NORSOK STANDARD

DESIGN PRINCIPLES

CODING SYSTEM

Z-DP-002 Rev. 1, January 1995

Coding System

Z-DP-002 Rev. 1, January 1995

CONTENTS
1. FOREWORD 2. SCOPE 3. NORMATIVE REFERENCES 4. DEFINITIONS AND ABBREVIATIONS 4.1 Definitions 4.2 Abbreviations 5. CODING SYSTEM APPLICATION 6. PROJECT CODING 7. FUNCTION CODING ELEMENTS 7.1 General Format 7.2 System Function 7.3 Item function 8. TAG CODING 8.1 General format 8.2 Piping 8.3 Junction box and cable numbering 9. DOCUMENT CODING 9.1 General Format 9.2 Document Number 9.3 Mandatory attributes 10. BULK COMPONENT/COMPONENT IDENTIFICATION 11. INFORMATIVE REFERENCES 2 2 2 3 3 4 4 4 4 4 4 8 9 9 10 10 12 12 12 13 13 14

NORSOK Standard

1 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

1.

FOREWORD
This standard has been developed by the NORSOK standardisation work group for the widest possible national and international application. For the purpose of assisting those using this document the following information is given: The coding system in this standard is based on a functional breakdown of systems into subsystems and units. This is due to the following main objectives: Compliance with the functional system specific NORSOK standards. To relate all documentation to systems, subsystems and units to ensure traceability and use. To enable commissioning and operation activities on systems, subsystems and units without additional coding. To enable contractors and suppliers to number their deliveries and documentation with a minimum of centralised coordination. To minimize the requirements for documentation of identical items on different systems, subsystems or units.

All annexes are normative except annex I, Application Examples, which is informative.

2.

SCOPE
This coding system has been developed for tag coding and technical document coding by breakdown of an installation into functions. In addition identification of bulk components/components have been established with a possible future relation to a new article coding system.

3.

NORMATIVE REFERENCES
ISO 3511-1 (NS 1438) ISO 3511-2 Process Measurement Control Functions and Instrumentation Symbolic Representation Part I: Basic Requirements Process Measurement Control Functions and Instrumentation Symbolic Representation Part II: Extension of Basic Requirements Process Measurement Control Functions and Instrumentation Symbolic Representation Part III: Detailed Symbols for Instrument Interconnection Diagrams

ISO 3511-3

NORSOK Standard

2 of 57

Coding System

Z-DP-002 Rev. 1, January 1995 Item Designation in Electro Technology Supplier's Documentation of Equipment (4.4, Acceptance Codes)

IEC 750 NS 5820

4.
4.1

DEFINITIONS AND ABBREVIATIONS


Definitions A N Z = = = Alphabetic character Numeric character Alphanumeric character A platform consists of systems which performs process, utility and service functions etc. The systems may be broken down into functional subsystems. The subsystems may be broken down into project specific subsubsystems. The subsystems/sub-subsystems may be broken down into project specific units. The unit may be broken down into project specific subunits. The unit/subunit may be broken down into project specific items. An item is the lowest level of functional identification. Units or items which does not require an individual physical identity (tag no.). A bulk component shall be identified by manufacturer's name and model/type identification. Items which does require an individual physical identity. A component shall be identified by manufacturer's name, model/type identification and serial number. (Note that functional systems, subsystems and units shall not be identified as a component because it has a serial number, but because of additional requirements for identification/traceability (recertification, non-interchangeable spare parts etc.)) Part Article code Part is any part of a bulk component/component. Part shall be identified by manufacturer's model/type identification. Unique operator specific numbers assigned by the individual operators to all physical parts that fulfill identical functional and interface requirements. 3 of 57

System Subsystem Sub-subsystems Unit Subunit Item Bulk component

Component

NORSOK Standard

Coding System

Z-DP-002 Rev. 1, January 1995

4.2

Abbreviations ISO NS IEC DFO International Standardisation Organisation "Norsk standard" International Electrotechnical Commission Documentation for Operation

5.

CODING SYSTEM APPLICATION


The application of the coding system is described for systems, subsystems, units, items and documents in clauses 7, 8 and 9 below. Coding for lower levels, like assembly, bulk component or part is not part of this standard (see also clause 10). The specific coding details consists of the following elements: System and subsystem codes (Annex A) Type and function codes (Annex B) Pipeline and piping codes (Annex C) Discipline and administration codes (Annex D) Document type codes (Annex E) Area codes (Annex F) Revision, status and acceptance codes (Annex G) Originator and responsible party codes (Annex H)

6.

PROJECT CODING
The project identification/number is standardised to a maximum of six alphanumeric characters. The project number will be used as a reference in all tag and document coding. The project number shall be used as an attribute to the coding system (available in the data systems) and will therefore not be a visible part of a tag or document code.

7.
7.1

FUNCTION CODING ELEMENTS


General Format Functional coding consists of system, subsystem, unit and item identification. It is usually grouped in system and item functions.

7.2

System Function The system code consists of six numeric characters, broken down as follows:

NORSOK Standard

4 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

NN - NN - NN System Subsystem Unit Example of system code: Cooling medium and refrigeration sysem, System 40:

40

00

00

For cooling medium pumping, Subsystem 30:

40

30

00

For pump unit, Unit 10:

40

30

10

For systems that are not broken down, the various relevant characters shall be set to 0 (zero). 7.2.1 System The systems are defined by the first and second numeric character of the six-character functional code. Reference is made to Annex A, System and Subsystem Coding. Interfaces to other systems shall be set at items serving isolation and separation purposes (e.g. valves, junction boxes, distribution boards, termination racks etc.). 7.2.2 Subsystem The subsystems are defined by the third and fourth numeric character of the six-character functional code. Reference is made to Annex A, System and Subsystem Coding. The interfaces between subsystems shall be defined as for systems.

NORSOK Standard

5 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

7.2.3

Sub-subsystem The fourth numeric character may be used for additional breakdown of subsystems into sub-subsystems. The sub-subsystems shall be defined by the individual project. The differentiation of the fourth numeric character may be required for mechanical completion, precommissioning, commissioning and operation activities. Example of system, subsystem and sub-subsystem code: Cooling medium and refrigiration system, System 40:

40

00

00

For cooling medium pumping, Subsystem 30:

40

30

00

For project specific sub-system 31:

40

31

00

7.2.4

Unit The units are defined by the fifth and sixth numeric character of the six-character functional coding. The units shall be defined by the individual project.

