Process Process & & Instrumentation Instrumentation Diagrams Diagrams
Definition Definition Standards Standards Examples Examples The The Big Big Picture Picture Task Task Summary Summary Cost Cost Considerations Considerations
P P& & ID ID Development Development Hazard Hazard & & Operability Operability Studies Studies Functional Functional Description Description Detailed Detailed Design Design Phase Phase Treatment Treatment Plant Plant Construction Construction Treatment Treatment Plant Plant Commissioning Commissioning and and Operation Operation
Definition
A Process and Instrumentation Diagram (P&ID) is a detailed graphical representation of a process including the hardware and software (eg. piping, equipment and instrumentation) necessary to design, construct and operate the facility. In Other Words: P&IDs are the foundation on which the successful design, construction and operation of a treatment plant will depend.
Standards
A standard set of symbols is used to prepare drawings of processes. The instrument symbols used in these drawings are generally based on ISA*35.1 Although ISA-35.1 is an excellent flexible document to define symbolism there is no universal standard for the development of P&IDs Every organization has to develop an unique standard. Dayton & Knight uses 2 legend sheets for this purpose: P1 - Standard tags and abbreviations P2 - Standard symbols
* The Instrumentation, Systems and Automation Society
P1
P1
P1
P1
P2
P2
P2
Pre-design
? ? ?
? ?
Task Summary
Pre-implementation Phase Implementation Phase
Objectives Finalized
Design Options
Design Parameters
Process Diagrams
P&IDs
Design Documents
Operation
? ? ?
? ?
Cost Considerations
Pre-implementation Phase Implementation Phase
Costs Higher and Escalate as Project Progresses P&IDs Developed, Frozen & Approved at an Early Stage in order to Control Costs & Avoid Delays
? ? ? ? ? ?
The Cloud of Unknowing Operating Treatment Plant
P&ID Development
Pilot Studies
Freeze!
Process Diagrams
Preliminary P&IDs
HAZOPS
Final P&IDs
Design Documents
Key Steps
Functional Description
Method Method
Questioning Questioning & & systematic systematic analysis analysis using using keywords keywords to to focus focus attention attention of of team team upon upon deviations, deviations, their their possible possible causes causes and and effects. effects.
Keywords Keywords Divided Divided into into two two subsets subsets
Primary Primary Keywords Keywords focus focus attention attention on on a a particular particular aspect aspect of of the the design design intent intent Secondary Secondary Keywords, Keywords, which which (when (when combined combined with with a a Primary Primary Keyword) Keyword) suggest suggest possible possible deviations deviations
HAZOPS (contd)
Examples Examples of of Primary Primary Keywords: Keywords:
Flow, Flow, Pressure, Pressure, Temperature, Temperature, Level Level
Method Method
P&IDs P&IDs are are divided divided into into subsystems subsystems and and each each is is examined examined using using primary primary and and secondary secondary keywords. keywords. The The process process is is guided guided by by a a facilitator facilitator who who frequently frequently uses uses software software to to record record the the proceedings proceedings and and produce produce a a final final report. report. The The input input of of all all participants participants is is encouraged. encouraged. Results Results are are recorded recorded in in a a columnar columnar format format similar similar to to the the following following example: example: Deviation Cause Consequence Action
The The final final report report will will recommend recommend changes changes to to be be made made to to the the P&IDs P&IDs to to eliminate eliminate hazards hazards and and improve improve operability. operability.
HAZOPS (contd)
Examples of Sustainability Provisions:
Results Results are are recorded recorded in in a a columnar columnar format format similar similar to to the the following following example: example:
Deviation Energy Use Rates of NON Renewable Resources Creation of nonbiodegradables Degradation of environement Quality of life Cause Consequence Action
HAZOPS (contd)
Following receipt of the HAZOPS Report, to the greatest extent possible, Finalize & Sign off the P&IDs.
This is a key step in bringing the project in on time and under budget.
Method:
The The process process is is broken broken into into discrete discrete systems, systems, each each of of which which is is described described in in a a systematic systematic manner. manner. Flexibility Flexibility is is not not permitted. permitted. Headings Headings such such as as the the following following are are used: used:
System Overview Subsystem A
Subsystem Abstract Equipment Abstract Technical Description Interfaces SCADA Interface Initialisation Alarms
Subsystem B
etc.
P&IDs
Pre-commissioning Planning
Commissioning
Operation
Debugging