SUBSECTION INDEX 1.0 2.0 3.0 4.0 5.0 General Traffic Control Voltage Ratings of Motors Start-up Spare Parts Delivery, Storage and Handling
1.0 General A. Contractor shall conform to all miscellaneous requirements as herein specified and as specified under Saudi Aramco Engineering Standards. Traffic Control For control of traffic, Contractor shall provide an adequate number of flag-men employed at his own expense. The employment or presence of traffic flag-men, shall in no way relieve Contractor of any responsibility or liability which is his, under the terms of the Contract. Contractor shall provide detour signs, barricades, etc., as and where required. A traffic flow plan shall be provided per G.I. 1021.00. All traffic signs shall be standard in compliance with Saudi Government and Saudi Aramco regulations. Voltage Ratings of Motors Unless otherwise specified or indicated on Drawing, motors rated voltages shall be in accordance with SAES-P-113. Start-Up Spare Parts Refer to schedule `G' of the Contract.
2.0 A.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
B.
PROJECT ENGINEER
____________ DATE
C. D. E.
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
3.0 A.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
4.0 A.
Date:
5.0 A. B.
Delivery, Storage and Handling Comply with the manufacturer's instructions and recommendations. Shipping:
DWG. TYPE PLANT NO. INDEX DRAWING NO.
Section 01005
SHT. NO. REV. NO.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
1 OF 2
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DATE JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
ENGG
CERT
1.
Ship equipment, material and specified spare parts complete except where partial disassembly is required by transportation regulations or for protection of components. Pack spare parts in containers bearing labels clearly designating contents and pieces of equipment for which intended. Deliver specified spare parts at same time as pertaining equipment. Deliver to Saudi Aramco after completion of Work.
2.
DESCRIPTION
3.
C.
Receiving: 1. Assume responsibility for equipment, material and spare parts before unloading from carrier at site. Inspect and inventory items upon delivery to site. Unload, haul, and store items. Pay all demurrage charges if failed to promptly unload items. Store and safeguard equipment, material and spare parts.
DATE JOB/EWO
2. 3. 4. 5.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
- END OF SECTION -
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
Section 01005
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
2 OF 2
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
PMT
Date: