre-
ation of Engg. and test records studies of plant qualification of
special processes.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 20 10 26
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
STEAM TURBINE, Design familiarization: Operating feedback of Manufacturing and
GENERATORS & various equipments of inspection/testing at
AUXILIARIES z Modular turbines steam turbine, generators various stages of :
and auxiliaries.
z Field validation of modules - Turbine casings,
Appreciation of field blades, rotors,
z Features of turbines deisgn validation of modular governing system
concept of the equipment etc.
z Advanced designed bladings
- Generator compon-
z High Pressure governing and ents and system
control system of turbine like core assembly,
core suspensions,
z Vibrational behaviour of turhbine/ rotor, windings,
generator system and interpretation insulation system,
of field results cooling system etc.
PRODUCT AREAS OF TRAINING REQUIREMENT
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENTS
PAGE
59 OF 64
PRODUCT DESIGN Plant Visit Visit To Operation & Maintenance of
Manufacturer's Work Plant
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
z Features of components/system - Development of
of generator like core suspension, special manufacturing
overhang winding, core clamping, processes/facilities
insulation system, cooling system
etc.
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 20 10 50
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CONTROLS & Familiarization with control system Feedback on performance Manufacturing activities
INSTRUMENTS and instrumentation of C&I Systems for critical instruments/
Items
QA system for manufacture of reliable
components Implementation of
testing programme to
ensure reliablity
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
MANDAYS 6 4 4
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENT
PAGE
60 OF 64
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
LIST OF ITEMS REQUIRING QUALITY PLAN
AND SUB-SUPPLIER APPROVAL
SUB-SYSTEM :
DOC. NO. :
REV. NO. :
DATE :
PAGE : OF
S.No. ITEM
Project : Stage :
Package :
Supplier :
Contractor No. :
FORMAT NO. : QS-01-QAI-P-1/F3-R0 1 / 1 Engg.Div./QA&I
QP/
Insp.
Cat.
QP No.
QP Sub-
Schedule
QP
approval
schedule
Proposed sub-supplier Place Sub-
Suppliers
approval
status/
category
Sub-supplier
Details
submission
schedule
Remarks
LEGENDS :
1. SYSTEM SUPPLIER / SUB-SUPPLIER APPROVAL STATUS CATEGORY (SHALL BE FILLED BY NTPC)
A - For these items proposed vendor is acceptable to NTPC. To be indicated with letter "A" in the list alongwith the condition of approval, if any.
DR - For these items "Detailed required" for NTPC review. To be identified with letter "DR" in the list.
NOTED - For these items vendors are approved by Main Supplier and accepted by NTPC without specific vendor approval from NTPC. To be identified with "NOTED".
2. QP/INSPN CATEGORY :
CAT-I : For these items the Quality Plans are approved by NTPC and the final acceptance will be on physical inspection witness by NTPC.
CAT-II : For these items the Quality Plans approved by NTPC. However no physical inspection shall be done by NTPC. The final acceptance by NTPC shall be on the basis review of documents
as per approved QP.
CAT-III : For these items Main Supplier approves the Quality Plans. The final acceptance by NTPC shall be on the basis certificate of conformance by the main supplier.
UNITS/WORKS : Place of manufacturing Place of Main Supplier of multi units/works.
ANNEXURE - III
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENT
PAGE
61 OF 64
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
STATUS OF ITEM REQUIRING QP &
SUB-SUPPLIER APPROVAL
DOC. NO. :
REV. NO. :
DATE :
PAGE : OF
S.No. ITEM/SERVICE
Project : Stage :
Package :
Contractor :
Contractor No. :
QP/Insp.
Cat.
QP Sub.
Schedule
Approval
Schedule
Date of
Sub-
mission
Date of
commt.
Appl.
Status
Code
C/II/I
Proposed Sub-suppliers Place of manufacturing
works
Approval
Status
Sub-supplier
detail
submission
schedule
Remarks
FORMAT NO. : QS-01-QAI-P-02/F1-R0 1 / 1 Engg.Div./QA&I
ANNEXURE - IV
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENT
PAGE
62 OF 64
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DOC. NO. :
REV. NO. :
DATE :
PAGE : OF
Project : Stage :
Contractor :
Contractor No. :
System :
Sl. DRG No. for Description Matl. Dimensions Process of Type of Electrode WPS. Min. Heat treatment NDT RFF Remarks
No. Weld Location of parts to Spec. welding weld filler spec. No. pre-heat method/
and Identifi- welded Quantum
cation mark
Temp.
Holding
time
Spec. No. ACC Norm
Ref.
NOTES:
SIGNATURE
FORMAT NO.: QS-01-QAI-P-02/F2-R0 1/1 Engg. Div./QA&I
FIELD WELDING SCHEDULE
(To be raised by the contractor)
Welding Code ......................................................
ANNEXURE - V
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENT
PAGE
63 OF 64
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PROJECT :
PACKAGE :
CONTRACT NO. :
MAIN-SUPPLIER :
MANUFACTURING QUALITY PLAN
ITEM QP NO. :
REV.NO. :
SUB-SYSTEM DATE :
PAGE : OF
Manufacturer's Name
& Address
FORMAT - QS-01-QAI-P-09/F1-R1 1/1 ENGINEERING DIV. / QA&I
DOC. NO. : REV.........CAT.........
REVIEWED BY
LEGEND : * RECORDS, IDENTIFIED WITH "TICK" ( ) SHALL BE
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION
** M : MANUFACTURER / SUB-SUPPLIER
C : MAIN SUPPLIER, N : NTPC
P : PERFORM W : WITNESS AND V : VERIFICATION, AS
APPROPRIATE
CHP : NTPC SHALL IDENTIFIED IN COLUM "N" AS 'W'
MANUFACTURER / MAIN-SUPPLIER
SUB-SUPPLIER
SIGNATURE
SL.
NO.
COMPONENT &
OPERATIONS
CHARACTERISTICS CLASS
TYPE OF
CHECK
QUANTUM
OF CHECK
REFERENCE
DOCUMENT
ACCEPTANCE
NORMS
FORMAT OF
RECORD
AGENCY
M C N
REMARKS
1
2
3 4 5 6 7 8 9 D* ** 10. 11
APPROVED BY APPROVAL SEAL
FOR
NTPC
USE
MFGR.s LOGO
M C/N
TECHNICAL SPECIFICATION
SECTION-VI
PART-C
GENERAL TECHNICAL
REQUIREMENT
PAGE
64 OF 64
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PROJECT :
PACKAGE :
CONTRACT NO. :
MAIN-SUPPLIER :
FIELD QUALITY PLAN
ITEM QP NO. :
REV.NO. :
SUB-SYSTEM DATE :
PAGE : OF
Supplier's Name
& Address
FORMAT - QS-01-QAI-P-09/F2-R0 1/1 ENGINEERING DIV. / QA&I
DOC. NO. : REV.........CAT.........
REVIEWED BY
LEGEND : * RECORDS, IDENTIFIED WITH "TICK" ( ) SHALL BE
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION
LEGEND TO BE USED : CLASS #: A - CRITICAL, B =MAJ OR,
C =MINOR; "A' SHALL BE WITNESSED BY NTPC FQA, 'B' SHALL
BE WITNESSED BY NTPC ERECTION / CONSTRUCTION DEPTT.
AND 'C' SHALL BE WITNESSED BY ERECTION SUPPLIER (A &
B CHECK SHALL BE NTPC CHP STAGE)
MANUFACTURER / MAIN-SUPPLIER
SUB-SUPPLIER
SIGNATURE
SL.
NO.
ACTIVITY AND
OPERATION
CHARACTERISTICS/INSTRUMENTS
CLASS# OF
CHECK
TYPE OF
CHECK
QUANTUM
OF CHECK
REFERENCE
DOCUMENT
ACCEPTANCE
NORMS
FORMAT OF
RECORD
REMARKS
1
2
3 4 5 6 7 8 9
APPROVED BY APPROVAL SEAL
FOR
NTPC
USE
D*
10.
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - D T - D T - D T - D T - D
SECTION - VI
TECHNICAL SPECIFICATION
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - D T - D T - D T - D T - D
SECTION - VI
TECHNICAL SPECIFICATION
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
(This document is meant for the exclusive purpose of bidding against this
Package and shall not be transferred, reproduced or otherwise used for
purposes other than that for which it is specifically issued).
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TABLE OF CONTENTS
PART SECTION NO. TITLE
SCOPE OF SUPPLY & SERVICES
A Project Synopsis
A A-1 Provenness
A Essential Data
A Phased Manufacturing Program
A A-2 General
A A-3 Turbine Generator and Auxiliaries
A A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Unit
A A-6 Low Pressure Piping System
A A-7 (NOT USED)
A A-8 Hydrogen Generation Plant
A A-9 Service Elevators
A A-10 Power Cycle Piping
A A-11 Other Cranes and Hoists
A B-1 Electrical System/Equipment
A IIC-01 Control and Instrumentation System
A D-1 Civil Works
A Terminal Points & Exclusions
A Functional Guarantees & Liquidated Damages
A Spares
TECHNICAL REQUIREMENTS
MECHANICAL
B A-1 Operating Capability of Plant
B A-2 Layout
B A-3 Turbine Generator and Auxiliaries
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Plant
B A-6 Low Pressure Piping System
B A-7 (NOT USED)
B A-8 Hydrogen Generation Plant
B A-9 Service Elevators
B A-10 Power Cycle Piping
B A-11 Other Cranes and Hoists
ELECTRICAL
B B-1 Generator and Auxiliaries
B B-2 Motors
B B-3 L.T. Power Cables
B B-4 L.T. Control Cables
B B-5 Cabling Earthing Lighting and Protection
B B-6 Electric Actuators with Integral Straters
B B-7 Lighting
B B-8 L.T. Switchgear
CONTROL & INSTRUMENTATION (C&I)
B IIIC-01 Basic Design Criteria
B IIIC-02 Distributed Digital Control, Monitoring & Information System
(DDCMIS)
B IIIC-03 Main Equipment Related Control and Instrumentation System
B IIIC-04 Measuring Instruments (Primary and Secondary)
B IIIC-05 Electrical Power Supply System
B IIIC-06 Process Connection and Piping
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B IIIC-07 Instrumentation and Power Supply Cable
B IIIC-08 Control Valve and Actuators
B IIIC-09 Plant Auxiliary System
B IIIC-10 Type Test Requirements
CIVIL
B D-1 Civil Works
QUALITY INSURANCE (QA)
B E-1 Steam Turbine Generator & Auxiliaries
B E-2 Condenser on Line Tube Cleaning System
B E-3 Condensate Extraction Pump
B E-4 Power Cycle Heaters & De-aerator
B E-5 Boiler Feed Pump
B E-6 Turbine Hall EOT Crane
B E-7 Equipment Cooling Water System
B E-8 Condensate Polishing Unit
B E-9 Low Pressure Piping System
B E-10 (NOT USED)
B E-11 Hydrogen Generation Plant
B E-12 Service Elevators
B E-13 Power Cycle Piping
B E-14 Other Cranes and Hoists
B E-15 Generator and Auxiliaries
B E-16 Motors
B E-17 LT Switchgear
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B E-18 LT Power Cables
B E-19 LT Control Cables
B E-20 Cabling
B E-21 Lighting
B E-22 Passenger/Service Elevators & Lifts
B E-23 Distributed Digital Control, Monitoring & Information System (DDCMIS)
B E-24 Main Equipment Related Control and Instrumentation System
B E-25 Measuring Instruments (Primary and Secondary)
B E-26 Power Supply System
B E-27 Process Connection and Piping
B E-28 Instrumentation Cables
B E-29 Control Valves
B E-30 Electrical Actuators
B E-31 Auxiliaries Plant Control
B Pre-Commissioning and Commissioning
C GENERAL TECHNICAL REQUIREMENT
D ERECTION CONDITIONS OF CONTRACT
E TENDER DRAWING
F NOT USED
G TECHNICAL DATA SHEET
TECHNICAL SPECIFICATION
SECTION-VI
PART-D
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - D
ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATION
SECTION-VI
PART-D
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ERECTION CONDITIONS OF CONTRACT
PART - D
CONTENTS
-------------------------------------------------------------------------------------------------------------------------------
Clause No. Description Page No.
-------------------------------------------------------------------------------------------------------------------------------
1.00.00 General 1
2.00.00 Regulation of Local Authorities and Statutes 1
3.00.00 Welding of Pressure Parts and High Pressure Piping 1
4.00.00 Heat Treatment 2
5.00.00 Weld Edge Preparation 3
6.00.00 Cleaning and Servicing 3
7.00.00 Field Welding Schedule 4
8.00.00 Site Run Miscellaneous Piping 5
9.00.00 Thermal Expansions 5
10.00.00 Piping Supports 5
11.00.00 Pressure Testing 6
12.00.00 Thermowells and Flow Nozzles 6
13.00.00 Insulation, Lagging and Cladding 7
14.00.00 Code Requirements 10
15.00.00 Removal of Material 10
16.00.00 Inspection, Testing and Inspection Certificates 10
17.00.00 Access to site and Works on Site 10
TECHNICAL SPECIFICATION
SECTION-VI
PART-D
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
-------------------------------------------------------------------------------------------------------------------------------
Clause No. Description Page No.
-------------------------------------------------------------------------------------------------------------------------------
18.00.00 Contractor's Site Office Establishment 10
19.00.00 Co-operation with other contractors 11
20.00.00 Discipline of Workmen 11
21.00.00 Contractor's Field Operation 12
22.00.00 Photographs and Progress Report 12
23.00.00 Man-Power Report 12
24.00.00 Protection of Work 13
25.00.00 Employment of Labour 13
26.00.00 Facilities to be provided by the Employer 14
27.00.00 Facilities to be provided by the Contractor 15
28.00.00 Lines and Grades 16
29.00.00 Fire Protection 17
30.00.00 Security 17
31.00.00 Contractor's Area Limits 18
32.00.00 Contractor's Co-operation with the Employer 18
33.00.00 Pre-commissioning and Commissioning Activities 18
34.00.00 Materials Handling and Storage 21
35.00.00 Construction Management 23
36.00.00 Field Office Records 23
37.00.00 Contractor's Materials Brought on to Site 24
38.00.00 Protection of Property and Contractor's Liability 24
TECHNICAL SPECIFICATION
SECTION-VI
PART-D
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
-------------------------------------------------------------------------------------------------------------------------------
Clause No. Description Page No.
-------------------------------------------------------------------------------------------------------------------------------
39.00.00 Painting 25
40.00.00 Insurance 25
41.00.00 Unfavourable Working Conditions 26
42.00.00 Protection of Monuments and Reference Points 27
43.00.00 Work & Safety Regulations 27
44.00.00 Foreign Personnel 38
45.00.00 Foundation Dressing & Grouting for 39
Equipment/Equipment Bases
46.00.00 Shaft Alignments 41
47.00.00 Dowelling 41
48.00.00 Check Out of Control Systems 41
49.00.00 Commissioning Spares 41
50.00.00 Cabling 42
51.00.00 Equipment Delivery and Erection 43
52.00.00 Welding-Special Requirements 51
53.00.00 Deviations Dispositioning 51
54.00.00 Non-Destructive Testing (NDT) 51
55.00.00 Testing Equipment & Facilities 51
Annexure-I Standard Check List 52
Annexure-II Brief Writeup on the contents of 60
testing schedule/commissioning schedule
Annexure-III Safety Plan 61
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
1 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 GENERAL
1.01.00 The following provisions shall supplement the conditions already contained in
the other parts of these specifications and documents and shall govern that
portion of the work of this contract which is to be performed at site. The
erection requirements and procedures not specified in these documents shall
be in accordance with the recommendations of the equipment manufacturer, or
as mutually agreed to between the Employer and the Contractor prior to
commencement of erection work.
1.02.00 The Contractor upon signing of the Contract shall, in addition to a Project Co-
ordinator, nominate another responsible officer as his representative at Site
suitably designated for the purpose of overall respon-sibility and co-ordination of
the Works to be performed at Site. Such a person shall function from the Site
office of the Contractor during the pendency of Contract.
2.00.00 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.01.00 In addition to the local laws and regulations, the Contractor shall also comply
with the Minimum Wages Act and the Payment of Wages Act (both of the
Government of India) and the rules made there under in respect of its labour
and the labour of its sub-contractors currently employed on or connected with
the contract.
2.02.00 All registration and statutory inspection fees, if any, in respect of his work
pursuant to this Contract shall be to the account of the Contractor. However,
any registration, statutory inspection fees lawfully pay-able under the provisions
of the Indian Boiler Regula-tions and any other statutory laws and its
amendments from time to time during erection in respect of the plant
equipment ultimately to be owned by the Employer, shall be to the account of
the Employer. Should any such inspection or registration need to be re-
arranged due to the fault of the Contractor or his Sub-Contractor, the additional
fees for such inspection and/or regis-tration shall be borne by the Contractor.
3.00.00 WELDING OF PRESSURE PARTS AND HIGH PRESSURE PIPING
The welding of all pressure parts and high pressure piping shall be in
accordance with the following requirements :
3.01.00 Qualification of Weld Procedures
Only qualified welding procedures as per ASME Section IX shall be used by
contractor at site. Procedure qualification records along with WPS shall be
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
2 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
submitted to NTPC for review. Welding procedure shall indicate all essential
and non-essential parameters as per ASME Section IX. Makes of welding
consumables shall be subject to employer's approval.
3.02.00 Welder's Qualification
Only welders who are qualified in accordance with the latest applicable
requirements of the Indian Boiler Regulations, shall be permitted to perform
any welding work on the pressure parts and its attachment welding. In addition
to such statutory qualification requirements, the welders shall also undergo a
satisfactory pre-production qualification test to be conducted by the Contractor
at site as per ASME Sec IX in presence of employer's representative(s), prior
to performing work under these specifications. The services of an independent
testing laboratory shall be retained by the Contractor to perform welder
qualification tests for welders.
All the welders carrying out welding at site shall carry an identification badge,
which shall indicate the category and the grade of welding for which they have
been tested and authorised to carry out welding.
3.03.00 Records
Welders performance shall be monitored regularly and record of their
performance shall be maintained by contractor in a manner acceptable to the
employer. Contractor shall maintain such records including record of
procedure qualification & welder qualification and hand-over to the employer at
the end of work.
3.04.00 MARKING
On completion of each welded joint, the welder shall mark his regularly
assigned identification mark near the joint. The welder's identification numbers,
inspection stamps or code symbol stamps and any other information shall not
be directly stamped on any alloy steel piping. In alloy steel piping, all such
information shall be stamped on separate marking plate which shall be tack
welded on pipe near the weld.
4.00.00 HEAT TREATMENT
4.01.00 Pre-heating, post-heating and post-weld stress relief operations of all welds,
shall be performed in accordance with the requirements of applicable code.
Local post weld stress relieving heat - treatments shall be adopted only in
cases where it is normally impracticable to subject the entire assembly as
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
3 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
such for stress relieving operations. Heating may be by means of electric
induction coils or electric resistance coils. Oxy-acetylene flame heating or
exothermic chemical heating methods will not be permitted. Complete
recording of the temperatures through out the stress relieving cycle of the
material and the weld subjected to heat treatment shall be made by means of
a potentiometric recorder. Recorders other than those of potentiometric type
shall not be used for such temperature recording during stress relieving
operations.
The contractor & employer's representative, at start and at the end of HT
Cycle shall sign the time and temperature charts for heat-treatment.
4.03.00 After setting up the weld joint for heat treatment operation, the Employer's
signature shall be obtained on the strips chart of the recorder prior to starting
of heat treatment cycle. The right hand corner of the strip chart at the starting
point of the heat treatment cycle shall contain details like the weld number,
material, diameter and thickness, method of heating adopted, prescribed ranges
of heat treatment temperatures, date of heat treatment, reference to item
number of the Field welding Schedule ( as specified at clause no 7.00.00- of
this chapter) etc.
5.00.00 WELD EDGE PREPARATION
Preparation at site of weld joint shall be in accordance with details acceptable
to the Employer. Wherever possible, machining or automatic flame cutting shall
be used for edge preparation. Hand flame cutting will be permitted only where
edge preparation otherwise is impractical. All slag shall be removed from cuts
and all the hand cuts shall be ground smooth to the satisfaction of the
Employer. Flame cutting of alloy steel pipe shall be avoided. Wherever such
cutting is done, a 200mm length at the cut face shall be removed by
machining. Pneumatic hand tools such as edge preparation, tube cutting
machine can be used.
6.00.00 CLEANING AND SERVICING
6.01.00 The inside of all tubes, pipes, valves and fittings shall be free from dirt, and
loose scales before being erected. All the pipelines shall be thoroughly blown
and/or flushed. Each steam and water tubes shall be blown with compressed
air and shall be subjected to 'ball test' before erection to ensure that no
obstructions exist. A system for recording of all such operations shall be
developed and maintained in a manner to ensure that no obstructions are left
inside the tubes and no tubes are left uncleaned and untested.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
4 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6.02.00 All valves and valve actuators, and dampers and damper actuators, if any,
shall be thoroughly cleaned and serviced prior to pre-commissioning tests and/
or Initial Operations of the plant. A system for recording of such servicing
operation shall be developed and maintained in a manner acceptable to the
Employer and to ensure that no valves or dampers including their actuators
are left unserviced.
6.03.00 All interior surfaces of the turbine shall be thoroughly cleaned prior to boxing -
up to remove all traces of oil preservations.
7.00.00 FIELD WELDING SCHEDULE
The Contractor shall submit to the Employer, a certified and complete field
welding schedule for all the field welding activities to be carried out in respect
of the pressure parts involved in the equipment furnished and erected by him,
at least 90 days prior to the scheduled start of erection work at site. Such
schedule will be strictly followed by the Contractor during the process of
erection. The above field-welding schedule to be issued by the Contractor shall
contain the following:
(a.) Drawing No (s)
(b.) Location of the weld
(c.) Size of the weld (outside diameter and thickness)
(d.) Type of joints
(e.) Material specifications
(f.) Size of fillet on backing ring, when the type of joint is with backing
ring
(g.) Electrode/ filler metal specifications
(h.) Number of welds per unit
(i.) Quantity of filler metal per weld
(j.) Indication of required Non-destructive Examination (NDE) for each weld
(k.) Pre-heat temperatures for welding
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
5 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(l.) Process of welding
(m.) Post-welding heat treatment temperature ranges, duration, under as
specified at clause no 4.00.00- of this chapter entitled "Heat
Treatment".
(n.) Qualification details of weld procedures to be adopted as specified
under as specified at clause no 3.01.00- of this chapter entitled
'Qualification of Weld Procedures'.
8.00.00 SITE RUN MISCELLANEOUS PIPING
Sketches or diagrams of the proposed routings of all piping, not already
indicated and routed on the shop drawings which were reviewed by the
Employer, shall be submitted to the Employer for review, Employer's
acceptance of such site routings shall be obtained before the piping is erected.
All these site run piping shall be installed in such a manner as to present an
orderly and neat installation. They shall be located as to avoid obstruction of
access and passages. Valves, instruments or any other special items shall be
located convenient for operation by the operating personnel. Pipe runs shall be
plumb or level except where pitch for drainage is required. Pipe runs that are
not parallel to the building structure, walls or column rows shall be avoided so
that deflection of pipes between hangers does not exceed 6 mm. No
miscellaneous pipe shall be routed and installed above or adjacent to electrical
equipment.
9.00.00 THERMAL EXPANSIONS
All piping installation shall be such that no excessive or destructive expansion
forces exist either in the cold condition or under condition of maximum
temperature. All bends, expansion joints and any other special fittings,
necessary to provide proper expansion, shall be incorporated. During
installation of expansion joints and anchors, care must be taken to make sure
that full design movement is available at all times for maximum to minimum
temperature and vice-versa.
10.00.00 PIPING SUPPORTS
10.01.00 Hangers, supports and anchors shall be installed as required to obtain a safe,
reliable and complete pipe installation. All supports shall be properly levelled
and anchored when installed. The anchors shall be so placed that thermal
expansion will be absorbed by bends without subjecting the valves or
equipment to excessive strains.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
6 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
10.02.00 The hanger assemblies shall not be used for the attachment of rigging to
hoist the pipe into place. Other means shall be used to securely hold the
pipe in place till the pipe support is completely assembled and attached to the
pipe and building structures and spring support is set to accommodate the
pipe way. All temporary rigging shall be removed in such a way that the pipe
support is not subjected to any sudden load. All piping, having variable spring
type supports, shall be held securely in place by temporary means during the
hydraulic test of pipe system. Constant support type spring hangers used
during hydraulic test shall be pinned or blocked solid during the test. After
complete installation and insulation of the piping and filling of the piping with its
normal operating medium, the pipe support springs shall be adjusted to the
cold positions. If necessary, the spring support shall be re-adjusted to the hot
positions after the line has been placed for service at its normal maximum
operating temperature conditions. Electric arc welding only shall be used to
weld all pipe supports to structural steel members that form part of the
building supporting structure. The structural beams shall not be heated more
than necessary during welding of supports and such welds shall run parallel
to the axis of the span. All lugs or any other attachments welded to the piping
shall be of the same material as the pipe.
11.00.00 PRESSURE TESTING
11.01.00 On completion of erection of pressure parts/boiler external piping/ non boiler
external piping, a hydraulic test in accordance with the requirements of the
Indian Boiler Regulations shall be performed by the Contractor.
11.02.00 All blank flanges, caps, removable plugs, temporary valves, pipes & fittings,
spools, other accessories and services required for carrying out hydraulic
testing of pipings and pressure parts shall be furnished by the Contractor. The
pressurization equipment including water piping needed for the above test shall
also be furnished by the Contractor. Any defects noticed during the testing are
to be rectified and the unit re-tested. If any welding is done on the pressure
parts after the Hydraulic test, the Hydraulic test for that portion of pressure
parts shall be repeated. Water as required for such pressure testing shall be
provided by the Employer.
11.03.00 Thy hydraulic test shall be considered successful only on certification to that
effect by the concerned inspecting Authority as per the provisions of the Indian
Boiler Regulations and the Employer.
12.00.00 THERMOWELLS AND FLOW NOZZLES
12.01.00 All the thermowells and flow nozzles in the equipment furnished under the
technical specifications shall be installed as a part of this work.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
7 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
12.02.00 All thermowell connections incorporated in the steam service shall be plugged
during the pressure testing and the blow out of steam piping systems. Upon
completion of the blow out operation, all thermowells shall be installed and
seam welded. Similarly, all flow nozzles in the steam lines shall also be
installed only on completion of steam blowing operations unless otherwise
agreed to by the Employer, depending upon the sequence of cleaning and
purging operations to be adopted by the Contractor at the field.
13.00.00 INSULATION, LAGGING AND CLADDING
The provision of insulation, lagging and cladding of the various equipments and
portion of the equipment covered under the Contract, shall be furnished by the
Contractor as specified elsewhere or agree to separately in writing. Welds
required for holding insulation on pressure parts shall be carried out by IBR
qualified welder.
13.01.00 In case of equipment other than steam turbine, Lugs made out of MS rods of
5 mm dia conforming to IS280 or equivalent shall be welded on the surface at
intervals of 250 mm pitch zigzag to support insulation. Mineral wool mats with
wire netting on both sides shall be applied against the surface with lugs
piercing through. The edges of mattress shall be laced together with
galvanised MS 0.71 mm dia (22 SWG) IS 280 or equivalent (soft) lacing wire.
Galvanized binding wire of 1.63 mm dia (16 SWG) IS 280 or equivalent (soft)
will be used criss-cross between lugs to hold it. The lugs will then be bent
over the netting.
13.02.00 Unless otherwise specified, all equipment insulation shall be covered with
aluminium cladding/ jacketing. The thickness of aluminium sheet shall not be
less than 0.63 mm. Galvanic corrosion shall be prevented by carefully avoiding
permanent contact of aluminium cladding with copper, copper alloys, tin, lead
nickel or nickel alloys including monel metal. Where cladding is attached to
carbon steel or low alloy steels, the steel shall first be prime painted with
zinc chromate and then painted with aluminium paint. The use of lead base
paints for this purpose shall be avoided.
13.03.00 Prior to application of cladding, all surface imperfections such as ducts, cracks
and voids shall be filled with insulation cement so as to form a smooth base
for the final shall be machine rolled and formed. All overlaps at longitudinal
joints shall face downwards. The fixing of cladding shall be by means of
screws and they shall be adequate in number and be so place is such
location as to produce tight joints eliminating 'bellying'. The screws, as far as
possible, shall be uniformly placed and on centres not exceeding 150 mm
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
8 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
except where insulated outside diameters are smaller than 230 mm in which
case spacing shall be on centres not exceeding 100mm. Self tapping type
screws, of 12 mm size of stainless steel/aluminium alloy as per the
requirements shall be used. All joints wherever possible shall be lapped a
minimum of 50 mm. The overlaps of longitudinal joints shall be a 10 mm
turnback edge. Butt joints such as those at piping tees, shall be made using
a rolled seam. Suitable provisions for expansion movement shall be provided in
joints. Hinged or sliding doors for convenience shall be provided in the
cladding at all access openings, non-projecting connections, important codes
stampings etc.
13.04.00 Piping, Pipe Fittings & Valves
All piping insulation and metal cladding furnished with the equipment to be
erected shall be applied as specified herein.
13.04.01 Piping
The insulation on piping shall be applied using wire loops on 150mm centres.
These wire loops shall be thoroughly embedded into the outer insulation
surface and all cracks, voids and depressions shall be filled with insulating
cement suitable for the piping temperature so as to form a smooth base for
application of cladding. The wires used for piping insulation shall be of 16
SWG. The surface shall be smooth and uniform before applying the outer
covering. All piping insulation ends shall be terminated at a sufficient distance
from flanges to facilitate removal of bolts.
13.04.02 Flanges
Insulation on flanges shall be by means of blocks of insulating material
securely bound to the flange by wire loops. Such blocks of insulation shall be
long enough to overlap the adjacent pipe insulation by an amount equal to the
thickness of adjacent pipe insulation. Smooth finish shall be obtained by the
application of insulating cement. Alternatively, sectional pipe insulation of proper
diameter may be used. Insulation on flanges shall not be done until the pipe
and equipment have been in service during the initial operation and till all the
flange bolts have been retightened.
13.04.03 Bends and Elbows
Insulation on bends and elbows shall be cut into sections sufficiently short to
form a reasonable smooth external surface. After the application of insulation
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
9 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
material in place, it shall be smoothly coated with insulating cement. Elbows
may be insulated as above or alternatively by means of specially moulded
insulation enclosures.
13.04.04 Cladding
Cladding shall be of aluminium sheet of thickness as per details given in
detail Technical Specification or will be provided during detail engineering shall
be machine rolled and formed to accurately fit insulation curvatures. Cladding
shall be secured using self-tapping screws. Screws shall be adequate number
and so located as to produce tight joints. The spacing of screws shall be as
far as possible uniform and on centres not exceeding 150 mm. For outside
diameters less than 230 mm, spacing of screws shall be on centres not
exceeding 100 mm. adequate number of screws shall be provided for fixing
the cladding and be so placed in such locations, as to produce a smooth
cladding finish without bellying'. Insulated elbows having insulated diameters less
than 330 mm shall be provided with preformed smooth aluminium elbow
jackets. Wherever possible, all joints should be lapped a minimum of 50 mm
with joints facing downwards and so placed that they are obscured from
normal points of vision. All the joints in the cladding shall be made with
suitable provisions for expansions. All butt joints such as those at piping tees
shall be made using rolled seams. In addition, to prevent galvanic corrosion,
suitable action, as specified at clause no 13.02.00- of this chapter, shall be
taken.
13.04.05 Valves and Fittings
All valves and fittings installed in the pipelines shall also be applied with
insulation and furnished with suitably shaped boxes so as to facilitate easy
dismantling of the fittings. The insulation thickness for valves, valve fittings etc.,
shall be same as that used on the line on which they are installed. All voids
shall be properly filled up with insulating material and as per the directions of
the Employer.
13.05.00 Protection of Equipment during Insulation Applications
All equipment and structures shall be suitably protected from damage while
applying insulation after completion of insulation. All equipment and structures
shall be thoroughly cleaned and remove insulating materials which might have
fallen on them.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
10 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
14.00.00 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation
of the equipment shall be in accordance with the relevant Indian Electricity
Rules & Codes, Indian Boiler Regulations, ASME codes and accepted good
practices, the Employer's Drawings and other applicable Indian recog-nised
codes and laws and regulations of the Government of India.
15.00.00 REMOVAL OF MATERIAL
No material brought to the Site shall be removed from the Site by the
Contractor and/or his Sub-Contractors without the prior written approval of the
Employer.
16.00.00 INSPECTION, TESTING AND INSPECTION CERTIFICATES
The provisions of the clause entitled Inspection, Testing and Inspection
Certificates given in Part - C of Section-VI B of the Technical Specification,
shall also be applicable to the erection portion of the Works. The Employer
shall have the right to re-inspect any equipment though previously inspected
and approved by him at the Contractor's works, before and after the same
are erected at Site. If by the above inspection, the Employer rejects any
equipment, the Contractor shall make good for such rejections either by
replacement or modification/ repairs as may be necessary to the satisfaction of
the Employer. Such replacements will also include the replacements or re-
execution of such of those works of other Contractors and/or agencies, which
might have got damaged or affected by the replacements or re-work done to
the Contractor's work.
17.00.00 ACCESS TO SITE AND WORKS ON SITE
17.01.00 Suitable access to site and permission to work at the Site shall be accorded
to the Contractor by the Employer in reasonable time.
17.02.00 In the execution of the Works, no person other than the Contractor or his duly
appointed representative, Sub-Contractor and workmen, shall be allowed to do
work on the Site, except by the special permission, in writing by the
Employer or his representative.
18.00.00 CONTRACTOR' S SITE OFFICE ESTABLISHMENT
The Contractor shall establish a Office at the Site and keep posted an
authorised representative for the purpose of the Contract. Any written order or
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
11 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
instruction of the Employer or his duly authorised representative shall be
communicated to the said authorised resident representative of the Contractor
and the same shall be deemed to have been communicated to the Contractor
at his legal address.
19.00.00 CO-OPERATION WITH OTHER CONTRACTORS
19.01.00 Employer, who may be performing other works on behalf of the Employer and
the workmen who may be employed by the Employer and doing work in the
vicinity of the works under the Contract. The Contractor shall also arrange to
perform his work as to minimise, to the maximum extent possible,
interference with the work of other Contracts and their workmen. Any injury or
damage that may be sustained by the employees of the other Contractors and
the Employer, due to the Contractor's work shall promptly be made good at
his own expense. The Employer shall determine the resolu-tion of any
difference or conflict that may arise between the Contractor and other
Contractors or between the Contractor and the workmen of the Employer in
regard to their work. If the work of the Contractor is de-layed because of the
any acts of omission of another Contractor, the Contractor shall have no claim
against the Employer on that account other than an extension of time for
completing his works.
Employer shall have full access to visit the contractor's site at any time for
inspection and surveillance checks.
1902.00 The Employer shall be notified promptly by the Contractor of any defects in
the other Contractor's works that could affect the Contractor's Works. The
Employer shall determine the corrective measures if any, re-quired to rectify
this situation after inspection of the works and such decisions by the Employer
shall be binding on the Contractor.
20.00.00 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Employer
in respect of his employees and workmen at Site. The Employer shall be at
liberty to object to the presence of any representative or employee of the
Contractor at the Site, if in the opinion of the Employer such employee has
mis-conducted himself or is incompetent, negligent or otherwise unde-sirable
then the Contractor shall remove such a person objected to and provide in
his place a competent replacement.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
12 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
21.00.00 CONTRACTOR' S FIELD OPERATION
21.01.00 The Contractor shall keep the Employer informed in advance regarding his field
activity plans and sched-ules for carrying out each part of the works. Any
review of such plan or schedule or method of work by the Employer shall not
relieve the Contractor of any of his responsibilities towards the field activities.
Such reviews shall also not be considered as an assumption of any risk or
liability by the Employer or any of his representatives and no claim of the
Contractor will be entertained because of the failure or inefficiency of any such
plan or schedule or method of work reviewed. The Contractor shall be solely
re-sponsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
21.02.00 The Contractor shall have the complete responsibility for the conditions of the
Work-Site including the safety of all persons employed by him or his Sub-
Contractor and all the properties under his custody during the performance of
the work. This requirement shall apply continuously till the completion of the
Contract and shall not be limited to normal working hours. The construction
review by the Employer is not intended to include review of Contractor's safety
measures in, on or near the Work-Site, and their adequacy or otherwise.
22.00.00 PHOTOGRAPHS AND PROGRESS REPORT
22.01.00 The Contractor shall furnish three (3) prints each to the Employer of progress
photographs of the work done at Site. Photographs shall be taken as and
when indi-cated by the Employer or his representative. Photo-graphs shall be
adequate in size and number to indicate various stages of erection. Each
photograph shall contain the date, the name of the Contractor and the title of
the photograph.
22.02.00 The above photographs shall accompany the monthly progress report detailing
out the progress achieved on all erection activities as compared to the
schedules. The report shall also indicate the reasons for the variance between
the scheduled and actual progress and the action proposed for corrective
measures, wherever necessary.
22.03.00 The Contractor shall submit the progress of work in video cassettes (2
copies) quarterly highlighting the progress and constraints at site.
23.00.00 MAN-POWER REPORT
23.01.00 The Contractor shall submit to the Employer, on the first day of every month,
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
13 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
a man hour schedule for the month, detailing the man hours scheduled for
the month, skill-wise and area-wise.
23.02.00 The Contractor shall also submit to the Employer on the first day of every
month, a man power report of the previous month detailing the number of
persons sched-uled to have been employed and actually employed, skill-
wise and the areas of employment of such labour.
24.00.00 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is
finally taken over by the Employer. No claim will be entertained by the
Employer or the representative of the Employer for any damage or loss to the
Contractor's works and the Contractor shall be responsible for complete
restoration of the damaged works to original conditions to comply with the
specification and drawings. Should any such damage to the Contractor's
Works occur because of other party not being under his supervision or
control, the Contractor shall make his claim directly with the party concerned.
If disagree-ment or conflict or dispute develops between the Contractor and the
other party or parties concerned regarding the responsibility for damage to the
Contractor's Works the same shall be resolved as per the provisions of the
as specified at clause no 20.00.00- of this chapter entitled "Co-opera-tion with
other Contractors." The Contractor shall not cause any delay in the repair of
such damaged Works because of any delay in the resolution of such dis-
putes. The Contractor shall proceed to repair the Work immediately and no
cause thereof will be assigned pending resolution of such disputes.
25.00.00 EMPLOYMENT OF LABOUR
25.01.00 In addition to all local laws and regulations pertaining to the employment of
labour to be complied with by the Contractor pursuant to GCC, the Contractor
will be expected to employ on the work only his regular skilled employees with
experience of the particular work. No female labour shall be employed after
darkness. No person below the age of eighteen years shall be employed.
25.02.00 All travelling expenses including provisions of all necessary transport to and
from Site, lodging allow-ances and other payments to the Contractor's
employees shall be the sole responsibility of the Contractor.
25.03.00 The hours of work on the Site shall be decided by the Employer and the
Contractor shall adhere to it. Working hours will normally be eight (8) hours
per day - Monday through Saturday.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
14 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
25.04.00 Contractor's employees shall wear identification badges while on work at Site.
25.05.00 In case the Employer becomes liable to pay any wages or dues to the labour
or any Government agency under any of the provisions of the Minimum
Wages Act, Workmen Compensation Act, Contact Labour Regulation Abolition
Act or any other law due to act of omission of the Contractor, the Employer
may make such payments and shall recover the same from the Contractor's
Bills.
26.00.00 FACILITIES TO BE PROVIDED BY THE EMPLOYER
26.01.00 Space
The Contractor shall advise the Employer within thirty (30) days from the
date of acceptance of the Notification of Award about his exact requirement
of space for his office, storage area, pre-assembly and fabrication areas,
labour and staff colony area, toilets, etc. The above requirement shall be
reviewed by the Employer and space as decided by Employer will be allotted
to the Contractor for construction of his temporary structures/ facilities like
office, storage sheds, pre-assembly and fabrication areas, labour and staff
colony, toilets, etc. for Contractor's as well as his Sub-Contractor's use.
26.02.00 Electricity
The Contractor shall submit to the Employer within thirty (30) days from the
date of acceptance of the Notification of Award, his electrical power
requirements, if any, to allow the planning of the same by the Employer. The
Contractor shall be provided with free supply of electricity for the purposes of
the Contract, only at maximum three (3) locations in the Employer's Site, at
415V voltage level. The Contractor shall make his own further distribution
arrangement and shall maintain a minimum drawal power factor of 0.8, and all
such devices for maintaining power factor of 0.8, and all such devices for
maintaining power factor of 0.8 or better shall be under the scope of
contractor. All temporary wiring must comply with local regulations and will be
subject to Employer's inspection and approval before connection to supply. The
free supply of power will not be provided for the use in the labour and staff
colony. Power supply for labour and staff colony shall be provided at one point
within the plant boundary either at 11 KV or 415 V depending on the quantum
and distance. It shall be the responsibility of the Contractor to take the power
supply upto the point of his use. The Contractor shall be charged for power
supply to labour and staff colony at rates prevalent at the site.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
15 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
26.03.00 Water
Contractor shall make all arrangements himself for the supply of construction
water as well as potable water for labour and other personnel at the worksite/
colony.
Note: Employer shall provide suitable quality water required for pre-
commissioning & commissioning activities of equipments like flushing of pipes,
hydraulic test of tanks, condenser, vessels etc.
26.04.00 Communication
The Employer will extend the telephone facilities, if available at Site, for
purposes of Contract. The Contractor shall be charged at actuals for such
facili-ties.
26.05.00 Cranes
Turbine hall EOT cranes may be used by the Contractor on chargeable basis
for erection of the units / equipments under this package. For the equipments
which cannot be handled by these Turbine hall EOT cranes, the Contractor
shall make his own arrangements.
27.00.00 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
27.01.00 Contractor's site office Establishment
The Contractor shall establish a site office at the site and keep posted an
authorized representative for the purpose of the contract, pursuant to GCC.
27.02.00 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments, tools, tackles and
scaffoldings required for pre-assembly, installation, testing, commissioning and
conducting Guarantee tests of the equipments covered under the Contract. He
shall submit a list of all such materials to the Employer before the
commencement of pre-assembly at Site. These tools and tackles shall not be
removed from the Site without the written permission of the Employer. The
Contractor shall arrange Dozer, Hydra, Cranes, Trailer, etc. for the purpose of
fabrication, erection and commissioning.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
16 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
27.03.00 Testing Equipment and Facilities:
The contractor shall provide the necessary testing, equipment and facilities.
27.04.00 Site laboratory for civil works:
Contractor shall provide and maintain a site laboratory for the testing of
construction material under the direction and general supervision of employer.
Alternatively, bidder shall make arrangement for testing of material/workmanship
of work in his scope at employer's lab (if available) or any other approved
external laboratory.
27.05.00 First-aid
27.05.01 The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of
Contractor's personnel shall be trained in administering first-aid.
27.05.02 The Employer will provide the Contractor, in case of any emergency, the
services of an ambulance for transportation to the nearest hospital.
27.06.00 Cleanliness
27.06.01 The Contractor shall be responsible for keeping the entire area allotted to him
clean and free from rubbish, debris etc. during the period of Contract. The
Contractor shall employ enough number of special personnel to thoroughly
clean his work-area at least once in a day. All such rubbish and scrap
material shall be stacked or disposed in a place to be identified by the
Employer. Materials and stores shall be so arranged to permit easy cleaning
of the area. In areas where equipment might drip oil and cause damage to
the floor surface, a suitable protective cover of a flame resistant, oil proof
sheet shall be provided to protect the floor from such damage.
27.06.02 Similarly the labour colony, the offices and the residential areas of the
Contractor's employees and workmen shall be kept clean and neat to the
entire satisfaction of the Employer. Proper sanitary arrangements shall be
provided by the Contractor, in the work-areas, office and residential areas of
the Contractor.
28.00.00 LINES AND GRADES
All the Works shall be performed to the lines, grades and elevations indicated
on the drawings. The Contractor shall be responsible to locate and layout the
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
17 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Works. Basic horizontal and vertical control points will be established and
marked by the Employer at Site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform
the Employer well in advance of the times and places at which he wishes
to do work in the area allotted to him so that suitable datum points may be
established and checked by the Employer to enable the Contractor to proceed
with his works. Any work done without being properly located may be
removed and/or dismantled by the Employer at Contractor's expense.
29.00.00 FIRE PROTECTION
29.01.00 The work procedures that are to be used during the erection shall be those
which minimise fire hazards to the extent practicable. Combustible materials,
combustible waste and rubbish shall be collected and removed from the Site
at least once each day. Fuels, oils and volatile or flammable materials shall be
stored away from the construction and equipment and materials storage areas
in safe containers. Untreated canvas, paper, plastic or other flammable flexible
materials shall not at all be used at Site for any other purpose unless
otherwise specified. If any such materials are received with the equipment at
the Site, the same shall be removed and replaced with acceptable material
before moving into the construction or storage area.
29.02.00 Similarly corrugated paper fabricated cartons etc. will not be permitted in the
construction area either for storage or for handling of materials. All such
materi-als used shall be of water proof and flame resistant type. All the other
materials such as working drawings, plans etc. which are combustible but are
essential for the works to be executed shall be protected against combustion
resulting from welding sparks, cutting flames and other similar fire sources.
29.03.00 All the Contractor's supervisory personnel and suffi-cient number of workers
shall be trained for fire-fighting and shall be assigned specific fire protection
duties. Enough of such trained personnel must be avail-able at the Site during
the entire period of the Contract.
29.04.00 The Contractor shall provide enough fire protection equipment of the types and
number for the warehouses, office, temporary structures, labour colony area etc.
Access to such fire protection equipment, shall be easy and kept open at all
time.
30.00.00 SECURITY
The Contractor shall have total responsibility for all equipment and materials in
his custody stores, loose, semi-assembled and/or erected by him at Site. The
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
18 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Contractor shall make suitable security arrangements including employment of
security personnel to ensure the protection of all materials, equipment and
works from theft, fire, pilferage and any other damages and loss. All materials
of the Contractor shall enter and leave the Employer Site only with the written
permission of the Employer in the prescribed manner.
31.00.00 CONTRACTOR'S AREA LIMITS
The Employer will mark-out the boundary limits of access roads, parking
spaces, storage and construction areas for the Contractor and the Contractor
shall not trespass the areas not so marked out for him. The Contractor shall
be responsible to ensure that none of his personnel move out of the areas
marked out for his operations. In case of such a need for the Contactor's
personnel to work out of the areas marked out for him the same shall be
done only with the written permission of the Employer.
32.00.00 CONTRACTOR' S CO-OPERATION WITH THE EMPLOYER
In case where the performance of the erection work by the Contractor affects
the operation of the system facilities of the Employer, such erection work of
the Contractor shall be scheduled to be performed only in the manner
stipulated by the Employer and the same shall be acceptable at all times to
the Contractor. The Employer may impose such restrictions on the facilities
provided to the Contractor such as electricity, etc. as he may think fit in the
interest of the Employer and the Contractor shall strictly adhere to such re-
strictions and co-operate with the Employer. It will be the responsibility of the
Contractor to provide all necessary temporary instrumentation and other
measuring devices required during start-up and operation of the equipment
systems which are erected by him. The Contractor shall also be responsible
for flushing and initial filling of all the oil and lubricants required for the
equipment furnished and installed by him, so as to make such equipment
ready for operation. The Contractor shall be responsible for supplying such
flush-ing oil and other lubricants unless otherwise specified elsewhere in
documents and specifications.
33.00.00 PRE-COMMISSIONING AND COMMISSIONING ACTIVITIES
33.01.00 GENERAL
33.01.01 The Contractor upon completion of installation of equipments and systems,
shall conduct pre-commissioning and commissioning activities, to make the
equipment/systems ready for safe, reliable and efficient operation on sustained
basis. All pre-commissioning/commissioning activities considered essential for
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
19 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
such readiness of the equipment/systems including those mutually agreed and
included in the Contractor's quality assurance programme as well as those
indicated in clauses elsewhere in the technical specifications shall be
performed by the contractor.
33.01.02 The pre-commissioning and commissioning activities including Guarantee tests,
checks and trial operations of the equipment/systems furnished and installed
by the contractor shall be the responsibility of the Contractor as detailed in
relevant clauses in Technical Specification. The Contractor shall provide, in
addition, test instruments, calibrating devices etc. and labour required for
successful performance of these operations. If it is anticipated that the above
test may prolong for a long time, the Contractor's workmen required for the
above test shall always be present at site during such operations.
33.01.03 The following activities shall be carried out by the contractor, 18 month prior
to schedule date of commissioning of the equipment/systems installed by him.
(a.) The contractor shall furnish the organization chart of his operation and
commissioning engineers for the acceptance of employer. Adequate
number of operation and commissioning engineers shall be deployed by
the contractor to effectively meet the requirement of round the clock
operation in shifts also, till the plant is taken over by the employer.
(b.) The contractor shall submit the bio-data containing the details of
experience of his operation and commissioning engineers for the
acceptance of employer.
(c.) The contractor shall furnish the deployment schedule of his operation
and commissioning engineers for the acceptance of the employer.
(d.) Apart from above, contractor shall ensure deployment of sufficient
skilled/semi-skilled/unskilled manpower during pre-commissioning and
commissioning activities.
33.01.04 It shall be the responsibility of the Contractor to provide all necessary
temporary instrumentation and other measuring devices required during start-up
and initial operation of the equipment/systems which are installed by him.
33.01.05 The Contractor shall also be responsible for flushing and initial filling of all oils
and lubricants required for the equipment furnished and installed by him so as
to make such equipment ready for operation. The Contractor shall be
responsible for supplying such flushing oil and other lubricants unless
otherwise specified elsewhere in these specifications and documents.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
20 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
33.02.00 COMMISSIONING DOCUMENTATION
33.02.01 The contractor shall submit the commissioning documentation, comprising of
Standard checklists, pre-commissioning procedures, testing schedules,
commissioning schedules and commissioning networks for various equipment/
systems covered under the contract, for the approval of employer.
33.02.02 Standard checklist, as the name suggests, shall be a fairly general
documents, containing the list of all checks required to be carried out for
similar and repetitive type of equipment to ensure consistent and thorough
checking. An indicative list of such equipment is enclosed as Annexure I.
33.02.03 The testing schedule is a document, designed for safe and systematic
commissioning of individual equipment/sub-system (for example Boiler Feed
Pump, condensate pump, compressor etc) Commissioning schedule is a
document envisaged for commissioning of a system (for example feed
system, Condensate system, Compressed Air system, commissioning etc).
The testing/Commissioning schedule shall have a standard format in order to
maintain consistency of presentation, content and reporting. A brief write up
on the contents of the Testing Schedule/Commissioning Schedule is enclosed
as Annexure-II.
33.02.04 The contractor shall submit the list of commissioning documentation to be
submitted by him, alongwith their submission schedule for various equipment/
systems covered under the contract, with in 6(six) month from the date of
award of contract, for the acceptance of employer.
33.02.05 The Contractor shall submit the commissioning documentation, for various
equipment/covered under the contract, for the approval of employer, at least
18 months before the scheduled date of commissioning of the equipment/
systems.
33.03.00 COMMISSIONING ACTIVITIES
33.03.01 Upon completion of pre-commissioning activities/tests, the contractor shall
initiate commissioning of facilities. During commissioning the Contractor shall
carry out system checking and reliability trials on various parts of the facilities.
33.03.02 Contractor shall carry out the checks/tests at site to prove to the Employer
that each equipment of the supply complies with requirements stipulated and
is installed in accordance with requirements specified.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
21 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
33.03.03 Before the plant is put into initial operation the Contractor shall be required to
conduct test to demonstrate to the Employer that each item of the plant is
capable of correctly performing the functions for which it was specified and its
performance, parameters etc. are as per the specified/approved values. These
tests may be conducted concurrently with those required under commissioning
sequence.
33.03.04 The Contractor shall also demonstrate the performance of all C&I equipment,
the tests on main equipment of prior to that as the case may be.
33.03.05 Other tests shall be conducted, if required by the Employer, to establish that
the plant equipment are in accordance with requirements of the specifications.
33.03.06 The Contractor shall conduct all the commissioning tests and undertake
commissioning activities pertaining to all other auxiliaries and equipments
including all electrical and C&I equipment/systems not specifically brought out
above but are within the scope of work and facilities being supplied and
installed by the Contractor and follow the guidelines indicated above or
elsewhere in these technical specifications.
33.05.00 Initial Operation
Upon completion of system checking/Tests as above and as a part of
commissioning of facilities, complete plant/facilities shall be put on initial
operation as stipulated in General Technical Requirements.
34.00.00 MATERIALS HANDLING AND STORAGE
34.01.00 All the equipments furnished under the Contract and arriving at Site shall be
promptly received, unloaded and transported and stored in the storage spaces
by the Contractor.
34.02.00 Contractor shall be responsible for examining all the shipment and notify the
Employer immediately of any damage, shortage, discrepancy etc. for the
purpose of Employer's information only. The Contractor shall submit to the
Employer every week a report detailing all the receipts during the week.
However, the Contractor shall be solely responsible for any shortages or
damage in transit, handling and / or in storage and erection of the equipment
at Site. Any demurrage, wharfage and other such charges claimed by the
transporters, railways etc. shall be to the account of the Contractor.
34.03.00 The Contractor shall maintain an accurate and exhaustive record detailing out
the list of all equipment received by him for the purpose of erection and keep
such record open for the inspection of the Employer.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
22 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
34.04.00 All equipment shall be handled very carefully to prevent any damage or loss.
No bare wire ropes, slings, etc. shall be used for unloading and/or handling
of the equipment without the specific written permission of the Employer. The
equipment stored shall be properly protected to prevent damage either to the
equipment or to the floor where they are stored. The equipment from the
store shall be moved to the actual location at the appropriate time so as to
avoid damage of such equip-ment at Site.
34.05.00 All electrical panels, controls gear, motors and such other devices shall be
properly dried by heating before they are installed and energised. Motor
bearings, slip rings, commutators and other exposed parts shall be protected
against moisture ingress and corrosion during storage and periodically
inspected. Heavy rotating parts in assembled conditions shall be periodically
rotated to prevent corrosion due to prolonged storage.
34.06.00 All the electrical equipment such as motors, generators, etc. shall be tested
for insulation resistance at least once in three months from the date of
receipt till the date of commissioning and a record of such measured
insulation values maintained by the Contractor. Such records shall be open
for inspection by the Employer.
34.07.00 The Contractor shall ensure that all the packing materials and protection
devices used for the various equipments during transit and storage are
removed before the equipment are installed.
34.08.00 The consumables and other supplies likely to deteriorate due to storage must
be thoroughly protected and stored in a suitable manner to prevent damage or
dete-rioration in quality by storage.
34.09.00 All the materials stored in the open or dusty location must be covered with
suitable weatherproof and flame-proof covering material wherever applicable.
34.10.00 If the materials belonging to the Contractor are stored in areas other than
those earmarked for him, the Employer will have the right to get it moved to
the area earmarked for the Contractor at the Contractor's cost.
34.11.00 The Contractor shall be responsible for making suitable indoor storage facilities
to store all equipment which require indoor storage. Normally, all the electrical
equipments such as motors, control gear, generators, exciters and
consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Employer, in addition, may direct the Contractor to move
certain other materials, which in his opinion will require indoor storage, to
indoor storage areas which the Contractor shall strictly comply with.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
23 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
35.00.00 CONSTRUCTION MANAGEMENT
35.01.00 The field activities of the Contractors working at Site, will be coordinated by
the Employer and the Employer decision shall be final in resolving any
disputes or conflicts between the Contractor and other Contractors and
tradesmen of the Employer regarding scheduling and co- ordination of work.
Such decision by the Employer shall not be a cause for extra compensation
or extension of time for the Contractor.
35.02.00 The Employer shall hold weekly meetings of all the Contractors working at
Site, at a time and place to be designated by the Employer. The Contractor
shall attend such meetings and take notes of discussions during the meeting
and the decisions of the Employer and shall strictly adhere to those decisions
in performing his Works. In addition to the above weekly meeting, the
Employer may call for other meeting either with individual Contractors or with
selected number of Contractors and in such a case the Contractor if called,
will also attend such meetings.
35.03.00 Time is the essence of the Contract and the Contractor shall be responsible
for performance of his works in accordance with the specified construction
schedule. If at any time, the Contractor is falling behind the schedule, he shall
take necessary action to make good for such delays by increasing his work
force or by working overtime or otherwise accelerate the progress of the work
to comply with the schedule and shall communicate such actions in writing to
the Employer, satisfying that his action will compensate for the delay. The
Contractor shall not be allowed any extra compensation for such action.
35.04.00 The Employer shall however not be responsible for provision of additional
labour and/or materials or supply or any other services to the Contractor
except for the co-ordination work between various Contractors as set out
earlier.
36.00.00 FIELD OFFICE RECORDS
The Contractor shall maintain at his Site Office up-to- date copies of all
drawings, specifications and other Contract Documents and any other
supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continu-ous record of all changes
to the above Contract Docu-ments, drawings, specifications, supplementary
data, etc. effected at the field and on completion of his total assignment under
the Contract shall incorporate all such changes on the drawings and other
Engineering data to indicate as installed conditions of the equipment furnished
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
24 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
and erected under the Contract. Such drawings and Engineering data shall be
submitted to the Employer in required number of copies.
37.00.00 CONTRACTOR' S MATERIALS BROUGHT ON TO SITE
37.01.00 The Contractor shall bring to Site all equipment, components, parts, materials,
including construction equipment, tools and tackles for the purpose of the
Works under intimation to the Employer. All such goods shall, from the time
of their being brought vest in the Employer, but may be used for the purpose
of the Works only and shall not on any account be removed or taken away
by the Contractor without the written permission of the Employer. The
Contractor shall nevertheless be solely liable and responsible for any loss or
destruction thereof and damage thereto.
37.02.00 The Employer shall have a lien on such goods for any sum or sums which
may at any time be due or owing to him by the Contractor, under, in respect
of or by reasons of the Contract. After giving a fifteen (15) days notice in
writing of his intention to do so, the Employer shall be at liberty to sell and
dispose off any such goods, in such manner as he shall think fit including
public auction or private treaty and to apply the proceeds in or towards the
satisfaction of such sum or sums due as aforesaid.
37.03.00 After the completion of the Works, the Contractor shall remove from the Site
under the direction of the Employer the materials such as construction
equipment, erection tools and tackles, scaffolding etc. with the written
permission of the Employer. If the Contractor fails to remove such materials,
within fifteen (15) days of issue of a notice by the Employer to do so then
the Employer shall have the liberty to dispose off such materials as detailed
under as specified at clause no 38.02.00- of this chapter and credit the
proceeds thereto to the account of the Contractor.
38.00.00 PROTECTION OF PROPERTY AND CONTRACTOR' S LIABILITY
38.01.00 The Contractor shall be responsible for any damage resulting from his
operations. He shall also be re-sponsible for protection of all persons including
members of public and employees of the Employer and the employees of
other Contractors and Sub- Contractors and all public and private property
including structures, building, other plants and equipments and utilities either
above or below the ground.
38.02.00 The Contractor will ensure provision of necessary safety equipment such as
barriers, sign - boards, warning lights and alarms, etc. to provide adequate
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
25 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
protection to persons and property. The Contractor shall be responsible to give
reasonable notice to the Employer and the Employers of public or private
property and utili-ties when such property and utilities are likely to get
damaged or injured during the performance of his Works and shall make all
necessary arrangements with such Employers, related to removal and/or
replacement or pro-tection of such property and utilities.
39.00.00 PAINTING
All exposed metal parts of the equipment including pipings, structure railings,
etc. wherever applicable, after installation unless otherwise surface protected, shall
be first painted with at least two coats of suit-able primer which matches the
shop primer paint used, after throughly cleaning all such parts of all dirt, rust,
scales, greases, oils and other foreign materials by wire brushing, scraping or
sand blasting and the same being inspected and approved by the Employer for
painting. Afterwards, the above parts shall be fin-ished painted with three coats
of allowed resin machin-ery enamel paints. The minimum thickness of paint film
shall not be less than 100 microns. The quality of the finish paint shall be as
per the standards of Bureau of Indian Standards (BIS) or equivalent and to be
of the colour as approved by the Employer.
Painting for structures shall confirm to the painting specification specified in
Part-'B' under "Civil".
40.00.00 INSURANCE
40.01.00 In addition to the conditions covered under the Clause entitled "Insurance" in
Section General Conditions of Contract (GCC), the following provisions will also
apply to the portion of works to be done beyond the Contractor's own or his
Sub-Contractor's manufacturing Works.
40.02.00 Workmen's Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under
the Workmen's Compensation Act, 1948 (Government of India). This policy
shall also cover the Contractor against claims for injury, disa-bility disease or
death of his or his Sub-Contractor's employees, which for any reason are not
covered under the Workmen's Compensation Act, 1948. The liabili-ties shall
not be less than the following:
Workmen's Compensation - As per Statutory Provisions
Employee's Liability - As per Statutory Provisions
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
26 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
40.03.00 Comprehensive Automobile Insurance
This insurance shall be in such a form to protect the Contractor against all
claims for injuries, disability, disease and death to members of public
including the Employer's men and damage to the property of other arising
from the use of motor vehicles during on or off the Site operations,
irrespective of the Ownership of such vehicles. The liability covered shall be
as herein indicated :
Fatal Injury : Rs.100,000 each person
: Rs.200,000 each occurrence
Property Damage : Rs.100,000 each occurrence
40.04.00 Comprehensive General Liability Insurance
40.04.01 The insurance shall protect the Contractor against all claims arising from
injuries, disabilities, disease or death of members of public or damage to
property of others, due to any act or omission on the part of the Contractor,
his agents, his employees, his representa-tives and Sub-Contractors or from
riots, strikes and civil commotion. This insurance shall also cover all the
liabilities of the Contractor arising out of the Clause entitled "Defence of
Suits" in Section General Conditions of Contract (GCC).
40.04.02 The hazards to be covered will pertain to all the Works and areas where
the Contractor, his Sub-Contractors, his agents and his employees have to
perform work pursuant to the Contract.
40.05.00 The above are only illustrative list of insurance covers normally required and it
will be the responsi-bility of the Contractor to maintain all necessary insurance
coverage to the extent both in time and amount to take care of all his
liabilities either direct or indirect, in pursuance of the Contract.
41.00.00 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works which can
be performed without subject-ing the equipment and materials to adverse
effects during inclement weather conditions, like monsoon, storms, etc. and
during other unfavourable construction conditions. No field activities shall be
performed by the Contractor under conditions which might adversely affect the
quality and efficiency thereof, unless special precautions or measures are
taken by the Contractor in a proper and satisfactory manner in the
performance of such Works and with the concurrence of the Employer. Such
unfavourable construction condi-tions will in no way relieve the Contractor of
his responsibility to perform the Works as per the schedule.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
27 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
42.00.00 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins,
fossils, etc. which he may come across during the course of performance of
his Works either during excavation or elsewhere, are properly protected and
handed over to the Employer. Similarly the Contractor shall ensure that the
bench marks, reference points, etc., which are marked either with the help of
Employer or by the Employer shall not be disturbed in any way during the
performance of his Works. If, any work is to be preformed which disturb such
reference, the same shall be done only after these are transferred to other
suitable locations under the direction of the Employer. The Contractor shall
pro-vide all necessary materials and assistance for such relocation of
reference points etc.
43.00.00 WORK & SAFETY REGULATIONS
43.01.00 General
i) The contractor shall comply with all the requirements of "The Building
and Other Construction Workers (Regulation of Employment &
Conditions of Service) Act," 1996 and its Central Rule 1998 / State
Rules and any other statutory requirements as applicable.
ii) The Contractor shall follow NTPC Safety Rules as issued from time to
time with respect to safety in construction & erection.
iii) The contractor shall have the approved Safety, Health and Environment
(SHE) Policy in respect of Safety and health of Building Workers and it
shall be circulated widely and displayed at conspicuous place in Hindi
and local language understood by the majority of the workers. A copy of
the safety policy should be submitted to Engineer in charge.
iv) The contractor shall submit the safety plan comprising of methods to
implement the Safety Policy/ Rules, Risk assessment and ensuring
Safety at work areas, Safety audits, inspections and its compliance,
Supervision and responsibility to ensure Safety at various levels, Safety
training to employees, review of Safety and accident analysis, ensure
Health and Safety Procedures to prevent accidents to Engineer I/c for
approval as per the format of Safety plan as annexed at Annexure - I.
v) The Contractors shall ensure proper safety of all the workmen,
materials, plant and equipment belonging to him or to the Employer or
to others, working at the Site.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
28 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
vi) All equipments used in construction and erection by the contractor shall
meet BIS / International Standards and where such standards do not
exist, the Contractor shall ensure these to be absolutely safe. All
equipments shall be strictly operated and maintained by the contractor
in accordance with manufacturer's operation manual. The contractor
should also follow Guidelines / Rules of the Employer in this regard.
vii) The Contractors shall provide suitable latest Personal Protective
Equipments of prescribed standard to all their employees and workmen
according to the need. The Engineer I/c shall have the right to examine
these safety equipments to determine their suitability, reliability,
acceptability and adaptability. The contractor should also ensure these
before their use at worksite.
viii) The Contractor shall provide safe working conditions to all workmen
and employees at his workplace including safe means of access,
railings, stairs, and ladders, scaffolding, work platforms, toe boards etc.
The scaffoldings shall be erected under the control and supervision of
an experienced and competent person. For erection of scaffolds,
access, work platforms etc. shall be good and the contractor shall use
standard quality of material.
ix) The Contractor shall follow and comply with all the Safety Rules,
standards, code of practices of NTPC and relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant
and equipment as may be prescribed from time to time without any
protest or contest or reservation. In case of any unconformity between
statutory requirement and the Safety Rules of the Employer referred
above, the latter shall be binding on the Contractor unless the statutory
provisions are more stringent. As and when required he can refer /
obtain copy of NTPC safety documents as stated above.
x) The contractor shall have his own arrangements with nearby hospitals
for shifting and treatment of sick and injured.
The medical examination of the workers employed in hazardous areas
shall be conducted as per Rule 223 0f The Building and Other
Construction Worker (Regulation of Employment and Condition of
Service) Central Rule 1998 Their health records shall be maintained
accordingly and to be submitted to Engineer I/c when asked for. If any
worker found suffering from occupational health hazard, the worker
should be shifted to suitable place of working and properly treated
under intimation to Engineer I/c. The medical fitness certificate to be
submitted to Engineer (I/c).
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
29 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xi) First Aid boxes equipped with requisite articles as specified in the Rule
231 of The Building and Other Construction Worker (Regulation of
Employment and Condition of Service) Central Rule 1998 shall be
provided at construction sites for the use of workers. Training has to
be provided on first aid to workmen & office bearers working at site.
43.01.01 Emergency Action Plan
The contractor shall prepare an emergency action plan approved by his
competent authority to handle any emergency occurred during construction
work. Regular mock drills shall be organized to practice this emergency plan.
The Emergency Action Plan should be widely circulated to all the employees
and suitable infrastructure shall be provided to handle the emergencies.
43.01.02 Scaffolding
The contractor shall take all precautions to prevent any accidental collapse of
scaffolding or fall of persons from scaffolding. The contractor should ensure
that scaffolding are designed by a competent person and it erection and
repairs should be done under the expert supervision. The scaffolding shall
meet the required strength and other requirements for the purpose for which
the scaffold is erected. The material used for scaffold should conform to the
BIS / International standards.
43.01.03 Openi ng
The contractor shall ensure that there is no opening in any working platform/
any floor of the building, which may cause fall of workers or material. When
ever an opening on a platform/any floor of the building is unavoidable, the
opening should be suitably fenced and necessary measures for protection
against falling objects or building workers from such platform are taken by
providing suitable safety nets, safety belts or other similar means.
43.01.04 Expl osi ves
The contractor shall take all precautions while handling, using, storing or
transporting of all explosives. Before usage of any explosive necessary warning
/ danger signals be erected at conspicuous places to warn the workers and
general public. The contractor should strictly ensure that all measures and
precautions required to be complied for use, handling, storing or transportation
of explosives under the rules framed under the Explosives Act, 1884.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
30 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
43.02.00 Fencing of Machinery
The contractor shall provide suitable fencing or guard to all dangerous and
moving parts of machinery.
The contractor shall not allow any of the employees to clean, lubricate, repair,
adjust or examine during machinery in motion, which may cause injury to the
person.
43.03.00 Carrying of Excessive Weight by a Worker
The worker shall not be allowed to lift by hand or carry over his head, back
or shoulder more than the maximum limit set by the prescribed rules for the
construction Workers.
43.04.00 Dangerous and Harmful Gases / Equipment
The contractor shall ensure that the workers are not exposed to any harmful
gases during any construction activity including excavation, tunneling, confined
spaces etc.
The contractor should not allow any worker to go into the confined space
unless it is certified by Engineer (I/c) to be safe and fit for the entry to such
work place. Proper record and work permits should be followed to carry out
such works.
43.05.00 Overhead Protecti on
The contractor shall ensure that any area exposed to risk of falling materials,
articles or objects is roped off or cordoned off or otherwise suitably guarded
from inadvertent entry of any person.
Wherever there is a possibility of falling of any material, equipment or
construction workers while working at heights, a suitable and adequate safety
net should be provided. The safety net should be in accordance with BIS
Standards.
43.06.00 Working at Heights
All working platforms, ways and other places of construction work shall be
free from accumulations of debris or any other material causing obstructions
and tripping.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
31 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Wherever workers are exposed to the hazard of falling into water, the
contractor shall provide adequate equipment for saving the employees from
drowning and rescuing from such hazards. The contractor shall provide boat
or launch equipped with sufficient number of life buoys, life jackets etc.
manned with trained personnel at the site of such work.
Every opening at elevation from ground level through which a building worker,
vehicle, material equipment etc. may fall at a construction work shall be
covered and/or guarded suitably by the contractor to prevent such falls.
Wherever the workers are exposed to the hazards of falling from height, the
contractor shall provide full harness safety belts fitted with fall arresting
systems to all the employees working at higher elevations and life line of 8
mm diameter wire rope with turn buckles for anchoring the safety belts while
working or moving at higher elevations. Safety nets shall also be provided for
saving them from fall from heights and such equipment should be in
accordance with BIS standards.
Wherever there is a possibility of falling of any material, equipment or
construction workers while working at heights, a suitable and adequate safety
net should be provided. The safety net should be in accordance with BIS
Standards.
The contractor shall provide standard prefabricated ladders on the columns
where the workers are required to use them as an access for higher
elevations till permanent staircase is provided. The workers shall be provided
with safety belts fitted with suitable fall arresting system (Fall arrestors) for
climbing/getting down through ladders to prevent fall from height.
43.07.00 Handling of Hazardous Chemicals
The Contractor will notify well in advance to the Engineer I/c of his intention to
bring to the Site any container filled with liquid or gaseous fuel or explosive or
petroleum substance or such chemicals which may involve hazards. NTPC
shall have the right to prescribe the conditions, under which such container is
to be stored, handled and used during the performance of the works and the
Contract shall strictly adhere to and comply with such instructions. The
Engineer I/c shall have the right at his sole discretion to inspect any such
container or such construction plant / equipment for which material in the
container is required to be used and if in his opinion, its use is not safe, he
may forbid its use. No claim due to such prohibition shall be entertained by
NTPC and NTPC shall not entertain any claim of the Contractor towards
additional safety provisions / conditions to be provided for / constructed.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
32 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Further, any such decision of the Engineer I/c shall not, in any way, absolve
the Contractor of his responsibilities and in case, use of such a container or
entry thereof into the Site area is forbidden by NTPC, the Contractor shall use
alternative methods with the approval of the NTPC without any cost implication
to the NTPC or extension of work schedule.
Where it is necessary to provide and / or store petroleum products or petroleum
mixtures and explosives, the Contractor shall be responsible for carrying-out such
provision and / or storage in accordance with the rules and regulations laid down
in Petroleum Act 1934, Explosives Act 1948, and Petroleum and Carbide of Calcium
Manual published by the Chief Inspector of Explosives of India. All such storage
shall have prior approval of the Engineer I/c. In case any approvals are necessary
from the Chief Inspector (Explosives) or any statutory authorities, the Contractor
shall be responsible for obtaining the same.
The Contractor shall be fully responsible for the safe storage of his and his
Sub-contractor's radio-active sources in accordance with BARC/DAE (Bhabha
Atomic Research Centre/ Department of Atomic Energy, Govt. of India) Rules
and other applicable provisions. All precautionary measures stipulated by
BARC/DAE in connection with use, the contractor would take storage and
handling of such material.
The contractor shall provide suitable personal protective equipments to the
workers who are handling the hazardous and corrosive substances including
alkalis and acids.
As a precautionary measure the contractor should keep the bottles filled with
distilled water in cupboard / Boxes near work place for emergency eye wash
by worker exposed to such hazardous chemicals.
43.08.00 Eye Protection
The contractor shall provide suitable personal protective equipment to his
workmen depending upon the nature of hazards and ensure their usage by
the workers engaged in operations like welding, cutting, chipping, grinding or
similar operations which may cause injuries to his eyes.
43.09.00 Excavation
The contractor shall take all necessary measures during excavation to prevent
the hazards of falling or sliding material or article from any bank or side of
such excavation which is more than one and a half meter above his footing
by providing adequate piling, shoring, bracing etc. against such bank or sides.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
33 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Adequate and suitable warning signs shall be put up at conspicuous places at
the excavation work to prevent any persons or vehicles falling into the
excavation trench. No worker should be allowed to work where he may be
stuck or endangered by excavation machinery or collapse of excavations or
trenches.
43.10.00 Electrical Hazards
The contractor should ensure that all electrical installations at the construction
work comply with the requirements of latest electricity acts / rules.
The contractor shall take all adequate measures to prevent any worker from
coming into physical contact with any electrical equipment or apparatus,
machines or live electrical circuits which may cause electrical hazards during
the construction work. The contractor shall provide the sufficient ELCBs /
RCCBs for all the portable equipments, electrical switchboards, distribution
panels etc. to prevent electrical shocks.
The contractor should ensure use of single / double insulated hand tools or
low voltage i.e., 110 volts hand tools.
The contractor should also ensure that all temporary electrical installations at
the construction works are provided with earth leakage circuit breakers.
43.11.00 Vehicular Traffic
The contractor should employ vehicle drivers who hold a valid driving license
under the Motor Vehicles Act, 1988.
43.12.00 Lifting Appliances, Tools & Tackles, Lifting Gear And Pressure Plant &
Equipment etc.
The contractor shall ensure all the lifting appliances, tools & tackles including
cranes etc., lifting gear including fixed or movable and any plant or gear,
hoists, Pressure Plant and equipment etc. are in good condition and shall be
examined by competent person and only certified shall be used at sites.
Periodical Examination and the tests for all lifting / hoisting equipment &
tackles shall be carried out. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and
when desired by the Engineer I/c or by the person authorized by him.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
34 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
43.13.00 Excessive Noise, Vibration
The contractor shall take adequate measures to protect the workers against
the harmful effect of excessive noise or vibration. The noise should not
exceed the limits prescribed under the concerned rules, Noise Pollution
(Regulation and Control) Rules, 2000.
43.14.00 Electrical Installations
43.14.01 The Contractor shall not interfere or disturb electric fuses, wiring and other
electrical equipment belonging to the Employer or other contractors under any
circumstances, whatsoever, unless expressly permitted in writing by the
Engineer I/c to handle such fuses, wiring or electrical equipment.
Before the Contractor connects any electrical appliances to any plug or socket
belonging to the other contractor or the NTPC, he shall
i) Satisfy the Engineer I/C that the appliance is in good working condition;
ii) Inform the Engineer I/C of the maximum current rating, voltage and
phases of the appliances;
iii) Obtain permission of the Engineer I/C detailing the sockets to which
the appliances may be connected.
The Engineer I/C will not grant permission to connect until he is
satisfied that:
The appliance is in good condition and is fitted with suitable plug;
having earth connection with the body.
Wherever armored / metallic sheathed multi core cable is used, the
same armored / sheathed should be connected to earth.
iv) No repair work shall be carried out on any live equipment. The
Engineer I/c must declare the equipment safe and a permit to work
shall be issued by the NTPC / contractor as the case may be to
carry out any repair / maintenance work. While working on electric
lines / equipments whether live or dead, suitable type and sufficient
quantity of tools will have to be provided by the contractor to
electricians / workmen / Officers.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
35 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
v) The contractor shall employ necessary number of qualified, full time
Electricians / Electrical Supervisors to maintain his temporary electrical
installation.
The installations are provided with suitable ELCBs and RCCBs
wherever required.
43.15.00 Safety Organisation
43.15.01 The contractor employing more than 250 workmen whether temporary, casual,
probationary, regular or permanent shall employ at least one full time safety
officer exclusively to supervise safety aspects of the equipments and
workmen, who will coordinate with the NTPC Safety Officer. Further
requirement of safety officers, if any, shall be guided by Rule 209 of The
Building and Other Construction Worker (Regulation of Employment and
Conditions of Service) Central Rule 1998. In case the work is being carried
out through subcontractor, the employees / workmen of the sub contractor
shall also be considered as the contractor's employees/workmen for the above
purpose.
In case of contractor deploying less than 250 workmen he should designate
one of his Engr / supervisor or the contractor himself (if he is directly
supervising the work) as safety officer in addition to his existing
responsibilities. The Engr./ supervisor should get atleast 2days safety training
from any reputed organization or from NTPC before resuming the work. If
already trained in past the declaration along with trg. certificate to be furnished
to NTPC safety officer.
43.15.02 The name and address of such Safety Officer of the Contractor will be
promptly informed in writing to the EIC with a copy to the Project Safety
Officer before he starts work or immediately after any change of the
incumbent is made during currency of the Contract.
