Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name: Civil works
to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
M / SEPCOIII / GDC / 5 / 30 11 08 / 006 Date: From 01.11.2008 to 30.11.2008 [Consolidated]
NO.
APL / SFQP / 001 Visual and Witnessed by AG's FQA, Survelliance by AG's
1 dated 27.02.2008 A Excavation Nature of soil Random, SR OK FQA
1.0 SC as per USCS Results maintained : LB
2 samples in every
APL / SFQP / 001 Witnessed by AG's FQA, Survelliance by AG's
Moisture content of Rapid moisture 2000 cum ,
2 dated 27.02.2008 A Fill materials OK FQA
Fill before compaction meter Results as per IS
2.6 Results maintained : LB
2720
For foundation
APL / SFQP / 001 Compaction test of backfill one for every Witnessed by AG's FQA, Survelliance by AG's
Dry density by core
3 dated 27.02.2008 A bakfilling by Proctor Fill materials 10 foudations for OK FQA
cutter method
2.7 density determination each compacted Results maintained : LB and SR
layer
APL / SFQP / 001 Four trials are IS 456, Witnessed by AG's FQA, Survelliance by AG's
Trial Mix (CCS) Mix
7 dated 27.02.2008 A Concrete carried out for each IS516 and OK FQA
Design
3.1.5(b) grade of concrete IS10262 Results maintained : LB and SR
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name: Equipment / System :Civil works
Simplex Infrastructure Ltd. [M/s SIL]
Contractor : M/s SEPCO III,China Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL] Manufacturer Civil
: works awarded to M/s SIL
Date of Inspection:-
From 01.11.2008 to 30.11.2008 [Consolidated] Location Unit
: No: 6 [ 660 MW TPP]
Consolidated Report
CHP M
NO.
/ SEPCOIII / Simplex / 6 / 301108 / 007 Date: From 01.11.2008 to 30.11.2008 [Consolidated]
2 samples in every
APL / SFQP / 001 Witnessed by AG's FQA, Survelliance by
Moisture content of 2000 cum ,
2 dated 27.02.2008 A Fill materials Rapid moisture meter OK AG's FQA
Fill before compaction Results as per IS
2.6 Results maintained : LB
2720
APL / SFQP / 001 Check for concrete The water is tested for its Witnessed by AG's FQA, Survelliance by
6 dated 27.02.2008 A compressive strength Water as per IS 456 at each IS 456 OK AG's FQA
3.1.4 and IST change of source Results maintained : LB
APL / SFQP / 001 Four trials are carried out IS 456, Witnessed by AG's FQA, Survelliance by
Trial Mix (CCS) Mix
7 dated 27.02.2008 A Concrete for each grade of IS516 and OK AG's FQA
Design
3.1.5(b) concrete IS10262 Results maintained : LB and SR
Copies to :
1). Contractor / Sub-Contractor 2)Executing Dept/Site 3)FQA Site 4)CQA & IG
ADANI POWER LTD
CHP CLEARANCE REPORT
Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name: Civil works
to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
APL / SFQP / 001 Visual and Witnessed by AG's FQA, Survelliance by AG's
1 dated 27.02.2008 A Excavation Nature of soil Random, SR OK FQA
1.0 SC as per USCS Results maintained : LB
APL / SFQP / 001 Four trials are IS 456, Witnessed by AG's FQA, Survelliance by AG's
Trial Mix (CCS) Mix
4 dated 27.02.2008 A Concrete carried out for each IS516 and OK FQA
Design
3.1.5(b) grade of concrete IS10262 Results maintained : LB and SR
One set of 6 cubes
per 100 cubic
meter or part
APL / SFQP / 001 thereof for each Witnessed by AG's FQA, Survelliance by AG's
Crushing strength IS 456, OK
5 dated 27.02.2008 A Concrete grade of concrete. FQA
Work test cubes IS 516
3.1.5 ( c) 3 cubes tested at Results maintained : LB and SR
age of 7 days and
3 cubes at age of
28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name: Civil works
to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
M / SEPCOIII / GDC / 5 / 2912 08 / 00 Date: From 01.12.2008 to 29.12.2008 [Consolidated]
NO.
APL / SFQP / 001 Visual and Witnessed by AG's FQA, Survelliance by AG's
1 dated 27.02.2008 A Excavation Nature of soil Random, SR OK FQA
1.0 SC as per USCS Results maintained : LB
2 samples in every
APL / SFQP / 001 Witnessed by AG's FQA, Survelliance by AG's
Moisture content of Rapid moisture 2000 cum ,
2 dated 27.02.2008 A Fill materials OK FQA
Fill before compaction meter Results as per IS
2.6 Results maintained : LB
2720
For foundation
APL / SFQP / 001 Compaction test of backfill one for every Witnessed by AG's FQA, Survelliance by AG's
Dry density by core
3 dated 27.02.2008 A bakfilling by Proctor Fill materials 10 foudations for OK FQA
cutter method
2.7 density determination each compacted Results maintained : LB and SR
layer
APL / SFQP / 001 Four trials are IS 456, Witnessed by AG's FQA, Survelliance by AG's
Trail Mix (CCS) Mix
7 dated 27.02.2008 A Concrete carried out for each IS516 and OK FQA
Design
3.1.5(b) grade of concrete IS10262 Results maintained : LB and SR
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name: Equipment / System :Civil works
Simplex Infrastructure Ltd. [M/s SIL]
Contractor : M/s SEPCO III,China Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL] Manufacturer C
: ivil works awarded to M/s SIL
Date of Inspection:-
From 01.12.2008 to 31.12.2008 [Consolidated] Location Unit
: No: 6 [ 660 MW TPP]
Consolidated Report
CHP
M / SEPCOIII / Simplex / 6 / 3112 08 / 0 Date: From 01.12.2008 to 31.12.2008 [Consolidated]
NO.