7.2.5

Subunit The sixth numeric character may be used for additional breakdown of units into subunits. The unit code shall define main units in steps of ten as 10, 20, 30, 40 etc. Subunits may be identified as 11, 12, 13 etc. within unit 10 etc. Example of unit and subunit code: For pump unit in subsystem, Unit 10:

40

30

10

NORSOK Standard

6 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Pump. Subunit 11:

40

30

11

Pump, Subunit 12:

40

30

12

Pump, Subunt 13:

40

30

13

NORSOK Standard

7 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Fig. 1

Example of function coding for some subsystems within system 40, Cooling medium and refrigeration system.

7.3

Item function The item function code consists of maximum seven characters, broken down as follows: AAAA NN Item according to Annex B (max four char.) Sequence number (max two characters) Parallell items (one character) Examples: Temperature switch Junction box TSHH01 TSHH01A EJ01 (sequence number 01) (parallell item A) (sequence number) Z

Item codes are unique within a system but common to all identical items in various systems.

NORSOK Standard

8 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Examples: Valve, pump, antenna, temperature transmitter, pressure switch, electrical motor, junction box.

8.
8.1

TAG CODING
General format The actual tag coding consists of the following elements (described in clause 7): System function coding. Item function coding.

Tagging means to equip an item function with a label that gives it a unique identification. A tag is also allocated to a location. Note: Tagging shall identify the lowest item function. The tag code consists of:

System

Item

40-31-11 - TSHH01A

40 - 30 - 11 - TSHH01A
System: Subsystem: Unit: Item: Cooling medium and refrigiration system Cooling medium pumping Pump Temperature switch high high

System
Tag label :

Item 40-30-11
Tag label example :

TSHH01A

NORSOK Standard

9 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Fig. 2 8.2 Piping

Example of tag coding showing parallell units and items

Piping shall be labelled according to the system and item function coding in clause 8.1. Item identification shall be according to Annex C, Pipeline and Piping Codes. 8.3 Junction box and cable numbering Junction box and cable coding consists of system and item function coding as defined in clause 8.1.

NORSOK Standard

10 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

The item code consists of:

AA A NN
Discipline code (EL - Electrical low voltage) (EH - Electrical low voltage) (EG - Electrical ground) (ET - Electrical heat tracing) (I - Instrumentation) (T - Telecommunication) J - Junction box W - Cable Sequence number For certain junction boxes with multiple system cabling, the junction boxes shall be numbered with system 87, as detailed in Annex A, System and Subsystem Codes. Examples: Junction box in system 84-20:

84 - 20 - 01 - ELJ01
System: Subsystem: Unit: Item: Emerg. power generation and distrib. Emergency power distribution Switch gear unit Junction box

Tag label example:

84 -20 -01 ELJ01

NORSOK Standard

11 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Junction box in system 86-11:

86 - 11 - 00 - TJ01
System: Subsystem: Unit: Item: Telecommunication Public address and alarm Possible subsystem Junction box

Tag label example:

86 -11 -00 TJ01

9.
9.1

DOCUMENT CODING
General Format All documents produced shall be traceable by the project document code. Project specific documentation from manufacturer/supplier shall be identified according to this standard.

9.2

Document Number The identification structure is:

Project

Function

Sequence number

(ZZZZZZ) - NN-NN-NN - NNN


Project identification (attribute) System identification Sequence number (max three characters) The sequence number relates to the lowest level of identification. Number allocation shall be done by the system/unit designer. NORSOK Standard 12 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Documentation of manufacturer's standard units and standard bulk components/components shall be identified according to manufacturer's normal identification system. In addition necessary project identification shall be given as required to enable registration and tracing in the project. This will provide the required connection between documents to: System/subsystem/units/items (tags). Bulk component/component identification. Manufacturer's normal identification system.

Note: Documents not related to a specific system shall be identified as: ZZZZZZ 00-00-00 NNN. Piping GA drawings shall be identified as: ZZZZZZ 90-10-00 NNN. 9.3 Mandatory attributes Mandatory attributes to documents shall be used to enable the necessary tracing without having long and complex document numbers. Acceptance Code (Annex G) Acceptance Status Code (Annex G) Area Code (Annex F) Discipline (Annex D) Document Title/Subject Document Type (Annex E) Originator Code (Annex H) Responsible Party (Annex H) Revision Code (Annex G) Revision Date Sheet number shall be used as required.

10.

BULK COMPONENT/COMPONENT IDENTIFICATION


The third element of identification is the bulk component/component identification. The part element is physical equipment identified by manufacturer's name and model/type. A serial number may be identified if additional identification/traceability is required.

NORSOK Standard

13 of 57

Coding System

Z-DP-002 Rev. 1, January 1995

Functional tag coding System


Fig. 3

Item

Bulk component/component equipment identifcation

Relation between functional tag (system/subsystem/unit/item) coding and bulk component/component equipment identification.

The bulk component/component identification should be related to an article coding system for simple identification of items to simplify spare part administration and documentation.

Fig. 4

Relation between functional tag coding and physical equipment identification.

Note that the article code system is not part of this coding system standard. An article code system should be administrated by the industry.

11.

INFORMATIVE REFERENCES
This coding system structure and elements are based on: AIR Transport Association of America (ATA), ATA-100 International Atomic Energy Agency Coding System Hydro, Coding manual Saga, Engineering Numbering System, ENS ASG-004 Statoil, Statoil Engineering Numbering System, SENS A-SG-014

NORSOK Standard

14 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

ANNEX A SYSTEM AND SUBSYSTEM CODES (NORMATIVE)

NORSOK Standard

15 of 57

Coding System Annex A SYSTEM CODES The following main grouping of platform systems is used. System 01 - 09 10 - 19 20 - 39 40 - 49 50 - 69 70 - 79 80 - 89 90 - 99 System Main Groups

Z-DP-002 Rev. 1, January 1995

Reserved for systems that are specific to a particular plant Drilling and well related systems for oil and gas production (Well Related systems for oil and gas Production) Process Systems that comprise the systems directly involved in the production of the plant Process Support and Feed/Product Storage that comprise all systems which have a mass or heat interaction with the process system Utility Systems that comprise all systems necessary for the plant to operate, but are not part of the actual production Safety and Facility Systems Electrical - Telecommunication - Instrumentation Systems Structural, Civil Systems

NORSOK Standard

16 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

10

DRILLING SYSTEMS
Derrick/mast and hoisting Rotary equipment Pipehandling Drillfloor and substructure with equipment Coil tubing Snubbing Well testing