43.16.00 Reporting of Accident and Investigation
In case any accident occurs during the construction / erection or other
associated activities undertaken by the Contractor thereby causing any near
miss, minor or major or fatal injury to his employees due to any reason,
whatsoever, it shall be the responsibility of the Contractor to promptly inform
the same to the Engineer I/C, NTPC Safety Officer with a copy to NTPC
Head of Project in the prescribed form and also to all the authorities
envisaged under the applicable laws.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
36 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
43.17.00 Right to stop Work
43.17.01 The Engineer I/C shall have the right at his sole discretion to stop the work,
if in his opinion the work is being carried out in such a way that it may
cause accidents and endanger the safety of the persons and / or property,
and / or equipments. In such cases, the contractor shall be informed in
writing about the nature of hazards and possible injury / accident and he shall
comply to remove shortcomings promptly. The Contractor after stopping the
specific work can, if felt necessary appeal against the order of stoppage of
work to the Project Manager within 3 days of such stoppage of work and
decision of the Project Manager in this respect shall be conclusive and binding
on the Contractor.
43.17.02 The Contractor shall not be entitled for any damages / compensation for
stoppage of work, {Sub-Clause XVIII (I)} due to safety reasons and the period
of such stoppage of work shall not be taken as an extension of time for
Completion of the Facilities and will not be the ground for waiver of levy of
liquidated damages.
43.18.00 Fi re Protecti on
The contractor shall provide sufficient fire extinguishers at place /s of work.
The fire extinguishers shall be properly maintained as per relevant BIS
Standards. The employees shall be trained to operate the fire extinguishers /
equipment.
43.19.00 Penal ti es
I If the Contractor fails in providing safe working environment as per the
Safety Rules of NTPC or continues the work even after being
instructed to stop the work by the Engineer I/C as provided in Clause
XVIII (1) above, the Contractor shall be penalized at the rate of Rs.
25,000/- per day or part thereof till the instructions are complied with
and so certified by the Engineer I/C. However, in case of accident, the
provisions contained in Sub-Clause XX (II) below shall also apply in
addition to the penalties mentioned in this sub-clause.
II If the Contractor does not take all safety precautions and / or fails to
comply with the Safety Rules as prescribed by the Employer or under
the applicable law for the safety of the plant and equipment and for the
safety of personnel and the contractor does not prevent hazardous
conditions which cause injury to this own employees or employees of
other contractors, or NTPC's employees or any other person who are
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
37 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
at the Site or adjacent thereto, the Contractor shall be responsible for
payment of penalty to NTPC as per the following schedule:-
a) Fatal injury or accident causing death:
Penalty @10% of contract value or Rs. 5,00,000/- per person,
which ever is less.
b) Major injuries or accident causing 25% or more permanent
disablement to workmen or employees:
Penalty @2.5% of contract value or Rs. 1,00,000/- per person
which ever is less
Permanent disablement shall have the same meaning as
indicated in The Workmen's Compensation Act' 1923. The
penalty mentioned above shall be in addition to the
compensation payable to the workmen / employees under the
relevant provisions of the Workmen's Compensation Act' 1923
and rules framed there under or any other applicable laws as
applicable from time to time.
III If any contractor worker found working without using the safety
equipment like safety helmet, safety shoes, safety belts, etc. or without
anchoring the safety belts while working at height the Engineer I/c /
Safety Officer of NTPC shall have the right to penalize the contractor
for Rs. 200/- per person per day and such worker shall be sent out of
the workplace immediately and shall not be allowed to work on that
day. Engineer I/c / Safety Officer of NTPC will also issue a notice in
this regard to the contractor.
IV If two or more fatal accidents occur at same NTPC site under the
control of contractor during the period of contract and he has
(1) not complied with keeping adequate PPEs in stock or
(2) defaulted in providing PPEs to his workmen
(3) not followed statutory requirements / NTPC safety rules
(4) been issued warning notice/s by NTPC head of the project on
non observance of safety norms
(5) not provided safety training to all his workmen, the contractor
can be debarred from getting tender documents in NTPC for two
years from the date of last accident.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
38 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
The safety performance will also be one of the overriding criteria for
evaluation of overall performance of the contractors by NTPC. The contractor
shall submit the accident data including fatal / non-fatal accidents for the last
3 years where he has undertaken the construction activities Projects-wise
along with the tender documents. This will also be considered for evolution of
tender documents. If the information given by the contractor found incorrect,
his contract will be liable to be terminated.
43.20.00 Award
If the Contractor's performance on safety front is found satisfactory i.e. without
any fatal/reportable accident in the year of consideration; he may be
considered for suitable award "ACCIDENT FREE SAFETY MERITORIOUS
AWARD" as per scheme of the employer.
44.00.00 FOREIGN PERSONNEL
44.01.00 The Contractor shall submit to the Employer data on all personnel he
proposes to bring into India from abroad for the performance of the Works
under the Contract, at least thirty (30) days prior to their departure to India.
Such data will include for each person the name, his present address, his
assignment and responsibility in connection with the works, and a short
resume of his qualification, experience etc. in relation to the work to be
performed by him.
44.02.00 Any person unsuitable and unacceptable to the Employer shall not be brought
to India. Any person brought to India, if found unsuitable or unacceptable by
the Employer, the Contractor shall within a reasonable time make alternate
arrangements for providing a suitable replacement and repatriation of such
unsuitable personnel.
44.03.00 No person brought to India for the purposes of the works shall be repatriated
without the consent of the Employer in writing, based on a written request
from the Contractor for such repatriation giving reasons for such an action to
the Employer. The Employer may give permission for such repatriation
provided he is satis-fied that the progress of work will not suffer due to such
repatriation.
44.04.00 The cost of passports, visas and all other travel expenses to and from India,
incurred by the Contractor shall be to his account. The Employer will not
provide any residential accommodation and/or furniture for any of the
Contractor's personnel including foreign personnel and Contractor shall make
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
39 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
his own arrangements for such facilities in the area allotted at Site, to him by
the Employer for that purpose.
44.05.00 The Contractor and his expatriate personnel shall respect all Indian Acts, Laws,
rules and regulations and shall not in any way interfere with Indian political and
religious affairs and shall conform to any other rules and regulations which the
Government of India and the Employer may establish from time to time, on
them. The Contractor's expatriate personnel shall work and live in close co-
operation and coordination with their co-workers and the community and shall
not engage themselves in any other employment neither part-time or full-time
nor shall they take part in any local politics.
44.06.00 The Employer shall assist the Contractor, to the extent possible, in obtaining
necessary permits to travel to India and back, by issue of necessary
certificates and other information needed by the Government agencies.
45.00.00 FOUNDATION DRESSING & GROUTING FOR EQUIPMENT/ EQUIPMENT
BASES
45.01.00 The surfaces of foundations shall be dressed by Bidder to bring the top
surface of the foundations to the required level, prior to placement of
equipment/equipment bases on the foundations.
45.02.00 All the equipment/ equipment bases, shall be grouted and finished by Bidder
as per these specifications unless otherwise recommended by the equipment
manufacturer.
45.03.00 The concrete foundation surfaces shall be properly prepared by Bidder by
chipping, grinding as required to bring the top of such foundation to the
required level, to provide the necessary roughness for bondage and to assure
enough bearing strength.
45.04.00 Grout
The grout for equipment foundations shall be high strength grout having a
minimum characteristic compressive strength of 60 N/mm2 at 28 days. The
grout shall be ready mix non-shrink, chloride - free, cement based, free
flowing, non-metallic grout as recommended by equipment manufacturer. The
ready mix grout shall be of reputed make as approved by the Employer.
The Grout shall have good flowability even at very low water/ grout powder
ratio.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
40 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
The Grout shall have characteristics of controlled expansion to be able to
occupy its original volume to fill the voids and to compensate for shrinkage.
Grout shall be of pre-mix variety so that only water needs to be added before
use.
The mixing of the Grout shall conform to the recommendations of the
manufacturer of the Grout.
45.05.00 Placing of Grout
45.05.01 After the base has been prepared, its alignment and level has been checked
and approved and before actually placing the grout, a low dam shall be set
around the base at a distance that will permit pouring and manipu-lation of the
grout. The height of such dam shall be at least 25mm above the bottom of
the base. Suitable size and number of chains shall be introduced under the
base before placing the grout, so that such chains can be moved back & forth
to push the grout into every part of the space under the base.
45.05.02 The grout shall be poured either through grout holes if provided or shall be
poured at one side or at two adjacent sides to make the grout move in a
solid mass under the base and out in the opposite side. Pouring shall be
continued until the entire space below the base is thoroughly filled and the
grout stands at least 25 mm higher all around than the bottom of the base.
Enough care should be taken to avoid any air or water pockets beneath the
bases.
45.05.03 In addition to the above, recommendations of Grout manufacturer shall also be
followed.
45.06.00 Finishing of the Edges of the Grout
The poured grout should be allowed to stand undisturbed until it is well set.
Immediately thereafter, the dam shall be removed and grout which extends
beyond the edges of the structural or equipment base plates shall be cut off,
flushed and removed. The edges of the grout shall then be pointed and
finished with 1:2 cement mortar pressed firmly to bond with the body of the
grout and smoothened with a tool to present a smooth vertical surface. The
work shall be done in a clean and scientific manner and the adjacent floor
spaces, exposed edges of the foundations, and structural steel and equipment
base plates shall be thoroughly cleaned of any spillage of the grout.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
41 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
45.07.00 Checking of Equipment After Grouting
After the grout is set and cured, the Contractor shall check and verify the
alignment of equipments, alignment of shafts of rotating machinery, the slopes
of all bearing pedestals, centering of rotors with respect to their sealing bores,
couplings, etc. as applicable and the like items to ensure that no
displacement had taken place during grouting. The values recorded prior
to grouting shall be used during such post grouting check- up and
verifications. Such pre and post grout records of alignment details shall be
maintained by the Contractor in a manner acceptable to the Employer.
46.00.00 SHAFT ALIGNMENTS
All the shafts of rotating equipment shall be properly aligned to those of the
matching equipments to as perfect an accuracy as practicable. The
equipment shall be free from excessive vibration so as to avoid overheating of
bearings or other conditions which may tend to shorten the life of the
equipment. The vibration level of rotating equipments measured at bearing
housing shall Zone A of ISO 10816. All bearings, shafts and other rotating
parts shall be thoroughly cleaned and suitably lubricated before starting.
47.00.00 DOWELLING
All the motors and other equipment shall be suitably doweled after alignment
of shafts with tapered machined dowels as per the direction of the Employer.
48.00.00 CHECK OUT OF CONTROL SYSTEMS
After completion of wiring, cabling furnished under separate specification and
laid and terminated by the Employer, the Contractor shall check out the
operation of all control systems for the equipment furnished and installed
under these specifications and documents.
49.00.00 COMMISSIONING SPARES
49.01.00 It will be the responsibility of the Contractor to provide all commissioning
spares including consumable spares required for initial operation till the
Completion of Facilities. The Contractor shall furnish a list of all commissioning
spares within 60 days from the date of Notification of Award and such list
shall be reviewed by the Employer and mutually agreed to. However. such
review and agreement will not absolve the Contractor of his responsibilities to
supply all commissioning spares so that initial operation do not suffer for want
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
42 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
of commissioning spares. All commissioning spares shall be deemed to be
included in the scope of the Contract at no extra cost to the Employer.
49.02.00 These spare will be received and stored by the Contractor atleast 3 months
prior to the schedule date of commencement of initial operation of the
respective equipment and utilised as and when required. The unutilised
spares and replaced parts, if any, at the end of successful completion of
guarantee tests shall be the property of the Contractor and he will be
allowed to take these parts back at his own cost with the permission of
Employer.
50.00.00 CABLING
50.01.00 All cables shall be supported by conduits or cable tray run in air or in cable
channels. These shall be installed in exposed runs parallel or perpendicular to
dominant surfaces with right angle turn made of symmetrical bends or fittings.
When cables are run on cable trays, they shall be clamped at a minimum
intervals of 2000mm or otherwise as directed by the Employer.
50.02.00 Each cable, whether power or control, shall be provided with a metallic or
plastic tag of an approved type, bearing a cable reference number indicated in
the cable and conduit list (prepared by the Contractor), at every 5 meter run
or part thereof and at both ends of the cable adjacent to the terminations.
Cable routing is to be done in such a way that cables are accessible for any
maintenance and for easy identification.
50.03.00 Sharp bending and kinking of cables shall be avoided. The minimum radii for
PVC insulted cables 1100 V grade shall be 15 D where D is the overall
diameter of the cable. Installation of other cables like high voltage, coaxial,
screened, compensating, mineral insulated shall be in accordance with the
cable manufacturer's recommendations. Wherever cables cross roads and
water, oil, sewage or gaslines, special care should be taken for the protection
of the cables in designing the cable channels.
50.04.00 In each cable run some extra length shall be kept at a suitable point to
enable one or two straight through joints to be made, should the cable
develop fault at a later date.
50.05.00 Control cable terminations shall be made in accordance with wiring diagrams,
using identifying codes subject to the Employer's approval. Multicore control
cable jackets shall be removed as required to train and terminate the
conductors. The cable jacket shall be left on the cable, as far as possible,
to the point of the first conductor branch. The insulated conductors from
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
43 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
which the jacket is removed shall be neatly twined in bundles and terminated.
The bundles shall be firmly but not tightly tied utilising plastic or nylon ties or
specifically treated fungus protected cord made for this purpose. Control cable
conductor insulation shall be securely and evenly cut.
50.06.00 The connectors for control cables shall be covered with a transparent
insulating sleeve so as to prevent accidental contact with ground or adjacent
terminals and shall preferably terminate in Elmex terminals and washers. The
insulating sleeve shall be fire resistant and shall be long enough to over pass
the conductor insulation. All control cables shall be fanned out and connection
made to terminal blocks and test equipment for proper operation before cables
are corded together.
51.00.00 EQUIPMENT DELIVERY AND ERECTION
51.01.00 General Requi rements
(a.) This part covers Contractor's responsibilities for packing, shipping, ware-
housing and the installation of all equipment and materials furnished
and installed under this specification.
(b.) The Contractor shall submit for Employer's approval draft manual for
Equipment Delivery and Erection (EDE Manual) covering detailed
instructions, write up, technical data, drawings, check-lists,
documentation formats for all activities after equipment manufacture upto
installation of equipment. This manual shall cover general instructions
for all equipment and specific instructions for individual equipment
wherever required and shall include at least the following :
(1.) Instructions for packing, shipping, receiving handling, ware-
housing and storage.
(2.) Instructions for location and installation of equipment furnished by
this specification.
(3.) Installation drawings for field mounted equipment, panels,
cubicles and other equipment covered under this specification.
(4.) Instruction relating installation of piping/ tubing, support and
routing drawings of impulse pipes/signal tubes and tube/cable
trays.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
44 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(5.) Check lists and quality assurance hold points.
(6.) Format for all related documentation.
(c.) The EDE Manual shall conform to the requirements of this specification,
all applicable codes and standards, recommendations of equipment
manufacturers and accepted good engineering practices and shall be
subject to Employer approval during detailed engineering.
(d.) The Contractor shall ensure that all work under this part shall be
performed as per the requirements of this specification, Employer
approved EDE Manual and drawing/documents approved by the
Employer during detailed engg.
51.02.00 Crating
(a.) All equipment and materials shall be suitably coated, wrapped, or
covered and boxed or crated for moist humid tropical shipment and to
prevent damage or deterioration during handling and storage at the site.
(b.) Equipment shall be packed with suitable desiccants, sealed in water
proof vapour-proof wrapping and packed in lumber of plywood
enclosures, suitably braced, tied and skidded. Lumber enclosures shall
be solid, not slatted.
(c.) Desiccants shall be either silica gel or calcium sulphate, sufficiently
ground to provide the required surface area and activated prior to
placing in the packaging. Calcium sulphate desiccants shall be of a
chemical nature to absorb moisture. In any case, the desiccant shall
not be of a type that will absorb enough moisture to go into solution.
Desiccants shall be packed in porous containers, strong enough to
withstand handling encountered during normal shipment. Enough
desiccant shall be used for the volumes enclosed in wrapping.
(d.) Review by the Employer of the Contractor's proposed packaging
methods shall not relieve the Contractor of responsibility for damage or
deterioration to the equipment and materials specified.
(e.) All accessory items shall be shipped with the equipment. ; Boxes and
crates containing accessory items shall be marked so that they are
identified with the main equipment. The contents of each box and
crates shall be indicated by markings on the exterior.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
45 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(f.) All boxes, crates, cases bundles, loose pieces, etc. shall be marked
consecutively from No.1 upward throughout all shipments from a given
port to completion of the order without repeating the same number.
(g.) An itemized list of contents shall be enclosed inside each case and
one other copy securely fastened to the outside of the case in a tin or
light weight sheet metal envelope or pocket. The lists shall be plainly
marked and placed in accessible locations to facilitate receipt and
inspection. The packing list shall indicate whether shipment is partial
or complete and shall incorporate the following information on each
container, etc., according to its individual shipping number :
a) Export case markings
b) Case number
c) Gross weight and net weight in Kilograms
d) Dimensions in centimeters
e) Complete description of material
(h.) Packaging or shipping units shall be designed within the limitations of
unloading facilities and the equipment which will be used for transport.
Complications involved with ocean shipment and the limitations of ports,
railways and roads shall be considered. It shall be the Contractor's
responsibility to investigate these limitations and to provide suitable
packaging to permit safe handling during transit and at the job site.
(i.) Electrical equipment, control and instrumentation shall be protected
against moisture and water damage. All external gasket surfaces and
flange faces, couplings, motor pump shafts, bearing and like items shall
be thoroughly cleaned and coated with rust preventive compound as
specified above and protected with suitable wood, metal or other
substantial type covering to ensure their full protection.
(j.) Equipment having antifriction or sleeve bearings shall be protected by
weather tight enclosures.
(k.) Coated surfaces shall be protected against impact, abrasion,
discolouration and other damage. Surfaces which are damaged shall be
repaired.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
46 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(l.) All exposed threaded parts shall be greased and protected with metallic
or other substantial type protectors. All female threaded openings shall
be closed with forged steel plugs. All pipings, tubing, and conduit
equipment and other equipment openings shall be sealed with metallic
or other rough usage covers and tapped to seal the interior of the
equipment piping, tubing, or conduit.
(m.) Provisions shall be made to ensure that water does not enter any
equipment during shipment or in storage at the plant site.
(n.) Returnable containers and special shipping devices shall be returned by
the manufacturer's field representative at the Contractor's expense.
(o.) While packaging the material, care shall be taken for the limitation from
the point of view of availability of railway wagon sizes in India.
51.03.00 Factory Assembly
(a.) Instrument enclosures shall be supplied and erected completely in the
factory with instrument, air supply and blow down piping with necessary
valves, fittings, etc. and also all electrical wiring between the
instruments and the enclosure terminal blocks. Control panel and
cubicles shall also be fully wired in the factory. Control panel mounted
equipments are to be dismounted from the panels before shipment and
individually packed for shipment. Electronic control modules of the plug-
in type are to be removed from equipment racks after factory checkout
are individually packed for shipment. Other equipment shall be fully
assembled at the factory, except for necessary shipping splits in
panels.
(b.) All separately packaged accessories items and parts shall be shipped
with the equipment. Containers for separately packaged items shall be
marked so that they are identified with the main equipment. An itemized
packing slip, indicating what is in that carton only, shall be attached to
the outside and inside of each container used for packing.
A master packing slip covering all accessories items for a given piece
of equipment which are shipped in separate containers, shall be
attached to one container.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
47 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
51.04.00 Equipment Installation
(a.) General Requi rements
(1.) The Contractor shall furnish all construction materials, tools and
equipment and shall perform all work required for complete
installation of all control and instrument equipment furnished
under this specification.
(2.) Contractor shall prepare detailed installation drawings for each
equipment furnished under this specification for Employer's
approval. Installation of all equipment/systems furnished by this
specification shall be as per Employer's approval.
(3.) Erection procedures not specified herein shall be in accordance
with the recommendations of the equipment manufacturers. The
procedures shall be acceptable to the Employer.
(4.) The Contractor shall coordinate his work with other suppliers
where their instruments and devices are to be installed under
specifications.
(b.) Installation Materials
All materials required for installation, testing and commissioning of the
equipment shall be furnished by the Contractor.
(c.) Regulatory Requirements
All installation procedures shall confirm with the accepted good
engineering practice and with all applicable governmental laws,
regulations and codes.
(d.) Cleaning
All equipment shall be cleaned of all sand, dirt and other foreign
materials immediately after removal from storage and before the
equipment is brought inside the power plant building or to other
installation sites. All piping and tubes shall be air blown.
(e.) Equipment Assembly
Equipment installed under these specifications shall be assembled if
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
48 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
shipped unassembled. The equipment shall be dismantled and
reassembled as required to perform the installation and commi ssioning
work described in these specifications.
(f.) Equipment Setting
Field mounted instruments and accessories shall be bracket or sub
panel mounted on the nearest suitable firm steel work or masonry.
The brackets, stands, supports and other miscellaneous hardware
required for mounting instruments and accessories such as receiver
gauge, air set, valve manifold, purge-meter etc. shall be furnished and
installed. No field mounted instruments shall be installed such that it
depends for support or rigidity on the impulse piping or on electrical
connection to it.
Indicating type field mounted instruments shall be installed in such a
way that centre of indicating dial shall be about 1600-1800mm from
operating floor level. Non-indicating type field instruments shall be
installed such that operating handle of manifold block / isolating cock
comes within 1600 mm from operating floor level.
(g.) Free-Standing Equipment
Free-standing Cabinets shall be attached to the floor, concrete
equipment bases or supporting steel as indicated on the manufacturer's
drawings and the Employer's Plant Arrangement Drawings. The cabinets
shall be shimmed for proper alignment before bolting them to the floor.
Adjacent enclosures shall be shimmed to maintain mutually level
appearance before they are attached to floor. Vibration dampening
mounts shall be installed between supporting structures and panels
when specified.
(h.) Non-free Standing Equipment
(1.) Non-free standing local enclosures and cabinets shall be
mounted in accessible locations on columns, walls, or stands in
locations as indicated on the Employer's Plant Arrangement
Drawings. Bracket and stands shall be fabricated as required to
install the local enclosures and cabinets in a workman like
manner.
(2.) Rough edges and welds on all fabricated supports shall be
ground smooth. The supports shall be finished with two coats
of primer and two coats of paint as specified in this part.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
49 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(i.) Equipment Location
(1.) All individual items of equipment not located in cabinets or on
panels and racks are located approximately according to the
floor elevation and the nearest building column designated by the
Employer.
(2.) Solenoid valves not located in enclosures or mounted on valves
shall be mounted in easily accessible protected locations near
the components with which they are associated.
(3.) All brackets, stands, supports and other miscellaneous hardware
required for mounting devices shall be furnished and installed.
(4.) Thermometers shall be installed in the process lines and ducts
as required and adjusted for ease in reading.
(5.) Permanent temperature wells on the main steam, hot reheat
and cold reheat piping shall not be installed until steam blowing
has been completed. Temporary temperature wells shall be
installed in the main and reheat steam piping during steam blow
and discarded after completion.
(6.) Any required adapting hardware such as pipe bushings, nipples,
drilled caps and the like shall be provided for complete
installation of control devices into process connections.
For location of C&I related equipment/devices, the requirement
specified elsewhere in the technical specification may be
referred.
(j.) Installation of Field Mounted Instruments and Devices
The Contractor shall submit installation drawings for all field mounted
equipment furnished under this specification for Employer's approval.
These drawings shall meet the requirements of this specification,
installation drawings, applicable codes and standards and
recommendations of manufacturers of instruments/devices. All
installation work under this specification shall be strictly as per
installation drawings approved by the Employer during detailed
engineering stage.
In addition to above relevant Portion as specified elsewhere in technical
specification may be referred.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
50 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(k.) Piping Connections
(1.) All equipment having piping connections shall be levelled, aligned
and wedged in place but shall not be grouted or bolted prior to
the initial fitting and alignment of connecting piping. All
equipment shall, however, be grouted or bolted to its foundation
prior to final bolting or welding of the connection piping.
(2.) All flanged joints shall be checked and retightened after
approximately 10 days of operation at normal operating
temperature.
(l.) Equipment Checkout
(1.) All equipment shall be cleaned after installation. Equipment
subject to pressure differentials shall be checked for leakage.
(2.) After erection, all equipment having moving parts, having
electrical apparatus, or subject to pressure differentials shall be
trial-operated.
(m.) Defects
(1.) All defects in erection shall be corrected to the satisfaction of
the Employer and the Project Manager. The dismantling and
reassembly of Contractor furnished equipment to remove
defective parts, replace parts, or make adjustments shall be
included as a part of the work under these specifications.
(2.) The removal of control and instrument equipment in order to
allow bench calibration, if required, and the re-installation of the
said equipment after calibration shall also be included as a part
of the work under these specifications.
(n.) Equipment Protection
(1.) All equipment to be erected under these specifications shall be
protected from damage of any kind from the time of contract
award until commissioning of each unit.
(2.) The equipment shall be protected during storage as described
herein.
(3.) Equipment shall be protected from weld spatter during
construction.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
51 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(4.) Suitable guards shall be provided for protection of personnel on
all exposed rotating or moving machine parts. All such guards
with necessary spares and accessories shall be designed for
easy removal and maintenance.
(5.) Equipment having glass components such as gauges, or
equipment having other easily breakable components, shall be
protected during the construction period with plywood enclosures
or other suitable means. Broken, stolen, or lost components
shall be replaced by the Contractor.
(6.) Machine finished surfaces, polished surfaces, or other bare
metal surfaces which are not to be painted, such as machinery
shafts and couplings shall be provided temporary protection
during storage and constructional periods by a coating of a
suitable non- drying, oily type, rust preventive compound.
52.00.00 WELDING - SPECIAL REQUIREMENTS
If the manufacturer has special requirements relating to the welding procedures
for welds at the terminals of the equipments to be performed under separate
specifi-cations, the requirements shall be submitted to the Project Manager in
advance of commencement of erection work.
53.00.00 DEVIATIONS DISPOSITIONING:
Any deviation to the contract and employer approved documents shall be
properly recorded in the format prescribed by NTPC. Al the deviations shall
be bought to the knowledge of employer's representative for suitable
dispositioning.
54.00.00 NON-DESTRUCTIVE TESTING (NDT):
The contractor shall record results of NDTs carried out at site in the format
acceptable to employer. All the radiographs & its report duly signed &
correlated to the job shall be handed over to the employer. Sensitivity of all
the test equipment shall be compatible to the job & acceptance norms agreed.
55.00.00 TESTING EQUIPMENT & FACILITIES:
Contractor shall provide the testing equipment and facilities necessary to carry
out tests & inspections.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
52 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ANNEXURE-I
STANDARD CHECKLIST
COMMISSIONING/TESTING ESSENTIAL PRE-REQUISITE
1. MECHANICAL
(A.) VALVES
(1.) MANUALLY OPERATED VALVE
(2.) ELECTRICALLY OPERATED VALVE
(3.) PNEUMATICALLY ACTUATED VALVE
(4.) HYDRAULICALLY ACTUATED VALVE
(5.) SAFETY VALVE
(6.) ELECTROMATIC RELIEF VALVE
(7.) STEAM TRAP
(8.) BUTTERFLY VALVE(ELECTRICALLY OPERATED)
(9.) BUTTERFLY VALVE (MANUALLY OPERATED)
(10.) BUTTERFLY VALVE(FOUR WAY-ELECTRICAL)
(11.) NON-RETURN VALVE(INCLUDING HYDRAULIC/PNEUMATIC
FCNRVS)
(12.) THREE WAY CONTROL VALVE
(13.) RELIEF VALVE
(14.) DIFFERENTIAL PRESSURE REGULATING VALVE
(15.) FLOAT OPERATED VALVES
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
53 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(B.) TANKS AND PRESSURRE VESSELS
(1.) TANKS (METAL)UPTO 20 M2
(2.) TANKS (LARGE STORAGE)
(3.) PRESSURE VESSEL (BELOW 17 BARS)
(4.) AIR RECEIVER
(5.) PRESSURE VESSEL-ACCESS DOOR
(6.) TURBINE MAIN OIL TANK
(C.) PUMPS
(1.) PUMP LOW PRESSURE CENTRIFUGAL (MOTOR DRIVEN)
(2.) PUMP UP TO 350 HP (260 KW)
(3.) PUMP SUMP INSTALLATION
(4.) GEAR PUMP/SCREW PUMP
(D.) PIPE WORK SYSTEM
(1.) STEAM SERVICES
(2.) WATER SERVICES
(3.) OIL/FIRE RESISTANT FLUID SYSTEM
(4.) AIR SERVICES (COMPRESSOR)
(5.) HIGH PRESSURE SERVICES
(6.) CONSTANT LOAD SUPPORT
(7.) SPRING SUPPORTS
(8.) HANGERS AND OTHER SUPPORTS
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
54 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(E.) STRAINER AND FILTER
(1.) STRAINER/FILTER BASKET TYPE
(2.) STRAINER ROTARY(LOW PRESSURE)
(3.) FILTER & STRAINERS CENTRIFUGAL SEPARATORS
(4.) FILTER & STRAINER Y-TYPE
(5.) FILTER & STRAINER (PLATE TYPE)
(6.) PURIFIER
(7.) FILTER-COMPRESSED AIR LINE
(F.) HEAT EXCHANGER
(1.) HEAT EXCHANGER (GENERAL)
(2.) HEAT EXCHANGER-OIL/WATER
(3.) ROTARY AIR HEATER
(G.) FANS AND COMPRESSORS
(1.) FANS-NON-PRESSURE LUBRICATED
(2.) FANS-AXIAL FLOW PRESSURE LUBRICATED
(3.) COMPRESSORS-GENERAL
(4.) DAMPERS AND GATES
(H.) CRANES AND ELEVATORS
(1.) AUXILIARY OVERHEAD CRANE
(2.) TRAVEL SUPPORT STRUCTURE FOR CRANE
(3.) LONG TRAVEL & CROSS TRAVERSE MOTION OF CRANE
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
55 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(4.) MAIN AUX. HOIST MOTION (CRANE)
(5.) ELECTRIC HOIST
(I.) POWER TRANMISSION
(1.) POWER TRANSMISSION GEAR BOX
(2.) BEARING
(3.) FLUID COUPLINGS
2. ELECTRICAL
(1.) D.C. MOTOR
(2.) HV SQUIRREL CAGE INDUCTION MOTOR
(3.) 415 V SQUIRREL CAGE INDUCTION MOTOR
(4.) MOTOR OPERATED ACTUATORS
(5.) LT SWITCHGEARS/MCC
(I.) STANDARD CHECKLISTS FOR ALL TYPES OF RELAYS
USED IN SWITCHGEARS PROTECTION SYSTEM
(II.) PT CARRIAGE AND CUBICLES
(III.) CABLE/BUS DUCT/BUS BARS
(IV.) CONTACTOR MODULE
(V.) SWITCH FUSE MODULE
(VI.) MASTER PANEL OF LUBE OIL PANEL
(VII.) FEEDER PANEL OF LUBE OIL PANEL
(VIII.) SPACE HEATER AND CABLE MODULE
(IX.) CONTROL TRANSFORMER MODULE
(X.) 415 V CIRCUIT BREAKER
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
56 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(6.) POWER CABLE
(7.) CONTROL CABLE
(8.) EXPLOSION PROOF ELECTRICAL EQUIPMENT (IF
APPLICABLE)
(9.) J UNCTION BOX
(10.) BRUSH GEAR ASSEMBLY
(11.) AUX. CONTROL AND RELAY PANEL
(12.) INDICATING INSTRUMENT
(13.) RECORDING INSTRUMENT
3. CONTROL & INSTRUMENTATION
(A.) CONDUCTIVITY ANALYSING EQUIPMENT INCLUDING TEST
PROCEDURES
(B.) PH ANALYSER INCLUDING TEST PROCEDURE
(C.) SILICA ANALYSER
(D.) LEVEL SWITCH (FLOAT ACTUATED)
(E.) LEVEL SWITCH (ELECTRODE TYPE)
(F.) LEVEL SWITCH DISPLACED ACTUATED)
(G.) TRANSMITTER (FLOAT OPERATED PNEUMATIC OUTPUT) INCLUDING
TESTING PROCEDURE
(H.) LEVEL INDICATOR (FLOAT/PULLEY TYPE)
(I.) LOCAL TEMPERATURE INDICATORS INCLUDING TEST PROCEDURE
(J .) RESISTANCE THERMOMETER ELEMENT INCLUDING TEST
PROCEDURE
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
57 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(K.) THERMOCOUPLE ELEMENT AND CONNECTING CABLE
(L.) THERMOCOUPLE AND RESISTANCE THERMOMETER CONVERTOR/
TRANSMITTER INCLUDING TEST PROCEDURES.
(M.) TEMPERATURE SWITCH/THERMOSTAT INCLUDING TEST
PROCEDURES
(N.) COLD J UNCTION BOXES
(O.) ZENER BARRIER
(P.) O2 ANALYSER
(Q.) O2 IN HYDROGEN INCLUDING TEST PROCEDURES
(R.) PRESSURE AND VACUUM GAUGE
(S.) PRESSURE AND VACUUM SWITCH INCLUDING TEST PROCEDURE
(T.) DIFFERENTIAL PRESSURE TRANSMITTER INCLUDING TEST
PROCEDURE
(U.) DIFFERENTIAL PRESSURE SWITCH INCLUDING TEST PROCEDURE.
(V.) FLOW INDICATOR (VARIABLE AREA)
(W.) ORIFICE PLATE
(X.) TURBINE FLOW MEASUREMENT
(I.) FLOW SWITCH
(II.) WEIR
(III.) NOZZLE
(IV.) FLOW INDICATOR (PNEUMATIC INPUT) INCLUDING TEST
PROCEDURE
(V.) FLOW INTEGRATOR (PNEUMATIC INPUT)INCLUDING TEST
PROCEDURE
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
58 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(VI.) FLOW INDICATOR (FLOAT OPERATED) INCLUDING TEST
PROCEDURE
(VII.) VENTURI (FLUID)
(VIII.) FLOW SWITCH (MAGNETIC TYPE)
(IX.) AVERAGING INLET
(X.) LIMIT SWITCHES
(Y.) TURBINE SUPERVISORY MEASURING SYSTEM
(Z.) POSITION MEASUREMENT AND INDICATION INCLUDING TEST
PROCEDURES
(AA.) TACHOMETER
(BB.) VIBRATION MEASUREMENT
(CC.) DIGITAL INDICATOR
(DD.) MOVING COIL INDICATOR INCLUDING TEST PROCEDURE
(EE.) RECORDER INCLUDING TEST PROCEDURE
(FF.) FLAME SCANNER
(GG.) ELECTRICAL AUTO MANUAL CONTROL STATION
(HH.) PUSH BUTTON MODULE
(II.) ALARM ANNUNCIATOR EQUIPMENT INCLUDING TEST PROCEDURE
(J J .) TEST PROCEDURE FOR ELECTRONIC MODULES OF DDCMIS
(KK.) THERMO CONTROL VALVE
(LL.) TEST PROCEDURE FOR ADJ USTMENT OF MODULATING
CONTROLLER - PID TERMS
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
59 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(MM.) TEST PROCEDURE INDICATING CONTROLLER-ELECTRICAL INPUT
AND PNEUMATIC OUTPUT
Note: The items which are not part of this specification may be considered
as not applicable.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
60 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ANNEXURE-II
BRIEF WRITE UP ON THE CONTENTS OF TESTING
SCHEDULE / COMMISSIONING SCHEDULE
Testing Schedules should be designed to ensure that the plant area,
equipment or apparatus are tested and commissioned and will operate as per
the employer's specifications and good engineering practices.
Testing Schedule/Commissioning Schedule is required to be of a standard
format in order to maintain consistency of presentation, content and reporting.
Testing Schedule/Commissioning Schedule should contain the following sections
to make the document a self contained one:
1. Plant Details/Design data
2. Testing Objective/Proposals
3. State of the Plant
a) Erection Status with respect to Mech. Elect and C&I
b) Availability of the services required
c) Safety requirements as per Manufacturer's
4. Test method including completion/acceptance criteria
5. Results
6. Appendix
a) Testing Programme
b) Mech/Elect/C&I -Plant item completing list
c) List of Drawing/documents required for carrying out the testing.
CLAUSE NO. ERECTION CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS
SECTION-VI
PART-D
ERECTION
CONDITIONS OF
CONTRACT
PAGE
61 OF 61
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Annexure - III
Safety Plan
01. Safety Policy of the Contractor to be enclosed:
02. When was the Safety Policy last reviewed:
03. Details of implementation procedure / methods to implement Safety
Policy / Safety Rules :
04. Name, Qualification, experience of Safety Officer
05. Review of Accidents Analysis Method, Methods to ensure Safety and
Health:
06. Unit executive responsible to ensure Safety at various levels in work
area:
07. List of employees trained in safety employed before execution of the
job. Give the details of training:
08. Safety Training Targets, Schedules, methods Adopting to providing safety
training to all employees:
09. Details of checklist for different jobs / work and responsible person to
ensure compliance (copy of checklist to be enclosed):
10. Regular Safety Inspection Methods and Periodicity and list of members
to be enclosed:
11. Risk Assessment, Safety Audit by Professional Agencies, Periodicity:
12. Implementation of Recommendations of Audit / Inspections. Procedures
for implementation and follow up:
13. Provision for treatment of injured persons at work site:
14. Review of overall safety by top Management and Periodicity:
15. System for Implementation of Statutory legislations:
16. Issue of PPEs to employees, Periodicity / stock on hand etc:
Signature
Head of the Organisation
with date & stamp
NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
PART - E
SECTION - VI
TENDER DRAWING LIST
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
PART - E
SECTION - VI
TENDER DRAWING LIST
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
(This document is meant for the exclusive purpose of bidding against this
Package and shall not be transferred, reproduced or otherwise used for
purposes other than that for which it is specifically issued).
LIST OF TENDER DRAWINGS
CLAUSE NO. LIST OF TENDER DRAWINGS
TECHNICAL SPECIFICATION
SECTION-VI
PART-E
LIST OF TENDER
DRAWINGS
PAGE
1 OF 3
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
The drawings listed below shall form part of the specification and shall supplement the
requirements specified in these technical specifications. The scope and terminal points
of the equipment to be furnished under this Steam Turbine Generator Package shall
be as identified in these drawings read in conjunction with text of the specification.
---------------------------------------------------------------------------------------------------------------------------------------
Sl. No. Drawing Name Drawing No. Rev
---------------------------------------------------------------------------------------------------------------------------------------
1 General layout plan 9562-999-POC-F-001
2 Equipment layout plan at 0.0 M 9562-999-POM-A-001 B
3 Equipment layout plan
at 8.5 M./17.0M/24.0M/32.0M/38.0M 9562-999-POM-A-002 B
4 Main plant cross section 9562-999-POM-A-003 B
5 Main steam, Hot reheat 9562-999-POM-A-004 A
& Cold reheat P&ID
6 HP LP Bypass system P&ID 9562-999-POM-A-005 A
7 Auxiliary steam system P&ID 9562-999-POM-A-006 A
8 Extraction steam P&ID for heaters 9562-999-POM-A-007 A
9 Extraction steam P&ID 9562-999-POM-A-008 A
for BFP Turbine
10 Condensate P&ID 9562-999-POM-A-009 A
11 Feed water P&ID 9562-999-POM-A-010 A
12 Heater vents and drains P&ID 9562-999-POM-A-011 A
13 Steam drain P&ID 9562-999-POM-A-012 A
14 Symbols/ legends 9562-999-POM-A-013 A
15 Central Turbine lube oil storage 9562-999-POM-A-015 A
and purification system
16 Air extraction system and Condenser 9562-999-POM-A-016 A
on load tube cleaning system
17 P& ID of Equipment Cooling Water 0000-999-POM-A-025 A
System (Unit Auxiliaries)
CLAUSE NO. LIST OF TENDER DRAWINGS
TECHNICAL SPECIFICATION
SECTION-VI
PART-E
LIST OF TENDER
DRAWINGS
PAGE
2 OF 3
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
---------------------------------------------------------------------------------------------------------------------------------------
Sl. No. Drawing Name Drawing No. Rev
---------------------------------------------------------------------------------------------------------------------------------------
18 P&ID Condensate Polishing Plant 9562-110-POM-A-001 A
(2 Sheets)
19 DDCMIS Configuration diagram 0000-110-POI-A-001 A
20 HMIPIS Configuration diagram alternative-1 0000-110-POI-A-011 A
21 MMIPIS Configuration diagram alternative-2 0000-110-POI-A-012 A
22 Standard Configuration diagram for PLC 0000-110-POI-A-013 A
based offsite control systems
23 Scheme of programmer's room hardware 0000-110-POI-A-014 A
multiflexing
24 Local J unction Box Connection Details 0000-999-POI-A-017 D
25 Scheme for 24VDC power supply system 0000-405-POI-A-019 A
(2 sheets)
26 Instrumentation Cabling Diagram 0000-110-POI-A-021 A/B
(4 sheets)
27 Instrument Installation Diagram 0000-110-POI-A-022 A
(For Pressure Gauge)
28 Instrument Installation Diagram 0000-110-POI-A-023 A
(Pressure Measurement Using Press/DP
Transmitters (Inst./Service, Dirty Air/Flue Gas)
29 Instrument Installation Diagram 0000-110-POI-A-024 A
(Pressure Transmitter Fuel Oil)
30 Instrument Installation Diagram 0000-110-POI-A-025 A
(Pressure Measurement Using Press/DP
Transmitters Steam/Liquid Vacuum)
31 Instrument Installation Diagram 0000-110-POI-A-026 A
Flow Measurement (Using Flow Nozzles)
Steam & Feedwater
32 Instrument Installation Diagram 0000-110-POI-A-027 A
(Flow Measurement (Using Orifice Plates)
Copndensate & Service Water)
CLAUSE NO. LIST OF TENDER DRAWINGS
TECHNICAL SPECIFICATION
SECTION-VI
PART-E
LIST OF TENDER
DRAWINGS
PAGE
3 OF 3
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
---------------------------------------------------------------------------------------------------------------------------------------
Sl. No. Drawing Name Drawing No. Rev
---------------------------------------------------------------------------------------------------------------------------------------
33 Instrument Installation Diagram 0000-110-POI-A-028 A
(Flow Measurement Air/Gas)
34 Instrument Installation Diagram 0000-110-POI-A-029 A
(Flow Measurement Dirty air/Flue Gas)
35 Instrument Installation Diagram 0000-110-POI-A-030 A
Diff. Press Measurement
(Liquid, Oil, Air/Gas Service)
36 Instrument Installation Diagram 0000-110-POI-A-031 A
(Level Gauge & Switches)
37 Instrument Installation Diagram 0000-110-POI-A-032 A
(Level Measurement Using D/P Transmitters) (2 Sheets)
38 Instrument Installation Diagram 0000-110-POI-A-033 A
(Level Measurement-Open Vessel)
39 Instrument Installation Diagram 0000-110-POI-A-034 A
Typical Purge Air Connection & Blowdown
Header Connection Inside Instrument Rack
40 Instrument Source Connection Details 0000-110-POI-A-035 A
(14 Sheets)
41 Typical GA of Local Instrument 0000-999-POI-A-064 D
Enclosure/Rack (3 Sheets)
42 Interfacing of Field Intruments 0000-999-POI-A-065 A/B/C
(14 Sheets)
43 C&I KKS Code List & Guidelines 9562-110-POI-G-001 0
44 Excel formats for I/O List, Drive List, 9562-999-POI-G-002 A
Instrument Schedule & J B Grouping (5 Sheets)
45 Interfacing of Actuators 0000-999-POI-A-063 A
---------------------------------------------------------------------------------------------------------------------------------------
SAMPLEINLET A
fl COOLINGWATER IIL-
FILTER
TO THE REQUIRED
REGENERATION
VESSELS
r OIL FILTER
I INSTRUMENT AIR
~ 9 , AIR BLOWERS(2~100%C8pdty) I
~ 9 1 DM VATPI b REGENERATDN
AT 10.0 M FBOM
TEE FoUNDI'110N
4wNmm8AT -
emwmlrlcfit TO RESPECTIVE REGENERATION/
RESIN SEPARATION VESSELS
From Service.v DMWATER
Water Line
--- -----------
REFER NOTE 1
-------------------------------------
1. TO DRAIN TRENCH
LEADING TO
NEMmUUSAnON PIT - MECSURINO
ORIFICE BOARD
SERVICE WATER
I I I 1 I
I h
RECIRCULATION
I - ILc. I
& AGITATAION
-
EFFLUENTNEUTRALISINGSYSTEM
AClDDOSlWOPUIPL)
AClD UNLOADINGPUMPS
NOTES:
1) THE REGENERATION VESSELS ARRANGEMENT SHOWN HERE IS INDICATIVE ONLY.
BIDDER SHOULD FURNISH WEIR SCHEME OF VESSEL ARRANGEMENT IN DETAIL
ALONGWITH THE COMPLETE MJSTRUMENTATION.
2) FOR OTHER NOTES & LEGEFDS b REFER SHEET 1 OF THIS DRAWING.
3) COLLECTON k DISPOSAL AR~NAGMENT OF DM WASTE WATER USED FOR RESIN
TRANSFER FROM REGENERATION SYSTEM TO CPU SERVICE VESSELS AND CPU SERVICE
VESSELS TO REGENERATION 'SYSTEM IS NOT SHOWN IN THIS DRAWING. THE SAME SHALL
BE PROVIDED AS PER TECHNICAL SPECIFICATION. ADDITIONAL PNEUMATIC OPERATED VALVES
AS REQUIRED SHALL BE PROVIDED IN SERVICE VESSEL & RENGENERATION AREA BY CONTRACTOR.
5) PUMP RECIRULATION LINE WITH VALVES AT TANK END SHALL BE PROVIDED FOR EACH SET OF
PUMPING SYSTEM BY BIDDER.
6. FOR C & I NOTES & LEGENDS REFER TO DRG. NO, 9562-1 10-POI-G-001.
I FOR TENDER PURPOSE ONLY (
I ( , ~ ~ i NTPC L1lMITE.D
( A GOVT. OF INDIA ENTERPRISE )
ENGINEERING DIVISION
PROJECT
TAMDA THERMAL POWER PROJECT
A
i
I I I I
REV.
7 6 5 8
CAD FILE NAME : 9562-1 10-POM-A-001 (2/2)
RELEASED FOR TENDER
DESCRIPTION
STAGE-11 (2~aeoun)
TITLE P&I DIAGRAM
CONDENSATE POLISHING PLANT
SIZE
C
DRAWN M j l G N CHKO.
CLEARED BY
SCALE ' DRG.NO.
Do
I
9562- 110-POM-A-001 ( s ~ . 2 or 21, A
h
FIRE WALL
`
SEE NOTE-5
THE REMOTE I/O CABINET SHALL BE APPLICABLE IF MENTIONED IN PART-A OF TECHNICAL SPECIFICATIONS
`
`
COLD
NOTE:
This configuration diagram is applicable only for H2
Generation Plant PLC
.!
t
8-:
E 3
6 t
i E
, 4.
1;
t i
5 t
i =
+ -
X E
- E
! B
E r
3 r
FRONT VIEW W|TH COVER REMOVED' ' ,:
c
75 mm
25 mm
SEE NOTE-4
100 mm
150 mm
NOTES: -
1. J.UNC'TION BOXES SHALL HAVE CLAND PLATES AT THE EOTTOM'
OF THE BOX ONLY
2, TUBULrAN TYPE GASXEIS WILL BE USEO.
ipf;;!$l',llfi i*'fl
[jiil:l|
'.P6'6["K'#.X#.'8n?F!E'*':'
oiMENstoN oF
'F
st{ALL BE BASED oN No, or renutllt-
gloCks.
i8F
i-Ailff t*,gH.5H+?d-
"{,liI',T}.
uglt8#
o1'*, H3'8.
4.
i6F-itii.lifi
t* #H.5H+?d-'{,lil',T}.
u8lt3#
ffi , ft 8,8,,^.
gUGc_.
lrrAcE
AND sHALL BE suBJEcr ro EMpLbyER't lpFAoVrl
- --
WIIHOUT ANY PRICE REPERCUSSION-
THE KNOB FOR ALL THE JUNCTION sOXES S|IALL 8E IDENTICAL.
ANY TYPE OF SEALED FIxjNG ARMNGEMENT As PER MANUFACT\,RER,9
STANDARD cAN ALSo BE
pRovrDED
suBJEcT ro evploygn,J .
- -
APPROVAL. SIDE ELEVATION
FIXING SLOT I{I]H
REMOVABLE BOLT
.
(rfP)
(sEE NOTE-7) TENDER PURPOSE ONI-Y
r i - - - - - r
r - - - - - - ' l
t=i==f "I{r4eI
qF1_fr
-qrfrf
d'Tfqi
[
7; Lr' |
il"#o1o!
"#.?,rcX!,#3Y#{,"{"?
It6t
TYPICAL THERI\,IAL POWER PLANT
LOCAL JUNCTION BOX CONNECTION DETAILS
D E S C R I P T I O N
DRC. NO.
0000-999-Pot_A_017
d 5
z 5
s -
- - E
J .
E i
t g
3 i
E 3
i ;
i E
3 i
DMJN HEADES
(c^Jc6 youNIED
IEOVE INSIRUMENT SOURCE
pOtN')
ELEVATION
INST./ SERVTCE AtR
NOTES: -
:
I. THE UAIERU! SFECIfICATION TNO SCHEDULI NO, OF IIiPUISE PIP & NIPPLT A USIED
HEAEIN S|I^LL 8g A5 PER 'ICHNIC'I SPECJFTC'\IIONS.
2. THE IIAIERT L SPEC|nC toN lNo RATtNc Of nTr C5 ,s USIID SrUrl. BE AS
pEA
SPEC|' |CATIONS. tELoEDmnaDED fmtNGS Srlrt! CONnnM tO tltst_!.16-1t,
J. NSTNUUENNi V^IVEs BOOY SIET4 IAIENAL rllo PRESSUN: CIAS SHA!! 8E |!; PER
IECHNC{ SPECIFICAT]ONS.
tl. fOR BOrtfR AVTLUE C.S SEFVTCES SOUnCE CONNECnoNS tMpuLSE
ptprNc
AnD A[
FIrI|NoS STUU BE Of J/,1' NB S|ZE.
5, CAUCES S|1^!! NOI
gE
|IdUITTEO ON THE PIPE IT MLL BE TrcUNIEO ON A CH\IIHE!
on f&|lrE oR l Rfcx..
6.
'
SLQPE APPSOX. 40 U / I'EIRE.
OR TENDER PURPOSE ONLY
(cAuGE HO|J{IEO AELOW |N9RUMINI SOURCE
poDtn
(PREsSURE
INOIC{TORS MOUNTEO REUOIE FBOII INSIRU}.IEI{T
[rouMED
gtLow
tNsrRUMtW SOtjRC[ pO||II)
1/2'/r/{/1' Svv CIOBE Vrr}'t/CArE V{\
a/f / r- r r/2' Sw SEDrJctNc tNSERt
1/2'
/ J/1' PiPE
1/2'
/
J/4' Sw aOUN, Ea
1/2' / J/1' Srl GLOaa va!!.
1/?'
I Jla' NPS Srl , r/2' / J/.' NPr(U)
1/2'
/ 3/1' NPr(n cS c.aP,
1/2'
/ J/4' Pt?E UNION.
1'13/4' SW EAU t IEr.
tsoL l}orl vA!! 316 ss.t/4'sl{
NTPCLI MI TED
( A COVERttiVaiT Ot o{rt^ EMtEfpRrsE
)
TYI)ICAL THERMAL POWER PROJECT
INSTRUIVENT INSTALLATION DIAGRAM
(FOR PRESSURE GAUGE)
DRC. NO.
0000-1 10-Pot -A-022
O E S C R I P T ' O N
'a
3.
9 !
t 5
F i
d z
X E
J A
F.r.
r i
' F
i E
E F
: r
g E
SLOPE
DP,/PRESS,
lll^,isMI'IER
DP,/PRESS,
TRANSU|ITER
DUCT WAI
(b) ELEVAITON
DIRTY IR/' TI,E CdS PRESSURF UFIqURFIJFM
PURCE AJR
CONNECNON
NOTES:-
-
TO INS1NUMENI END
I IFD+
t v I
t 4 I
-'l-
tRoM
ploctss
ENo
DEt^lt oF
2-VArVa UAN|FOI6
t. sEE NOIES UNoIR DRO. NO.OOOO-IIO-PO|_A_022_
2, tMPUt.s[ UNE Dr4tN CONNECDONS S!iA!L BE DONt AS
ptn
IECBN|C.AL SpECtnO]tONS
3, l)l[ SLoP8 tN rlE HoRtzo|.lra ot THE tMpulst
plpE
SHAI" EE AppSOX. 50 n,,/mt,
'
ff ,ffi,,tt'ftffJ,
3,5Jr.. JHitCH"tft 1"["i:E3ilii,t5 sf
.*T
5. CoMMolt rNtRrJrrEM rrR HAOER (t.l{B) USTNC REDUND^IrI rJR n..[R ntcu! rons
!U 1t1 {^pl
I E^oi n^Nsvmrh rNC[osuRE REourFtNc puncE
x.t. iirifti ijil
FoR.ErcH |NsrR.rurM UNE s|r^[ aE r^ppro rRoM rxis xi,^ord uiriic iiiiiirjrjir
pURGE
RorAMmRs rS sHowN tN oRc. No, oDoo_ | t o_
poij^:
oir
-wparifi ---
IO ITISIRUMENT ENO
ilP<il I
M I
t + 4 i
-lT-tt-
FROM PNOCESS lNO
DFtl[ oF
s-VATVE uAr,trFOLn
TEND RPOS
IO BDR INSIDE LIE
NIRTY AR/FIUE GAS PRFSSURF MFdSIJREVFMI
42 X 405 UH M,S. S|',|CK P|PE
u12r2 tO t/a' REouctNc tNsERt
y,r!
sv oLoBE VALVE/GAIE V rVE
3/4' NpS Sw y4" Npi(u) csl^s NtppLf
5/,r' NPS SCfi aO CTRBON/I-IOY 9EEL
5/4' 5W a tY Y VAVE
1,/2' N8 SETItLESS Gr Ptpt
3/a' r 1/2' S.S. IUEE UNTON
PsqrEcr
TyplcAL THERMAL
powER pRoJEcr
]TTLE
INSTRUMENT INSTALLATION DIAGMM
(PRESSURE I,lEASUREI,IENT USING PRESS / OP TRANSIVlITTERS
(t NST. / SERV| CE,
Dt RTy AI R/ FLUE GAS)
D E S C N I P T I O N
0000-1 10-Pot -A-023
'-
P !
F !
g t
X E
x
i b
E-F
- f
= !
E I
t i
i l
6 a
: , i
! t
3 X
E:
E t
Ee
LIST OT MATERIALS
]RAC'NC
slE Jt/
E|.ECIRrCA!
TR^CINC
HEAY/ FUEL PRESS. MEASUREMENT USING WAFER TYPE TRANSMITTER WITH REMOTE SEAL
NOTES:-
1. SAM NOIES .s tiNoER oRG. N0.0000-1lo-FOl--A-023.
I, TON !'O STEAM IMCINC NOT TPPUCIBLE.
V"I d
qI
N T P C
( ^ oo\ERNvE[.7 OF INOA EMIENPNEE
)
r' NPS SCH
,r0l80 (^s PEn PROCESS REOUTRMIMr)
NlPPr,E ot ||AlEn|^r s^lrt As THir 0f M,N P'PE
1' x l,/2' Sy{ iEOUC|No iNSEnT
r' NPS SCn 40l6C CS PrFt
1/2' S\r GLOSI VALVE.
r/2" rPs sc8 1o/Bo sw | 1/2"Ncr (M) cs Nrpprl
t/2' NPr (f) cs crr.
AUN0-3!0|br nf lNSl FL NcE DRILL'D & TIPPEO
waFtn tlElroJi toR usE wtTS 2 72' lNst RF'FuNoE
r,/,1' CHRO a MOLY SIETL PIPE
r/2' NPS SCH. ,10160 CS PrF,
llf $r J16 SS ISOUTIoN VAVf-
TYPICAL THERMAL POWER PROJECT
INSTRUI\4ENT INSTALLATION DlAGRAlvl
(PRESSURE TRANST\4rrrER FUEL OtL)
O E S C R I P T I O N
0000-1 1 0-Po r-4-024
_
F!oo&
!!g_
ELEVATION
TRANSMITTER MOUNTED BELOW INSTRUMENT SOURCE POINT
TRAXSMMER
EULXHEAD
of L@AL
IMTBUVEl,T
ET.ICLOSUBE/
SIOPE
ELEVATION
TRANSMITTER MOUNTED ABOVE INSTRUMENT SOURCE POINT
LIOUID PRESSURE MEASUREMENT
TRANSMITTER MOUNTED ABOVE
i E POINT INSTRUMENT SOURCE POINT
STEAN4 PRESSURE MEASUREMENT
LIST OF MATERIALS
ELEVATION
VACCUM PRESSURE [ / EASUREI V, t NI
NOTESi -
r. $lrE NqIEJ UNDER DRG. NO. 0000- l 10-PO|-
-02J.
? Oi VACUIJM APPUCT-flON OI}iER POR' O' IRAiSVIIIER SML! 9T KEPI
OPEN IO AIMOSPI]'RE.
FOR TENDER
' ?
d 3
E 5
4 -
E i
HE
J '
E. b
g 5
6 3
t F
r 3
i =
i .
E i
P ?
? : i
6 t
. E ^
vff\' 10 \/2' AEDUCT|IG INSE{'
l,/2' sw fQuAt TEE
1,/2'NPS SCH. 801160 swrl/2'CS/AS couPlti
1/2' PIPE , I/2' ILIBE UNION
1/2'llPS SCli. 80,/100 Swrl /2'
NTPCLI MI TED
( A GOVERNUENI OF INDA ENTERPR'SI )
TYF' ICAL THERMAL POWER PROJECT
(TG PACKAGE)
TnLE ,NSTRUMENT INSTALLATION OIAGMM
(PRESS URE MEASUREMENT USING PRESS /DP
TRAI' ISMITTERS STEAIV/LIOUID
\/ACUUM)
0000-1 10-Pot-4-025 D E S C R I P ] I O N
Cf- - ------ ^""& .BE--
ELEVATION
g. :
6 5
3 t
X E
( .
{ s
6
t !
t ;
)
t r
F ?
- E
; 2
E r
E <
= 9
LIST OF MATERIALS
_
FLOOLUIE-
-TO
INSTRUTTIMI
,--l--r-----
l r f f i - - r l
I T T $ E I
_11+_+j:_
Fnov P&ocEss
NOTES:-
L S.Aff NOIES UNDEA DR6. NO. 0000- 1 t 0-p0r-A-02J,
2. CONDENSATE POTS sI'Q. BT PROVIDID TOR AI], STE{T SERVICES,
f. FoR
yr
rER sEavcEs coNDENs\-IE
poTs
st-urL EE
pRoMDfD
oNLY ttl THoSE crsEs alr[nE TE,P, > t20c
OETAIL OF 5 VALVE MANIFOLD
FF'O/AT'FIIPERAIIN{ $/ATTR FLOW I/EAURFIIFITI IN HORI'OMIAI
PIPE-tRArl SMrrER tol ![TEo FFt ow l NsrRl [rE{y snl RcE potNT
ELEVATION
yaTt' sr{ GLoBE v[vt.
3/4'/t' lO 1/2' nEDUC|HC tNSERr
1/ 2' PI PE r 1/ 2' I UBE uNl oN
60 swrr/2' 5$, cslrrs corJPtt8
r/2' fPI (F) CS C^P
NTPCLI MI TED
( A oo\aNMEMI oF |NDA o{rERpRtsE )
TYPICAL THERMAL POWER PROJECT
(TG PACKAGE)
IT INSTRUMENT INSTALLATION DIAGRAI\,,I
FLOW IMEASUREIVENT (USING
FLOW NOZZLES)
STEAM & FEEDWATER
D E S C R I P T I O N
ORG. NO,
0000-1 10-Pot-4-026
E
. i 5
7 '
z 5
x =
F '
6 :
9 2
F i
1 i
E, b
l i
1 7
r. 3
aE
i r
5. !
. : E
n n
Ee
OBIFICE fLINCE
ORIRCE PLATE
DRAN HE' OER
DRAN HEADER
T SW n !F CoUPLEI CS
t,/t' flPE r 112' 1UBE UNIoN
TUBE
NOTFq' -
1. 54$ NOtfS A UNOm DRG. NO, OOOO- I r o-por-,-o2J.
I FOR TENDER PURPOSE ONLTI
ELEVATION
HORITOMIII PIP' RUN
TRArlSUrtrER !OU{Tm IEa\/F tr.lslRur,trvr souRca
poDll
u4
NTPCLI MI TED
{ A COVERNIIIJ.II OF INDA EMERFSIST )
i- 8!LXXE^D Of lOCr i
NSTRI/x1ENT ENC!OSUnE/& Cr
PL TE
FLTNGE
TYPI CALTHERMALPOWERPROJECT i
(TG PACKAGE)
lrrlt
tNsrRUi/ENT tNsrALLATtoN DIAGMLI
FLOW MEASUREMENT (UStNG ORtFtCE PLATES)
CONDENSATE & SERVICE WATER
O E S C R I P T I O N
0000-1 1 0-Por-A-027
.9
.!
E
9 .
3 s
&- e
E ' :
X E
* a
H \
3 9
6 :
' F
. =
g -
: ;
E ?
SULXHECD OF I-OC|!
TNSTBUMENI
ENCIOSUSE/RACK
LIST OF MATERIALS
sLoPE (APPRoX. SOmh/Mh,)
EULI(|']TID COUPUNO
cT-
IO oRAr{ HoR trqsrDE uE
6l Flo_gn LtNt
-'O
DSAN IIDR INSIDE U[ ..
SCllE NOTTS AS UNDEN ORO.t0. 0oo0- 1 I o-Pot-A- 02J.
ELEVATION
TRAfl SUfi TR MOUMIFN rFO\,f INSIRUMF|II SOIIRCF PAI]\II
ELEVATION
TRANSM' ITIR MOUMT' N FNOW NSIRUVF|IT SOUR' F POINT
DER PURPOS
N T P C
1
A CC1VERNUENI OF tNDtA ENIERPRISE )
1212 tO ya'stv
REDTTCTNG tNstnl.
rr'
scH. 80 s!t!t/4' Npr (M) cs/rs Ntppu:
PIPE t l/2' IUBE UNroN
TYPICAL THERMAL POWER PROJECT
(TG
PACKAGE)
INSTRUMENT INSTALLATION DIAGRAM
(FLOW MEASUREMENT AIR/GAS)
O E S C R I P T I O N
o000-110-Pol-A-028
CAD FILE NAMEi Djl
5
e .
f 5
c -
t se
6 t
E E
1 E
E. b
: g
t t
A -
i 5
d t
E 2
LIST OF MATERIALS
3
I
TO DRAIN IIDR IN I]T
SETT]-ING
cH raEns
TO D&qIN HOR IN UE
oR DUCI
2, roR v cuu lpPltcAllolt o-ltER PoF4 0a TRANSMIIIER SftAL! 8E xEPr
oPtll ro ATMoSPIiE8E
\
ELEVATION
DIRTY AIR/FLUE GAs FLOW MEASUREMENT USING HEAD fi PE PRIMARY ELEMENT
EULXHIAD Of
LOC|L ITISIiUNENI
EllcrosrrRE/RACX
3/a' NPs swxJ,/.' NPt (tl) cslrs NIPPLE
PIPE I l/2' lt Bt LJNIoN
9W I l/2' SW BRANCH rEt.
NTPCLI MI TED
(
A GOWRNITENI OF DtoA OatERPRtSE )
TYPICAL THERMAL POWER PROJECT
(TG PACKAGE)
ItrLE
TNSTRUMENT |NSTALIITToN IJTAGRAn,
(FLOW MEASUREMENT DIRTY AIFY FLUE GAS)
0 [ s c R t P T t o N 0000-1 1 0-Po r-A-029
'i
d 5
g :
6 d
F r
{ E
p. b
x i
t i
; . 3
i =
b F
E t
Ee
|NSULAION
TR,'CINO
sE+r,/
ETf,CIRICAL
TR{CtNg
(Ltoutp sERV|cE)
TRANSMIrIFi lrOUIITtN TAOVF INS'RUUFM'
souncF
porNl
REMOIE S TL O,/P
]RINS'TITIER
3
H3
: E
EZ
:1
- b
:l -
EZ
ER PURPOSE ON
ELEVATION
cLEAN GAS/AIR SERVTCE
NLTER/EIMNEN
IRANSUITER UOU{IEN F' I OW INSIRTIMFMI
TO J,/.t' Slv REOUCING rNsEiL
v4'
SW 0!0BE VA!t.
/2' S\Y EOUA tEE.
NPS slv r r/2' NPT (u) CS NTPPLE.
scB 60 crnBoN/ALLoY srEtL P|PE.
5l' SW EOUA! CROSS.
WA'ER EI.IVENT IOR UsE lvnlt J'AISI R,F. V^!VE.
SCH. 10,/80 (AS PER PROCTSS REQUIREUEMD ,)S PtPt.
l' | 3/4' Sv REDUCING. rNsERT,
NTPCLI MI TED
( A oovEnuMENI OF lNor ENTERPRTSE
)
TYPICAL THERMAL POWER PROJECT
.
(TG
PACKAGE)
lrn!
tNsrRUt\,1ENT tNsrALLATloN DlAoMtv
DIFF. PRESS.MEASUREMENT (LIOUID, OIL, AIFUGAS SERVICE)
o E s c n ' P I t o N
oRe. No.
0000-1 10-Por-A-030
6
E
P !
F !
E '
9 6
E '
{ E
t s :
l s
5 A
' E
b- 3
) =
g !
LIVEL _
GAUCE
I
- - J _
50 mm
LIST OF MATERIALS
LOCAL LEVEL INDICATION USING MULTIPLE GAUGES
FOR INCBSSED RANGE NOT COVERED IN A SINGLE UNIT
BODY OF TTl
VESSEL
IEVEL
swncH
:
NOTES:-
t.
_!-0.I.[q4r-
c4uqq J/.1'IND toR urvE! swrch I'
paocEss
coNNlcTlo
$tA[ BE ?Ro\ oeD.
2, NOIES UNDER DRo. NO, 00OO- t r o-pOr-A-O2J (WHrCriaVES ARE nELEVf,tr),
DCERNAL
c c s
FOR TENDER
ELEVATION
TO DRAN I'iDR
IN IIE
ELEVATION
TO D&AIN HON
FLOAT OR DISPLACER OPERATED'"EXTERNAL
CAGE TTPE LEVEL SWITCH XSTALIifION
y,l' NPT clogE v Llt
NTPCLI MI TED
( A covERNuon ot |NDA EMTERpRTSE
)
TYPICAL THERMAL POWER PROJECT
:
(TG
PACKAGEI
NSTRUMENT INSTALLATION OIAGRAM
(LEVEL
GAUGE & SWITCHES)
D E S C R I P T I O N
0000-1 10-Pot-A-031
Y:al,
::'::
:!. :
.'':::
..'
1i*lii;:,.
.t' ;'.,-
.9
. i E
9 o
- E .
&- P
g P
: s
J '
t i
' F
E 3
) =
i r
o_7
: . 4
2 i
3 r
E 2
LIST OF MATERIALS
NOTES:-
t, sr E alotEs as UNoER DRo. No.o000- 1 I D-Por-A-o23.
(WHICH'VER ARE REIIVEND.
. T0 0R N HE DER tN lrElUR,
TRANSMITTER MOUNTED BELOW INSTRUMENT SOURCE POINT
ELEVATION
TRANSMITIER MOUN-TED ABOVE INS'TRUMENT SOURCE POINT
LEVEL MEASUREMENT OF CLEAR NON-VISCOUS OR NON-CORROSIVE LIOUID IN CLOSED VESSEL
WITH CONDENSABLE ATMOSPHERE USING D/P TRANSMITTER
ELEVATION
TO DRA'N HE\DER IN UE
t/2' Nps SCH.80,/I60AX5{rS Pt8 PSOCESS REa.)CS/A5 PtPt.
1/2' NPs swrl/2' NPI([l) csl,{s NiPP!E.
1/2 NPI (D CS CrP.
1/2' PIPE r l/2' TUBE UN|oN,
PRqiEcT
rypicAl THERMAL
powER
PRoJECT ;
(TG PACKAGE)
'ImE
tNsrRU[4ENT rNsrALLATroN DTAGRAM
(LEVEL MEASUREMENT USING O/P TMNSMITTERS)
O E S C R I P T I O N
oRc. No.
0000-1
' 10-Por-A-032
r 49r zv, . w| - - - - " " ' ,
t ; n, , )
't
9 .
d d
! t
t r E
c a
z i
3 t
E ;
I !
E E
E:
F -
i E
r
LIST OF MATERIALS
BODY OF THE
VESSEL
DISPLACER TYPE
LEVEL TRANSMITIER
NOTES: -
s,{$E NOIS AS ITNDER DRC, N0,0000- | r 0-PO|-A-02J
(rvlircHE!,tR ARE REtE!Mr).
NPS SCH. {o/ao
65
PEn PnOCE5S nEQUTiEMEI{I) VtS tL
a' NPs sty r J/t' Npr (u) cs,/rs NrpPLI-
2' lNSr Joo lb. R.JSED Ptl Sl wELo NEcx FL^NGE.
INSI FLANCE O' I.EVEI TR,INSMI'IER.
NPS SCH. 4Ol8O CARBON SrEEt P|PE.
TYPICAL THERMAL POWER PROJECT
(TG PACKAGE)
T'TLE
INSTRUi,4ENT INSTALLAIIoN DIAGRAi,I
(LEVEL MEASUREMENT USING DISPLACER TYPE
0 E s c R l P r t o
DRG. NO,
0000-1 10-Por-A-032
i l
} I
, : I
z l I
E; I
F : i
a_E I
E g I
t s E
I
3 F I
p b
I
Ei I
5 F
I
: ;
I
I
x 5 |
. : ? I
t ' I
3- r I
Ee I
I
I
I
t
I
I
I
I
I
h
I
I
I
.
!]SLAL!$IEB]AIS
!fi,l DEscirmoN
lT
JAl r' rPs ro/so c^^ro, srrL HPE.
2,1 l/t' sr{ cLoaE vlwE
3.1 y47
l/2'sw lEcucrNc lNsERr.
4.11/2'
Nps scn. 4o/ao cs
prp.
-tFzrw
Eo,J r rrE
6.
|
1,/2' sx/ clogE vArvE.
-t17'
"ps
s-'Vr' 't"(t ) cs r1|'"rr
8.1 l/2' Npr (f) cs c^p.
f ] 3i 1' r ct ' axpr l t oER
to-
|
J/t' Bfi wEtpEp crIE v&vE.
rl.
I
a' ANst 3o0 rbr R,F. rytLD NEcK rl.ArrcE,
fi
FmffiFrft-Fin-.r"TF-msp-b*i
IJ, I SS TUBE
!a I l-v Lvt ri NrroLD (FOR
DElIJL REf. DRC.
I 0000- 1 | 0-P0t- -02r
*T
Vr' *a ' va. t"*
""-.
NOTEST-
.
I SA : NOTES UNDER DRC, N0. 0OO0- | 1O-pOl-A-O?f,.
2. FOR VACDU APPUOCTION O-THER PORT OI TRTXSMIIIIR SI]AU BE KEPI
OP' I' TO AruOSPHERE,
ELEVATION
LEVEL MEASUREMENT OF VISCOUS OR CORROSIVE LIOUID
IN cLoSED VESSEL USING FLUSH DIAPHRAGM,/WAFER
TYPE
LFIEL TRANSMITIER WITH REMOTE SEAL
ELEVATION
LEVEL MEASUREMENT OF CLEAN LIOUID IN AN OPEN VESSEL
USING D,/P TRANSMITTER
FOR TENDER PURPOSE
PR*JECI
TYPICAL THERMAL PoWER PRoJECT
(TG PACKAGE)
'rm'E
TNSTRUMENT rNsrALLAloN DrAGRArv4
(LEVEL MEASUREIVENT-OPEN VESSEL)
NFsT ISSUE
s'i
!)
N!
I\
0 [ s c R r P T t o N
CHXD.
f,
TD
I
D\IE srzE scNI
N.T.S.
0Rc. NO.
0000-1 10-Por-A-033
REV. NO
CEAAED EY
,I\NORIH KAMNPTJRA-3X66OMW\0000-1 1o-P CAO FILE NAME:
/-
TNSTRUMEM
. E ' _ , 1 _ ' _ , _
BLOW DOWI UNE
(l'rPlcAr)
TYPICAL PURGE AIR CONNECTION INSIDE THE INST. ENCLOSURE
fi PICAL BLOW DOWN HEADER CONNECTION
(^ppucr,aLr
roR AR & rLUE cas sEnucE rNsrRUMEr..E FEquRNc
puRc
AR)
INSIDE THE INSTRUMENT RAcK,/ENcLosuRE
@.
t - -
I
I
I
!
I
I
I
l 6 b
:
/2'
t r -
L _
NOTE:-
'.1, oRAIN Sft lI AE CONNEC'IED Br lltt BIDOER TO ThE NEARE5I
ptAal
OnAN
THFoUCH OPEN FUNNEL (t
/2J.
T2.
fOR ^JRlILqq CAS LII! FOR DIWNINC IHE ITPULSE UNT EMVEEN II8*I 17
DRAIN POT TO 8E PROVIOD TLONCW'IH DRAIII 'IEADERI J//I' SW tlAlf COUP!!-I,
!!v
rgl2orl?,2r! & fuNN[L rl])NcwlH r/2-
plptNc
io Fwn oain n-ero:n-'
SH.ALL a
pROVroEo
fOR sru/wArE8. AL'|T[MS EXCEpI DRA|i
piOI
iO eiFiOMOrO.
3. CI PIPES SI' AII 8E PROVIDEO FO8 PURGE A' R CONNECIION OUISIDE UE,/UN,
LIST OF MATERIALS
9 o
t s e
4 2
E 6
6 2
J '
E -i.
6 E
t 5
; ;
b. !
: a
E:
3 r
E S
(Ga*A
LXIIIJ
w eI
q
dI l-flatd<
NTPCLI MI TED
{ A COVERNMOT' Of INDA EIITERPRISE )
TYPICAL THERMAL POWER PROJECT
(TG PACKAGE)
rltl.g INATRUMENT INSTALI-A,TION DIAGMM
ryPICAL PURGE AIR CONNECTi ON & BLOWDOWN HEAIIER
CONNECTION INSIDE INSTRUIVENT RACK
D E S C R I P T I O ' I
DRC. NO.
0000-1 t 0-Pot-A-034
PURGE AIR COITINECIIOS
TO II{SIRUUEM SOURCE
tNO orP)
(
)
B f
l
r ! 6 o
-
I I
z o o c
t
2 3 t
r
u
a
l
l
!
,
r
.
q
l
l
n
o
q
l
l
,
.
,
s
t
{
o
6
u
,
'
0
|
N
o
r
r
w
o
d
s
o
c
l
J
^
\
o
d
,
(
u
o
r
q
p
e
c
n
p
o
j
d
a
l
-
t
v
y
t
u
l
H
r
-
t
v
N
o
t
l
v
N
a
q
J
o
a
l
t
d
l
o
-
l
d
l
<
.
-
l
O
I
i
-
l
E
I
u
l
l
@
(
)
d
.
z
z
o
6
g
H
T
^
E
9
x
=
6
o
=
d
3
e
3
c
r
S
r
,
-
r
d
5
<
g
1
q
o
h
"
l
o
-
l
-
-
:
l
s
t
z
l
o
l
N
I
E
I
o
l
o 6
o F o 1 u
.
l
.
D
q O o
,
t
\
z o F (
,
q
c o
.
z o F I F s G
c c 2 E ) F t
r
o
I
: s g
p
'
*
e
8
n
\
>
J
6
Y
a
t
(
t
>
:
H
p
c
i
i
o
q
E
>
a
I
5
d
I
O
u
t
I
6
<
;
V
L
r
t
h
'
J
'
l
k I a
A
'
-
E
>
I
l
f
i
>
K
P
=
\
o
p
\
q
$
=
z
>
!
-
z u
l
E t
r
l
t u
.
l
a u
l
&
*
1
^
/
F
D
I
G
"
E
s
-
s
i
;
R
I
I
E
l
F
:
3
F (
J
l
L
t
o (
}
-
i
l
f
i
<
(
,
a
g
<
s
>
:
t
r
!
J
U
J
t
r
,
I F -
J
i
l
b e
o z t
r
u
,
z z l o F z E l E F z
r
{
l
o
6
Y
A
-
.
{
o o I -
-
-
:
I
F
6
i
H
t
2
l
!
.
t
I
r
l
l
t
|
-
j
|
-
-
-
-
-
-
-
-
t
r
I
-
a
F
Q
|
-
-
'
7
l
t
i
-
-
/
f
{
H
6
l
=
,
4
a
l
c
l
i
l
6
l
6
l
u
l
t
t
-
l
d
d
C
)
l
a
z
l
q
o
l
"
r
l
L
J
I
E
I
l
l
a
l
c
o
l
H
I
o
-
l
(
:
.
T
u
n
C
i
H
;
-
Q
=
l
\
6
;
l
"
l
\
F
i
i
l
Z
l
t
-
g
6
1
9
l
i
!
=
l
8
l
,
-
r
f
,
l
Z
l
5
t
6
l
'
l
L
d
l
t
r
l
l
l
@
l
a
l
*
_
l
o
-
l
z t
r
5 l a z
f
i
t
r
u o
-
r
,
-
r
l
O
I
r
3
E
l
i
k
l
@
l
j
-
?
l
o
l
i
"
1
6
1
r
l
P
=
t
-
Y
B
3
o
o
l
"
I a
a I
w
i
.
i
:
:
.
i
i
r
t
'
l
t
l
a
l
u
e
u
r
n
r
o
P
s
l
q
l
J
o
p
q
g
o
N
I
u
a
d
o
r
d
e
q
l
s
,
1
u
.
.
u
n
c
Q
p
t
u
J
.
'
u
o
!
s
s
r
L
L
i
J
a
d
PRESSURE MEASUREMENT
(SYSTEM
PR.>40K0/Sq
Cm CL 9000) (SYSTEIM
PR.>40KoiSq Cm CL 6000)
----{Q
J3.axs.09F
(SYSTEM
PR.
