Sunteți pe pagina 1din 7

Parent Casing

Liner

Drill Pipe

Drill Pipe (Top)

Rat Hole

O/H Annulus

Over Lap Annulus

D/P Annulus

D/P (Top) Annulus

OD Open Hole ID2 ______________ 1029.4 Weight

Open Hole ID2 Liner OD2

- Casing ID2

______________ 1029.4

Liner OD2 ____________ 1029.4

- Casing ID2 - Casing ID2 Drill Pipe OD2 Drill Pipe OD2 ____________ ____________ 1029.4 1029.4

ID (Tech) Barrels per Foot (ID2 / 1029.4) (Tech) Feet per Barrel (1 / BF) (Tech) (Tech) (Tech) (Tech) (Tech) (Tech) (Tech) (Tech) (Tech) (Tech)

Areas Drill Pipe Bottom

(OD2 - ID2) x .785 (OD2 - ID2) x .785 OD2 x .785 (LOD2 - StingerOD2) x .785 Stinger OD 100mm = 3.94 70mm = 2.76

Mud#
Drill Pipe Top

CMT#
Bottom of Liner OD

S#
TOL OD Buoyancy Factor (BF)

65.63 - Mud#_____/ 65.63=

Barrel per foot x length = volume


Barrerl per foot V DP Bottom V
Liner

Length DP Top

Volume

V3
Shoe Track

V4
Rat Hole

V5
O/H Annulus

Total=

V6
Liner over lap

V7

TOC to TOL

V8
Spacer

V9
DP to surface

V10

1) Bouyed Liner Weight


Length of Liner Weight of Liner Buoyancy Factor

[=]

3) Bouyed DP Weight
Length of DP1 Weight of DP1 Buoyancy Factor

x
Length of DP2 (Top) Weight of DP2 (Top)

x
Buoyancy Factor

[=]

[=]

2) Hook Load
Liner Bouyed Weight DP Bouyed Weight

[+]

[=]

4) Work String stretch due to Liner Weight


DP1 Liner Bouyed Weight DP1 Length

(
( 30,000,000 DP2 Liner Bouyed Weight

x
DP1 Area

) [=] )
DP2 Top Length

(
( 30,000,000

x
DP2 Top Area

) [=] )

5) Length of Work String needed to set 20,000# onto TOL while cementing liner
F ( ( 30,000,000 F ( ( 30,000,000 x DP2 Top Area x ) x DP1 Area x DP2 Top Length ) ) DP1 Length )

[=]

[=]

6) Top of Cement after plugs bump


Cement Volume

Sum of V4,V5,V6,V7 (-) (=)

DP or Liner Annulus (Ft per BBl)

V8=
Top of Liner

(=)

(+/-) (=) TOC= add if cement is below the Liner top subtract if cement is above the Liner top

7) Top of Spacer after plugs bump


Spacer Pumped DP Annulus (Ft per BBl)

x
TOC /Top of Liner if below

(=)

(-)

(=) TOS=

If the spacer is in the Liner overlap figure out how many barrels in the overlap and subtract that from the

barrels of spacer pumped to complete question 7. (Length of Spacer in overlap x Overlap bpf) 9) Maximum strain that can be pulled on Work String if stuck at Top of Liner

Note: If using two workstrings, the answer will always be the lesser of the two
DP1 Tensile Drill Pipe Grade DP1 Bouyed Weight

[-]
DP2 Tensile Drill Pipe Grade Total DP Bouyed Weight

[=]

[-] Note: Answer is smaller value of DP1 or DP2 max over pull

[=] [=]

10) Work String stretch to attain maximum strain


Max over pull workstring Length DP1 Area

(
Max over pull

x
workstring Length

)/

( 30000000 X
DP2 Top Area

)/

( 30000000 X

8) Bouyed weight of Liner after cement job


F= Pressure x Area Mud# F= Spacer# F= (-)

0.052 x 0.052 x

Length of Spacer x

Bottom of Liner OD Area F=

F= Pressure x Area Mud# F= Cement# F= (-)

0.052 Top of Cement to Top of LC x 0.052 x

Bottom of Liner OD Area x F=

F= Pressure x Area Mud# F= Spacer# F= (-)

0.052 x 0.052 x

Length of Spacer x

Top of Liner OD Area F=

F= Pressure x Area Mud# F= Cement# F= (-)

0.052 x 0.052 x

Top of Cement to TOL x

Top of Liner OD Area F=

Original Liner Bouyed Weight (Add) Total down force (Add) Total down force (Subtract) Total up force (Subtract) Total up force New Weight

(=)

V1= TOL TOL=

V7=

Casing Shoe Depth=

V3=

LC

LC Depth=

V6=

V4=

Liner Depth= V5= TVD=

S-ar putea să vă placă și