10 - 10 10 - 20 10 - 30 10 - 40 10 - 50 10 - 60 10 - 70

11

DRILLING PROCESS SYSTEMS


Bulk Mud mixing and storage High pressure mud Mud treatment Cementing Cutting disposal Mud base fluid Completion fluid

11 - 10 11 - 20 11 - 30 11 - 40 11 - 50 11 - 60 11 - 70 11 - 80

12

DRILLING WELLCONTROL SYSTEMS


Kill and choke manifold BOP, diverter and drilling riser Kill subsystem Well control subsystem Well logging subsystem, rental equipment

12 - 10 12 - 20 12 - 30 12 - 40 12 - 50

13

RISER AND WELL SYSTEM


Well subsystem Production / injection riser Oil export riser Gas export riser Downhole equipment

13 - 10 13 - 20 13 - 30 13 - 40 13 - 50

14

RISER OPERATIONS SYSTEMS


Riser guidance subsystem Marine growth cleaning subsystem Riser position reference subsystem Riser inspection subsystem ROV subsystem 17 of 57

14 - 10 14 - 20 14 - 30 14 - 40 14 - 50 NORSOK Standard

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

15

WELL RELATED PRODUCTION SYSTEMS TOPSIDE


Wellbay production subsystem Well testing subsystem Kill subsystem Subsea manifold Subsea pigging

15 - 10 15 - 20 15 - 30 15 - 40 15 - 50

16

GAS AND WATER INJECTION WELL SYSTEM TOPSIDE


Water injection to subsea templates Water injection to platform wells Water injection to pigging subsystems Gas injection to platform wells

16 - 10 16 - 20 16 - 30 16 - 40

17

SUBSEA PRODUCTION SYSTEM - INSTALLATION, MAINTENANCE AND WORKOVER SYSTEMS


Drilling equipment Handling equipment Completion riser subsystem Workover control subsystem Pull-in and connection subsystem ROMV subsystem Testing sSystem Running tool subsystem Dummy wellbay subsystem Leveling system-templates

17 - 10 17 - 20 17 - 30 17 - 40 17 - 50 17 - 60 17 - 70 17 - 80 17 - 90 17 - 95

18 19

NOT DEFINED SUBSEA PRODUCTION SYSTEM


Wellhead equipment Manifold equipment Downhole equipment Flowlines Flexible risers and jumpers Flexible jumpers Subsea control subsystem and umbilicals Subsea tree subsystem TFL system 18 of 57

19 - 10 19 - 15 19 - 20 19 - 25 19 - 30 19 - 35 19 - 40 19 - 50 19 - 60 NORSOK Standard

Coding System Annex A 19 - 70 19 - 80 Wellbay subsystem Tubing hanger subsystem

Z-DP-002 Rev. 1, January 1995

20

SEPARATION AND STABILIZATION


Production manifold/headers Heaters and separators

20 - 10 20 - 20

21

CRUDE HANDLING
Crude pumping (storage/pipeline/loading) Crude storage Crude metering Crude offshore loading FPU/FPSO offloading Articulated loading column SPAR busy Single point mooring buoy Anchor leg mooring UKOLS offloading STL (Submerged turret loading)

21 - 10 21 - 20 21 - 30 21 - 40 21 - 41 21 - 42 21 - 43 21 - 44 21 - 45 21 - 46 21 - 47

22 23

NOT DEFINED GAS RECOMPRESSION, COOLING AND SCRUBBING


Gas cooling and scrubbing Gas recompression

23 - 10 23 - 20

24

GAS TREATMENT
Gas cooling and scrubbing Gas dehydration Regeneration

24 - 10 24 - 20 24 - 30

25

NOT DEFINED

NORSOK Standard

19 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

26

GAS REINJECTION TO RESERVOIR


Reinjection gas cooling and scrubbing Reinjection gas compression Reinjection manifold

26 - 10 26 - 20 26 - 30

27

GAS PIPELINE COMPRESSION, METERING AND TRANSFER


Gas cooling and scrubbing Gas pipeline compression Gas metering

27 - 10 27 - 20 27 - 30

28

GAS SWEETENING
H2S removal CO2 removal

28 - 10 28 - 20

29 30

NOT DEFINED OIL PIPELINE, EXPORT STABILIZED OIL


Pipeline Pig launching

30 - 10 30 - 20

31

CONDENSATE EXPORT PIPELINE


Pipeline Pig Launching

31 - 10 31 - 20

32 GAS EXPORT PIPELINE


32 - 10 32 - 20 Pipeline Pig launching

33

NOT DEFINED

NORSOK Standard

20 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

34

WATER PIPELINE HIGH PRESSURE


Risers Pipeline Pig launching

34 - 10 34 - 20 34 - 30

35

METHANOL PIPELINE
Risers Pipeline Pig launching

35 - 10 35 - 20 35 - 30

36

PIPELINE WELLSTREAM, MULTIPHASE


Risers Pipeline Pig launching

36 - 10 36 - 20 36 - 30

37 - 39 40

NOT DEFINED

COOLING MEDIUM AND REFRIGERATION SYSTEM


Cooling medium Cooling medium expansion Cooling medium pumping Cooling medium cooling Cooling medium distribution Refrigeration

40 - 10 40 - 20 40 - 30 40 - 40 40 - 50 40 - 70

41

HEATING MEDIUM SYSTEM


Heating medium Heating medium expansion Heating medium pumping Heating medium heating Heating medium distribution

41 - 10 41 - 20 41 - 30 41 - 40 41 - 50

NORSOK Standard

21 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

42

CHEMICAL INJECTION SYSTEM


Methanol injection Methanol storage Methanol pumping Methanol distribution topside Methanol distribution subsea Chlorination Hypochlorite production Hypochlorite storage Hypochlorite distribution Injection chemicals Antifoam Biocid Oxygen scavenger Corrosion inhibitor De-emulsifier Scale inhibitor Polyelectrolyte Glycol regeneration Glycol filtration Glycol treatment Glycol distribution

42 - 10 42 - 11 42 - 12 42 - 13 42 - 14 42 - 20 42 - 21 42 - 22 42 - 23 42 - 30 42 - 31 42 - 32 42 - 33 42 - 34 42 - 35 42 - 36 42 - 37 42 - 40 42 - 41 42 - 42 42 - 43