<4OKq/Sq
cm.Nb 25 CL 3OO0)
--lq
r:.o"+.ssl--
1. MATERIAL OF THE BOSS AND NIPPLE SHALL BE THE SAUE AS THE PIPE II.ITO WHICH
IT IS WELDED AND CONFIRM TO ANSI B 16.11.
2. THE LENGTH OF THE NIPPLE SHOULD BE 25omm.
3.
I1E.oItqR
END OF THE NlppLE Sr-tALL BE SOCXFT |VELDED wltH ?" 6LO8E VALVE
OF MATERIAL AS PER ANSI B 16.1.
4- TWO ISOLATED VALVES ARE TO BE USED FOR PRESSURE =
>+O Kg/Cm2 OR TEMp.= >280.C.
5. EDGE HOLE MUST BE CLEAN AND SOUARE OR ROUNOED SUGHTLY (1//64' RAD'US)
FREE FROM BURRS, WIRE EDGES OR OTHER IRREGUTARTIES.
6. ORIENTATION OF TAP WILL BE VARY WTH TYPE OF PROCESS FLUID AND NATURE OF
RUN OF THE PIPE.
7. ACTIVITIES TO 8E COMPLETED AT THE SHOP. WELD THE COUPLING (OR
BOSS) ON
THE PIPE AND DRILL PRESSURE CONNECTION HOLE (SAME
AS I D OF NIPPLE) IN
THE PIPE IN ALLIGNMENT WTH HOLE IN THE COUPLING.
8. ALL DIMENSIONS ARE tN mm UNLESS OTHERWISE STATEO. FOR TENDER PURPOSE ONLY
( r o{E'n .r .. ro. r||ErEa
)
PROJC'
ryPICALTHERMALPOWERPROJECT
INSTRUMENT SOURGE CONNECTION DETAILS
*F
0000-110.PO1-A-035
t;
.9
6
z ?
9 a '
c -
\--rE
I -
6 3
K R
z i
o ;
5' t
P-
.tz
o
5.E
oRcs\o@o- 1 1O-PO|-A-OJ5SH2R ,DWG
PRESS- MEASUREMENT
SCREWEO CONNECTION OF M 42x2 AND
LENGTH OF THREADED ENCAGEMENT WILL
BE NORMAL CATEGORY AS PER 15:4610
SCREWED
,
(Gl )
.A
Y
AIR
OR
FLUE
(
'6
-9
E
o 0.1
z t
9 { ,
8 . ,
/--E
d- a
> u
g > .
- -
_ < 5
E R
z i
d =
_ E
9 i
. 9 b
@r
o r
'-i
-
NOTES:-
1. THIS ryPE OF PRESSURE CONNECTON SHALL BE PROVIDED FOR
PRESSURE MECSUREMENTS iN AIR AND FLUE GAS DUCT/FURNACE.
2. DIMENSIONS
ARE INDICATIVE ONLY.
FOR TENDER PURPOSE ONLY
w l a q
NT PC
INSTRUMENT SOURCE CONNECTION OETAILS
oiq fo.
0000_1 10_Pol_A_035
CAD FILE NAI{E coMMoN DRSS\OOOO-I1O-PO|-A-O35SH3RA,OWG
c
. 9
o o )
* , 4
;
9 o
E::lrt
F+l
E T
( J ]
= - R
c i
Ex .
a -
d r
A
3E
j o
3" c
= 9
SOCKET WELDED
REDUCING COUPLING
TEMP. MEASUREMENT
2- SOCKET WELOED
INSERT x SIZE SUITABLE FOR
CONNECTION
2- SOCK$ WELDED
INSERT x LINE SIZE
MAIN PROCESS
PIPE
2" SOCKET
WELDED IEE
1, THIS ryPE OF THERMOWELL INSTALLATION IS SUITABLE FOR THE PROCESS
PIPE OF 2" NPS AND SMALLER.
2. FOR STTAM SERVICE THIS TYPE OF IHERMOWELL INSTALLATION 90' BEND
MAY BE USED ONLY IN VERTICAL PLANE.
J. THE LENGTH OF THE I-ARGER PIPE SECTlOi.l SHALL BE MINIMUIJ r50mm
(rI
MUST BE GREATER THAN THERMOWELL LENGTH).
THERMOWELL SUITABLE
FOR THE BOSS
TEMP. BOSS
DI MENSI ONS SUI TABLE
INCLINED INSTALLATION
CONNECTIONS AS PER
FOR
SCREWED WELDTD
PROCESS CONNECTION.
1. INCLINED INSTALLATION OF THERMOWELL SHALL BE APPLTCABLE FOR 4" AND
SMALLER LINE SIZE BUT LIMITED TO MIN. 3" LINE SIZE.
2. FOR 2' ' AND SMALLER LINE SIZE NECESSARY EXPANDER OF MIN. 3' ' SIZE OF
MAIN PIPING SPECIFICATION
SHALL BE USED.
3. THIS TYPE OF 'NSTALI,AT'ON
IS APPLICABLE FOR HORIZONTAL AND VERTICAL
PIPE SECTION,
4. FOR STEAM SERVICES EXPANDER SECTION MAY BE USED ONLY IN VERTICAL RUN.
5. THE EXPANDER SECTION SHALL BE OF ADEOUATE LENGTH
(ATLEAST
J-4 TIMES
DIA OF THE MAIN PROCESS PIPE AT BOTH SIDE OF THE INSTALLED THERMOWELL).
FOR TENDER PURPOSE ONLY
eqa d & BBe
NTPCLIMITED
( i oor ar adf l BDmr Ff i s)
FiOJECT
TYPICALTHERMALPOWERPROJECT
INSTRUMENT SOURCE CONNECTION DETAILS
**
0000-110-Pol -A-035
cAD FILE f,tAME: C:\COMMON oRCS\OOOO-1 tO-.pot-A-oJ5SH4M.0WG
.s
, 2
o 0.1
z >
9.
q)
tl
t ! o
6 ' ;
= o
g > -
: E -
* P
a *
Z Y
d i
tr
9 -
E Z
TEMP. MEASUREMENT
NOTES:-
1. FLOW INSTALLATION OF THERMOWELL SHALL BE APPLICABLE FOR 4- AND SMALLER
LINE SIZE BUT UMIED TO
,MINIMUM
3" LINE SIZE.
2' FOR 2'AND SIV'IALLER UNE SIZE NECESSARY EXPANDER OF ELBOW FORM
iAS
SHOWN) OF MINIMUM 3" SIZE SHALL BE USED.
3. ELBOW EXPANDER SECTION IN HORIZONTAL PLANE MAY BE USED FOR LIQUID
SERVICES. ONLY SI-EAM SERVICES EXPANDER SECTION MAY BE USED IN VERTICAL
PLAN,
FOR TENDER PURPOSE ONLY
edaf r
NT PC
pnorEdr
TPTCALTHERMALPOWERPROJECT
INSTRUMENT SOURCE CONNECTION DETAILS
D l s c i t P t t 0 {
D"" *"
0000-1 1 0-Pol-A-035
CAD FILE MME: coMMoN DRGS\0000-1 t0-POr-A-035SH5RA.OWc
. q
o a )
z .
9 { ,
'g-
( ! o
o t
= H
f f l
I -
= t
? F
z t r
b ;
a,tT
3 t
TEMP. MEASUREMENT
1/2" NPI EOUIVALLENI AS
PER MANUFACTURER'S
STAN DARD
r
- - - \
i nsul oti on
EXTERNAL rHnao n rll
MATCH WITH
INTERNAL THREAD Rc
NOTES:-
THIS TYPE OF TEMPERATURE EOSS
SHALL BE USED FOR THE PROCESS
PRESS EAUAL/AeoVE aO Ks/cnz(s).
THE MATERIAL OF THE BOSS SHOULD
BE SIMILAR TO THAT OF PIPING
MATERIAL OF SPECIFICATION,
ALL WELD TO BE TESIED IN
ACCORDANCE WITH APPLICABLE
CODES BY MANUFACTURER.
MATER'AL OF THE THERMOWELL SHALL
BE OF 31655.
IHERMOWELL SMLL BE DRILLED
BARSTOCK TTPE.
IMERNAL BORE OF THE THERMOWELL
SHOULD BE SELECTED BASED ON THE
NORMAL SIZE OF THE SENSING
ELEMENT AS PER ASME,PTC-I9,3,
THE BOTTOM OIAMFTER OF THE
THERMOWELL TYPICALLY SHOWN HERE
SHALL BE SUBJECT TO VARATION
BASED ON THE INIERNAL BORE OF
THERMOWELL AND THICKNESS OF
THERMOWELL MATERIAL TO WITHSTAND
THE PROCESS PRESS.AND TEMP.,AS
PER ASME,PTC_ t 9.3.
THE TYPE OF TAPERED THERMOWELL
SHALL 8E USED FOR LIOUIO V[LO-
crTrEs uP To 92M.P.S.(300F.T.P.S.).
THERMOWELL WITH THE INSULATION
LAG EXTENSIONS
SHALL BE USED
WHEREVER APPLICABLE.
ACTIVITIES TO BE COMPLETED AT THE
SHOP. WELD THE BOSS ON THE PIPE
AND DRILL THE HOLE IN THE PIPE IN
ALLIGNMENI WITH HOLE IN THE BOSS.
PROVIDE INTERNAL THREAD AS PER
lsi554 IO MATCH IVITH IHE THERMO-
WELL ETTERNAL THREAD.
ALL DIMENSIONS ARE IN MM UNLESS
OTHERWSE STATED.
WIILL BE SUIABLE TO MATCH THE
STUB DIMENSIONS AS PER RC 1ll2
THE
"U"
&
"1,'
DIMENSIONS SHALL BE
BE SELECTED BASED ON PARTICUTAR
APPLICATION AND THE SAME SHALL BE
il
r
14 ns PER rs;ss4
1 .
SHOP 2.
WELD
5.
NOTE- 6
7.
t1.
sEE NOTE-7
10.
SEE NOTE_I?
1 t .
SUBJECT TO OIVNER'S APPROVAL
DURING DFTAILED ENGINEERING.
14. ALL DIMENSIONS ARE INDICATIVE ONLY,
@
ffi
I tlze) ,^WLJWER**,
|
-
lratttltllEt rE DttEtolt
piorEcr
TYPTCALTHERMALPOWERPROJECT
rG PACKAGE}
rnJqTpl rirtrNlT c.}r roa
FIRSJ ISSUE
tl E c tat ^4rul
fi
I
,ffi
l"*
*
0000-1 10-POI-A435
,. I
*A*
qIM@
9'
cAD FILE NAME: CI\COMMON DRGS\0000-1 1 O-POI-A-OJ5SH6RA.OWO
I
= ; i
J >
E x
] I -
-: tl
6 B
i *
z (
. 9
.2
E
- -
9 "
r l\5
\:y-
o ;
b 3
6 ;
\4
d -
3 r
TEMP. MEASUREMENT
1/2' NPT EOUIVALLENT AS
PER
STANDARD
EXIERNAT TAPERS IHRTAD
R1 TO MATCH WITH INTERNAL TAPER
THREADED Rc 1AS PER tS:55+.
SHOP
WELD
NOTES:-
1.
llls
TypE
OF TEITPERATURE
BOSS tS APPLICABLE
FOR THE
_
PR0CESS
PRESSURE
BELOW 40 Kq,/Cm2(o)
-
2. FOR PRESSURE
TIGIIT
JOINTS TTIT' ' EOSS' dfiOULD
HAVE INTERNAL
TAPERED
PIPE THREAD
RC 1 AS PTN iS-:SS+, }UE LENGTH OF
_
THIEAD
ENGAGEMENT
SHOULD er As
ptR-ebovE
STANDARD.
3.
prpEs
HAVTNG
PROBABLTrY
Os
pnoior.rctb
ileRArroN
Senf
'wrr_orr.rc
MAY BE^DONE
ALL AROUND AFTER TIGHTENINC
THCNVOWET-i
Wrrrrr.r
-
I n c DU) S-
4. SEE NOTES_2
TO i 4 0F DRc. NO. 0000_110_pot _A_0J5,
sh_6 0f 14.
SEE NOIE_6 OF DRG.
NO.0000- 1 10-pOt-A-035,
Sh_6 0f 14.
sEE NOTE-7 OF DRG.
NO.O000- 1 10-pol -A-035,
Sh-6 0f 14.
FOR TENDER PURPOSE ONLY
N TP C LITITED
( ^ cors.-[r d rot E{tEir6r
)
PiOEc'
TPICALTHERMALPoWER
INSTRUMNT
SOURCE CONNECTION DETAILS
*" ,.q
0000-1 10-PO|-A_035
CAD FILE NAME: C: DRCS\0000-1
I o-pot-A-O35SH7Rl,Dwc
.9
.9
E
z =
9 q r
r.,1fi
ai- o
(t
.a
5 ' t
9 H
8 E
j o
: E -
, P
z q
o o
z i
b B
t ,
6 ,
3 r
TEMP. MEASUREMENT
DUCT WALL
INSULATION
+
AI R TO
FLUI GAS
PATH
172
"NPT
3oo tbs
FLANGE AS PER
ANSI B 16.5
NOTES:-
I, THIS TYPE OF TEMPERATURE CONNECflONS SHALL BE PROVIDED FOR
TEMPEMTURE MEASUREMENT IN A]R AND FLUE GAS DUCT.
2. MATERIAL OF THERMOWELL SHALL BE OF J16SS.
J. ETTERNAL CONNECTION SHALL BE OF SLIP ON FLANGED TYPE AND THERMOWELL
DESTGN Sr-lALL BE As
pER
ASME-PIC-19.5 (REFER
NOTES 9&'10 OF DRG.NO.
0000- 1 1o-Por-A-055, sh-6 of 14).
4. B'DDER TO SUPPLY AND INSTALL THE COUNTER FLANGED AND THERMOWELL
(ALONG
WTH TEMP. ELEMENT).
5. ALL DIMENSIONS ARE INDICATIVE ONLY.
FOR TENDER PURPOSE ONLY
42.4 x 4.O5
Ydaf r
NT PC.
I A corERnEJl cf, Esr
PROJICT
ryPICALTHERMALPOWERPROJECT
INSTRUMENT
SOURCE CONNECTION DETAILS
o*: *
0000-1 10-POI-A-035
CAD FILE NAME: C:\COMMON DRGS\OOOO- 1 1O-POI-A-O35SH8RA,DWG
= :
G .
I -
F -
6 3
b =
G
3 t
E
F
FLOW MEASUREMENT
FLOW NOZZLE
f \
I
PIPE
'
STRAPS
z t
9 o
I+}'
I L O
L r i
= : <
< =
E > .
I -
g : '
5 E
5 3
; =
x 6
- E
SOCKET WELDED
3/47 1" cLoBE vLv
SOCKET TO SUIT
NIPPLE.
NTPPLE 3/4"
OF MAIN PIPE CLASS
SCHEDULE
SI DE VI EW
SAME AS
MAIN PIPE
NOIES:-
1. THIS MFTHOD OF CONNECTING NIPPLES AND VALVES ON THE HORIZONTAL PIPE
IS APPLICABLE FOR MASUREMENT OF STFAM AT TEMP. ABOVE 455C ,
2. FOR STEAM SERVICE IN HORIZONTAL PIPE THE PRESSURE HOLES AND CONNECTING
NIPPLES SHOULD BE IN THE HORIZONTAL PLANE OF THE PIPE CENTRE LINE.
3. THE ENTIRE LENGTH OF THESE NIPPLES AS WELL AS SHUI OFF VALVES SHOULD
BE LAGGED IN WITH STEAM LINE AS SHOWN IN IHE DRAWNG.
4. FLOW ELEMENIS SHALL BE PROVIDED WTH 3 PAIRS OF TIPPINC POINTS.
FOR TENDER PURPOSE ONLY
(l c.^rEirlron 6 tJl oflE?irsE
t
PaoJEc'
TYPICALTHERMALPOWERPROJECT
{TG P
INSTRUI\4ENTSOURCE
CONNECTION DETAILS
o'
"o.
0000-1 10-Pol-A-035
cAD FILE MME: C:\COMMON DRGS\OOOO-| |O-PO|-A-035SH9RA.DWG
o
. 9
E
- i
9-.,s
( ! o
E E
o i
= 3
< s
S *
T -
j 9
6 5
t R
z a
t E
l J c
- E
.Ety
5 !
3' r
FLOW MEASUNEHIEI.IT
NTPPLE 3/4"
't"
SCHEDULE 160 MATERIAL
SAME AS
I+]AT
OF
MA' N PIPT
SOCK$ WELDED
3/4"/ 1" 9LOBE VALVE
OF MAIN PIPE CLASS
o
z.
=
o
INSULATIQN
ELEVATION
NOTES: -
1. THIS METHOD OF CONNECTING NIPPLES AND VALVES ON THE VERTICAL STFAM PIPE
IS APPLICABLE FOR MFASUREMENT OF STEAM AT TEMP. ABOVE 455'C
2. THE ENTIRE LENGTH OF THESE NIPPLES A5 WELL AS SHUT OFF VALVES SHOULD
BE LAGGED IN WITH STEAM LINE AS SHOWN IN THE DRAWING.
J. ON VERTICAL STFJM PIPE BOTH HIGH TEMPERATURE (SPECIAL VENTS) NIPPLES
WILL BE LONG ENOUGH SO THAT HIGH AND LOW PRESSURE CONNECTION NIPPLES
WILL BE AT SAME LEVEL
4. UP STREAM AND DOWN STREAM PRESSURE CONNECTIONS MUST BE INSTAI.LEO IN
DIFFERENT PIANES PASSING THROUGH THE CENTRE OF THE PIPE.
5. FLOW ELEMENTS SHALL BE PROVIDED WITH 3 PAIRS OF TAPPING POINTS.
FOR TENDER PURPOSE ONLY
NTPCLIMITED
(
a ca/g roar d rn^ oal@i6E l
pra,.cr
TYPICALTHERMALPOWERPROJECT
INSTRUMENT SOURCE CONNECTION DETAILS
* *'
0000-1 10-Pol-A-035
slFto Ot ll
DRGS\0000-'l 1O-PO|-A-O3sSH1OR]^..DWC
. 9
. p
E
o i t
J t
z -
9-o
t-#;
P- e
( ,
-
= U
< E
9 ( x
I _
4 3
o o
< ; i
Z E
b =
E
FT
t =
FLOW M
DETAIL
^\ \
FLow
- o+J. r s l .
o
\
-XCq
-p/?l
I
_0.Jo
I
>
4D MI N 2D MI N
5D MIN
3D MI N
SEE
EASUREMENT
TONGUE AROUND
NOZZLE
0 + O . 1 5 O + O . 1 5
_ 0.30 _ o.o0
NOTES: -
DETAI L- . A'
1. COMPLETE FLOW NOZZLE BRANCH ASSEMBLY ALONC WITH NIPPLES AND SOURCE
ISOLATION VALVES SHALL BE SUPPLIED BY THE BIDDER. 'HE BIDDER ALSO TO INS]ALL
FLOW NOZZLE WITHIN THE MACHINED BRANCH. PRESSURE SfUBS ON THE BRANCH
PIPE
(FOR
ORIENTA]ION OF PRESSURE TAP REF, NOTE-3) ALONG WITH NIPPLE AND
SOURCE TSOLATION VALVES-
2. THE MACHTNING OF BRANCH PIPE SHOULD BE DONE AFTER PRESSURE CONNECTIONS
I.IAVE BEEN WELDED TO PIPE AND ALSO EXTEND FOR ATLEAST 4D IN THE INLFT
SECTION. 2D IN THE OTJTLET SECTION. MEASURED FROM THE INLET FACE OF FLOW
NOZZLE. TOIAL BRANCH PIPE ASSEMBLY SHOULD BE ATLEAST A LENGTH OF 8Dl5D
IN THE INLET SECTION AND 5D tN THE OI'TLET SECTION, MEASURED FROM THE
INLET FACE OF THE FLOW NOZZLE AS SHOWN ABOVE,
3. ON HORIZONTAL PIPE RUN PRESSURE COf{NECTIONS ARE IO BE LOCATED ON SIDES
OF I}tE PIPE FOR LIOUID AND STEAM SERr'ICE AND ON THE TOP FOR DRY GAS
SERVICE FOR PROCESS LIQUIDS, TNSTALLATION OF.PRESS. TAPS MAY BE ALLOWED
WTHIN AN ANGLE OF 45' ELBOW HORIZONIAL FOR SPECIAL CASES BUT NO
BOTTOM CONNECTIONS ARE ALLOWED.
4, THE LOCATION OF PRESSURE TAPS MUST BE WITHIN 1.5
.'|'fi(1/16.)
OF DISTANCE
SPECIFIED AND NUMBER OF PAIRS OF PRESSURE TAPS TO BE PROVIDED WILL BE
AS PER FLOW MEASUREMENT DATA SHEFT.
5. PRESSURE TAPS SHOUI.D BE DRILLED MDIALLY h'TTH RESPECT TO PIPE AND THIS
ORILLING SHOULD BE OONE AFTER Alf/ COUPUNG FOR ATTACHING TNE PRESSURE
TUBING IIAS BEEN WET,DED TO THE PIPE. THE HOLE WHERE IT BREAKS THROUGH
THE INNER SURFACE OF'IHE PIPE MUSI BE FREE OF BURRS OR WIRE EDGE
AND CORNER OF EDGE HOLE LEFI ROUNDED VERY SLIGHTLY
(1/64" RADIOUS).
6. RECOMMENDED MAXIMUM DIAMFI-ERS OF PRESSURE TAP HOLES IN THE BRANCH
PIPES WILL BE AS PER ASME PTC 19.5, THE DIAMFIER FOR HOLE SHOULD
REMAIN SAME FOR DISIANCE NOT LESS I}|/qN 2,5 TIME OF DIA FROM THE INNER
SURFACE OF THE PIPE.
7. FLOW NOZZLE S|IALL BE CENTRED lN THE PIPE vJlTHlN O.8 nm (1/32) OF rHE
PIPE AXIS. INSIDE DIAME ER MEASURED AT FOUR POINTS AT AI'T' CROSS SECTION
SHALL NOT DIFFER BT MORE THAN 1%,
8. BRANCH PIPE SHALL BE AS PER MAIN PIPING MATERIAL SPECIFICATION' INTERNAL
SURFACE OF BORED SECTIONS MUST BE SMOOTH AND STRAIGHT, FREE FROM
SCALES, PTTS, BURRS OR ANY IRREGULARTIES.
9. FLOW NOZZLE MATERIAL SHALL 8E 516 SS AND THE DESIGN AS PER ASME.
1O, MAXIMUM UPSTREAM AND DOWN STRAM STRAIGHT LENGTH REOUIRED FROM
INLET FACE OF FLOW NOZZLE SHALL BE AS PER ASME, PTC-19.5.
FOR TENDER PURPOSE ONLY
INCREASES WITH I
SHOULD BE
THE PIPE SIZE
I
MIN' 21 mm
NTPCLIMT| ED
( l co!/ir{ro{t of m$ aftr?frrsr )
INSTRUMENT SOURCE CONNECTION DETAILS
oRc ,' 0.
0000-1 10-Pol-A-035
N.T.S.
CAD RLE C:\COMMON DRCS\0O00-1 1 o-POI-A-OJ5SHl 1 RA.DWG
a
. g
.9
E
FLOW MEASUREMENT
LENGTH TO BE NOT LESS THAN
2, 5
TI Mr S Dr a
DF
PRFSSTJRE
HOLES
EXTERNAL TAPERED THREAD
R 1/2" rO MATCH W| TH
INTERNAL TAPER THREAD
RC 1/2" A,S PER rS:554
NOTES: -
1 .
,
7.
al.
ORIFICE PLATE M0UNTED BFfWEEN FTANGES WTH FTANGE TAPPING (As
sHowN ABoVE)
SHOULD BE LIMITED TO PIPE SIZES OF 2'' OR TARGER.
ORIFICE PLATE SHALL BE MOUNTED BETWEEN PIPING FLANGES WITH THE SHARP EDGE
FACING UPSTREAM SUCH THAT CENTRE OF THE CONCENIRIC ORIFICE SHOULD BE
wl THrN o.79 mm (1/32' )
OF THE AX| S OF THE
ptpE.
TWO GASKM SHALL BE INSERTED EEIWEEN THE PLATE AND THE FLANGES AND INSIDE
DAMETER OF I}1E GASKETS SHOULD BE ATLEAST 1.5 MM (1/'16")
GREATER THAN THE
INSIDE DIAMEIER OF THE PIPE SO THAT THEf DO NOT PROTRUDE'INTO THE PIPE.
PIPING FLANGES SHALL BE ANSI WELD NECK, RAISED FACE TYPE. THE FLANGE IS TO
BE ALIGNED WITH THE FACE PERPENDICULAR TO THE FLOW AXIS.
BIDDER TO SUPPLY ORIFICE PLATE SPECIAL TYPE (HAVING PRESS. CONNECTIONS) OF
FLANGES ALONG WITH GASKETS, NIPPLES AND SOUIICE VALVES.
ON HORIZONIAL PIPE RUN PRESSURE CONNECTIONS ARE TO BE TAKEN FROM SIDES FOR
LIQUID ANO STEAM STRVICE AND FROM TOP FOR DRY GAS SERVICE FOR PROCESS
LIOUIDS INSTALTAIION OF PRESSURE TAPS MAY BE ALLOWED WITHIN AN ANGLE OF 45'
ELBOII'/ THE HORIZONTAL IN SPECIAL Cr'.sFS BUT NO BOTTOM CONNECTIONS ARE ALLOWED.
IHE. LOCANON OF PRESSURE TAPS MUST BE WITHIN ],5 mm (1/16")
oF THE DISTANCE
SPECIFIED.
MAXIMUM DIAMEIER OF PRESS. CONNECTION HOLES SHALL BE AS PER RECOMMENDATIONS
OF ASME PTC 19,5. THE DLqMETER OF THE HOLE SHOULD REMAIN IHE SAME FOR A
DISTANCE NOT LESS IHAN 2,5 TIMES OF IHE DIAMEIER BEFORE EXPANOING 'NIO THE
PRESSURE PIPE.
THERE MUST BE NO BURRS WIRE EDGES OR OTHER IRREGULARTIES ALONG THE EDGE
OF THE HOLE AND IT MUST BE SQUARE AND ROUNDED SLIGHILY (1//64'
MDIUS).
oRrFrcE PLATE SHOULD BE FLAT W|IHIN 0.02 mm
(O.0Or")
AND THt SURFACE
ROUGHNESS
SHOULD NOT EXCEED 20 MICRO INCH. THE I}iICKNESS OF THE ORIFICE
PLATE SHOULD BE AS PER ASME,PTC-19.5.
FOR HORIZONTAL PIPE RUN DMIN HOLES IN ORIFICE PLATES ARE AT THE BOTTOM
(APPROX.
TANGENT TO TNSIDE DIA OF PIPE) FOR STEAM OR GAS SERVICE, VENI HOLES
SHOULD BE LOCATED ON UPPER SIDE FOR INCOMPRESSIBLE FLUID.
ORIFICE PLATE SHOULD BE OF 516 SS
(ASTM
A167-54 GMDE_II).
RECOMMENDED MINIMUM LENGTHS OF STRAIGHT PIPE PRECEDING AruO TOLLOWII.IC
ORIFICES SHALL BE AS PER ASME.PTC-I9.5.
THREE PAIRS OF PRESSURE TAPS SI-IALL BE PROVIDED WITH NIPPLES OF REQUIRED
LENGTH AND SOURCE VALVES AND THE UN-USED TAPS ARE PLUGCED.
THE INTERNAL TAPERED CONNECTION WITHIN THE FLANGE FOR PRESSURE TAPS SHOULD
9E_!9 il?".4!.q_LHqlgll_E,srrouLD
ALso oF EnERNAL THREcDED
c tiz' as-cla
IS:554. THE LENGIH OF THREADED ENGAGEMENI SHALL BE AS PER ABoVE'STANDARD.
t n
' 1 1 .
12.
1+.
15.
FLOW
FOR TENDER PURPOSE ONLY
eq*dzf r BBe
NTPCLIMT| ED
( ^ co/E lron f rFrr fxrEFi6E
)
INSTRUMENTSOURCE
CONNECTION OETAILS
* *.
0000-1 10-Pot-A-035
CAD FILE MME: coMMoN DRGS\0000- I 1 o-pot-A-o35SH1 2RA.DWG
d '
_q
o t
F E
_9
-a
a d
__.r
t
z t
9 o
3-
F.r.rt
0*'6
o 3
= - i
t u c
> e
E > ,
- *
, 9 ?
>. *
o 5
z i
T-
l 0O TO 15O mm
3/471" NTPPLE
3/4/1" SOCKfr WELDED GLOBE,/
VALVE MATERIAL AS PER ANSI
B 3 1 . 1
socKFr TO SU|T NTPPLE
OF 3/471"
or*rFJ-
c&r coNTRAcroR's
scb-ii
scoPE
LEVEL MEASUREMENT
3/4'/1" NTPPLE rO AE
CONNECTED WTTH LEVEL GAUGE/
SWITCH THROUGH SOCKFT
WELDED EQUAL UNION
t\l nTtrq. -
VESSEL/TANK
WALL
1. THIS- TYPE OF PROCESS CONNECTION SFI,ALL BE USED FOR LEVEL GAUGE AND
EXTERNAL CAGE TYPE FLOAT OR DISPLACER OERATE-D
LilEiiWTCH.
2. FOR
GAUGES. 3/4' NIPPLE ALONG WITH 3/4" SW SOURCE VALVE AND FOR
s-ytr_cHEs 1' NrppLE ALoNG wnH r' s$r'sounCe
-viivi-sniir_
ee
pRovtDED
AS PROCESS
CONNECTON.
3.
:ggRcq
CoNNECTTON ON VES-SF! SHOULD NOT BE LOCATED
Ar
pLAcES
SUB\,ECTED
TO INTERFACE
AND TURBULENCE rNOU r|,r-r-Iifir,iO
OUrr-NS,
4.
ll_lguER
coNNECTtON
ts TAKEN,FROM
BOTTOM OF THE VESSEL THEN THE
NIPPLE MUST BE IOO MM TO 150 rrlrN ABOVE iiE'E'OrrOT"Or
IHE VESSEL.
VESSELAANK
WALL
4- ANSI MATCHING FLANGE
ATIACHED WIIH FLUSH
DJAPHRAGM
OF LEVEL
TRANSMITTER
4" NPS VESSEL
NOZZLE
4" BUTT WELDED
GATE VALVE
4' ANSI Joo rbs
NOTES:-
2.
L TIIS
]]Iq
OF PROCESS
CONN-ECTION
S||ALL BE PROVJDED FOR TANK LEVEL MEASUREMENT
9J
yLsqqus oR coRRostvE
Lroujt usjNc
-FLUSH
ilb-H-riAdiw;iER
rypE LEVEL
TRANSMITTER.
WELDING
OF MATCHING
FLANGE IO GATE VALVE SHALL BE DONE BY BIDDER.
R.F. WELD NECK
FTANGE
FOR TENDER
pUnpOSf
Ot' it-y
lG-a-d#l
Lse_sJ
ear et El
NTPC
PRC'EC'
ryPICALTH-qBMALPOWERPROJECT
INSTRUMENI
SOURCE CONNECTION DETAILS
D"" *.
0000-' 1 10-PO|-A-035
cAD FILE MME: D:\NgRrH KAMNpUna\ oooo-ll o-EolJ]iilifiiTi",^
LEVEL' MEASUREMEi -i T
2" NPS VESSEL
NOZZLE
2" NIPPLE TO BE
CONNECTED WITH LEVEL
TRANSMITTER
2" SOCKET WELDED GLOBE
VALVE MATERIAL AS PER ANSI
B J 1. 1
SOCKET TO SUIT
N}PPLE OF 2"
VESSEL/TANK
WALL
NOTES: -
1. THIS Tt'PE OF PROCESS CONNECTION SI-'ALL BE USED FOR DISPLACER TYPE
LEVEL TRANSMITTER.
2. SOURCE CONNECIION ON VESSEL SHOULD NOT BE LOCATED AT PLACES
SUBJECTED TO INTERFACE AND TURBULENCE rNOU IIIIrri IHO OUrrrrS.
3. IF.LOWER CONNECTION IS TAKEN FROM BOTIOM OF ]HE VESSEL THEN THE
NIPPLE MUST BE IOO mm TO 150 rnm ABOVE THE AOTTOM- Or rHr vEiSer.
FOR TENDER PURPOSE ONLY
eqAdz f r
Ef r e
Nf PCLI MI TED
( A oOrdr ltn r rd^ OrEirfitsa
,
'iOJ.cT
TPICALTHERMALPoWERPRoJECT
INSTRUMENT SOURCE CONNECTION DETAILS
* *
0000-110-Pol-A-035
' 6
"2
E
- =
9 o r
t:+?
d- 6
d E
< g
T _
g 5
6 6
< ; i
z a
b !
* -
- E
f.i
ldrt
o " E
.g
l -
i . i . : 1 1 ' - .
;==t
RA\OOOO- t 1O-PO|-A-O55SH
j
4RI,DWG
I
t
dJ
i :
t l
TI
J i
l !
i I
' E
t ,
ii
r l
! l
.!t
r i
-H--+-{'+
| l l l l
'
l%.TIWF;s.,&!i"ff'"
r
mlnib "J"lS
H.l'.3''s^r'*[,'i'""
F6fiENoEFilFFoqg
$oE!.Eq
-l'o
iltu{mFnBEl'"
TYP TcALGA of
sLocAf AX:lf
'"t*t
t!!r-a rarro i rrca ItmllB
UE
TYPE
|lAX. NO, Ot
IRAN9JITTERS
0tyENSlON
'x'
(mm)
6
! 250
E
9J0
c 2
610
I
t-_
-I
I
'
;im$ f"fia
"S^lB',ff"*d'i'o.
ffi'-":-,'3,u6!Hffi"'J1'"1-
Iwicer ce or locAL INSTRUMENT
ENCLOSURE
/ RACK
rI.tlafl |!tnd oBAI rr190r tot'(:G
tlri-a r& | Iticr cairlard
ii+i+i+i l l l l l l l l
*^n^,^4,-
LIEWTH PURGING
SECTION-88
I
z t
t I
3t
II
t l
I f
l r
rl
i l
I t
i t
tl
l l
l l
! i
; 8 l
n
t_
,t
I
I I
l t
l l
t l
. I . }
: r
i l
: I
I
i J
SECTION.AA
LIE \,4/THOUT PURGING
UR
TYFE
u x. N0. ol
'IRTNSUrr'ERI
0tMEfistoN
'x'
(mh'
I ; : 1 5 5 0
6 I J50:
I 1010 i
..1r:..r;:,:ria4$snr.:",{*srrrc$c{:,:}-,tr!:?d,lrti.:!1
it!!1#g:;]i!i: j.t,i:*f#:1!dialii)lEil-,_liillj;;:-.,:.Jij;iffi
i
.E
F
7 .
2 5
&-c
6 t
F '
5 B
X E
3 F
E. b
6 E
1 F
r - 3
i =
E S
: i
E:
3 i
F e
4 PAI R, o. 5 mmsq.
MARSHALLING/TERMINATION
CUBICLE
n-t l ; a1
2
3
4
7
s
s
I
I .
o
s
s
o
o
s
o
o
o
@
a
a
p
g
g
o
g
g
E)
g
g
g
4 PAJR,O.s mmsq.
SHIELO BUS
_ J
SIGNAL CROUND
FOR TENDER PURPOSE ONLY
TYPICAL THERI\,IAL POWER PROJECT
INTERFACINq OF FIELD INSTRUMENTS/
SWGR SWITCH (COC) TERMINATION DETAILS
D I S C R I P T I O N
DRG. NO.
0000-999-Por-A-065
sH 01 0F t 4
I
!
a
e !
a .
EE
at I
A '
; E
l r
F. b
1 g
6 :
t i
r t
' s
- r
. . E
! e
: t
E r
8 i
Et
ONLY
SHITLD BUS
a
Et/Gc/Ct/\flh CORE S}]iJ-L BE TERMTMTIO rN IERMTML I OR 3-
I I OR 13, 21 OR 2J ANO 31 OR 33 RESPECI TVELY DEPENDI NG
0N IHE PIRTIoULAR TrpE oF coMAcT (No oR Nc) rs To BE
WRED TO DOCMIS.
r{^Fs|Al.rlNGdtERurMnON
G-a-1
9 g
S E
i r
5
1
6
L _ J
NO/NC
NTPCLI MI TED
( A CO/ERNUEM OF t[Ot O{IEPR|SE )
TYPICAL THERMAL POWER PROJECT
INTERFACING OF FIELD INSTRUIVENTS
swtrcH TERt\4tNATtoN DETA|LS
NO/NC
O E S C R I P T I O N
DRO. NO,
0000-999-POt-A-065
I
u.lR s unLL, r't c
7tt
R li tNnt ro ll
(
UBI CLE
,-t-
t,
l s
6
|
t o @
|
q 2
J
5
6
7
8
l s
s
I
l o o
l s
a
I
Br(
INTERNAL WIRING/
CAELE
INTECRAL JS
SI I I ELD
AUS m$no ff/
--fs @
l q o
l a
s
,
l @
o
l s @
s
t , l
L _ _ J L _ J
SI GNAL
CROUNO
FOR TENDER PURPOSE ONL'
NTPC LI MI TED
TYPICAL THERN,4AL POWER PROJECT
I NTERFACI NG OF FI ELD I NSTRUMENTS
CONTROL VALVE
0 t s c R t P T r o N
sH Of , 0r 14
'a
3
q u
c -
& 2
t 3
d ' E
7 a
' P
-
: 3
2 r
9 e
6 t
x 9
z 6
' E
D=
d.
- : 3
5 5
6- t s
E2
INTERML WIR|NG/2 PA|R,O,5 mmsq.(Typ)
INTEGAL
+-
LIE//LlR
/TERMINATION
CUBI CLE
TMNSMTNER io--l-z.u oc *u.
f;
-^-l
t '
' I
l s
E
I
l o o l
I
a a l
l s
s
I
l a
o l
I o o l
| ^ ^ l
l " " l
l o
q l
l s . s l
I g
o t
t l
t s
o i
l o
ol
I s o l
t *
- l
l o
s l
I s o l
f " i
e o l
& o l
i ' t " i
I
I
SI GNAL
GROUND
2 s'iaa
3 g
4 g
t _ '
TRANSMITTER
6 s
7 E
a 6
TMNSMITTER
SHI ELD BUs
TRANSMI'TER
LOCAL J8 ;;1
t ^ '
TRANSMITTER
3 6
+ g
5 s
6 a
7 s
BN
TRANSMITTER BK
u-,-
)
FOR PURP
4 PA| R, O. 5 mmsq.
N T P C L'MITED
TYPICAL THERMAL POWER PROJECT
IiIRINC OF S'IANO ALONE IXIR SHOIIN
TI I LE
INTERFACING OF FIELO INSTRUMENTS
l _20mA
o E S C R r P t r O N
DRC. NO,
0000-999-Pot-A-065
sH 04 0F 14
MARSHALLING/
TERMINATION
CUdICLES
14
pAtR,
I 0.S Sq, -,6fc;/swcn
\:..' F-------::1
SHI ELD
BUS
MCC DISTURBANCE
STATUS
' oN'
' OFF,
COMMANO' OFF'
COMMAND' ON'
t .
- d!
- t
E 5
Ei
E :
F g
t s E
, .
E.e
3 S
6 B
t !
E I
i E
i r
! . i
: 5
s
E :
b
Er
OVERLOAD TRIP
OPERATEO
SICNAL
CROUNO
NOTE
1. FOR CHP DRI VES, THE SCHEME SHALL
8E FINALISED DURING DFTAILED ENOG,
06
08
1 0
1 4
E E
t r E
o o
O D
o a
o t r
E t r
El o
o t r
o t r
u 4 a q l
N T P C
( A GOVERNMNI
TYPICAL THERMAL POWER PROJECT
tTL
tnreRrRctrue
or rtelo tttsinu|Etws
INTERFACE
OF DDCMISWITH
MCC/SWGR/ACTUATOR
D S C R I P T I O N
0000-999-POt-A-065
sH 05 0F 14
FOR OTHER SYSTEMS
(WHERE REQUIRED)
EMERCENCY PUSH BUTTON
OPERATED
FOR OTHER SYSTEMS
(WHERE REOUIRED)
STATUS ON/OFF
FOR O1HER SYS1EMS
(WHERE REQUIRED)
MARSH./TERM CUBICLE 0,54S,.%m MCC/SWGR
D- MCC/SWGR
ELECT. PROTECllCN OPERATED
(RELAY/ MET CABINET)
STATUS
ON } w
BREAKDl STATUS ON/Off
Of f > CONTACTS FOR
OTHER SYSTEMS
(WHERE REQUIRED
0.g. BMS/ATRS)
i
TRlP COMUAND CONTrn
( P m m m TRlP COL
ClRCwr) TO 0E USED WHERE
REWIRED 0.0. FOR MILL/ PA FAH
MOTOR
1. SPARE CORES AT MCC/SWGR END ARE TO BE
TERMINATED AT SPARE TERMINALS.
2. OMRLAOD ALARM & RELAY FAULT ALONG WITH OTHER
INFORMATION SHALL FLOW THROUGH SOFT UNK.
191
[FOR TENDER PURPOSE ONLY I
-
-
n
m&bf& l2k'%k
N T P C LIMITED
( A CoVERNMENT OF lNDu ENlERPRIY )
BNCINBHIMC DIVmON
PROJECT
TYPICAL THERMAL POWER PROJECT
rmr INTERFACING OF FIELD INSTRUMENTS
INTERFACE OF DDCMIS WITH MCCISWGRIACTUATOR
0
REV NO
Revised fa Numen'cd relay based Sm;R
D E S C R I P T I O N
DRAWN
Y
Z$y
DESIGN
MI
CHKD.
c L w m EZ
ARCH,
SH 0 7 OF 14
l4.CQ.W (HT MOTORS)
B
DATE SIZE SCALE
NTS
DRC. NO.
0000-999-POI-A-065
REV. NO.
6
'i!
.i
S
G g
z o
$ f
8 5
$ [
g
;r
ai
% X
.p"
L
.
fi
z !j
. -
.-
i;b
5
: t
w g
E n
I
MARSHALLING/
MCC/SWGR
ELECT. PROTECTION OPERATED
(RELAY/ MET CABINm
STATUS CLOSED/ OPEN
CONTACTS FOR
OTHER SYSTEMS
(WHERE REQUIRED)
IN SYNCH SIGNAL
FROM RELAY/ MFT
CABINET
1. SPARE CORES AT MCC/SWGR END ARE TO BE
TERMINATED AT SPARE TERMINALS.
2. RELAY FAULT ALONG WITH OTHER INFORMAllON SHALL
FLOW THROUGH SOFT LINK.
I FOR TENDER PURPOSE ONLY I
- -
8
REV.NO.
[mx*]
ma&& h?%9i%
N T P C LIMITED
( A CaKRNUENT OF INOU ENTERPRISE )
ENGINEERING DIVISION
PROJECT
TYPICAL THERMAL POWER PROJECT
TITLE INTERFACING OF FIELD INSTRUMENTS
INTERFACE OF DDCMIS WlTH MCCISWGRIACTUATOR
(Elect. Bkr. - Syflc.-LT)
REV. NO.
B
SZE
A3
14.0208
MTE
R w h d lor Numerical day based SWGR.
D E S C R I P T I O N
SCZLE
NTS
CLELRED BY
C
DRAW DESIGN CHKD. yT\
E
DRC. NO.
0000-405-POI-A-065
SH 10 OF 14
Cdrl ARCH.
ELECT. PROTECTION OPERATED
(RELAY/ MET CABINET)
STATUS CLOSED/ OPEN
CONTACTS FOR
OTHER SYSTEMS
(WHERE REQUIRED)
1. SPARE CORES AT MCC/SWGR END ARE TO BE
TERMINATED AT SPARE TERMINALS.
2. RELAY FAULT ALONG WITH OTHER INFORMATION SHALL
FLOW THROUGH SOFT LINK.
D E S C R I P T I O N 0000-405-POI-A-065
MARSH./TERM CUBICLE 0, 54Sr mm MCC/SWGR
D-
ELECT. PROTECTION OPERATED
(RELAY/ MET CABINU)
STATUS
ON } FROM
BREAKER STATUS CLOSED/OPEN
OFF CONTACTS FOR
OTHER SYSTEMS
COMMAND 'OPEN' 24 V SI GN4 (WHERE REQUIRED
} D o c g F m
COMMAND 'CLOSED' RE&i:n
IN SYNCH SIGNAL
J
TRlP COYUAND CONTACT
FROM RELAY/ M n (PARWLED W~TH TRIP
CABINET COIL CIRCUIT) TO BE
UYD WERE REWIRfD
1. SPARE CORES AT MCC/SWGR END ARE TO BE
TERMINATED AT SPARE TERMINALS.
2. RELAY FAULT ALONG WITH OTHER INFORMATlON SHAU
FLOW THROUGH SOFl LINK.
1 FOR TENDER PURPOSE ONLY I
m a ii%t%k
N T P C LIMITED
( A m R N Y E N l OF lNDl4 W R P R I K )
ENCrnRINC DIVmON
PROJECT
TYPICAL THERMAL POWER PROJECT
TITLE INTERFACING OF FIELD INSTRUMENTS
INTERFACE OF DDCMIS WITH MCCISWGRIACTUATOR
- -
/ rr\
B
REV.NO.
L
Revired f a Numerical relay b o w MICR
D E S C R I P T I O N
CRAW
()Y\Of %,
GSGN
C
CHKD.
CLEARED Bv
Cdrl
SH 13 OF 14
14.02.00 JElect. Brkr. - Sync.-HT)
B
ARCH.
A3
SCKE
NTS
DRC. NO.
0000-405-POI-A-065
REV. NO.
MARSH./TERM CUBICLE 0 , 5 4 S r k m MCC/SWGR
D- MCC/SWGR
ELECT. PROTECTION OPERATED
(RELAY/ MET CABINET)
STATUS
ON } rn0M
BREAKER
I
STATUS CLOSED/OPEN
OFF CONTACTS FOR
OTHER SYSTEMS
COMMAND 'OPEN' 24 V SICNU (WHERE REQUIRED
} D K g m
COMMAND 'CLOSED'
TRIP (PARULELED COMUWD mTCl CONTACT TRIP
ColL CIRCUIT) TO BE
USEO WERE REQUIRED
1 . SPARE CORES AT MCC/SWGR END ARE TO BE
TERMINATED AT SPARE TERMINALS.
2. RELAY FAULT ALONG WlTH OTHER INFORMATION SHAU
FLOW THROUGH SOFT LINK.
I FOR TENDER PURPOSE ONLY I
- -
B
RW.NO.
[ - I
ma&& !az?3
N T P C LIMITED
( A CCMRNMfhl Of INMA ENTERPRISE )
ENGINEERING DIVISION
PROJECT
TYPICAL THERMAL POWER PROJECT
r m ~ INTERFACING OF FIELD INSTRUMENTS
INTERFACE OF DDCMIS WITH MCCISWGRIACTUATOR
IElect. Brkr. - Non Sync.-HT)
SIZE
A3
Revised fa Numerical d a y baxd SWGR
D E S C R I P T I O N
SCKE
NTS
DRC. NO.
0000-405-POI-A-065
SH 14 OF 14
I
REV. NO.
B
1 4 . ~ ~ 0 8
DATE MUWN
??
CHKD.
$%
DESIGN
0
M
CLE*RED BY
@db
Ck'h
$
c , , H.
KKS CODE
GUIDELINES
DOCUMENT NO: 0000-110-POI-G-001
NTPC Limited
(A GOVERNMENT OF INDIA ENTERPRISE)
ENGINEERING DIVISION
STANDARD 660 MW TG PKG
APPD
BY
CHKD
BY
PREP BY REV
0 AS AB
Thursday, December 09, 2010 Page 1 of 25
9562
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
AMMONI A DOSI NG SYS
QCD01AA101 AMMONIA DOSING PUMP-1 STROKE CTL CLCS
QCD01AP001 AMMONIA DOSING PUMP-1 LT
QCD02AA101 AMMONIA DOSING PUMP-2 STROKE CTL CLCS
QCD02AP001 AMMONIA DOSING PUMP-2 LT
QCD02AP201 AMMONIA MIX/STRG TANK AGITATOR LT
BULK AMMONI A STORAGE CUM TRANSFER SYS
QCD11AP001 AMMONIA DOSING TFR PMP-1 LT
QCD11AP002 AMMONIA DOSING TFR PMP-2 LT
CENTRAL LUBE OI L STORAGE & PURI FI CATI ON SYS
MGV10CL201 DIRTY OIL TANK LEVEL LS
MGV10CL202 DIRTY OIL TANK LEVEL LS
MGV10CL301 DIRTY OIL TANK LEVEL LG
MGV10CL302 DIRTY OIL TANK LEVEL LG
MGV10CL303 DIRTY OIL TANK LEVEL LG
MGV10CL304 DIRTY OIL TANK LEVEL LG
MGV10CP201 DOT PUMP STAINER CLEANER DIFF PRESS DPS
MGV10CP301 Dirty Oil Tnk PUMP STAINER CLEANER DIFF PRESS DPG
MGV10CP302 DIRTY OIL TNK PUMP DISCH PRESS PG
MGV10CP303 DIRTY OIL TNK PUMP SUCTION PRESS PG
MGV20CL201 CLEAN OIL TANK LEVEL LS
MGV20CL202 CLEAN OIL TANK LEVEL LS
MGV20CL301 CLEAN OIL TANK LEVEL LG
MGV20CL302 CLEAN OIL TANK LEVEL LG
MGV20CL303 CLEAN OIL TANK LEVEL LG
MGV20CL304 CLEAN OIL TANK LEVEL LG
MGV20CP201 COT PUMP STAINER CLEANER DIFF PRESS DPS
MGV20CP301 Clean Oil Tnk PUMP STAINER CLEANER DIFF PRESS DPG
MGV20CP302 CLEAN OIL TNK PUMP DISCH PRESS PG
MGV20CP303 CLEAN OIL TNK PUMP SUCTION PRESS PG
CONDENSATE SYS
LAA01AA201 D/A OVERFLOW TO LPD F/T CV SOV/O/L
LAA01CL101 DEAERATOR LEVEL LT
LAA01CL102 DEAERATOR LEVEL LT
LAA01CL103 DEAERATOR LEVEL LT
LAA01CL104 DEAERATOR LEVEL LT
LAA01CL301 DEAERATOR LEVEL LG
LAA01CL302 DEAERATOR LEVEL LG
LAA01CL303 DEAERATOR LEVEL LG
LAA01CL304 DEAERATOR LEVEL LG
LAA01CP302 DEAERATOR PRESS PG
LAA01CT101 DEAERATOR FST TEMP TE
LAA01CT102 DEAERATOR FST TEMP TE
LAA01CT301 DEAERATOR FST TEMP TG
LAA01CT305 DEAERATOR FST TEMP TG
Thursday, December 09, 2010 Page 2 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAA02AA201 D/A OVERFLOW TO LPD F/T STBY VLV MOV
LCA00CT101 CEP SUCTION TEMP TE
LCA01AA202 CEP-A DIS VLV MOV
LCA01AA212 CEP-A DIS VLV-IBV MOV
LCA01AP001 CEP-A HT
LCA01CF101 CEP-A DISCH FLOW FT
LCA01CF102 CEP-A DISCH FLOW FT
LCA01CP101 CEP-A DISCH HDR PRESS PT
LCA01CP102 CEP-A DISCH HDR PRESS PT
LCA01CP103 CEP-A SUCTION PRESS ACROSS STAINER DPT
LCA01CP301 CEP-A SUCTION PRESS ACROSS STAINER DPG
LCA01CP302 CEP-A SUCTION PRESS PG
LCA01CP303 CEP-A DISCH HDR PRESS PG
LCA01CT301 CEP-A SUCTION TEMP TG
LCA01CT302 CEP-A DISCHARGE TEMP TG
LCA02AA202 CEP-B DIS VLV MOV
LCA02AA212 CEP-B DIS VLV-IBV MOV
LCA02AP001 CEP-B HT
LCA02CF101 CEP-B DISCH FLOW FT
LCA02CF102 CEP-B DISCH FLOW FT
LCA02CP101 CEP-B DISCH HDR PRESS PT
LCA02CP102 CEP-B DISCH HDR PRESS PT
LCA02CP103 CEP-B SUCTION PRESS ACROSS STAINER DPT
LCA02CP301 CEP-B SUCTION PRESS ACROSS STAINER DPG
LCA02CP302 CEP-B SUCTION PRESS PG
LCA02CP303 CEP-B DISCH HDR PRESS PG
LCA02CT301 CEP-B SUCTION TEMP TG
LCA02CT302 CEP-B DISCHARGE TEMP TG
LCA03AA202 CEP-C DIS VLV MOV
LCA03AA212 CEP-C DIS VLV-IBV MOV
LCA03AP001 CEP-C HT
LCA03CF101 CEP-C DISCH FLOW FT
LCA03CF102 CEP-C DISCH FLOW FT
LCA03CP101 CEP-C DISCH HDR PRESS PT
LCA03CP102 CEP-C DISCH HDR PRESS PT
LCA03CP103 CEP-C SUCTION PRESS ACROSS STAINER DPT
LCA03CP301 CEP-C SUCTION PRESS ACROSS STAINER DPG
LCA03CP302 CEP-C SUCTION PRESS PG
LCA03CP303 CEP-C DISCH HDR PRESS PG
LCA03CT301 CEP-C SUCTION TEMP TG
LCA03CT302 CEP-C DISCHARGE TEMP TG
LCA11AA101 CEP-A MIN RECIRC CV CLCS
LCA12AA101 CEP-B MIN RECIRC CV CLCS
LCA13AA101 CEP-C MIN RECIRC CV CLCS
LCA20CF101 COND. FLOW AT GSC O/L FT
LCA20CF102 COND. FLOW AT GSC O/L FT
Thursday, December 09, 2010 Page 3 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LCA20CP101 COND. DISCH HDR PRESS PT
LCA20CP102 COND. DISCH HDR PRESS PT
LCA20CP103 COND. DISCH HDR PRESS PT
LCA20CP301 COND. DISCH HDR PRESS PG
LCA20CP302 COND. PRESS AT GSC O/L PG
LCA20CP303 COND PRESS AFT CPU PG
LCA20CQ101 COND. CAT CONDUCTIVITY CCT
LCA20CQ102 CONDENSATE SODIUM NaT
LCA20CQ103 CONDENSATE DISS O2 DOT
LCA20CQ104 CONDENSATE pH pHT
LCA20CQ105 CONDENSATE CONDUCTVITY CT
LCA20CT101 COND. TEMP AT GSC I/L TE
LCA20CT102 COND. TEMP AT GSC O/L TE
LCA31AA101 GSC MIN RECIRC FLOW CV CLCS
LCA32AA201 GSC MIN RECIRC FLOW BYP VLV MOVI
LCA33AA101 COND TO VALVE GLD SEALING CV CLCS
LCA33CP101 GLAND SEAL WATER HDR PR PT
LCA33CP102 GLAND SEAL WATER HDR PR PT
LCA41AA101 EXCESS COND DUMP TO CST CV CLCS
LCA41CP301 EXCESS COND PR BEF CV 43 PG
LCA41CP302 EXCESS COND PR AFT CV 43 PG
LCA42AA201 EXCESS COND DUMP TO CST BYP VLV MOVI
LCA50CQ101 COND SODIUM AFT CPU NaT
LCA50CQ102 COND SILICA AFT CPU SiT
LCA50CQ103 COND CONDUCTVITY AFT CPU CT
LCA50CQ104 COND pH AFT CPU pHT
LCA50CQ105 COND CAT CONDVTY AFT CPU CCT
LCA51AA101 DEA LVL CONTROL STN MAIN CONT VLV CLCS
LCA51AA201 DEA LVL CONTROL STN MAIN CV ISO VLV MOV
LCA52AA101 DEA LVL CONTROL STN STBY CV CLCS
LCA52AA201 DEA LVL CONTROL STN STBY CV ISO VLV MOV
LCA53AA201 DEA LVL CONTROL STN BYPAS VLV MOVI
LCA61AA201 LPH-1 BYP VLV MOV
LCA62AA201 COND I/L TO DC & LPH-1 ISO VLV MOV
LCA62AA202 COND O/L FROM LPH-1 ISO VLV MOV
LCA62AA211 COND I/L TO DC & LPH-1 ISO VLV-IBV MOV
LCA62CP101 LPH-1 COND I/L PRESS PT
LCA62CP102 LPH-1 COND O/L PRESS PT
LCA62CP103 DRAIN CLR I/L PRESS PT
LCA62CT101 LPH-1 COND I/L TEMP TE
LCA62CT103 DRAIN COOLER I/L TEMP TE
LCA62CT301 DRAIN COOLER I/L TEMP TG
LCA62CT302 DRAIN COOLER O/L TEMP TG
LCA62CT303 LPH-1 COND I/L TEMP TG
LCA62CT304 LPH-1 COND O/L TEMP TG
LCA71AA201 LPH-2 BYP VLV MOVI
Thursday, December 09, 2010 Page 4 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LCA72AA201 COND TO LPH-2 I/L ISO VLV MOV
LCA72AA202 COND FROM LPH-2 O/L ISO VLV MOV
LCA72AA211 COND TO LPH-2 I/L ISO VLV -IBV MOV
LCA72CP101 LPH-2 COND O/L PRESS PT
LCA72CT101 LPH-2 COND I/L TEMP TE
LCA72CT102 LPH-2 COND O/L TEMP TE
LCA72CT301 LPH-2 COND I/L TEMP TG
LCA72CT302 LPH-2 COND O/L TEMP TG
LCA75CP101 LPH-3 COND O/L PRESS PT
LCA75CT101 LPH-3 COND I/L TEMP TE
LCA75CT102 LPH-3 COND O/L TEMP TE
LCA75CT301 LPH-3 COND I/L TEMP TG
LCA75CT302 LPH-3 COND O/L TEMP TG
LCA81AA201 LPH-3 BYP MOVI
LCA82AA201 COND TO LPH-3 I/L ISO VLV MOV
LCA82AA202 COND FROM LPH-3 O/L ISO VLV MOV
LCA82AA211 COND TO LPH-3 I/L ISO VLV-IBV MOV
LCA82CP101 LPH-4 COND O/L PRESS PT
LCA82CT101 LPH-4 COND I/L TEMP TE
LCA82CT102 LPH-4 COND O/L TEMP TE
LCA82CT301 LPH-4 COND I/L TEMP TG
LCA82CT302 LPH-4 COND O/L TEMP TG
LCA90CF101 CONDENSATE FLOW TO DEA FT
LCA90CF102 CONDENSATE FLOW TO DEA FT
LCA90CP101 DEA FEED STR TNK I/L PRESS PT
LCA90CT101 COND. TEMP AT DEA I/L TE
LCA90CT102 COND. TEMP AT DEA I/L TE
LCA90CT103 COND. TEMP AT DEA I/L TE
LCB01AA201 CEP-A VENT TO LPDFT VLV SOV/O/L
LCB02AA201 CEP-B VENT TO LPDFT VLV SOV/O/L
LCB03AA201 CEP-C VENT TO LPDFT VLV SOV/O/L
LCJ 15CT301 GSC I/L TEMP TG
LCJ 15CT302 GSC O/L TEMP TG
LCR34CP101 DM MU TO STATOR WTR COOLING SYS PT
LCR41AA101 DM NORMAL M/U TO HOTWELL CV CLCS
LCR41AA201 DM NORMAL M/U CV ISO VLV MOV
LCR41CF101 NORMAL MU FLOW TO COND FT
LCR41CF102 NORMAL MU FLOW TO COND FT
LCR42AA201 DM NORMAL M/U TO HOTWELL BYP VLV MOVI
LCR80CF101 EMER MU FLOW TO COND FT
LCR80CF102 EMER MU FLOW TO COND FT
LCR80CP101 EMER MU TO COND I/L PRESS PT
LCR81AA101 DM EMERG M/U TO HOTWELL CV CLCS
LCR81AA201 DM EMERG M/U CV ISO VLV MOV
LCR82AA201 DM EMERG M/U TO HOTWELL BYP VLV MOVI
MAG10CL101 HOTWELL LEVEL LT
Thursday, December 09, 2010 Page 5 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
MAG10CL102 HOTWELL LEVEL LT
MAG10CL103 HOTWELL LEVEL LT
MAG10CL104 HOTWELL LEVEL LT
MAG10CL301 HOTWELL LEVEL LG
MAG10CL302 HOTWELL LEVEL LG
MAG10CL303 HOTWELL LEVEL LG
MAG10CL304 HOTWELL LEVEL LG
MAG10CQ101 HOTWELL CONDUCTVTY (L) CT
MAG10CQ102 HOTWELL CONDUCTVTY (R) CT
CW & ACW SYS
PAB11CP011 DP ACROSS COND DPT
PAB11CP501 CONDENSER I/L PRESS PG
PAB11CP502 CONDENSER O/L PRESS PG
PAB11CP511 DP ACROSS COND DPG
PAB11CT001 CONDENSER I/L TEMP TE
PAB11CT002 CONDENSER O/L TEMP TE
PAB11CT501 CONDENSER I/L TEMP TG
PAB11CT502 CONDENSER O/L TEMP TG
PAB12CP011 DP ACROSS COND DPT
PAB12CP501 CONDENSER I/L PRESS PG
PAB12CP502 CONDENSER O/L PRESS PG
PAB12CP511 DP ACROSS COND DPG
PAB12CT001 CONDENSER I/L TEMP TE
PAB12CT002 CONDENSER O/L TEMP TE
PAB12CT501 CONDENSER I/L TEMP TG
PAB12CT502 CONDENSER O/L TEMP TG
PAB31CP511 DP ACROSS PHE A DPS
PAB32CP511 DP ACROSS PHE B DPS
PAB33CP511 DP ACROSS PHE C DPS
PAB41CP511 DP ACROSS VACUUM PMP H EXCH DPS
PAB42CP511 DP ACROSS VACUUM PMP H EXCH DPS
PAB51CP511 DP ACROSS PHE FOR BOILER AUX-1 DPS
PAB52CP511 DP ACROSS PHE FOR BOILER AUX-2 DPS
PCB00CP001 ACW PUMP's I/L PRES PT
PCB00CP002 ACW PUMP's I/L PRES PT
PCB00CP003 ACW PUMP's I/L PRES PT
PCB01CP001 ACW PUMP-A DISCH HDR PRES PT
PCB01CP501 ACW PMP-A SUCTION PRESS PG
PCB01CP502 ACW PMP-A DISCHARGE PRESS PG
PCB02CP001 ACW PUMP-B DISCH HDR PRES PT
PCB02CP501 ACW PMP-B SUCTION PRESS PG
PCB02CP502 ACW PMP-B DISCHARGE PRESS PG
PCB03CP001 ACW PUMP-C DISCH HDR PRES PT
PCB03CP501 ACW PMP-C SUCTION PRESS PG
PCB03CP502 ACW PMP-C DISCHARGE PRESS PG
PCB10CP001 ACW PUMP's O/L PRES PT
Thursday, December 09, 2010 Page 6 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
PCB10CP002 ACW PUMP's O/L PRES PT
PCB10CP003 ACW PUMP's O/L PRES PT
PCB10CP501 ACW PMP DISCHARGE HDR PRESS PG
PCB10CT001 ACW PUMP's O/L TEMP TE
PCB10CT501 ACW PUMP's O/L TEMP TG
PCB20CF001 AUTO SELF CLEANING FLTR O/L FLOW FT
PCB30AA201 ACW PUMPS CMN RECIRC VLV MOV
PCB30CF100 I/L FLOW TO PHE's FOR TG AUX ROTAMETER
PCB31AA201 ACW PUMP-A SUC VLV MOV
PCB31AA202 ACW PUMP-A DIS VLV MOV
PCB31AP001 ACW PUMP-A LT
PCB31CP111 DP ACROSS PHE A DPG
PCB31CT001 PHE A I/L TEMP TE
PCB31CT002 PHE A O/L TEMP TE
PCB31CT501 PHE A I/L TEMP TG
PCB31CT502 PHE A O/L TEMP TG
PCB32AA201 ACW PUMP-B SUC VLV MOV
PCB32AA202 ACW PUMP-B DIS VLV MOV
PCB32AP001 ACW PUMP-B LT
PCB32CP111 DP ACROSS PHE B DPG
PCB32CT001 PHE B I/L TEMP TE
PCB32CT002 PHE B O/L TEMP TE
PCB32CT501 PHE B I/L TEMP TG
PCB32CT502 PHE B O/L TEMP TG
PCB33AA201 ACW PUMP-C SUC VLV MOV
PCB33AA202 ACW PUMP-C DIS VLV MOV
PCB33AP001 ACW PUMP-C LT
PCB33CP111 DP ACROSS PHE C DPG
PCB33CT001 PHE C I/L TEMP TE
PCB33CT002 PHE C O/L TEMP TE
PCB33CT501 PHE C I/L TEMP TG
PCB33CT502 PHE C O/L TEMP TG
PCB40CF100 VACUUM PMP's I/L FLOW ROTAMETER
PCB41CP111 DP ACROSS VACUUM PMP H EXCH DPG
PCB41CP501 I/L PRESS VACUUM PMP H EXCH PG
PCB41CT001 I/L TEMP VACUUM PMP H EXCH TE
PCB41CT002 O/L TEMP VACUUM PMP H EXCH TE
PCB41CT501 I/L TEMP VACUUM PMP H EXCH TG
PCB41CT502 O/L TEMP VACUUM PMP H EXCH TG
PCB42CP111 DP ACROSS VACUUM PMP H EXCH DPG
PCB42CP501 I/L PRESS VACUUM PMP H EXCH PG
PCB42CT001 I/L TEMP VACUUM PMP H EXCH TE
PCB42CT002 O/L TEMP VACUUM PMP H EXCH TE
PCB42CT501 I/L TEMP VACUUM PMP H EXCH TG
PCB42CT502 O/L TEMP VACUUM PMP H EXCH TG
PCB51CF100 I/L FLOW TO PHE-1 FOR BOILER AUX ROTAMETER
Thursday, December 09, 2010 Page 7 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
PCB51CF100 PHE FOR BOILER AUX-1 I/L FLOW FE
PCB51CF501 PHE FOR BOILER AUX-1 I/L FLOW FG
PCB51CP111 DP ACROSS PHE FOR BOILER AUX-1 DPG
PCB51CT001 PHE FOR BOILER AUX-1 I/L TEMP TE
PCB51CT002 PHE FOR BOILER AUX-1 O/L TEMP TE
PCB51CT501 PHE FOR BOILER AUX-1 I/L TEMP TG
PCB51CT502 PHE FOR BOILER AUX-1 O/L TEMP TG
PCB52CF100 PHE FOR BOILER AUX-2 I/L FLOW FE
PCB52CF100 I/L FLOW TO PHE-2 FOR BOILER AUX ROTAMETER
PCB52CF501 PHE FOR BOILER AUX-2 I/L FLOW FG
PCB52CP111 DP ACROSS PHE FOR BOILER AUX-2 DPG
PCB52CT001 PHE FOR BOILER AUX-2 I/L TEMP TE
PCB52CT002 PHE FOR BOILER AUX-2 O/L TEMP TE
PCB52CT501 PHE FOR BOILER AUX-2 I/L TEMP TG
PCB52CT502 PHE FOR BOILER AUX-2 0/L TEMP TG
DM COOLI NG WATER (DMCW) SYS FOR TG AUX
LCP02AA209 DMCW NORMAL M/U TO ECW OH TANK (TG) MOV
LCP02AA210 DMCW EMERG M/U TO ECW O/H TANK (TG) MOV
PGB00AA201 ECW PUMPS (TG) CMN RECIRC VLV MOV
PGB01AA201 ECW PUMP-A (TG) SUC VLV MOV
PGB01AA202 ECW PUMP-A (TG) DIS VLV MOV
PGB01AP001 ECW PUMP-A (TG) HT
PGB01CL001 DMCW OVR HEAD TNK LEVEL LT
PGB01CL002 DMCW OVR HEAD TNK LEVEL LT
PGB01CL501 DMCW OVR HEAD TNK LEVEL LG
PGB02AA201 ECW PUMP-B (TG) SUC VLV MOV
PGB02AA202 ECW PUMP-B (TG) DIS VLV MOV
PGB02AP001 ECW PUMP-B (TG) HT
PGB03AA201 ECW PUMP-C (TG) SUC VLV MOV
PGB03AA202 ECW PUMP-C (TG) DIS VLV MOV
PGB03AP001 ECW PUMP-C (TG) HT
PGB04AA101 ECW PUMP-(TG) I/O HDR DP CV CLCS
PGB41AA201 MDBFP-C CW VALVE MOV
PGC00CF100 DMCW PMP's I/L FLOW ROTAMETER
PGC00CP001 DMCW TNK O/L PRESS PT
PGC00CP002 DMCW TNK O/L PRESS PT
PGC00CP003 DMCW TNK O/L PRESS PT
PGC00CP501 DMCW TNK O/L PRESS PG
PGC00CT501 DMCW TNK O/L TEMP TG
PGC01CP001 DMCW PMP-A DISCH PRESS PT
PGC01CP501 DMCW PMP-A SUCTION PRESS PG
PGC01CP502 DMCW PMP-A DISCH PRESS PG
PGC02CP001 DMCW PMP-B DISCH PRESS PT
PGC02CP501 DMCW PMP-B SUCTION PRESS PG
PGC02CP502 DMCW PMP-B DISCH PRESS PG
PGC03CP001 DMCW PMP-C DISCH PRESS PT
Thursday, December 09, 2010 Page 8 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
PGC03CP501 DMCW PMP-C SUCTION PRESS PG
PGC03CP502 DMCW PMP-C DISCH PRESS PG
PGC10CF001 DMCW PMP's O/L FLOW FT
PGC10CP001 DMCW PMP HDR DISCH PRESS PT
PGC10CP002 DMCW PMP HDR DISCH PRESS PT
PGC10CP003 DMCW PMP HDR DISCH PRESS PT
PGC10CP501 DMCW PMP HDR DISCH PRESS PG
PGC10CQ001 DMCW PMP's DISCHARGE pH pHT
PGC10CT001 DMCW PMP HDR O/L TEMP TE
PGC10CT501 DMCW PMP's O/L TEMP TG
PGC11CP101 DPS ACROSS PHE-A DPS
PGC11CP551 DP ACROSS PHE-A DPG
PGC11CT001 PHE-A O/L TEMP TE
PGC11CT501 PHE-A I/L TEMP TG
PGC11CT502 PHE-A O/L TEMP TG
PGC12CP101 DPS ACROSS PHE-B DPS
PGC12CP551 DP ACROSS PHE-B DPG
PGC12CT001 PHE-B O/L TEMP TE
PGC12CT501 PHE-B I/L TEMP TG
PGC12CT502 PHE-B O/L TEMP TG
PGC13CP101 DPS ACROSS PHE-C DPS
PGC13CP551 DP ACROSS PHE-C DPG
PGC13CT001 PHE-C O/L TEMP TE
PGC13CT501 PHE-C I/L TEMP TG
PGC13CT502 PHE-C O/L TEMP TG
PGC15CP011 DP ACROSS I/L DMCW PMP's AND O/L OF PHE DPT
PGC15CP012 DP ACROSS I/L DMCW PMP's AND O/L OF PHE DPT
PGC15CP511 DP ACROSS I/L DMCW PMP's AND O/L OF PHE DPG
PGC20CP001 PHE DISCH PRESS PT
PGC20CP501 PHE DISCH PRESS PG
PGC20CT001 PHE HDR O/L TEMP TE
PGC20CT501 PHE HDR O/L TEMP TG
PGC30CP001 PRESS AT I/L HDR OF BFP MTR AND DUPLEX WRK OIL CLR PT
PGH10CP501 TURBINE OIL CLR I/L PRESS PG
PGH10CP502 TURBINE OIL CLR O/L PRESS PG
PGH10CT501 TURBINE OIL CLR I/L TEMP TG
PGH10CT502 TURBINE OIL CLR O/L TEMP TG
PGH20CF100 OIL CLR's I/L FLOW ROTAMETER
PGH21CP501 HYDROGEN CLR I/L PRESS PG
PGH21CP502 HYDROGEN CLR O/L PRESS PG
PGH21CT501 HYDROGEN CLR I/L TEMP TG
PGH21CT502 HYDROGEN CLR O/L TEMP TG
PGH22CP501 PRIMARY WTR CLR I/L PRESS PG
PGH22CP502 PRIMARY WTR CLR O/L PRESS PG
PGH22CT501 PRIMARY WTR CLR I/L TEMP TG
PGH22CT502 PRIMARY WTR CLR O/L TEMP TG
Thursday, December 09, 2010 Page 9 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
PGH23CP501 SEAL OIL CLR I/L PRESS PG
PGH23CP502 SEAL OIL CLR O/L PRESS PG
PGH23CT501 SEAL OIL CLR I/L TEMP TG
PGH23CT502 SEAL OIL CLR O/L TEMP TG
PGH24CP501 CLR FOR HPSU I/L PRESS PG
PGH24CP502 CLR FOR HPSU O/L PRESS PG
PGH24CT501 CLR FOR HPSU I/L TEMP TG
PGH24CT502 CLR FOR HPSU O/L TEMP TG
PGH25CP501 CLR FOR HPSU (LPBV) I/L PRESS PG
PGH25CP502 CLR FOR HPSU (LPBV) O/L PRESS PG
PGH25CT501 CLR FOR HPSU (LPBV) I/L TEMP TG
PGH25CT502 CLR FOR HPSU (LPBV) O/L TEMP TG
PGL00CF100 COMBINE BFP CLR's I/L FLOW ROTAMETER
PGL11CP501 TD-BFP-A TURB OIL CLR I/L PRESS PG
PGL11CP502 TD-BFP-A TURB OIL CLR O/L PRESS PG
PGL11CT501 TD-BFP-A TURB OIL CLR I/L TEMP TG
PGL11CT502 TD-BFP-A TURB OIL CLR O/L TEMP TG
PGL12CP501 BSTR PMP-A SEAL J KT CLR I/L PRESS PG
PGL12CP502 BSTR PMP-A SEAL J KT CLR O/L PRESS PG
PGL12CT501 BSTR PMP-A SEAL J KT CLR I/L TEMP TG
PGL12CT502 BSTR PMP-A SEAL J KT CLR O/L TEMP TG
PGL13CP501 TD-BFP-A SEAL J KT. CLR I/L PRESS PG
PGL13CP502 TD-BFP-A SEAL J KT. CLR O/L PRESS PG
PGL13CT501 TD-BFP-A SEAL J KT. CLR I/L TEMP TG
PGL13CT502 TD-BFP-A SEAL J KT. CLR O/L TEMP TG
PGL21CP501 TD-BFP-B TURB OIL CLR I/L PRESS PG
PGL21CP502 TD-BFP-B TURB OIL CLR O/L PRESS PG
PGL21CT501 TD-BFP-B TURB OIL CLR I/L TEMP TG
PGL21CT502 TD-BFP-B TURB OIL CLR O/L TEMP TG
PGL22CP501 BSTR PMP-B SEAL J KT CLR I/L PRESS PG
PGL22CP502 BSTR PMP-B SEAL J KT CLR O/L PRESS PG
PGL22CT501 BSTR PMP-B SEAL J KT CLR I/L TEMP TG
PGL22CT502 BSTR PMP-B SEAL J KT CLR O/L TEMP TG
PGL23CP501 TD-BFP-B SEAL J KT. CLR I/L PRESS PG
PGL23CP502 TD-BFP-B SEAL J KT. CLR O/L PRESS PG
PGL23CT501 TD-BFP-B SEAL J KT. CLR I/L TEMP TG
PGL23CT502 TD-BFP-B SEAL J KT. CLR O/L TEMP TG
PGL31CP501 COOLING DUPLEX WORKING OIL CLR I/L PRESS PG
PGL31CP502 COOLING DUPLEX WORKING OIL CLR O/L PRESS PG
PGL31CP503 COOLING DUPLEX WORKING OIL CLR I/L PRESS PG
PGL31CP504 COOLING DUPLEX WORKING OIL CLR O/L PRESS PG
PGL31CT501 COOLING DUPLEX WORKING OIL CLR I/L TEMP TG
PGL31CT502 COOLING DUPLEX WORKING OIL CLR O/L TEMP TG
PGL31CT503 COOLING DUPLEX WORKING OIL CLR I/L TEMP TG
PGL31CT504 COOLING DUPLEX WORKING OIL CLR O/L TEMP TG
PGL32CP501 BFP MTR CLR I/L PRESS PG
Thursday, December 09, 2010 Page 10 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
PGL32CP502 BFP MTR CLR CLR O/L PRESS PG
PGL32CP503 BFP MTR CLR I/L PRESS PG
PGL32CP504 BFP MTR CLR O/L PRESS PG
PGL32CT501 BFP MTR CLR I/L TEMP TG
PGL32CT502 BFP MTR CLR O/L TEMP TG
PGL32CT503 BFP MTR CLR I/L TEMP TG
PGL32CT504 BFP MTR CLR O/L TEMP TG
PGL33CP501 COOLING DUPLEX LUBE OIL CLR I/L PRESS PG
PGL33CP502 COOLING DUPLEX LUBE OIL CLR O/L PRESS PG
PGL33CP503 COOLING DUPLEX LUBE OIL CLR I/L PRESS PG
PGL33CP504 COOLING DUPLEX LUBE OIL CLR O/L PRESS PG
PGL33CT501 COOLING DUPLEX LUBE OIL CLR I/L TEMP TG
PGL33CT502 COOLING DUPLEX LUBE OIL CLR O/L TEMP TG
PGL33CT503 COOLING DUPLEX LUBE OIL CLR I/L TEMP TG
PGL33CT504 COOLING DUPLEX LUBE OIL CLR O/L TEMP TG
PGL34CP501 MD-BOOSTER PMP SUCTION PRESS PG
PGL34CP502 MD-BOOSTER PMP DISCH PRESS PG
PGL34CT501 MD-BOOSTER PMP I/L TEMP TG
PGL34CT502 MD-BOOSTER PMP O/L TEMP TG
PGL35CP501 MD-BFP SEAL J KT. CLR I/L PRESS PG
PGL35CP502 MD-BFP SEAL J KT. CLR O/L PRESS PG
PGL35CT501 MD-BFP SEAL J KT. CLR I/L TEMP TG
PGL35CT502 MD-BFP SEAL J KT. CLR O/L TEMP TG
PGL41CP501 CEP-C I/L PRESS PG
PGL41CP502 CEP-C O/L PRESS PG
PGL41CT501 CEP-C I/L TEMP TG
PGL41CT502 CEP-C O/L TEMP TG
PGL42CP501 CEP-B I/L PRESS PG
PGL42CP502 CEP-B O/L PRESS PG
PGL42CT501 CEP-B I/L TEMP TG
PGL42CT502 CEP-B O/L TEMP TG
PGL43CP501 CEP-A I/L PRESS PG
PGL43CP502 CEP-A O/L PRESS PG
PGL43CT501 CEP-A I/L TEMP TG
PGL43CT502 CEP-A O/L TEMP TG
DRAI NI NG AND MAKEUP SYS OF LUB OI L RESERVI ORS
MTV90AP005 BFPDT-A DRAIN OIL PUMP LT
MTV91AP005 BFPDT-B DRAIN OIL PUMP LT
EXTRACTI ON STEAM SYS FOR BFP TURBI NE
LBG60AA201 BFPDT-A AUX STM BLK VLV MOV
LBG60CT103 AUX STM TEMP TO TBFP-A TE
LBG61AA201 BFPDT-B AUX STM BLK VLV MOV
LBG61CT103 AUX STM TEMP TO TBFP-B TE
LBQ72AA201 BFPDT-A CRH STM BLK VLV MOV
LBQ72AA202 BFPDT-A AUX CV WARMUP VLV MOV
LBQ73AA201 BFPDT-B CRH STM BLK VLV MOV
Thursday, December 09, 2010 Page 11 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LBQ73AA202 BFPDT-B AUX CV WARMUP VLV MOV
LBS42AA201 EXT-4 STM TO BFPDT-A & B BLK VLV MOV
LBS42CP101 IPT EXHAUST PRESS TO COM I/L OF BFP PT
LBS42CT101 IPT EXHAUST TEMP TO COM I/L OF BFP TE
LBS42CT301 IPT EXHAUST TEMP TO COM I/L OF BFP TG
LBS43AA201 BFPDT-A VENT VLV U/S OF ESV MOV
LBS43CF101 STM FLOW TO TBFP-A FT
LBS43CF102 STM FLOW TO TBFP-A FT
LBS43CP151 BFP-A I/L PRESS PT
LBS43CP152 BFP-A I/L PRESS PT
LBS43CP153 BFP-A I/L PRESS PT
LBS43CP154 BFP-A I/L PRESS PT
LBS43CP351 BFP-A I/L PRESS PG
LBS43CT151 BFP-A I/L TEMP TE
LBS43CT152 BFP-A I/L TEMP TE
LBS43CT351 BFP-A I/L TEMP TG
LBS44AA201 BFPDT-B VENT VLV U/S OF ESV MOV
LBS44CF151 STM FLOW TO TBFP-B FT
LBS44CF152 STM FLOW TO TBFP-B FT
LBS44CP151 BFP-B I/L PRESS PT
LBS44CP152 BFP-B I/L PRESS PT
LBS44CP153 BFP-B I/L PRESS PT
LBS44CP154 BFP-B I/L PRESS PT
LBS44CP351 BFP-B I/L PRESS PG
LBS44CT151 BFP-B I/L TEMP TE
LBS44CT152 BFP-B I/L TEMP TE
LBS44CT351 BFP-B I/L TEMP TG
LBS45AA201 BFPDT-A EXHAUST STM VALVE TO COND MOV
LBS45CP158 BFP-A O/L PRESS PT
LBS45CP159 BFP-A O/L PRESS PT
LBS45CP160 BFP-A O/L PRESS PT
LBS45CP356 BFP-A O/L PRESS PG
LBS45CT157 BFP-A O/L TEMP TE
LBS45CT158 BFP-A O/L TEMP TE
LBS45CT159 BFP-A O/L TEMP TE
LBS45CT354 BFP-A O/L TEMP TG
LBS46AA201 BFPDT-B EXHAUST STM VALVE TO COND MOV
LBS46CP158 BFP-B O/L PRESS PT
LBS46CP159 BFP-B O/L PRESS PT
LBS46CP160 BFP-B O/L PRESS PT
LBS46CP356 BFP-B O/L PRESS PG
LBS46CT157 BFP-B O/L TEMP TE
LBS46CT158 BFP-B O/L TEMP TE
LBS46CT159 BFP-B O/L TEMP TE
LBS46CT354 BFP-B O/L TEMP TG
MTA01CT160 BFP-A TEMP TE
Thursday, December 09, 2010 Page 12 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
MTA01CT161 BFP-A TEMP TE
MTA02CT160 BFP-B TEMP TE
MTA02CT161 BFP-B TEMP TE
EXTRACTI ON STEAM SYS FOR HEATERS
LAA01CP011 DEA PRESS PT
LAA01CP012 DEA PRESS PT
LAA01CP501 DEA PRESS PG
LAA01CT503 FEED STR TNK TEMP TG
LAA01CT504 FEED STR TNK TEMP TG
LAA01CT505 DEA SHELL TEMP TG
LAD01CP501 HPH-6A PRESS PG
LAD02CP501 HPH-6B PRESS PG
LAD03CP511 HPH-7A PRESS PG
LAD04CP501 HPH-7B PRESS PG
LAD05CP501 HPH-8A PRESS PG
LAD06CP501 HPH-8B PRESS PG
LBG40CP501 DESUPERHEATER TO MAIN TURBINE PRESS PG
LBG40CT001 DESUPERHEATER TO MAIN TURBINE TEMP TE
LBG40CT002 DESUPERHEATER TO MAIN TURBINE TEMP TE
LBG40CT501 DESUPERHEATER TO MAIN TURBINE TEMP TG
LBG51AA101 AUX STEAM TO D/A PEGG CV CLCS
LBG52AA201 AUX STEAM TO D/A PEGG BYP VLV MOVI
LBG53AA201 AUX STM TO D/A INITIAL HEATING VLV MOVI
LBG58AA101 CRH TO TURBINE GLAND SEAL ISO VLV MOV
LBQ10CP011 CRH LINE PRESS PT
LBQ10CT011 CRH LINE TEMP TE
LBQ11AA101 CRH STM TO D/A PEGG CV CLCS
LBQ12AA201 CRH STM TO D/A PEGG BYP VLV MOVI
LBQ50CP001 HPH-6A & 6B I/L PRESS PT
LBQ50CP511 HPH-6A I/L PRESS PG
LBQ50CT001 HPH-6A & 6B I/L TEMP TE
LBQ50CT511 HPH-6A I/L TEMP TG
LBQ51AA202 EXTN STM TO HPH-5A ISO VLV MOV
LBQ51CP011 HPH-6A I/L PRESS PT
LBQ51CP511 HPH-6A I/L PRESS PG
LBQ51CT011 HPH-6A I/L TEMP TE
LBQ51CT501 HPH-6A I/L TEMP TG
LBQ52AA202 EXTN STM TO HPH-5B ISO VLV MOV
LBQ52CP011 HPH-6B I/L PRESS PT
LBQ52CP511 HPH-6B I/L PRESS PG
LBQ52CT011 HPH-6B I/L TEMP TE
LBQ52CT501 HPH-6B I/L TEMP TG
LBQ61AA202 EXTN STM TO HPH-6A ISO VLV MOV
LBQ61CP011 HPH-7A I/L PRESS PT
LBQ61CP511 HPH-7A I/L PRESS PG
LBQ61CT011 HPH-7A I/L TEMP TE
Thursday, December 09, 2010 Page 13 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LBQ61CT501 HPH-7A I/L TEMP TG
LBQ62AA202 EXTN STM TO HPH-6B ISO VLV MOV
LBQ62CP011 HPH-7B I/L PRESS PT
LBQ62CP511 HPH-7B I/L PRESS PG
LBQ62CT011 HPH-7B I/L TEMP TE
LBQ62CT501 HPH-7B I/L TEMP TG
LBQ71AA212 EXTN STM TO HPH-7A ISO VLV MOV
LBQ71CP011 HPH-8A I/L PRESS PT
LBQ71CP511 HPH-8A I/L PRESS PG
LBQ71CT011 HPH-8A I/L TEMP TE
LBQ71CT501 HPH-8A I/L TEMP TG
LBQ72AA212 EXTN STM TO HPH-7B ISO VLV MOV
LBQ72CP011 HPH-8B I/L PRESS PT
LBQ72CP511 HPH-8B I/L PRESS PG
LBQ72CT011 HPH-8B I/L TEMP TE
LBQ72CT501 HPH-8B I/L TEMP TG
LBS11CP011 LPH-2 I/L STM PRESS PT
LBS11CP021 LPH-1 I/L PRESS PT
LBS11CP501 LPH-2 PRESS PG
LBS11CP512 LPH-2 I/L STM PRESS PG
LBS11CT011 LPH-2 I/L STM TEMP TE
LBS11CT512 LPH-2 I/L STM TEMP TG
LBS21AA201 EXTN STM TO LPH-2 ISO VLV MOV
LBS21CP011 LPH-3 I/L STM PRESS PT
LBS21CP501 LPH-3 PRESS PG
LBS21CP512 LPH-3 I/L STM PRESS PG
LBS21CT011 LPH-3 I/L STM TEMP TE
LBS21CT512 LPH-3 I/L STM TEMP TG
LBS22CP001 LP EXT STM TO LPH-2 PRESS PT
LBS22CT001 LP EXT STM TO LPH-2 TEMP TE
LBS31AA201 EXTN STM TO LPH-3 ISO VLV MOV
LBS31CP011 LPH-4 I/L STM PRESS PT
LBS31CP501 LPH-4 PRESS PG
LBS31CP512 LPH-4 I/L STM PRESS PG
LBS31CT011 LPH-4 I/L STM TEMP TE
LBS31CT512 LPH-4 I/L STM TEMP TG
LBS32CP001 LP EXT STM TO LPH-3 PRESS PT
LBS32CT001 LP EXT STM TO LPH-3 TEMP TE
LBS40CP001 IP EXT STM TO DEA PRESS-1 PT
LBS40CP002 IP EXT STM TO DEA PRESS-2 PT
LBS40CT001 IP EXT STM TEMP TE
LBS40CT501 IP TURBINE EXT STEAM TEMP TG
LBS41AA201 EXTN STM TO D/A ISO VLV MOV
LBS41CF011 STM FLOW TO DEA FT
LBS41CF012 STM FLOW TO DEA FT
LBS41CP002 DIFF PRESS ACROSS EXV-6 DPT
Thursday, December 09, 2010 Page 14 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LBS41CP011 DEAERTOR I/L PRESS PT
LBS41CP511 DEAERTOR I/L PRESS PG
LBS41CP511 DEAERTOR I/L PRESS PG
LBS41CT011 STM TEMP TO DEA TE
LBS41CT511 STM TEMP TO DEA TG
LBS42CP511 BFP TURBINES I/L PRESS PG
LCC01CP002 LP HEATER-1 SHELL press. PT
LCC01CP531 LPH-1 PRESS PG
LCC01CT521 LPH-1 SHELL TEMP TG
LCM50CL501 FW HTR SV DISCH FT LVL LG
LCM50CT501 FW HTR SV DFT TEMP TG
FEED WATER SYS
LAB10CF011 BFP-A SUCTION FLOW FT
LAB10CF012 BFP-A SUCTION FLOW FT
LAB10CF013 BFP-A SUCTION FLOW FT
LAB10CP011 BP-A SUCTION PRESS PT
LAB10CP020 BP-A STAINER DIFF PRESS DPT
LAB10CP021 BFP-A SUCTION PRESS PT
LAB10CP021 CONICAL STRAINER BP-A DISCHARGE DIFF PRESS DPT
LAB10CP022 BFP-A SUCTION PRESS PT
LAB10CP023 BFP-A DISCHARGE PRESS PT
LAB10CP024 BFP-A DISCHARGE PRESS PT
LAB10CP501 BP-A SUCTION PRESS PG
LAB10CP502 BP-A DISCHARGE PRESS PG
LAB10CP503 BFP-A SUCTION PRESS PG
LAB10CP504 BFP-A DISCHARGE PRESS PG
LAB10CP520 BP-A STAINER DIFF PRESS DPG
LAB10CP521 CONICAL STRAINER BP-A DISCHARGE DIFF PRESS DPG
LAB10CQ012 DISSOLVED O2 AT DEA O/L DOT
LAB10CQ013 pH AT DEA O/L pH
LAB10CT011 BP-A SUCTION TEMP TE
LAB10CT012 BP-A SUCTION TEMP
LAB10CT013 BP-A DISCHARGE TEMP TE
LAB10CT020 BFP-A SUCTION TEMP TE
LAB10CT021 BFP-A SUCTION TEMP TE
LAB10CT022 BFP-A SUCTION TEMP TE
LAB10CT023 BFP-A DISCHARGE TEMP TE
LAB10CT024 BFP-A DISCHARGE TEMP TE
LAB10CT025 BFP-A DISCHARGE TEMP TE
LAB10CT520 BFP-A SUCTION TEMP TG
LAB10CT521 BFP-A DISCHARGE TEMP TG
LAB11AA201 AMMONIA DOSING AT BFP A SUC VLV MOV
LAB11AA202 HYDRAZINE DOSING AT BFP A SUC VLV MOV
LAB11AA203 O2 DOSING AT BFP D SUC VLV MOV
LAB11AA203 O2 DOSING AT BFP A SUC VLV MOV
LAB12AA201 AMMONIA DOSING AT BFP B SUC VLV MOV
Thursday, December 09, 2010 Page 15 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAB12AA202 HYDRAZINE DOSING AT BFP B SUC VLV MOV
LAB12AA203 O2 DOSING AT BFP B SUC VLV MOV
LAB13AA201 AMMONIA DOSING AT BFP C SUC VLV MOV
LAB13AA202 HYDRAZINE DOSING AT BFP C SUC VLV MOV
LAB13AA203 O2 DOSING AT BFP C SUC VLV MOV
LAB14AA201 AMMONIA DOSING AT BFP D SUC VLV MOV
LAB14AA202 HYDRAZINE DOSING AT BFP D SUC VLV MOV
LAB20CF011 BFP-B SUCTION FLOW FT
LAB20CF012 BFP-B SUCTION FLOW FT
LAB20CF013 BFP-B SUCTION FLOW FT
LAB20CP011 BP-B SUCTION PRESS PT
LAB20CP020 BP-B STAINER DIFF PRESS DPT
LAB20CP021 CONICAL STRAINER BP-B DISCHARGE DIFF PRESS DPT
LAB20CP021 BFP-B SUCTION PRESS PT
LAB20CP022 BFP-B SUCTION PRESS PT
LAB20CP023 BFP-B DISCHARGE PRESS PT
LAB20CP024 BFP-B DISCHARGE PRESS PT
LAB20CP501 BP-B SUCTION PRESS PG
LAB20CP502 BP-B DISCHARGE PRESS PG
LAB20CP503 BFP-B SUCTION PRESS PG
LAB20CP504 BFP-B DISCHARGE PRESS PG
LAB20CP520 BP-B STAINER DIFF PRESS DPG
LAB20CP521 CONICAL STRAINER BP-B DISCHARGE DIFF PRESS DPG
LAB20CT011 BP-B SUCTION TEMP TE
LAB20CT012 BP-B SUCTION TEMP
LAB20CT013 BP-B DISCHARGE TEMP TE
LAB20CT020 BFP-B SUCTION TEMP TE
LAB20CT021 BFP-B SUCTION TEMP TE
LAB20CT022 BFP-B SUCTION TEMP TE
LAB20CT023 BFP-B DISCHARGE TEMP TE
LAB20CT024 BFP-B DISCHARGE TEMP TE
LAB20CT025 BFP-B DISCHARGE TEMP TE
LAB20CT520 BFP-B SUCTION TEMP TG
LAB20CT521 BFP-B DISCHARGE TEMP TG
LAB21AA201 TDBFP-A DIS VLV MOV
LAB21AA202 TDBFP-A MIN RECIRC VLV SOV/O/L
LAB21AA211 TDBFP-A DIS VLV-IBV MOV
LAB22AA201 TDBFP-B DIS VLV MOV
LAB22AA202 TDBFP-B MIN RECIRC VLV SOV/O/L
LAB22AA211 TDBFP-B DIS VLV-IBV MOV
LAB23AA201 MDBFP-C DIS VLV-MAIN MOV
LAB23AA202 MDBFP-C MIN REC VLV SOV/O/L
LAB23AA211 MDBFP-C DIS VLV-IBV MOV
LAB24AA201 MDBFP-D DIS VLV-MAIN MOV
LAB24AA202 MDBFP-D MIN REC VLV SOV/O/L
LAB24AA211 MDBFP-D DIS VLV-IBV MOV
Thursday, December 09, 2010 Page 16 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAB24CP101 TO RH SPRAY PRESS PT
