Analysis for
1.00 m 1.54
3
Units bags m3 m3 Kg
LABOUR With Mechanical Mixer & Vibrartor MASON LABOUR WATER CARRIER BAR BENDER MIXER OPERTOR MIXER VIBRATOR PRIME COST (Rs.): Water Charges 1.5% Sundries (including mixer machine, transportation etc) 7.5 % Contractor's Profit
14 % Total Cost per m3 of RCC = Cost of RCC for Given Data = Rs.
CEMENT CONCRETE
Steel % by volume of Concrete SLAB BEAM COULMN 1.00% 2.00% 2.50%
Road 0.60% AMOUNT SUBTOTA (Rs.) L (Rs.) Rs. / Unit 300 900 700 60 3329 347 539 9420 13634.03
111.00 700.00 278.00 314.00 14.28 14.28 15066 226 1130 2109 18531 18531
1431.56