43

FLARE, VENT AND BLOW-DOWN SYSTEMS

43 - 10 High pressure flaring 43 - 11 HP flare header/knock-out drum 43 - 12 HP flare and metering43 - 20 Low pressure flaring 43 - 21 LP flare header/knock-out drum 43 - 22 LP flare and metering 43 - 30 Maintenance flaring 43 - 31 Maintenance header/knock-out drum 43 - 32 Maintenance flare and metering 43 - 40 Atmospheric venting 43 - 50 Flame generation and pilot flaring 44 OILY WATER TREATMENT 44 - 10 Produced water treatment 44 - 11 Produced water hydrocyclones 44 - 12 Produced water degassing drum and reclaimed sump 44 - 20 Ballast water treatment 44 - 30 Sludge treatment 44 - 40 Bilge subsystem 45 FUEL GAS 45 - 10 HP fuel gas 45 - 11 HP fuel gas heating/scrubbing 45 - 12 HP fuel gas distribution NORSOK Standard 22 of 57

Coding System Annex A 45 - 20 45 - 21 45 - 22 LP fuel gas LP fuel gas heating/scrubbing LP fuel gas distribution

Z-DP-002 Rev. 1, January 1995

46 - 49 50

NOT DEFINED

SEA WATER SYSTEMS (LOW TO MEDIUM PRESSURE)


Sea water lift Sea water filtration Sea water lift pumping Medium pressure seawater Medium pressure seawater pumping Medium pressure seawater distribution

50 - 10 50 - 20 50 - 30 50 - 50 50 - 60 50 - 70

51

SEA WATER SYSTEM (HIGH PRESSURE)


Water injection Water injection filtering/deaeration Water injection pumping Water injection manifold Jet water system Jet water header Jet water distribution

51 - 10 51 - 20 51 - 30 51 - 40 51 - 50 51 - 60 51 - 70

52

BALLAST WATER SYSTEM


Ballast water inlet/filtering Ballast water control tank Ballast water pumping Ballast water distribution Temporary ballast water

52 - 10 52 - 20 52 - 30 52 - 40 52 - 60 53

FRESH WATER SYSTEM Water desalination (fresh water makers) Desalinated water storage Desalinated water distribution Potable water sterilization Potable water storage Potable water distribution

53 - 10 53 - 20 53 - 30 53 - 40 53 - 50 53 - 60

54

NOT DEFINED
23 of 57

NORSOK Standard

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

55

STEAM, CONDENSATE AND HOT WATER SYSTEM


Steam generation and distribution Hot water generation and distribution

55 - 10 55 - 20

56

OPEN DRAIN SYSTEM


Non-hazardous open drain Non-hazardous open drain collection Non-hazardous open drain separator/pumps Hazardous open drain Hazardous open drain collection Hazardous open drain separator/pump Shale disposal Drain water treatment

56 - 10 56 - 11 56 - 12 56 - 20 56 - 21 56 - 22 56 - 30 56 - 40

57

CLOSED DRAIN SYSTEM


Closed drain collection Closed drain separator/pumps

57 - 10 57 - 20

58 - 59 60 61

NOT DEFINED

DRY AND WET BULK LOADING JET FUEL SYSTEM


Jet fuel storage/pumping Jet fuel filtering/dispensing

61 - 10 61 - 20

62

DIESEL OIL SYSTEM


Untreated diesel oil storage Untreated diesel oil distribution Treatment untreated diesel oil Treated diesel oil storage Treated diesel oil distribution

62 - 10 62 - 20 62 - 30 62 - 40 62 - 50

63

COMPRESSED AIR SYSTEM

NORSOK Standard

24 of 57

Coding System Annex A 63 - 10 63 - 20 63 - 30 63 - 50 63 - 60 63 - 61 63 - 62 63 - 63 63 - 70 Instrument air compression Instrument air drying/receiving Instrument air distribution Plant air subsystem Black start subsystem Black start compression Black start air receiver Topping-up compression Bleed air subsystem

Z-DP-002 Rev. 1, January 1995

64

INERT PURGE SYSTEM


Inert gas generation and distribution

64 - 10

65

HYDRAULIC POWER SYSTEMS


Hydraulic power pack and distribution top-side Hydraulic power pack and distribution subsea Hydraulic power pack and distribution wellhead

65 - 10 65 - 20 65 - 30

66

SEWAGE TREATMENT
Sewage collection and treatment package

66 - 10

67 - 69 70 71

NOT DEFINED

FIRE AND GAS DETECTION FIRE WATER SYSTEM


Fire water pumping Fire water distribution Deluge Sprinkler Water spray/AFFF Monitor Hose reel

71 - 10 71 - 20 71 - 50 71 - 60 71 - 70 71 - 80 71 - 90

72

MISCELLANEOUS FIRE FIGHTING SYSTEMS


AFFF storage and pumping 25 of 57

72 - 10 NORSOK Standard

Coding System Annex A 72 - 20 72 - 50 72 - 60 72 - 70 72 - 80 AFFF distribution CO2 system Fire extinguishers Smoke diving equipment Dry chemicals

Z-DP-002 Rev. 1, January 1995

73

MATERIAL HANDLING
Pedestal cranes Overhead cranes Trolleys/hoist Monorails and lugs Elevators Winches

73 - 10 73 - 20 73 - 30 73 - 40 73 - 50 73 - 60

74

ACCOMMODATION FACILITIES
Sleeping facilities Food service system Recreation Administration and control Helideck

74 - 10 74 - 20 74 - 30 74 - 40 74 - 50

75

PASSIVE FIRE PROTECTION SYSTEMS


Structural fire protection Fire walls

75 - 10 75 - 50

76

ESCAPE AND PERSONNEL SAFETY


Life boats Life boats davits Life rafts/MOB Escape provisions (survival suits, ropes etc.) Personal protection (first aid, eye washers, etc.) Escape chute

76 - 10 76 - 20 76 - 30 76 - 40 76 - 50 76 - 60

NORSOK Standard

26 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

77

HEATING AND VENTILATION


HVAC living quarter HVAC other areas Air handling Damper Hot and cold water makers Hot and cold water distribution

77 - 10 77 - 20 77 - 21 77 - 22 77 - 50 77 - 60

78

WORKSHOP AND STORAGE


Workshop facilities Storage facilities

78 - 10 78 - 20

79

EMERGENCY SHUTDOWN AND BLOWDOWN SYSTEM


Emergency shutdown Blowdown

79 - 10 79 - 20

80

MAIN POWER GENERATION AND DISTRIBUTION HIGH VOLTAGE (> 6.6 kV)
Main power generation Main power distribution