LAB24CT101 RH SPRAY LIME TEMP TE
LAB30AA101 FW TO HPH (30% CAP LINE) MAIN CV CLCS
LAB30AA102 FW TO HPH (30% CAP LINE) ISO VLV U/S OF CV MOV
LAB30AA103 FW TO HPH (30% CAP LINE) ISO VLV D/S OF CV MOV
LAB30AA112 FW TO HPH (30% CAP LINE) ISO VLV U/S OF CV-IBV MOV
LAB30AA113 FW TO HPH (30% CAP LINE) ISO VLV D/S OF CV-IBV MOV
LAB30AA201 FW TO HPH (50% CAP LINE 1) ISO VLV MOV
LAB30AA201 FW TO HPH (50% CAP LINE 2) ISO VLV MOV
LAB30AA211 FW TO HPH (50% CAP LINE 1) ISO VLV-IBV MOV
LAB30AA212 FW TO HPH (50% CAP LINE 2) ISO VLV-IBV MOV
LAB30CF011 BFP-C SUCTION FLOW FT
LAB30CF012 BFP-C SUCTION FLOW FT
LAB30CF013 BFP-C SUCTION FLOW FT
LAB30CP011 DIFF PRESS ACROSS FDV14 DPT
LAB30CP012 DIFF PRESS ACROSS FDV14 DPT
LAB30CP013 DIFF PRESS ACROSS FDV14 DPT
LAB30CP014 FW DISCHARGE HDR PRESS PT
LAB30CP015 FW DISCHARGE HDR PRESS PT
LAB30CP016 FW DISCHARGE HDR PRESS PT
LAB30CP020 BP-C STAINER DIFF PRESS DPT
LAB30CP021 BFP-C SUCTION PRESS PT
LAB30CP021 CONICAL STRAINER BP-C DISCHARGE DIFF PRESS DPT
LAB30CP022 BFP-C SUCTION PRESS PT
LAB30CP023 BFP-C DISCHARGE PRESS PT
LAB30CP024 BFP-C DISCHARGE PRESS PT
LAB30CP501 BP-C SUCTION PRESS PG
LAB30CP502 BP-C DISCHARGE PRESS PG
LAB30CP503 BFP-C SUCTION PRESS PG
LAB30CP504 BFP-C DISCHARGE PRESS PG
LAB30CP511 FW DISCHARGE HDR PRESS PG
LAB30CP512 FW DISCHARGE HDR PRESS PG
LAB30CP513 FW DISCHARGE HDR PRESS PG
LAB30CP520 BP-C STAINER DIFF PRESS DPG
LAB30CP521 CONICAL STRAINER BP-C DISCHARGE DIFF PRESS DPG
LAB30CQ011 FW DISCHARGE pH pH
LAB30CT011 BP-C SUCTION TEMP TE
LAB30CT012 BP-C SUCTION TEMP TE
LAB30CT013 BP-C DISCHARGE TEMP TE
LAB30CT014 FW DISCHARGE HDR TEMP TE
LAB30CT020 BFP-C SUCTION TEMP TE
LAB30CT021 BFP-C SUCTION TEMP TE
LAB30CT022 BFP-C SUCTION TEMP TE
LAB30CT023 BFP-C DISCHARGE TEMP TE
LAB30CT024 BFP-C DISCHARGE TEMP TE
LAB30CT025 BFP-C DISCHARGE TEMP TE
Thursday, December 09, 2010 Page 17 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAB30CT520 BFP-C SUCTION TEMP TG
LAB30CT521 BFP-C DISCHARGE TEMP TG
LAB31AA201 HPH-5A I/L ISO VLV MOV
LAB31AA202 HPH-7A O/L ISO VLV MOV
LAB31AA211 HPH-5A I/L ISO VLV-IBV MOV
LAB31AA212 HPH-7A O/L ISO VLV-IBV MOV
LAB32AA201 HPH-5B I/L ISO VLV MOV
LAB32AA202 HPH-7B O/L ISO VLV MOV
LAB32AA211 HPH-5B I/L ISO VLV-IBV MOV
LAB32AA212 HPH-7B O/L ISO VLV-IBV MOV
LAB33AA201 HPH FW 50% BYP VLV MOV
LAB33AA211 HPH FW 50% BYP IBV MOV
LAB34AA201 HPH FW 50% BYP VLV MOV
LAB34AA211 HPH FW 50% BYP-IBV MOV
LAB41AA101 LOW LOAD FEED CNTRL STATION VLV CLCS
LAB41AA201 LOW LOAD FEED CNTRL STN I/L ISO VLV MOV
LAB41AA202 LOW LOAD FEED CNTRL STN O/L ISO VLV MOV
LAB41AA211 LOW LOAD FEED CNTRL STN I/L ISO-IBV MOV
LAB41AA212 LOW LOAD FEED CNTRL STN O/L ISO-IBV MOV
LAB41CP011 I/L PRESS. OF HP HEATER 6A PT
LAB41CT011 I/L TEMP. OF HP HEATER 6A TE
LAB41CT511 I/L TEMP. OF HP HEATER 6A TG
LAB42AA201 FEED CNTRL STN MAIN VLV MOV
LAB42AA211 FEED CNTRL STN MAIN VLV-IBV MOV
LAB42CP011 I/L PRESS OF HP HEATER 7A PT
LAB42CP511 I/L PRESS OF HP HEATER 7A PG
LAB42CT011 I/L TEMP. OF HP HEATER 7A TE
LAB42CT511 I/L TEMP. OF HP HEATER 7A TG
LAB43CP011 I/L PRESS OF HP HEATER 8A PT
LAB43CP511 I/L PRESS OF HP HEATER 8A PG
LAB43CT011 I/L TEMP. OF HP HEATER 8A TE
LAB43CT511 I/L TEMP. OF HP HEATER 8A TG
LAB44CP011 O/L PRESS OF HP HEATER 8A PT
LAB44CP511 O/L PRESS OF HP HEATER 8A PG
LAB44CT011 O/L TEMP. OF HP HEATER 8A TE
LAB44CT511 O/L TEMP. OF HP HEATER 8A TG
LAB45CP011 I/L PRESS OF HP HEATER 6B PT
LAB45CT011 I/L TEMP. OF HP HEATER 6B TE
LAB45CT511 I/L TEMP. OF HP HEATER 6B TG
LAB46CP011 I/L PRESS OF HP HEATER 7B PT
LAB46CP511 I/L PRESS OF HP HEATER 7B PG
LAB46CT011 I/L TEMP. OF HP HEATER 7B TE
LAB46CT511 I/L TEMP. OF HP HEATER 7B TG
LAB47CP011 I/L PRESS OF HP HEATER 8B PT
LAB47CP511 I/L PRESS OF HP HEATER 8B PG
LAB47CT011 I/L TEMP. OF HP HEATER 8B TE
Thursday, December 09, 2010 Page 18 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAB47CT511 I/L TEMP. OF HP HEATER 8B TG
LAB48CP011 O/L PRESS OF HP HEATER 8B PT
LAB48CP511 O/L PRESS OF HP HEATER 8B PG
LAB48CT011 O/L TEMP. OF HP HEATER 8B TE
LAB48CT511 O/L TEMP. OF HP HEATER 8B TG
LAB50AA101 FW TO S/H SPRAY I/C VLV MOV
LAB50AA102 BFP CMN DISCH TO S/H SPRAY I/C VLV MOV
LAB60CF011 ECO I/L FLOW FT
LAB60CF012 ECO I/L FLOW FT
LAB60CF013 ECO I/L FLOW FT
LAB60CP501 ECO I/L FLOW PRESS PG
LAB60CP512 ECO I/L FLOW PRESS PG
LAB60CT011 ECO I/L TEMP TE
LAB60CT012 ECO I/L TEMP TE
LAB60CT013 ECO I/L TEMP TE
LAC03AP001 MDBFP-C HT
LAC04AP001 MDBFP-D HT
LAC10CP001 BFP-A LEAK OFF PRESS PT
LAC10CP505 BFP-A LEAK OFF PRESS PG
LAC20CP001 BFP-B LEAK OFF PRESS PT
LAC20CP505 BFP-B LEAK OFF PRESS PG
LAC30CP001 BFP-C LEAK OFF PRESS PT
LAC30CP505 BFP-C LEAK OFF PRESS PG
GOVERNI NG SCHEME FOR BFPDT
LAC21AP001 TDBFP-A SPEED CLCS
LAC22AP001 TDBFP-B SPEED CLCS
XAV43AA011 BFPDT-A TRIP SOLENOID-1 SOV/O/L
XAV43AA012 BFPDT-A TRIP SOLENOID-2 SOV/O/L
XAV43AA013 BFPDT-A REMOTE ENGAGE SOLENOID SOV/O/L
XAV46AA011 BFPDT-B TRIP SOLENOID-1 SOV/O/L
XAV46AA012 BFPDT-B TRIP SOLENOID-2 SOV/O/L
XAV46AA013 BFPDT-B REMOTE ENGAGE SOLENOID SOV/O/L
HEATER DRAI NS & VENT SYS
LAA01AA202 D/A VENT TO ATMOSPHERE VLV MOV
LAA01AA203 D/A VENT TO ATMOSPHERE VLV MOV
LAA01AA204 D/A VENT TO ATMOSPHERE VLV MOV
LAA01AA205 D/A VENT TO ATMOSPHERE VLV MOV
LAA01AA206 D/A VENT TO ATMOSPHERE VLV MOV
LAD01AA201 HPH-5A VENT TO HPDFT VLV MOV
LAD02AA201 HPH-5B VENT TO HPDFT VLV MOV
LAD03AA201 HPH-6A VENT TO HPDFT VLV MOV
LAD04AA201 HPH-6B VENT TO HPDFT VLV MOV
LAD05AA201 HPH-7A VENT TO HPDFT VLV MOV
LAD06AA201 HPH-7B VENT TO HPDFT VLV MOV
LAD12CL011 HPH-6A LEVEL MEASUREMENT LT
LAD12CL012 HPH-6A LEVEL MEASUREMENT LT
Thursday, December 09, 2010 Page 19 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LAD12CL013 HPH-6A LEVEL MEASUREMENT LT
LAD12CL511 HPH-6A LEVEL MEASUREMENT LG
LAD22CL011 HPH-6B LEVEL MEASUREMENT LT
LAD22CL012 HPH-6B LEVEL MEASUREMENT LT
LAD22CL013 HPH-6B LEVEL MEASUREMENT LT
LAD22CL511 HPH-6B LEVEL MEASUREMENT LG
LAD32CL011 HPH-7A LEVEL MEASUREMENT LT
LAD32CL012 HPH-7A LEVEL MEASUREMENT LT
LAD32CL013 HPH-7A LEVEL MEASUREMENT LT
LAD32CL511 HPH-7A LEVEL MEASUREMENT LG
LAD42CL011 HPH-7B LEVEL MEASUREMENT LT
LAD42CL012 HPH-7B LEVEL MEASUREMENT LT
LAD42CL013 HPH-7B LEVEL MEASUREMENT LT
LAD42CL511 HPH-7B LEVEL MEASUREMENT LG
LAD52CL011 HPH-8A LEVEL MEASUREMENT LT
LAD52CL012 HPH-8A LEVEL MEASUREMENT LT
LAD52CL013 HPH-8A LEVEL MEASUREMENT LT
LAD52CL511 HPH-8A LEVEL MEASUREMENT LG
LAD62CL011 HPH-8B LEVEL MEASUREMENT LT
LAD62CL012 HPH-8B LEVEL MEASUREMENT LT
LAD62CL013 HPH-8B LEVEL MEASUREMENT LT
LAD62CL511 HPH-8B LEVEL MEASUREMENT LG
LCC01AA201 LPH-1 VENT TO CONDENSER VLV MOV
LCC01CL131 LPH-1 LEVEL MEASUREMENT LT
LCC01CL132 LPH-1 LEVEL MEASUREMENT LT
LCC01CL133 LPH-1 LEVEL MEASUREMENT LT
LCC02AA201 LPH-2 VENT TO CONDENSER VLV MOV
LCC03AA201 LPH-3 VENT TO CONDENSER VLV MOV
LCC11CL031 LPH-1 LEVEL MEASUREMENT LT
LCC11CL531 LPH-1 LEVEL MEASUREMENT LG
LCC21CL011 LPL-2LEVEL MEASUREMENT LT
LCC21CL012 LPL-2 LEVEL MEASUREMENT LT
LCC21CL013 LPL-2LEVEL MEASUREMENT LT
LCC21CL511 LPH-2 LEVEL MEASUREMENT LG
LCC31CL011 LPL-3 LEVEL MEASUREMENT LT
LCC31CL012 LPL-3 LEVEL MEASUREMENT LT
LCC31CL013 LPL-3 LEVEL MEASUREMENT LT
LCC31CL511 LPH-3 LEVEL MEASUREMENT LG
LCC41CL011 LPL-4 LEVEL MEASUREMENT LT
LCC41CL012 LPL-4 LEVEL MEASUREMENT LT
LCC41CL013 LPL-4 LEVEL MEASUREMENT LT
LCC41CL511 LPH-4 LEVEL MEASUREMENT LG
LCH10CF011 HPH-6A DRAIN FLOW TO DEA FT
LCH10CF012 HPH-6A DRAIN FLOW TO DEA FT
LCH10CT011 HPH-6A O/L TEMP TE
LCH10CT012 HPH-6A O/L TEMP TE
Thursday, December 09, 2010 Page 20 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LCH10CT511 HPH-6A O/L TEMP TG
LCH10CT512 HPH-6A O/L TEMP TG
LCH11AA101 HPH-5A DRN TO D/A CV CLCS
LCH12AA101 HPH-5A DRN TO HPD F/T CV CLCS
LCH13AA101 HPH-5B DRN TO D/A CV CLCS
LCH14AA101 HPH-5B DRN TO HP F/T CV CLCS
LCH15AA101 HPH-6A DRN TO HPH-5A CV CLCS
LCH15CT001 EMER DRAIN FRM HPH-6A TEMP TE
LCH15CT002 EMER DRAIN FRM HPH-6A TEMP TE
LCH16AA101 HPH-6A DRN TO HPD F/T CV CLCS
LCH17AA101 HPH-6B DRN TO HPH-5B CV CLCS
LCH18AA101 HPH-6B DRN TO HPD F/T CV CLCS
LCH19AA101 HPH-7A DRN TO HPH-6A CV CLCS
LCH20AA101 HPH-7A DRN TO HPDFT CV CLCS
LCH20CF011 HPH-6B DRAIN FLOW TO DEA FT
LCH20CF012 HPH-6B DRAIN FLOW TO DEA FT
LCH20CT011 HPH-6B O/L TEMP TE
LCH20CT012 HPH-6B O/L TEMP TE
LCH20CT511 HPH-6B O/L TEMP TG
LCH20CT512 HPH-6B O/L TEMP TG
LCH21AA101 HPH-7B DRN TO HPH-6B CV CLCS
LCH22AA101 HPH-7B DRN TO HPDFT CV CLCS
LCH25CT001 EMER DRAIN FRM HPH-6B TEMP TE
LCH25CT002 EMER DRAIN FRM HPH-6B TEMP TE
LCH30CT011 HPH-7A O/L TEMP TE
LCH30CT012 HPH-7A O/L TEMP TE
LCH30CT511 HPH-7A O/L TEMP TG
LCH30CT512 HPH-7A O/L TEMP TG
LCH35CT001 EMER DRAIN FRM HPH-7A TEMP TE
LCH35CT002 EMER DRAIN FRM HPH-7A TEMP TE
LCH40CT011 HPH-7B O/L TEMP TE
LCH40CT012 HPH-7B O/L TEMP TE
LCH40CT511 HPH-7B O/L TEMP TG
LCH40CT512 HPH-7B O/L TEMP TG
LCH45CT001 EMER DRAIN FRM HPH-7B TEMP TE
LCH45CT002 EMER DRAIN FRM HPH-7B TEMP TE
LCH50CT011 HPH-8A O/L TEMP TE
LCH50CT012 HPH-8A O/L TEMP TE
LCH50CT511 HPH-8A O/L TEMP TG
LCH50CT512 HPH-8A O/L TEMP TG
LCH55CT001 EMER DRAIN FRM HPH-8A TEMP TE
LCH55CT002 EMER DRAIN FRM HPH-8A TEMP TE
LCH60CT011 HPH-8B O/L TEMP TE
LCH60CT012 HPH-8B O/L TEMP TE
LCH60CT511 HPH-8B O/L TEMP TG
LCH60CT512 HPH-8B O/L TEMP TG
Thursday, December 09, 2010 Page 21 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LCH65CT001 EMER DRAIN FRM HPH-8B TEMP TE
LCH65CT002 EMER DRAIN FRM HPH-8B TEMP TE
LCJ 10CT031 LPH-1 SHELL TEMP TE
LCJ 10CT512 DRN CLR I/L TEMP TG
LCJ 10CT531 LPH-1 TEMP TG
LCJ 12AA101 LPH-2 DRN TO LPH-1 CV CLCS
LCJ 13AA101 LPH-2 DRN TO LPD F/T CV CLCS
LCJ 14AA101 LPH-3 DRN TO LPH-2 CV CLCS
LCJ 15AA101 LPH-3 DRN TO LPD F/T CV CLCS
LCJ 20CT002 LP DRN FT I/L TEMP TE
LCJ 20CT011 LPH-2 O/L TEMP TE
LCJ 20CT012 LPH-2 O/L TEMP TE
LCJ 20CT511 LPH-2 O/L TEMP TG
LCJ 21CT002 LP DRN FT I/L TEMP TE
LCJ 30CT011 LPH-3 O/L TEMP TE
LCJ 30CT012 LPH-2 I/L TEMP TE
LCJ 30CT511 LPH-3 O/L TEMP TG
LCJ 30CT512 LPH-2 I/L TEMP TG
LCJ 31CT002 LP DRN FT I/L TEMP LPH-4 TE
LCJ 40CT011 LPH-4 O/L TEMP TE
LCJ 40CT012 LPH-3 I/L TEMP TE
LCJ 40CT511 LPH-4 O/L TEMP TG
LCJ 40CT512 LPH-3 I/L TEMP TG
LCJ 50CP511 DRAIN COOLER PRESS PG
LCJ 50CT011 DRAIN COOLER O/L TEMP TE
LCJ 50CT511 DRAIN COOLER O/L TEMP TG
LCL20CT011 LPH-3 O/L TEMP TE
LCL21CT011 LPH-2 O/L TEMP TE
LCL31CT011 LPH-4 O/L TEMP TE
LCM30CL501 HP DRAIN FLASH TNK LVL LG
LCM30CT015 HP DRN-FT SHELL TEMP TE
LCM30CT501 HP DRN-FT SHELL TEMP TG
LCM40CL501 LP DRN FT LVL LG
LCM40CT015 LP DFT TEMP TE
LCM40CT501 LP DRN FT TEMP TG
HP/LP BYPASS SYS
LAE30CT301 SPRAY WTR FRM BFP DICSH TEMP TG
LBA01CP101 MS LINE PRESS PT
LBA01CP102 MS LINE PRESS PT
LBF10CF101 BPV-1 I/L FLOW FT
LBF10CF102 BPV-1 I/L FLOW FT
LBF10CT101 BPV-1 I/L TEMP TE
LBF10CT301 BPV-1 I/L TEMP TG
LBF11CT101 BPV-1 O/L TEMP TE
LBF11CT102 BPV-1 O/L TEMP TE
LBF11CT103 BPV-1 O/L TEMP TE
Thursday, December 09, 2010 Page 22 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LBF11CT301 BPV-1 O/L TEMP TG
LBF12AA201 HP BP WARM UP LINE VLV MOVI
LBF20CF101 BPV-2 I/L FLOW FT
LBF20CF102 BPV-2 I/L FLOW FT
LBF20CT101 BPV-2 I/L TEMP TE
LBF20CT301 BPV-2 I/L TEMP TG
LBF21CT101 BPV-2 O/L TEMP TE
LBF21CT102 BPV-2 O/L TEMP TE
LBF21CT103 BPV-2 O/L TEMP TE
LBF21CT301 BPV-2 O/L TEMP TG
LBF22AA201 HP BP WARM UP LINE VLV MOVI
HYDRAZENE DOSI NG SYS
QCA01AA101 HYDRAZINE DOSING PUMP-1 STROKE CTL CLCS
QCA01AP001 HYDRAZINE DOSING PUMP-1 LT
QCA02AA101 HYDRAZINE DOSING PUMP-2 STROKE CTL CLCS
QCA02AP001 HYDRAZINE DOSING PUMP-2 LT
QCA02AP201 HYDRAZINE MIX/STRG TANK AGITATOR LT
J ACKI NG OI L SYS FOR BFPDT
MTV70AP004 BFPDT-A J ACKING OIL PUMP LT
MTV71AP004 BFPDT-B J ACKING OIL PUMP LT
LUB & WORKI NG OI L SYS OF MDBFP
LAC23AP001 MDBFP-C SCOOP CLCS
LAC23AP002 MDBFP-C AOP LT
LUBE OI L SYS-BFPDT
MTV10AN001 BFPDT-A OIL VAPOR EXTRACTOR-FAN-A LT
MTV10AN002 BFPDT-A OIL VAPOR EXTRACTOR-FAN-B LT
MTV10AP001 BFPDT-A LUB OIL PUMP-A LT
MTV10AP002 BFPDT-A LUB OIL PUMP-B LT
MTV11AN001 BFPDT-B OIL VAPOR EXTRACTOR-FAN-A LT
MTV11AN002 BFPDT-B OIL VAPOR EXTRACTOR-FAN-B LT
MTV11AP001 BFPDT-B LUB OIL PUMP-A LT
MTV11AP002 BFPDT-B LUB OIL PUMP-B LT
MTV45AP003 BFPDT-A EMERG OIL PUMP LT-DC
MTV46AP003 BFPDT-B EMERG OIL PUMP LT-DC
MTV50AA201 BFPDT-A LUB OIL TO TURNING GEAR V/V MOV
MTV51AA201 BFPDT-B LUB OIL TO TURNING GEAR V/V MOV
MDBFP I NSTRUMENTATI ON SCHEME
LAC23AA201 MDBFP-C RAPID START UP DEV SOV SOV/O/L
LAC23AA202 MDBFP-C RAPID START UP DEV SOV SOV/O/L
NAOH DOSI NG SYS
QCH01AP201 NAOH MIX/STRG TANK (SG) STIR LT
QCH02AP201 LP DOS-TG (NAOH) STR MTR LT
STEAM AND DRAI N SYS FOR BFPDT
MTA01AA301 BFPDT-A EXHAUST HOOD SPRAY VLV SOV/O/L
Thursday, December 09, 2010 Page 23 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
MTA02AA301 BFPDT-B EXHAUST HOOD SPRAY VLV SOV/O/L
MTL01AA254 BFPDT-A CASING DRAIN MOV
MTL02AA255 BFPDT-A DRAIN MOV
MTL03AA256 BFPDT-A G/S HDR DRN VLV TO LPDFT (AFT GS PR CV) MOV
MTL04AA257 BFPDT-A GS DUMP LINE DRAIN MOV
MTL06AA254 BFPDT-B CASING DRAIN MOV
MTL07AA255 BFPDT-B CASING CROSS DRAIN VLV MOV
MTL08AA256 BFPDT-B G/S HDR DRN VLV TO LPDFT (AFT GS PR CV) MOV
MTL09AA257 BFPDT-B GS DUMP LINE DRAIN MOV
MTW60AA251 BFPDT-A BEF GS I/L DRN VLV MOV
MTW61AA251 BFPDT-B BEF GS I/L DRN VLV MOV
STEAM DRAI NS SYS
LBC10CL201 CRH DRAIN POT LEVEL LS
LBC10CL202 CRH DRAIN POT LEVEL LS
LCM10CT101 HPBP WL DRN TO UFT TMP TE
LCM10CT102 HPBP WL DRN TO UFT TMP TE
LCM10CT109 UNIT FLASH TANK TEMP TE
LCM10CT301 UNIT FLASH TANK TEMP TG
LCM20CL301 STM DRN FLASH TANK LEVEL LG
LCM20CT101 CRH LINE DRN TO SDFT TMP TE
LCM20CT112 STM DRN FLASH TANK TEMP TE
LCM20CT301 STM DRN FLASH TANK TEMP TG
LCM30AA201 CRH TO D/A PEGG LN DRIN TO HPDFT MOV
LCM30AA202 BFPDT-A CRH DRN TO HPDFT VLV MOV
LCM30AA203 BFPDT-B CRH DRN TO HPDFT VLV MOV
LCM30AA204 EXTN TO HPH-6A LN DRN TO HPDFT VLV MOV
LCM30AA205 EXTN TO HPH-6B LN DRN TO HPDFT VLV MOV
LCM30AA208 BFPDT-A AUX STM DRN BEF BLK VLV MOV
LCM30AA209 BFPDT-B AUX STM DRN BEF BLK VLV MOV
LCM30AA210 BFPDT-A AUX CV D/S DRN TO HPDFT VLV MOV
LCM30AA211 BFPDT-A ESV U/S DRN TO HPDFT VLV MOV
LCM30AA212 BFPDT-B AUX CV D/S DRN TO HPDFT VLV MOV
LCM30AA213 DRN VLV U/S OF BFPDT-B ESV MOV
LCM30AA214 EXTN TO HPH-5A/5B LINE DRN TO HPDFT VLV MOV
LCM30CT101 CRH TO D/A PEGGING DRN LINE TE
LCM30CT102 CRH STM TO BFPT-A LINE DRN TE
LCM30CT103 CRH STM TO BFPT-B LINE DRN TE
LCM30CT104 HPH-7A EXT DRN TMP TE
LCM30CT105 HPH-7B EXT DRN TMP TE
LCM30CT106 HPH-8 EXT DRN LINE TEMP TE
LCM30CT107 HPH-8B EXT DRN LINE TEMP TE
LCM30CT108 AUX STM TO BFPT-A LINE DRN TE
LCM30CT109 AUX STM TO BFPT-B LINE DRN TE
LCM30CT110 CRH STM TO BFPT-A D/S OF CV LINE DRN TE
LCM30CT111 CRH STM TO BFPT-A D/S OF CV LINE DRN TE
LCM30CT112 CRH STM TO BFPT-B D/S OF CV LINE DRN TE
Thursday, December 09, 2010 Page 24 of 25
KKS_CODE DESCRI PTI ON I NST/DRI VE TYPE
LCM30CT113 CRH STM TO BFPT-B D/S OF CV LINE DRN TE
LCM30CT114 HPH-8A EXT DRN LINE TEMP TE
LCM30CT115 HPH-6A/B COM EXT DRN LINE TEMP TE
LCM40AA201 CRH TO D/A PEGG D/S CONT STN LN DRN TO LPDFT VLV MOV
LCM40AA202 EXTN TO BFPDT A&B LINE DRN TO LPDFT VLV MOV
LCM40AA203 EXTN TO D/A LN DRN TO LPDFT VLV MOV
LCM40AA204 EXTN TO LPH-3 LINE DRN TO LPDFT VLV MOV
LCM40AA205 EXTN TO LPH-2 LINE DRN TO LPDFT VLV MOV
LCM40CT101 CRH TO D/A PEGGING D/S LINE TEMP TE
LCM40CT102 EXT TO BFPT-A&B LINE TEMP TE
LCM40CT103 EXTN TO D/A LINE TEMP TE
LCM40CT104 LPH-4 EXT DRN LINE TEMP TE
LCM40CT105 LPH-3 EXT DRN LINE TEMP TE
LCM40CT106 LPH-2 EXT DRN LINE TEMP TE
MAW10AA011 TURB GLD SEALING LINE DRN TO HPD F/T VLV MOV
MAW10CT101 TURB GLAND SEAL DRN TEMP TE
Thursday, December 09, 2010 Page 25 of 25
22 9562 9562
22
9562 9562
22 9562 9562
22
9562 9562
22 9562 9562
n
!
i
.
d
a
(
f
t
.
d
.
i
.
a
r
E
$
.
.
p
r
t
t
a
l
N
A
i
i
O
N
/
L
l
l
t
R
l
,
i
^
!
p
o
w
a
R
C
O
R
p
O
R
A
U
o
'!
t
t
o
.
N
o
p
o
r
t
.
l
t
h
i
.
d
o
c
u
n
.
n
i
r
i
l
l
b
.
r
c
p
l
o
d
u
c
.
d
b
,
o
n
/
m
c
o
n
r
*
i
t
h
o
l
t
t
h
c
,
r
i
t
t
.
n
p
.
m
i
$
i
o
n
.
q F
=
q
E
3
a
=
H
d
"
6
e
x
z
L
-
-
-
-
-
-
-
-
_
-
-
-
-
_
-
_
_
_
_
_
_
J
z -
{
m g o z o o -
n
o { c -
-
J
7 U
'
-
t
o r + T m r m n T
]
n o m -
t
>
:
I
a
=
6
r
g
\
4
o
;
s
:
i
l
f
,
R
t
3
o
)
(
t
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - G T - G T - G T - G T - G
SECTION - VI
TECHNICAL DATA SHEETS
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
NTPC Limited NTPC Limited
NTPC Limited NTPC Limited NTPC Limited
(A Government of India Enterprise)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
P PP PPAR AR AR AR ART - G T - G T - G T - G T - G
SECTION - VI
TECHNICAL DATA SHEETS
FOR
STEAM TURBINE GENERATOR PACKAGE
BIDDING DOCUMENT NO. : CS-9562-110-2
(This document is meant for the exclusive purpose of bidding against this
Package and shall not be transferred, reproduced or otherwise used for
purposes other than that for which it is specifically issued).
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TABLE OF CONTENTS
PART SECTION NO. TITLE
SCOPE OF SUPPLY & SERVICES
A Project Synopsis
A A-1 Provenness
A Essential Data
A Phased Manufacturing Program
A A-2 General
A A-3 Turbine Generator and Auxiliaries
A A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Unit
A A-6 Low Pressure Piping System
A A-7 (NOT USED)
A A-8 Hydrogen Generation Plant
A A-9 Service Elevators
A A-10 Power Cycle Piping
A A-11 Other Cranes and Hoists
A B-1 Electrical System/Equipment
A IIC-01 Control and Instrumentation System
A D-1 Civil Works
A Terminal Points & Exclusions
A Functional Guarantees & Liquidated Damages
A Spares
TECHNICAL REQUIREMENTS
MECHANICAL
B A-1 Operating Capability of Plant
B A-2 Layout
B A-3 Turbine Generator and Auxiliaries
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B A-4 Equipment Cooling Water System
A A-5 Condensate Polishing Plant
B A-6 Low Pressure Piping System
B A-7 (NOT USED)
B A-8 Hydrogen Generation Plant
B A-9 Service Elevators
B A-10 Power Cycle Piping
B A-11 Other Cranes and Hoists
ELECTRICAL
B B-1 Generator and Auxiliaries
B B-2 Motors
B B-3 L.T. Power Cables
B B-4 L.T. Control Cables
B B-5 Cabling Earthing Lighting and Protection
B B-6 Electric Actuators with Integral Straters
B B-7 Lighting
B B-8 L.T. Switchgear
CONTROL & INSTRUMENTATION (C&I)
B IIIC-01 Basic Design Criteria
B IIIC-02 Distributed Digital Control, Monitoring & Information System
(DDCMIS)
B IIIC-03 Main Equipment Related Control and Instrumentation System
B IIIC-04 Measuring Instruments (Primary and Secondary)
B IIIC-05 Electrical Power Supply System
B IIIC-06 Process Connection and Piping
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B IIIC-07 Instrumentation and Power Supply Cable
B IIIC-08 Control Valve and Actuators
B IIIC-09 Plant Auxiliary System
B IIIC-10 Type Test Requirements
CIVIL
B D-1 Civil Works
QUALITY INSURANCE (QA)
B E-1 Steam Turbine Generator & Auxiliaries
B E-2 Condenser on Line Tube Cleaning System
B E-3 Condensate Extraction Pump
B E-4 Power Cycle Heaters & De-aerator
B E-5 Boiler Feed Pump
B E-6 Turbine Hall EOT Crane
B E-7 Equipment Cooling Water System
B E-8 Condensate Polishing Unit
B E-9 Low Pressure Piping System
B E-10 (NOT USED)
B E-11 Hydrogen Generation Plant
B E-12 Service Elevators
B E-13 Power Cycle Piping
B E-14 Other Cranes and Hoists
B E-15 Generator and Auxiliaries
B E-16 Motors
B E-17 LT Switchgear
TECHNICAL SPECIFICATION
SECTION-VI
TANDA THERMAL POWER PROJECT
STAGE - II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART SECTION NO. TITLE
B E-18 LT Power Cables
B E-19 LT Control Cables
B E-20 Cabling
B E-21 Lighting
B E-22 Passenger/Service Elevators & Lifts
B E-23 Distributed Digital Control, Monitoring & Information System (DDCMIS)
B E-24 Main Equipment Related Control and Instrumentation System
B E-25 Measuring Instruments (Primary and Secondary)
B E-26 Power Supply System
B E-27 Process Connection and Piping
B E-28 Instrumentation Cables
B E-29 Control Valves
B E-30 Electrical Actuators
B E-31 Auxiliaries Plant Control
B Pre-Commissioning and Commissioning
C GENERAL TECHNICAL REQUIREMENT
D ERECTION CONDITIONS OF CONTRACT
E TENDER DRAWING
F NOT USED
G TECHNICAL DATA SHEET
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL SPECIFICATION
SECTION - VI
PART - G
TECHNICAL DATA SHEETS
CONSISTS OF :
MODULE : I - MECHANICAL
MODULE : II - ELECTRICAL
MODULE : III - C&I
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SECTION - VI
PART - G
TECHNICAL DATA SHEETS
MODULE - I
MECHANICAL
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
MECHANICAL SECTION
MODULE - I DA1 : General Requirement
DA2 : Steam Turbine & Auxiliaries
DA3 : Compressed Air System (Not Used)
DA4 : Hydrogen Generation Plant
DA5 : Equpiment Cooling Water System
DA6 : Power Cycle Piping
DA7 : Low Pressure Piping
DA8 : Layout Requirement
DA9 : Elevators
DA10 : Other Cranes & Hoist
DA11 : CPU
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION-DA1
GENERAL REQUIREMENT
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 2 DA1
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 GENERAL REQUIREMENTS
1.01.00 INSTRUCTIONS TO BIDDERS
1.01.01 Part-G describes the technical information and data to be submitted by the Bidder alongwith
the proposal for the equipment and services described in Section-VI.
1.01.02 The Bidder shall ensure that all information, data, performance curves, technical literature
(catalogues) and drawings furnished with the proposal fully describe all equipment/systems
covered under this proposal and fully meet the requirements of the technical specifications.
1.01.03 The Bidder shall use one of the following responses while filling the questionnaire and
proposal and fully meet the requirements of the technical specifications.
a) The Section No. and Page No. of the proposal where the required information/
data has been furnished by the Bidder.
b) An answer (data or narrative description).
c) A Not-Applicable statement (N.A.)
1.01.04 Bids not meeting the above requirement or not containing full description/data/technical
literature/details regarding past experience for similar application for the proposed equipment
may be treated as non responsive and this will be considered as an adequate reason
for rejection of the concerned Bid.
1.01.05 The Employer reserves the right to ask for further details regarding technical features,
application particulars, performance, past experience for similar applications or any other
information as may be required to fully satisfy himself regarding suitability, quality, reliability
and full compliance with this specification for all equipment and systems offered by the
Bidder.
1.01.06 Bidder shall furnish with his proposal the original Technical Data Sheets completely filled
in and five photostat Copies of the data sheets (photocopies of the original). In no case,
the Bidder shall retype/redraft these data sheets.
1.01.07 It may be noted that this technical data sheets section is for Bidding purpose only. During
detailed engineering, the Bidder shall be required to furnish all additional data about the
equipment/system being supplied, even if such details are not asked for in this section.
1.01.08 a) Bidder should legibly fill in all the data asked for in these sheets either by hand
in black ink or preferably by typing the matter. All the filled in data sheets should
be duly returned with the bid.
b) Continuation sheets may be suitably attached whenever the need arises. These
pages may be suitably numbered accordingly.
c) Corrections should be avoided. However, whenever it is imperative to carry out
correction, this should be done neatly and should be initiated by the authorised
signatory.
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 2 DA1
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d) Each page of the data sheet should be initiated by the authorised signatory &
should bear the legal stamp of the company.
e) Bidder should indicate his name on each sheet.
1.01.09 In case the BIDDER proposes to take any deviations/execeptions to the tender requirements,
the same shall be listed in an orderly manner under Schedule of technical deviations of
Bid Forms. Each page of the filled schedule shall be signed & duly stamped by the
BIDDER.
1.01.10 BIDDER is required to ensure that no contradictions will be brought out on the information/
data/writeup/drg. provided with the bid. In the event of any contradictions, views of the
Employer will be final.
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION-DA2
STEAM TURBINE & AUXILIARIES
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-I
ESSENTIAL DATA SHEETS
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
1 OF 12
The information in this chapter has been identified by the Employer as the essential,
which is to be provided by the bidders along with the bid necessarily. The
information provided by the bidder shall be the basis for Employer to design the
balance facilities of the project. Incase bidder does not fill these information, their bid
may be considered as non responsive.
Sl.N0. Description Data to be filled by Bidder
SYSTEM INTERFACE DATA
1. Steam Generator output corresponding
to BMCR flow under rated steam
condition, turbine under VWO
operation, condenser pressure of 77
mmHg (abs), 0% make up. Difference
of BMCR flow and VWO steam flow
through turbine shall be assumed to be
drawn off from Main steam line. Same
quantity of flow to be added to
condenser as additional make up.
Heat Balance Diagram
2. 105% of rated load under rated steam
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
3. 660 MW output under rated steam
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
4. 660 MW output under sliding pressure
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
5. 528 MW output under sliding pressure
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
6. 396 MW output under sliding pressure
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
7. 330 MW output under sliding pressure
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
2 OF 12
8. 660 MW output with all HP heaters out
of service under rated steam
conditions at condenser pressure of 77
mmHg (abs) with 0% makeup.
Heat Balance Diagram
9. Turbine Startup Curves for Cold, Warm
and Hot startup.
Start up Curve
10. Cooling water flow across Main Steam
Turbine Condenser at design point of
Condenser (Cu m/Hr )
11. Cooling water temperature rise across
Main Steam Turbine Condenser at
design point of Condenser (Deg C)
12. Pressure Drop on Cooling Water side
being measured between TG Package
terminal points across Main Steam
Turbine Condenser.(MWC)
13. Cooling water flow across BFP Drive
Turbine Condenser (if separate) at
design point of Condenser
14. Cooling water temperature rise across
BFP Drive Turbine Condenser (if
separate) design point of Condenser
15. Pressure Drop on Cooling Water side
being measured between TG Package
terminal points across BFP Drive
Turbine Condenser (if separate)
16. Auxiliary Cooling Water(ACW) pump
design flow
POWER CYCLE PIPING DATA
A. HP TURBINE INLET
1. No. & Size (ID/OD x thk) of HP turbine
steam inlet nozzles
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
3 OF 12
2. Material of HP turbine steam inlet
nozzles
3. Whether piping /matching piece
material of P91/F91 or X20 can be
directly welded to the above HP
Turbine nozzles (material) at site or
shop welding is required as per
recommendation of equipment
supplier.
B. HP TURBINE OUTLET
1. No. & size (ID/OD x thk) of HP turbine
exhaust nozzle
2. Material for HP turbine exhaust nozzle
3. Whether piping /matching piece
material of P22/F22 or A106Gr.C/A105
can be directly welded to the above HP
Turbine exhaust nozzles (material) at
siteor shop welding is required as per
recommendation of equipment
supplier.
4. HP turbine exhaust maximum
temperature (Deg.C)
C. ESV / HP STEAM STOP VALVE &
CONTROL VALVE
1. No. of ESV/ HP steam stop valve
2. No. of HP steam control valve
3. Material of steam inlet & outlet
nozzles of ESV
4. Material of steam inlet & outlet
nozzles of HP control valve
5. Whether piping /matching piece
material of P91/F91 or X20 can be
directly welded to the above valve
nozzles (material) at site or shop
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
4 OF 12
welding is required as per
recommendation of equipment
supplier.
6. Pressure drop in MS strainer
D. IP TURBINE
1. No. & Size (ID/OD x thk) of IP turbine
steam inlet nozzles
2. Material of IP turbine steam inlet
nozzles
3. Whether piping /matching piece
material of P91/F91 or X20 can be
directly welded to the above IP Turbine
nozzles (material) at site or shop
welding is required as per
recommendation of equipment
supplier.
E. IV/IP STOP VALVE & IP CONTROL
VALVE.
1. No. of IV/ IP steam stop valve
2. No. of IP steam control valve
3. Material of steam inlet & outlet
nozzles of IV
4. Material of steam inlet & outlet
nozzles of IP control valve
5. Whether piping /matching piece
material of P91/F91 or X20 can be
directly welded to the above valve
nozzles (material) at site or shop
welding is required as per
recommendation of equipment
supplier.
6. Pressure drop in HRH strainer
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
5 OF 12
F. CRH NRV
1. No. ,Size & Body material of CRH NRV
2. Whether piping /matching piece
material of P22/F22 or A106Gr.C/A105
can be directly welded to the above HP
Turbine exhaust nozzles (material) at
site or shop welding is required as per
recommendation of equipment
supplier.
3. Pressure drop in CRH NRV
G. HP BYPASS VALVE
1. No. of HP Bypass valve/unit
2. Inlet & outlet nozzle material of HP
Bypass valve
3. Whether piping /matching piece
material of P91/F91 or X20 can be
directly welded to the above HP
Bypass valve nozzles (material) at site
or shop welding is required as per
recommendation of equipment
supplier.
H. LP BYPASS VALVE
1. No. of LP Bypass valve/unit
2. Inlet & outlet nozzle material of LP
Bypass valve
3. Whether piping of material A335
Gr.P91 or X20 or P22 can be directly
welded to the above LP Bypass
nozzles (inlet & outlet) at site or shop
welding is required as per
recommendation of equipment
supplier.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
6 OF 12
I. No. & size of dump steam(LP Bypass)
inlet nozzles on condenser
J . Location of Spray arrangement in LP
Bypass down stream path.
K. Max. permissible dump steam pressure
& temperature at inlet to condenser
dump steam inlet nozzles.
LAYOUT AND CIVIL DATA
1. A-B and B-C bay width for TG building,
2. Elevation of CW pit in TG building,
3. TG hall EOT crane rail elevation,
4. TG hall EOT crane clearance diagram,
5. TG hall EOT crane capacity
6. Deaerator centerline elevation,
7. TG building column spacing
8. TG top deck size and elevation
9. TG foundation GA & Loading details of
deck. Design criteria for TG deck and
suggestive location of TG columns.
10. CW Pit Loading details & Layout of
pipes
11. CEP pit GA & loading details
12. Equipment layout Drawings for various
floors of Main plant building.
i) Floor Plan
ii) Loading drawing
iii) Bracing location
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
7 OF 12
ELECTRICAL DATA
1. Generation Voltage
2. BFP Motor Rating.
Station Piping Package:
S.
N
Item Qty.
(m
3
/hr)
T.P.
Location &
Elev.
T.P.
Pressure /
Temp.
Pipe size
OD x
thickness
Material
1 Instrument air
consumption for
TG & Auxiliaries
2 Plant air (service
air) consumption
for cleaning of
instruments /
equipment.
3 Demineralised
water for
condenser
normal make-up
& ECW O/H
tank M/U.
4 Demineralised
water for
condenser
emergency
make-up.
5 Service water
for cleaning /
washing of
equipment (if
any).
6 Circulating water
to & from
condenser
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
8 OF 12
C&I DATA
1.00.00 DATA REQUIREMENTS FOR EMPLOYERS STATION-C&I PACKAGE
1.01.00 Bidder to furnish the quantity of drives and Input /outputs for all systems/equipments
in his scope that are being controlled through employer procured BOP-C&I DDCMIS
control system and as identified under exclusions clause no in Part-A in the below
mentioned format: For understanding the drives type refer tender drawings/ and
other relevant part of specification
1.01.00.01 Drives Table:-
Type of
control
Type of Drive
Quantity
HT
LT (AC+DC)
VARIABLE FREQUENCY DRIVE (OLCS)
MOD/MOV (MODULATING DAMPER/
VALVE)
MOVI/MODI (INCHING VALVE/DAMPER)
DSOV (DUAL SOLENOID VALVE)
OLCS
SSOV (SINGLE SOLENOID VALVE)
CLCS-1 (MODULATING CONTROL DRIVE
WITH GALVANICALLY ISOLATED
FEEDBACK)
CLCS-2 (MODULATING CONTROL DRIVE
WITHOUT GALVANICALLY ISOLATED
FEEDBACK)
CLCS
CLCS-3 (MODULATING VARIABLE
FREQUENCY DRIVE)
ANY OTHER DRIVE
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
9 OF 12
1.01.00.02 Input output signals Table:-
Note:
1) The I/O,s per drive shall be as per that indicated in the Appendix-1 to C&I
scope, Part-A
Quantity
Signal Type
AI (4-20mA)
AI (4-20mA) HART COMPATIBLE AI (Control)
AI (4-20mA) Galvanic ISOLATED
AI (4-20mA)
AI (4-20mA) HART COMPATIBLE
AI
(Information)
AI (4-20mA) Galvanic ISOLATED
AO (4-20mA)
AO
AO (4-20mA) Galvanic ISOLATED
DI (COC) CHANGE OVER
CONTACT
DI
DI (NO/NC) NORMALLY OPEN/
NORMALLY CLOSED CONTACT
DO (Contact)
DO
DO (24 VDC)
SEQUENCE OF EVENTS FROM
BIDDERS CONTROL SYSTEM/
EQUIPMENTS
DI-SOE
SEQUENCE OF EVENTS FOR
BIDDERS EQUIPMENTS BEING
CONTROLLED THROUGH
EMPLOYER CONTROL SYSTEM
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
10 OF 12
1.02.00 HART SIGNAL MONITORING:-Bidder to furnish the quantity of HART compatible
signals in his scope to be monitored in Employers BOP-C&I control system
Signals Quantity
HART signals connected to BOP-C&I DDCMIS from TG-
C&I
(Note: All the HART compatible signals being connected in TG-C&I control system
shall also be monitored in HART management system being procured under
Employers Station-C&I package. Quantity of such signals shall be indicated in the
above table)
1.03.00 VIBRATION MONITORING SYSTEM:- Bidder to furnish following details for
Vibration Monitoring system to be procured under Employers Station-C&I package,
required for interlock, protection and monitoring of Bidders HT equipment(s)
Sl.
No
Name of
main HT
drive
Type of
Bearing
Type of
Vibration
Sensor
No of
Sensors
Range Remarks
1.04.00 CONTROL PANELS/OTHER PANELs Bidder to furnish details of control
panels/other panels to be placed in control equipment room as per the following
format.
Sl
No
Panel
description
Qty Dimensions Cut-out
dimensions
Heat
load
Remarks
1.05.00 UPS load requirement:- Bidder to furnish total load requirement of 230 V AC supply
for his systems/equipment, to be fed from Employers UPS system. The following
feeders have been considered under employer procured UPS system.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
11 OF 12
Sl.
no
Fdr no. Frm To Feeder Desc. KVA PDB
location
PDB
scope
1 Fdr-1 ACDB-1 PDB-
110-1
HMI Load-1 Prog.
Room
TG
vendor
2 Fdr-2 ACDB-1 PDB-
110-1
HMI Load-2 Prog.
Room
TG
vendor
3 Fdr-3 ACDB-1 PDB-
110-2
TSI & other
Loads
CER TG
vendor
4 Fdr-4 ACDB-1 PDB-
110-3
Miscellaneous
Loads
8.5m TG
vendor
Notes:
(1) Feeders from ACDB-1 are only indicated above. Identical feeders for each
PDB shall be provided from ACDB-2.
(2) Above indicated UPS feeders shall be provided from Employers ACDB.
(3) PDBs along with the necessary change over circuits (as applicable) along
with further distribution to the load shall be in the scope of the contractor.
(4) Half of the HMI Loads are to be powered through Feeder-1 and remaining
half through Feeder-2 to ensure availability of at least 50% of the HMI Loads
in event of any fault in either of the feeders.
1.06.00 SOFT/Hard wired signal exchange:-Bidder to furnish the quantity of soft/hardwired
signal Exchange between TG C&I system and Employers Station C&I system in the
following format:
Sl
No
Syste
m
(from)
System
(to)
Total Database Periodically
transmitted
Unit(U) /
Common
(C)
Soft/
Hardwired
Analog Binary Analog Binary
1.07.00 Measuring instruments:- Bidder to furnish the quantity of following measuring
instruments to be procured under employer supplied station C&I package based on
enclosed tender P&ID and bidders recommendation for the offered systems
/equipments.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 2(I)
ESSENTIAL DATA
PAGE
12 OF 12
Sl No Type of Measuring
instrument
Service Process range
1 Pressure Transmitters
2 Differential Pressure
Transmitters
3 Level Transmitters with
type (for ex
rada/ultrasonic etc)
4 Flow Transmitters with
type (DP, any other type)
5 Analytical measurement
like pH, Conductivity,
Silica etc with type
1.08.00 The above information is essentially required to be furnished along with the bid.
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-I
TECHNICAL DATA TO BE
SUBMITTED ALONGWITH THE BID
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION - DA 2 (I)
PART - 1
BASIC DATA
1.00.00 STEAM TURBINE AND REFERENCE TO APPENDIX
AUXILIARY SYSTEMS AND DRAWING NO.
1.01.00 Performance Data
1.01.01 Heat Balance Diagrams in
Metric Units as called for
under Clause No. 1.22.01
Sub-Sec-A3, Part-B, Section-VI
of the specification including
the following :
(a) 693MW (i.e. 105% of
rated load) under rated
steam condition at
condenser pressure
77 mm Hg (abs), with
zero make up ....................................................................
(b) 660 MW output under
rated steam conditions
at condenser pressure
of 77 mmHg (abs) with
zero make-up ....................................................................
(c) 528 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure operation and
rated steam temperature
at condenser pressure
of 77 mm Hg (abs) with
0% make-up. ....................................................................
(d) 528 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure operation and
rated steam temperature
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
at condenser pressure
of 77 mm Hg (abs) with
3% make-up. ....................................................................
(e) 396 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure at condenser
pressure of 77 mm Hg
(abs) with 0%
make-up. ....................................................................
(f) 396 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure at condenser
pressure of 77 mm Hg
(abs) with 3%
make-up. ....................................................................
(g) 330 MW output under
turbine throttle inlet steam
conditions corresponding
to sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) with zero make-up. ....................................................................
(h) 660 MW output under
rated steam conditions at
condenser pressure of
77 mm Hg (abs) with
3% make-up. ....................................................................
(i) 660 MW output under
rated steam conditions at
condenser pressure of
89 mm Hg (abs) with 3%
make-up. ....................................................................
(j) 198 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure operation at
condenser pressure of
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
77 mm Hg (abs) with 0%
make-up. ....................................................................
(k) 198 MW output under
turbine throttle inlet
steam conditions
corresponding to sliding
pressure operation at
condenser pressure of
77 mm Hg (abs) with
3% make-up. ....................................................................
(l) VWO with over
pressurisation
corresponding to boiler
capability at condenser
pressure of 77 mm Hg
(abs) with 3% make-up
(If applicable). ....................................................................
(m) VWO output under rated
steam conditions at
condenser pressure of
89 mm Hg (abs) with
3% make-up. ....................................................................
(n) VWO output under rated
steam conditions at
condenser pressure of
77 mm Hg (abs) with
0% makeup ....................................................................
(o) VWO output under rated
steam conditions at
condenser pressure of
77 mm Hg (abs) with
3% makeup ....................................................................
(p) HP heaters out of service
(One string and both
strings) under rated
steam conditions at
condenser pressure
of 77 mm Hg (abs) and
89 mm Hg (abs) with
0% make up maximum
continuous output ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(q) HP heaters out of service
(One string and both
strings) under rated
steam conditions at
condenser pressure
of 77 mm Hg (abs) and
89 mm Hg (abs) with
3% make up maximum
continuous output ....................................................................
(r) All HP heaters out of
service under rated
steam conditions at
condenser pressure of
77 mm Hg (abs) and
89 mm Hg (abs) with
0% percent make up
and maximum continuous
output ....................................................................
(s) All HP heaters out of
service under rated
steam conditions at
condenser pressure of
77 mm Hg (abs) and
89 mm Hg (abs) with
3% percent make up.
and rated output ....................................................................
(t) 660 MW output under
sliding pressure conditions
at condenser pressure of
77 mm Hg (abs) with
0% percent make-up. ....................................................................
(u) 660 MW output under
sliding pressure conditions
at condenser pressure of
77 mm Hg (abs) with
3% percent make-up ....................................................................
(v) HP-LP bypass operation
under rated steam
condtions with bypass
valves open to full
capacity and turbine on
house load operation. ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
5 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(w) HP-LP bypass operation
under rated steam
conditions with steam
generator output of 65%
of BMCR. ....................................................................
(s) 60% unit load with one
pass of condenser(s) in
isolated condition. ....................................................................
(y) Steam generator output
corresponding to BMCR
flow under rated steam
conditions, turbine in
parallel operation with
HP-LP bypass with by
pass open to full capacity. ....................................................................
(z) 462 MW output under
sliding pressure operation
at condenser pressure of
77 mm Hg (abs) with 0%
makeup. ....................................................................
(aa) 462 MW output under
sliding pressure operation
at condenser pressure of
77 mm Hg (abs) with
3% makeup. ....................................................................
(bb) Steam Generator output
corresponding to BMCR
flow under rated steam
condition, turbine under
VWO operation,
condenser pressure of
77 mmHg, 0% make up. ....................................................................
(cc) Steam Generator output
corresponding to BMCR
flow under rated steam
condition, turbine under
VWO operation,
condenser pressure of
77 mmHg, 3% make up. ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
6 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(dd) Turbine operation at 40%
rated pressure at
condenser pressure of
77mmHg, 0% make up,
under sliding pressure
operation. ....................................................................
(ee) Turbine operation at 40%
rated pressure at
condenser pressure of
77mmHg, 3% make up,
under sliding pressure
operation. ....................................................................
(ff) 65% unit rated output
under sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) with 0% make up. ....................................................................
(gg) 65% unit rated output
under sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) with 3% make up. ....................................................................
1.01.02 Turbine expansion lines/dia-
grams as called in Sub-Section-A-3,
Part-B, Section-VI of specification
clearly marking pressure,
temperature, mass flow, specific
volume and enthalpy at various
points including the following points: .......................................................................
a) Inlet and outlet of main
steam stop valves
b) Inlet and outlet of M.S.
control valves
c) Inlet of HP turbine first
stage & after first stage
d) Exhaust of H.P. turbine
e) Inlet of reheat stop valves
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
7 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
f) Inlet of reheat control
valves
g) Inlet of I. P. turbine
h) Exhaust of I. P. turbine
i) Inlet of L. P. turbine
j) L. P. Turbine last stage
k) Inlet of condenser
l) At each extraction point
The expansion lines are to be
furnished for the following
operating conditions:
i) 660 MW output under
rated steam conditions
at condenser pressure
of 77 mm Hg (abs) &
0% make up .......................................................................
ii) 528 MW output under
turbine throttle inlet
steam condition corr-
esponding hrottle steam
pressure of 230 Kg/cm
2
(abs) and rated steam
temperature at condenser
pressure of 77mm Hg (abs)
and 0% makeup .......................................................................
iii) 396 MW output under
turbine throttle inlet
steam conditions
corresponding to modified
sliding pressure operation
at condenser pressure of
77mm Hg (abs) and
0% make up .....................................................................
iv) 330 MW output under
turbine throttle inlet
steam conditions
corresponding to modified
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
8 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
sliding pressure operation
at condenser pressure of
77mm Hg (abs) and
0% make up ....................................................................
v) 660 MW output under
rated steam conditions
at condenser pressure
of 77 mm Hg (abs) &
3% make up .....................................................................
vi) 660 MW output under
rated steam conditions
at condenser pressure
of 89 mm Hg (abs) &
3% make up .....................................................................
vii) VWO output under
rated steam conditions,
at condenser pressure
of 77 mm Hg (abs) &
3% make up ....................................................................
viii) VWO output under
rated steam conditions
at condenser pressure
of 89 mm Hg (abs) &
3% make up ....................................................................
ix) VWO with maximum
allowable over pressuri-
sation at condenser
pressure of 77 mm Hg
(abs) & 3% make up .....................................................................
(if applicable)
x) 660 MW output under
sliding pressure condi-
tions with 0% throttle
reserve at condenser
pressure of 77 mm Hg
(abs) & 0% make up ....................................................................
xi) 528 MW output under
pure sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) & 0% make up ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
9 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xii) 396 MW output under
pure sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) & 0% make up ....................................................................
xiii) 330 MW output under
pure sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) & 0% make up .....................................................................
xiv) 198 MW output under
pure sliding pressure
operation at condenser
pressure of 77 mm Hg
(abs) & 0% make up ......................................................................
1.02.00 Correction curves for Perfor-
mance Guarantee. Furnish
justification with necessary
calculations to substantiate
the correction curves. .....................................................................
1.02.01 Correction curves for variation
in heat rate and load for per-
formance guarantee under rated
steam pressure operation for
660 MWand throttle steam pressure
of 230 Kg/cm
2
(abs) and rated
steam temperature for 528 MW
guarantee load conditions as
called for under clause 1.22.03
Sub-Section-A-3, Part-B,
Section-VI of specification. .....................................................................
i) Correction curves for
throttle steam pressure
variation .....................................................................
ii) Correction curves for
throttle steam temperature
variation ......................................................................
iii) Correction curves for
reheat steam temperature
variation ......................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
10 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iv) Correction curves for
reheat circuit pressure drop
variation ......................................................................
v) Correction curves for
SH spray flow variation
(applicable as indicated in
spcification) ....................................................................
vi) Correction curves for
RH spray flow variation ......................................................................
vii) Correction curves for
feed water pressure variation
at inlet to economiser NRV
i.e. at bidder's terminal point ......................................................................
viii) Correction curves for
condenser pressure
variation ......................................................................
ix) Correction curves for
BFP DT condenser pressure
variation (if separate
condenser offered for BFP
drive turbine) ..................................................................
v) Correction curves for
variation in power factor,
frequency, generator
hydrogen pressure
and voltage ......................................................................
vi) Correction curves for
variation in system
water storage ......................................................................
1.02.02 Correction curves showing the
changes in the guaranteed
output of 3% make up and
89 mm Hg (abs) with conden-
ser pressure variation at rated
inlet steam condition ......................................................................
1.02.03 Condenser performance /
correction curves showing
pressure Vs. heat load to
the condenser under various
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
11 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CW flows, fouling factors,
and CW inlet temperatures
(from 15 deg C to 40 deg.C
in steps of 5.0 deg C). Also
indicate the design point (Ref.
clause 1.22.03, Sub-Section-A-3,
Part-B, Section-VI of
specification.) ......................................................................
1.02.04 Curves showing change in
output with condenser inlet CW
temperature at rated inlet steam
conditions, VWO conditions &
over pressure conditions ......................................................................
1.03.00 Characteristic Curves
1.03.01 Throttle flow Vs. megawatt load ......................................................................
1.03.02 Heat rate Vs.megawatt load (Also
identify valve points) ......................................................................
1.03.03 Turbine cooling curves ......................................................................
1.03.04 Start up curves for turbine gene-
rator set for hot, warm and cold
conditions for both constant
pressure & sliding pressure
operations. ......................................................................
1.03.05 Specific steam consumption Vs.
flow .......................................................................
1.03.06 High pressure section exhaust
pressure and end point enthalpy
Vs. megawatt load ......................................................................
1.03.07 Cross over enthalpy and pressure
Vs. megawatt load ......................................................................
1.03.08 Efficiency Vs. output and flow for
each Turbine cylinder (indicating
the group stage efficiency points
for each steam extraction) ......................................................................
1.03.09 Last stage efficiency curves ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
12 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.03.10 Expansion line end point Vs.
throttle flow for HP and reheat
section ......................................................................
1.03.11 Condenser flow (as percent of
throttle flow) Vs. megawatt load .....................................................................
1.03.12 Exhaust loss curves (variation
in exhaust loss Vs total volu-
metric flow of steam leaving the
last stage of LP turbine.) ......................................................................
1.03.13 Turbine and Generator losses
Vs. output .....................................................................
1.03.14 Extraction stage pressure Vs.
flow to the succeeding stages
through turbine ......................................................................
1.03.15 HP-LP bypass capacity Vs.
main steam pressure ......................................................................
1.03.16 Sealing steam leak off curves
Vs. main steam pressure ......................................................................
1.03.17 Sealing steam distribution
curves and diagrams ......................................................................
1.03.18 Gland leakages from various
points and their corresponding
enthalpy at various loads and
throttle flows ......................................................................
1.03.19 Boiler feed pump set efficiency
Vs. throttle flow ......................................................................
1.03.20 a) For throttle governed machines
i) Pressure drop in Kgf/
cm
2
in M.S. control
valve Vs total steam
flow in T/hr through
the control valve .....................................................................
b) For nozzle governed
machines
i) Valve stroke % and
steam flow in T/hr.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
13 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
through each valve
and total steam flow
in T/hr Vs MW load. .....................................................................
ii) Pressure drop in
Kgf/cm
2
across each
control valve Vs MW
load. .....................................................................
1.03.21 Condenser air evacuation pumps
performance characteristic curves .....................................................................
1.03.22 Performance characteristics for
oil centrifuge including .....................................................................
a) Percentage impurity in lube
oil system Vs. through put
capacity of centrifuge ......................................................................
b) Viscosity Vs. temperature
of lube oil .....................................................................
c) Impurity level in purified oil
Vs. temperature of lube oil
to centrifuge ......................................................................
1.03.23 First stage pressure Vs. MW load
& steam flow for constant pres-
sure and variable pressure
regimes ......................................................................
1.03.24 Output Vs. C.W. inlet temperature ......................................................................
1.03.25 Characteristic Curves for
Condensate Pumps
i) Characteristic curves for
head, NPSHR at 3% head
drop and 40,000 hours
erosion life, NPSHR at 1%
head break down, power
consumption, efficiency
against pump flow for the
condensate extraction
pumps. .....................................................................
ii) Speed Vs Torque characte-
ristic curves of condensate
pump .....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
14 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iii) Speed Vs Torque characte-
ristic curves of condensate
pump motor. ......................................................................
1.03.26 Performance Curves for
Heaters & Deaerator
a) Performance curves for the
load ranges from 25% to
150% of the flow through
the heaters with regard to
the following parameters.
i) Terminal temperature
difference. .....................................................................
ii) Drain cooler approach
temperature difference .....................................................................
iii) Feed water pressure
drop across nozzle. .....................................................................
iv) Pressure drop of
steam/condensate,
shell side. ......................................................................
v) Loss of steam through
venting ......................................................................
b) Performance curves for the
load range from no load
to VWO conditions of the
flow through deaerator with
regard to the following
parameters:
i) Oxygen content in
feed water at deae-
rator outlet. .....................................................................
ii) Loss of steam
through venting ......................................................................
iii) Pressure decay
characteristic ....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
15 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.03.27 Characteristic Curves for
Boiler Feed Pumps .....................................................................
i) Characteristic curves for
discharges head, inter-stage
bleed pressure, kicker stage
(if applicable), power con-
sumption, NPSHR at 3%
head break-down and for
40,000 hours erosion life,
NPSHR at 1% head break-
down, efficiency against
pump flow for Boiler feed
pump. .....................................................................
ii) Total dynamic head, NPSHR
at 3% head break down
and for 40,000 hours erosion
life, NPSHR at 1% head
break-down, efficiency
against pump flow power
consumption for the BFP
booster pumps. .....................................................................
The characteristics curves
shall be submitted at the
rated speed, maximum
speed, minimum speed and
over the range of intervals
660 rpm. The run out-
condition and also the
emergency condition shall
be clearly marked on the
characteristic curves. The
minimum flow time at vari-
ous speed shall also be
marked.
iii) Speed Vs Torque charac-
teristics for BFP .....................................................................
iv) Speed Vs. Torque chara-
cteristics of BFP motor. .....................................................................
v) Speed Vs. Torque charac-
teristics for the step down
gear box ......................................................................
vi) Torque Vs.slip charact-
eristics and losses Vs
speed characteristics for
the hydraulic coupling .....................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
16 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 2
SUPPLEMENTARY DATA
1.01.00 Thermal kit data for heat
balance computation ................................................................
1.02.00 Broad procedure for perfor-
mance guarantee test proposed
for this project indicating the
code, primary flow measure-
ment, type and accuracy class
of all instrumentation etc. ..................................................................
1.03.00 True copies (signed) for the
performance guarantee test
reports on the turbine generator
sets rated for 660 MW and
above supplied by the Bidder
indicating the complete details
of the performance actually
realised for the machine.
Indicate the rated conditions,
actual test conditions, guara-
nteed parameters, test codes
adopted, list of instruments and
their accuracies, actual meas-
urements taken for various para
meters needed for computation
of the performance and calcul-
ations of heat rate (Ref. clause
1.22.02 Sub-Section-A-3, Part-B,
Section-VI of the specification) .............................................................
1.04.00 Write up on special design
features, if any provided in
respect of the heat rate figures
quoted ..................................................................
1.05.00 Campbell diagrams (typical)
for blading proposed, clearly
indicating the resonant points
and the operating frequency
range (Ref. clause 1.06.00 (f),
Sub-Section-A-3, Part-B, Section-VI ..................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
17 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.06.00 a) Schedule of valves giving
service type, make, size,
body, trim materials, location
and details of actuators ..................................................................
b) Schedule of control valves
as above .................................................................
1.07.00 Write-up on Online Automatic
Turbine Testing System including
the features of selection of each
test ..................................................................
1.08.00 Write-up on HP-LP bypass
system with necessary process
& control scheme and arrange-
ments provided for operation of
HP-LP bypass system under
variable pressure and constant
pressure modes of operation and
with sufficient details to establish
the provenness (Ref. Sub-Section-
PROVENNESS, Part-A, Section-VI) ..................................................................
1.09.00 Write-up on ARTS, turbine gover-
ning system, turbine supervisory
system, turbine control system,
gland seal steam control system,
fire protection system design for
oil leaks etc. with necessary
diagrams and typical logics for
ATRS. ..................................................................
1.10.00 Write up on the suggested
control schemes for lube oil
system, control oil system, seal
oil system, generator gas system,
stator water cooling system etc. .................................................................
1.11.00 Write-up on suggested generator
supervisory system like ..................................................................
a) Core monitoring system ..................................................................
b) End winding vibration
monitoring system ..................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
18 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c) Active shaft grounding
system ..................................................................
d) On-line radio frequency
monitoring system for arc
detection inside generator .................................................................
e) Alkaliser unit and on line
oxygen monitoring system ..................................................................
f) On-line temperature
monitoring of water in
stator winding bars .................................................................
g) Power system stabiliser .................................................................
h) TG shaft torsional
oscillation monitoring
system .................................................................
1.12.00 Write-up on interlock and
protection for turbine and
generator alongwith functional
requirements .................................................................
1.13.00 Detailed write-up on start up
and shut down procedure for
steam turbine generator set
(Enclose start up curves) ..................................................................
1.14.00 The turbine generator unit
shall be suitable for two shift
and cyclic operation at an early
date in its life and will be
required to participate in
automatic load frequency
control system. Bidder
to furnish the following data
(Also refer clause 1.01.04
& clause 1.21.00 Sub-Section-A-3,
Part-B, Section-VI
for additional details) ..................................................................
a) Design Criteria ..................................................................
b) Limits of thermal stresses .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
19 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c) Critically stressed compo-
nents/locations and cycle life
expended for each of the
following: ..................................................................
i) Cold startup .................................................................
ii) Warm overnight startup .................................................................
iii) Warm week end startup ..................................................................
iv) hot startup .................................................................
v) Cyclic load variations .................................................................
d) Instruments provided for
monitoring critical parameters .................................................................
e) Write-up, data and start up
curves .................................................................
f) Permissible variation of load
under various regimes .................................................................
g) Controls provided to limit the
requirements of the start up
curves .................................................................
h) List of units supplied which
are in operation in two shift
and cyclic mode (Design
criteria to be elaborated, and
operating cycle, steam para-
meters, start-up time after
8 hours shut down and 32
hours shut down, date of
commercial operation and
cumulated number of start
ups till date to be indicated) ..................................................................
1.15.00 Write up on variable pressure
mode of operation of TG set with
output Vs. main steam pressure,
M.S. temp & HRH temp curves,
for pure and modified sliding operation and
possibility of running units in constant
pressure mode of operation etc.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
20 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.16.00 Write-up on turbine water
damage protection as per
ASME-TDP-1-1985 (Refer
clause 1.01.02 (xiii),
Sub-Section-A-3,
Part-B, Section-VI) ....................................................................................
1.17.00 Write-up on corrosion protection
of turbine during long shutdown
(turbine preservation system)
including schematic & GA
drawings and details of system
provided) (Ref. clause 1.03.00
(iii), Sub-Section-A-3,
Part-B, Section-VI) .......................................................................................
1.18.00 Sizing calculations for conden-
ser air evacuation pump (Refer
clause 2.06.00 Sub-Section-A-3,
Part-B, Section-VI .......................................................................................
1.19.00 Thermal, hydraulic and mecha-
nical design calculations for
condenser (Ref. clause 2.00.00,
Sub-Section-A-3, Part-B, Section-VI) .......................................................................................
1.20.00 Gland steam condenser
thermal design calculations .................................................................
1.21.00 Sizing calculations for flash
tanks ..................................................................
1.22.00 Thermal design of all heat
exchangers ..................................................................
1.23.00 Sizing criteria for vapour
exhausters for gland steam
condenser and lube oil system .......................................................................................
1.24.00 Life expenditure curves for TG set .......................................................................................
1.25.00 Recommended wet steam washing
procedure (indicating the list of equip-
ments required, steam parameters
etc.) (Ref. Clause 1.03.00,
Sub-Section-A-3, Part-B, Section-VI) .......................................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
21 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.26.00 Temporary speed rise values (To be duly
supported by detailed calculations bringing
out clearly all the input data correlation
considered and results) .................................................................
1.27.00 Write up on criteria for back end loading
of the turbine. Also furnish complete tec-
hnical data alongwith LP exhaust
area, Last stage blade height, max. steam
flow under VWO condition through LP
annulus area, actual back end loading,
design back end loading etc (Refer
clause 1.06.00 (h), Sub-
Section-A-3, Part-B, Section-VI) ..................................................................
1.28.00 Write-up on selection basis of the proven
turbine modules proposed, backed up with ..................................................................
i) No. and name of units in operation
with year of commercial operation .................................................................
ii) Design details and dimensional
arrangement drawings of each
module .................................................................
iii) Variation, if any, in the modules
proposed for this project from
those modules already manufactured
and supplied and which are in suc-
cessful operation. (Bring out all major
variations like the changes in blade
profile, blade height & any other
details). .......................................................................................
iv) Operational availability records from
utilities with exact information on the
unavailability, type of failure/break
down, corrective action taken etc. .................................................................
1.29.00 Boiler Feed Pumps and Condensate
Extraction Pumps
i) Complete write-up and control
schemes for condensate extraction
pumps and all internals. ..................................................................
ii) Complete write-up and control
schemes for Boiler feed pumps
including its booster pump and
all internals. .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
22 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iii) Complete write-up on the hydraulic
coupling including all accessories. .................................................................
iv) Write-up on cartridge removal
system for BFP .................................................................
v) Data on special features incorpo-
rated in the feed and condensate
pumps so as to ensure a high
degree of reliability .................................................................
1.30.00 Heaters and Deaerator
i) All the necessary technical write-
ups and any special features
incorporated for the following: .................................................................
a) Methods of separating the
various heat exchange
zones and means of prote-
cting the tubes and other
internal parts from imping-
ement and erosion. .................................................................
b) Methods of providing adeq-
uate venting of non-con-
densable gases with
minimum loss of steam
taking into account the
variation in water level,
accompanying load changes. ..................................................................
ii) Illustrative literatures and catal-
ogues covering design and
construction of the heaters and
deaerator. .................................................................
iii) Catalogues for the standard
equipment like level gauges,
sentinel valves and relief valves. .................................................................
iv) Procedure for cladding of tube
sheet. ..................................................................
v) Procedure for rolling tubes into
the tube sheet. .................................................................
vi) Procedure for welding tubes to
the tube sheet. .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
23 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
vii) Procedure for leak testing of
tube to tube sheet joint,
hydraulic testing and drying. ..................................................................
viii) Detailed procedure for over-
hauling, maintenance and
operation of the equipment
and method of protecting the
heaters and deaerator during
transportation/erection/storage/
commissioning. ..................................................................
ix) Detailed procedure of the
plugging and information reg-
arding number of tubes that
can be plugged during operation
without affecting the performance. ..................................................................
x) Procedure for measurement of
dissolved oxygen and carbon
dioxide content at the deaerator
outlet and details of the test kit
for measuring the dissolved
oxygen content. ..................................................................
xi) Complete thermal design cal-
culation for each feed water
heater clearly bringing out the
calculation, curves etc. for
determining the heat transfer
coefficient of various zones. .................................................................
1.31.00 List of Turbine Generator Unit asse-
mblies/sub-assemblies/components
and other components / systems
covered in this package .................................................................
1.31.01 Items of above list proposed to be
manufactured at
i) Bidder's works .................................................................
ii) Collaborator's works .................................................................
iii) Sub-Vendor's works (Also
identify name of sub-vendor/works) .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
24 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.31.02 Experience in respect of above list
(other than TG modules) indicating
Name of utility, Name of Power station,
Number of units, type of unit (fossil
fuel fired/nuclear) Unit size, capacity
of the equipment/component/system
type of equipment, date of commissi-
oning of the unit. .................................................................
1.32.00 Allowable forces, moments and move-
ments if any on the turbine, main steam
and reheat stop and control valves,
steam inlet, outlet and extraction piping,
HP-LP bypass valves and condenser
under cold and hot conditions .................................................................
1.33.00 i) Components requiring
a) replacement .................................................................
b) repairs during life cycle of
the plant .................................................................
ii) Mean time between failures. .................................................................
iii) List of tasks to be carried out
during major overhauls. .................................................................
1.34.00 Write-up on criteria & details of studies
carried out for selection of Turbine
Generator Combination offered. .................................................................
1.35.00 Technical information and exchange
capacity curves of the resins of
condensate polishing unit for stator
water coolant. .......................................................................................
1.36.00 Write -up on condenser on -load
tube cleaning system including list of
supply under tube cleaning system
(Refer clause 3.00.00, Sub-Section-A-3,
Part-B, Section-VI) ...................................................................
1.37.00 Complete technical literature including
characteristic curves, data sheets, sizing
calculations etc. for all control valves,
process valves and flow measuring
devices in steam, condensate and
feedwater ...................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
25 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.38.00 Characteristic curves of all the actuators
in respect of valves ....................................................................
1.39.00 Compressed air (station & Instrument)
requirements stating the quantity and
quality etc. for the various equipment
and actuators forming part of this
specification. ...................................................................
1.40.00 i) Cooling water requirements equip-
mentwise, stating the quantity,
quality, pressure etc. at Bidder's
terminal point alongwith the scheme ....................................................................
ii) Details of arrangement provided (if
any) to meet the pressure and temp-
rature requirements. ....................................................................
1.41.00 Auxiliary steam requirement
a) Pressure (Kg/cm
2
) .......................................................................................
b) Temperature (deg C) .......................................................................................
c) Quantity (T/hr) .......................................................................................
1.42.00 a) Complete list of maintenance tools
and tackles included in the offer .......................................................................................
b) Complete list of special calibration,
testing & maintenance instruments
included in the offer .................................................................
c) Maintenance facilities provided
for assembly, disassembly and
alignment work of Turbine
Generator components .......................................................................................
1.43.00 Details of forced cooling of the turbine
indicating the provisions made,
equipments provided/required, turbine life
expended when force cooled. (ref clause
1.03.00, Sub-Section-A-3, Part-B, Section-VI) ........................................................
1.44.00 Write-up on Gland Type & Gland Steam
Sealing System ........................................................
1.45.00 Calculation for Steam requirement for
starting TDBFP using Aux. Steam or any
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
26 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
other alternate source considered for
Start up of the unit in Cold, Warm &
Hot condition ........................................................
1.46.00 Write-up on BFPDT including its Control
arrangement, steam washing lube oil,
control oil, protection etc. ........................................................
PART - 3
DRAWINGS
1.01.00 Schematic diagrams with instrumen-
tation and control for turbine lube oil
and control oil system, gland sealing
system, turbine drainage system, con-
densate spray system HP-LP bypass
system clearly indicating the scope of
supply. ..................................................................
1.02.00 Schematic diagram for turbine and BFP drive
turbine governing system ..................................................................
1.03.00 Layout drawing showing the preferred
location of the equipment covered in
the proposal ..................................................................
1.04.00 Drawing showing loading and location
of all columns around T. G. Platform ..................................................................
1.05.00 Drawing showing details of sub zero
pits, pipe trenches with sizes and levels .................................................................
1.06.00 Drawing showing details of structural
steel arrangement around T.G. pedestal
and the restrictions on number and sizes. ..................................................................
1.07.00 Drawing showing the details of fixtures,
embedded parts, foundation plates .................................................................
1.08.00 Recommended foundation drawings
adopting reinforced concrete foun-
dations for all the equipment covered
under this specification including
various static and dynamic loads
coming at different points with location
and direction and the embedment
requirements. ..................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
27 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.09.00 General arrangement giving dimensions,
weights (empty, operating & flooded),
nozzle connections, orientation with
respect to main plant axes, mounting
and support details of each equipment
and assembly including but not limited
to ..................................................................
a) Turbine ..................................................................
b) Condenser .................................................................
c) i) Condensate Extraction System
ii) Drip pumps (if offered) .................................................................
d) Boiler Feed Pump and its Booster
Pump, drive turbine, gear box etc. .................................................................
e) LP heater (in condenser neck)
(with limiting dimensions if any) .................................................................
f) Other LP Heaters .................................................................
g) Water box handling arrangement ..................................................................
h) Lube oil tank (unit & central) ..................................................................
i) Lube oil coolers, control fluid
coolers and control fluid tank ..................................................................
j) Gland steam condensers .................................................................
k) Deaerator ..................................................................
l) Condensate flow nozzle for PG test .................................................................
m) HP Heaters. .................................................................
n) Generator .......................................................................................
o) Exciter .......................................................................................
p) Seal oil coolers .......................................................................................
q) Stator water coolers .......................................................................................
r) Hydrogen cooler .......................................................................................
s) HP and LP bypass valves .......................................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
28 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
t) Steam throw off device .......................................................................................
u) Main steam & reheat stop & control
valves with strainers ..................................................................
v) Flash tanks ..................................................................
w) Condenser air evacuation pp ..................................................................
x) COLTCS system including its
components .................................................................
y) Lube oil purification system (unit
& central) .................................................................
z) GSC vapour exhauster .................................................................
1.10.00 Sectional drawings (dimensioned) of all
equipment including but not limited to
a) Turbine .................................................................
b) Condenser ..................................................................
c) i) Condensate Extraction pump .................................................................
ii) Drip Pumps (if offered)
d) Boiler Feed Pump and Mechanical
Seal, gear box, BFP drive turbine etc. .................................................................
e) BFP Booster Pump and Mechanical
Seal ..................................................................
f) Hydraulic Coupling .................................................................
g) Generator and Exciter ..................................................................
h) Main steam & reheat stop and control
valves ..................................................................
i) PG test primary flow nozzle assembly .................................................................
j) LP & HP Heaters .................................................................
k) Deaerator .................................................................
l) Centrifuge .................................................................
m) Oil pumps .................................................................
n) J OP .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
29 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.10.01 Drawing showing suggestive layout below
the T.G. deck for MS, CRH, HRH, LP bypass
together with extraction lines, heater drain lines ..................................................................
1.11.00 Schematic diagram indicating terminal points
and instrumentation for the following:
i) BFP and booster pumps including
sealing arrangement. ..................................................................
ii) Condensate pumps including sealing
arrangement. .................................................................
iii) Lubricating oil system for motor
driven pumps. ...............................................................
iv) Lube oil and control oil system for ...............................................................
turbine drive BFP
v) Auxiliary cooling water supply &
return for TDBFP and MDBFP ..................................................................
1.12.00 a) Preliminary static and dynamic loads
to be considered for design of TDBFP/
MDBFP, booster pump and condensate
extraction pump foundations, indicating
the point of application of loads. ..................................................................
b) Individual cross sectional drawing
for the following: ..................................................................
i) First stage impeller of feed pump. .................................................................
ii) First stage impeller of condensate
pump. ..................................................................
iii) Booster pump impeller. ..................................................................
c) Drawing showing the hydraulic
balancing device and the proc-
edure of fixing it to the shaft. ..................................................................
d) Preliminary drawing of BFP and
CEP shafts indicating the diameters
at various stages. ..................................................................
e) Drawing clearly indicating the various
internal clearances for each of the
following: ..................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
30 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
i. Boiler feed pump .................................................................
ii. Booster pump ..................................................................
iii. Condensate pump .................................................................
iv. Drip Pumps (if offered)
v. BFP drive turbine .................................................................
f) Drawing indicating the clearances
at the feed pump glands ..................................................................
g) Drawing indicating all the terminal
connections. ..................................................................
h) Drawing of strainers for each of the
following:
i) Gland sealing line of BFP turbine ..................................................................
ii) Booster Pump ..................................................................
iii) From booster pump discharge
to BFP suction. ..................................................................
iv) CEP ....................................................................
i) Drawing indicating the maximum forces
and moments that can be permitted on
the following nozzles from the connecting
piping. .................................................................
i) Booster pump suction and discharge. ..................................................................
ii) BFP suction and discharge. ..................................................................
iii) CEP suction and discharge. ..................................................................
iv) BFP drive turbine .....................................................................
v) Drip Pump suction and discharge. ..................................................................
(if offered)
j) Drawing indicating the initial movements
at BFP booster pump suction and disch-
arge, BFP suction and discharge, CEP
suction and discharge and BFP drive
turbine .................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
31 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.13.00 Drawing showing the laydown space
requirements ..................................................................
1.14.00 Overall length, width and height of TG
set in the rotor withdrawal space
requirement ..................................................................
1.15.00 Drawing indicating generator stator kept
on a well type rail wagon indicating all
dimensions. ..................................................................
1.16.00 Locations and sizes of steam inlet
connections .................................................................
1.17.00 Bearing spans and coupling locations ................................................................
1.18.00 Shaft centre line to operating floor
dimension .................................................................
1.19.00 Generator rotor widthdrawal clearance ..................................................................
1.20.00 Temperature control diagram .................................................................
1.21.00 Erection assembly drawings. .................................................................
1.22.00 Details of torsional oscillation frequen-
cies of the TG shaft sections and their
torsional mode shapes ..................................................................
1.23.00 Drawings indicating the final loading
data, and fixing details of the equipment ..................................................................
1.24.00 Integral piping diagrams including com-
plete piping schemes, layouts, location
and loading ..................................................................
1.25.00 Dimensional drawing showing the
suggested routing of main steam, Hot
Reheat piping between strainer/stop
valves & turbine. ..................................................................
1.26.00 Atmospheric relief diaphragm ..................................................................
1.27.00 Drawing showing the edge preparation
details of terminals for welding to the
contractor's equipment alongwith
allowable forces, moments and
movements ..................................................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
32 OF 32
DA2(I)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.28.00 Drawing showing the bolt (casing) loading
and strains and indicating the estimated
period in which retightening or replace-
ment of bolts is required alongwith the
instructions. ..................................................................
1.29.00 Erection assembly drawings as
detailed below .................................................................
1.29.01 Turbine including casings, rotors,
nozzles, exhaust connections, emer-
gency stop valve, interceptor valves,
non-return valves, nozzle valves, turning
gear arrangement etc ................................................................
1.29.02 Condensing plant including condenser,
vacuum pumps, circulating water valves
and expansion joints, vacuum breaker
system etc. .................................................................
1.29.03 Governing system .................................................................
1.29.04 Turbine lube oil tanks ..................................................................
1.29.05 HP and LP bypass valves .................................................................
1.29.06 Butterfly valves ..................................................................
1.29.07 Pumps including emergency oil pump,
auxiliary oil pump and jacking oil pump ..................................................................
1.29.08 Drawing indicating the preferred location
of L.P. heater(s) in condenser neck
(with the limiting dimensions & location
of nozzles etc.) ..................................................................
1.30.00 Turbine clearance diagram indicating ..................................................................
values for radial & axial clearances and
leakage rate at EMCR load & worst
operating condition.
1.31.00 Condenser tube layout including withdrawal
space of the condenser necessary for tube
banks,steam laying arrangement inside the
condenser,condenser hotwell and deaerating
section layout ..................................................................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-II
TECHNICAL DATA TO BE
SUBMITTED ALONGWITH THE BID
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION - DA2 (II)
PART - 1
STEAM TURBINE AND ACCESSORIES
1.00.00 RATING AND CAPABILITIES
1.01.00 Rated output MW ........................................
1.02.00 a) Maximum continuous Rating
under rated steam conditions at
89 mm Hg (abs) Condenser pressure
and 3% make up MW .........................................
b) Maximum continuous output the
machine can deliver (indicate the
operating conditions and furnish
heat balance diagram) MW ...........................................
1.03.00 a) Economic Maximum Continuous
Rating (EMCR) (corresponding to
77 mm Hg (abs) and 3% make-up
and rated steam conditions) MW ........................................
b) Main steam flow rate under EMCR
condition T/hr ...........................................
1.04.00 Peak capability
a) Peak load MW ...........................................
b) Time limitation if any Sec ...........................................
c) Operating condition(s)
(with heat Balance) ...........................................
d) Limiting factor (indicate whether it is
turbine flow path/blade stressing/
generator capability / any other
factor) ...........................................
1.05.00 a) Is the turbine designed for over
pressure operation Yes/No
b) Indicate the % over-pressure
capability of the turbine generator
under VWO condition and the
corresponding continuous output
and steam flow with rated steam
temperature & 77 mm Hg Condenser
pressure
(Furnish Heat Balance Diagram) % ...........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.06.00 a) Flow through turbine under V.W.O.
conditions (with rated steam inlet
pressure and temperature) T/hr ............................................
b) VWO output at rated steam
conditions 77 mm Hg (abs)
Condenser pressure & 3% make up MW ............................................
c) VWO output at rated steam
conditions, 89 mm Hg (abs)
Condenser pressure & 3% make up MW ............................................
d) VWO output at rated steam
conditions, all HP heaters out of
service 77 mm Hg (abs) Condenser
pressure at 0% and 3% make up
(furnish HBDs) MW ............................................
1.07.00 Indicate maximum continuous output the
unit is capable of delivering under rated
steam conditions at 77 mm Hg (abs) and
89 mm Hg (abs) Condenser pressure & 3%
as well as 0% make up with. .............................................
a) i) Both strings of HP Heaters out MW ............................................
with 0% make up
ii) Both strings of HP Heaters out MW ............................................
with 3% make up
b) i) One string of HP heaters out MW ............................................
with 0% make up
ii) One string of HP heaters out MW ............................................
with 3% make up
c) Capacity of TG set as per Clause MW ............................................
1.01.04 (i), Sub-Section-A-3, Part-B
of Section-VI
1.08.00 Maximum flow through LP turbine (Indicate
pressure, Temp. & Wetness & condition of
operation) T/hr ............................................
1.09.00 Design back-pressure for above mm Hg
rating (EMCR) (abs) ............................................
1.10.00 Number of uncontrolled extraction points ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.11.00 Final feed water temperature .........................................
a) Under heat rate guarantee point deg C ..........................................
b) Under EMCR conditions deg C ..........................................
1.12.00 Rated speed of the turbine rpm ..........................................
1.13.00 a) Operating frequency range
for turbine Hz ............................................
b) Limitations on number of hours
of operation if any at frequency
beyond this range ..........................................
1.14.00 Is the turbine capable of two shift
and cyclic operation Yes/No ..........................................
1.15.00 Is the turbine primarily designed for
constant pressure mode of operation Yes/No ..........................................
1.16.00 Is the turbine capable of sliding
pressure mode of operation Yes/No ..........................................
1.17.00 Rated throttle steam pressure ata ..........................................
1.18.00 Rated throttle steam temperature deg. C ..........................................
1.19.00 Reheat steam inlet temperature deg. C ..........................................
1.20.00 Is the acceptable variation from rated
steam pressure and temperature as
per IEC-45 ..........................................
a) Under normal pressure condition Yes/no ..........................................
b) Under over pressure condition Yes/No ..........................................
1.21.00 Maximum vibration level on any of the
bearings of TG set Microns ..........................................
1.22.00 Maximum noise level of
i) Main TG set Decibels ..........................................
ii) Auxiliaries including HP/LP
bypass system Decibels ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.23.00 a) i) Is the turbine generator
suitable for installation on
conventional framed
foundation Yes/No ..........................................
ii) Experience list for framed
foundation above ..........................................
b) i) Is the turbine generator
suitable for installation on
vibration isolation system
consisting of helical springs
and viscous dampers Yes/No
ii) Experience list for (b), above i) ....................................
ii) ....................................
2.00.00 DESIGN AND OPERATION DATA
2.01.00 Make .........................................
2.02.00 Type of blading (Impulse /Reaction) .........................................
2.03.00 Type of governing (throttle/nozzle/
combined with auto change over
facility) ..........................................
2.04.00 Number of turbine cylinders ..........................................
a) HP ..........................................
b) IP ..........................................
c) Combined HP-IP (if applicable) ..........................................
d) LP ..........................................
e) Total ..........................................
f) Tandem/cross compound ..........................................
2.05.00 Module number and details (attach
dimensioned drawings, experience
details, operational feed back etc.)
a) HP ..........................................
b) IP ..........................................
c) Combined HP-IP (if applicable) ..........................................
d) LP ..........................................
e) Generator ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
5 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.06.00 Installation (Indoor/Outdoor) ..........................................
2.07.00 Mode of operation (constant/
variable/both) pressure ..........................................
2.08.00 Maximum allowable throttle Kg/Cm
2
steam pressure (abs) ..........................................
2.09.00 Maximum allowable throttle steam
temperaturedeg C ..........................................
2.10.00 Maximum allowable reheat turbine
inlet temperature deg C ..........................................
2.11.00 Maximum HP exhaust pressure
(under transients)
a) expected Kg/Cm
2
..........................................
(abs)
b) allowable Kg/Cm
2
..........................................
(abs)
2.12.00 Maximum permissible steam metal
temperature differential during
a) Cold start-up (after more than 36
hrs shut down) deg C ..........................................
b) Warm start-up (between 36 hrs
and 8 hours shut down) deg C ..........................................
c) Hot start up (less than 8 hrs
shut down) deg C ..........................................
d) Loading/unloading and shut
down deg C ..........................................
e) Normal operation deg C ..........................................
2.13.00 Maximum reheat steam pressure at
intermediate pressure turbine Kg/cm
2
inlet (abs) ..........................................
2.14.00 Steam pressure drop in the reheater % of HP
circuit turbine
exhaust
pressure ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
6 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.15.00 Turbine exhaust pressure Kg/cm
2
..........................................
(abs)
2.16.00 No-load steam flow through turbine T/hr ..........................................
2.17.00 Make-up to heat cycle (at condenser
hotwell) ..........................................
a) Under heat rate guarantee % of M.S.
conditions flow ..........................................
b) Normal operating conditions % of M.S ..........................................
2.18.00 Exhaust steam parameters to condenser
(at condenser design conditions)
2.18.01 Flow T/hr. ..........................................
2.18.02 Enthalpy at turbine exhaust Kcal/kg ..........................................
2.18.03 Dryness fraction ..........................................
2.18.04 Maximum allowed dryness fraction ..........................................
2.19.00 Design conditions for Extraction steam
at Turbine Extraction point.
Note: 1) The steam parameters for
various steam extractions
to be filled under this clause
must correspond to the
turbine extraction nozzles /
turbine outlet.
2) Figures must be
furnished for 100% Heat rate
guarantee conditions. Separate
figures for 80%, 60% and 50%
Load conditions.
2.19.01 Extraction Steam to Low Pressure Feed
Water Heater(s) in condenser neck
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature (Dryness fraction) deg C ..........................................
d) Pressure Kg/cm
2
..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
7 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(abs)
2.19.02 Extraction Steam to Low Pressure Feed
Water Heater No. 2
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
(abs)
2.19.03 Extraction Steam to Low Pressure Feed
Water Heater No. 3
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
(abs) ..........................................
2.19.04 Extraction Steam to Deaerating
Pressure Feed Water Heater at
Deaerator
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
(abs)
2.19.05 Extraction Steam from Turbine
to Boiler feed pump turbine drives at
BFPT
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
8 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.19.06 Extraction Steam to High Pressure Feed
Water Heater No. 5 A/5B
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
(abs)
2.19.07 Extraction Steam from Cold
Reheat Line to High Pressure Feed
Water Heater No. 6A/6B
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
(abs)
2.19.08 Extraction Steam from Cold
Reheat Line to High Pressure Feed
Water Heater No. 7A/7B
a) Flow T/hr ..........................................
b) Enthalpy kcal/kg ..........................................
c) Temperature deg C ..........................................
d) Pressure Kg/cm
2
..........................................
(abs)
2.19.09 Extraction Steam from Cold
Reheat Line to Boiler Feed
pump drive turbine at low load
a) Flow T/hr .........................................
b) Enthalpy kcal/kg .........................................
c) Temperature deg C .........................................
d) Pressure Kg/cm
2
.........................................
(abs)
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
9 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.19.10 LP turbine exhaust before mixing with
BFPT exhaust steam
a) Flow T/hr .........................................
b) Enthalpy kcal/kg .........................................
c) Temperature deg C .........................................
d) Pressure Kg/cm
2
.........................................
(abs)
2.20.00 Change over of steam source
from IP-LP cross over to alternate
steam source for boiler feed
pump drive turbine during normal
plant operation. % EMCR .........................................
2.21.00 Critical speeds for turbine bladed
rotors (State for individual rotors
& for combined rotor) RPM .........................................
2.22.00 Combined critical speeds of TG set RPM .........................................
2.23.00 Does any turbine rotor pass through
critical speed coming up to rated
speed? If so, what shaft and at
what speed? RPM .........................................
2.24.00 Combined critical speed studies
for offered TG sets Yes/No ..........................................
Furnished at ......................................
2.25.00 Type of turning gear (Hydraulic/
Motorised) .........................................
2.25.01 KW rating of motor (if motorised turning
gear is used) KW .........................................
2.25.02 Turning speed RPM .........................................
2.26.00 Is the turbine designed for full
arc admission during start-up? Yes/No .........................................
2.27.00 Moisture at LP last stage under
normal steam conditions and with
all extractions open for boiler
feed pump drive turbines % .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
10 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.28.00 Maximum allowable temperature at LP
turbine exhaust hood deg C .........................................
2.29.00 Temperature of exhaust hood at
which spray will be initiated deg C .........................................
2.30.00 Is spray water required at
i) Low load operation Yes/no .........................................
ii) House load operation Yes/no .........................................
iii) No load operation Yes/No .........................................
iv) HP-LP bypass operation Yes/No .........................................
2.31.00 Minimum stable load for
operation of TG set:
a) Continuous without exhaust
hood spray MW .........................................
b) With time limitation MW .........................................
c) Continuous with exhaust hood
spray MW .........................................
2.32.00 Coast - down time to turning gear
speed standstill condition after
Turbine Trip-out .........................................
2.32.01 with Vacuum Minutes .........................................
2.32.02 With Vacuum broken Minutes .........................................
2.33.00 Total quantity of spray water required
a) For Exhaust Hood Spray T/hr .........................................
b) Other flash Boxes T/hr .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
11 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.34.00 Thermal Kit Data
2.34.01 Turbine internal efficiencies For 660 For 528
considered in guarantee heat MW MW
balance diagrams Guarantee Guarantee
heat heat
balance balance
a) Efficiency of each stage of HP turbine % ............ ......... ............ ............
b) Group stage efficiency upto first
extraction (i.e. of HP turbine) % ............ ......... ............ ............
c) Weighted efficiency of HP module % ............ ......... ............ ............
d) Efficiency of each stage of IP turbine % ............ ......... ............ ............
e) Group stage efficiencies for stages
between each extraction point in IP
turbine % ............ ......... ............ ............
f) Weighted efficiency of IP Module % ............ ......... ............ ............
g) Efficiency of each stage of
LP turbine % .......... ......... ......... ......... ............
h) Group stage efficiencies for
stages between each extraction
point in LP turbine % .......... ......... ......... ......... ............
i) Weighted efficiency of LP
module % .......... ......... ......... .....................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
12 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.34.02 Losses considered in heat bal-
ance computations
VWO 660 528 396 330
3% mu MW MW MW MW
& HR HR 0% mu 0% mu
design guar guar modified sliding
conden- antee antee & &
ser point point
press- & &
ure design design design design
cond- cond- cond- cond-
enser enser enser enser
pres- pres pres pres
sure sure sure sure
a) Turbine mechanical loss
including bearing friction
but excluding power
consumed by shaft driven
driven MOP KW .......... ........ ......... ......... ........ .........
b) Turbine windage losses KW .......... ........ ......... ......... ........ .........
c) Turbine Exhaust losses Kcal/Kg .......... ........ ......... ......... ........ .........
KW
d) Generator losses KW .......... ........ ......... ......... ........ .........
e) Generator mechanical
losses (including
bearing friction losses) KW .......... ........ ......... ......... ........ .........
f) Power consumed
by main oil pump KW .......... ........ ......... ......... ........ .........
g) Power consumed by
other integral auxiliary
services for the turbine
generator (with list of
auxiliaries) KW ....... ........ ......... ......... ......... .........
h) Total losses and power
consumption considered for
arriving at Pg for guaranteed
heat rate consumption (Also
indicate if all the items at
serial numbers (a) to (g)
considered for computation) KW ........ ......... ......... ........ ......... .........
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
13 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.34.03 Main steam pressure at inlet to Kg/cm
2
strainer (abs) ...........................................
2.34.04 Main steam pressure at inlet
to stop valve Kg/cm
2
...........................................
(abs)
2.34.05 Main steam pressure at inlet to Kg/cm
2
1st stage of HP turbine (abs) ...........................................
2.34.06 Pressure drops (in kg/cm
2
(abs)/percentage) VWO 660 528 396 330 396
3% mu MW MW MW MW MW
& HR HR 0% mu 0% 0% mu
design guar guar modi- mo- &
cond- antee antee fied slid design
enser point point pres- back press-
press- & de- & de- sure & & de- ure
ure sign sign design sign
cond- cond- cond- cond-
enser enser enser enser
pres- pres pres pres
sure sure sure sure
a) Main steam strainer ......... ........ ......... ......... ........ .........
b) Main steam stop valve ......... ........ ......... ......... ........ .........
c) Main steam control valve ......... ........ ......... ......... ........ .........
d) Hot reheat strainer ......... ........ ......... ......... ........ .........
e) Reheat stop valve ......... ........ ......... ......... ........ .........
f) Reheat control valve ......... ........ ......... ......... ........ .........
g) Extraction lines to HPH7A/B
if applicable
(including the part of CRH line) ......... ........ ......... ......... ........ .........
h) Extraction lines to HPH6A/B
(including the part of CRHline) ......... ........ ......... ......... ........ .........
i) Extraction lines to HPH-5A & 5B ......... ........ ......... ......... ........ .........
i) From stage outlet
to turbine flange.
ii) From turbine flange to
heater inlet
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
14 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
j) Extraction line to deaerator ......... ........ ......... ......... ........ .........
i) From stage outlet
to turbine flange.
ii) From turbine flange to
deaerator inlet
k) Extraction line to LPH-3 ......... ........ ......... ......... ........ .........
i) From stage outlet
to turbine flange.
ii) From turbine flange to
heater inlet
l) Extraction line to LPP-2 ......... ........ ......... ......... ........ .........
i) From stage outlet
to turbine flange.
ii) From turbine flange to
heater inlet
m) Extraction line to LP Heater(s) ......... ........ ......... ......... ........ .........
& Condenser neck
i) From stage outlet
to turbine flange.
ii) From turbine flange to
heater inlet
n) M.S. line from strainer to stop ......... ........ ......... ......... ........ .........
valve/control valve
o) H.R.H. line from strainer to stop
valve ......... ........ ......... ......... ........ .........
p) M.S. line from control
valve to HP turbine inlet ......... ........ ......... ......... ........ .........
q) H.R.H. line from control
valve to IP turbine inlet ......... ........ ......... ......... ........ .........
r) Reheater circuit ......... ........ ......... ......... ........ .........
s) Exhaust hood ......... ........ ......... ......... ........ .........
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
15 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
t) Condensate/feedwater side of ......... ........ ......... ......... ........ .........
I) HPH 7A & 7B ......... ........ ......... ......... ........ .........
ii) HPH 6A & 6B ......... ........ ......... ......... ........ .........
iii) HPH 5A & 6B ......... ........ ......... ......... ........ .........
iv) LPH 3 ......... ........ ......... ......... ........ .........
v) LPH 2 ......... ........ ......... ......... ........ .........
vi) LP heater(s) in condenser neck ......... ........ ......... ......... ........ .........
vii) Gland steam condenser ......... ........ ......... ......... ........ .........
Note: All pressure drop figures for items
under Sl. No. a) to s) of the clause
2.34.06 above must be filled in
Kgf/cm
2
2.34.07 Gland leakage coefficients
a) Stop and control valves ..........................................
b) HP front ..........................................
c) HP rear ..........................................
d) Reheat stop & control valve ..........................................
e) IP front ..........................................
f) IP rear ..........................................
2.34.08 Efficiency of boiler feed pump
considered % ........................................
2.34.09 Enthalpy rise across Boiler feed pump Kcal/kg ..........................................
2.34.10 Enthalpy rise across condensate
extraction pump Kcal/kg ..........................................
2.35.00 Temporary speed rise of turbine ..........................................
a) Volume of steam entrained
between main steam control
valves and inlet to first stage M
3
..........................................
to HP turbine
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
16 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Volume of steam entrained
between re-heat control valves
and inlet to IP turbine M
3
..........................................
c) Volume of steam entrained
between first stage to last
stage of HP turbine M
3
..........................................
d) Volume of steam entrained
between last stage of HP
turbine and NRVs on CRH
lines M
3
..........................................
e) Volume of steam entrained
in IP turbine M
3
..........................................
f) Volume of steam in IP-LP
cross over pipe M
3
..........................................
g) Volume of steam in LP turbine M
3
..........................................
h) Volume of steam entrained
in the extraction lines between
the turbine and NRVs on
i) extraction to HPH 7A & 7B M
3
..........................................
ii) extraction to HPH 6A & 6B M
3
..........................................
iii) extraction to HPH 5A & 5B M
3
..........................................
iv) extraction to deaerator M
3
..........................................
v) extraction to LPH 3 M
3
..........................................
vi) extraction to LPH 2 M
3
..........................................
i) Steam parameters at extraction
points
Stage number Steam Parameter
Pressure Enthalpy
Kg/cm
2
Kcal/Kg
(abs)
Extraction to HPH 7 A & 7B
Extraction to HPH 5 A & 5B
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
17 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
extraction to deaerator
extraction to LPH 3
extraction to LPH 2
extraction to LP heater(s) in
condenser neck
j) Stored energy in
i) Main steam line Kcal ..........................................
ii) HRH line Kcal ..........................................
iii) HP turbine Kcal ..........................................
iv) CRH line Kcal ..........................................
v) IP turbine Kcal ..........................................
vi) Cross over pipe Kcal ..........................................
vii) LP turbine Kcal ..........................................
viii) Extraction lines Kcal ..........................................
k) Tripping lag for
i) main steam stop valve sec ..........................................
ii) Reheat stop valve sec ..........................................
2.36.00 Performance guarantee test
2.36.01 Test code for guarantee heat rate test ..........................................
2.36.02 Type of primary flow measuring device
(furnish the drawing) ..........................................
2.36.03 Method of calibration of flow
measuring device and institute of
calibration ..........................................
2.36.04 Type of instrumentation for
temperature measurement and
accuracy class ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
18 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.36.05 Type instrumentation for
pressure measurement and
their accuracy class ..........................................
2.36.06 Test code for condenser performance ..........................................
2.37.00 Turbine governing system
2.37.01 Mode of governing (Nozzle/Throttle ..........................................
combined)
2.37.02 Type ..........................................
2.37.03 Make ..........................................
2.37.04 Model No. ..........................................
2.37.05 Mechanical-Hydraulic back-up provided Yes/No ..........................................
2.37.06 Electro-hydraulic back-up provided Yes/No ..........................................
2.37.07 Dead band of the governor % ..........................................
2.37.08 Percentage regulation and its range
of adjustability % ..........................................
2.37.09 Method of sensing speed changes ..........................................
2.37.10 a) What is the time delay of the
system between speed signal
and governor valve initiation? Sec ..........................................
b) For opening through full travel? Sec ..........................................
c) For closing through full travel? Sec .........................................
2.37.11 On-full load throw-off:
a) Temporary speed rise (TSR) % ..........................................
b) Permanent speed rise % ..........................................
c) Time taken to reach steady
state Sec ..........................................
d) Over all response time of the
governor from the moment of
full load throw off to the moment
of full closing of HP and Interceptor
governor valves Sec ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
19 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.37.12 Range of adjustability of speeder gear % ..........................................
2.38.00 Other components of governing
system
2.38.01 Recommended type of control fluid
and make ..........................................
2.38.02 Specific gravity of control fluid ..........................................
2.38.03 Specification of control fluid ..........................................
2.38.04 Degree of cleanliness to be
maintained for the control fluid
for satisfactory operation of the
system.
a) Permissible suspended
particle size Micron ..........................................
b) Permissible water-content
in fluid by volume % ..........................................
2.38.05 If fire resistant fluid is used as
the control fluid, what are the
specific features provided in the
design to avoid contamination of
control fluid with lube oil during
normal operation? ..........................................
2.38.06 If mineral oil is used as the control
fluid, is extensive protection provided
for oil piping around high temperature
areas against fire hazard? If so, give
details. ..........................................
2.38.07 Total system fluid capacity Lt ..........................................
2.38.08 Fluid reservoir capacity Lt ..........................................
2.38.09 Fluid in piping Lt ..........................................
2.38.10 Fluid flow through the system Lt/min ..........................................
2.38.11 Normal operating fluid pressure Kg/cm
2
(g) ..........................................
2.38.12 a) Number of fluid pumps Nos & ..........................................
furnished make
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
20 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Material of pump
components ..........................................
2.38.13 Capacity and discharge pressure Lt/min ..........................................
Kg/cm
2
(g)
2.38.14 Fluid pump motor rating KW ..........................................
2.38.15 Heaters (if provided)
a) Type and Number ..........................................
b) Rating KW ..........................................
c) Design temperature deg C ..........................................
d) Thermostatic control range
and type ..........................................
2.38.16 Filters/strainers
a) Type of filter ..........................................
b) Make ..........................................
c) Number of filters ..........................................
d) Pressure drop across filter Kg/cm
2
..........................................
e) Material of filter ..........................................
f) Mesh size ..........................................
g) Indicate whether the mesh Yes/No ..........................................
size provided is Bidder's
standard practice
2.38.17 Piping, Valves & Fittings
a) Material ..........................................
b) Design Code ..........................................
2.38.18 Is fluid conditioning equipment
furnished Yes/No ..........................................
2.38.19 If fluid conditioning equipment
provided, furnish following data:
a) Type of conditioner ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
21 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Make & Model ..........................................
c) Mode of operation ..........................................
d) Capacity of unit ..........................................
e) Description of system with
literature/catalogues ..........................................
f) Materials ..........................................
g) Design Code, if any ..........................................
h) No. of circulating pumps
working/stand-by ..........................................
i) Capacity of each circulating
pump (m
3
/hr) ..........................................
j) Material of circulating water
pumps ..........................................
2.38.20 Fluid Coolers
a) Number of coolers in
service ..........................................
b) Number of standby coolers ..........................................
c) Type of heat exchanger
and make ..........................................
d) Design Code ..........................................
e) Capacity of each cooler Lt/min ..........................................
f) Cooling water requirements ..........................................
i) Flow Lt/min ..........................................
ii) Pressure Kg/cm
2
(g) ..........................................
iii) Temperature deg C ..........................................
iv) Quality ..........................................
g) Velocity of water through the
tubes m/sec ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
22 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
h) Water side pressure drop of
each cooler kg/cm
2
(g) ..........................................
i) Tube O.D. and thickness mm & mm ..........................................
j) Material of ..........................................
i) Cooler tubes ..........................................
ii) Cooler shell ..........................................
iii) Cooler waterbox ..........................................
k) Fluid inlet temperature deg C ..........................................
l) Fluid outlet temperature deg C ..........................................
m) Cooling water outlet
temperature deg C ..........................................
n) LMTD deg C ..........................................
o) Fluid pressure drop across
each cooler Kg/cm
2
(g) ..........................................
p) Heat load Kcal/hr ..........................................
q) Heat transfer coefficient Kcal/hr.
m
2
degC ..........................................
r) Heat transfer area required
for rated load condition m
2
..........................................
s) Heat transfer area provided m
2
..........................................
t) Pressure of control fluid
at inlet to cooler Kg/cm
2
(g) ..........................................
u) Shell design/test pressure Kg/cm
2
..........................................
v) Tube & Water box design
pr./test pr. Kg/cm
2
(g) ..........................................
w) Tube to tube sheet joint
(welded/expanded/any other ..........................................
x) Facility provided for changeover ..........................................
of coolers.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
23 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.39.00 Lubricating Oil System
2.39.01 Recommended type of turbine
oil and specification of oil including
a) Absolute viscosity Centipoise ..........................................
b) Kinematic viscosity Centistokes ..........................................
c) Specific gravity ..........................................
d) Specific heat Kcal/kg
0
C ..........................................
e) Flash point (by Cleveland
open cup method) deg C ..........................................
f) Fire point (by Cleveland open
cup method) deg C ..........................................
2.39.02 Oil requirement per bearing M
3
/hr ..........................................
2.39.03 Total oil system capacity Lit ..........................................
2.39.04 Number of oil changes per hour ..........................................
2.39.05 Oil tank capacity
a) Upto normal operating temp Lit ..........................................
b) Total volume of tank Lit ..........................................
2.39.06 Material of oil tank ..........................................
2.39.07 Oil in piping and bearings Lit ..........................................
2.39.08 Normal lube oil pressure Kg/cm
2
..........................................
(g)
2.39.09 Oil requirement for
lubrication system Lit/min ..........................................
2.39.10 Oil requirement for seal
oil system under emergency Lit/min ..........................................
2.39.11 Degree of cleanliness to be
maintained for the lube oil at
inlet to bearings ..........................................
a) Permissible suspended
particle size Microns ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
24 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Permissible water content in
oil by volume % ..........................................
2.39.12 Oil temperature
a) At inlet to the bearings
i) normal deg C ..........................................
ii) maximum deg C ..........................................
b) At outlet from the bearings
i) Normal deg C ..........................................
ii) maximum deg C ..........................................
2.39.13 Main oil pump
a) Capacity Lit/min ..........................................
b) Discharge pressure Kg/cm
2
(g) ..........................................
c) Normal operating flow Lit/min ..........................................
d) Material of pump components ..........................................
e) Make ..........................................
f) Type ..........................................
2.39.14 Main oil pump drive ..........................................
2.39.15 Method of providing positive suction
pressure to main oil pump ..........................................
2.39.16 A. C. Motor Driven Auxiliary oil Pumps
a) Number of pumps in service ..........................................
b) Number of stand by pumps ..........................................
c) Make ..........................................
d) Type ..........................................
e) Capacity of each pump Lit/min .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
25 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
f) Discharge pressure Kg/cm
2
(g) ..........................................
g) Motor rating KW ..........................................
2.39.17 A.C. Motor Driven Turning Gear oil pump
(If provided)
a) Number in service / Stand by ..........................................
b) Make ..........................................
c) Type ..........................................
d) Capacity of pump Lit/min ..........................................
e) Discharge pressure Kg/cm
2
(g) ..........................................
f) Motor rating KW ..........................................
2.39.18 D.C. Motor Driven emergency
Oil Pump
a) Number ..........................................
b) Make ..........................................
c) Type ..........................................
d) Capacity of pump Lit/min ..........................................
e) Discharge pressure Kg/cm
2
(g) ..........................................
f) Motor rating KW ..........................................
2.39.19 AC motor driven jacking oil pump
a) Number ..........................................
b) Make ..........................................
c) Type ..........................................
d) Capacity Lit/min ..........................................
e) Discharge pressure Kg/cm
2
(g) ..........................................
f) Motor rating KW ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
26 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.39.20 DC Motor driven jacking oil pump
a) Number ..........................................
b) Make ..........................................
c) Type ..........................................
d) Capacity Lit/min ..........................................
e) Discharge pressure Kg/cm
2
(g) ..........................................
f) Motor rating KW ..........................................
2.39.21 Filter/Strainer on common lube
oil supply line.
a) Type of Filter ..........................................
b) Make ..........................................
c) Number of filters ..........................................
d) Pressure drop across filters Kg/cm
2
(g) ..........................................
e) Material of filter element ..........................................
f) Size of filter NB mm ..........................................
g) Mesh size mm ..........................................
2.39.22 Piping
a) Material ..........................................
b) Design Code ..........................................
b) Arrangement provided to prevent
fire hazards due to oil leakage ..........................................
2.39.23 Oil Cooler
a) Design Code ..........................................
b) Number of oil Coolers working
furnished /standby ..........................................
c) Type of oil cooler ..........................................
d) Capacity Lit/min ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
27 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e) Cooling water requirement
(at inlet to the cooler) ..........................................
i) Flow Lit/min ..........................................
ii) Quality ..........................................
iii) Pressure Kg/cm
2
(g) ..........................................
iv) Temperature deg C ..........................................
f) Water side pressure drop Kg/cm
2
..........................................
g) Tube (OD & Thickness) mm & mm ..........................................
h) Material of
i) Cooler tubes ..........................................
ii) Cooler sheet ..........................................
iii) Cooler waterbox ..........................................
i) Oil inlet temp. deg C ..........................................
j) Oil outlet temp. deg C ..........................................
k) Water outlet temp. deg C ..........................................
l) Cooling water velocity
through the tubes m/sec ..........................................
m) Oil pressure drop in cooler kg/cm
2
..........................................
n) Heat Load on the Cooler Kcal/hr ..........................................
o) Heat transfer coefficient kcal/hr/ ..........................................
m
2
degC
p) LMTD degC ..........................................
q) Heat transfer area required for
rated load conditions m
2
..........................................
r) Heat transfer area provided m
2
..........................................
s) Pressure of oil at kg/cm
2
..........................................
inlet to cooler (g)
t) Shell design pr/Test pressure kg/cm
2
......................................
(g)
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
28 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
u) Tube & Water box kg/cm
2
..........................................
design pr/Test pr (g)
v) Tube to Tube sheet joint
(welded/expanded/any other) ..........................................
w) Facility provided for
changeover of coolers ..........................................
2.39.24 Vapour Extractor
a) Number of vapour extreactors
furnished Nos. .........................................
b) Capacity Nm
3
/hr .........................................
c) Motor rating KW .........................................
2.40.00 Unit Lube Oil Purifier
2.40.01 Type .........................................
2.40.02 Make & model .........................................
2.40.03 Number .........................................
2.40.04 Capacity Lit/Hr .........................................
2.40.05 Optimum throughput capacity .........................................
(percentage of max. through put capactiy) % .........................................
2.40.06 Max. particle size in oil at outlet a) microns .........................................
b) ISO desig
nation .........................................
2.40.08 Materials of rotating parts & bowl .........................................
2.40.09 Centrifuge motor rating KW .........................................
2.40.10 Heater capacity & no. of steps Kw/No. .........................................
2.40.11 Material of various components .........................................
2.41.00 Details of the central lube oil storage
and purification system given at
2.41.01 Central lube oil purifier
a) Number .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
29 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Capacity Lit/min. .........................................
c) Make & model .........................................
d) Type .........................................
e) Oil purity level at outlet of centrifuge .........................................
i) microns .........................................
ii) ISC designation .........................................
f) Moisture content in oil at outlet % .........................................
of centrifuge
g) Material of rotating parts and bowl .........................................
h) Centrifuge motor rating KW .........................................
2.41.02 Oil storage tanks
a) Capacity of clean oil tank M
3
.........................................
b) Capacity of dirty oil tank M
3
.........................................
c) Material of oil tank .........................................
2.41.03 Oil transfer pumps
a) No. of pumps provided .........................................
b) Capacity of each pump LIt/hr .........................................
c) Head (MWC) .........................................
d) Motor rating KW .........................................
2.42.00 Gland seal System .........................................
2.42.01 Source of gland sealing steam .........................................
a) During normal operation .........................................
b) During low load operation .........................................
(indicate the load range)
2.42.02 Quantity of sealing steam required T/hr .........................................
2.42.03 Sealing steam pressure at turbine glands Kg/cm
2
....................................
(abs)
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
30 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.42.04 Sealing steam temperature at turbine glands deg C .........................................
2.42.05 Minimum steam pressure required for Kg/cm
2
.........................................
operating steam seal system at start-up (abs)
2.42.06 Pressure and temperature of gland steam
supply header during
Pressure Temperature
Kg/cm
2
(abs) deg C
a) Initial start -up ............... ................
b) Normal operation .............. .................
c) Transient operation .............. .................
2.42.08 Type of gland steam condenser .........................................
(indicate whether shell & tube type
or any other type and whether straight
tube or U tube type)
2.42.09 Arrangement of gland steam .........................................
condenser bypass as per
specification (Furnish Drawing)
2.42.10 Minimum cooling condensate
flow through gland steam condenser T/hr .........................................
required
2.42.11 Design condensate flow through T/hr .........................................
gland steam condenser
2.42.12 Pressure drop across gland steam condenser
a) Condenser side Kg/cm
2
.........................................
b) Steam side Kg/cm
2
.........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
31 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.42.13 Capacity of gland steam condenser T/hr .........................................
2.42.14 Material of .........................................
i) Tubes .........................................
ii) Shell .........................................
iii) Water box .........................................
2.42.15 Heat exchange surface area M2 .........................................
2.42.16 Blower rating KW .........................................
2.42.17 No. of blowers provided in service/standby .........................................
2.42.18 Gland steam condenser (GSC) details : .........................................
a) Tube length m .........................................
b) Heat transfer coefficient Kcal/hr/M
2
/
deg C .........................................
c) Total heat considered Kcal/hr .........................................
d) LMTD deg C .........................................
e) Temp. of condensate entering the GSC deg C .........................................
f) Temp. of condensate at outlet of GSC deg C .........................................
2.43.00 HP/LP Steam turbine bypass system
2.43.01 HP bypass station
a) Make & Model (Furnish experience
details for specified capacity & service
with operating feed back) .........................................
b) Capacity T/hr .........................................
c) Type of actuation .......................................
d) Number of hydraulic oil
supply units provided on oil
system .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
32 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e) Number of pumps provided In service/
in each hydraulic oil supply stand by
unit .........................................
f) Capacity of the above pumps Lit/min .........................................
g) Number of accumulators
provided in each hydraulic
oil supply unit .........................................
h) Number of tanks in each
hydraulic oil supply unit .........................................
i) Capacity of accumulators in Number
each hydraulic oil supply unit of valve
strokings .........................................
j) Is fully redundant safety
channel provided Yes/No .........................................
k) Details of hydraulic actuation
system Drg. No. .........................................
l) Number of valves on steam
side and their location .........................................
m) Capacity of each valve on
steam side with corresponding
up stream pressure and
temp. T/hr/ata/deg.C .........................................
n) Design pressure of above
valves Kg/cm
2
(g) .........................................
o) Design temperature of above
valves deg. C .........................................
p) Number of valves on spray
water side .........................................
q) Capacity of each valve on
spray water side T/hr .........................................
r) Design pressure of valves
on spray water side Kg/cm
2
(g) ..........................................
s) Design temperature of valves
on spray water side deg C .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
33 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
t) Stroking time (from full open
to full close position) of steam
pressure reducing valve .........................................
i) Under quick action sec .........................................
ii) Under modulating mode sec .........................................
2.43.02 LP Bypass Station
a) Make & Model (Furnish
experience details for
specified capacity &
service with operating
feed back) ..........................................
b) Is the hydraulic oil supply
system independent of the
turbine control oil system Yes/No .........................................
c) Capacity T/hr .........................................
d) Type of actuation .........................................
e) Number of hydraulic oil
supply units provided on oil
system .........................................
f) Number of pumps provided In service/
in each hydraulic oil supply stand by
unit .........................................
g) Capacity of the above pumps Lit/min .........................................
h) Number of accumulators
provided in each hydraulic
oil supply unit .........................................
i) Number of tanks in each
hydraulic oil supply unit .........................................
j) Capacity of accumulators in Number
each hydraulic oil supply unit of valve
strokings .........................................
k) Is fully redundant safety
channel provided Yes/No .........................................
l) Details of hydraulic actuation
system Drg. No. .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
34 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
m) Number of valves on steam
side and their location .........................................
n) Capacity of above valves
with corresponding up
stream pressure and
temperature T/hr/ata/deg.C .........................................
o) Design pressure of above
valves Kg/cm
2
(g) .........................................
p) Design temperature of above
valves deg. C .........................................
q) Number of valves on spray
water side .........................................
r) Capacity of valves on
spray water side T/hr .........................................
s) Design pressure of valves
on spray water side Kg/cm
2
(g) .........................................
t) Design temperature of valves
on spray water side deg C .........................................
u) Stroking time (from full open
to full close position) of steam
pressure reducing valve .........................................
i) Under quick action sec .........................................
ii) Under modulating mode sec .........................................
2.43.03 Minimum temperature of spray
water required for
a) HP Bypass Station deg. C .........................................
b) LP Bypass Station deg. C .........................................
2.43.04 a) LP exhaust hood
temperature during HP-LP
Bypass operation. deg. C .........................................
b) Condenser pressure during
HP-LP Bypass operation with
C.W. inlet temperature of. .........................................
i) 33 deg.C mm of Hg(abs) .........................................
ii) 36 deg C mm of Hg(abs) .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
35 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.44.00 Whether Low initial Pressure
Unloading is provided Yes/No ........................................
(Furnish details)
2.45.00 Whether Low Vacuum Unloading
gear is provided (Furnish backup information
on standard proven practice) Yes/No .........................................
a) Give operating Condenser pressure mm Hg (abs) .........................................
b) Furnish details .........................................
2.46.00 Condenser
2.46.01 Is drive turbine condenser is separate Yes/No
(If drive turbine condenser is separate,
separate data for drive turbine condenser
also to be provided as indicated below)
Steam Surface Condenser
i) Design, manufacture and testing ............................................
(a) Whether own design or
Collaborator's design ............................................
(b) Name of the design agency ............................................
(c) Desin, manufacture and
testin code ............................................
ii) Number of passes ............................................
iii) Heat load considered for design
(with reference of corresponding heat
balance diagram) ............................................
iv) Whether Condenser centre line is
parallel or perpendicular to TG centre
line? ............................................
v) Design circulating water quantity with
inlet temp. of 33 de. C and 36 Deg C. ............................................
vi) Vacuum in the condenser with inlet mm
water temp. of 33 deg. C and 36 Deg. C. Hg (abs) ............................................
vii) Tube length betwen tue plates mm ............................................
viii) Total number of tues ............................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
36 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ix) Tube outside diameter and thickness mmxmm ..........................................
x) Tube material ..........................................
a) Top rows of tubes ..........................................
b) condensing zone ..........................................
c) Air cooling zone ..........................................
xi) No. of water passes ............................................
xii) Water box material ............................................
xiii) Water box design pressure Kg/cm2 ............................................
(gauge)
xiv) Water box test pressure Kg/cm2 ...........................................
xv) Water box material thickness mm ..........................................
xvi) Corrosion allowance for mm
water box ..........................................
xvii) Shell material ..........................................
xviii) Single shell or double shell ..........................................
xix) Shell thickness mm ..........................................
xx) Corrosion allowance mm ..........................................
xxi) Shell design pressure Kg/cm2 ..........................................
(abs)
xxii) Shell test pressure Kg/cm2 ..........................................
(abs)
xxiii) Tube plate thickness mm ..........................................
xxiv) Corrosion allowance for tube mm ..........................................
plate
xxv) Tube plate material ..........................................
xxvi) No. of tube support plates ..........................................
xxvii) Tube support plate thickness mm ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
37 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xxviii) Material of the support plate ..........................................
xxix) Design velocity through tubes m/sec ..........................................
xxx) Head loss under design
CW flow and CW inlet temp.
through ..........................................
a) Condenser (between
inlet & outlet flanges
of water box) mwc ..........................................
b) Butterfly valves on CW
side mwc ..........................................
c) Expansion joints on mwc ..........................................
CW side
d) CW duct in Bidder's mwc ..........................................
scope
e) CW system between
Bidder\s terminal mwc ..........................................
points (total)
xxxi) Pressure drop across tube
bundle of condenser on
steam side mwc ..........................................
(Furnish back-up calculations
& data on provenness).
xxxii) Design cleanliness factor ..........................................
a) Steam side ..........................................
b) Cooling water side ..........................................
xxxiii) Total heat transfer surface
area m2 ..........................................
xxxiv) Overall heat transfer Kcal/hr/
coefficient m2/deg C ..........................................
xxxv) Number of tubes which
can be plugged without
affecting condenser
performance ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
38 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xxxvi) Rated terminal temperature
difference with design steam
and C.W. flows and with circulating
water inlet temperature of ..........................................
a) Design value deg C ..........................................
b) 36 deg. C deg C ..........................................
xxxvii)Temp. rise of cooling water deg C ..........................................
xxxviii)Weight of condenser (without ..........................................
LP heater)
a) Empty Tonnes ..........................................
b) Flooded Tonnes ..........................................
xxxix) Limiting weight of LP heaters ..........................................
in condenser neck
a) Empty Tonnes ..........................................
b) Flooded Tonnes ..........................................
c) Weight of Tubes Tonnes ..........................................
xL) Method of supporting the
condenser ..........................................
xLi) Type of condenser neck to LP ..........................................
turbine casing joint
xLii) Material of expansion
piece (if used in the condenser
neck) ..........................................
xLiii) Provision for compensation
of differential expansion between
shell & tube ..........................................
xLiv) Provision for expansion of
condenser as per specification ..........................................
xLv) Type of water box Removable/ ..........................................
Non-removable
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
39 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xLvi) Maximum oxygen content in the
condensate leaving the hotwell
(Furnish write-up on how deaeration
of make up water is done) ..........................................
a) under normal condition ..........................................
b) under abnormal condition ..........................................
xLvii) Condenser hotwell storage capacity
between the normal water level
and low water level m3 ..........................................
xLviii) Condenser pressure during Kg/cm2
bypass operation (abs) ..........................................
xLix) Arrangement for protecting
top row of condenser tubes ..........................................
L) Steam throw off device
a) Capacity T/hr ..........................................
b) Number of nozzles ..........................................
c) Total no. of devices ..........................................
(per condenser)
Li) Tube density (No. of tubes per m2
of tube sheet surface area) (furnish
backup information on provenness)
Lii) Dome angle (Condenser dome wall
inclination to the vertical) (furnish
backup data on provenness for
effective steam distribution over
entire tube nest)
Liii) T.G. output with one half of the
condenser isolated, C.W. flow limited
to half the design flow, 3% make-up
to the cycle and CW inlet temp.
of 33 deg. C ..........................................
2.46.02 Expansion joints on C.W. connections to
Condenser
a) Make ..........................................
b) Design Standard ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
40 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c) Size (Nominal dia) mm ..........................................
d) Design Pressure Kg/cm2 (g) ..........................................
e) Design Vacuum mmHg ..........................................
f) Pressure drop across
expansion joint mwc ..........................................
g) Design Temperature deg C ..........................................
h) Test pressure Kg cm2 (g) ..........................................
i) Arrangement for preventing collapse ..........................................
j) Materials ..........................................
k) Are the expansion joints of
pressure balance type Yes/No ..........................................
2.46.03 Circulating Water Butterfly valves ..........................................
a) Make ..........................................
b) Design Standard ..........................................
c) No. offered ..........................................
d) Flow rate (normal) m3/hr (g) ..........................................
e) Flow rate (maximum) m3/hr ..........................................
f) Design Pressure Kg/cm2 (g) ..........................................
g) Test Pressure Kg/cm2 (g) ..........................................
h) Pr. drop across valve Kg/cm2 ..........................................
i) Max. design temperature deg. C ..........................................
j) Connecting flange size/rating ..........................................
k) Type of bonnet ..........................................
l) Time for full opening and sec ..........................................
closing of valve
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
41 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
m) Materials
i) Body ..........................................
ii) Disc ..........................................
iii) Shaft ..........................................
iv) Dowels ..........................................
v) Bearing ..........................................
vi) Seal ..........................................
vii) Seat ..........................................
viii) Seating ..........................................
ix) Gland Packing ..........................................
n) Are the butterfly valves of Yes/No ..........................................
pressure balance type?
o) Size (Nominal dia) mm ..........................................
2.46.04 Condenser Air evacuation system
(vacuum pumps) for Main Drive turbine
Condenser Condenser
(if offered)
a) Make & Model ..........................................
b) Number offered ..........................................
c) Number working ..........................................
d) Size and type ..........................................
e) Design code ..........................................
f) Capacity in free air delivered
at standard conditions with pump
operating at saturated inlet
condition of 25.4 mm Hg (abs) &
at design condenser pressure & sub-
cooled by 4.17 deg. C below
temperature corresponding to the
absolute suction pressure scfm i) .....................................
( at 25.4 mm Hg (abs))
ii) ....................................
(at Design condenser pressure)
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
42 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
g) Capacity of each pump during hogging
operation at 10" (254 mm) Hg (abs)
suction pressure scfm .........................................
h) Suction Pressure mm Hg ..........................................
(abs)
i) Suction temperature at ..........................................
i) 25.4 mm Hg (abs)
suction pressure deg C ..........................................
ii) 77 mm Hg (abs) suction
pressure deg C ..........................................
j) Suction line pressure drop mm Hg ..........................................
k) Power required at pump ..........................................
i) 25.4 mm Hg condenser pressure kW ..........................................
ii) Condenser design pressure kW ..........................................
l) Sealing water for vacuum pump and
Cooling water required for sealant
heat exchanger m
3
/hr ..........................................
m) Design ITD (Saturation temperature-
cooling water inlet temp.) deg. C ..........................................
n) Design TTD of heat exchanger deg C ..........................................
o) Volume of condenser and turbine
steam spaces to be evacuated
as a basis of pump design m
3
..........................................
p) Time to evacuate the above volume
under standard conditions
(21.1 deg C & 1.033 (abs) minutes ..........................................
q) Whether air ejector is provided Yes/no ..........................................
r) Number of stages ..........................................
s) Compression ratio of each stage ..........................................
t) Cooling water pressure at inlet
to heat exchanger ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
43 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
u) Blank off suction pressure
(at 36 deg. C cooling water
inlet temp.) mmHg ..........................................
v) Motor
i) Make ..........................................
ii) Rating kW ..........................................
iii) Rated voltage kV ..........................................
w) Weight of each pump motor unit Tonnes ..........................................
x) Material of pump
i) Casing ..........................................
ii) Shaft ..........................................
iii) Impeller ..........................................
iv) Shaft Sleeves ..........................................
v) Cooler tubes ..........................................
y) Characteristic/Performance curves
(without air ejector and with air
ejector, if applicable) :
i) Inlet air capacity in free
dry air vs. suction pressure
for ITD values of 10 deg. C,
11 deg C, 13 deg C,
15 deg. C & 16 deg. C ..........................................
ii) Power consumption
vs. suction pressure ..........................................
iii) Suction pressure vs. sealant
temp./ITD showing air ejector
cutting in and cutting off
(if applicable) ..........................................
iv) Pump performance with
and without air ejector
(if applicable) for different
back pressures and
condenser heat loads ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
44 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
v) Air evacuation time
(hogging time) vs. pump
suction pressure with one
pump in operation and two
pumps in operation. ..........................................
vi) Design Air leakage into the
condenser considered for
sizing the condenser air
evacuation system ..........................................
2.46.05 Condenser on Load Tube Cleaning system
a) Name of Manufacturer ..........................................
b) Model No. & Design ..........................................
c) List of item/assemblies
sub assemblies enclosed? Yes/No ..........................................
d) Materials of various components ..........................................
e) Average life of sponge
rubber ball ..........................................
f) No. of sponge rubber balls
i) For single charge ..........................................
ii) For 3 years of
continuous operation ..........................................
iii) Lost during 1000 hrs.
of plant operation ..........................................
g) No. of Abrasive coated balls provided ..........................................
h) Arrangement provided on
CW side to prevent loss
of balls during
Conden Conden
ser inlet ser outlet
i) Normal operation .............. ................
ii) CW pumps trip .............. ..................
i) Pressure drop across the ball
collecting strainer in the C.W.
circuit mwc ............... .................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
45 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
i) Under clean condition
(normal operating) ..........................................
ii) under 50% clogged
condition ..........................................
iii) When strainer back
washing is indicated ..........................................
j) Whether complete descriptive
write up of the system and individual
equipment and explaining control
& instruments provided. Enclosed? Yes/No ..........................................
k) Whether schematic of the system,
layout drawing & drawings of all
components enclosed? Yes/No ..........................................
l) Duration of operation per day ..........................................
m) Number of ball circulation pump
provided for each TG unit ..........................................
n) Number of ball collecting vessels
for each TG unit ..........................................
o) Number of ball oversize monitors for
each TG unit ..........................................
p) Number of ball recirculation
monitors for each TG unit ..........................................
q) Number of ball strainers for
each TG unit ..........................................
r) Number of ball ejector nozzles ..........................................
s) Type of ball sorter Automatic/ ..........................................
Manual
t) No. of ball sorters ..........................................
u) Diff. pressure measurement Yes/No ..........................................
across ball collection strainers
provided or not
v) Flushing arrangement of Diff.
pressure impulse line ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
46 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.47.00 Turbine Protection System
2.47.01 Emergency overspeed trip of governor % of rated
speed ..........................................
2.47.02 Low lubircating oil pressure trip Kg/cm2 ..........................................
(gauge)
2.47.03 High exhaust-hood temperature trip deg C ..........................................
2.47.04 Low initial steam pressure unloading
operation (range, setting) Kg/cm2 ..........................................
(gauge)
2.47.05 Low initial steam pressure trip Kg/cm2 ..........................................
(gauge)
2.47.06 Low vacuum unloading operation Kg/cm2 ..........................................
(range, setting) (gauge)
2.47.07 Low vacuum trip Kg/cm2 ..........................................
(abs)
2.47.08 Thrust bearing excessive wear trip +/- mm ..........................................
2.47.09 Pressure relief diaphragm setting Kg/cm2 ..........................................
(abs)
2.48.00 State load limitations, in percent of rated
load, if any, for testing full closure of
2.48.01 Main stop valves % ..........................................
2.48.02 HP governor valves % ..........................................
2.48.03 Reheat stop valves % ..........................................
2.48.04 Interceptor valves % ..........................................
2.49.00 Quantity of first fill and one year topping
requirement of lube oil Tonnes ..........................................
2.50.00 Quantity of first fill and one year topping
requirement of control oil Tonnes ..........................................
3.00.00 MATERIAL OF CONSTRUCTION
Indicate ASTM designations whenever
possible. Otherwise furnish details like
applicable standards, casting/forging,
chemical composition, etc.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
47 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.01.00 Turbine Casings
3.01.01 HP outer casing ..........................................
3.01.02 HP blade carrier/casings ..........................................
3.01.03 IP outer casing ..........................................
3.01.04 IP inner casing ..........................................
3.01.05 LP inner casing (s) ..........................................
3.01.06 LP outer casing ..........................................
3.02.00 Turbine shaft
3.01.01 HP shaft ..........................................
3.02.02 IP shaft ..........................................
3.02.03 LP shaft ..........................................
3.03.00 Turbine Disc (if shrunk on)
3.03.01 HP Turbine ..........................................
3.03.02 IP Turbine ..........................................
3.03.03 LP Turbine ..........................................
3.04.00 Moving Blades
3.04.01 HP Turbine first stage ..........................................
3.04.02 HP Turbine other stages ..........................................
3.04.03 IP Turbine first stage ..........................................
3.04.04 IP Turbine other stages ..........................................
3.04.05 LP Turbine last stage ..........................................
3.04.06 LP Turbine other stages ..........................................
3.05.00 Fixed Blades
3.05.01 HP Turbine first stage ..........................................
3.05.02 HP Turbine other stages ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
48 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.05.03 IP Turbine first stage ..........................................
3.05.04 IP Turbine other stages ..........................................
3.05.05 LP Turbine first stage ..........................................
3.05.06 LP Turbine other stages ..........................................
3.06.00 Casing Joint Bolts
3.06.01 HP cylinder ..........................................
3.06.02 IP cylinder ..........................................
3.06.03 LP cylinder ..........................................
3.07.00 Shaft Couplings ..........................................
3.08.00 IP/LP Crossover/cross around piping ..........................................
3.09.00 Main steam chest ..........................................
3.10.00 Main steam strainer ..........................................
3.11.00 MS stop valves ..........................................
3.11.01 Valve body ..........................................
3.11.02 Valve Spindle ..........................................
3.11.03 Valve Seat ..........................................
3.12.00 Main Steam Control valves ..........................................
3.12.01 Valve body ..........................................
3.12.02 Valve spindle ..........................................
3.12.03 Valve seat ..........................................
3.13.00 Hot Reheat Strainer ..........................................
3.14.00 Reheat stop valves ..........................................
3.14.01 Valve body ..........................................
3.14.02 Valve spindle ..........................................
3.14.03 Valve seat ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
49 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.15.00 Reheat Control valves ..........................................
3.15.01 Valve body ..........................................
3.15.02 Valve spindle ..........................................
3.15.03 Valve seat ..........................................
3.16.00 Main steam piping from strainer to
turbine nozzle
3.17.00 HRH piping from strainer to turbine
nozzle ..........................................
3.18.00 LP turbine extraction piping inside
condenser neck ..........................................
3.19.00 Labyrinth Seals
(a) HP ..........................................
(b) IP ..........................................
(c) LP ..........................................
3.20.00 Whether all of the above materials Yes/No ..........................................
are field proven for the rated
parameters
3.21.00 Indicate Materials used for various ..........................................
components covered under Clause
3.00.00 above, for two separate
stations for rated steam parameters
4.00.00 CONSTRUCTION FEATURES AND
OTHER DATA
4.01.01 Main TG
4.01.01 Number of cylinders ..........................................
a) HP ..........................................
b) IP ..........................................
c) Combined HP-IP (if applicable) ..........................................
d) LP ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
50 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.02 Type of turbine cylinders ..........................................
a) Single flow/double flow ..........................................
i) HP ..........................................
ii) IP ..........................................
iii) HP-IP (if applicable) ..........................................
iv) LP ..........................................
b) Barrel/Horizontally split ..........................................
