PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2nd AUGUST, 2012 By: Eng. M. S. M. KAMAU, CBS, HSC Permanent Secretary Ministry of Roads
1.0 INTRODUCTION
Economic pillar of the Vision 2030 is founded on road transport infrastructure as an enabler. Connectivity through a network of roads, railways, ports, airports, water and sanitation facilities, and telecommunications. How does RSIP affect the operations of Nairobi Business Park and the entire business environment?
1.0 INTRODUCTION
Vision 2030
Social Pillar
Economic Pillar
Political Pillar
Energy
Sound Infrastructure
ICT
Transport
Energy
Telecommunications
ICT
Airports
Roads
Railways
1.0 INTRODUCTION
1.1 Role of Road Transport in Business Development Efficient Road Transport vital for Business Mobility and access for people and goods Public Transport Linkages with other modes of transport Stimulate development of new undeveloped areas
1.0 INTRODUCTION
1.2 Challenges to Efficient Road Transport Traffic congestion Low capacity of existing Roads Inefficient Junction designs Increased demand Low levels of Investment in roads Poor spatial planning Encroachment on Road reserves Unregulated public transport
1.0 INTRODUCTION
1.3 Ministrys Approach to the Challenges Proper maintenance of existing roads Expansion of existing Roads Opening and Construction of Missing Link Roads Construction of Bypasses Introduction of Bus Rapid Transit (BRT) Systems Proper coordination of land use Traffic management measures Demarcation and Protection of road reserves Private sector participation in infrastructure development and Maintenance
ONGOING PROJECTS
1.
PROJECTS ONGOING
2. NAIROBI EASTERN AND NORTHERN BYPASS
NK 0+000 - Start
EK 0+000 - Start
2.2
Nairobi Langata
Upgrading of Eastleigh Roads Rehabilitation of South C Roads Upgrading of Syokimau Katani Road Upgrading of KasaraniMwiki-Githurai Link Road (Phase I)
GoK
GoK
GoK
GoK
The project commenced on 13th March, 2012 and is expected to be completed by 24th May 2013
PLANNED PROJECTS
Non- Motorized Transport Routes MISSING LINK NAME No NMT-16 Footpaths and cycle tracks on Jogoo Road NMT-17 NMT-18 Footpaths and cycle tracks on Lusaka Road Footpaths and cycle tracks on Rabai Road Total LENGTH (KM) 4.0 5.2 2.5 11.7km
Juja Road
Kangundo Road Outer Ring Road
Njiru
NCBD
WAY FORWARD
1. 2. 3. 4. 5. 6. 7. 8.
Enhance investment in Road infrastructure Proper maintenance of existing roads Promote Safety in our roads Encourage private sector participation in Infrastructure financing and development Improve Public Transport Enhance good governance in Management of Roads. Protection of Road Reserves Proper coordination with other agencies with regard to demarcation and protection of road corridors
Thank You!