80 - 10 80 - 20

81

MAIN POWER GENERATION AND DISTRIBUTION HIGH VOLTAGE (1.0 kV - 6.6 kV)
Main power generation Main power distribution

81 - 10 81 - 20

82

MAIN POWER GENERATION AND DISTRIBUTION LOW VOLTAGE (< 1.0 kV)
Main power generation Main power distribution

82 - 10 82 - 20

NORSOK Standard

27 of 57

Coding System Annex A

Z-DP-002 Rev. 1, January 1995

83

ESSENTIAL POWER GENERATION AND DISTRIBUTION


Essential power generation Essential power distribution

83 - 10 83 - 20

84

EMERGENCY POWER GENERATION AND DISTRIBUTION


Emergency power generation Emergency power distribution

84 - 10 84 - 20

85

BATTERY AND NO-BREAK SYSTEM


24V DC power supply 48V DC power supply 110V DC power supply 230V AC UPS

85 - 10 85 - 20 85 - 40 85 - 50

86

TELECOMMUNICATION
Sound subsystems Public address and alarm Drillers intercom Network subsystems PABX Mulitplexer Office data network (servers, bridges/routers etc.) Office data and telephone cabling network Platform intercom External carriers Radio links Satellite links Private radio network Cable links Fibre optic links Radio subsystems Mandatory radio (GMDSS) and general radio. (GMDSS, Global Maritime Distress and Safety) VHF radio and paging Audio and video entertainment Surveillance subsystems Closed circuit television (CCTV) Meteorological observation Marine radar Aviation radar Communication recorder 28 of 57

86 - 10 86 - 11 86 - 12 86 - 20 86 - 21 86 - 22 86 - 23 86 - 24 86 - 25 86 - 30 86 - 31 86 - 35 86 - 37 86 - 38 86 - 39 86 - 40 86 - 41 86 - 42 86 - 43 86 - 50 86 - 51 86 - 52 86 - 53 86 - 54 86 - 55 NORSOK Standard

Coding System Annex A 86 - 60 86 - 61 86 - 62 86 - 63 86 - 70 86 - 71 86 - 72 86 - 73 86 - 80 86 - 81 86 - 82 86 - 83 86 - 84 86 - 90

Z-DP-002 Rev. 1, January 1995 Telemetry Shuttle tanker loading telemetry Work-over telemetry Pipeline telemetry Navigational aids Distance measuring equipment (DMF) ATIS/AFTN for aviation Positioning Common subsystems MDF (main distribution frame) Telecom power supply Real time clock TSS, Telecom Surveillance subsystem incl. TMS, Traffic Management subsystem Temporary subsystems (subsystems used during installation, hook-up, commissioning and start-up

87

INSTRUMENTATION SYSTEMS
Multipurpose systems (cables and junction boxes) Process control systems Process shutdown systems Emergency shutdown systems Fire and gas systems Wellhead control system (incl. hydraulic power unit) Environmental condition monitoring systems Power distribution system General CCR equipment

87 - 00 87 - 10 87 - 20 87 - 30 87 - 40 87 - 50 87 - 60 87 - 70 87 - 80

88

EARTHING AND LIGHTNING


Earthing and lightning protection Electrical lightning protection

88 - 10 88 - 20

89 90

NOT DEFINED STRUCTURAL/CIVIL SYSTEMS


Piping general arrangement Piping layouts Piping plot plans

90 - 10 90 - 20 90 - 30

91

DECK STRUCTURES
29 of 57

NORSOK Standard

Coding System Annex A 91 - 10 91 - 20 91 - 30 91 - 40 91 - 90 Primary structures Secondary structures Outfitting/non-structural Protection systems (bumpers etc.) Temporary structures

Z-DP-002 Rev. 1, January 1995

92

SUPPORT STRUCTURES/HULLS
Primary structures Secondary structures Outfitting/non-structural Prestressing reinforcements Ordinary reinforcements Protection systems (boat bumpers etc.) Jacking subsystems (jack-ups) Temporary structures

92 - 10 92 - 20 92 - 30 92 - 40 92 - 50 92 - 60 92 - 70 92 - 90

93

LOADING SYSTEMS
Primary structures Secondary structures Outfitting/non-structural Temporary structures

93 - 10 93 - 20 93 - 30 93 - 90

94

POSITIONING SYSTEMS
Piles Anchors Anchor lines Tethers Tether anchors Dynamic positioning Propulsion Power supply Thruster

94 - 10 94 - 20 94 - 30 94 - 40 94 - 50 94 - 60 94 - 70 94 - 71 94 - 72

95

ONSHORE/CIVIL SYSTEMS
Primary structures Secondary structures Outfitting/non-structural Roads Bridges Pads 30 of 57

95 - 10 95 - 20 95 - 30 95 - 40 95 - 50 95 - 60 NORSOK Standard

Coding System Annex A 95 - 70 95 - 80 95 - 90 Quays Tunnels/caverns Temporary structures

Z-DP-002 Rev. 1, January 1995

96

SUBSEA PRODUCTION SYSTEMS


Primary structure Secondary structure Temporary structure

96 - 10 96 - 20 96 - 90

97

WELL TEMPLATES
Primary structure Secondary structure Temporary structure

97 - 10 97 - 20 97 - 90

98

CORROSION PROTECTION SYSTEMS


Painting Cathodic protection Corrosion monitoring

98 - 10 98 - 20 98 - 30

99

MISCELLANEOUS SYSTEMS
Structural monitoring Lifting (spreader bars etc.) Installation aids Transportation aids Grillage/seafastening

99 - 10 99 - 20 99 - 30 99 - 40 99 - 50

NORSOK Standard

31 of 57

Coding System Annex B

Z-DP-002 Rev. 1, January 1995

ANNEX B ITEM FUNCTION CODES (NORMATIVE)

NORSOK Standard

32 of 57

Coding System Annex B ITEM FUNCTION CODES

Z-DP-002 Rev. 1, January 1995

International standards are the primary identification principles to be used. As supplement for not defined type and function codes in international standards as referenced pr. type and function in this appendix, the following codes shall be applied: ARCHITECTURAL AA AB AC AX AD Kitchen Equipment Laundry Equipment Sanitary Equipment Doors