INNER OUTER
i) HP ................. .................
ii) IP .................. .................
iii) HP-IP (if applicable) ..........................................
iv) LP ................ ...................
c) Number of Shells ............... ..................
i) HP ............... .................
ii) IP .............. ................
iii) HP-IP (if applicable) ..........................................
4.01.03 Is the HP outer casing and IP outer ................ ..................
casing separate? Yes/No ..........................................
4.01.04 Number of Stages : ..........................................
a) HP : No of impulse stages ..........................................
No. of reaction stages ..........................................
b) IP : No of impulse stages ..........................................
No. of reaction stages ..........................................
c) LP : No. of impulse stages ..........................................
No. of reaction stages ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
51 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.05 Number of rows and blades integrally
shrouded ..........................................
a) HP ..........................................
b) IP ..........................................
c) LP ..........................................
4.01.06 Number of rows of blades unshrouded
(indicate whether free standing or with
lacing wires)
a) IP ..........................................
b) LP ..........................................
4.01.07 First stage diameter mm ..........................................
4.01.08 Length of longest blade mm ..........................................
4.01.09 a) Tip diameter of largest wheel mm ..........................................
b) Pitch circle diameter of largest wheel mm ..........................................
4.01.10 Maximum peripheral velocity of
largest wheel M/sec ..........................................
4.01.11 a) LP turbine last two stages details Last stage Last But
one stage
i) Blade height mm ............... ...................
ii) Root diameter mm ................ ...................
iii) Pitch diameter mm ................ ..................
iv) Tip diameter mm ................ .................
(Furnish velocity triangles clearly
indicating inlet and outlet angles of
blades and various velocity sectors)
b) Modulus of section (Z) for critical
sections including root, pcd & tip
sections ..........................................
c) Steam bending stresses at the
above critical sections kg/cm2 ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
52 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d) Reaction at root, pitch circle diameter
and tip Kgf ..........................................
e) Leaving velocity at the exit of last
stage blades m/sec ..........................................
f) Safe design bending stress of last
stage blades kg/cm2 ..........................................
g) Actual bending stress (duly supported
by detailed calculations bringing out
clearly all input data, correlation
considered and results) kg/cm2 ..........................................
4.01.12 a) Method of vibration test on LP stages ..........................................
b) Furnish details ..........................................
4.01.13 Furnish campbell diagrams (typical) for the
LP blading proposed ..........................................
a) Are LP turbine blading individually
tuned? Yes/No ..........................................
b) Indicate the stages which are
individually tuned ..........................................
4.01.14 LP exhaust annulus area m2 ..........................................
4.01.15 i) Design back end loading T/hr-m2 ..........................................
ii) Back end loading under following
conditions T/hr-m2 ..........................................
a) EMCR ..........................................
b) VWO ..........................................
c) VWO +over pressure ..........................................
d) HP heaters out ..........................................
4.01.16 Method of moisture removal in the last
stage ..........................................
4.01.17 i) Type of blade protection against
moisture erosion ..........................................
ii) Details substantiating the superiority
of the proposed arrangement
(if other than as called for in
specification) ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
53 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.18 Number of low pressure stages protected
against moisture erosion ..........................................
4.01.19 Area of blades protected against moisture
erosion mm2 ..........................................
4.01.20 Exhaust area at condenser neck m2 ..........................................
4.01.21 Pressure drop between LP exhaust
and condenser top row tubes mwc ..........................................
4.01.22 Main steam and reheat stop & control
valves
Main Reheat
steam steam
a) No. of : ..........................................
i) Stop valves ..........................................
ii) Control valves ..........................................
b) Type of : ..........................................
i) Stop valves ..........................................
ii) Control valves ..........................................
c) Whether combined or separate
(Furnish details & arrangement
drawing) ..........................................
d) Type of valve support ..........................................
e) Is the external steam chest supported
independent of main casing &
arranged to accept piping forces
during operation without transmitting
to the casing Yes/No ..........................................
f) If no then details of alternate
arrangement justify its superiority ..........................................
4.01.23 Strainers : Main Reheat
steam steam
a) No. of strainers ..........................................
i) Permanent ..........................................
ii) Temporary ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
54 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Mesh size ..........................................
c) Strainer element material ..........................................
d) Strainer body material ..........................................
e) Are strainers removable Yes/No ..........................................
4.01.24 Bearings for turbine and generator
(Furnish a diagram indicating the
location of all bearings)
a) Number of journal bearings for turbine ..........................................
b) Number of journal bearings for
generator including exciter
(if applicable) ..........................................
c) Total number of journal bearings ..........................................
d) No. of thrust/thrust cum journal
bearings & their location ..........................................
e) Type of thrust bearing Fixed/ ..........................................
tilting pad
f) Type of journal bearing Fixed/
tilting pad ..........................................
g) Material of bearing shell ..........................................
h) Type of lining (antifriction material) ..........................................
i) Radial clearance for each bearing mm ..........................................
j) Bearing length mm ..........................................
k) Bearing pressure (due to running load) Kg/cm2
(gauge) ..........................................
m) Expected bearing temperature deg. C ..........................................
n) Maximum temperature permissible deg C ..........................................
o) Mean coefficient of friction between
journal and bearing ..........................................
p) Total load on the bearing kg ..........................................
q) Kilowatt loss per bearing kg ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
55 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.25 Shaft gland packing
a) Type ..........................................
b) Method adjustment ..........................................
c) Is packing replaceable Yes/No ..........................................
4.01.26 Method of mounting blades on rotor ..........................................
4.01.27 Method of fastening shroud ..........................................
4.01.28 Method of securing the fixed
blades to the casing ..........................................
4.01.29 Can the glands be examined without lifting
the top half casing? Yes/No ..........................................
4.01.30 Is turbine flange heating envisaged? Yes/No ..........................................
4.01.31 Is bolt heating envisaged? Yes/No ..........................................
4.01.32 Minimum Fixed Blade/moving Blade, Axial
& Radial Clearances (Furnish clearance
diagram & leakage rates as per
specification) ..........................................
Stationary Running
a) HP cylinder mm ..........................................
b) IP cylinder mm ..........................................
c) LP cylinder mm ..........................................
4.01.33 Shaft Glands ..........................................
a) Type of gland ..........................................
b) No. of stages per gland ..........................................
c) Normal running radial clearance ..........................................
d) Normal running axial clearance ..........................................
4.01.34 Overspeed Trip
a) Type ..........................................
b) Number ..........................................
c) Method of varying trip speed setting ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
56 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.35 Type of shaft couplings
a) HP/LP ..........................................
b) IP/LP ..........................................
c) LP/LP (if applicable) ..........................................
d) LP/Generator ..........................................
4.01.36 Turning Gear
a) Type ..........................................
b) Method of engagement ..........................................
4.01.37 Number and size of External Connections NO. Size Type
a) Main steam ..........................................
b) HP outlet for reheating ..........................................
c) Hot reheat return ..........................................
d) Extraction to deaerator ..........................................
e) Extraction to HP heaters
(state individual sizes) ..........................................
f) Extraction to LP heaters
(state individual sizes) ..........................................
g) Extraction to boiler feed pump
drive turbine ..........................................
4.01.38 Maximum allowable forces, moments at
each of the connections listed in 4.01.37
with notations used (Furnish this data in
the form of drawings and state drawing
numbers) ..........................................
4.01.39 For foundations design, furnish the
following in the form of drawings and
indicate drawing number :-
Loading data static and dynamic
values-including weights of rotating parts,
loading at base of bearings, short
circuit moments loads, loads from pipes,
dynamic out of balance forces
(two directional) ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
57 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.01.40 No. and location of water detection
thermocouples provided in the turbine
casing and drain lines
(furnish drg. indicating locations) ..........................................
4.01.41 LP turbine bursting diaphragms
a) Number ..........................................
b) Diameter mm ..........................................
c) Diaphragm material ..........................................
d) Area provided to pass the steam m2 ..........................................
e) Internal pressure at ..........................................
which the diaphragm is kg/cm
2
designed to rupture (abs) ..........................................
f) Time taken from the point of loss of
vacuum & turbine trip to the
diaphragm bursting sec ..........................................
g) Relieving capacity m/Sec. ..........................................
4.01.42 a) Are the cylinder horizontal joint bolts
heat tightened Yes/No ..........................................
b) Design feature incorporated to
prevent the seizure of the nuts and
studs. ..........................................
CLAUSE
NO.
(Bidder's Name...........................................................)
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
58 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.02.00 Extraction line non-return valves
i) Ordinary Power operated Make Type Rating Material Bore Seat Pressure Valve Valve
(nos.) (indicate type & swing Lb class size dia. drop across closing opening
of actuation Design check/ the valve time time
i.e. power oil Code tilting disc/
or pneumatic) piston check mm mm ata sec sec
Extraction to
HP Heater 7A/7B
CRH line
Extraction to
HP Heater 6A/6B
Extraction to
HP Heater 5 A/5B
Extraction to Deaerator
Extraction to BFP
drive turbine
Extraction to LP Heater 3
Extraction to LP Heater 2
Extraction to LP heater no. 1
(if located outside the
condenser neck)
Others (for additional
extraction if any)
ii) Experience list of the valves of each size, type & rating offered indicating Name of manufacturer, utility, plants, unit size, Type, Size, rating,
service
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
59 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.03.00 Vacuum Breaker Valve
a) Number ............... ..................
b) Make ............... ..................
c) Type of actuator ................ .................
d) Type of seat & gland sealing
(Furnish arrangement drawing) ............... .................
4.04.00 Insulation for turbine and
other equipment
Turbine Other Equip-
ment
a) Supplier ............ ..................
b) Insulating material ............ ..................
c) Type of application ............ ..................
d) Density of insulation ............ ..................
e) Thickness of insulation mm ............ ..................
f) Max. continuous temperature at
which the material is guaranteed
free from deterioration deg. C. ............ ...................
g) Thermal conductivity of
insulation at different
temperatures ............ .................
h) Surface temperature of
insulation (at 45 deg. C
ambient temperature) deg.C ............ ................
i) Total quantity of insulation
material envisaged ............... ................
j) Design Codes & standards ............... ................
k) Sheathing materials .............. ................
l) Thickness of sheathing ............... ..................
m) Cladding material & details ............... ..................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
60 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.05.00 Arrangement for noise
reduction of
a) Turbine .........................................
b) HP/LP Bypass .........................................
c) Others .........................................
(Furnish a write up on the
arrangement provided for noise
reduction of these equipment)
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
61 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART-2
1.00.00 CONDENSATE EXTRACTION PUMPS
(PER UNIT)
1.01.00 Design flow rate (kg/hr) ..........................................
1.02.00 Design inlet condition .........................................
1.02.01 Inlet temp. (deg.C) .........................................
1.02.02 Specific gravity .........................................
1.02.03 NPSH required at impeller centre line .........................................
a) 3% head breakdown m .........................................
b) 1% head breakdown m .........................................
c) 0% head breakdown m ..........................................
d) 40,000 hrs. erosion life of
first stage impeller m ..........................................
1.03.00 Design discharge conditions
1.03.01 Discharge pressure ata ..........................................
1.03.02 TDH m ..........................................
1.03.03 Shut off head m ..........................................
1.04.00 Pump speed rpm ..........................................
1.05.00 Power Consumption at design Condition ..........................................
1.05.01 Power input to motor at
50 Hz/47.5 Hz kW ..........................................
1.05.02 Loss in motor at
50 Hz/47.5 Hz kW ..........................................
1.05.03 Power input to pump at
50 Hz/47.5 Hz kW ..........................................
1.05.04 Efficiency of pump alone, % ..........................................
1.05.05 Overall efficiency of pump set % ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
62 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.06.00 Suction Specific speed for first
stage indicating the flow at which US Units
the same is considered ............................................
1.07.00 Cannister losses mwc ............................................
1.08.00 Seal water requirement (flow/pressure/temp.) m
3
/hr./ata/
o
C ............................................
1.09.00 Minimum flow for continuous
stable operation m
3
/hr ............................................
1.10.00 On set recirculation flow m
3
/hr ............................................
1.11.00 Peripheral speed at the eye of
first stage impeller, m/sec ............................................
1.12.00 Maximum thrust, up/down Kgs ............................................
1.13.00 Manufacturer ............................................
1.14.00 Model Number and No. of
pumps ............................................
1.15.00 Number of stages ............................................
1.16.00 Type of first stage impeller ............................................
1.17.00 Impeller outer diameter, mm ............................................
1.18.00 Suction specific speeds US units ............................................
1.19.00 Design pressure of bowl and
discharge components, ata ............................................
1.20.00 Outer casing (can) :
1.20.01 Minimum wall thickness, mm ............................................
1.20.02 Design pressure ata ............................................
1.20.03 Depth below pump mounting flange mm ............................................
1.21.00 Suction connection:
1.21.01 Size/schedule ............................................
1.21.02 Type of connection with piping ............................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
63 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.21.03 Depth of centerline below pump
mounting flange mm ..........................................
1.22.00 Discharge connection:
1.22.01 Size/schedule ...........................................
1.22.02 Type of connection with piping ...........................................
1.22.03 Height of centerline above pump
mounting flange mm ...........................................
1.23.00 Critical speeds: ...........................................
1.23.01 First critical speed in water rpm ...........................................
1.23.02 Second critical speed in water rpm ...........................................
1.24.00 GD
2
of rotor including coupling kg-m
2
..........................................
1.25.00 Impeller shaft: ...........................................
1.25.01 Length mm ...........................................
1.25.02 Dia mm ...........................................
1.25.03 Span between bearings, mm ...........................................
1.26.00 Intermediate shafts: ...........................................
1.26.01 Length mm ...........................................
1.26.02 Dia mm ...........................................
1.26.03 Span between bearings (max.) mm ..........................................
1.26.04 Method of coupling with adjacent
shafting. ...........................................
1.27.00 Radial bearings ..........................................
1.27.01 Type & Number ...........................................
1.27.02 Size mm ...........................................
1.28.00 Thrust bearing ..........................................
1.28.01 Located in pump/motor ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
64 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.28.02 Type & number ..........................................
1.28.03 Design load, kg ...........................................
1.28.04 Max. load kg ...........................................
1.29.00 Bearing lubrication type: ...........................................
1.29.01 Radial bearing ...........................................
1.29.02 Thrust bearing ...........................................
1.29.03 Recommended hole size
of suction strainer ...........................................
1.30.00 First stage details
(Bidder shall necessarily fill up this data)
1.30.01 Impeller eye diameter mm
1.30.02 Hub diameter mm
1.30.03 Inlet angle degrees
1.30.04 Inlet area between vanes normal
to average Meridional velocity mm
2
1.30.05 Eye, peripheral velocity M/sec.
1.30.06 Axial fluid velocity, in eye M/sec.
1.30.07 Discharge angle Degrees
1.30.08 Discharge area between vanes
normal to average meridional
velocity mm
2
1.30.09 Width of impeller water way at
discharge mm
2
1.30.10 Impeller eye area mm
2
1.30.11 Impeller/diffuser width ratio
1.30.12 Number of impeller vanes
1.30.13 Clearance between impeller tip
and diffuser %
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
65 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.31.00 Pressure pulsation data (peak-to-peak)
1.31.01 At sunction and discharge nozzle :
- design, flow metres
- b.e.p. metres
- 60% flow metres
- 40% flow metres
- Minimum flow metres
1.31.02 Maximm allowable metres
2.00.00 DRIP PUMPS (IF OFFERED)
(PER UNIT)
2.01.00 Design flow rate (kg/hr) ..........................................
2.02.00 Design inlet condition .........................................
2.02.01 Inlet temp. (deg.C) .........................................
2.02.02 Specific gravity .........................................
2.02.03 NPSH required at impeller centre line .........................................
a) 3% head breakdown m .........................................
b) 1% head breakdown m .........................................
c) 0% head breakdown m ..........................................
d) 40,000 hrs. erosion life of
first stage impeller m ..........................................
2.03.00 Design discharge conditions
2.03.01 Discharge pressure ata ..........................................
2.03.02 TDH m ..........................................
2.03.03 Shut off head m ..........................................
2.04.00 Pump speed rpm ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
66 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.05.00 Power Consumption at design Condition ..........................................
2.05.01 Power input to motor at
50 Hz/47.5 Hz kW ..........................................
2.05.02 Loss in motor at
50 Hz/47.5 Hz kW ..........................................
2.05.03 Power input to pump at
50 Hz/47.5 Hz kW ..........................................
2.05.04 Efficiency of pump alone, % ..........................................
2.05.05 Overall efficiency of pump set % ..........................................
2.06.00 Suction Specific speed for first
stage indicating the flow at which US Units
the same is considered ...........................................
2.07.00 Cannister losses mwc ..........................................
2.08.00 Seal water requirement (flow/pressure/temp.) m
3
/hr./ata/
o
C ..........................................
2.09.00 Minimum flow for continuous
stable operation m
3
/hr ..........................................
2.10.00 On set recirculation flow m
3
/hr ..........................................
2.11.00 Peripheral speed at the eye of
first stage impeller, m/sec ..........................................
2.12.00 Maximum thrust, up/down Kgs ..........................................
2.13.00 Manufacturer ..........................................
2.14.00 Model Number and No. of
pumps ..........................................
2.15.00 Number of stages ..........................................
2.16.00 Type of first stage impeller ..........................................
2.17.00 Impeller outer diameter, mm ..........................................
2.18.00 Suction specific speeds US units ..........................................
2.19.00 Design pressure of bowl and
discharge components, ata ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
67 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.20.00 Outer casing (can) :
2.20.01 Minimum wall thickness, mm ..........................................
2.20.02 Design pressure ata ..........................................
2.20.03 Depth below pump mounting flange mm ..........................................
2.21.00 Suction connection:
2.21.01 Size/schedule ..........................................
2.21.02 Type of connection with piping ..........................................
2.21.03 Depth of centerline below pump
mounting flange mm ..........................................
2.22.00 Discharge connection:
2.22.01 Size/schedule .........................................
2.22.02 Type of connection with piping .........................................
2.22.03 Height of centerline above pump
mounting flange mm .........................................
2.23.00 Critical speeds: .........................................
2.23.01 First critical speed in water rpm .........................................
2.23.02 Second critical speed in water rpm .........................................
2.24.00 GD
2
of rotor including coupling kg-m
2
..........................................
2.25.00 Impeller shaft: .........................................
2.25.01 Length mm .........................................
2.25.02 Dia mm .........................................
2.25.03 Span between bearings, mm .........................................
2.26.00 Intermediate shafts: .........................................
2.26.01 Length mm .........................................
2.26.02 Dia mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
68 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.26.03 Span between bearings (max.) mm ..........................................
2.26.04 Method of coupling with adjacent
shafting. .........................................
2.27.00 Radial bearings ..........................................
2.27.01 Type & Number .........................................
2.27.02 Size mm .........................................
2.28.00 Thrust bearing ..........................................
2.28.01 Located in pump/motor ..........................................
2.28.02 Type & number ..........................................
2.28.03 Design load, kg .........................................
2.28.04 Max. load kg ..........................................
2.29.00 Bearing lubrication type: .........................................
2.29.01 Radial bearing .........................................
2.29.02 Thrust bearing .........................................
2.29.03 Recommended hole size
of suction strainer .........................................
2.30.00 First stage details
(Bidder shall necessarily fill up this data)
2.30.01 Impeller eye diameter mm
2.30.02 Hub diameter mm
2.30.03 Inlet angle degrees
2.30.04 Inlet area between vanes normal
to average Meridional velocity mm
2
2.30.05 Eye, peripheral velocity M/sec.
2.30.06 Axial fluid velocity, in eye M/sec.2
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
69 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.30.07 Discharge angle Degrees
2.30.08 Discharge area between vanes
normal to average meridional
velocity mm
2
2.30.09 Width of impeller water way at
discharge mm
2
2.30.10 Impeller eye area mm
2
2.30.11 Impeller/diffuser width ratio
2.30.12 Number of impeller vanes
2.30.13 Clearance between impeller tip
and diffuser %
2.31.00 Pressure pulsation data (peak-to-peak)
2.31.01 At sunction and discharge nozzle :
- design, flow metres
- b.e.p. metres
- 60% flow metres
- 40% flow metres
- Minimum flow metres
2.31.02 Maximm allowable metre
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
70 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 3
FEED WATER HEATING PLANT
1.00.00 GLAND STEAM CONDENSER
1.01.00 Manufacturer ..........................................
1.02.00 Model number and No. off ..........................................
1.03.00 Type and arrangement ..........................................
1.04.00 Design and construction standard ..........................................
1.05.00 Minimum / Max. condensate flow Kg/hr. ..........................................
1.06.00 Pressure drop through water
tubes corresponding to above
flows. ..........................................
1.07.00 Number of tubes ..........................................
1.08.00 Tube outside dia x thickness mmxmm ..........................................
1.09.00 Tube material ..........................................
1.10.00 Water velocity through tubes m/sec ..........................................
1.11.00 Shell material ..........................................
1.12.00 Overall length of shell m ..........................................
1.13.00 Shell OD mm ..........................................
1.14.00 Shell thickness mm ..........................................
1.15.00 Motor driven vent fan Yes/No ..........................................
provided
1.16.00 No. of vent fans ..........................................
1.17.00 Type of vent fan ..........................................
1.18.00 Power absorbed by vent fan ..........................................
1.19.00 Vent fan motor rating ........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
71 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.20.00 Steam supply to gland steam
condenser ejector. .........................................
1.21.00 Quantity Kg/hr .........................................
1.22.00 Pressure (Kg/cm
2
) .........................................
1.23.00 Temperature (deg.C) .........................................
2.00.00 LOW PRESSURE HEATERS & DRAIN
COOLER
LP Heaters Drain
cooler
3 2 1
2.01.00 Manufacturer ........... .......... .......... .................
2.02.00 Model number and No. off ........... .......... .......... .................
2.03.00 Type and arrangement ........... .......... .......... .................
2.04.00 Design and construction standard ........... .......... .......... .................
2.05.00 No. of shell passes ........... .......... .......... .................
2.06.00 No. of tube passes ........... .......... .......... .................
2.07.00 No. of zones ........... .......... .......... .................
2.08.00 Heat transfer surface area
a. Drain cooling zone m
2
..........................................
b. Condensing zone m
2
..........................................
c. Desuperheating zone m
2
..........................................
d. Ineffective area m
2
..........................................
e. Total area m
2
..........................................
f. Total extra surface provided m
2
..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
72 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.09.00 Heat transfer data under design
(guaranteed ) condition:
a. Heat (kcal/Hr.) transferred in
i. Drain cooling zone ..........................................
ii. Condensing zone ..........................................
iii. Desuperheating zone ..........................................
iv. Total heat transferred ..........................................
b) L.M.T.D. (deg C)
i. Drain cooling zone .........................................
ii. Condensing zone .........................................
iii. Desuperheating zone ..........................................
c) Overall heat transfer co-
efficient (Kcal/Hr-m
2
degC)
i. Drain cooling zone ..........................................
ii. Condensing zone ..........................................
iii. Desuperheating zone ..........................................
d) Tube inside fouling factor
(hr-m
2
-degC/Kcal) as
applied to each heat transfer
zone. ..........................................
e) Outer tube surface fouling
factor (hr-m
2
-degC/Kcal)
for
i. Drain cooling zone ..........................................
ii. Condensing zone ..........................................
iii. Desuperheating zone ..........................................
f) Velocity through tubes m/sec ..........................................
g) Drain level in the Heaters
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
73 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
i. Normal mm ..........................................
ii. Maximum mm ..........................................
iii. Minimum mm ..........................................
iv. Clearance between the
maximum operating
level and the bottom
of the tube bundle ..........................................
2.10.00 Maximum noise level produced during
operating (dBA) ..........................................
2.11.00 Tubes
a) Type of tube provided (welded
or seamless) ..........................................
b) Total no. of U-tubes ..........................................
c) No. of extra tubes provided ..........................................
d) Effective length of U-tubes mm ..........................................
e) Total straight length of one
leg. mm ..........................................
f) Outside diameter mm ..........................................
g) Wall thickness, before
bending mm(BWG) .........................................
h) Minimum thickness at bend
after bending mm(BWG) ..........................................
i) Maximum carbon content in tube ..........................................
j) Design pressure Kgf/cm
2
(g) ..........................................
k) Design temperature deg. C ..........................................
i) Desuperheating zone ..........................................
ii) Other zones ..........................................
l) Hydrostatic test pressure Kgf/cm
2
(g) .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
74 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
m) Type of tube to tube sheet joint ..........................................
n) Tube pitch mm ..........................................
o) Groove dimensions .........................................
p) Type of tube pattern ..........................................
q) Shell /tube bundle clearance
space (clearance between
outside diameter of tube
bundle and inside diameter
of shell) mm ..........................................
r) Tube withdrawal space required.
(for LP Heater(s) in condenser
neck only). mm .........................................
2.12.00 Shell
a. Outside diameter mm .........................................
b. Wall thickness mm ..........................................
c. Shell skirt outside diameter mm ..........................................
d. Shell skirt length mm ..........................................
e. Shell skirt length mm ..........................................
f. Overall length mm ..........................................
g. Withdrawal length mm ..........................................
h. Type of dished end for shell
cover (Hemispherical/torispherical/
Ellipsoidal or any other) ..........................................
i. Design pressure Kgf/cm
2
(g) ..........................................
j. Length of desuperheating zone mm ..........................................
k. Design temperature deg. C ..........................................
i) Skirt ..........................................
ii) Shell ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
75 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
l. Hydraulic test pressure Kgf/cm
2
(g) ..........................................
m. Design vacuum mm of Hg ..........................................
n. Corrosion allowance provided mm ..........................................
o. Type of shell supports for LP Heater
in condenser neck Also indicate the
shell length inside the condenser
neck. ..........................................
p. Dimension of the anti flash
baffle for LP heater in condenser
neck & drain cooler. ..........................................
q. Whether stainless steel liners
are provided in the flashed
drain inlets or not? ..........................................
r. Whether stainless steel band
is provided at the cutting point
s. What type of provision has
been provided for compensating
differential expansion between
shell and tube for drain cooler ..........................................
2.13.00 Impingement Plates
a. Number ..........................................
b. Thickness mm ..........................................
2.14.00 Tube support plate, Tie Rods etc. ..........................................
a. No. of tube support plates in ..........................................
i. Desuperheating zone ..........................................
ii. Drain cooling zone ..........................................
iii. Condensing zone ..........................................
b. Thickness of tube support plates mm ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
76 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c. Spacing of support plates in ..........................................
i. Desuperheating zone ..........................................
ii. Drain cooling zone ..........................................
iii. Condensing zone ..........................................
d. No. of the rods .......................................
e. Diameter of the rods mm .........................................
f. Number of spacers ..........................................
g. Clearance between tube and ..........................................
support plate hole in
i. Desuperheating zone .........................................
ii. Drain cooling zone .........................................
iii) Condensing zone .........................................
2.15.00 Shell side Relief Valves
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Nos. provided .........................................
d. Size .........................................
e. Capacity of each at 10%
accumulation kg/hr .........................................
f. Set pressure, Kgf/cm
2
(g) .........................................
g. Blow down pressure Kgf/cm
2
(g) .........................................
h. Material .........................................
i. Body and Bonnet/cover .........................................
ii. Disc .........................................
iii. Spring .........................................
iv. Nozzle .........................................
v. Spindle .........................................
vi. Sleeve guide/spindle
guide, bushing .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
77 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
vii Bolts .........................................
viii. Nuts .........................................
i. Hand lever provided for testing? .........................................
2.16.00 Tube side Relief Valve
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Nos. provided .........................................
d. Size & type .........................................
e. Set pressure, Kgf/cm
2
(g) .........................................
f. Blow down pressure Kgf/cm
2
(g) .........................................
g. Materials .........................................
i. Body and Bonnet/cover ..........................................
ii. Disc ..........................................
iii. Spring .........................................
iv. Nozzle ..........................................
v. Spindle .........................................
vi. Sleeve guide/spindle
guide, bushing .........................................
vii Bolts .........................................
viii. Nuts .........................................
h. Hand lever provided for testing? .........................................
2.17. 00 Materials of Construction (indicate
ASTM Specification
a. Heater Body ..........................................
i. Skirt ..........................................
ii. Shell .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
78 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iii. Head .........................................
b. Water Box and Covers .........................................
i. Skirt .........................................
ii. Shell .........................................
iii. Head .........................................
c. Water Box and Covers .........................................
i. Water box pass partition plate .........................................
ii. Flow diffusers, straighteners .........................................
d. Tubes .........................................
e. Tube sheet (including overlay material) .........................................
f. Baffles & support plates .........................................
g. Impingement plates .........................................
h. Antiflash baffles .........................................
i. Nozzles .........................................
j. Flanges .........................................
k. Tie rods and spacers .........................................
l. Bolts .........................................
m. Nuts .........................................
n. Gaskets .........................................
2.18.00 Nozzles connection size (Indicate
No. Size (mm) & type)
a. Feed water /condensate inlet .........................................
b. Feed water /condensate outlet .........................................
c. Steam inlet .........................................
d. Cascading drain inlet .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
79 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e. Cascading drain outlet .........................................
f. Drain cooler bypass (Not
applicable for LP heater-1) .........................................
g. Shell vent (Operating) .........................................
h. Shell drain .........................................
i. Start up vent .........................................
j. Water box drain .........................................
k. Water box vent .........................................
l. Water box relief valve .........................................
m. Shell relief valve .........................................
n. Stand pipes .........................................
2.19.00 Operating Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
c. Steam flow through each
orifice at heater design
condition Kg/hr .........................................
d. Material of orifice plate
(Indicate ASTM Specification) .........................................
e. Diameter of orifice mm .........................................
f. Diameter of orifice plate mm .........................................
g. Thickness of orifice plate mm .........................................
2.20.00 Start-up Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
c. Steam flow at start-up Kg/hr .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
80 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d. Material of orifice plate
(Indicate ASTM Specification) .........................................
e. Diameter of orifice mm .........................................
f. Diameter of orifice plate mm .........................................
g. Thickness of orifice plate mm .........................................
2.21.00 Stand Pipe
a. Material (Indicate ASTM
Specification) .........................................
b. Nominal diameter & thickness mm .........................................
c. Over all length mm .........................................
d. Nos. provided .........................................
e. Drain & isolation valve provided .........................................
2.22.00 Level Gauge Glass
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Measurement range mm .........................................
d. Isolation, drain, vent & ball
check valves provided? .........................................
e. Number provided .........................................
2.23.00 Weights (Tonnes)
a. Empty .........................................
b. Normal operating ..........................................
c. Hydrostatic test weight flooded .........................................
d. Weight of tube bundle .........................................
e. Weight of shell .........................................
f. Weight of water box .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
81 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
g. Total shipping weight .........................................
h. Weight of heaviest single piece
during: .........................................
i. Erection .........................................
ii. Maintenance .........................................
2.24.00 Shipping Dimensions (mm) (Indicate
the following for heaviest as well
as largest piece
a. Length .........................................
b. Breadth .........................................
c. Height .........................................
3.00.00 DEAERATOR
3.01.00 Manufacture .........................................
3.02.00 Model No. & Number off .........................................
3.03.00 Type .........................................
3.04.00 Design and construction standard .........................................
3.05.00 Design pressure Kgf/
cm
2
(g) .........................................
3.06.00 Design temperature (deg.C) and design
Vacuum (mm of Hg) .........................................
3.07.00 Hydrostatic test pressure Kgf/
cm
2
(g) .........................................
3.08.00 Shell diameter and thickness mm .........................................
a. Deaerator .........................................
b. Storage tank .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
82 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.09.00 Straight length and overall length
of shell mm .........................................
a. Deaerator .........................................
b. Storage tank .........................................
3.10.00 Type of dished ends and thickness mm .........................................
a. Deaerator .........................................
b. Storage tank .........................................
3.11.00 Type of storage tank supports to
mount the deaerator on floor .........................................
3.12.00 Number of supports on storage tank .........................................
3.13.00 Distance between the supports .........................................
3.14.00 Dimensions of sparger pipe .........................................
3.15.00 Whether antivortex baffle .........................................
provided
3.16.00 Mesh size of the reinforced wide
meshed strainer provided at the
discharge connections from
deaerator storage tank .........................................
3.17.00 Whether the access platform provided
is adequate enough from the
maintenance and operation point
of view? .........................................
3.18.00 Whether the oxygen measuring kit
has been provided? .........................................
3.19.00 Number of sections the storage
tank and deaerator to be split for
shipping it to the site .........................................
3.20.00 Type of manhole provided .........................................
3.21.00 Dimension of manhole .........................................
3.22.00 Number of splash plates provided .........................................
3.23.00 Number of trays provided .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
83 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.24.00 Number of steam distribution
rakes provided .........................................
3.25.00 Corrosion allowance provided
on shells and dished ends mm .........................................
3.26.00 Storage capacity at normal
water level, with a filling factor
of 0.66 of the cross-sectional
area of the storage tank m
3
.........................................
3.27.00 Storage capacity available from
normal level to the low-low level m
3
.........................................
3.28.00 Water level from centre line
of horizontal vessel mm
a. Normal .........................................
b. Low .........................................
c. Low-Low .........................................
d. High .........................................
e. High-High .........................................
3.29.00 Type of integral, vent condenser
provided .........................................
3.30.00 Spray valves
a. Manufacturer & Model No. .........................................
b. Type (Disc Spring or Plunger
type) .........................................
c. Nos. provided .........................................
d. Control range .........................................
e. Pressure drop across the valve Kgf/cm
2
.........................................
f. Material of construction
(Indicate ASTM Standard ) of
body, disc, spring and nozzle). .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
84 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
g. Residence time .........................................
h. Droplet size .........................................
i. Arrangement of spray
nozzles within deaerator .........................................
3.31.00 Protection against inflow of
condensate in the steam
supply pipe. .........................................
3.32.00 Whether flashed drain inlet is
provided with hardened SS liner. .........................................
3.33.00 Safety Valves
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Nos. provided .........................................
d. Size .........................................
e. Capacity at 10%
accumulation kg/hr .........................................
f. Set pressure, Kgf/cm
2
(g) .........................................
g. Blow down Kgf/cm
2
(g) .........................................
h. Material of construction
(Indicate ASTM St.) .........................................
i. Body and Bonnet/cover .........................................
ii. Disc. .........................................
iii. Spring .........................................
iv. Nozzle .........................................
v. Spindle .........................................
vi. Sleeve guide/spindle
guide, bushing .........................................
vii Bolts .........................................
viii. Nuts .........................................
i. Hand lever provided for testing? .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
85 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.34.00 Stand Pipe
a. Material (Indicate ASTM
Standard) .........................................
b. Nominal diameter & thickness mm .........................................
c. Over all length mm .........................................
d. Nos. provided .........................................
e. Drain & isolation valve provided .........................................
3.35.00 Level Gauge Glass
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Number provided .........................................
d. Measurement range mm .........................................
e. Isolation, drain, vent & ball
check valves provided? .........................................
3.36.00 Materials of construction (Indicate
ASTM Standard)
a. Shell and head
i. Deaerator .........................................
ii. Storage tank .........................................
b. Splash plates .........................................
c. Steam distribution rakes .........................................
d. Trays .........................................
e. Baffles (including Antivortex
baffle). .........................................
f. i. Nozzles .........................................
ii. Nozzle liner .........................................
g. Restricting orifices .........................................
h. Vent Pipes .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
86 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
i. Valves .........................................
j. Bolts .........................................
k. Nuts .........................................
l. Gaskets .........................................
m. Access platform .........................................
n. Strainer .........................................
o. Impingement plate ........................................
3.37.00 Nozzle Connections
Nos. Size Type
a. Condensate inlet .........................................
b. Condensate outlet .........................................
c. Extraction steam inlet .........................................
d. Auxiliary steam inlet .........................................
e. Pressure equalising between
supply pipe and deaerator .........................................
vessel
f. Deaerator overflow .........................................
g. Drain from HP Heaters .........................................
h. Recirculation from BF pumps .........................................
i. Leak-off from BF pumps .........................................
j. Vent .........................................
k. Drain .........................................
l. Safety valve outlet .........................................
m. Thermowell .........................................
3.38.00 Operating Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
87 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c. Steam flow through each
orifice at heater design
condition Kg/hr .........................................
d. Material of orifice plate
(Indicate ASTM Specification) .........................................
e. Diameter of orifice mm .........................................
f. Diameter of orifice plate mm .........................................
3.39.00 Start-up Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
c. Steam flow through each
orifice at heater design
condition Kg/hr .........................................
d. Material of orifice plate
(Indicate ASTM Specification) .........................................
e. Diameter of orifice mm .........................................
f. Diameter of orifice plate mm .........................................
g. Thickness of orifice plate mm .........................................
3.40.00 Weights (Tonnes)
a. Empty .........................................
b. Normal operating .........................................
c. Hydrostatic test condition
(flooded weight) .........................................
d. Total shipping weight .........................................
e. Weight of heaviest single piece
during: .........................................
i. Erection .........................................
ii. Maintenance .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
88 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.41.00 Shipping Dimensions (mm) piece
Heaviest Biggest
piece piece
a. Length .........................................
b. Breadth .........................................
c. Height .........................................
d. No. of pieces complete
deaerator shell be shipped .........................................
4.00.00 HIGH PRESSURE HEATERS
HP Heaters
5A/5B 6A/6B 7A/7B
4.01.00 Manufacturer ..........................................
4.02.00 Model No. and Number off .........................................
4.03.00 Type and arrangement .........................................
404.00 Design and construction standard .........................................
4.05.00 No. of shell passes .........................................
4.06.00 No. of tube passes .........................................
4.07.00 No. of zones .........................................
4.08.00 Heat transfer surface area
a. Drain cooling zone m
2
.........................................
b. Condensing zone m
2
.........................................
c. Desuperheating zone m
2
.........................................
d. Ineffective area m
2
.........................................
e. Total area m
2
.........................................
f. Total extra surface provided m
2
.........................................
4.09.00 Heat transfer data under design
(guaranteed ) condition:
a. Heat (kcal/Hr.) transferred in
i. Drain cooling zone .........................................
ii. Condensing zone .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
89 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iii. Desuperheating zone .........................................
iv. Total heat transferred .........................................
b) L.M.T.D. (deg C)
i. Drain cooling zone .........................................
ii. Condensing zone .........................................
iii. Desuperheating zone .........................................
c) Overall heat transfer co-
efficient (Kcal/hr-m
2
degC)
i. Drain cooling zone .........................................
ii. Condensing zone .........................................
iii. Desuperheating zone .........................................
d) Tube inside fouling factor
(hr-m
2
deg C/Kcal) as
applied to each heat transfer
zone. .........................................
e) Outer tube surface fouling
factor (hr-m
2
-degC/Kcal)
for
i. Drain cooling zone .........................................
ii. Condensing zone .........................................
iii. Desuperheating zone .........................................
f) Velocity through tubes m/sec .........................................
g) Drain level in the Heaters mm
i. Normal mm .........................................
ii. Maximum mm .........................................
iii. Minimum mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
90 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
iv. Clearance between the
maximum operating
level and the bottom
of the tube bundle .........................................
4.10.00 i. Velocity through tubes at maximum m/sec
flow .........................................
ii. Tube side pressure drop at maximum Kgf/cm
2
flow .........................................
4.11.00 Maximum noise level produced during
operating (dBA) .........................................
4.12.00 Tubes
a) Type of tube provided (welded
or seamless)
(Furnish details & experience) .........................................
b) Total no. of U-tubes .........................................
c) No. of extra tubes provided .........................................
d) Effective length of U-tubes mm .........................................
e) Total straight length of one
leg. mm .........................................
f) Outside diameter mm .........................................
g) Wall thickness, before
bending mm(BWG) .........................................
h) Minimum thickness at bend
after bending mm(BWG) .........................................
i) Maximum carbon content in tube .........................................
j) Design pressure Kgf/cm
2
(g) .........................................
k) Design temperature deg. C .........................................
i) Desuperheating zone .........................................
ii) Other zones .........................................
l) Hydrostatic test pressure Kgf/cm
2
(g) ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
91 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
m) Type of tube to tube sheet joint .........................................
n) Tube pitch mm .........................................
o) Type of tube pattern .........................................
p) Shell /tube bundle clearance
space mm .........................................
4.13.00 Shell
a. Outside diameter mm .........................................
b. Wall thickness mm .........................................
c. Shell skirt outside diameter mm .........................................
d. Shell skirt thickness mm .........................................
e. Shell skirt length mm .........................................
f. Overall length mm .........................................
g. Withdrawal length mm .........................................
h. Type of dished end for shell
cover (Hemispherical/
Ellipsoidal or any other) .........................................
i. Design pressure Kgf/cm
2
(g) .........................................
j. Length of desuperheating zone mm .........................................
k. Length of drain cooling zone mm .........................................
l. Design temperature deg. C
i Skirt .........................................
. ii Shell .........................................
m. Design vacuum mm/Hg .........................................
n. Hydraulic test pressure Kgf/cm
2
(g) .........................................
o. Corrosion allowance provided mm .........................................
p. Type of shell supports .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
92 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
q. Whether stainless steel liners
are provided in the flashed
drain inlets or not? .........................................
r. Whether stainless steel band
is provided at the cutting point .........................................
4.14.00 Impingement Plates
a. Number .........................................
b. Thickness mm .........................................
4.15.00 Tube support plate, Tie Rods etc. .........................................
a. No. of tube support plates in .........................................
i. Desuperheating zone .........................................
ii. Drain cooling zone .........................................
iii. Condensing zone .........................................
b. Thickness of tube support plates mm .........................................
c. Spacing of support plates in .........................................
i. Desuperheating zone mm .........................................
ii. Drain cooling zone mm .........................................
iii. Condensing zone mm .........................................
d. Diameter of the tie rods mm .........................................
e. No. of the rods .........................................
f. Number of spacers .........................................
g. Clearance between tube and .........................................
support plate hole in
i. Desuperheating zone mm .........................................
ii. Drain cooling zone mm .........................................
iii. Condensing zone mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
93 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.16.00 Shell side Relief Valves
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Nos. provided .........................................
d. Size .........................................
e. Capacity of each at 10%
accumulation Kg/hr. .........................................
f. Set pressure, Kgf/cm
2
(g) .........................................
g. Blow down pressure Kgf/cm
2
(g) .........................................
h. Materials .........................................
i. Body and Bonnet/cover .........................................
ii. Disc. .........................................
iii. Spacing .........................................
iv. Nozzle .........................................
v. Spindle .........................................
vi. Sleeve guide/spindle
guide/ bushing .........................................
vii Bolts .........................................
viii. Nuts .........................................
i. Hand lever provided for testing? .........................................
4.17.00 Tube side Relief Valve
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Nos. provided .........................................
d. Size and type .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
94 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e. Set pressure, Kgf/cm
2
(g) .........................................
f. Blow down pressure Kgf/cm
2
(g) .........................................
g. Materials .........................................
i. Body and Bonnet/cover .........................................
ii. Disc. .........................................
iii. Spacing .........................................
iv. Nozzle .........................................
v. Spindle .........................................
vi. Sleeve guide/spindle
guide/bushing .........................................
vii Bolts .........................................
viii. Nuts .........................................
h. Hand lever provided for testing .........................................
4.18. 00 Materials for Construction (indicate
ASTM Specification
a. Heater Body .........................................
i. Skirt .........................................
ii. Shell .........................................
iii. Head .........................................
b. Water Box and Covers .........................................
i. Water box .........................................
ii. Feed branches .........................................
iii. Water box cover .........................................
c. Tube .........................................
d. Tube sheet (including overlay material) .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
95 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e. Baffles & support plates .........................................
f. Impingement plates .........................................
g. Antiflash baffles .........................................
h. Nozzles .........................................
i. Flanges .........................................
j. Tie rods and spacers .........................................
k. Bolts .........................................
l. Nuts .........................................
m. Gaskets .........................................
4.19.00 Nozzles connection size (Indicate
No., Size (mm) & type)
a. Feed water /condensate inlet .........................................
b. Feed water /condensate outlet .........................................
c. Steam inlet .........................................
d. Cascading drain inlet .........................................
e. Cascading drain outlet .........................................
f. Drain cooler bypass .........................................
g. Shell drain .........................................
h. Shell vent (Operating) .........................................
i. Start up vent .........................................
j. Water box drain .........................................
k. Water box vent .........................................
l. Water box relief valve .........................................
m. Shell relief valve .........................................
n. Stand pipes .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
96 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.20.00 Operating Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
c. Steam flow through each
orifice at heater design
condition Kg/hr .........................................
d. Material of orifice plate
(Indicate ASTM Specification) .........................................
e. Diameter of orifice mm .........................................
f. Diameter of orifice plate mm .........................................
g. Thickness of orifice plate mm .........................................
4.21.00 Start-up Vent Orifice
a. Nos. provided .........................................
b. Design code/standard .........................................
c. Material of orifice plate
(Indicate ASTM Standard) .........................................
d. Diameter of orifice mm .........................................
e. Diameter of orifice plate mm .........................................
f. Thickness of orifice plate mm .........................................
g. Steam flow through each
orificeKg/hr. .........................................
4.22.00 Stand Pipe
a. Material (Indicate ASTM
Specification) .........................................
b. Nominal diameter & thickness mm .........................................
c. Over all length mm .........................................
d. Nos. provided .........................................
e. Drain & isolation valve provided .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
97 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.23.00 Level Gauge Glass
a. Manufacturer & Model No. .........................................
b. Type .........................................
c. Measurement range mm .........................................
d. Isolation, drain, vent & ball
check valves provided? .........................................
e. Number provided .........................................
4.24.00 Weights (Tonnes)
a. Empty .........................................
b. Normal operating .........................................
c. Hydrostatic test weight flooded .........................................
d. Weight of tube bundle .........................................
e. Weight of shell .........................................
f. Weight of water box .........................................
g. Total shipping weight .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
98 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 4
BOILER FEED PUMPS (PER UNIT)
1.01.00 Booster / Main Pump flow (kg/hr) ..........................................
1.02.00 Design inlet condition ..........................................
1.02.01 Suction temp (deg.C) ..........................................
1.02.02 Suction pressure (Booster/
Main pump) ata ..........................................
1.02.03 Specific gravity ..........................................
1.03.00 NPSH required for booster/Main pump ..........................................
1.03.01 3% head breakdown M ..........................................
1.03.02 1% head breakdown M ..........................................
1.03.03 0% head breakdown M ..........................................
1.03.04 40,000 hrs. erosion life of
impeller M ..........................................
1.04.00 Design discharge conditions
1.04.01 Discharge pressure for main pump ata ..........................................
1.04.02 Total dynamic head for pumping unit M ..........................................
1.04.03 Discharge temp for main pump deg. C ..........................................
1.04.04 Discharge pressure for booster ata ..........................................
pump
1.04.05 Shut off head (main +booster
pumps) M ..........................................
1.05.00 Pump speeds .........................................
1.05.01 Main pump rpm ..........................................
1.05.02 Booster pump rpm ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
99 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.06.00 Power Consumptions of
Motor Driven Pumps:
1.06.01 Main pump input
(50/47.5 Hz) kW ..........................................
1.06.02 Booster pump inlet
(50/47.5 Hz) kW .........................................
1.06.03 Losses in hydraulic coupling
(50/47.5 Hz) kW .........................................
1.06.04 Losses in step up gear box
(50/47.5 Hz) kW .........................................
1.06.05 Total output required at
motor shaft kW .........................................
1.06.06 Efficiency of main pump
(50/47.5 Hz) % .........................................
1.06.07 Efficiency of booster pump
(50/47.5 Hz) % .........................................
1.06.08 Efficiency of drive motor
(50/47.5 Hz) % .........................................
1.06.09 Overall efficiency of pump set
(50.47.5 Hz) % .........................................
1.07.00 Suction specific speeds
1.07.01 Booster pump, indicating flow
at which same is considered US units .........................................
1.07.02 Main pump first stage indicating flow
at which same is considered US units .........................................
1.08.00 Maximum Boiler feed pump speed .........................................
1.08.01 Maximum design pump speed at
50 Hz/47.5 Hz rpm .........................................
1.08.02 NPSH required at the maximum
speed at 3% head break down
at 50 Hz/47.5 Hz, (m) M .........................................
1.08.03 Pump shut off head at maximum
speed (50 Hz/47.5 Hz), metre .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
100 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.08.04 Pump TDH with minimum required M .........................................
recirculation flow and running at
maximum speed
1.09.00 Recirculation data
(i) Normal recirculation flow,
(for extended period) m
3
/hr .........................................
(ii) Onset recirculation flow m
3
/hr .........................................
(iii) Recirculation control valve
design flow m
3
/hr .........................................
(iv) Recirculation control valve
design pressure drop m
3
/hr .........................................
1.10.00 Thermal shock data
1.10.01 Is prewarming necessary in
case of cold start up Yes/No .........................................
1.10.02 Warm up flow, m
3
/hr (if required) .........................................
1.10.03 Maximum allowable step change
of inlet water temp. deg. C .........................................
1.11.00 Maximum axial thrust Kgs .........................................
1.12.00 Hydraulic coupling .........................................
1.12.01 Rated input speed, rpm .........................................
1.12.02 Corresponding output speeds
at the extreme positions of the
control element
a. Maximum rpm .........................................
b) Minimum rpm .........................................
1.12.03 Corresponding useful flow control
range of output speeds
a. Maximum rpm .........................................
b) Minimum rpm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
101 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.12.04 Maximum continuous output
torque kg-m .........................................
1.12.05 Rated output speed rpm .........................................
1.12.06 Circulation mechanicalc losses at
rated input and output speeds .........................................
1.12.07 Response time .........................................
a) Time taken by the control
element to move from
one extreme position
to other sec .........................................
1.12.08 Make/Model .........................................
1.12.09 Oil tank capacity m
3
.........................................
1.13.00 Boiler Feed Pump
1.13.01 Manufacturer .........................................
1.13.02 Model Number and No. of pumps .........................................
1.13.03 Casing outer type (Barrel, etc.) .........................................
1.13.04 No. of Stages ..........................................
1.13.05 Casing inner type (radially
split etc) .........................................
1.13.06 Casing design pressure, ata
and minimum wall thickness, mm .........................................
1.13.07 Pedestal and sole plates Type .........................................
1.13.08 Direction of rotation from drive end (CW/CCW) ..........................................
1.14.00 Suction connections:
1.14.01 Size/schedule .........................................
1.14.02 Location, top/bottom .........................................
1.15.00 Discharge Connection .........................................
1.15.01 ID/OD, (mm) .........................................
1.15.02 Location top/bottom .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
102 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.16.00 Warm-up connections:
1.16.01 Size .........................................
1.16.02 Quantity and location .........................................
1.16.03 Warm-up flow, m
3
/hr. .........................................
1.17.00 Reheat Attemperator and super
heater attemperator connection
1.17.01 ID (or size/schedule) .........................................
1.17.02 OD (or size/schedule) .........................................
1.17.03 Weld end details .........................................
1.18.00 Balancing Device leak-off
connection .........................................
1.18.01 Type .........................................
1.18.02 Size - schedule .........................................
1.19.00 Developed head per stage at best
efficiency point. .........................................
1.20.00 First stage, meters .........................................
1.20.01 Succeeding stages, meters .........................................
1.21.00 Shaft
1.21.01 Total shaft length, mm .........................................
1.21.02 Shaft dia. at bearings (nom.), mm .........................................
1.21.03 Shaft dia at seals (nom) mm .........................................
1.21.04 Shaft dia. at impeller (nom.), mm .........................................
1.21.05 Shaft dia at balancing drum
(nominal) mm .........................................
1.21.06 Shrink fit at impellers microns .........................................
1.21.07 Shrink fit at balancing drum microns .........................................
1.21.08 Shaft static deflection (at rest) microns .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
103 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.21.09 Shaft span between bearing centre mm .........................................
1.22.00 Bearings
1.22.01 L/D ratio at bearings (L=brg .........................................
length, D-shaft dia).
1.22.02 J ournal bearings - type .........................................
1.22.03 J ournal bearings - size .........................................
1.22.04 J ournal bearings length mm .........................................
1.22.05 J ournal bearings clearance microns .........................................
1.22.06 Thrust bearings - type .........................................
1.22.07 Thrust bearing size .........................................
1.23.00 % of axial thrust carried
by the thrust bearing % .........................................
1.24.00 At what loads is thrust
brg loaded? .........................................
1.25.00 Type of axial balancing device
(drum/opposed impeller) .........................................
1.26.00 Balancing device leak-off
flow m
3
/hr .........................................
1.27.00 Can balancing device handle
axial thrust at all loads and
conditions Yes/No .........................................
1.28.00 Method of indicating shaft axial
position (displacement) .........................................
1.29.00 Balancing device radial clearance, microns .........................................
1.30.00 Balancing designed with diffuser or
volute .........................................
1.31.00 Number of diffuser/volute blades
(tongues), First stage .........................................
1.32.00 Number of blades - Normal stages: .........................................
1.32.01 Diffuser/volute tongue ID First stage mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
104 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.32.02 Tongue ID, Normal stages mm .........................................
1.32.03 Impeller OD, First stage mm .........................................
1.32.04 Impeller OD, Normal stages mm .........................................
1.32.05 Clearance between impeller
vane tip; and diff/volute tongue
First stage mm .........................................
1.32.06 Clearance between imp vane tip
and diff/vol tongue, Normal stages mm .........................................
1.32.07 Diam clearances at impeller wear
ring, first stage mm .........................................
1.32.08 Diam clearances at impeller wear
ring, Normal stage mm .........................................
1.33.00 First stage details (Bidder shall
necessarily fill up the following data) :
1.33.01 Type of first stage
1.33.02 Impeller eye diameter mm
1.33.03 Shaft diameter, through eye mm
1.33.04 Hub diameter mm
1.33.05 Inlet angle Degrees
1.33.06 Inlet area between vanes normal
to average meridional velocity mm
1.33.07 Eye peripheral, velocity M/Sec.
1.33.08 Axial fluid velocity in eye M/Sec.
1.33.09 Discharge angle Degrees
1.33.10 Discharge area between vanes
normal to average meridional
velocity
1.33.11 Width of impeller water way
at discharge mm
1.33.12 Impeller eye area mm
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
105 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.33.13 Impeller eye area, First stage sq.mm .........................................
1.33.14 Impeller/diffuser width ratio
First stage .........................................
1.33.15 Impeller/diffuser width ratio
Normal stage .........................................
1.33.16 No. of impeller vanes, First stage .........................................
1.33.17 Number of impeller vanes,
Normal stages .........................................
1.34.00 Impeller vane mounting arrangement
between impeller (in line, staggered) .........................................
1.35.00 Rotor weight, kg .........................................
1.36.00 WR
2
of pump rotor kg-m
2
.........................................
1.37.01 First stage impeller polar moment
of inertia, Kg-m
2
.........................................
1.37.02 First stage impeller transverse
moment of inertia Kg-m
2
.........................................
1.37.03 Normal stage impeller polar
moment of inertia Kg-m
2
.........................................
1.37.04 Normal stage impeller transverse
moment of inertia Kg-m
2
.........................................
1.38.00 Location of centre of gravity of
the Rotor (Datum line at) mm .........................................
1.39.00 Permissible maximum unbalance
in any plane, gm-cm .........................................
1.40.00 Critical speeds: .........................................
1.40.01 First critical speed of rotor in water rpm .........................................
1.40.02 Second critical speed of rotor in
water rpm .........................................
1.40.03 First critical speed of rotor in air rpm .........................................
1.40.04 Second critical speed of rotor in air rpm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
106 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.41.00 Foundation: .........................................
1.41.01 Stiffness vertical Kg/mm .........................................
1.41.02 Stiffness horizontal kg/mm .........................................
1.42.00 Bearing Lubrication: .........................................
1.42.01 Type .........................................
1.42.02 Required flow per journal
bearing m
3
/hr .........................................
1.42.03 Required flow to thrust
bearing m
3
/hr .........................................
1.42.04 Bearing temp (recom/max) Deg. C .........................................
1.42.05 Oil pressure required
(min. /recom/max.) ata .........................................
1.43.00 Pump shaft at coupling: .........................................
1.43.01 Dia meter mm .........................................
1.43.02 Keyway size (if applicable) mm .........................................
1.43.03 Type of fit .........................................
1.43.04 Space between shafts mm .........................................
1.43.05 End float required mm .........................................
1.44.00 Drive shaft at coupling: .........................................
1.44.01 Diameter mm .........................................
1.44.02 Keyway size (if applicable) mm .........................................
1.44.03 Type of fit mm .........................................
1.45.00 Space envelope required to remove
rotating element, including laydown
space for casing or casing parts mm .........................................
1.46.00 Rotor removal cradle
(number required) .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
107 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.47.00 Rotor handling device
(number required) .........................................
1.48.00 End covers for pump flushing, when
internals are removed (each pump) .........................................
1.49.00 Combined first and second critical
speed of the set rpm .........................................
1.50.00 Booster Pumps (Per Unit) .........................................
1.50.01 Manufacturer .........................................
1.50.02 Model number and No. of pumps .........................................
1.50.03 Casing Type .........................................
1.50.04 Casing design pressure ata .........................................
1.50.05 Casing minimum wall thickness mm .........................................
1.50.06 Pedestals and sole plates type .........................................
1.50.07 Suction connections: .........................................
a. Size/schedule .........................................
b. Weld end details .........................................
c. Location top/bottom .........................................
1.50.08 Discharge connections: .........................................
a. Size/schedule .........................................
b. Weld end details .........................................
c. Location top/bottom .........................................
1.50.09 Suction piping design condition ata/
pressure/temp. deg C .........................................
1.50.10 Discharge piping design condition ata/
pressure/temp. degC .........................................
1.50.11 Direction of rotation from driver
end CW or CCW .........................................
1.50.12 Shaft length mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
108 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.50.13 Shaft diameters, at bearings, at
seals, at impeller mm, mm,mm ...........................................
1.50.14 Shrink fit impeller microns ..........................................
1.50.15 Shaft static deflection microns ..........................................
1.50.16 Shaft span between bearing
centres mm ..........................................
1.50.17 L/D ratio at bearings ..........................................
1.50.18 J ournal bearings (mm,dia) ..........................................
type size length mm
clearance microns
1.50.19 Thrust bearing type ..........................................
Size
Design Load Kg
1.50.20 Pump designed with diffuser or
volute ..........................................
1. Number of diffuser/volute blades ..........................................
2. Diffuser/volute tongue ID mm ..........................................
1.50.21 1. Impeller type ..........................................
2. Impeller OD mm ..........................................
1.50.22 1. Diametrical clearances at impeller
wearing ring mm ..........................................
2. Diametrical clearances at
impeller hub mm ..........................................
3. Impeller eye dia mm ..........................................
4. Impeller eye area mm
2
..........................................
5. Impeller/diffuser width ratio ..........................................
6. Number of impeller vanes ..........................................
1.50.23 Rotor weight, kg ..........................................
1.50.24 GD
-
of pump rotor kg-m
2
..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
109 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.50.25. 1 Impeller polar moment
of inertia, Kg-m
2
..........................................
2 Impeller transverse
moment of inertia Kg-m
2
..........................................
1.50.26 Permissible maximum unbalance
of rotor gm-cm ..........................................
1.50.27 Critical speeds: ..........................................
1. First critical speed in
water rpm ..........................................
2. Second critical speed in
water rpm ..........................................
3. First critical speed in air rpm ..........................................
1.50.28 Foundation: ..........................................
1. Stiffness vertical Kg/mm ..........................................
2. Stiffness horizontal kg/mm ..........................................
1.50.29 Bearing Lubrication: ..........................................
1. Type ..........................................
2. Required flow per journal
bearing m
3
/hr ..........................................
3. Required flow to thrust
bearing m
3
/hr ..........................................
4. Bearing temp (recom/max) Deg. C ..........................................
5. Oil pressure required
(min. /recom/max.) ata ..........................................
1.50.30 Pump shaft at coupling: ..........................................
1. Diameter mm ..........................................
2. Keyway size (if applicable) mm ..........................................
3. Type of fit ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
110 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4. Space between shafts mm ..........................................
5. End float required mm ..........................................
1.50.31 Drive shaft at coupling: ..........................................
1. Diameter mm ..........................................
2. Keyway size (if applicable) mm ..........................................
3. Type of fit ..........................................
1.50.32 Recommended hole size of suction
strainer ..........................................
1. For start-up ..........................................
2. Permanent, if desired by Employer ..........................................
1.51.00 Type of seals (Booster pump/
main pump) ..........................................
1. Model/make ..........................................
2. Material of rotating /stationary faces ..........................................
3. P. V. factor ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
111 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART-5
AUXILIARY TURBINE DRIVE
1.00.00 Auxiliary Drive Turbine (Per Unit):
A General
1. Manufacturer & Model No. .......................................
2. Numbers offered .........................................
3. Type of Turbine .........................................
4. No. of stages .........................................
5. Casing (split/barrel) .........................................
6. Steam admission (Single/Dual) .........................................
7. Direction of rotation viewed
from steam admission end .........................................
8. Location .........................................
9. Provided with output shafts
at both ends, Yes/No .........................................
10. Rotor (Solid / Built up) .........................................
11. Maximum noise level dBA .........................................
B Conditions: Design b.e.p. Start-
up
1. Steam Source ........... .......... ............
2. Steam conditions at inlet
pressure ata ........... .......... ............
Temperature deg C ........... .......... ............
Enthaply Kcal/Kg ........... .......... ............
3. Turbine operating speed rpm ........... .......... ............
4. Shaft power kw ........... .......... ............
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
112 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5. Steam consumption kg/hr ........... .......... ............
6. Steam conditions at exhaust:
pressure ata ........... .......... ............
Dryness fraction ........... .......... ............
Enthalpy Kcal/Kg ........... .......... ............
7. Throttle Steam flow for
exhaust pressure of
0.1 ata kg/hr ........... .......... ............
0.13 ata kg/hr ........... .......... ............
0.15 ata kg/hr ........... .......... ............
8. Corresponding enthalpies at
0.1 ata K cal/kg ........... .......... ............
0.13 ata KCal/kg ........... .......... ............
0.15 ata Kcal/kg ........... .......... ............
9. Corresponding dryness
fraction at:
0.1 ata ........... .......... ............
0.13 ata ........... .......... ............
0.15 ata ........... .......... ............
10. Is drive turbine designed
for full arc admission
during start up? ........... .......... ............
11. Is spray water required at low
load operation? ........... .......... ............
12. Critical Speeds rpm ........... .......... ............
First ........... .......... ............
Second ........... .......... ............
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
113 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
13. Turning gear speed rpm ........... .......... ............
C Governing System:
1. Type .........................................
2. Is back-up governor
provided? Yes/No .........................................
3. Mode .........................................
4. Dead band of governor .........................................
5. Percentage regulation and .........................................
range of adjustability
6. Method of Sensing speed .........................................
7. Time delay between speed signal
and governor valve initiation: .........................................
a) For opening through
full travel sec .......................................
b) For closing through
full travel sec .........................................
8. On load Throw off
a) Temporary Speed rise % .........................................
b) Permanent speed rise % .........................................
c) Time taken to reach steady
state sec ..........................................
d) Overall response time of
the governor from moment
of full load throw off to
moment of full closing of
governor valves millisec. ..........................................
9. Local manual speed control
range .........................................
10. Remote speed control range .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
114 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
11. Over speed trip
a) Type ..........................................
b) Number .........................................
c) Method of varying trip speed .........................................
D Bearings:
1. Radial
a) Type .........................................
b) Area mm
2
.........................................
2. Thrust
a) Type .........................................
b) Area mm
2
.........................................
c) Max load kg .........................................
d) Thrust capacity kg .........................................
E. Packing type :
1. Interstage gland seals .........................................
2. End gland seals .........................................
F. Connection:
1. Extraction steam inlet .........................................
2. Alternate steam inlet .........................................
3. Exhaust .........................................
G. Gland Sealing steam:
1. Normal quantity kg/hr .........................................
2. Maximum quantity kg/hr ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
115 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
H. Steam Strainers for gland sealing:
1. Type .........................................
2. Pressure drop ata .........................................
I. Inlet Section :
1. Number of governor controlled
Steam admission valves:
a. For normal supply .........................................
b. For alternate supply .........................................
2. First stage mean diameter mm .........................................
3. First stage blade height mm .........................................
4. First stage nozzle area mm
2
.........................................
a. For normal supply .........................................
b. For alternate supply .........................................
J . Exhaust Section:
1. Flow (Single/Double) .........................................
2. Length of last stage blades mm .........................................
3. Tip diameter of last Stage
wheel mm ..........................................
4. Annulus area of last stage m
2
.........................................
5. No. of openings ..........................................
6. Type of joint ..........................................
K. Valves:
1. Stop valves design pressure ata .........................................
2. Control valves design pressure ata .........................................
3. Stop valves design temperature deg C .........................................
4. Control valves design temperature deg C .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
116 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.00.00 Couplings (Per Unit)
1. Between Turbine and Main Pump:
1.1 Type .........................................
1.2 Make .........................................
1.3 Model No. and number offered .........................................
1.4 Rating and end play limit mm .........................................
2. Between Motor and Gear box /
Hydraulic Coupling:
2.1 Type and size .........................................
2.2 Make .........................................
2.3 Model No. and number offered .........................................
2.4 Rating and end play limit mm .........................................
3. Between Gear box / Hydraulic Coupling
and Boiler Feed Pumps:
3.1 Type and size .........................................
3.2 Make .........................................
3.3 Model No. and number offered .........................................
3.4 Rating and end play limit mm .........................................
4. Between Turbine Driven Booster
Pump and Gear box :
4.1 Type and size .........................................
4.2 Make .........................................
4.3 Model No. and number offered .........................................
4.4 Rating and end play limit mm .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
117 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5. Between Turbine and Booster
Pump Gear box
5.1 Type and size .........................................
5.2 Make .........................................
5.3 Model No. and number offered .........................................
5.4 Rating and end play limit mm .........................................
6. Between Motor Driven Pump
Shaft and Booster Pump:
6.1 Type and size .........................................
6.2 Make .........................................
6.3 Model No. and number offered .........................................
6.4 Rating and end play limit mm .........................................
7. Between Vertical Motor and Condensate
pump:
7.1 Type and size .........................................
7.2 Make .........................................
7.3 Model No. and number offered .........................................
7.4 Rating and end play limit mm .........................................
3.00.00 Lubrication System for feed Pump Sets
(Per Unit) :
1. Main Oil Pump
1.1 Manufacturer ............... ........................
1.2 Type ............... ........................
1.3 Model number and number offered ............... ........................
1.4 Pump drive ............... ........................
1.5 Rated capacity m
3
/hr ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
118 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.6 Rated head ata ............... ........................
1.7 NPSH required meters ............... ........................
2. Auxiliary Oil Pump :
2.1 Manufacturer ............... ........................
2.2 Type ............... ........................
2.3 Model number and number offered ............... ........................
2.4 Pump drive ............... ........................
2.5 Rated capacity m
3
/hr ............... ........................
2.6 Rated head ata ............... ........................
2.7 NPSH required meters ............... ........................
3. Emergency Oil Pump :
3.1 Manufacturer ............... ........................
3.2 Type ............... ........................
3.3 Model number and number offered ............... ........................
3.4 Pump drive ............... ........................
3.5 Rated capacity m
3
/hr ............... ........................
3.6 Rated head ata ............... ........................
3.7 NPSH required meters ............... ........................
4. J acking Oil Pump (For turbine driven
units), if required.
4.1 Manufacturer ............... ........................
4.2 Type ............... ........................
4.3 Model number and number offered ............... ........................
4.4 Pump drive ............... ........................
4.5 Rated capacity, m3/hr ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
119 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.6 Rated head, ata ............... ........................
4.7 NPSH required, meters ............... ........................
5. Lube Oil Coolers :
5.1 Manufacturer ............... ........................
5.2 Type ............... ........................
5.3 Model Number ............... ........................
5.4 Number of oil coolers for each unit ............... ........................
5.5 Rating data for each cooler: ............... ........................
- Heat load KCal/hr ............... ........................
- Oil flow rate m
3
/hr ............... ........................
- Water flow rate m
3
/hr ............... ........................
- Oil side pressure drop ata ............... ........................
- Inlet oil temperature
0
C ............... ........................
- Outlet oil temperature
0
C ............... ........................
- Maximum permissible water side
pressure ata ............... ........................
- Surface area m ............... ........................
5.6 Fouling factors used for design
i) Oil side ............... ........................
ii) Water side ............... ........................
5.7 Nozzle sizes, rating and drilling
standards:
- Oil inlet ............... ........................
- Oil outlet ............... ........................
- Water inlet ............... ........................
- Water outlet ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
120 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5.8 Construction :
- TEMA Class ............... ........................
- Tube OD and wall thickness ............... ........................
5.9 Bidder to indicate data as above for
working oil coolers also ............... ........................
6. Lube oil reservoirs :
6.1 Number per unit ............... ........................
6.2 Type ............... ........................
6.3 Net capacity m ............... ........................
6.4 Overall dimensions ............... ........................
6.5 Method of supporting ............... ........................
7. Lube Oil :
7.1 Type ............... ........................
7.2 Specification ............... ........................
7.3 Quantity required for one
complete filling of one unit m ............... ........................
8. Oil Purification System for
turbine driven Unit :
(A) Centrifuge :
8.1 Type of bowl ............... ........................
8.2 Operating speed rpm ............... ........................
8.3 Rated capacity m
3
/hr ............... ........................
8.4 Make ............... ........................
8.5 Model No. and Number offered ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
121 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.6 Oil heater : ............... ........................
1. Type ............... ........................
2. Rating KW ............... ........................
8.7 Dirty and clean oil pumps :
1. Number per unit ............... ........................
2. Method of drive ............... ........................
3. Type and Make ............... ........................
4. Rated capacity m3/hr ............... ........................
5. Rated head ata ............... ........................
8.8 Oil polishing filter ............... ........................
8.9 Type and Make ............... ........................
8.10 Rated capacity m3/hr ............... ........................
8.11 Differential for normal and alarm
set point ata ............... ........................
8.12 Particulate matter removal
efficiency (centrifuge/filter) ............... ........................
4.00.00 Strainer for boiler feed pumps
(per unit) Temporary Permanent
(if provided)
1. Type ............... ........................
2. Quality ............... ........................
3. Manufacturer ............... ........................
4. Strainer element ............... ........................
a) Nominal size mm ............... ........................
b) Connecting pipe size mm
ODXmm thk ............... ........................
c) Thickness of sheet mm ............... ........................
d) Perforation mm ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
122 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e) Screen wire size (gauge) ............... ........................
& screen mesh size (gauge)
f) Material of sheet ............... ........................
g) Material of screen wire ............... ........................
h) Total open area of screen
assembly sq.m ............... ........................
i) Ring OD mm ............... ........................
j) Ring thickness mm ............... ........................
k) Total length of strainer assembly, mm ............... ........................
l) Total end connection details ............... ........................
5. Strainer end connection details ............... ........................
6. Hydrostatic pressure and duration of
test for strianers ............... ........................
7. Guaranteed pressure drop at 100%
clean condition & design flow mlc ............... ........................
8. Pressure drop at 50% clogged
condition & design flow mlc ............... ........................
9. Max. differential pressure across
strainer without repture or damage kgf/cm2 ............... ........................
10. Max. particle size possible mm ............... ........................
5.00.00 Strainer for booster pumps (Per Unit)
1. Type ............... ........................
2. Quantity ............... ........................
3. Manufacturer ............... ........................
4. Strainer element ............... ........................
a) Nominal size mm ............... ........................
b) Connecting pipe size mm
ODXmm thk ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
123 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c) Thickness of sheet mm ............... ........................
d) Perforation mm ............... ........................
e) Screen wire size (gauge) ............... ........................
& screen mesh size (gauge)
f) Material of sheet ............... ........................
g) Material of screen wire ............... ........................
h) Total open area of screen
assembly sq.m ............... ........................
i) Ring OD mm ............... ........................
j) Ring thickness mm ............... ........................
k) Total length of strainer assembly mm ............... ........................
l) Total weight of strainer kg ............... ........................
5. Strainer end connection details ............... ........................
6. Hydrostatic pressure and duration of
test for strianers ............... ........................
7. Guaranteed pressure drop at 100%
clean condition & design flow mlc ............... ........................
8. Pressure drop at 50% clogged
condition & design flow mlc ............... ........................
9. Max. differential pressure across
strainer without repture or damage kgf/cm2 ............... ........................
10. Max. particle size possible mm ................ ........................
6.00.00 Strainer for condensate extraction pumps
1. Type ............... ........................
2. Quantity ............... ........................
3. Manufacturer ............... ........................
4. Strainer element ............... ........................
a) Nominal size mm ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
124 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Connecting pipe size mm
ODXmm thk ............... ........................
c) Thickness of sheet mm ............... ........................
d) Perforation mm ............... ........................
e) Screen wire size (gauge) ............... ........................
& screen mesh size (gauge)
f) Material of sheet ............... ........................
g) Material of screen wire ............... ........................
h) Total open area of screen
assembly sq.m ............... ........................
i) Ring OD mm ............... ........................
j) Ring thickness mm ............... ........................
k) Total length of strainer assembly mm ............... ........................
l) Total weight of strainer kg ............... ........................
5. Strainer end connection details ............... ........................
6. Hydrostatic pressure and duration of
test for strianers ............... ........................
7. Guaranteed pressure drop at 100%
clean condition & design flow mlc ............... ........................
8. Pressure drop at 50% clogged
condition & design flow mlc ............... ........................
9. Max. differential pressure across
strainer without repture or damage kgf/cm2 ............... ........................
10. Max. particle size possible mm ............... .....................
7.00.00 Weight kgs
1.0 Turbine driven Boiler Feed Pump ............... ........................
1.1 Per main pump ................. ........................
1. Assembly ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
125 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2. Casing ................. .......................
3. Rotor (all rotating parts, without
coupling half) ................. ........................
4. Shaft ................. ........................
5. Impeller first stage ................. ........................
6. Impeller normal stage ................. ........................
7. Balancing drum (rotating part only) ................. ........................
8. Inner assembly ................. ........................
1.2 Booster Pump ................. ........................
1. Assembly ................. ........................
2. Casing ................. ........................
a) Removable part ................. ........................
b) Fixed part ................. ........................
3. Rotor (all rotating parts, without
half coupling) ................. ........................
4. Impeller ................. ........................
1.3 Gear Box assembly for Booster pump ................. ........................
1.4 Drive Turbine assembly ................. ........................
1.5 Lube Oil Unit ................. ........................
1.6 Total shipping weight ................. ........................
1.7 Maximum weights ................. ........................
a) Main pump ................. ........................
b) Booster pump ................. ........................
c) Gear Box ................. ........................
d) Drive turbine ................. ........................
e) Others ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
126 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2. Motor-driven Boiler Feed Pump ................. ........................
1.1 Per Main-pump ................. ........................
1. Assembly ................. ........................
2. Casing ................. .......................
3. Rotor (all rotating parts,
without coupling half) ................. .......................
. 4. Shaft ................. ........................
5. Impeller first stage ................. ........................
6. Impeller normal stage ................. ........................
7. Balancing drum
(rotating part only) ................. ........................
8. Hydraulic coupling assembly ................. ........................
including accessories
1.2 Hydraulic coupling assembly
including accessories ................. ........................
1.3 Drive Motor ................. ........................
a) Assembly ................. ........................
b) Rotor ................. ........................
1.4 Total shipping weight ................. ........................
1.5 Maximum weights ................. ........................
a) Feed Pump ................. ........................
b) Drive motor ................. ........................
c) Gearbox/Hydraulic coupling ................. ........................
d) Others ................. ........................
3. Condensate Pump ................. .......................
3.1 Per pump assembly ................. ........................
3.2 Rotating elements of pump ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
127 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.3 Suction barrel or can ................. ........................
3.4 Impellers ................. ........................
a) First stage ................. ........................
b) Normal stage ................. .....................
3.5 Bowl assembly ................. ........................
3.6 Discharge head ................. ........................
3.7 Drive motor ................. ........................
a) Assembly ................. ........................
b) Rotor only ................. ........................
3.8 Maximum weights to be handled ................. ........................
a) During erection ................. ........................
b) During maintenance ................. ........................
3.9 Total shipping weight ................. ........................
8.00.00 Materials of construction
Indicate ASTM designations whenever
possible Otherwise furnish details like
applicable standards, casting/forging,
chemical composition, etc. ................. ........................
8.01.00 Boiler Feed Pumps :
1. Outer casing ................. ........................
2. Discharge head (barrel and head) ................. ........................
3. Inner casing ................. ........................
4. Diffusers or volutes ................. ........................
5. Casing wear rings ................. ........................
6. Impellers (First Stage/other stages) ................. ........................
7. Impellers wear rings ................. ........................
8. Pump shaft ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
128 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
9. Shaft sleeves ................. ........................
10. Balancing drum ................. ........................
- Rotating part ............... ........................
- Stationary part ............... ........................
11. Internal gaskets ................. ........................
12. Interstage packing, if applicable ................. ........................
13. Casing bolts, studs, nuts
(for outer casing) ................. ........................
14. Pump suction nozzle ................. ........................
15. Pump discharge nozzle ................. ........................
16. Overlay on casing at high velocity zones ................. ........................
8.02.00 Booster Pumps :
1. Casing ................. ........................
2. Impeller ................. ........................
3. Casing wear rings ................. ........................
4 . Impeller wear rings ................. ........................
5. Shaft ................. ........................
6. Shaft sleeves ................. ........................
Note: Indicated materials used for various
components covered under clause no.
8.01.00 and 8.02.00 above for two
separate stations for rate parameters
8.03.00 Condensate Pumps :
1. Top Case ................. .....................
2. Discharge head ................. ........................
3. Suction barrel/can ................. ........................
4. First stage impeller ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
129 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5. Other Impellers ................. ........................
