Sunteți pe pagina 1din 3

REAH JANISE DESIGNS

BLUE CABLE MITTS

MATERIALS Lion Brand Microspun yarn Lilac: 1 skein Double-pointed needles, size 5 GAUGE (stockinette) 5 stitches = 1 inch 8 rows = 1 inch

ABBREVIATIONS K = knit P = pearl BO = bind off sts = stitches cn = cable needle dp = double pointed needle pm = place marker sm = slip marker m1l = make one left: with left needle, lift strand between stitches from front to back, knit the lifted stitch through the back m1r = make one right: with left needle, life strand between stitches frm back to front, knit the lifted stitch through the front 6-st right cross: slip 4 to cn and hold in back of work, k 2, k 4 from cn 6-st left cross: slip 2 to cn and hold in front of work, k 4, k 2 from cn 3-st left cross: slp 2 to cn and hold in front, p 1, k 2 from cn 3-st right cross: slip 1 to cn and hold in back, k2, p 1 from cn

BEGIN MITT Both mitts are worked the same except for the thumb gussets. Cast on 42 stitches on 3 dp needles

Copyright Reah Janise Kauffman, 2013.


May be used free of charge. This material may not be reprinted or used for commercial purposes without my consent. Please ask if you would like to use this pattern for reasons other than personal use.

REAH JANISE DESIGNS

Cuff: K 1, p 1 ribbing for 4 inches Begin pattern rows Needle 1 will hold 18 sts for cable pattern. Needles 2 and 3 will hold 12 sts ea. Cable pattern: Row 1: p 2, k 6, p 2, k 6, p 2 Row 2 and all even-numbered rows work sts as appear Row 3: p 2, 6-st right cross, p 2, 6-st left cross, p 2 Row 5: p 2, k 4, 3-st left cross, 3-st right cross, k 4, p 2 Row 7: p 2, k 4, p 1, sl 2 to cn, hold in front, k 2, k 2 from cn, p 1, k 4, p 2 Row 9: p 2, k 4, right cross, left cross, k 4, p 2 K all sts on needles 2 and 3 k After 2 inches begin thumb gusset Right thumb gusset: Work on needle 2 Row 1: k 5, pm, m1r, k 1, m1l, pm, k 6 Row 2 and all even-numbered rows k all sts Row 3: k5, sm, m1r, k 3, m1l, sm, k 6 Row 5: k 5, sm, m1r, k 5, m1l, sm, k 6 Row 7: k 5, sm, m1r, k 7, m1l, sm, k 6 Row 9: k 5, sm, m1r, k 9, m1l, sm, k 6 Row 11: k 5, sm, m1r, k 11, m1l, sm, k 6 Row 12: k5, remove marker, slip 11 sts onto waste yarn, m1l, k 6 Continue in pattern for 2 inches BO all stitches Left thumb gusset: Work on needle 3 Row 1, k 6, pm, m1r, k 1, m1l, pm, k 5 Row 2 and all even-numbered rows k all sts Row 3: k 6, sm, m1r, k 3, m1l, sm, k 5 Row 5: k 6, sm, m1r, k 5, m1l, sm, k 5 Row 7: k 6, sm, m1r, k 7, m1l, sm, k 5 Row 9: k 6, sm, m1r, k 9, m1l, sm, k 5 Row 11: k 6, sm, m1r, k 11, m1l, sm, k 5 Row 12: k 6, remove marker, slip 11 sts onto waste yarn, m1l, k 6

Copyright Reah Janise Kauffman, 2013.


May be used free of charge. This material may not be reprinted or used for commercial purposes without my consent. Please ask if you would like to use this pattern for reasons other than personal use.

REAH JANISE DESIGNS

Shaping the thumb: Slip 11 sts from waste yarn onto 2 dp needles Pick up 3 sts K 14 sts for 5 rows BO all sts Weave in ends. Cable Pattern:

Copyright Reah Janise Kauffman, 2013.


May be used free of charge. This material may not be reprinted or used for commercial purposes without my consent. Please ask if you would like to use this pattern for reasons other than personal use.

S-ar putea să vă placă și