DRILLING BD BG BH BI BJ BM BN BS BT BX BOP/Accumulator Equipment Drawwork/Rotary table Riser Choke manifold Top drive Skid-Jack Diverter Drilling manifold Through flowline equipment Other drilling equipment

MISC. MECHANICAL CA CB CC CD CE CF CG CH CJ CN CP CQ CR CT CU CV CX CY Filter/Strainer Air driven motor/Starter Centrifuge Conclition engine Cyclone Mechanical separator/Shaker Gear Box Hydraulic cylinder Mixers/Agitator/Blender Solid waste disposal unit Pig Eductor and ejector Trash rack/Collector Gas turbine/Expander Steam turbine Hydraulic motor Other mechanical equipment Spring support 33 of 57

NORSOK Standard

Coding System Annex B

Z-DP-002 Rev. 1, January 1995

COMMISSION PACKAGE (codes to be allocated?) ELECTRICAL EQUIPMENT Electrical equipment shall be identified according to IEC 750. Additional codes are: EA Distribution board/switchgear for <400V, 400V<1kV and >1kV, Control equipment/interface panel <230V EC Capacitors EE Lighting fixtures, other electrical equipment EG Battery/battery charger, generator EI Navigation aid EJ Electrical junction boxes EM Electric motor EQ Circuit breaker/disconnector (isolator) ER Resistor ET Transformer EU Rectifier and inverter, frequency converter EW Electrical cables, earthing bar, bus bar/bus duct EX Socket outlets, terminals, plugs HEATER, FURNACE AND BOILER FA FB FC FD FE FM FX Oil fired boiler including stack and ducting Electrode boiler including stack and ducting Warm water maker Flare Electric heating element Mud burner Other heater, furnace, boiler

HEATING, VENTILATION AND AIR CONDITIONING GA GB GD GE GF GG GH GK GL GM GN GO Air handling unit Fan coil unit Centrifugal fan Axial fan/Mixed flow fan Air filters Roof hood Coding Coil/Heating Coil Humidifer Sound attenuator Fire damper Shut off damper Pressure control damper 34 of 57

NORSOK Standard

Coding System Annex B GP GQ GR GV GW GX GZ Coalescers Weather louvre Balancing damper Supply grille/Diffuser Extract grille Other HVAC equipment Inlet guide vanes/Flow measuring device/Sampling point

Z-DP-002 Rev. 1, January 1995

HEAT TRANSFER HA HB HC HE HW HX Shell and tube heat exchanger Plate heat exchanger Radiator Miscellaneous cooler and condenser Waste heat recovery unit Other heat transfer equipment

INSTRUMENT (not for field tagged instrument) IA IC ID IE IF IH IJ IK IL IM IO IP IR IS IT IV IW Air distribution header Controller/computer cabinet Desk/console Electrical distribution/power supply cabinet Field cabinet Hydraulic power unit Instrument junction boxes Field termination cabinet/cross connection cabinet Logger/printer/copies Matrix-/mimic panel Operator station, workstation, PC, VDU etc. Misc. instruments Valve control assembly Instrument cables

FIRE AND GAS (field equipment) AB BF BS BH Gas detector Fire detector - fire Fire detector - smoke Fire detector - heat

NORSOK Standard

35 of 57

Coding System Annex B

Z-DP-002 Rev. 1, January 1995

COMPRESSOR AND BLOWER KA KB KC KE KF KH KJ KX Centrifugal compressor Reciprocating compressor Screw/Rotary compressor Fan Blower Axial compressor Diaphram compressor Other compressor/Blower

MATERIAL HANDLING MA MB MC MD ME MF MG MH MJ MK ML MM MN MP MQ MR MS MT MU MV MX MY MZ Pedestal Crane/Jib crane Gantry crane Overhead traveling crane Electrical/Air driven hoist Manual driven hoist Lift Escalator Skyclimber, personnel basket etc. Screw feeder Winch Conveyor Loading/Discharging equipment Forklift, truck, transporter etc. Yoke, block, sheave, hook etc. Workshop machine Tool Pipe handling equipment (drilling only) Weighting equipment Packing equipment Other material and misc. products handling equipment Runway beam Padeye/Lifting lug

SPECIAL ITEM NP Special item

PUMP PA PB PC PD Centrifugal pump Reciprocating pump Rotary pump Special metering pump 36 of 57

NORSOK Standard

Coding System Annex B PE PF PG PM PX Gear pump Diaphragm pump Screw pump Mono pump Other pump

Z-DP-002 Rev. 1, January 1995

SAFETY, ESCAPE AND FIRE FIGHTING EQUIPMENT (lifeboat, raft, extinguisher etc.) SA SB SC Lifeboat and raft Pickup boat Life saving equipment (cabinet, survival suit, lifebuoy, breathing apparatus, ladder, torche, etc.) SD First aid equipment (stretcher, shower, eyebath, etc.) SE Fire fighting equipment (cabinet, smoke diving equipment, tool, etc.) SF Portable fire extinguisher SG Fire/Safety station SH CO2 equipment SJ Fixed foam unit SK Dual agent unit SL Dry chemical unit SM Fire monitor SP Fire hose cabinet SR Fire hose reel SS Sprinkler valve ST Fire door SU Utility station SW Deluge equipment SX Other safety, escape and fire fighting equipment TANK (atmospheric) TA TB TD TE TF TG TH TP TX Storage tank cylindrical Storage tank rectangular Water lock Drain collector/Drain pot Mud pit Sump Shaft skimmer (GBS) Water pond Other atmospheric tank

SUBSEA EQUIPMENT UA UB UC UD Wellhead, tieback, PGS equipment Tubing hanger system X-mas tree/cap system Lower safety block (LRP/SWIB) 37 of 57

NORSOK Standard

Coding System Annex B UE UF UG UH UI UJ UK UL UM UN UO UP UQ UR US UT UU UV UW UX UY UZ Running tool (EQDP/URT/TCRT) Work over riser system Upper safety block system Workover control system Subsea structure/manifold system Pigging system Flow and servicelines Hydraulic/Electrical control system Pull-in systems Connection systems Control pod system Control pod running tool system Intervention control system Production control system ROV tools and test equipment Other intervention tools systems

Z-DP-002 Rev. 1, January 1995

Other subsea equipment Aux. equipment

VESSELS AND COLUMN VA VB VC VD VE VG VH VJ VK VL VM VN VS VV VW VX VZ Separator Accumulator Gas bottle Settling tank, knockout drum, flash tank Column Scrubber Deaerator Coalescer Dryer Receiver and surge vessel, expansion and head tank Pig launcher and receiver Storage tank Slug catcher Special purpose vessel Pulsation damper Other vessel and column Storage cell (GBS)