6. Impeller wear rings ................. ........................
7. Suction bell and bowls ................. ........................
8. Sleeves bearings ................. ........................
9. Shaft ................. ........................
10. Packing ................. ........................
11. Glands ................. ........................
12. Gaskets ................. ........................
13. Shaft sleeve ................. ........................
14. Bowl bolts and other internal fasteners ................. ........................
8.04.00 Auxiliary Drive Turbine
1. High pressure casing ................. ........................
2. Exhaust casing ............... ........................
3. Low pressure steam chest ............... ........................
4. Low pressure nozzles ............... ........................
5. High pressure steam chest ............... ........................
6. High pressure nozzles ............... ........................
7. Blades ............... ........................
8. Shrouds ............... ........................
9. Wheel ............... ........................
10. Shaft ............... ........................
11. Shaft material under seals ............... ........................
12. Low pressure governor valve ............... ........................
13. High pressure governor valve ............... ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
130 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.05.00 Gear Box (for turbine driven Booster)
1. Gear Box ............... ........................
2. Oil seals ................. ........................
3. High speed shaft ................. ........................
4. Low speed shaft ................. ........................
5. Pinion, material and hardness ................. ........................
6. Gear, material and hardness ................. ........................
7. Tooth plating, if any ................. ........................
8.06.00 Hydraulic coupling
1. Housing ................. ........................
2. Inner casing ................. ........................
3. Outer casing ................. ........................
4. Rotor (impeller and runner) ................. ........................
5. Shaft ................. ........................
6. Gears ................. ........................
8.07.00 Lube Oil System Components
1. Main Oil Pump ................. ........................
1.1 Casting ................. ........................
1.2 Impeller/rotor ................. ........................
1.3 Trim ................. ........................
2. Auxiliary Oil Pump ................. ........................
2.1 Casting ................. ........................
2.2 Impeller/rotor ................. ........................
2.3 Trim ................. ........................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
131 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3. Emergency Oil Pump ................. ........................
3.1 Casting ................. ........................
3.2 Impeller/rotor ................. ........................
3.3 Trim ................. ........................
4. J acking Oil Pump (if required) ................. ........................
4.1 Casting ................. ........................
4.2 Impeller/rotor ................. ........................
4.3 Trim ................. ........................
5. Lube Oil Coolers ................. ........................
5.1 Shell ................. ........................
5.2 Tube ................. ........................
5.3 Tube sheet ................. ........................
5.4 Water Box ................. ........................
5.5 Support plates ................. ........................
6. Centrifugal bowl ................. ........................
7. Oil reservoir ................. ........................
8. Working Oil Coolers(for Hydraulic
Coupling)
8.1 Shell ................. ........................
8.2 Tube ................. ........................
8.3 Tube sheet ................. ........................
8.4 Water Box ................. ........................
8.5 Support plates ................. ....................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
132 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.08.00 Mechanical seals
1. Seal faces, stationary/rotating ................. ..................
2. Mechanical seal cooler shell ................. ..................
3. Mechanical seal cooler shell ................. ..................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
133 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 6
TURBINE HALL E.O.T. CRANES
1.00.00 Technical Particulars
i) Name of the manufacturer .........................................
ii) Type and class of crane .........................................
iii) Guaranteed lifting capacity of
the main hook tonnes .........................................
iv) Guaranteed maximum lifting
capacity of the auxiliary hook
tonnes .........................................
v) Guaranteed maximum lift of
the main hook metres .........................................
vi) Guaranteed maximum lift of
auxiliary hook metres .........................................
vii) Maximum speed at full load: .........................................
a) Main hoist metres/min .........................................
b) Auxiliary hoist meters/min .........................................
c) Trolley cross travel metres/min .........................................
d) Bridge travel metres/min .........................................
e) Creep speed of main hoist metres/min .........................................
f) Creep speed of auxiliary metres/min .........................................
hoist
viii) Crane bridge .........................................
a) Type .........................................
b) Method of fabrication .........................................
ix) Trucks .........................................
1. Number of trucks .........................................
2. Number of wheels per truck .........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
134 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3. Centre to centre distance of
wheels of end carriage mm .........................................
a) Inner wheels .........................................
x) Trolley : .........................................
a) Method of fabrication .........................................
b) Centre to centre distance of
transverse wheels mm .........................................
xi) Wheels Truck Trolley
a) Type ............... ......................
b) Diameter mm ............... ......................
c) Material ............... ......................
d) Type of bearings ............... ......................
xii) Motor particulars for Size (KW) Speed
(rpm)
a) Main hoist ............... ......................
b) Auxiliary hoist ............... ......................
c) Trucks ............... ......................
d) Trolley ............... ......................
xiii) Type of brakes for
Hoists ............... ......................
Trucks ............... ......................
Trolley ............... ......................
xiv) Hoisting rope Main Auxiliary
Construction ............... ......................
Steel quality ............... ......................
Diameter mm ............... ......................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
135 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Number of falls ............... ......................
Minimum breaking load (kg/cm
2
) ............... ......................
Factory of safety ............... ......................
xv) Crane hooks ............... ......................
a) Type ............... ......................
b) Size ............... ......................
c) Material ............... ......................
xvi) Controllers for motors
a) Type ............... ......................
b) Manufacturer ............... ......................
xvii) Limit Switches Hoist Bridges &
Trolley
a) Manufacturer ............... ......................
b) Type ............... ......................
c) Current Carrying capacity amps ............... ......................
xviii) Conductors: Cross Main
runway
a) Type ............... ......................
b) Size ............... ......................
c) Current rating amps ............... ......................
d) Voltage ............... ......................
xix) Type of collectors: ........................................
a) Main collectors ..........................................
b) Trolley collectors ..........................................
xx) Cables / wires .......................................
a) Rated voltage V .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
136 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Rated current amps .......................................
c) Type of insulation .......................................
d) Short-time current rating (amps) .......................................
e) Resistance per 1000 metres
(ohms) .......................................
f) Applicable standard .......................................
xxi) Dynamic wheel loading: .......................................
a) Impact vertical tonnes .......................................
b) Acceleration metres/sec
2
.......................................
c) Deceleration metres/sec
2
.......................................
d) Impact Horizontal Tonnes .......................................
xxii) Static wheel loadings: .......................................
a) Minimum tonnes/axle .......................................
b) maximum tonnes/axle .......................................
xxiii) Rope drums Main Auxiliary
Hoist Hoist
a) Diameter mm .............. ....................
b) Thickness of the drum at the
bottom of the grooves mm ............... ....................
c) Depth of grooves mm ............... ....................
d) Pitch of rope grooves mm ............... ....................
xxiv) Diameter of sheaves .......................................
a) Main hoist mm .......................................
b) Auxiliary hoist mm .......................................
xxvi) Runway rail .......................................
a) Weight per metre kg .......................................
b) Section .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
137 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xxvii) Type and rating of VVVF drive
a) MH .......................................
b) AH .......................................
c) CT .......................................
d) LT .......................................
xxviii) Voltage control range of drive for
a) MH .......................................
b) AH .......................................
c) CT .......................................
d) LT .......................................
xxix) Accuracy of drive output for
a) MH .......................................
b) AH .......................................
c) CT .......................................
d) LT .......................................
xxx) Drive voltage (V) & current (A)
rating for
a) MH .......................................
b) AH .......................................
c) CT .......................................
d) LT .......................................
(xxxi) Type & model of Radio Remote control .......................................
(xxxii) Frequency of Radio Remote control .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
138 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
xxxiii) Minimum working clearance .......................................
required as per clearance
diagram No. for dimensions.
a) L mm .......................................
b) M mm .......................................
c) V mm .......................................
d) W mm .......................................
xxxiv) Nett weight of crane bridge tonnes .......................................
xxxv) Nett weight of trolley Tonnes .......................................
xxxvi) Nett weight of complete crane Tonnes .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
139 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART- 7
OTHER EQUIPMENT/DEVICES
State if the following are included
in the scope and furnish details for
each
1.00.00 Piping with valves, hangers, insul-
ation, fittings, specialities etc. &
instrumentation for the following
systems.
1.01.00 Lube oil system for turbine generator
unit and its accessories including
emergency oil supply system to air
side of generator seal oil system
and control lube oil system Yes/No. .......................................
1.02.00 Turbine gland steam sealing system Yes/No. .......................................
1.03.00 Turbine control fluid system Yes/No. .......................................
1.04.00 Main steam and hot reheat lines
portion between strainers and turbine Yes/No. .......................................
1.05.00 Extraction lines in condenser neck Yes/No. .......................................
1.06.00 Exhaust hood spray & flash tanks
desuperheating Yes/No. .......................................
1.07.00 Turbine and integral system drains Yes/No. .......................................
1.08.00 CW system between butterfly
valves and condenser water-box Yes/No. .......................................
1.09.00 Air extraction lines for condenser
air evacuation and water box priming Yes/No. .......................................
1.10.00 Generator seal oil system, hydrogen
& CO
2
systems and stator water
system Yes/No. .......................................
1.11.00 Auxiliary cooling water system for
TG coolers Yes/No .......................................
1.12.00 Instrument and service air system Yes/No. .......................................
1.13.00 Wet steam washing system Yes/No. .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
140 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.14.00 Reheater entrapped steam
releasing system Yes/No. .......................................
1.15.00 Corrosion protection system
for TG under long shut down Yes/No. .......................................
2.00.00 Pressure relief diaphragms as
required in LP exhaust hood Yes/No. .......................................
3.00.00 Bolt heating equipment with
control Yes/No. .......................................
4.00.00 Turbine flange heating system
if required Yes/No. .......................................
5.00.00 Hand barring device Yes/No. .......................................
6.00.00 Base plates/sole plates fixtures,
embedments, inserts etc. as
required Yes/No. .......................................
7.00.00 Foundation bolts as required Yes/No. .......................................
8.00.00 Blanking arrangement for steam
blowing Yes/No. .......................................
9.00.00 Condenser waterbox handling
arrangement Yes/No. .......................................
10.00.00 First fill and one year topping
requirements of lubricants,
and other consumable Yes/No. .......................................
11.00.00 Temperature detectors for
heat exchangers, stator
winding, stator core, bearings etc. Yes/No. .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
141 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 8
CODES AND STANDARDS
1.01.00 Material specification for major
components of turbine, gener-
ator and condenser (Furnish a
list .......................................
1.02.00 Design and construction code
for turbine, generator and con-
denser .......................................
1.03.00 Governor performance charac-
teristics .......................................
1.04.00 Fluctuations / limitations of
variations of pressure / tempe-
rature at turbine throttle and
reheat inlet steam temperature .......................................
1.05.00 Specification for turbine lubric-
ating oil .......................................
1.06.00 Specification for turbine
control fluid .......................................
1.07.00 Design, manufacturing & testing
code for condenser .......................................
1.08.00 Design, manufacturing & testing
code for vacuum pumps .......................................
1.09.00 Design, manufacturing & testing
code for non-return valves on
extraction & CRH lines .......................................
1.10.00 Design, manufacturing & testing
code for heat exchangers (other
than condenser) .......................................
1.11.00 Design, manufacturing & testing
code for CW butterfly valves .......................................
1.12.00 Design, manufacturing & testing
code for CW expansion joints .......................................
1.13.00 Design, manufacturing & testing
code for HP-LP bypass valves .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
142 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.14.00 English translation of all codes &
standards followed by Bidder. .......................................
1.15.00 Information to justify the superiority
of stds followed by Bidder in case
of those varying from specified
standards .......................................
1.16.00 Specific variations and deviations
from specified standards (if
applicable) .......................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
143 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 9
START- UP & LOADING DATA
1.00.00 LOADING RATES
1.01.00 Load pick-up rates from 30%
MCR to 50% MCR after Constant Variable
Pressure Pressure
1.01.01 4 hours of shutdown MW/min ................ ....................
1.01.02 8 hours of shutdown MW/min ................ ....................
1.01.03 12 hours of shutdown MW/min ................ ....................
1.01.04 24 hours of shutdown MW/min ................ ....................
1.01.05 36 hours of shutdown MW/min ................ ....................
1.01.06 Absolute cold condition MW/min ................ ....................
1.02.00 Load pick-up rates from 50%
MCR to 80% MCR after Constant Variable
pressure Pressure
1.02.01 4 hours of shutdown MW/min ................ ....................
1.02.02 8 hours of shutdown MW/min ................ ....................
1.02.03 12 hours of shutdown MW/min ................ ....................
1.02.04 24 hours of shutdown MW/min ................ ....................
1.02.05 36 hours of shutdown MW/min ................ ....................
1.02.06 Absolute cold condition MW/min ................ ....................
1.03.00 Load pick-up rates from 80%
MCR to full rated load after Constant Variable
Pressure Pressure
1.03.01 4 hours of shutdown MW/min ................ ....................
1.03.02 8 hours of shutdown MW/min ................ ....................
1.03.03 12 hours of shutdown MW/min ................ ....................
1.03.04 24 hours of shutdown MW/min ................ ....................
1.03.05 36 hours of shutdown MW/min ................ ....................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
144 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.03.06 Absolute cold condition MW/min ................ ....................
1.04.00 Time required to bring the
unit on the line after Constant Variable
Pressure Pressure
1.04.01 4 hours of shutdown min ................ ....................
1.04.02 8 hours of shutdown min ................ ....................
1.04.03 12 hours of shutdown min ................ ....................
1.04.04 24 hours of shutdown min ................ ....................
1.04.05 36 hours of shutdown min ................ ....................
1.04.06 Absolute cold condition min ................ ....................
1.05.00 Time required to bring the
unit upto 30% load form Constant Variable
synchronisation after Pressure Pressure
1.05.01 4 hours of shutdown min ................ ....................
1.05.02 8 hours of shutdown min ................ ....................
1.05.03 12 hours of shutdown min ................ ....................
1.05.04 24 hours of shutdown min ................ ....................
1.05.05 36 hours of shutdown min ................ ....................
1.05.06 Absolute cold condition min ................ ....................
1.06.00 Conditions, if any, limiting
the time intervals in items
1.04.00 & 1.05.00 above ................ ....................
2.00.00 Total number of starts for
which the TG set is Constant Variable
designed over 30 years Pressure Pressure
2.01.01 Start after 4 hours of shutdown ................ ....................
2.01.02 Start after 8 hours of shutdown ................ ....................
2.01.03 Start after 12 hours of shutdown ................ ....................
2.01.04 Start after 24 hours of shutdown ................ ....................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
145 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.01.05 Start after 36 hours of shutdown ................ ....................
2.01.06 Absolute cold start ups ................ ....................
3.00.00 Furnish Life Expenditure Curves for
the various conditions of start-up
indication cl. 2.00.00 above and
cyclic load variations under both
constant pressure and variable
pressure mode of operation ................ ....................
4.00.00 Furnish start-up curves for various
conditions under both constant
pressure and variable pressure mode
of operation. For variable pressure
operation, the throttling reserve shall
be adjustable in steps & upto a
maximum of 20% ................ ....................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
146 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART 10
AVAILABILITY DATA
1.00.00 Availability data shall be furnished
by the Bidder for the TG set offered
to justify provenness of the set. This
data or any additional data which the
Bidder desires to submit shall atleast
be for two different stations belonging
to different customers. The Bidder
shall furnish adequate supporting
documents in proof of the source of
data as originating from the reference
customers.
1.01.00 Availability Hrs/year ..........................................
1.02.00 Maintenance outage rate Hrs/year ..........................................
1.03.00 Forced outage rate Hrs/year ..........................................
1.04.00 Causes of outage Hrs/year
..........................................
..........................................
..........................................
1.05.00 Remedial measures adopted
..........................................
..........................................
..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
147 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
PART - 11
WEIGHTS AND DIMENSIONS
1.00.00 WEIGHTS
1.02.00 Weight and name of the heaviest piece
to be handled during erection Tonnes ..........................................
1.02.01 Weight and name of the heaviest piece Tonnes ..........................................
to be handled during erection by turbine
hall EOT crane
1.02.02 Weight and name of the heaviest
piece to be handled by the station
EOT crane after erection Tonnes ..........................................
2.00.00 DIMENSIONS
2.01.00 Over all length of turbine from the
front standard to the turbine coupling m ..........................................
2.02.00 width at widest point m ..........................................
2.03.00 Width at operating floor line m ..........................................
2.04.00 Height of turbine shaft centre lint
above the operating floor m ..........................................
2.05.00 Minimum height required for removal
of the turbine shaft, with slings provided
for this purpose, measured from the
pedestal floor to the throat of the lifting
hook m .........................................
2.06.00 Minimum height required for removal
of the turbine casing, with slings
provided for this purpose, measured
from the pedestal floor to the throat of
the lifting hook. m ..........................................
2.07.00 Minimum height requirement, greater
than that for items 2.05.00 & 2.06.00
above, for lifting any other part of the
turbine and name of the part (Identify) m ..........................................
2.08.00 Maximum distance, that the top of the
than that oil tank may be placed, below
the top of the pedestal m ..........................................
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
148 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.09.00 Floor dimensions required for setting
down the largest part of the turbine
during overhaul m x m ..........................................
2.10.00 Suggest dimensions of a rectangle
inside which all parts of the turbine
may be placed during a complete
overhaul m x m ..........................................
2.11.00 Shipping dimensions
2.11.01 Turbine (Component wise attach a
separate sheet) m x m x m ..........................................
2.11.02 Lube oil coolers m x m x m ..........................................
2.11.03 Gland steam coolers m x m x m ..........................................
3.00.00 HANDLING ARRANGEMENT
Proposed arrangement for handling
of the following major items during
erection and during maintenance and
their weights:
(Furnish detailed write-up, drawings
and other technical data)
Sl. No. Components Weight Handling arrangement
During During maintenance erection
1.0 HP cylinder assembled
2.0 IP cylinder assembled
3.0 LP bladed rotor
4.0 HP bladed rotor
5.0 IP bladed rotor
6.0 LP casing
7.0 Generator stator
assembly
8.0 Generator rotor
assembly
9.0 Condenser
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
149 OF 149
DA2(II)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
10. Condensate extraction
pumps
11. LP heater no.1
12. LP heater no.2
13. LP heater no.3
14. Gland steam condenser
15. Deaerator
16. Boiler feed pumps
17. BFP Booster pumps
18. HP heater no.5A & B
19. HP heater no. 6A & B
20 HP heater no. 7A & B
21. Any others
4.00.00 ANY OTHER DATA
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-III
INSTRUCTIONS
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 4
DA2(III)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION - DA2 (III)
INSTRUCTIONS
The Employer's requirements of data and drawings from the successful Bidder in respect
of the equipment covered under this portion of the Package are broadly indicated in this
part of the specification. These data/drawings shall be submitted by the successful Bidder
in 12 (twelve) copies to the Employer during the period commencing from the fourth week
and ending at the twelfth week from the date of Notice of Award of Contract. In the case
of drawings, a polyester reproducible and one (1) micro film of each drawing shall also
be submitted by the successful Bidder to the Employer. Schedule of submission of these
and any other data/drawings not specifically included herein but required for project
engineering shall be furnished alongwith the bid proposal. The actual schedule of these
data/drawing requirements shall be mutually discussed and agreed to between the
Employer and the successful Bidder before the issue of notice of Award of Contract. The
successful Bidder shall also furnish to the Employer any addition data/drawing identified by
the Employer during post award engineering. Such requirements shall be met by the
successful Bidder within the time identified by the Employer so as to meet the overall
project schedule.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 4
DA2(III)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
GENERAL
1.00.00 CONTRACT DRAWINGS
1.01.00 Steam Turbine and Auxiliaries
1.01.01 Final TG Foundation drg. indicating the total embedment requirements.
1.01.02 Drawing indicating the final loading data and fixing details of the equipment.
1.01.03 Cross sectional arrangement/drawings.
1.01.04 Campbell diagrams showing the points of resonance for various stages.
1.01.05 Piping diagrams including complete piping schemes layouts, location and loading drawings
etc. for all piping.
1.01.06 Drawing showing clearly the terminal details.
1.01.07 Drawings showing the edge preparation details of terminals for welding to EMPLOYER'S
piping & equipment.
1.01.08 P & I diagrams for TG Integral system for steam, condensate, drains, DM cooling water,
compressed air, lube and control fluid, circulating water, gland sealing steam, stator cooling
water, seal oil, H
2
and CO
2
Systems, wet steam washing, exhaust hood spray, HP-LP
bypass, condenser air evacuation, condenser tube cleaning etc.
1.01.09 Allowable forces & moments on nozzles of turbine main-steam stop & control valves, reheat
stop & control valves, HP-LP bypass valves, condenser, heaters, CEP, Deareator, BFP,
MDBFP, BFPDT etc.
1.01.10 Drawing showing the bolt (casing) loading and strains and indicating the estimated period in
which retightening or replacement of bolts are required alongwith the instructions.
1.01.11 Erection assembly drawing as detailed below:
a) Turbine including casings, rotors, nozzles, exhaust connections, emergency stop
valves, Interceptor valves, non-return valves, nozzle valves, turning gear arrangement
etc.
b) Wet steam washing system
c) Forced cooling system
d) Exhaust hood spray system
e) Seal steam system
f) Governing system & Control fluid system.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 4
DA2(III)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
g) HP-LP bypass system.
h) Pumps including, emergency oil pump, stand by oil pump, starting oil pump.
i) Central lube oil storage & purification system.
j) Condenser air evacuation system.
k) Condenser on load tube cleaning system.
1.01.12 Condenser tube layout including withdrawal space of the condenser necessary for tube
banks, steam laying arrangement inside the condenser, Condenser hotwell and deaerating
section layout.
1.01.13 Condenser waterbox handling arrangement.
2.00.00 OTHER DOCUMENTS
2.01.00 General
2.01.01 Complete technical literature including characteristic curves, data sheets, sizing calculations
etc. for all control valves, process valves and flow measuring devices including that for PG
test.
2.01.02 Characteristic curves of all the actuators in respect of valves.
2.01.03 Description of the method to be adopted for protection of the equipment during manufacture,
shipment and storage at site.
2.01.04 Shipping breakdown of all equipment
2.01.05 Complete list of all the maintenance tools included in the proposal.
2.01.06 Necessary pamphlets to illustrate the features of design and construction of the component
parts of all equipment and systems furnished.
2.01.07 Detailed descriptions of all equipment and systems furnished under the scope of this
specification.
2.01.08 Instructions for erection, testing commissioning, operation and maintenance of the various
equipment and their systems.
2.01.09 Performance & guarantee test procedure, test scheme & Instrument list etc.
2.01.10 Final list of equipment, instruments and device included in scope of supply alongwith their
specification, location, electrical supply details, actuation setting, name of supplier etc.
2.01.11 Data sheets of flow nozzles and other instruments for PG test.
CLAUSE BIDDER'S NAME
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 4
DA2(III)
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.01.12 Drawings of flow nozzles and other instrument for PG test.
2.01.13 Cooling water requirements equipment-wise, stating the quantity, quality pressure etc.
2.01.14 Heat load of the equipment located in the TG hall covered under this package.
2.01.15 Details of the following:
a) Atmospheric relief diaphragm - type, rupture, pressure etc.
b) Insulation-type of insulation (matters or loose form), fibre diameter and length,
shot contents, max. size of shot, loss of weight during incombustibility test, max.
sulphur and carbon content etc.
2.02.00 Turbine and Auxiliaries
2.02.01 Results of vibration analysis on condenser tubes.
2.02.02 Transient speed rise analysis of turbine
2.02.03 Auxiliary Steam requirement for steam turbine (quantity, pressure and temperature)
2.02.04 Details of dynamic balancing of TG rotor and blade vibration tests.
2.02.05 Governing system stability Analysis results.
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA3
(NOT USED)
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA4
HYDROGEN GENERATION PLANT
Clause
No.
BIDDER'S NAME...........
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 4
DA4
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
HYDROGEN GENERATION PLANT
1.00.00 TYPE OF PLANT Unit Polor / Biplor Type
1.01.00 GENERAL
1.02.00 Manufacturer
1.03.00 Guaranteed performance data
1.03.01 Hydrogen generation
Plant Capacity (NM
3
/hr) .......................................................................
1.03.02 No. of Streams ......................................................................
1.03.03 Capacity of each Stream ......................................................................
1.03.04 Hydrogen Purity (%) ......................................................................
1.03.05 Moisture content ......................................................................
1.03.06 Whether the Plant System Yes/No
& equipments are designed
as per the rules of Explo-
sives Authority of India?
1.04.00 Whether the plant is designed
for :
i) Continuous duty ? Yes/No
ii) Parallel operation of Yes/No
streams ?
iii) Operation of electrolyser Yes/No
in part Load ?
iv) Operation from the Yes/No
control panel ?
v) Flexibility of isolating of Yes/No
any cell of electrolyser
and operation for rest
of the streams ?
vi) Automatic operation of Yes/No
standby compressors?
vii) Automatic change over Yes/No
of gas holders ?
Clause
No.
BIDDER'S NAME...........
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 4
DA4
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.05.00 Whether complete instrumen- Yes/No
tation and control system
provided as specified
1.06.00 Whether complete ventilation Yes/No
system as provided for no.
of plants as specified
2.00.00 EQUIPMENTS
A) Rectifiers
i) Make & Model No. .....................................................................
of rectifier
ii) Type of rectifier .....................................................................
iii) Rating in (KW) .....................................................................
B) Electrolysers
i) Manufacturer .....................................................................
ii) Capacity of the elec- .....................................................................
trolyser in (Nm
3
/hr)
(Rated)
iii) Pressure of hydrogen .....................................................................
gas generated
(Kg/cm
2
(g))
iv) Temperature of hy- .....................................................................
drogen gas generated
v) Consumption of electri- .....................................................................
city in KW/NM
3
of H
2
C) Gas holders of Hydrogen Hydrogen Oxygen
and Oxygen
i) No. of gas holders ............................... ..............................
offered
ii) Capacity and size of ............................... ..............................
each gas holder (m
3
)
Clause
No.
BIDDER'S NAME...........
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 4
DA4
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
D) De-oxy-unit and
gas cooler
i) Manufacturer .....................................................................
ii) Type .....................................................................
iii) Capacity .....................................................................
E) Hydrogen Gas drier
i) Type .....................................................................
ii) Make .....................................................................
F) Compressors for Hydrogen
i) Manufacturer .....................................................................
ii) No. of compressor .....................................................................
offered
iii) Type of compressor .....................................................................
iv) Delivery Pressure .....................................................................
(Kg/cm
2
(g))
v) Capacity (Nm
3
/hr) .....................................................................
vi) Speed (rpm) .....................................................................
vii) Type of drive .....................................................................
viii) No. of stages of .....................................................................
compressor
G) Gas Filling Manifold
i) No. of Manifolds .....................................................................
ii) No. of filling points .....................................................................
H) High pressure cylinder
testing apparatus
i) Manufacturer & .....................................................................
Model No.
ii) Rating of electric .....................................................................
motor (KW)
Clause
No.
BIDDER'S NAME...........
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 4
DA4
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.00.00 A) Cooling Water Required .....................................................................
for Hydrogen Generation
Plant per stream (M/hr.)
B) Temperature rise (deg.C) .....................................................................
4.00.00 DM water required for Hydrogen .....................................................................
Generation Plant per stream
(M/hr.) at its rated capacity
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA5
EQUIPMENT COOLING
WATER SYSTEM
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 3
DA5
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
EQUIPMENT COOLING WATER
SYSTEM
I. GENERAL
1.01.00 Primary Circuit (DM Water)
1.01.01 Flow of DM water in primary
circuit for TG & Aux. (M
3
/HR.) .......................................................
1.01.02 Design DM Water flow (M
3
/HR.) .......................................................
1.02.00 Seconary Circuit (Circulating water)
1.02.01 Flow for TG circuit (M
3
/HR) .......................................................
1.02.02 Flow for SG circuit (M
3
/HR) .......................................................
1.02.03 Total secondary water flow .......................................................
required (M
3
/HR.)
1.03.00 PUMPS DM Cooling Aux Cooling.
Water Pumps Water Pumps
(DMCW) (ACW)
1.03.01 Type of Pump ........................... . ......................
1.03.02 Number offered per unit ........................... . ......................
2.00.00 Technical particulars :
2.01.00 Guranteed Capacity ........................... . ......................
2.02.00 TDH at rated ........................... . ......................
capacity in MWC
2.03.00 Efficiency ........................... . ......................
2.04.00 Rated Output of Motor (KW) ........................... . ......................
2.05.00 Pump speed (RPM) ........................... . ......................
3.00.00 Whether material of construction is YES/NO YES / NO
as per specification?
4.00.00 Whether Mechanical seal provided
for DM CW pumps? Yes/No
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 3
DA5
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
I I HEAT EXCHANGERS
1.00.00 General
1.01.00 Numbers offered per unit ................................. ......................................
1.02.00 Manufacturer ................................. ......................................
1.03.00 Guaranteed Performance
Data for Individual heat
Exchanger:
DM Water Si de Secondary Cooling
Water Si de
1.03.01 Flow in heat Exchanger (M
3
/hr) ................................. ......................................
1.03.02 Inlet Temp.
o
C ................................. ......................................
1.03.03 Outlet Temp.
o
C ................................. ......................................
1.03.04 Total heat transfer area in M
2
................................. ......................................
heat exchanger
1.03.05 Pressure drop across heat ................................. ......................................
exchanger
1.04.00 Whether Material of construction YES / NO
of PHE is as per specification?
1.05.00 Whether frames suitable for YES / NO
addition of 25% plates
I I I . ECW Overhead Surge Tank
1.01.00 Capacity of tank .......................................................................
1.02.00 Number of tanks per unit .......................................................................
IV. Self Cleaning Strainer (ACW side)
1.01.00 Number offered per unit .......................................................................
1.02.00 Material of filter element .......................................................................
1.03.00 Pressure drop in strainer in
a. Clean condition .......................................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 3
DA5
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b. 50 % choked condition .......................................................................
c. 100 % choked condition .......................................................................
1.04.00 Manufacturer ........................................................................
V. Chemical Dosing System:
1.01.00 No. of Chemical dosing Tank .......................................................................
(per unit)
1.02.00 Tank Capacity (M
3
) .......................................................................
1.03.00 Material of Construction of tank as
per specification YES / NO
VI) Whether required Valves,
Instruments are provided or not ? YES / NO
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA6
POWER CYCLE PIPING
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 DATA SHEET FOR PIPES AND FITTINGS
1.01.00 Pipe sizes for various piping systems under the bidders scope:
Note: This Schedule shall be filled for each piping system covered under the Specification.
However, the pipe sizes shall be finalized during detailed stage.
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.02.00 Line J oint type for
a) Piping 65 mm NPS and over ..........................................................
b) Piping 50 mm NPS and less ..........................................................
1.03.00 Material Specifications
1.03.01 Pipes as per specification YES/NO
(If not, please specify the offered
material & system) ..........................................................
1.03.02 Fittings as per specification
(If not, please specify the offered
material & system)
a) 65 mm NPS and over YES/NO
..........................................................
b) 50 mm NPS and less YES/NO
..........................................................
1.03.03 Bends as per specification
(If not, please specify the offered
material & system)
a) 65 mm NPS and over YES/NO
..........................................................
b) 50 mm NPS & less YES/NO
..........................................................
1.04.00 Dimensional Standard
1.04.01 Pipes ..........................................................
1.04.02 Fittings
a) 65 mm NPS and over ..........................................................
b) 50 mm NPS and less ..........................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.04.03 Bends
a) 65 mm NPS and over ..........................................................
b) 50 mm NPS & less ..........................................................
1.05.00 General
1.05.01 Basic codes and standards for YES/NO
Design, fabrication and erection
as per specification ..........................................................
(If not, please specify)
1.05.02 Basic codes and standards for YES/NO.
testing including hydro test, inspection
as per specification (If not, please specify) ..........................................................
2.00.00 DATA SHEET FOR CAST CS & AS
GATE, GLOBE & CHECK VALVES
2.01.00 Type of valves- as per specification YES/NO
(If not, please specify) ..........................................................
2.01.01 Design code ..........................................................
2.01.02 Rating as per design Code YES/NO
2.01.03 Make ..........................................................
2.01.04 Type of operator provided as per spec YES/NO
2.02.00 Materials, as per specification
(if not, please specify the offered material
for CS/AS Gate/ globe/ check valves separately)
2.02.01 Body YES/NO
2.02.02 Bonnet/Cap YES/NO
2.02.03 Disc YES/NO
2.02.04 Spindle YES/NO
2.02.05 Body seat YES/NO
2.02.06 Disc seat YES/NO
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.02.07 Back seat (for gate &
globe valve) YES/NO
2.02.08 Bonnet / cap gasket YES/NO
2.02.09 Gland packing YES/NO
2.03.00 Testing pressure w.r.t design YES/NO
pressure
2.03.01 Test code ..........................................................
2.04.00 General
2.04 .01 Name plates and tags provided Yes/No
as specified in specifications
2.05.00 Leakage Rate as per spec. Yes/No
2.06.00 a) Hardness of seat ..........................................................
b) Any differential hardness
provided ..........................................................
3.00.00 DATA SHEET FOR FORGED
CS & AS GATE, GLOBE,ANGLE &
CHECK VALVES
3.01.00 Type of valves as per specification YES/NO
(If not, please specify)
3.01.01 Design code ..........................................................
3.01.02 Rating as per design Code YES/NO
3.01.03 Make ..........................................................
3.01.04 Type of operator provided as per spec YES/NO
3.02.00 Materials, as per specification
(if not, please specify the offered material
for CS/AS Gate/ globe/ check valves separately)
3.02.01 Body YES/NO
3.02.02 Bonnet/Cap YES/NO
3.02.03 Disc YES/NO
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
5 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.02.04 Spindle YES/NO
3.02.05 Body seat YES/NO
3.02.06 Disc seat YES/NO
3.02.07 Back seat (for gate &
globe valve) YES/NO
3.02.08 Bonnet/cap gasket YES/NO
3.02.09 Gland packing YES/NO
3.03.00 Testing pressure w.r.t design YES/NO
pressure
3.03.01 Test code ..........................................................
3.04.00 General
3.04 .01 Name plates and tags provided Yes/No
as specified in specifications
3.05.00 Leakage Rate as per spec. Yes/No
3.06.00 a) Hardness of seat ..........................................................
b) Any differential hardness
provided ..........................................................
4.00.00 DATA SHEET FOR SAFETY &
RELIEF VALVE
4.01.00 Service ..........................................................
4.03.00 Make/Manufacturer ..........................................................
4.04.00 Design Data
4.04.01 Design code ...........................................................
4.04.02 Relieving capacity as per code Yes/No
4.04.03 Allowable over-pressure as per spec. YES/NO
4.04.04 IBR certificate provided as YES/NO
called for in Spec.
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
6 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.05.00 Construction Features
4.05.01 Type ..........................................................
4.05.02 Body pattern ..........................................................
a) Type ..........................................................
b) Size ..........................................................
4.05.03 End connections
a) Inlet
i) Type ..........................................................
ii) Size ..........................................................
b) Outlet
i) Type ..........................................................
ii) Size ..........................................................
4.06.0 Materials , as per specifications
(if not, please specify the offered material)
4.06.01 Body YES/NO
4.06.02 Trim YES/NO
4.06.03 Spring YES/NO
4.06.04 Lever YES/NO
4.06.05 Bellows YES/NO
4.06.06 Gasket YES/NO
4.07.00 General
4.07.01 Hydrostatic test pressure w.r.t YES/NO
design pressure
4.07.02 Name plates and tags provided
as specified in specifications YES/NO
4.07.03 Technical literature/
catalogues furnished YES/NO
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
7 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.08.00 Maximum accumulation %........................................................
4.09.00 Maximum blow down % .........................................................
4.10.00 Hardness of seats ..........................................................
4.12.00 Leakage Rate ..........................................................
5.00.00 DATA SHEET FOR THERMAL
INSULATION FOR HOT
SURFACES
ITEM
5.01.00 Type of Insulating material ..........................................................
5.02.00 Name of the manufacturer ..........................................................
5.03.00 DESIGN DATA
5.03.01 Density of insulating material ..........................................................
5.03.02 Whether the insulating Yes/No
material is corrosive to
carbon steel or alloy steel
surfaces in contact
5.03.03 Sheating material ..........................................................
5.04.04 Material standard of Insulation ..........................................................
5.05.05 Emissivity of sheathing materials ..........................................................
5.05.06 Standard for testing insulating
material samples ..........................................................
5.05.07 Any other data specified ..........................................................
6.00.00 DATA SHEET FOR SS
PIPES & FITTINGS
6.01.00 Line joint type for:
a) Piping 50mm and less .........................................................
6.02.00 Material Specification
a) Pipes 50 mm and less .........................................................
b) Fittings 50 mm and less .........................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
8 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6.03.00 Dimensional standard
a) Pipes .........................................................
b) Fittings .........................................................
c) Bends .........................................................
6.04.00 Basic codes and standard for
design ,fabrication and erection as per spec. YES/NO
(If not, please specify)
....
6.05.00 Basic codes and standards for
testing including hydro- test YES/NO
and inspection as per spec.
(If not, please specify) ............
7.00.00 DATA SHEET FOR HANGER/
SUPPORTS
7.01.00 Manufacturer ..........................................................
7.02.00 Basic codes and standards for
i) Design ..........................................................
ii) Fabrication ..........................................................
iii) Erection ..........................................................
7.03.00 Minimum load adjustment
capacity of support for CLH ..........................................................
7.04.00 Over travel allowed as % YES/NO
of design travel as per spec.
(If not, please specify)
7.05.00 Supporting effort variation for CLH/VSH FOR CLH ..%
FOR VSH .............%.
7.06.00 Each rod of double tie rod
hanger designed for full Yes/No
hydro test load
7.07.00 Minimum Rod Diameter
(a) Pipe 50 mm Nb and smaller .....................................................mm
(b) Pipe 65 mm Nb & above ..mm
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
9 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.00.00 DATA SHEET FOR STAINLESS
STEEL GATE GLOBE AND
CHECK VALVES
8.01.00 Type of valves as per specification YES/NO
(If not, please specify)
8.02.00 Design code ..........................................................
8.02.01 Rating as per specification YES/NO
8.02.02 Type of end connection ..........................................................
8.02.03 Type of operator provided as per spec YES/NO
8.03.00 Make/Manufacturer ..........................................................
8.04.00 Materials, as per specification
(if not, please specify the offered material)
8.04.01 Body YES/NO
8.04.02 Bonnet, Cap YES/NO
8.04.03 Disc YES/NO
8.04.04 Spindle YES/NO
8.04.05 Body seat YES/NO
8.04.06 Disc seat YES/NO
8.04.07 Back seat (for globe valve) YES/NO
8.04.08 Bonnet/cap gasket YES/NO
8.04.09 Gland packing YES/NO
8.05.00 Testing pressure w.r.t. design pressure YES/NO
8.06.00 General
8.06.01 Name plates and tags provided
as specified in specifications YES/NO
8.06.02 Technical literature/catalogues YES/NO
8.07.00 Leakage Rate as per spec. YES/NO
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
10 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
8.08.00 a) Hardness of seat ..........................................................
b) Any differential hardness provided ..........................................................
9.00.00 DATA SHEET FOR
BUTTERFLY VALVE
9.01.00 Valve size .........................................................
9.02.00 Valve Design Code/Rating .........................................................
9.03.00 Type of end connection .........................................................
9.04.00 Make/Manufacturer .........................................................
9.05.00 Type of operator provided as per spec YES/NO
9.06.00 MATERIALS OF CONSTRUCTION AS
PER SPECIFICATION
( if not, please specify material.)
9.06.01 Body YES/NO
9.06.02 Disc YES/NO
9.06.03 Seat YES/NO
9.06.04 Shaft YES/NO
9.06.05 Bearings YES/NO
9.06.06 Gear casing YES/NO
9.06.07 Retaining segments YES/NO
9.06.08 Pins, plugs and internal hardware YES/NO
9.06.09 Lining of body or disc YES/NO
9.06.10 Companion flanges, if applicable YES/NO
9.06.11 Gears YES/NO
9.07.00 TESTS AND INSPECTION
9.07.01 Whether all the tests and
inspection as detailed in the
specification are included Yes/No..............................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
11 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
10.00.00 DATA SHEET FOR CORRUGATED
METALLIC EXPANSION J OINTS
10.01.00 Size & Type .........................................................
10.02.00 Design Code .........................................................
10.03.00 Make/Manufacturer .........................................................
10.04.00 CONSTRUCTION FEATURES
10.04.09 Permissible cyclic-life ..Cycles
10.05.00 MATERIALS AS PER SPECIFICATION
(if not, please specify material)
10.05.01 Bellows YES/NO
10.05.02 Sleeve YES/NO
10.05.03 Flange YES/NO
10.05.05 Bolts, studs, tie rods and
limit rods YES/NO
10.05.06 Gaskets YES/NO
10.05.07 External cover YES/NO
10.06.00 TESTING
10.06.01 Hydrostatic test pressure bar (g) ............................................
10.06.02 Vacuum test mm of HG ......................................
11.00.00 DATA SHEET FOR FLASH
TANKS
(Please Furnish for each flash tank)
11.01.00 Manufacturer .........................................................
11.02.00 Type .........................................................
11.03.00 Design and Fabrication Code .........................................................
11.04.00 DESIGN PARAMETERS
a) Design pressure .........................................................
b) Design temperature .........................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
12 OF 12
DA6
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
11.05.00 Size (dia x height) in mm .........................................................
11.06.00 Material (indicate standard and .........................................................
grade)
1200.00 DATA SHEET FOR SPRING LOADED HP
FEED WATER HEATER BYPASS VALVES.
12.01.00 Size of Valve .........................................................
12.02.00 Design code ..........................................................
12.03.00 Rating & design Code .........................................................
12.04.00 Make ..........................................................
12.05.00 End Connection .........................................................
12.06.00 Relieving capacity .........................................................
12.07.00 IBR Certificate .....
12.08.00 Materials:
12.08.01 Body .
12.08.02 Bonnet/Cap .
12.08.03 Disc/valve head .
12.08.04 Spindle/stem .
12.08.05 Body seat .
12.08.06 Disc seat .
12.08.07 Bonnet - cap gasket .
12.08.08 valve Guide .
12.08.09 Spring .
12.09.00 Testing pressure w.r.t design .
pressure
12.10.00 Test code ..........................................................
12.11.00 a) Hardness of seat ..........................................................
b) Any differential hardness
provided ..........................................................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA7
LOW PRESSURE PIPING
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
1 OF 11
GENERAL
1.00.00 This proforma is to be completely filled in for all the main equipment/components offered.
Bidder has to state whether the following equipment/services as specified in the Technical
Specification have been offered.
1.01.00 Complete LP piping with valves, fittings & specialities Yes/No
as per specification / scope
1.02.00 Unused special tools and tackles Yes/No
1.03.00 Mandatory spare parts as per Specification Yes/No
1.04.00 Recommended spare parts for three year's operation Yes/No
1.05.00 Special cables (if any) Yes/No
1.06.00 Tanks as per specification Yes/No
1.07.00 Painting and anti-corrosive protection of all above Yes/No
ground/trench piping included.
1.08.00 Water proofing and anti-corrosive protection of all buried piping Yes/No
included.
1.09.00 Excavation and backfilling for buried piping included Yes/No
1.10.00 All supports, hangers, trestles, racks, anchor bolts, Yes/No
foundation bolts, insert plates & supporting structures
etc. included
1.11.00 Teflon sealant tapes for all screwed joints included Yes/No
1.12.00 Civil and concrete work for Anchor blocks & thrust Yes/No
blocks for buried piping included
2.00.00 TECHNICAL INFORMATION AND DRAWINGS TO BE SUBMITTED WITH THE
PROPOSAL
2.01.00 Manufacturer's descriptive and illustrative literature on each category of tanks, valves,
specialities, instruments, valve actuators, strainers, expansion joints etc.
2.02.00 A write-up on the manufacturing and testing facilities in the shop of the manufacturer.
2.03.00 Any other relevant literature, drawings, certificates that the bidders may desire to submit, to
complete the bid.
2.04.00 Type test certificate for all pipes, valves, fittings, instruments, strainers, expansion joints etc.
2.05.00 Detailed experience list about the design, manufacturer, supply and erection of the
completely low pressure piping system.
2.06.00 The Bidder shall enclose with his proposal a list of items of non Indian origin, if any together
with the name and country of origin of the manufacturer.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
2 OF 11
2.07.00 The information sought out in data sheets (Technical Particulars) enclosed herewith in this
Sub-section, shall be furnished by the Bidder in the format specified. The Bidder shall
enclose these data sheets completely filled up with his proposal.
2.08.00 Bidder shall submit the single line flow diagram or P&ID or piping engineering diagram
indicating the schemetic arrangement for each system indicating the pipe size, instruments,
drains, vents, system parameters like pressure / temperature / flow etc.
2.09.00 Tank
2.09.01 Outline & sectional drawing of each category of tanks indicating overall dimensions, plate
thickness and connections provided.
2.09.02 Bill of material for tank
2.10.00 Piping, Valve & Fittings
2.10.01 Bill of material for piping, valves, fittings etc. indicating the system name, length, size,
thickness, material specification, pressure & temperature/rating and valve standards.
2.10.02 Outline and sectional drawing of each size/rating/type of valve and speciality offered.
2.10.03 A detailed write-up on protection and anticorrosive painting / coating (with reference to
relevant standards) to be provided on overground and burried pipes as well as other
equipments/components.
2.10.04 Calculation sheets for stiffening of large diameter burried pipes against ovality formation in
use, if necessary.
2.11.00 Instruments
2.11.01 A list of instruments
2.11.02 List of annunciations.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
3 OF 11
3.00.00 TECHNNICAL PARTICULARS
The following formats are
to be filled for each type
of equipment/components
3.01.00 PIPING AND FITTINGS
Following details shall be
furnished for each and every
system of piping separately
3.01.01 System ............................... (to be filled by Bidder).................
Above 50 mm size 50 mm size & below
3.01.02 Material of construction
& standard
a) Pipes : .................................... ....................................
b) Fittings : .................................... ....................................
3.01.03 Design Pressure &
Temperature
a) Pipes : .................................... .....................................
b) Fittings : .................................... .........................................
3.01.04 Hydraulic Test Pressure
a) Shop test : .................................... .........................................
i) Pipes : .................................... .........................................
ii) Fittings : .................................... .........................................
b) Site test : .................................... .........................................
3.01.05 Manufacturer
a) Pipes : .................................... .........................................
b) Fittings : .................................... .........................................
3.02.00 Flanges
a) Manufacturer : .................................... .........................................
b) Material standard/ : .................................... .........................................
specification
c) Type : .................................... .........................................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
4 OF 11
d) Standard : .................................... .........................................
e) Gasket Material &
standard : .................................... .........................................
3.03.00 Nuts, Bolts and Gaskets Nuts Bolts Gaskets
a) Manufacturer : .......................... ..................... ......................
b) Grade : ......................... ..................... ......................
c) Standard & codes : .......................... .................. ...................
3.04.00 Galvanising
a) Galvanising standard : .......................... .................. ...................
3.05.00 VALVES & SPECIALITIES
3.05.01 Cast Iron Body Val ves Gate Globe Check
i) Manufacturer : .......................... .................. ...................
ii) Material of construction : .......................... .................. ...................
(indicate standard)
a) Body : .......................... .................. ...................
b) Bonnet : .......................... .................. ...................
c) Wedge/Disc : .......................... .................. ...................
d) Seating Surfaces : .......................... .................. ...................
e) Hinge pin for non- : .......................... .................. ...................
return (check) valves
f) Stem : .......................... .................. ...................
g) Back seat : .......................... .................. ...................
h) Handwheel : .......................... .................. ...................
i) Bolts : .......................... .................. ...................
j) Nuts : .......................... .................. ...................
k) Gaskets : .......................... .................. ...................
l) Gland packing : .......................... .................. ...................
m) Counter flanges : .......................... .................. ...................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
5 OF 11
iii) Flange standard : .......................... .................. ...................
iv) Valve standard : .......................... .................. ...................
v) Manufacturer's catalogues Yes/No Yes/No Yes/No
furnished
3.05.02 Steel Body Val ves Gate Ball Globe Plug Check
i) Manufacturer : .......................... .................. ...................
ii) Material of construction : .......................... .................. ...................
(indicate standard)
a) Body : .......................... .................. ...................
b) Bonnet : .......................... .................. ...................
c) Wedge/Disc : .......................... .................. ...................
d) Seating Surfaces : .......................... .................. ...................
e) Hinge pin for non- : .......................... .................. ...................
return (check) valves
f) Stem : .......................... .................. ...................
g) Back seat : .......................... .................. ...................
h) Handwheel : .......................... .................. ...................
i) Bolts : .......................... .................. ...................
j) Nuts : .......................... .................. ...................
k) Gaskets : .......................... .................. ...................
l) Gland packing : .......................... .................. ...................
m) Counter flanges : .......................... .................. ...................
iii) End connection standard
a) Flange : .......................... .................. ...................
b) Butt welded : .......................... .................. ...................
c) Socket welded : .......................... .................. ...................
iv) Valve standard : .......................... .................. ...................
v) Manufacturer's catalogues Yes/No Yes/No Yes/No
furnished
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
6 OF 11
3.05.03 Stainless steel Body Val ves Gate Ball Globe Plug Check
i) Manufacturer : .......................... .................. ...................
ii) Material of construction
(indicate standard)
a) Body : .......................... .................. ...................
b) Bonnet : .......................... .................. ...................
c) Wedge/Disc : .......................... .................. ...................
d) Seating Surfaces : .......................... .................. ...................
e) Hinge pin for non- : .......................... .................. ...................
return (check) valves
f) Stem : .......................... .................. ...................
g) Back seat : .......................... .................. ...................
h) Handwheel : .......................... .................. ...................
i) Bolts : .......................... .................. ...................
j) Nuts : .......................... .................. ...................
k) Gaskets : .......................... .................. ...................
l) Gland packing : .......................... .................. ...................
m) Counter flanges : .......................... .................. ...................
iii) End connection standard
a) Flange : .......................... .................. ...................
b) Butt welded : .......................... .................. ...................
c) Socket welded : .......................... .................. ...................
iv) Valve standard
v) Manufacturer's
catalogues Yes/No Yes/No Yes/No
furnished
3.05.04 Gun Metals Body Valves Gate Globe Check
i) Manufacturer : .......................... .................. ...................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
7 OF 11
ii) Material of construction
(indicate standard)
a) Body : .......................... .................. ...................
b) Bonnet : .......................... .................. ...................
c) Wedge/Disc : .......................... .................. ...................
d) Seating Surfaces : .......................... .................. ...................
e) Hinge pin for non- : .......................... .................. ...................
return (check) valves
f) Stem : .......................... .................. ...................
g) Handwheel : .......................... .................. ...................
h) Gland packing : .......................... .................. ...................
iii) Type of Body / Bonnet : .......................... .................. ...................
Connection
iv) Valve standard : .......................... .................. ...................
v) Manufacturer's catalogues Yes/No Yes/No Yes/No
furnished
3.05.05 Butterfly Valves C.I.* Fabricated* Cast car- S.S.+ Austenitic
Body steel body bon steel body Ductile
body Iron
(Cast)
Valves for
Sea Water
Appliction
Note: Bidder to choose only one option (either C.I. body or Fabricated steel body BF
val ves as per Tech. Spec., Part-B) and indicate the data in the relevant accordingly for
sizes 300 NB and above for Non-DM-water application
i) Manufacturer : .......... ................. ............... ......... ............
ii) Manufacturing Standards/ : .......... ................. ............... ......... ............
Pressure class
iii) Material of construction
(indicate standard)
a) Body : .......... ................. ............... ......... ............
b) Disc : .......... ................. ............... ......... ............
c) Shaft : .......... ................. ............... ......... ............
d) Seating/clamping : .......... ................. ............... ......... ............
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
8 OF 11
e) Seal : .......... ................. ............... ......... ............
f) Shaft bearing : .......... ................. ............... ......... ............
g) Bolts : .......... ................. ............... ......... ............
h) Nuts : .......... ................. ............... ......... ............
i) Counter Flanges : .......... ................. ............... ......... ............
iv) Maximum Torque
required for opening : .......... ................. ............... ......... ............
iv) Flange standard : .......... ................. ............... ......... ............
v) Manufacturer's catalogues Yes/No Yes/No Yes/No Yes/No Yes/No
furnished
3.05.06 Float Valve
i) Manufacturer : .......................... .................. ...................
ii) Material of Construction : .......................... .................. ...................
(Indicate standard)
iii) Dimension Standard/ : .......................... .................. ...................
Deisgn Code
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
9 OF 11
1.00.00 TECHNICAL INFORMATION AND DATA TO BE SUBMITTED AFTER AWARD OF
CONTRACT
All document/data sheets/calculations / BOMS/GA drgs/erection drgs/fabrication drgs/layout
drgs/schedules/information write ups/instruction manuals etc. submitted under this Sub-
section shall be for Employer's review/approval.
1.01.00 After finalisation of the Contract, the Contractor shall submit various drawings and data
sheets to Employer for review and approval. The actual submission schedule of these
drawings/data sheets shall be discussed and mutually agreed to, between the Employer and
the bidder before the issue of notice of award of contract. The various drawings and data
sheets to be furnished shall include the following.
1.02.00 Final version of all drawings and data sheets enclosed with the proposal. Revision of any
data furnished earlier must meet the approval of Employer.
1.03.00 Single line flow diagram, P&ID/Piping engineering diagrams of all low pressure piping system
including valves, instrumentation, terminal points, etc. suitably tagged and showing clearly
the scope of work, pipe size, design parameters, temp/pressure /Flow etc,.
1.04.00 Layout Drawings
1.04.01 Detailed dimensional piping layout drawings of all piping systems included along with cross
sectional drawings and showing all supports and equipment.
1.04.02 Equipment GA drawing, GA/fabrication drawings for various fittings/specialities / accessories.
1.04.03 Isometric drawings wherever required.
1.04.04 Arrangement of pipe supports, trenches, racks, trestles, pedestals, hangers etc.
1.05.00 Foundation design and load data, for equipments and supports/hangers supporting structure
etc. Loading data and insert locations wherever required for hangers shall also be indicated.
1.06.00 Design and layout data/drg for trenches (if any), embedment plates/ anchorblocks/thrust
blocks etc.
1.07.00 Calculation & Data Sheets
1.07.01 a) Calculation and data Sheets for large dia pipes and stiffening of large dia buried
pipes against ovality in use, if necessary.
b) Calculations for Body thickness for Fabricated steel body valves it applicable.
c) Calculations for Anchor Block/ Thrust Blocks, if any.
d) Pipe support trestle/ foundation design calculations.
e) Strainer sizing calculation & thickness calculations.
1.07.02 Data sheets for selection of all pipes/valves/tanks/fittings etc.
1.07.03 Particulars of proposed tests at shop and site for pipes, valves, tank and other equipment.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
10 OF 11
1.07.04 Reports on shop tests and also test certificates for pipes, valves, tank and other equipment.
1.07.05 Material test certificate.
1.07.06 Hydraulic and air leakage test results for tank, pipes and valves as applicable.
1.07.07 Non-destructive test results as applicable.
1.07.08 If stage inspection is called for, the various stages of inspection, together with a programme
shall be submitted to the Employer. The inspection and test procedures shall also be
submitted for Employer's approval.
1.07.09 Test reports, certified performance curves and other particulars as required by applicable
clause of this specification.
1.07.10 Details of cleaning procedure and paint application procedure.
1.07.11 Details of Hydraulic test procedure. Details of Exacavation / bed preparation/laying of buried
piping/anticorrosive protection application, backfilling, compaction etc.
1.07.12 Test results of anticorrosive coating.
1.08.00 Bill of material
1.08.01 Bill of material for Pipe
1.08.02 Bill of material for Pipe Fittings
1.08.03 Bill of material of Tanks.
1.08.04 Bill of material for Valves
1.08.05 Bill of material for Strainers
1.08.06 Bill of material for Expansion J oints
1.08.07 Bill of material for Instruments.
1.09.00 Instruction Manual
1.09.01 The instruction Manuals shall present the following basic categories of information in a
comprehensive manner prepared for use by operation and/or maintenance personnel:
i) Instruction for Erection
ii) Instruction for pre-commissioning check-up, operation, abnormal conditions,
maintenance and repair.
iii) Recommended inspection points and periods of inspection.
iv) Schedule of preventive maintenance.
v) Ordering information for all replaceable parts.
vi) Recommendation for type of lubricants, lubricating points, frequency of lubrication
and lubricant changing schedule.
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DA 7
PAGE
11 OF 11
1.09.02 The information shall be organised in a logical and orderly sequence. A general description
of the equipment including significant technical characteristics shall be included to familiarise
operation and maintenance personnel with the equipment.
1.09.03 Necessary drawings and/or other illustration shall be included or copies of appropriate final
drawings shall be bound in the manual. Test, adjustment and calibration information, as
appropriate, shall be included and shall be identified to the specific equipment. Safety and
other warning notices and installation, maintenance and operating cautions shall be
emphasized.
1.09.04 A parts list shall be included showing part nomenclature, manufacturer's part number and/or
other information necessary for accurate identification for ordering of replacement parts.
1.09.05 The instruction Manual shall include the list of spare parts that have been procured along
with the equipment. It shall also include list of all unused special tools and tackles furnished
with complete drawings and instructions for use of such tools and tackles.
1.09.06 The Instruction Manual will need approval of Employer in the same fashion as that for
drawing.
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA8
LAYOUT REQUIREMENT
Clause
No.
BIDDER'S NAME...........
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 1
DA8
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
LAYOUT REQUIREMENTS
Bidder to furnish the following
the layout drgs :
1) Main Plant Layout
plan at 0.0M (Transformer
Yard to Chimney)
2) Main Plant Cross Sections ........................................................................
3) Main Plant Longitudinal ........................................................................
Sections
4) Equipment layout plan ........................................................................
at 0.0m
5) Equipment layout plan ........................................................................
at mezzanine floors
6) Equipment layout plan ........................................................................
at operating
7) Layout of BC bay at ........................................................................
various elevations
8) GA of turbine hall ........................................................................
EOT crane
9) Compressor House Layout ........................................................................
10) CW Piping around the
condenser ........................................................................
11) CEP Pit General
arrangement drgs. ........................................................................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA9
ELEVATOR
BIDDER'S NAME CLAUSE
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 1
DA9
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 SCHEDULE OF GUARANTEED AND
OTHER TECHNICAL PARTICULARS
1.01.00 Lift Particulars
(i) Load carrying capacity of
the lift in Kgs.
(ii) Type of loading for which
the lift is designed
(iii) Type of lift.
(iv) Speed (Meter/sec.)
(v) Travel (metres)
(vi) Floors served by the lift
(vii) Landing Entrances:
(a) No. size and type
of doors
(b) Method of operation
of doors
(viii) Size of lift well
(ix) Car dimensions
(a) Internal size of the
lift car
(b) External size of the
car platform
(x) Weight of car
2.00.00 SAFETY GEAR
(i) Type
(ii) Operation
(iii) Distance travelled
from start to stop
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA10
OTHER CRANES & HOISTS
BIDDER'S NAME CLAUSE
NO.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 1
DA10
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 EOT TYPE CRANES : (IS:3177 - Latest Edition & IS:807 - Latest Edition)
(a) Manufacturer
(b) Type
(c) Number offered
(d) Crane capacity (Tonne)
(e) SPAN
(f) Height of Lift
(g) Safe Working Load
(h) MOTORS :
(i) Hoist (Main)
(ii) Micro Hoist (Main)
(iii) Long Travel/Cross Travel
(i) Speeds
(i) Main Hoist Mtrs/Min.
(ii) Cross Travel "
(iii) Long Travel "
(j) Brakes (Type/Details)
1.01.00 HOT/Monorail Cranes : (IS : 3832 Latest)
(a) Manufacturer
(b) Type and Number offered
(c) Crane capacity
(d) Height of Lift
(e) Hoisting Motor Details
(f) Brakes
(g) Hook Details
(h) Other Details, if any
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SUB-SECTION DA11
CONDENSATE POLISHING PLANT
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 8
DA11 TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CONDENSATE POLISHING PLANT
NAME OF SUPPLIER ..........................................................................
1.00.00 Chemical consumption ..........................................................................
1.01.01 Hydrochloric Acid (30% conc.)
required for regeneration of
one vessel charge, Kgs ..........................................................................
1.01.02 Sodium Hydroxide (48% purity)
required for regeneration of
one vessel charge, Kgs. ..........................................................................
2.00.00 CONDENSATE POLISHING SERVICE
VESSELS
(a) Design Service flow rate (m/hr) ..........................................................................
per vessel
(b) Resin sluice Rate (m/hr)
and simultaneous Air (NM/hr) ..........................................................................
(c) Vessel Details
(i) Design Pressure Kg/m
(gauge) ..........................................................................
(ii) Type CYLIDRICAL / SPHERICAL
(iii) Vessel material ..........................................................................
(vi) Lining Material & thickness ..........................................................................
(vii) Freeboard (%) ..........................................................................
(e) Resin Details
(i) Resin-Manufacturer Cation: ................................................
Anion: ................................................
Inert : ................................................
(ii) Volume (litres) per vessel Cation: ................................................
Anion: ................................................
Inert : ................................................
(iii) Type of resin Cation: ................................................
Anion: ................................................
Inert : ................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 8
DA11 TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
(f) By-pass control valve ..........................................................................
(i) Type & No. ..........................................................................
(ii) Actuator type ..........................................................................
(h) Whether design calculation
justifying resin volume selection
to achieve the guaranteed
chemical consumption furnished Yes/No
(i) Whether system description &
Control philosophy furnished Yes/No
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.00 CONDENSATE POLISHING RESIN CATION ANION RESIN MIXED RESIN
EXTERNAL REGENERATION SEPARATION REGENERATION REGENERATION STORAGE
3.1. Air Mix (Nm/hr) and pressure kg/cm ...................... ............................. .......................... ........................
3.2 Resin sluicing Rate (M/hr) ...................... ............................. .......................... ........................
and simultaneous Air (Nm/hr)
3.3 Resin Separation Flow Rate (m/hr) ...................... ............................. .......................... ........................
3.4 Vessel Details
3.5 Design Pressure kg/cm (g) ...................... ............................. .......................... ........................
3.6 Tank Size (dia x shell ht) mm ...................... ............................. .......................... ........................
3.7 Vessel Material ...................... ............................. .......................... ........................
3.8 Lining (Material/thickness) ...................... ............................. .......................... ........................
3.9 Collectors & Distributors
i) Rinse Inlet
(a) Type ...................... ............................. .......................... ........................
(b) Material ...................... ............................. .......................... ........................
ii) Regenerant Inlet
(a) Type ...................... ............................. .......................... ........................
(b) Material ...................... ............................. .......................... ........................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
RESIN CATION ANION RESIN MIXED RESIN
SEPARATION REGENERATION REGENERATION STORAGE
iii) Outlet
(a) Type ...................... ............................. .......................... ........................
(b) Material ...................... ............................. .......................... ........................
3.10 Regeneration
a) Dilute Regeneration Concentration (%) ...................... ............................. .......................... ........................
b) Total volume of waste effluent
per regeneration / vessel (m) ...................... ............................. .......................... ........................
3.11 Whether system description
& Control philosophy furnished Yes/No Yes/No Yes/No Yes/No
4.00 ATMOSPHERIC VESSELS RESIN MAKE- ALKALI ALKALIDAY ACID MEASU-
UP HOPPER PREP TANK TANK RING TANK
4.1 Number Provided
4.2 Vessel Details
4.2.1 Vessel Material ...................... ............................. .......................... ........................
4.2.2 Lining (Material / Thickness) ...................... ............................. .......................... ........................
4.3 Whether breather /seal etc
provided for the acid tank and alkali tanks ----- YES /NO YES /NO YES /NO
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
5 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5.00 CENTRIFUGAL PUMPS ALKALI TRANSFER CUM- D.M. WATER REGENERATION
RECIRCULATION PUMPS PUMPS
5.1 Pump Manufacturer ............................................... ......................................................
5.2 Number ............................................... ......................................................
5.3 Capacity M/hr ............................................... ......................................................
5.4 T.D.H. MWC ............................................... ......................................................
5.5 Materi al
5.5.1 Pump Casing ............................................... ......................................................
5.5.2 Impeller ............................................... ......................................................
5.5.3 Shaft ............................................... ......................................................
5.5.4 Shaft Sleeves ............................................... ......................................................
5.6 Motor rating (KW) ............................................... ......................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
6 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6. METERING PUMPS
ACID ALKALI
6.1 Pump Manufacturer ........................... .....................................
6.2 Liquid Handled ........................... .....................................
6.3 Sp. Gravity ........................... .....................................
6.4 Type ........................... .....................................
6.5 Motor Rating (KW) at 50
o
C ........................... .....................................
6.6 Operating Conditions
6.6.1 Capacity (m/hr) ........................... .....................................
6.6.2 Discharge Pressure [kg/cm(g)] ........................... .....................................
6.6.3 Capacity adjustable range ........................... .....................................
6.6.4 Type of protection against ........................... .....................................
shut off head operation
6.7 Materi al
6.7.1 Diaphragm ........................... .....................................
6.7.2 Liquid end ........................... .....................................
6.7.3 Casing ........................... .....................................
7.0 ACTIVATED CARBON FILTER
7.1 Service Rate (m/hr) ..........................................................................
7.2 Backwash rate (m/hr) ..........................................................................
7.3 Vessel Details
7.3.1 Design Pressure (Kg/mg) ..........................................................................
7.3.2 Vessel material ..........................................................................
7.3.3 Lining Material & Thickness ..........................................................................
7.4 Activated Carbon Material
7.4.1 Supplier ..........................................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
7 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
7.4.2 Grade / Type ..........................................................................
7.4.3 Surface area (m/gram) ..........................................................................
7.4.4 Iodine number ..........................................................................
9.0 AIR BLOWERS For Service Vessels For Regeneration
in each unit
9.1 Manufacturer ................................ ......................................
9.2 Type ................................ ......................................
9.3 Discharge Capacity NM/hr ................................ ......................................
Discharge pressure ................................ ......................................
9.4 Efficiency at rated duty point ................................ ......................................
9.5 Motor rating ................................ ......................................
9.6 Inlet Filter-cum-silencer provided Yes/No Yes/No
10. HOT WATER TANK
10.1 Capacity & performance
10.1.1 Capacity (litres) ........................................................................
10.1.2 Outlet Temp. (
o
C) ........................................................................
10.1.3 Recovery Time (Hr.) ........................................................................
10.1.4 Heat Input (kcal/hr) ........................................................................
10.2 Vessel Details
10.2.1 Design pressure ........................................................................
10.2.2 Vessel Material ........................................................................
10.2.3 Lining Material & thickness ........................................................................
11 RESIN TRANSFER PIPELINE & VALVES
11.1 Size of Pipe ........................................................................
11.2 Valves
11.2.1 Type ........................................................................
CLAUSE
NO.
BIDDER'S NAME .......
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
8 OF 8
DA11
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
11.2.2 Manufacturer ........................................................................
11.2.3 Size ........................................................................
11.2.4 Material of body ........................................................................
11.2.5 Material of trim ........................................................................
11.3 Over Pressure Protection Device
11.3.1 Type ........................................................................
11.3.2 Material of construction
(a) Body ........................................................................
(b) Internals ........................................................................
12.0 RESIN TRAPS SERVICE ACTIVATED WASTE
VESSEL CARBON EFFLUENT OF
OUTLET FILTER REGENERATION
OUTLET VESSELS
12.1 Make ................... .................... ........................
12.2 Type of Internal ................... .................... ........................
12.3 Nos. Provided ................... .................... ........................
12.4 Screen Opening ................... .................... ........................
12.5 Material of Construction
12.5.1 Body ................... .................... ........................
12.5.2 Screen ................... .................... ........................
12.5.3 Lining ................... .................... ........................
12.6 In place Manual Backwashing
Provided? Yes/No Yes/No Yes/No
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SECTION - VI
PART - G
TECHNICAL DATA SHEETS
MODULE - II
ELECTRICAL
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ELECTRICAL SECTION
MODULE - II
DB0 : GENERAL
DB1 : GENERATOR AND GENERATOR
AUXILIARIES SYSTEM
DB2 : MOTORS
DB3 : POWER AND CONTROL CABLES
DB4 : CABLING EARTHING AND LIGHTNING
PROTECTION
DB5 : ELECTRICAL ACTUATOR
DB6 : LIGHTING (H
2
GENERATION PLANT)
DB7 : LT SWTICHGEAR & LT BUSDUCTS
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB0
GENERAL
Clause No.
.........................................................
(Bidder's Name)
GENERAL
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 1
DB0 :
GENERAL
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.00.00 Information and drawings to be submitted alongwith the proposal
The following information and drawings of the proposed equipment shall be submitted
in required number of copies by the Bidder alongwith his proposal :
1.01.00 Complete technical literature supported by catalogues for all the equipments and accessories
covered in his scope of supply.
1.02.00 Drawings showing adequate details of equipment/panels and accessories offered and typical
drawings of major schemes offered.
1.03.00 Type test and routine test reports for all the equipments and accessories covered under
Bidder's scope of supply.
1.04.00 Technical data sheets (guaranteed technical particulars) of the equipments offered.
2.00.00 Information and drawings to be submitted after the award of the contract.
2.01.00 Contractor shall submit all the drawings, data documents, manuals, catalogues etc. as
per the requirements given under applicable Sub-sections of the specification.
2.02.00 Contractor shall also submit the technical data sheets (Guaranteed Technical Particulars)
of all the equipments being supplied in the format to be handed over to the successful
bidder.
2.03.00 Instruction manuals for all the equipments and accessories covered in Bidder's scope
of supply.
3.00.00 Check list for information and drawings to be submitted with the bid (This checklist
must be attached to the data sheet).
Document Enclosed
3.01.00 Type test and routine test reports Yes/No
for all the equipments and accessories
3.02.00 Drawings showing adequate details Yes/No
of equipment/panels and accessories
offered
3.03.00 Complete technical literature supported Yes/No
by catalogue for all the equipments and
accessories
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB1
GENERATOR AND GENERATOR
AUXILIARIES SYSTEMS
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
1 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
GENERATOR AND GENERATOR
AUXILIARY SYSTEMS
1.00.00 GENERATOR PARAMETERS
1.01.00 Manufacturers Name ...........................
(Shall be as per approved QA make)
1.01.01 Type Designation ...........................
1.01.02 Model No. ............................
1.02.00 Rated/economic maximum MVA ............................
continuous output at rated
Hydrogen Pr. and secondary
cooling water temp. mentioned MW ............................
in specification (Part-B)
1.02.01 Maximum continuous output MVA ............................
(with VWO, HP heaters out
conditions etc.) at rated hydro- MW ............................
gen pressure and secondary
cooling water temperature
mentioned in specification (Part-B) ............................
1.03.00 Rated terminal voltage KV ............................
1.04.00 Rated stator current Amps ............................
1.05.00 Rated frequency Hertz ............................
1.06.00 Rated power factor ............................
1.07.00 Field current at economic Amps ............................
maximum continous rating
1.08.00 Field voltage at economic Volts ............................
maximum continuous rating
1.09.00 Maximum continuous permissible
variation range in ............................
a) Rated terminal voltage % ............................
b) Rated frequency % ............................
c) Combined permissible
variation of frequency
and voltage % ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
2 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.10.00 a) Number of Phases ............................
b) Number of parallel paths/phase ...........................
c) Line terminals brought out ............................
d) Neutral terminals brought out ............................
1.11.00 Whether space provided in generator
leads to mount bushing current
transformers? Yes/No ............................
1.12.00 Compliance with IEC standard No. ............................
1.13.00 Type & class of insulation system
a) Stator ............................
b) Rotor ............................
1.14.00 Details of winding support ............................
system
1.15.00 Details of core and core ............................
support system
1.16.00 Type of Excitation system ............................
1.17.00 Generator efficiency at : ............................
a) 100% load % ............................
b) 80% load % ............................
c) 60% load % ............................
d) 40% load % ............................
e) 25% load % ............................
f) MCR condition % ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
3 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.18.00 Minimum guaranteed short
circuit ratio corresponding
to economic maximum
continuous capability ............................
1.19.00 Permissible tolerance in SCR +/- ............................
1.20.00 Enclosure class of protection ............................
for the generator
1.21.00 Rated Hydrogen pressure Kg/cm
2
............................
(gauge)
1.22.00 Rated hydrogen cooling Kg/cm
2
............................
water pressure at (gauge)
i) Cooler inlet ............................
ii) Cooler outlet ............................
1.23.00 Hydrogen cooling water flow
at normal load m
3
/hr ............................
1.24.00 Basic impulse insulation withstand
voltage of stator winding with res-
pect to earth (For standard wave
kVshape of 1.2/50 micro sec) (peak) ............................
1.25.00 Symmetrical run short circuit
current with generator isolated-initial
saturated value and sustained value
Ini t i al Sustained
Val ue Val ue
a) 3 phase KA ...... .......
b) Single phase to neutral KA ...... .......
1.26.00 Short circuit current P.U
1.26.01 Subtransient current
a) on 3 phase short circuit ...........................
b) on 2 phase short circuit ...........................
c) on 1 phase short circuit ...........................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
4 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.26.02 Transient Current
a) On 3 phase short circuit ............................
b) On 2 phase short circuit ............................
c) On 1 phase short circuit ............................
1.26.03 Steadystate current on 2 phase short circuit ............................
1.27.00 Whether suitable for specified
earth fault current and duration Yes/No ............................
1.28.00 Indicate values of earth current and duration ............................
1.29.00 3 phase short circuit withstand time Secs ............................
1.30.00 Saturation factor ............................
1.31.00 Waveform factor ............................
1.32.00 Permissible unbalanced loading
subject to rated current not being
exceeded in any phase ............................
a) Maximum continuous negative
phase sequence current (I
2
)
amps ............................
b) Maximum value of I
2
2
t for
transient operation under
system conditions (where t
is in seconds) ............................
1.33.00 Maximum permissible capacitive
loading at full load MVAR ............................
1.34.00 Maximum capacitive loading for
stability at rated voltage and zero
power factor MVAR ............................
1.35.00 Generator reactances in percent at
rated KV and MVA
1.35.01 Direct axis synchronous reactance
(unsaturated) X
d
% ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
5 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.35.02 Direct axis synchronous reactance
(saturated) X
d
% ............................
1.35.03 Quadrature axis synchronous reactance
(unsaturated) X
q
% ............................
1.35.04 Direct axis transient reactance (unsaturated)X
d
% ............................
1.35.05 Direct axis transient reactance (saturated)X
d
% ............................
1.35.06 Quadrature axis transient reactance (unsaturated)X
q
% ............................
1.35.07 Direct axis sub-transient reactance (saturated)X
d
% ............................
1.35.08 Direct axis sub-transient reactance (unsaturated)X
d
% ............................
1.35.09 Quadrature axis sub-transient reactance
(unsaturated)X
q
% ............................
1.35.10 Quadrature axis sub-transient reactance
(saturated)X
q
% ............................
1.35.11 Negative phase sequence reactance (unsaturated) X
2
% ............................
1.35.12 Negative phase sequence reactance (saturated)X
2
% ............................
1.35.13 Zero phase sequence reactance (unsaturated)X
0
% ............................
1.35.14 Zero phase sequence reactance (saturated) X
0
% ............................
1.35.15 Potier reactance X
p
% ............................
1.35.16 Leakage reactance X
t
a) Combined % ............................
b) Stator % .............................
c) Rotor % ............................
d) Damper winding % ............................
1.35.17 Permissible tolerance in all
guaranteed reactance values % +/- ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
6 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.35.18 Effective winding capacitance to earth .......................................
a) Per phase Micro ......................
farad
b) All phases connected Micro ............................
together farad
1.35.19 Effective surge impedance
to neutral per phase Ohms ............................
1.35.20 Synchronous impedance Ohms ............................
1.35.21 The Harmonic voltage generated by
the generator at 100%, 75%, 50%,
25% and no load ............................
1.36.00 Armature resistance per phase at:
a) 25 deg. C Ohms ............................
b) 75 deg. C ohms ............................
1.37.00 Field resistance at :
a) 25 deg. C Ohms ............................
b) 75 deg. C Ohms ............................
1.38.00 Effective negative sequence resistance ............................
1.39.00 Zero sequence resistance ............................
1.40.00 Guaranteed maximum temperatures with
the secondary cooling water inlet tempe-
rature as per specification (Part-B) while
output considered after excluding
excitation power for static excitation
system.
1.40.01 Guaranteed maximum absolute temperatures
when generator delivers at its terminals
500MW at 0.85 p.f ............................
a) Stator windings deg.C ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
7 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Stator core ............................
c) Primary water at
inlet of stator winding deg.C ............................
d) Primary water at outlet
of stator winding deg.C ............................
e) Rotor windings deg.C ............................
f) Cold gas deg. ............................
g) Hot gas in the stator
and rotor deg.C ............................
h) Water at inlet of gas
cooler deg.C ............................
i) Water at outlet of gas cooler deg.C ............................
1.40.02 Guaranteed maximum absolute
temperatures when generator delivers
maximum capacity of its turbine (with
VWO, HP heaters out etc.)
at 0.85 p.f. at its terminals
a) Stator Windings deg.C ............................
b) Stator core ............................
c) Primary water at inlet of stator winding deg.C ............................
d) Primary water at outlet of stator winding deg.C ............................
e) Rotor windings deg.C ............................
f) Cold gas deg.C ............................
g) Hot gas in the stator and rotor deg.C ............................
h) Water at inlet of gas cooler deg.C ............................
i) Water at outlet of gas cooler deg.C ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
8 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.40.03 Actual/Estimated absolute temperature when
the generator delivers different output in
steps of 50 MW upto rated output sensed
by each temperature detector provided in
stator core and winding for the following cases
a. At max. leading MVAR generation ............................
b. At max. lagging MVAR generation ............................
(please provide separate tables)
1.41.00 Distilled water/Deminera-lised water (Primary water)
a) Pressure at inlet of stator winding Kg/cm
2
(g) ........................
b) Pressure at outlet of stator winding Kg/cm
2
(g) ........................
c) Flow of primary water at normal load m
3
/hr ............................
1.42.00 Generator losses (Indicate where one loss
component is included in another one)
a) No load loss KW ............................
i) Iron loss KW ............................
ii) Rotor copper loss KW ............................
b) Full load loss KW ............................
i) Iron loss KW ............................
ii) Stator copper loss KW ............................
iii) Stray load loss KW ............................
iv) Rotor copper loss KW ............................
v) Friction and windage loss KW ............................
vi) Mechanical losses including
bearing losses KW ............................
vii) Exciter and exciter rheostat losses KW ............................
viii) Collector brush contact losses KW ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
9 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ix) Rotary rectifier losses KW ............................
x) Fan loss KW ............................
xi) Shaft seal loss KW ............................
xii) Eddy current loss KW ............................
xiii) Any other loss (to be defined) KW ............................
xiv) Total loss at full load KW ............................