2 samples in every
APL / SFQP / 001 Witnessed by AG's FQA, Survelliance by
Moisture content of 2000 cum ,
2 dated 27.02.2008 A Fill materials Rapid moisture meter OK AG's FQA
Fill before compaction Results as per IS
2.6 Results maintained : LB
2720
APL / SFQP / 001 Check for concrete The water is tested for its Witnessed by AG's FQA, Survelliance by
6 dated 27.02.2008 A compressive strength Water as per IS 456 at each IS 456 OK AG's FQA
3.1.4 and IST change of source Results maintained : LB
APL / SFQP / 001 Four trials are carried out IS 456, Witnessed by AG's FQA, Survelliance by
Trial Mix (CCS) Mix
7 dated 27.02.2008 A Concrete for each grade of IS516 and OK AG's FQA
Design
3.1.5(b) concrete IS10262 Results maintained : LB and SR
Copies to :
1). Contractor / Sub-Contractor 2)Executing Dept/Site 3)FQA Site 4)CQA & IG
ADANI POWER LTD
CHP CLEARANCE REPORT
Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name: Civil works
to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
M / SEPCOIII / GDC / 7 / 291208 / 008 Date: From 01.12.2008 to 29.12.2008 [Consolidated]
NO.
APL / SFQP / 001 Visual and Witnessed by AG's FQA, Survelliance by AG's
1 dated 27.02.2008 A Excavation Nature of soil Random, SR OK FQA
1.0 SC as per USCS Results maintained : LB
APL / SFQP / 001 Four trials are IS 456, Witnessed by AG's FQA, Survelliance by AG's
Trial Mix (CCS) Mix
4 dated 27.02.2008 A Concrete carried out for each IS516 and OK FQA
Design
3.1.5(b) grade of concrete IS10262 Results maintained : LB and SR
One set of 6 cubes
per 100 cubic
meter or part
APL / SFQP / 001 thereof for each Witnessed by AG's FQA, Survelliance by AG's
Crushing strength IS 456, OK
5 dated 27.02.2008 A Concrete grade of concrete. FQA
Work test cubes IS 516
3.1.5 ( c) 3 cubes tested at Results maintained : LB and SR
age of 7 days and
3 cubes at age of
28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :
Under EPC awarded to SEPCO III, Civil works are awarded to M/s
Contract Name: Equipment / System :Civil works
Simplex Infrastructure Ltd. [M/s SIL]
Contractor : M/s SEPCO III,China Sub- Contractor : M/s Simplex Infrastructure Ltd. [M/s SIL] Manufacturer Civil
: works awarded to M/s SIL
Date of Inspection:-
From 01.12.2008 to 31.12.2008 [Consolidated] Location Unit
: No: 8 [ 660 MW TPP]
Consolidated Report
CHP
M / SEPCOIII / Simplex / 8 / 311208 / 00 Date: From 01.12.2008 to 31.12.2008 [Consolidated]
NO.
APL / SFQP / 001 Check for concrete The water is tested for its Witnessed by AG's FQA, Survelliance by
3 dated 27.02.2008 A compressive strength Water as per IS 456 at each IS 456 OK AG's FQA
3.1.4 and IST change of source Results maintained : LB
APL / SFQP / 001 Four trials are carried out IS 456, Witnessed by AG's FQA, Survelliance by
Trial Mix (CCS) Mix
4 dated 27.02.2008 A Concrete for each grade of IS516 and OK AG's FQA
Design
3.1.5(b) concrete IS10262 Results maintained : LB and SR
One set of 6 cubes per
100 cubic meter or part
APL / SFQP / 001 thereof for each grade of OK Witnessed by AG's FQA, Survelliance by
Crushing strength IS 456,
5 dated 27.02.2008 A Concrete concrete. [Separate AG's FQA
Work test cubes IS 516
3.1.5 ( c) 3 cubes tested at age of sheets attached] Results maintained : LB and SR
7 days and 3 cubes at
age of 28 days
Copies to :
1). Contractor / Sub-Contractor 2)Executing Dept/Site 3)FQA Site 4)CQA & IG
ADANI POWER LTD
CHP CLEARANCE REPORT
Under EPC awarded to SEPCO III, Civil works are awarded Equipment /
Contract Name: Civil works
to M/s Gannon Dunkerley and Company Ltd. [M/s GDC] System :
CHP
M / SEPCOIII / GDC / 9 / 2912 08 / 0 Date: From 01.12.2008 to 29.12.2008 [Consolidated]
NO.
APL / SFQP / 001 Visual and Witnessed by AG's FQA, Survelliance by AG's
1 dated 27.02.2008 A Excavation Nature of soil Random, SR OK FQA
1.0 SC as per USCS Results maintained : LB
APL / SFQP / 001 Four trials are IS 456, Witnessed by AG's FQA, Survelliance by AG's
Trial Mix (CCS) Mix
4 dated 27.02.2008 A Concrete carried out for each IS516 and OK FQA
Design
3.1.5(b) grade of concrete IS10262 Results maintained : LB and SR
One set of 6 cubes
per 100 cubic
meter or part
APL / SFQP / 001 thereof for each Witnessed by AG's FQA, Survelliance by AG's
Crushing strength IS 456, OK
5 dated 27.02.2008 A Concrete grade of concrete. FQA
Work test cubes IS 516
3.1.5 ( c) 3 cubes tested at Results maintained : LB and SR
age of 7 days and
3 cubes at age of
28 days
Contractor M/s SEPCO III Manufacturer M/s GDC Executing Department ,APL Mundra FQA,APL Mundra
Copies to :