EQUIPMENT PACKAGE/SKID XX Equipment package/skid

NORSOK Standard

38 of 57

Coding System Annex B INSTRUMENT AND CONTROL FUNCTION CODES

Z-DP-002 Rev. 1, January 1995

The function code for loop level instruments and control functions comprises 2-4 alphabetic characters according to ISO 3511. FIRE AND GAS AB AX AZ AT BU BX BS BO BQ BR BC CA CD CI DR ES Gas detector IR, Beam Gas detector Gas detector duct mounted Gas transmitter Flame detector ultra violet Flame detector infra-red Smoke detector, ionization Smoke detector, optical indicator Smoke detector, high sensitivity Heat detector rate of rise Heat detector rate compensated Extinguisher agent pre-discharge alarm Extinguisher agent pre-discharge lamp Extinguisher agent status indicator Door release units Emergency shutdown switch ER Manual area reset AS AR AI BD BF BM BI BW BE BL CN CO Gas detector H2S Gas detector IR, point Gas detector remote indicator Addressable unit Fixed heat detector Manual fire alarm Smoke detector remote Water release switch Manual electrical isolation Electric isolation status light Extinguisher agent release unit Extinguisher agent timer

TELECOMMUNICATION AA AW AX AP CA CS CT CO DA EC HH IX LG LY Antenna Antenna tuning unit Antenna socket Antenna amplifier Cable amplifier Cable splitter Cable tapper CAS outlet Display unit Equipment cabinet Acoustic hood Intercom unit (Ex) Flashing light, green Flashing light, yellow 39 of 57

NORSOK Standard

Coding System Annex B LS MC MH MP MR MT MW NM NT ND NX OC OP PA RU SP TC TJ TR TV TW WR Loudspeaker Met. sensor, cloud height Met. sensor, humidity Met. sensor, pressure Met. sensor, wave radar Met. sensor, temperature Met. sensor, wind Network socket, multipoint (telephone, data, LAN etc.) Network socket, telephone Network socket, data/LAN Ex telephone Operator console Operator/control panel (access unit) Power amplifier Radio unit Service panel CCTV camera Telecom junction box Tape recorder TV (video) monitor Telecom cable Remote unit

Z-DP-002 Rev. 1, January 1995

NORSOK Standard

40 of 57

Coding System Annex C

Z-DP-002 Rev. 1, January 1995

ANNEX C PIPELINE AND PIPING CODES (NORMATIVE)

NORSOK Standard

41 of 57

Coding System Annex C PIPELINE AND PIPING CODES

Z-DP-002 Rev. 1, January 1995

The type and function code to be incorporated in the tag number for topside piping is "L" and pipelines "Y". For piping the following specific attributes to the item identification are used: Line size Pipe classification Insulation class Example: The piping classification code is interpreted as follows: First letter - Piping pressure rating code A B D E F G J K = = = = = = = = 150 pounds rating according to ANSI codes 300 " " " " " " 600 " " " " " " 900 " " " " " " 1500 " " " " " " 2500 " " " " " " 5000 " " " " API " 10000 " " " " " " : : : NNN AA N

Second letter - Material classification code A B C D F G K L N P S T V W X Y Z = = = = = = = = = = = = = = = = = Aluminium and aluminium alloys Concrete Carbon steel Duplex stainless steel Ferritic and martensitic stainless steel Galvanized carbon steel Copper and copper alloys Lined material (non-metallic lining) Nickel and nickel base alloys Plastic and reinforces pipes (GRP) Austenitic stainless steel Titanium Alloyed steels - low temperature grades Alloyed steels - high temperature grades Alloyed steels Structural steel Other materials not specified above

NORSOK Standard

42 of 57

Coding System Annex C The insulation class code means: Code 1 2 3 4 5 6 7 8 9 Description Heat conservation Cold medium conservation Personnel protection Frost proofing Fire proofing (insulation) Acoustic 10 dB Acoustic 20 dB Acoustic 30 dB External condensation protection No insulation

Z-DP-002 Rev. 1, January 1995

Abbreviations HC CC PP FP FI AI AI AI EP NI

NORSOK Standard

43 of 57

Coding System Annex D

Z-DP-002 Rev. 1, January 1995

ANNEX D DISCIPLINE AND ADMINISTRATION CODING (NORMATIVE)

NORSOK Standard

44 of 57

Coding System Annex D DISCIPLINE AND ADMINISTRATION CODING

Z-DP-002 Rev. 1, January 1995

The discipline code is used as attribute to the documentation identification and it consists of a one character alphabetic code as follows: A B C D E F G H I J K L M N O P Q R S T U W X Y Z Administration Procurement Civil/architect Drilling Electrical Project control/cost/economy Geology HVAC Instrumentation/metering Marine operation Inspection Piping/layout Material technology Structural Operation Process Quality management Mechanical Safety Telecommunication Subsea Weight control Reservoir Pipeline Multidiscipline

NORSOK Standard

45 of 57

Coding System Annex E

Z-DP-002 Rev. 1, January 1995

ANNEX E DOCUMENT TYPE CODES (NORMATIVE)

NORSOK Standard

46 of 57

Coding System Annex E DOCUMENT TYPE CODES AA BA CA CB DS DA EA FA FB FC GA HA KA KB KC KD LA LB LC LD LE LF LG MA MB* MC* MD* ME* MG* MF MH NA Accounting Budget Analysis, test and calculation Cause and effect Data sheets Data sheets for health, environment and safety Estimate Principal decision Philosophy Design basis Authorities document Standard Procedures System function test procedure Performance test procedure Work instruction Indexes Registers Main equipment list Instrument index Cable list Legends List of special tools Operation and maintenance instruction Technical description Corrective maintenance Operating instruction Predictive maintenance Equipment handling instruction Parts and spare parts list Lubrication schedule Catalogue

Z-DP-002 Rev. 1, January 1995

OA Work package * Primary delivery MA, separate codes is used only for separate delivery NORSOK Standard 47 of 57