1.43.00 Type of Cooling & cooling medium
a) Stator Winding ............................
b) Stator Core ............................
c) Rotor ............................
d) Bushing ............................
1.44.00 Time required for the TG set
to deAccelerate from synchronous
speed to barring gear speed
i) Under normal unit tripping sec. ............................
ii) Under condenser vaccum
broken condition sec. ............................
1.45.00 Dissipation of losses in
a) Hydrogen cooler KW ............................
b) Stator water cooler KW ............................
c) Seal oil cooler KW ............................
d) Exciter air cooler KW ............................
e) Excitation system panels KW ............................
1.46.00 Inertia constant (H)
a) Generator & Exciter KW-Sec/KVA ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
10 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Complete turbine KW-Sec/KVA ........................
1.47.00 i) Maximum continuous MVA
capacity of generator ............................
a) on loss of flow of stator
winding cooling water MVA ............................
b) with one hydrogen cooler out
of operation MVA ............................
ii) MVA rating at 110%V operation MVA ............................
1.48.00 Maximum inductive capacity MVAR ............................
1.49.00 Guaranteed maximum noise level
at 1 meter from the generator dBA ............................
1.50.00 Guaranteed maximum 100 Hz ............................
vibration velocity of
i) Stator end winding mm/sec pk ......................
ii) Stator core mm/sec pk ......................
iii) Core bore ring mm/sec pk ......................
iv) Stator casing/wrapper mm/sec pk ......................
v) Stator phase lead/ mm/sec pk ......................
flexible connector
1.51.00 Main Weights
a) Heaviest lift of generator
stator with trunnions etc. ............................
b) Weight of complete
Generator Stator Tonnes ............................
c) Weight of complete rotor Tonnes ............................
d) Weight of complete
generator Tonnes ............................
e) Weight of lifting beam
assembly Tonnes ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
11 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.52.00 Critical speeds of Gen. + Exciter (if any)
a) First RPM ............................
b) Second RPM ............................
c) Third RPM ............................
1.53.00 Paint Shade ............................
1.54.00 Value of generator shaft torsion oscillation (in rad)
(a) Maximum value ............................
(b) Minimum value ............................
1.55.00 Intertia (Kg/m2) of each TG shaft section
including the rotor and exciter
(a) ............................
(b) ............................
(c) ............................
(d) ............................
(e) ............................
(f) ............................
1.56.00 Spring constant/stiffness (Nm/rad) for each coupling
between TG shaft section
(a) ............................
(b) ............................
(c) ............................
(d) ............................
(e) ............................
(f) ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
12 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
1.57.00 Time constants:
i) T'do ............................
ii) T"do ............................
iii) T'qo ............................
iv) T''qo ............................
2.00.00 EXCITATION SYSTEM
2.01.00 Voltage regulation under conditions of rated
speed, voltage & output
a) at 0.85 power factor lag
i) with AVR % ......................
ii) without AVR % ......................
b) at unity power factor
i) with AVR % ......................
ii) without AVR % ......................
c) at 0.90 power factor lead
i) with AVR % ......................
ii) without AVR % ......................
2.02.00 Excitation requirement at Volts & Amps
a) Rated load ............................
b) No load ............................
c) At maximum capacitive load
(at Zero Active power) ............................
d) Under field forcing condition ............................
2.03.00 Short circuit torque as a ratio of full
load torque ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
13 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.04.00 Number, type and rating of CTs
and PTs used exclusively
for EHG and generator excitation
system
2.05.00 Automatic Voltage Regulators
a) Manufacturer ............................
b) Type ............................
c) Power supply to the regulator Volts ............................
d) Range of generator voltage adjustment % ............................
i) in auto position ............................
ii) in manual position ............................
e) Frequency range of operation Hz ............................
f) Temperature range of operation deg.C ............................
g) Accuracy % ............................
h) Dead band ............................
i) Excitation system response
time with AVR (The
time for the generator field
voltage to attain 95% of the
difference between field forcing
voltage & rated excitation
voltage with 5% drop in
generator terminal voltage
and generator rated MVA) ............................
j) Time required for the generator
terminal voltage to get restored
to within 2% of the nominal
preset value when subjected to
sudden loss of rated output ............................
k) Excitation system response ratio,
as defined in clause 3.2.6 of
IEEE-421 A standard ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
14 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
l) Excitation control
system band width as
defined in IEEE 421 A ............................
m) Overall dimension of the
AVR panel (mmxmmxmm) ............................
n) Total heat lost in
AVR panel (KW) ............................
2.06.00 Static Excitation System (if applicable)
2.06.01 Rectifier Transformer
a) Type ............................
b) Frequency Hz ............................
c) Phase ............................
d) Capacity kVA ............................
e) Voltage ............................
i) High Voltage Volts ............................
ii) Low Voltage Volts ............................
f) Percentage impedance ............................
g) Vector Group ............................
h) Mode of connection between
low Voltage terminals and
thyristor converter ............................
i) Class of insulation ............................
j) Conductor cross-section area of ............................
i) HV Winding mm
2
............................
ii) LV Winding mm
2
............................
k) Type of cooling ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
15 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
l) Weight of the transformer (Kg) .............................
m) Overall dimension LxBxH (mm X mm X mm) ............................
n) Recommended location ............................
2.06.02 Rectifier Assembly
a) Type Designation ............................
b) Rated rectifier current
output amp ............................
c) Rated rectifier voltage
output Volts ............................
d) Ceiling current rating output amps ............................
e) Ceiling voltage rating output Volts ............................
f) Ceiling duty duration sec ............................
g) Rectifier sink/base temp.
for field forcing duty at MCR deg.C ............................
h) Rated peak inverse voltage of
rectifier used Volts ............................
i) Frequency of input supply
voltage Hz ............................
j) Voltage drop across rectifier cell Volts ............................
k) Type of bridge 3phase/
2phase/
any other ............................
l) Over voltage with-standing capacity
m) Overall dimension of each
panel/assembly for
rectifier/convertor (mmxmmxmm) ............................
n) Resistance of the discharge
resistor in generator field
circuit at 20 deg. C ohm ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
16 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
o) Total heat loss in rectifier/converter
panel at rated output KW ...........................
p) Type of converter cooling
arrangement KW ............................
q) Maximum temp. of rectifier
cell for ceiling duty ............................
i) J unction temp. ............................
ii) Sink temp. ............................
r) Total no. of rectifier cells ............................
per parallel path of a bridge arm
s) No. of parallel paths per bridge arm ............................
t) Total no. of 3 phase bridges ............................
u) Maximum no. of rectifier cells/
bridge without which the rectifier
can give output corresponding to
generator MCR including field forcing
requirement ............................
v) Total no. of panels for the
complete rectifier/converter
power circuits ............................
2.06.03 Generator field breaker
a) Manufacturer ............................
b) Type designation ............................
c) Rated Voltage Volts ............................
d) Rated Current Amps. ............................
e) Catalogues attached
as annexure no. ............................
f) Overall dimension of
panel (mmxmmxmm) ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
17 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.00.00 AUXILIARY SYSTEMS
3.01.00 Stator Water Cooling System(As Applicable)
3.01.01 Pump motor sets
a) Number of pump motor sets
i) Working ............................
ii) Standby ............................
b) KW & Voltage rating of driving
motors for pump
i) Regular ............................
ii) Standby ............................
c) Power consumption of pump
motor at design duty point
i) Regular ............................
ii) Standby ............................
d) Shut off head mwc ............................
e) Pressure at the outlet of Kg/
the pump cm
2
(g) ............................
3.01.02 Primary water heat exchanger
a) Total no. of coolers ............................
b) Capacity rating of each 100%/50% ............................
cooler
c) Material of :
i) Cooler tubes
ii) Cooler sheet
iii) Water box
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
18 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d) Total heat load on coolers KW............................
e) Heat transfer coefficient Kcal/hr/deg. ............................
f) Log mean temperature deg.C ............................
g) Heat transfer area required
for rated load M
2
............................
h) Heat transfer area provided
in the coolers M
2
............................
i) Shell design pressure Kg/Cm ............................
j) Quantity of primary water per
cooler M
3
............................
k) Quantity of secondary
water per cooler M
3
............................
l) Pressure drop of primary
water through cooler kg/cm
2
............................
m) Pressure drop of secondary
water through cooler kg/cm
2
............................
3.01.03 Primary water strainer
a) No. of strainers
i) Permanent ............................
ii) Temporary ............................
b) Mesh size ............................
c) Strainer material ............................
d) Strainer body material ............................
3.01.04 General
a) Whether material other than
stainless steel is used
anywhere, which can come in
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
19 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
contact with primary water
in the stator water circuit,
except the winding. Yes/No ............................
b) Duration of refilling the
mixed bed demineraliser months ............................
c) Dissolved oxygen content
in primary water for
normal operating regime ppb ............................
3.02.00 Gas System Data
a) Volume of Hydrogen space
in generator m
3
............................
b) Cooling gas flow m
3
/min ............................
c) Volume of CO
2
at NTP required
for displacing air m
3
............................
d) Volume of CO
2
at NTP required
for displacing hydrogen m
3
............................
e) Volume of H
2
at NTP required
for displacing carbon di-oxide
and to bring the casing to the
rated pressure m
3
............................
f) Purity of H
2
required
i) Normal % ............................
ii) Minimum allowable % ............................
g) Leakage of H
2
by volume at
NTP per day at rated H
2
pressure
in the generator m
3
............................
h) Volume of Nitrogen at NTP required
to displace CO
2
in the generator m
3
............................
i) Volume of air at NTP required to
displace CO
2
in the generator
and pressurise it for gas
tightness test. m
3
............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
20 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
j) No. of cylinders proposed to be furnished for
each generator.
i) Hydrogen ............................
ii) Carbon dioxide ............................
iii) Nitrogen ............................
k) Standards to which the cylinders conform
i) Hydrogen ............................
ii) Carbon dioxide ............................
iii) Nitrogen ............................
l) Internal Volume of the Cylinders at NTP
i) Hydrogen ............................
ii) Carbon dioxide ............................
iii) Nitrogen ............................
j) Volume of H
2
required
for one start-up at NTP ...........................................m
k) No of cylinders normally connected
at the manifold for
i) Hydrogen ............................
ii) Carbon dioxide ............................
iii) Nitrogen ............................
3.03.00 Seal Oil System
3.03.01 Seal Oil Pump Motor Set on
the air side stream
Standard Emergency
a) Type .................. ..................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
21 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
b) Numbers .................. ..................
c) Capacity m
3
/hr .................. ..................
d) Discharge pressure kg/cm
2
.................. ..................
e) Shut-off Head mwc .................. ..................
f) Size of motor KW .................. ..................
g) Power consumption of motor
at design duty point KW .................. ..................
3.03.02 Seal Oil Pump Motor Set on the
hydrogen side stream
Standard Emergency
a) Type .................. ..................
b) Numbers .................. ..................
c) Capacity m
3
/hr .................. ..................
d) Discharge pressure kg/cm
2
.................. ..................
e) Shut-off Head mwc .................. ..................
f) Size of motor KW .................. ..................
g) Power consumption of motor KW .................. ..................
3.03.03 Seal Oil cooler ............................
a) Total no. of coolers ............................
b) Capacity rating at each ............................
cooler 100%/50%
c) Material of ............................
i) Cooler tubes ............................
ii) Cooler sheet ............................
iii) Water box ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
22 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d) Total heat load on KW ............................
coolers
e) Heat tranfer coefficient Kcal/hr/m
2
deg.C ............................
f) Log mean temperature ............................
difference
g) Heat transfer area required M
2
............................
for rated load
h) Heat transfer area provided ............................
in the cooler M
2
i) Shell design pressure Kg/cm
2
............................
j) Rated cooling water Kg/cm
2
............................
pressure at the inlet
k) Pressure drop across MWC ............................
the cooler
3.03.04 Seal Oil Strainer
a) No. of strainers
i) Permanente ............................
ii) Temporary ............................
b) Mesh size ............................
c) Strainer material ............................
d) Strainer body material ............................
3.03.05 Vapour extraction unit (in seal oil drain)
a) Type ............................
b) Capacity m
3
/hr ............................
c) Size of motor KW ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
23 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
4.00.00 ADDITIONAL INFORMATION TO BE FURNISHED
4.01.00 Permissible overload versus time
duration curve beyond MCR rating
matching with turbine capability (with
temperature limits for class F insulation) ............................
4.01.01 Number of starts/stops for which
generator is rated ............................
4.02.00 Details of de-excitation techniques &
de-excitation time (i.e. time for the
generator field current to fall from rated
load value to 10% of the same for a
sustained internal fault) ............................
4.03.00 Surge capacitor requirement for the
generator must be stated with reasons ............................
4.04.00 Experience in respect of providing the
supervisory instrumentation system for
the generator ............................
4.05.00 What provisions are made for automatic
generator runback (Turbine control point
set back) on loss of cooling ? ............................
4.06.00 Furnish permissible volts/Hz vs time
characteristics of the generator ............................
4.07.00 Details of recommended generator ............................
neutral grounding system
4.08.00 Details of generator rotor winding
temperature monitoring system and
rotor winding earth fault detection system ............................
4.09.00 Basis of selecting the proven generator
and excitation system, cooling arrange-
ment including gas circulating fan,
insulation, core and winding support
system backed up with following : ............................
i) No. of units of identical size
and design in operation with
their years of commercial ope-
ration along with utitlity names ............................
Clause No.
......................................................
(Bidder's Name)
GENERATOR AND GENERATOR AUXILIARY SYSTEMS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
PAGE
24 OF 24
DB1 : GEN. &
GEN. AUX.
SYSTEMS
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ii) Operational availability records from
the utitlities including type of failure/
breakdown and corrective actions
taken etc. ............................
4.10.00 Detailed literature for the excitation
system proposed for the generator
enclosed Yes/No
4.11.00 Detailed writeup on various limiters
enclosed Yes/No
4.12.00 Complete scheme and write-up
of hot air blowing system or
better arrangement to prevent
condensation of moisture during
long shut down of generators
(as applicable) ............................
4.13.00 Complete scheme and detailed writeup
on power system stabilizer enclosed Yes/No
4.14.00 Laplace domain transfer function block Yes/No
diagram that represents the generator
excitation system in accordance
with the IEEE standard excitation
model is enclosed. The values of all
time constants and gains are also to be
furnished by manufacturer
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB2
MOTORS
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
1 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Applicable Data to be filled for each rating of HT, LT and DC motors
MOTORS
1.00.00 GENERAL
1.01.00 Manufacturer & Country of origin .......................................................
(Shall be as per approved QA make)
1.02.00 Equipment driven by motor .......................................................
1.03.00 Motor type .......................................................
1.04.00 Quantity .......................................................
2.00.00 DESIGN AND PERFORMANCE DATA
2.01.00 Frame size .......................................................
2.02.00 Type of duty .......................................................
2.03.00 Type of enclosure and method .......................................................
of cooling, Degree of protection
2.04.00 Applicable standard to which .......................................................
motor generally conforms
2.05.00 Type of mounting .......................................................
2.06.00 Direction of rotation as viewed .......................................................
from DE END
2.07.00 Standard continuous rating at .......................................................
40 deg.C. ambient temp. (KW)
2.08.00 De rated rating for specified .......................................................
normal condition i.e. 50 deg.C
ambient temperature (KW)
2.09.00 Rated Voltage (volts) .......................................................
2.10.00 Permissible % variation of
a) Voltage (Volts) .......................................................
b) Frequency (Hz) .......................................................
c) Combined voltage and frequency .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
2 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.11.00 Minimum permissible starting .......................................................
Voltage (Volts)
2.12.00 Rated speed (RPM) at rated .......................................................
voltage and frequency
2.13.00 At rated Voltage and frequency
a) Full load current (Amps) .......................................................
b) No load current (Amps) .......................................................
2.14.00 Power Factor at
a) 100% load .......................................................
b) NO load .......................................................
c) Starting .......................................................
2.15.00 Efficiency at rated voltage
and frequency,
a) 100% load .......................................................
b) 75% load .......................................................
c) 50% load .......................................................
2.16.00 Starting current (amps) at
a. 100 % voltage .......................................................
b. 85% voltage .......................................................
c. 80% voltage .......................................................
d. Min permissible voltage .......................................................
2.17.00 Starting time (secs) with
minimum permissible voltage
a. Without driven equipment .......................................................
coupled
b. With driven equipment coupled .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
3 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
2.18.00 Safe stall time (secs) with
100% and 110% of rated voltage
a. From hot condition .......................................................
b. From cold condition .......................................................
2.19.00 Torques in Kg-m and in %
of FLT
a. Starting torque at min. .......................................................
permissible voltage
b. Pull up torque at rated .......................................................
voltage
c. Pull out torque .......................................................
d. Min accelerating torque .......................................................
(kg.m) available
e. Rated torque (kg.m) .......................................................
2.20.00 Stator winding DC resistance .......................................................
per phase (ohms at 20 Deg.C.)
2.21.00 GD2 value of motors .......................................................
2.22.00 No of permissible successive .......................................................
starts when motor is in
hot condition
2.23.00 a. locked rotor KVA input .......................................................
b. Locked rotor KVA/KW .......................................................
2.24.00 Bearings
a. Type .......................................................
b. Manufacturer .......................................................
c. Self Lubricated or forced .......................................................
Lubricated
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
4 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
d. Recommended Lubricants .......................................................
e. Guaranteed Life in Hours .......................................................
f. Whether Dial Type thermometer .......................................................
provided
g. Oil pressure Gauge/switch .......................................................
i. Range .......................................................
ii. Contact Nos. & ratings .......................................................
iii. Accuracy .......................................................
2.25.00 Vibration
a) Velocity (mm/s) .......................................................
b) Displacement (microns) .......................................................
2.26.00 Noise level (DB) or Noise pressure .......................................................
or Noise power
3.00.00 CONSTRUCTIONAL FEATURES
3.01.00 Stator winding insulation / Armature
winding insulation in case of
a. Class & Type .......................................................
b. Tropicalised (Yes/No) .......................................................
c. Temperature rise over
specified max.
i. Cold water temperature .......................................................
of 39 DEG. C.
ii. Ambient Air 50 DEG. C. .......................................................
(for air cooled motor)
d. Method of temperature .......................................................
measurement
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
5 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
e. Stator winding connection .......................................................
f. Number of terminals .......................................................
brought out
3.02.00 Type of terminal box for
a. stator leads .......................................................
b. space heater .......................................................
c. Temperature detectors .......................................................
d. Instrument switch etc. .......................................................
3.03.00 For main terminal box
a. Location
b. Entry of cables .......................................................
c. Suitable for cable size ------------Cores X --------------SQMM
(To be matched with cable
size envisaged by owner)
d. Fault level (MVA) .......................................................
3.04.00 For bearing
a. Type .......................................................
b. Manufacturer .......................................................
c. Recommended lubricant .......................................................
d. Oil quantity .......................................................
e. Max cold oil temp. to .......................................................
bearing (deg . C)
f. Guaranteed life in Hrs .......................................................
g. Lubrication type .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
6 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
h. Whether dial type thermometer .......................................................
provided
i. Oil pressure gauge/ switch .......................................................
3.05.00 Type of cooler
a. CACA / CACW / Number .......................................................
for HT motors
3.06.00 Cooling water requirements
(if applicable)
a. Quantity required (M3/hr) .......................................................
b. Maximum permissible inlet .......................................................
water temp. in deg.C
c. Pressure of water (KSC) .......................................................
at inlet to coolers
d. Outlet temperature (deg.C) .......................................................
of water at full load
e. Cold air temp. (deg.C) .......................................................
at outlet
3.07.00 Paint shade .......................................................
3.08.00 Max. permissible temperature .......................................................
of rotor (deg.C)
3.09.00 Temp. Rise of rotor during .......................................................
1st start (deg.C)
3.10.00 Temp. rise of rotor during .......................................................
2nd start (deg.C)
3.11.00 Surge withstand voltage (stator winding) .......................................................
only for HT Motors
a) 0.3/3 micro sec surge (KVp) .......................................................
b) 1.2/50 micro sec surge (KVp) .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
7 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
3.12.00 Weight of
a. Motor stator (KG) .......................................................
b. Motor Rotor (KG) .......................................................
c. Total weight (KG) .......................................................
4.00.00 LIST OF ACCESSORIES.
a) RTDs for winding for HT .......................................................
motors (Type/Nos/Leads/
Location/make/Res.at 0 Deg.C)
b) RTDs for bearing for HT .......................................................
motors (Type/Nos/Leads
location/make/Res.at 0 Deg.C)
c) RTDs for Hot Air for HT .......................................................
motors (Type/No/Leads)
d) RTDs for Cold Air for HT .......................................................
motors (Type/No./Leads)
e) Space Heaters for motors
beyond 30KW rating
i) Nos. .......................................................
ii) Power (Watts) .......................................................
iii) Supply Voltage .......................................................
f) Stator Terminal Box
(For HT motor)
i) Type .......................................................
ii) Fault Level (MVA) .......................................................
iii) Fault Level duration .......................................................
(secs)
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
8 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
g) Neutral TB for HT motors
i) Type .......................................................
h) Current Transformer for
HT motors
i) Nos. .......................................................
ii) Ratio .......................................................
iii) Accuracy Class .......................................................
iv) Knee Point Voltage-Vk .......................................................
(Volts)
v) Exciting Current .......................................................
vi) Max Secondary .......................................................
Resistance
i) Dial Type Thermometer
for HT motors (Type/make/
Accuracy/Connection type
& size
i) For Bearings (Nos.) .......................................................
ii) For Air Temp (Nos.)
a. Hot Air .......................................................
b. Cold Air .......................................................
iii) Contact Rating .......................................................
iv) Range .......................................................
v) Supply Votlage .......................................................
j) Rotor Terminal Box .......................................................
k) TBs for RTDs. BTDs & .......................................................
Space Heater (Yes/No)
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
9 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
l) Sole Plate (Yes/No) .......................................................
m) Foundation & Anchoring .......................................................
bolts (Yes/No)
n) Base Frame (Yes/No) .......................................................
o) speed switch (Yes/No)
i) No of contacts and .......................................................
contact ratings of
speed switch
p) Insulation of bearing (Yes/No) .......................................................
q) Forced oil lubrication (Yes/No) .......................................................
r) Oil level indicator (Yes/No) .......................................................
s) Noise reducer (Yes/No) .......................................................
t) Flow switch for CACW
motor (Quantity)
i) No of contacts and .......................................................
contact ratings
u) Water leakage detector
for HT motors
i) No of contacts and .......................................................
contact ratings
v) Grounding pads
i) No and size on .......................................................
motor body
ii) Nos on terminal Box .......................................................
w) Vibration pads
i) No and size .......................................................
ii) Location .......................................................
x) Any other fitments .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
10 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5.00.00 LIST OF CURVES
i. Torque speed characteristic .......................................................
of the motor
ii. Calibration characteristic of .......................................................
platinum type resistance
temperature detector
iii. Calibration characteristic .......................................................
of platinum BTD
iv. Thermal withstand characteristic .......................................................
v. starting current Vs. Time .......................................................
vi. starting. current Vs speed .......................................................
vii. Neg. sequence current vs Time .......................................................
viii. P.F. and Effi. Vs Load .......................................................
6.00.00 Additional Data to be filled
for each rating of DC Motor
6.01.00 Rated armature voltage (Volt) .......................................................
6.02.00 Rated field excitation (Amp) .......................................................
6.03.00 Permissible % variation in voltage .......................................................
6.04.00 Minimum Permissible Starting .......................................................
voltage (volt)
6.05.00 At rated voltage
i) Full load Armature current. .......................................................
(Amp)
ii) Full load Field current (Amp) .......................................................
iii) No load Armature current (Amp) .......................................................
6.06.00 Full load Field current (Amp) .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
11 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6.07.00 No load Aramature current (Amp) .......................................................
6.08.00 Minimum permissible field current
(Amp) to avoid overspeeding at
i) Maximum permissible voltage .......................................................
ii) Rated voltage .......................................................
iii) Minimum Permissible Voltage .......................................................
6.09.00 Resistance (indicative Values) in ohm
i) Armature winding .......................................................
(Arm + IP + Series)
at 25 deg.C
ii) Field Winding at 25 deg. C .......................................................
6.10.00 Inductance (indicative values)
i) Armature winding .......................................................
ii) Field winding .......................................................
6.11.00 Value of trimmer resistance (ohm)
to be connected in series with
the shunt field to obtain rated
speed at
i) 220 V DC .......................................................
ii) 250 V DC .......................................................
iii) 187 V DC .......................................................
6.12.00 Value of the external resistance (ohm) .......................................................
required to be connected in series
with armature during starting only
6.13.00 Technical data sheet for external .......................................................
resistance box
6.14.00 Terminal box arrangement .......................................................
Clause No.
...........................................................
(Bidder's Name)
MOTORS
PAGE
12 OF 12
DB2 :
MOTORS
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6.15.00 GA drawing of motor .......................................................
6.16.00 Starting time calculation .......................................................
6.17.00 Starter resistance design calculation .......................................................
6.18.00 Electrical connection diagram of motor .......................................................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB3
POWER AND CONTROL CABLES
Clause No.
...........................................................
(Bidder's Name)
POWER AND CONTROL CABLES
PAGE
1 OF 2
DB3 : POWER
AND CONROL
CABLES
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
POWER AND CONTROL CABLES
(Use separate sheet for each type and size of cables)
1.00.00 Make ............................ .....................
(Shall be as per approved QA make)
1.02.00 Country of Manufacturer ............................ .....................
1.03.00 Type & designation ............................ .....................
1.04.00 Applicable standard ............................ .....................
1.05.00 Cable size & no. of cores ............................ .....................
1.06.00 Rated voltage ............................ .....................
1.07.00 Catalogue attached as Annexure No. ............................ .....................
1.08.00 Continuous current rating ............................ .....................
for max. conductor temperature
a) When laid in air at an ambient ............................ .....................
temperature of 50 deg. C
b) When buried in soil having ............................ .....................
thermal resistivity of 150 deg.C
cm/n at a depth of 1000 mm
at ground ambient temperature
of 40 deg. C
1.09.00 Short circuit withstand capacity and ............................ .....................
duration for
a) Conductor ............................ .....................
b) Screen ............................ .....................
c) Armour ............................ .....................
1.10.00 Conductor ............................ .....................
a) Material ............................ .....................
b) Nominal cross section ............................ .....................
area in sq. mm
Clause No.
...........................................................
(Bidder's Name)
POWER AND CONTROL CABLES
PAGE
2 OF 2
DB3 : POWER
AND CONROL
CABLES
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
c) Shape of conductor ............................ .....................
d) DC resistance at 20
o
C (Maxm.) ............................ .....................
1.11.00 Insulation
a) Material ............................ .....................
b) Nominal thickness (in mm) ............................ .....................
c) Type of curing (for XLPE) ............................ .....................
1.12.00 Metallic screen (wherever applicable)
a) Material ............................ .....................
b) Type ........................... ....................
c) Short Ckt. (KA) & Period (Sec.)
1.13.00 Material & Type of Inner sheath ............................ .....................
1.14.00 Armour material & shape ............................ .....................
1.15.00 Outer sheath material & type ............................ .....................
1.16.00 Over all dia of cable (in mm) ............................ .....................
1.17.00 Guaranteed value of minimum ............................ .....................
oxygen index of outer sheath
1.18.00 Maximum acid-gas generation ............................ .....................
by weight (%) of outer sheath
1.19.00 Smoke Density rating of outer sheath ............................ .....................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB4
CABLING EARTHING AND
LIGHTNING PROECTION
Clause No.
...........................................................
(Bidder's Name)
CABLING EARTHING AND LIGHTNING PROTECTION
PAGE
1 OF 3
DB4 : CAB.
EARTH. & LIGHT.
PROTEC.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CABLE SUPPORT SYSTEM
1.00.00 Cable Trays, Fittings & Accessories
1.01.00 Makers, Name, Country of ............................ .....................
manufacturer
(Shall be as per approved QA make)
1.02.00 Type & Material of cable tray ............................ .....................
2.00.00 Conduit Pipes & Accessories
2.01.00 Maker's Name and Country of ............................ .....................
manufacture
2.02.00 Material ............................ .....................
2.03.00 Class of duty ............................ .....................
2.04.00 Type of Coating ............................ .....................
2.05.00 Applicable Standard ............................ .....................
3.00.00 Junction Boxes
3.01.00 Maker's Name and Country of ............................ .....................
manufacture
3.02.00 Material ............................ .....................
3.03.00 Applicable Standard ............................ .....................
3.04.00 Degree of Protection ............................ .....................
4.00.00 Cable Glands
4.01.00 Maker's Name and Country of ............................ .....................
manufacture
4.02.00 Type of cable gland ............................ .....................
4.03.00 Applicable Standard ............................ .....................
4.04.00 Material ............................ .....................
Clause No.
...........................................................
(Bidder's Name)
CABLING EARTHING AND LIGHTNING PROTECTION
PAGE
2 OF 3
DB4 : CAB.
EARTH. & LIGHT.
PROTEC.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
5.00.00 Cable lugs & Terminals
5.01.00 Maker's Name & Country of ............................ .....................
Manufacturer
5.02.00 Material ............................ .....................
5.03.00 Applicable Standard
(i) HT ............................ .....................
(ii) LT ............................ .....................
6.00.00 Earthing System
Equipment earthing
i) Material .............................. .....................
ii) Size ............................ .....................
iii) Applicable Standard ............................ .....................
7.00.00 Lightning Protection System
i) Applicable Standard ............................ .....................
ii) Size & material for Air termi- ............................ .....................
nation and down conductor
8.00.00 Cable Jointing/Termination Kits
(a) Maker's Name & Country
of Manufacturer ............................ .....................
(b) Type of System
(i) Termination H.T./L.T. ............................ .....................
(ii) J oints H.T./L.T. ............................ .....................
(c) Outdoor/Indoor ............................ .....................
Clause No.
...........................................................
(Bidder's Name)
CABLING EARTHING AND LIGHTNING PROTECTION
PAGE
3 OF 3
DB4 : CAB.
EARTH. & LIGHT.
PROTEC.
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
9.00.00 Cable Tray Support System
(a) Maker's Name, Country
of Manufacturer
(b) Type & Material of cable
tray support system
(c) Catalogue and indicative
sketch attach as annexure No.
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB5
ELECTRICAL ACTUATOR
Clause No.
...........................................................
(Bidder's Name)
ELECTRICAL ACTUATOR
PAGE
1 OF 3
DB5 :
ELECTRICAL
ACTUATOR
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
ACTUATOR DATA SHEET:
Sl.No. Description Unit Data
1. Actuator Manufacturer
(Shall be as per approved QA make)
2. Model
3. Torque Range & RPM Kg-M
4. Duty Cycle (ON-OFF/Regulating)
5. Local/Remote Selector Switch (Lockable)
6. Enclosure/Degree of Protection
7. Admissible Ambient Temperature
O
C
8. Average/Nominal Output KW
9. Rated Voltage V
10. Rated Frequency Hz
11. No. of Phases/No of Wires (3ph/3wires) Ph/Wires
12. Frame Size
13. Admissible Voltage Variation %
14. Admissible Frequency Variation %
15. Admissible Combined Volt. & Freq. Variation %
16. Nominal Current (Average) A
17. Starting Current A
18. Full Load Speed RPM
19. Insulation Class
20. Power Factor (Average Load)
21. Average Load fficiency %
22. Temp. Rise Over Ambient Temp. of 50
O O
C
Clause No.
...........................................................
(Bidder's Name)
ELECTRICAL ACTUATOR
PAGE
2 OF 3
DB5 :
ELECTRICAL
ACTUATOR
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Sl.No. Description Unit Data
23. Cable Gland Size/No: Power
(Double Compression Cable Gland)
24. Cable Gland Size/No: Control
(Double Compression Cable Gland)
25. Gear Box Lubrication
26. Position Limit Switches
(a) Quantity Nos.
(b) No. of Contacts Nos.
27. Torque Switches
(a) Quantity Nos.
(b) No. of Contacts Nos.
28. Voltage/Current Rating of Switches V/A
29. Position Transmitter-ON/OFF Duty Yes/No
30. Position Transmitter-Inching Yes/No
Duty (If provided)
31. Space Heater Power Supply Details
32. Cable size for Space Heater Terminal
33. Thermostat (One no. per phase) 3 Nos.
34. Internal Wiring Cable Size
35. Control Circuit Diagram (Enclosed) Yes/No
36. Integral Starter Provided Yes/No
37. Weight-Actuator Kg
38. Motor Suitable for ON-OFF/Inching
Clause No.
...........................................................
(Bidder's Name)
ELECTRICAL ACTUATOR
PAGE
3 OF 3
DB5 :
ELECTRICAL
ACTUATOR
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
Sl.No. Description Unit Data
39. Motor Type & Ref. Stanard
40. OLR Set Value (Recommended) A
41 Plug & Socket
(Integral mounted on the Actuator)
42. The Colour Coding of Cables
For 9 Pin Plug & Socket Suitable
For 4 Pair, 0.5 SQMM Copper Cables
43. Single Phase Yes/No
Sequence Protection Provided
44. Wrong Phase Yes/No
Sequence Protection Provided
45. Paint Shade
46. Secondary Gear Box
Gear Box Model & Ratio
Gear Box Make
Travel Time Secs
Secondary Gear Box Maximum Output Torque Kgm
Type of Enclosure
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB6
LIGHTING (H
2
GENERATION PLANT)
Clause No.
.........................................................
(Bidder's Name)
LIGHTING (H
2
GENERATION PLANT)
PAGE
1 OF 3
DB6 : LIGHTING
(H
2
GENERATION
PLANT)
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
LIGHTING
1.00.00 Lighting Panel
(a) Make .............................. ..........................
(Shall be as per approved QA make)
(b) Applicable standard .............................. ..........................
(c) Enclosure .............................. ..........................
(d) Catalogue attached as annexure no. .............................. ..........................
2.00.00 Miniature Circuit Breaker
(a) Make .............................. ..........................
(b) Type designation .............................. ..........................
(c) Applicable standard .............................. ..........................
(d) Rated current & voltage .............................. ..........................
(e) Breaking capacity at 0.6 p.f. .............................. ..........................
(f) Catalogue attached as annexure no. .............................. ..........................
3.00.00 Isolator
(a) Make .............................. ..........................
(b) Type designation .............................. ..........................
4.00.00 Fuses
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Applicable Standard .............................. ..........................
5.00.00 Contactor
(a) Make .............................. ..........................
(b) Type & duty .............................. ..........................
(c) Applicable Standard .............................. ..........................
Clause No.
.........................................................
(Bidder's Name)
LIGHTING (H
2
GENERATION PLANT)
PAGE
2 OF 3
DB6 : LIGHTING
(H
2
GENERATION
PLANT)
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
6.00.00 Synchronous timer (if applicable)
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Applicable standard .............................. ..........................
7.00.00 Lighting fixtures & Accessories
(a) Make of lighting fixtures & .............................. ..........................
accessories
(b) Catalogue for each type of .............................. ..........................
fixture attached as annexure no.
(c) Applicable Standard .............................. ..........................
8.00.00 Switches
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Catalogue attached as annexure no. .............................. ..........................
(e) Applicable standard .............................. ..........................
9.00.00 Receptacle/Sockets
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Applicable standard .............................. ..........................
10.00.00 J unction Boxes
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Material .............................. ..........................
(d) Applicable standard .............................. ..........................
Clause No.
.........................................................
(Bidder's Name)
LIGHTING (H
2
GENERATION PLANT)
PAGE
3 OF 3
DB6 : LIGHTING
(H
2
GENERATION
PLANT)
TECHNICAL DATA SHEET
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
11.00.00 Terminal Blocks
(a) Make .............................. ..........................
(b) Type .............................. ..........................
(c) Rating .............................. ..........................
12.00.00 Rigid steel Conduits/Fittings
& accessories
(a) Make .............................. ..........................
(b) Material .............................. ..........................
(c) Applicable standard .............................. ..........................
13.00.00 Flexible steel conduit
(a) Make .............................. ..........................
(b) Applicable standard .............................. ..........................
14.00.00 Lighting Wires
(a) Make .............................. ..........................
(b) Applicable standard .............................. ..........................
(c) Voltage grade .............................. ..........................
(d) Size .............................. ..........................
(e) Conductor material .............................. ..........................
(f) Insulation .............................. ..........................
15.00.00 Type test reports of all items for
Lighting enclosed at annexure no. .............................. ..........................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
DB7
LT SWITCHGEAR & LT BUSDUCTS
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
1 OF 11
LT SWITCHGEARS & LT BUSDUCTS
1.00.00 SWITCHGEAR & MCC
a) General
i) Manufacturer's Name
(Shall be as per approved QA make)
..........................
ii) Type designation ..........................
iii) Country of origin ..........................
b) Rated voltage ..........................
c) Symmetrical short circuit withstand current at rated
voltage of switchgear /MCC cubicle.
..........................
d) Peak short circuit withstand current ..........................
e) Rated current at ambient ..........................
f) Degree of protection as per IS:13947
i) Breaker / MCC cubicles ..........................
ii) Busbar chamber ..........................
g) Cubicle sheet metal details
i) Cold rolled / hot rolled ..........................
ii) Thickness, structural & load bearing members ..........................
iii) Thickness, front & rear ..........................
iv) Thickness, Sides & top ..........................
v) Thickness of gland plates ..........................
h) Painting shade & Thickness as per IS :5
i) External surfaces(front & rear) ..........................
ii) Extreme end covers ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
2 OF 11
i) Minimum Clearance in air for Busbars
i) Between phases ..........................
ii) Between phase & earth ..........................
j) Standard height, width & depth of typical panel
i) Circuit breaker panel ..........................
ii) MCC panels (S.F./D.F.) ..........................
iii) Circuit breaker panel with Bus trunking /Bus Duct
Termination
..........................
iv) ACDB/DCDB ..........................
v) AC/DC Fuse boards ..........................
k) Width of cable alley ..........................
l) Shrouding arrangement in cable alley provided or not YES/NO
m) Earth busbar size & material ..........................
n) Approx. Weight of one panel With circuit breaker ..........................
o) Recommended dynamic loading for foundation design ..........................
p) Approx. weight of one MCC panel ..........................
2.00.00 POWER BUSBARS & INSULATORS
a) Material & applicable standards ..........................
b) Bare/painted / epoxy insulated/sleeved ..........................
c) Continuous current rating at an ambient temp. of 50
0
C ..........................
d) Temperature rise over design ambient temperature for
continuous current rating deg. C
..........................
e) Material of the support insulators ..........................
f) One second current rating (kA) ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
3 OF 11
3.00.00 CONTROL SUPPLY TRANSFORMER
a) Make ..........................
b) Type ..........................
c) Material & class of insulation ..........................
d) Voltage rating & taps ..........................
e) Continuous rating (VA) ..........................
4.00.00 CIRCUIT BREAKER
a) Manufacturer's name and country of manufacturer ..........................
b) Manufacture's type and designation ..........................
c) Rated Voltage ..........................
d) Rated operating duty ..........................
e) Design ambient temperature ..........................
f) Rated current at design ambient temperature ..........................
g) Derating factor for site operating conditions inside
panel
..........................
h) Continuous current at ambient temp. ..........................
i) Rated symmetrical breaking current ..........................
j) Rated peak making current ..........................
k) Rated short time rating (for 1 sec.) ..........................
l) Rated peak momentary rating ..........................
m) Number of openings, the circuit breaker is capable of
performing without inspection, replacement of contacts
or other parts at 100% rated breaking current
..........................
n) No. of breaker auxiliary contacts provided on fixed
portion of breaker & their rating
..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
4 OF 11
o) Trip free and anti pumping features have been
provided (Furnish description)
YES/NO
p) Power operating mechanism ..........................
q) Spring charging motor details
i) Type ..........................
ii) Rating Watts ..........................
iii) Rated voltage ..........................
iv) Class of insulation ..........................
v) Time for fully charging the closing spring ..........................
r) Emergency Manual charging facility provided YES/NO
s) Limits of voltage for satisfactory operation of the
following devices as percentage of normal voltage
i) Motor ..........................
ii) Closing coil ..........................
iii) Tripping coil ..........................
t) Manual operating mechanism ..........................
u) i) Type of Releases provided ..........................
ii) Available range of following parameters for each
type of release offered
..........................
v) i) Maximum Tripping Time ..........................
ii) Maximum Closing time ..........................
w) i) Closing coil VA ..........................
ii) Tripping coil VA ..........................
x) Telescopic trolley
i) Make ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
5 OF 11
ii) Type designation ..........................
iii) Dimensions ..........................
5.00.00 AIR BREAK SWITCHES
(The following details shall be furnished for each type & rating)
a) Make ..........................
b) Type ..........................
c) Applicable standards ..........................
d) Rated current at design ambient temperature (Amps) ..........................
e) Design ambient temperature Deg C ..........................
f) Rated breaking current (kA) ..........................
g) Maximum through fault current withstand kA ..........................
h) Door interlock as specified has been provided ? YES/NO
i) No. of auxiliary contacts and its rating ..........................
6.00.00 CONTROL/SELECTOR SWITCH
a) Make ..........................
b) Type Designation ..........................
c) Voltage grade ..........................
7.00.00 CONTACTOR
(The following details shall be furnished for each type and rating)
a) Make ..........................
b) Type & applicable standards ..........................
c) Rated voltage of main and auxiliary contacts ..........................
d) Rated voltage of coils ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
6 OF 11
e) Limits of operation
i) Supply voltage variation +/-% ..........................
ii) Supply frequency variation for closing (+/-)% ..........................
iii) Drop out voltage % ..........................
f) Rated (thermal) current A ..........................
g) Rated duty ..........................
h) Rated utilisation category as per IS:13947 ..........................
i) Rated breaking capacity kA ..........................
j) Rated making capacity - kA ..........................
k) Coil VA burden ..........................
8.00.00 AUXILIARY CONTACTOR
a) Make ..........................
b) Type ..........................
c) Catalogue attached as Annexure No. ..........................
9.00.00 FUSES
a) Make ..........................
b) Type ..........................
c) Category ..........................
10.00.00 CURRENT TRANSFORMERS
(The following details shall be provided for each type & rating)
a) Make ..........................
b) Applicable standards ..........................
c) Ratio ..........................
d) VA Rating ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
7 OF 11
e) Accuracy class ..........................
f) Class & type of insulation ..........................
11.00.00 VOLTAGE TRANSFORMERS
a) Make ..........................
b) Ratio ..........................
c) VA Rating ..........................
d) Accuracy class ..........................
e) Over voltage factor ..........................
f) Class & type of insulation ..........................
12.00.00 Numerical relays( If applicable)
a) General Technical Details and Drawings Enclosed ..........................
b) Make/Model No ..........................
c) Place of Manufacture ..........................
d) Hardware version number ..........................
e) Firmware version number ..........................
f) Rated Voltage Vn (phase-to-neutral) ..........................
g) Rated Current In ..........................
h) Rated Frequency ..........................
i) Over voltage capability - continuous ..........................
j) Over voltage capability 3s ..........................
k) Burden on voltage transformers (VA per phase) ..........................
l) Over current capability - continuous ..........................
m) Over current capability 1s ..........................
n) Burden on current transformers (VA per phase) ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
8 OF 11
o) Reference standards ..........................
p) Operating principle ..........................
q) No Of communication Ports ..........................
r) Compliance to IEC-61850 ..........................
s) Built-in functions provided in the relay (list out) ..........................
t) Protection Functions ..........................
u) Measurements ..........................
v) Monitoring Functions ..........................
w) Control functions ..........................
x) Detailed Technical Catalogue for offered Relays
enclosed
..........................
y) Spares and Repairs
a) State availability of spares in country and spares
holding in country of origin
..........................
b) Maximum repair turnaround time ..........................
c) Define the proposed repair strategy ..........................
d) Recommended spares list ..........................
z) List of reference sites in operation for more than 1 year ..........................
13.00.00 THERMAL OVERLOAD RELAY & SINGLE PHASING PREVENTER
(The following details shall be furnished for each type & rating)
a) Make & type designation ..........................
b) Catalogue ..........................
14.00.00 VOLTMETER
a) Make ..........................
b) Type ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
9 OF 11
c) Catalogue ..........................
15.00.00 AMMETER
a) Make ..........................
b) Type ..........................
c) Catalogue ..........................
16.00.00 PUSH BUTTONS
a) Make ..........................
b) Type designation ..........................
c) Catalogue ..........................
17.00.00 INDICATING LAMPS
a) Make ..........................
b) Type ..........................
c) Catalogue ..........................
18.00.00 LOCAL STARTERS
a) Make & Type ..........................
b) Catalogue ..........................
19.00.00 415 V NON SEGREGATED BUSDUCTS(If applicable)
a) Manufacturer's name & address ..........................
b) Type of busduct ..........................
c) Material and cross section of busbars ..........................
d) Rated voltage (volts) ..........................
e) Maximum voltage at which busduct can operate
continuously (volts)
..........................
f) Continuous current rating of busbars (Amps) ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
10 OF 11
g) Short circuit current ratings & duration (kA /Sec) ..........................
h) Momentary current rating kA peak ..........................
i) Temperature rise over the ambient temperature
i) Busbars ..........................
ii) Enclosures ..........................
j) Material of support insulator ..........................
k) No. and arrangement of support insulators ..........................
l) Material of Gaskets ..........................
m) One minute power frequency withstand voltage (kV) ..........................
n) Minimum creepage distance over insulator (mm) ..........................
o) Conductor treatment ..........................
p) Clearance (mm) ..........................
i) Phase to Phase ..........................
ii) Phase to earth ..........................
q) Average weight per meter of busduct (kg) ..........................
r) Material and thickness of Busduct ..........................
s) Shape & size of enclosure ..........................
20.00.00 LIGHTING / WELDING TRANSFORMERS
a) Make ..........................
b) Voltage Ratio ..........................
c) kVA Rating ..........................
d) Vector Group ..........................
e) Type of Cooling ..........................
f) Percentage impedance ..........................
CLAUSE NO.
BIDDERS NAME
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DB:7 LT SWITCHGEARS
& LT BUSDUCTS
PAGE
11 OF 11
g) Details of taps provided ..........................
h) Class of insulation ..........................
i) Degree of protection for enclosure ..........................
j) Whether mounted inside MLDB or outside ..........................
k) If it is mounted outside dimension of the enclosure ..........................
21.00.00 Metering Network and Energy Meters (For Motor>& = 100 KW)(If applicable)
a) Energy Meters
i. Manufacturer's type designation ..........................
ii. Accuracy (Power and Energy) ..........................
iii. Input Voltage ..........................
iv. Input current ..........................
v. Mounting ..........................
vi. Communication (in Built 485 Port) ..........................
vii. Data recorded in Non-volatile memory ..........................
viii. Burden ..........................
b) Type designation of RS 485 Converter ..........................
c) Type designation of LAN cable ..........................
d) Type Designation of Data Cable ..........................
22.00.00 Ethernet switches (For Networking of Numerical Relays)(If applicable)
a) Compliance to IEC 61850 ..........................
b) No of Ports ..........................
c) Power supply to Ethernet Switches ..........................
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
SECTION - VI
PART - G
TECHNICAL DATA SHEETS
MODULE - III
CONTROL AND INSTRUMENTATION SYSTEM
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CONTROL & INSTRUMENTATION
MODULE - III CHAPTER - I : Technical Data to be Submitted
alongwith the Bid.
DC 01 : C&I Data Requirements
CHAPTER - II : Technical information and Data
to be submitted after Award of Contract
DC 02 : Post Award Technical Data
Requirements
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-I
TECHNICAL DATA TO BE
SUBMITTED ALONGWITH THE BID
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
1 OF 13
DC 01
C&I DATA
REQUIREMENTS
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
2 OF 13
1.00.00 GENERAL REQUIREMENTS
1.01.00 INSTRUCTIONS TO BIDDERS
1.01.01 The following table describes the non applicabilty of the subsequent clauses for
the current scope of the work identified under this package.
1.01.02 The Bidder shall ensure that all information, data, performance curves, technical
literature (catalogues/instruction manuals) and drawings furnished with the
proposal fully describe all equipment/systems covered under this proposal and fully
meet the requirements of this and related Sub-sections and other applicable
specification documents.
1.01.03 The Bidder shall use one of the following responses while filling the questionnaire
and proposal data sheets included in this part.
a) The Section No. and Page No. of the proposal where the required
information/data has been furnished by the Bidder.
b) An answer (data or narrative description).
c) A Not-Applicable statement (N.A.)
1.01.04 Bids not meeting the above requirement or not containing full description/data/
technical literature/details regarding past experience for similar application for the
proposed equipment may be treated as non responsive and this will be considered
as an adequate reason for rejection of the concerned Bid.
1.01.05 The Employer reserves the right to ask for further details regarding technical
features, application particulars, performance, past experience for similar
applications or any other information as may be required to fully satisfy himself
regarding suitability, quality, reliability and full compliance with this specification for
all equipment and systems offered by the Bidder.
1.01.06 Bidder shall furnish with his proposal the original Technical Data Sheets completely
filled in and five Photostat Copies of the data sheets (photocopies of the original).
In no case, the Bidder shall retype/redraft these data sheets.
Sl
No
Clause No Key words of the
clause
Applicability Remarks
1 Not applicable Not applicable Not applicable
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
3 OF 13
1.01.07 It may be noted that this technical data sheet is for Bidding purpose only. During
detailed engineering, the Bidder shall be required to furnish all additional data
about the equipment/System being supplied, even if such details are not asked for
in this part.
1.01.08 Bidder should legibly fill in all the data asked for in these sheets either by hand in
black ink or preferably by typing the matter. All the filled in data sheets should be
duly returned with the bid.
1.01.09 Continuation sheets may be suitably attached whenever the need arises. These
pages may be suitably numbered accordingly.
1.01.10 Corrections should be avoided. However, whenever it is imperative to carry out
correction, this should be done neatly and should be initialled by the authorised
signatory.
1.01.11 Each page of the technical data sheet should be initialled by the authorised
signatory & should bear the legal stamp of the company.
1.01.12 Bidder should indicate his name on each sheet.
1.02.00 BIDDER'S / C&I SYSTEM SUB-SUPPLIER
ORGANISATION STRUCTURE
1.02.01 Details regarding quality assurance Procedures
and test facilities available in the Works of Bidder
/ C&I System/ Sub-Supplier Page No .......... Sec. No.........
1.02.02 Reference list of comparable control and
instrumentation packages furnished by the
Bidder/C&I system/Sub-Supplier Page No ......... Sec. No.......
1.02.03 Brief description regarding manufacturing
facilities of the Bidder and DDC-MIS
manufacturer. (Please furnish details of floor
area, number of engineers, workers,
manufacturing facilities, special equipment
for manufacture andtesting etc.) Page No .......... Sec. No.........
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
4 OF 13
1.03.00 CONFIRMATION REGARDING Bidders's Response
BIDDERS PROPOSAL
1.03.01 Bidder/C&I System Sub-supplier to
furnish a list of bought out items
covered in his proposal along with
names of sub-vendors Page no .................. Sec No ..............
1.03.02 Bidder to confirm that all equipment
and System covered under this
specification shall be furnished as per
the requirements of this specification
and drawings / documents approved
by the Employer during contract stage .......................... Yes ....................
1.03.03 Bidder to confirm that all bought out
items shall be furnished as per make,
model and technical specifications
approved by the Employer during contract
stage within the quoted price .......................... Yes ....................
1.04.00 DISTRIBUTED DIGITAL CONTROL,
MONITORING AND INFORMATION
SYSTEM (DDCMIS)
1.04.01 General Technical Details and Drawings
i) DDCMIS manufacturers name ....................................;................
ii) Make / Model No. .......................................................
iii) Place of manufacture ........................................................
1.04.02 Detailed descriptions of Distributed Digital
Control, Monitoring and Information
System (DDCMIS) proposed by the Bidder
covering all salient features of hardware,
software, system configuration for each
system/ sub-system testing, documentation,
post commissioning support facilities, etc.
furnished at Page No .............. Sec. No.............
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
5 OF 13
1.04.03 Complete Bill of Materials including all
hardware items/equipment and accessories
(along with model no. of each item)
furnished at Page No ............Sec. No.............
1.04.04 Cabinet size/ Type ..
1.04.05 Cutout details of each type of cabinet
Furnished at
1.04.06 Layout drawings of Bidders cabinets for
CER / CR / RIO room furnished at ...
1.04.07 List of proprietary control systems not
offered as a part of offered DDCMIS. No. ............................................ ...........
1.04.08 Supporting documents furnished
for above. Page No .............. Sec. No.............
1.04.09 The offered HMIPIS is as per which alternative
Alternative - I / Alternative II
1.05.00 TG CONTROL SYSTEM
1.05.01 General
a) Control System functional grouping
diagram furnished at Page No ............ Vol.No..............
b) No. of functional groups (FGs)
offered .....................................................
c) Confirm that for each of the FGs,
separate sets of controllers, I/O
modules, communication controllers,
power supply packs/modules are Yes/No
provided
.....................................................
d) Confirm that Control System
shall function under environmental
conditions as per Sub-section Basic
Design Criteria, Yes/No
Part-B of Section-VI . .....................................................
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
6 OF 13
e) On-line simulation, testing, configura- Yes/No
tion & tuning of controllrs is possible .....................................................
f) Programs in controllers is stored
in (e.g. EEPROM/EPROM etc.) .....................................................
1.05.02 Please indicate make/model no. of
each of the control system indicated
below
i) TG Governing system .....................................................
ii) ATRS .....................................................
iii) TG C&I system (Turbine Protection) .....................................................
iv) TG C&I system (Non Turbine
Protection part) .....................................................
v) HP/LP Bypass .....................................................
vi) BFP TDBFP governing & protection .
vii) COLCTS
viii) SCS
ix) CPU .
x) LOPS
1.05.03 Turbine Protection System (TPS)
1. Whether all modules used in Yes/No
TPS are of fail safe design ....................................................
2. Whether that TPS meets all
applicable safety requirements
including those stipulated in
VDE 0116, section 8.7, VDE 0160/ Yes/No
8.83; DIN 57116 or IEC61508/IEC61511 .............................................
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
7 OF 13
3. Confirm that any single fault in
either primary sensor, input/output
modules, controller module etc.
will not result in loss of safety Yes/No
function .....................................................
4. i) Electronic protection channel in
2-out-of-3/ Or 1 out of 2
ii) Hydraulic protection channel
2-out-of-3/ Or 1 out of 2 Yes/No
. .....................................................
5. Confirm that all trip signal
inputs required for the safety
of the turbine will be based Yes/No
on 2 out 3 logic ( indicate exceptions) .....................................................
6. Confirm that redundant turbine trip Yes/No
solenoids one provided .....................................................
7. Make/Model no. of each type
module used in TPS
a) Input module .....................................................
b) Output module .....................................................
c) Controller module .....................................................
d) Communication controller
module .....................................................
e) Any other modules .....................................................
1.06.00 MAIN EQUIPMENT RELATED CONTROL & INSTRUMENTATION
1.06.01 Turbine Supervisory system (TSS)
1) All sensors, transmitters, conver-
ters, LVMs, measuring & amplifier
modules, power supplies etc. with
required accessories, special
cables (if any) etc. provided for all
types of measurements as specified Yes/No
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
8 OF 13
2) Distribution of signals and
interface with control system/
HMIPIS provided Yes/No
3) Make & Model (for sensors/
transmitters, converter/monitor
etc.)
i) Shaft Eccentricity ...........................................................
ii) Absolute & relative
shaft vibration ...........................................................
iii) Diff expansion of HPT,
IPT & LPT ...........................................................
iv) Overall Expansion of
HPT & IPT ...........................................................
v) Absolute bearing vibration
in each bearing ...........................................................
vi) Stator winding vibration ...........................................................
vii) Axial shift ...........................................................
viii) Turbine speed ...........................................................
ix) ESV/CV position ...........................................................
x) All metal steam & oil
temperature ...........................................................
xi) MS/HRH steam inlet
press ...........................................................
xii) Any other (Pl. list) ...........................................................
4) For Vibration measurement
Confirm That following
has been provided
a) Measurement provided in
both X & Y Directions Yes/No
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
9 OF 13
b) On-line spectrum/ Yes/No
harmonic analysis
c) Identification of exact Yes/No
nature of failure & direct
message on CRT
d) Storage & comparative
Analysis of vibration Yes/No
e) Generation/Analysis of
Bode plot /orbit plot &
time wave form /Nyquest
plot/shaft centre line plot/
coscade & water fall plot Yes/No
f) Shaft mounted reference
detectors and required
supervisory circuitry
provided Yes/No
5) All parameter fed to TCS
through hardwiring Yes/No
6) Test calibration jigs for site Yes/No
calibration provided
7) Detailed Technical literatures
for all TSS equipment
furnished at Page No. ........ Sec. No. .....................
8) Reference plant where
the offered TSS system
is in successful operation ...........................................................
9) Bill of material for entire
TSS system furnished at Page No............... Sec. No. ................
1.06.02 BFP Turbine Supervisory Instruments
1) All sensors, transmitters,
converters, LVMs, measuring
& amplifier modules, power
supplies etc. with required
accessories, special cables
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
10 OF 13
(if any) etc. provided for all types
of measurements as specified Yes/No
2) Distribution of signals
and interface with control
system / HMIPIS provided Yes/No
3) Make & Model (for sensors/
transmitters, converters
/monitors etc.)
a) Shaft Eccentricity ............................................................
b) Axial Shift
c) Differential expansion ............................................................
d) Overall Expansion ............................................................
e) Speed ............................................................
f) All steam & metal temp. ............................................................
g) Bearing pedestal vibration ............................................................
4) Test calibration jigs for site
calibration provided Yes/No
5) Detailed Technical literatures
furnished at Page No. ........ Sec. No. .................
6) Reference plant where the
offered system is in
successful operation ............................................................
7) Bill of material for entire
BFP Turbine Supervisory
System furnished at Page No.............. Sec. No. ................
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
11 OF 13
1.07.00 PROCESS CONNECTIONS AND PIPING (PCP)
a) Scope
Confirm that impulse pipes/tubes, sample pipes,
pneumatic pipes, required fittings, valves, valve
manifolds, condensing pots, balancing reservoirs,
air filter regulators, etc. and other accessories
for impulse piping and sample piping system
shall be furnished by the bidder on as required Yes/No
basis ..........................................
b) Detailed technical literature and data and Bill of
materials covering specification of each type of
impulse piping & tubing, sample piping,
pneumatic tubing fittings, instrument valves valve
manifolds and all other installation hardware &
accessories Page No ....... Sec No. ........
c) Details of skid mounted instruments considered
for mechanical equipments Page No ........ Sec No. ......
1.08.00 TG Auxillary Plant Control Functionalities
Control systems details make/ model/ type for
TG auxiliary control Page No ........ Sec No. ..........
1.09.00 PNEUMATIC CONTROL VALVES, ACTUATORS, AND ACCESSORIES
1.09.01 Pneumatic Control valve characteristic
Cv curves for all valves enclosed at Page No. ............ Sec. No. ...........
1.09.02 Control Valve Design Data
Control valve design data indicating
valve design specification sheets for all
valves, Technical literature for all
categories of valves included in the
proposal, Control valve sizing calculation
methods used and calculation sheets
for all valves including outlet velocity
calculations and noise calculations
and Details of special features of valve
design for
a) Cavitation services, Flashing
services and Low noise applications Page No. .......... Sec. No. ...........
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
12 OF 13
1.09.03 Control Valve Actuator Design Data
Actuator design specification for all
valves, Technical literature for each
type of actuator included in the
proposal and actuator sizing calculation
methods used and calculation
sheets for each type of actuator Page No. ............ Sec. No. ...........
1.09.04 Experience
1.09.05 Name and location of manufacturing Name ...........................................
1.09.06 Works Location .......................................
1.09.07 Separate reference lists of installations comparable to one specified herein where
the manufacturer at above has supplied the following equipment to power utilities
Control valves for flashing services, Control valves with anticavitation trims and
Other control valves for power station applications
Page No. ............ Sec. No. ...........
1.09.08 Microprocessor Based Positioners details
1. Make & Model No. ........................................................
2. E/P convertion & positioning
functions available Yes/No
3. Detailed diagnostic functions Yes/No
provided
4. Diagnostic & Historical infor- Yes/No
mation available via HART
interface
5. Position feed back (4-20mA) Yes/No
included
6. Characterisation via software Yes/No
7. Possible to stayput the valve Yes/No
or open/close or signal failure
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-01
C&I DATA
REQUIRMENTS
PAGE
13 OF 13
8. These are suitable for control Yes/No
dampers also
9. Detailed technical literature/ Page No.................. Sec No..............
catalogue furnished at
TECHNICAL DATA SHEETS
SECTION-VI
PART - G
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
CHAPTER-II
TECHNICAL INFORMATION AND
DATA TO BE SUBMITTED AFTER
AWARD OF CONTRACT
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
1 OF 12
DC 02
POST AWARD TECHNICAL
DATA
REQUIRMENTS
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
2 OF 12
TECHNICAL INFORMATION AND DATA TO BE
SUBMITTED AFTER THE AWARD OF CONTRACT
1.00.00 GENERAL
A) For standard documentation requirement by the bidder please also refer
document list at Section VI, Part-B, IIIC-02 DDCMIS Clause no: 11.00.00
B) The minimum requirements of data, drawings and instruction manuals for
this package are indicated in this Part, in addition to the requirements of
various clauses of Technical Specification, Section-VI and other applicable
Sections/Sub-sections (to be submitted in multiple copies to the Employer
as per of GTC, Part-C of Section-VI).
The Contractor shall prepare an exhaustive Master Drawing List (MDL) of all
drawings/documents/manuals to be submitted during detailed engg. stage
(including those from sub-contractors). The MDL shall contain drawing/document
no., rev. no., title, scheduled date of submission, actual date of submission,
approval status (Category & date), etc. The exact format shall be as approved by
Employer. The Contractor shall furnish the MDL to Employer before Notification of
Award (NOA). This shall be discussed and finalized during pre-award discussions.
The MDL will be modified by Contractor periodically to take care of detailed
engineering requirements. The MDL shall be submitted by Contractor for
Employer's information every month with latest status. The MDL as well as each
drawing/document/manual submitted by Contractor/sub-contractor shall also have
provision for indicating Employer's drawing/document no. corresponding to each of
Contractor's/sub-Contractor's drawing/document/manual for document control at
Employer's end.
2.00.00 DISTRIBUTED DIGITAL CONTROL, MONITORING & INFORMATION SYSTEM
(DDCMIS):
(Refer sub-section DDCMIS, Part-B of Section-VI and other applicable clauses)
2.01.00 PHASE- I (Standard Documentation)
2.01.01 Detailed standard technical literature for all types of modules, peripherals of
DDCMIS.
2.01.02 User guide/details of
(i) diagnostic stations & diagnostic facilities
(ii) programming stations & programming facilities
(iii) system documentation facilities
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
3 OF 12
2.01.03 List of all types of software used in HMIPIS, Control system, Programming &
Documentation Stations, etc.
2.01.04 Details of all types of functional software blocks available in the system for
developing control loops/logics.
2.01.05 Details of standard & customised applications in HMIPIS.
2.01.06 Details of symbols used in graphic displays/mimics in HMIPIS.
2.01.07 Contractor's standard formats for database and other displays for Employer's
inputs.
2.02.00 PHASE-II (Preliminary Design Documents)
2.02.01 Overall configuration diagram of DDCMIS showing all components/modules.
2.02.02 Detailed functional grouping diagram of Control System showing distribution of
drives, calculations showing capabilities (including spare capacity) of each group.
2.02.03 Detailed configuration diagram of HMIPIS showing all peripherals and network
connections.
2.02.04 Preliminary Bill of Material (BOM) of DDCMIS indicating no. of system cabinets,
marshalling cabinets, relay cabinets, peripherals etc. with weight, heat load, degree
of protection of each item.
2.02.05 Outline & mounting drawings for all types of cabinets, peripherals in DDCMIS.
2.02.06 NOT USED
2.02.07 Preliminary write-up & recommendation for closed loop controls as well as interlock
& protection room main equipment manufacturers (including TPS, EHTC, TSCS
etc.)
2.02.08 Preliminary control loop & logic diagram of control system (covering total TG -C&I).
2.03.00 PHASE-III (Detail Design Documents)
2.03.01 Functional Design Specification for DDCMIS containing :
(i) Design philosophy for DDCMIS indicating how the specification
requirements are translated in Contractor's system, implementation
philosophy, redundancy features, etc.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
4 OF 12
(ii) Write up on the system offered and as configured & customized for this
project.
(iii) Write up on HMIPIS elaborating
(a) System/operator functionalities for displays, logs, calculations,
historical storage, long term storage etc.
(b) Various application engineering details.
(c) System security
(d) Redundancy features
(e) Parametric requirements
(f) Programming requirements
(g) Diagnostic facilities
(h) Connectivity with LAN/WAN
(i) Interfaces for other systems like PLCs, off-line LAN/WAN of
Employer, etc.
(j) Alarm reporting
(iv) NOT USED
(v) NOT USED
(vi) Write-up on time synchronising scheme for master & slave clock system( IN
EMPLOYER'S SCOPE)
2.03.02 Single line diagram for power supply requirements and distribution scheme of
DDCMIS.
2.03.03 Grounding Scheme for DDCMIS.
2.03.04 Standard O&M manuals & programming guides e.g. for data base, mimics, logs,
HSR, etc. in HMIPIS.
2.03.05 Calculations to show how system spare capacity & expandability requirements as
specified are being met in Contractor's system.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
5 OF 12
2.03.06 Calculations to show how system parametric requirements as specified are being
met in Contractor's system.
2.03.07 Calculations to show how system availability requirements are being met in the
offered configuration of DDCMIS and details of MTBF/MTTR figures for each
component of Contractor's system.
2.03.08 Detailed BOM of DDCMIS with main & mandatory spares quantities for each of the
subsystems of DDCMIS. The detailed BOM shall be furnished for each cabinet &
peripheral indicating quantity, make, model, part no., ordering code for each
part/component so that based on this information Employer can procure these
parts/components.
2.03.09 Detailed I/O list giving complete connectivity of input & outputs. This shall include
tag no., TB no., cable no., marshalling rack/pin no., functional group, system
cabinet no., I/O module location, channel no., related loop/logic drawing no.,
process range, alarm limits, set points, use of signal for interlock/protection/
sequence/control loop/SOE/annunciation/information only etc., destination details
for output signals including system cabinet no., I/O module no., channel no., Cable
no., etc. The exact no. of fields in the list shall be as approved by Employer during
detailed engg. stage.
2.03.10 Implemented control loop & logic diagrams for control system (covering TG-C&I
systems).
2.03.11 Displays, mimics, logs, reports, etc. for HMIPIS.
2.03.12 Methodology of testing including details of testing facilities available, model test for
control loops etc.
2.03.13 General Arrangement, Internal Arrangement of all cabinets (including card layout).
2.03.14 Interfacing details indicating interfacing arrangement of various sub-systems of
Contractor's system with other systems not in Contractor's scope.
2.03.15 Interconnection schedule (ICS) for connecting all equipment/cabinets in
Contractor's scope.
2.03.16 Schematic/wiring drawings for all cabinets/systems.
2.03.17 Safety requirements for grounding, interlocks, safety control circuits, etc.
2.03.18 Site handling, storage requirement/recommendations.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
6 OF 12
2.03.19 Fuse/MCB characteristics of all types of fuses/MCBS used in the system, fuse
coordination, make/model nos. of all fuses/MCBs.
2.03.20 NOT USED
2.03.21 Detailed drawings showing complete system connectivity right from field
instruments/ devices/MCC/SWGR/actuators to individual channels of input
modules and system outputs from individual output channels to relay
cabinets/MCC/SWGR/actuators, etc. irrespective of scope of supply of
instruments/devices/actuators & cables.
2.03.22 a) Flow charts, program description and explanatory notes for all system
software, standard application software package. (Listings of all PROMs
and micro programs shall also be provided, wherever applicable).
b) Source listing of all application S/W & project specific files.
2.03.23 Detailed System Generation (Sys-Gen) procedures, i.e. the process of finally
integrating all programs and data modules in to a single system module.
2.03.24 Pre-ATS and ATS test documents including :
(i) Details of tests conducted on all modules, procedures followed, test data
used, results and interference drawn on all software modules.
(ii) Test plans for components performance checks that shall be performed by
Contractor on components/equipment before final assembly.
(iii) ATS test plan, preliminary ATS test procedures and test results and final
ATS test procedure to be conducted at works.
2.03.25 Any other design data, drawings and documents prepared for this project but not
specifically listed above.
2.04.00 PHASE-IV (Along with Equipment Dispatch)
2.04.01 Operation and maintenance manuals and diagnostics/trouble shooting guides for
all equipment/devices of DDCMIS. The manuals shall include all information
required for trouble-shooting, repair and maintenance information regarding all the
equipment furnished for the completeness of the system including on-line
insertion/removal of all types of modules.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
7 OF 12
2.04.02 Installation & Commissioning manuals.
2.04.03 Detailed instruction manuals for all systems/modules of DDCMIS, which shall
include all standard technical literature and drawings/documents, approved by
Employer.
2.04.04 Application software listings including source floppy discs/CD-ROMs for
application system software and any changes from system software earlier
submitted, system generation discs, on-line/off-line diagnostics programs, software
system maintenance manuals, special to project data files and any other document
not listed specifically here but required to understand, trouble-shoot, repair,
maintain the offered system.
2.04.05 Consolidated detailed BOM of all devices/equipment as approved, approved
datasheets bound together.
2.05.00 Phase-V
2.05.01 All changes made to the system after its dispatch from the works shall be reflected
in the related documents and those revised documents shall be handed over to the
Employer in required number of copies. (As-built drgs)
3.00.00 TG RELATED MEASURING INSTRUMENTS (Refer Sub-section- TG related
Measuring Instruments, Part-B of Section-VI and other applicable clauses)
3.01.00 Turbine Supervisory System
3.01.01 Data Sheets of various Supervisory Instruments and their accessories.
3.01.02 Consolidated BOM.
3.01.03 Installation and mounting drawing for each sensor and other accessories.
3.01.04 Technical Write-up explaining the operating principle for each Supervisory
Instrument.
3.01.05 Total Schematic giving interconnection between various system components,
power supply etc.
3.01.06 Interconnection scheme and cable schedule.
3.01.07 Technical details and User manual for the On-line Spectrum and Harmonic
Analysis system
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
8 OF 12
3.01.08 Detailed Technical Literature giving system description, all technical parameters,
installation procedure & precautions, trouble-shooting and maintenance procedure
etc.
3.02.00 BFP Turbine Supervisory System
Same as Turbine Supervisory System above.
4.00.00 MEASURING INSTRUMENTS (PRIMARY AND SECONDARY)
(Refer Sub-section-MEAS INST, Part-B of Section-VI and other applicable clauses)
a) General
1. Complete Bill of material for all instruments including all necessary
accessories etc.
2. Specification sheets/Data sheets for all instruments including
accessories provided.
3. Instruction manual covering instructions for installation, calibration,
commissioning, normal operation, trouble shooting and
maintenance for all instruments furnished by the Bidder.
4. Outline and mounting drawings, detailing all necessary dimensions
for each category of instrument, thermowell etc,
5. Installation drawings for instruments and measurement systems
furnished along with details of erection material furnished.
6. Power supply distribution- single line and wiring diagram wherever
applicable.
7. Applicable internal wiring diagram and interconnection diagram for
each type of instrument furnished.
8. External connection and interconnection wiring diagrams.
9. Name-plate design and engraving.
b) Design calculations for thermowells and flow elements etc.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
9 OF 12
c) Additional requirement for Vibration Monitoring System
a) Vibration monitor cabinet/rack, GA, internal arrangement, floor
opening etc.
b) Transducer mounting pad drawing, showing mounting hole and
other mounting details.
d) Instrument installation detail drawing showing instrument location, mounting
within enclosure/rack, floor opening (if any).
5.00.00 ELECTRICAL POWER SUPPLY
(Refer sub-section-Power Supply, Part-B of Section-VI and other applicable
clauses)
5.01.00 Design specification sheet for each type of system hardware/instrument.
5.02.00 Write up on DC system including descriptions for start-up/shut down procedures,
normal operation etc.
5.03.00 Total schematic diagrams showing connections between various
devices/instruments, for all DC system including feeder ratings.
5.04.00 General arrangement, layout & mounting drawings for all cabinets/enclosures,
including AC & DC distribution boards.
5.05.00 Calculations for sizing of batteries, battery charger, transformer etc.
5.06.00 Complete Bill of Materials for all DC power supply system equipment and system
components including associated accessories.
5.07.00 Wiring diagrams for the DC power supply system cubicles & battery.
5.08.00 All terminal board drawings required to define input/output connections for the
Power Supply System.
5.09.00 Interconnection diagram and cable schedule for DC power supply system and all
connected input and output system.
5.10.00 Detailed circuit diagrams (Including component level details) of the chargers,
inverters, static switches etc., including the circuit diagrams of various printed
circuit boards for facilitating maintenance of Power supply systems by Employer.
This shall include Specifications, ratings etc., of various components/devices
including international code numbers which will enable the Employer to procure
these components/devices from sources other than the original system supplier.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
10 OF 12
5.11.00 Instruction manual covering instructions for installation, testing, commissioning,
normal operation, trouble shooting and maintenance for each type of DC power
supply system hardware furnished and for the system as a whole.
6.00.00 PROCESS CONNECTIONS AND PIPING
(Refer Sub-section-PCP, Part-B of Section-VI and other applicable clauses)
6.01.00 Detail installation drawings showing parts and material specification for process
connection, instrument valves, valve manifolds, fittings, etc.
6.02.00 Detail technical specification including material specification, dimensional details of
each type of impulse piping, sample piping, pneumatic piping/tubing, fittings,
flexible hoses, instrument valve, Air line valves, valve manifolds Cond. pot. and all
other required accessories.
6.03.00 Bill of Materials for impulse piping, sample piping, pneumatic tubing, fittings,
instrument valves, valve manifolds, tubing trays and all other accessories required
for erection.
6.04.00 Drawings indicating complete tray system, supports, etc., giving construction and
design features.
6.05.00 Drawings and documentation required for ensuring installation and commissioning
of all instruments and systems furnished under this specification as per intent and
requirements of this specification.
6.06.00 Instruction for inspection and erection of process connection, fittings, hydraulic and
leakage test methods and procedures.
6.07.00 Local Transmitter Enclosures/Racks
Following data/drawings shall be submitted for the transmitter enclosures/racks:
a) Outline and mounting drawings for transmitter enclosure/racks.
b) Drawing showing construction details for transmitter enclosures/racks.
c) Transmitter enclosures & racks piping drawing.
d) Tubing and electrical wiring layout drawings for transmitter
enclosures/racks.
e) Transmitter power supply wiring diagram.
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
11 OF 12
f) Instrument installation detail drawing showing instrument location, mounting
within enclosure/rack, floor opening (if any).
7.00.00 INSTRUMENTATION CABLE, INTERNAL WIRING AND ELECTRICAL
FIELD CONSTRUCTION MATERIAL
(Refer sub-section-Inst. Cable, Part-B, Section-VI and other applicable clauses)
7.01.00 Data sheets for cables, conduit, junction boxes etc.
7.02.00 Cable cross sectional drawings.
7.03.00 Complete Bill of Materials for all types of instrumentation cable and electrical field
construction material and accessories.
7.04.00 Cable interconnection diagrams & cables schedules for all cables furnished by the
Contractor.
7.05.00 Instruction for laying, pulling, inspection tests and termination procedures for
cables and erection of electrical field construction materials, instruction of
continuity, identification, circuit checking and testing of cables.
8.00.00 CONTROL VALVES AND ACTUATORS
(Refer Sub-section-Control Valve, Part-B of Section-VI and other applicable
clauses)
8.01.00 Data sheets / specification sheet of each control valve & its accessories.
8.02.00 Sizing calculation of each control valve
8.03.00 General arrangement, dimensional and edge preparation drawings.
8.04.00 Complete bill of material of control valves & accessories.
8.05.00 Technical details of control valves.
8.06.00 Interconnection schemes & wiring details
8.07.00 Piping & tubing diagrams.
8.08.00 Instructions for installation, settings & maintenance.
9.00.00 Not applicable
CLAUSE NO.
Bidders Name ..
TANDA THERMAL POWER PROJECT
STAGE-II (2X660 MW)
STEAM TURBINE GENERATOR PACKAGE
TECHNICAL DATA SHEETS
SECTION - VI
PART-G
DC-02
POST AWRAD
TECHNICAL DATA
PAGE
12 OF 12
10.00.00 CONTROL & INSTRUMENTATION FOR AUX. PLANT
(Refer Sub-section-Aux. Plant Ctrl., Part-B of Section-VI and other applicable
clauses)
10.01.00 Technical data sheets for all measuring instruments & accessories.
10.02.00 Complete bill of material of main and mandatory spare quantities.
10.03.00 Other applicable details as referred in clause 4.00.00 above.
10.04.00 Configuration drawings for PLC system (including its MMI).
10.05.00 Bill of material for PLC system (including MMI) and its accessories.
10.06.00 General arrangement drawing of PLC panels with complete BOM of panel mounted
items.
10.07.00 Control schemes and functional write-up of control system including hardware and
software details.
10.08.00 Wiring and termination details.
10.09.00 Interconnection cable schedules and diagrams.
10.10.00 Powers supply single line diagram.
10.11.00 NOT USED
10.12.00 Interfacing details & diagrams of control systems with station wide LAN and signal
exchange.
10.13.00 Detailed I/O list including tag nos, process range, alarm limits, set points, cable no.
TB no. etc.
10.14.00 Details of software used in PLCs, symbols in graphic displays etc.
11.00.00 TYPE TESTS
(Refer Sub-section-C&I Type Test, Part-B of Section-VI and other applicable
clauses)
11.01.00 Type test procedures for items for which tests are to be conducted .
11.02.00 Type test certificates / results for all identified items.