Coding System Annex E PA PB PC PD PE PF PG PH PI PJ PK QA RA RB RC RD SA SC SD TA TB TC TD TE TF TG VA VB VC VD VE VF VG WA WB WC WD XA XB XC XD NORSOK Standard Purchase orders Blanket order/frame agreement Call off order Major contract Minor contract Work order Material take off (MTO) Material release note (MRN) Material movement ticket (MMT) Material receiving report (MRR) Over, shortage and damage report (OS & D) Query Report Technical report Non conformance report Corrective action Specification Special technical specification Project design criterias, philosophies etc. Schedule Planning schedule Work plan Cable schedule/cable transit schedule Schedules architect Pipe support schedules Spring schedules

Z-DP-002 Rev. 1, January 1995

Manufacturing record and verifying documentation Certificate of conformance Traceability lists List of certificates, reports, procedures and calculations Third party verification and certification Certificates for cranes and lifting equipment Type approval certificate Isometric drawing hydrotest Pipe support drawing Structural fire protection drawings Acoustic/thermal insulation and fire protection plan Drawings, misc. Flow diagrams Pipe & instrument diagram (P&ID / D&ID) General agreement 48 of 57

Coding System Annex E XE XF XG XH XI XJ XK XL XM XN XO XQ XP XS XT XU XV XW XX XY ZA ZB ZC ZD Layout drawings Detail crossectional drawings with parts list Location drawing Cable rack and tray layout Area classification drawing Fire area location drawing Foundation drawing Pipe connections Isometric fabrication drawing Isometric drawing stress test Isometric design drawing System block diagram Termination drawing for external connections Single line diagram Field equipment installation drawings Logic diagram Loop diagram Nodal diagram Wiring diagram Hook up drawing EDP documentation Software documentation System documentation VDU pictures

Z-DP-002 Rev. 1, January 1995

NORSOK Standard

49 of 57

Coding System Annex F

Z-DP-002 Rev. 1, January 1995

ANNEX F AREA CODES (NORMATIVE)

NORSOK Standard

50 of 57

Coding System Annex F AREA CODING General

Z-DP-002 Rev. 1, January 1995

An installation is divided on a geographic/coordinate basis by means of area coding. The area codes are used as attributes to plant items and documentation identification codes. Format The area code shall be:

A NN ZZ
Main area (alpha character) Sub area (numeric character) Section (alpha numeric character) Three characters shall always be used. Main Area (A) A single alphabetic character defines a main area type or major division within the plant as follows: A B C D E F G H J L Template Bridge Load transfer frame (LTF)/ Cellar deck Drilling Export pipelines Flare Gravity base structure (GBS) Helideck Jacket Living quarter M P Q S T U W X Y Z Modules Process Utility R Risers/j-tubes/umbilicals Pipelines Topside Subsea Wellhead General (all areas) Tender support vessel (TSV) General

Sub Area (NN) A two character numeric code defines sub divisions of the main area. Sub areas will be defined according to the needs of each plant. Section (A) Section is a subdivision of sub areas and is defined by a two character number. The first character is used to split the subarea into sections, e.g. 10 = section 1, 20 = section 2. The second character is used to identify rooms within each section or subarea.

NORSOK Standard

51 of 57

Coding System Annex F Examples Process area: P10 P11 P12 P1210 Module P10, Module P10, Module P10, Module P10, general level 1 level 2 (mezzanine) level 2 (mezzanine), section 1

Z-DP-002 Rev. 1, January 1995

Living quarters: L1124 L2236 Module L10, level 1, section/room 24 Module L20, level 2, section/room 36

Fire Area Coding Fire areas are coded according to the area coding principles but identified with the letter F after the number. Examples: P1210F P1211F L2236F Fire Area is Module P10, Level 2 Mezzanine Fire Area is Control Room located within P12 Fire Area is Module L26 Room 36

The fire area code may for certain fire areas differ from the room code. This may be the case when one fire area is covering two or more rooms.

NORSOK Standard

52 of 57

Coding System Annex G

Z-DP-002 Rev. 1, January 1995

ANNEX G REVISION, STATUS AND ACCEPTANCE CODES (NORMATIVE)

NORSOK Standard

53 of 57

Coding System Annex G GENERAL

Z-DP-002 Rev. 1, January 1995

This section describes the codes to be used for revision, status and acceptance coding as attributes to the document number. The format for these attributes are as follows:

NN A N (A)
Revision code Status code Acceptance code REVISION CODES Revision codes (NN) The purpose of the sequential revision number is to give each revision a unique number. A two digit sequential number starting at 01 shall be given for the documents first issue and shall be increased with one for each revision. STATUS CODES The purpose of the status code is to give each issue an application The reason/description of status has to be described in the document identification header/matrix and in addition identified in the attributes to the document number with a letter as described below: A B C D E F G H K Approved/accepted for application for granting of production licenses Approved/accepted for exploration Approved/accepted for pre-feasibility study Approved/accepted for feasibility study Approved/accepted for main study, basic engineering or design basis Approved/accepted for detail engineering Approved/accepted for inquiry or tender Approved/accepted for order placement/purchase agreement or contract award Approved/accepted for construction

NORSOK Standard

54 of 57

Coding System Annex G

Z-DP-002 Rev. 1, January 1995

L M N

As built Approved (independent of project phases) Voided

ACCEPTANCE CODES An acceptance code shall be assigned to documents submitted for review and acceptance. The following codes shall be used: Code 1: Code 2A: Code 2: Code 3: Accepted Interface information as clouded is accepted and frozen Accepted with comments incorporated, revise and resubmit Not accepted, revise and resubmit

(Code 4 according to NS 5820 shall not be used). The assigned acceptance code shall be shown on the document.

NORSOK Standard

55 of 57

Coding System Annex H

Z-DP-002 Rev. 1, January 1995

ANNEX H ORIGINATOR AND RESPONSIBLE PARTY CODES (NORMATIVE)

NORSOK Standard

56 of 57

Coding System Annex H GENERAL

Z-DP-002 Rev. 1, January 1995

Originator, responsible party and transmittal codes are a two or three character alphanumeric code and is used in document coding to identify each contractor, supplier and company. They are also referenced in engineering registers. ORIGINATOR CODES The originator code defines which organization has created the document, by four alpha numeric characters. The originator code does not change, even if the responsibility for a document is transferred. RESPONSIBLE PARTY CODES The responsible party defines the organizational unit responsible for the original and updating of the document. This organization will, at first, be the same as the originator but may change during a document's life cycle. For example will a document created by an engineering contractor have it's responsibility transferred to the fabricator and later to a hook-up/commissioning contractor. After handover as as-built documentation, theoperation unit will be the responsible party for all documents.

NORSOK Standard

57 of 57

S-ar putea să vă placă și