PROYECTO: CONSTRUCCIN DE DEPSITO DE DESMONTE DE MINA PAMPA VERDE Y CARRETERA TAJO PAMPA VERDE - SAN PEDRO SUR FORMATO

DE CONTROL DE AVANCE DIARIO FRENTE:


DA / NOCHE (D/N): CDIGO DESCRIPCIN TOP EXCAVACIN DE TOPSOIL COM EXCAVACIN COMN ROCA EXCAVACIN DE ROCA RELL COM RELLENO COMN RELL SEL RELLENO SELECTO CDIGO DESCRIPCIN

FECHA:
ING. O CAP. :

Progresiva

TOP

COM

ROCA RELL COM RELL SEL

EQUIPOS
Excavadora Retroexcavadora Mini Cargador Cargador Frontal Tractor D6 Tractor D8 Motoniveladora 140 h Rodillo Liso Vibratorio 1-3 ton Rodillo Liso (10-12 ton) Camin Cisterna de Agua Camin Volquete 15 m3 Grupo Electrgeno 100 kw Torre de Iluminacin Camin Cisterna D2

CANT

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

PERSONAL Residente Capataz Operador Oficial Pen Viga Cuadrador

CANT

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

OBSERVACIONES:

FIRMA SUPERVISOR CONTRATISTA

FIRMA SUPERVISOR MLZ

PROYECTO: 1740 - CONGA - K12 CAMPAMENTO 4500 PERSONAS


FORMATO DE CONTROL DE AVANCE DIARIO FRENTE: 02 OBRAS ELCTRICAS
DA / NOCHE (D/N): CDIGO 1000 1100 1200 1300 1400 1500 1600 DESCRIPCIN TRABAJOS DE ATERRAMIENTO (ml) TENDIDO DE CABLE DE BAJA TENSIN (Banco Ductos y tendido de Cable) (ml) TENDIDO DE CABLE DE MEDIA TENSIN (ml) TRABAJOS DE ALUMBRADO (und) INSTALACIN DE PARARRAYOS (und) MONTAJE DE EQUIPOS ELCTRICOS (und) INSTRUMENTACIN (Comunicacin) (ml) ING. O CAP. : FECHA:

FASE / SUBFASE / ZONA

1000

1100

1200

1300

1400

1500

1600

EQUIPOS
Excavadora Retroexcavadora Mini Cargador Cargador Frontal Tractor D6 Tractor D8 Motoniveladora 140 h Rodillo Liso Vibratorio 1-3 ton Rodillo Liso (10-12 ton) Camin Cisterna de Agua 4000 gln Camin Volquete 15 m3 Grupo Electrgeno 100 kw Torre de Iluminacin 04x500kw-15kw Camin Cisterna D2

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

OBSERVACIONES:

FIRMA INGENIERO RESPONSABLE

FIRMA GERENTE DE CONTRUCCIN

PROYECTO: 1740 - CONGA - K12 CAMPAMENTO 4500 PERSONAS


FORMATO DE CONTROL DE AVANCE DIARIO FRENTE: 03 OBRAS SANITARIAS
DA / NOCHE (D/N): CDIGO 700-API 700-ALC 800-API 800-ALC 900 DESCRIPCIN INSTAL. TUB. Y ACCES. LUF 2" < D < 6" (ml) INSTAL. TUB. Y ACCES. LUP 4" < D < 6" (ml) INSTAL. TUB. Y ACCES. LUF 8" < D < 10" (ml) INSTAL. TUB. Y ACCES. LUP 10" < D < 12" (ml) INSTAL. DE TUB. HDPE ESTRUCTURAL (ml) ING. O CAP. : FECHA:

FASE / SUBFASE / ZONA

700-API

700-ALC

800-API

800-ALC

900

EQUIPOS
Excavadora Retroexcavadora Mini Cargador Cargador Frontal Tractor D6 Tractor D8 Motoniveladora 140 h Rodillo Liso Vibratorio 1-3 ton Rodillo Liso (10-12 ton) Camin Cisterna de Agua 4000 gln Camin Volquete 15 m3 Grupo Electrgeno 100 kw Torre de Iluminacin 04x500kw-15kw Camin Cisterna D2

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

HM

OBSERVACIONES:

FIRMA INGENIERO RESPONSABLE

FIRMA GERENTE DE CONTRUCCIN

Partida Tpica

Description FRENTE PARTIDA

UoM

Quantity A Material Cost (supply) 1.95 1.95 1.95 23.39 139.77 302.26 13.87 52.25 138.14 177.27 42.94 9.98 1.73 336.80 344.29 342.68 74.67 45.19 98.40 64.78 23.14 10.54 9.00 4.80 50.06 34.88 12.41 5.81 96.00 64.80 4,525.81 600.00 1,837.74 1,683.72 1,683.72 1,683.72 1.95 68.94 68.94 3.94 281,767.12 0.00 4,750.00 0.00 331,812.37 0.00 182,091.69 0.00 141,989.11 0.00 240,482.66 0.00 349,770.95

UNIT PRICE (US$) Installation Cost 9.15 9.15 9.15 13.39 98.89 317.17 7.48 33.09 81.51 118.18 11.94 14.66 6.50 386.42 389.38 277.45 104.40 79.06 141.57 141.57 79.06 62.35 38.01 31.34 154.49 102.57 55.56 43.35 45.00 40.00 1,749.89 365.00 1,478.03 2,445.46 2,445.46 2,445.46 9.15 11.94 11.95 11.94 0.00 65,792.27 0.00 38,824.19 0.00 244,032.44 0.00 85,200.69 0.00 140,869.79 0.00 139,511.64 0.00 Total Unit Price (Matl.+ Instal) 11.10 11.10 11.10 36.78 238.66 619.43 21.35 85.34 219.65 295.45 54.88 24.64 8.23 723.22 733.67 620.13 179.07 124.25 239.97 206.35 102.20 72.89 47.01 36.14 204.55 137.45 67.97 49.16 141.00 104.80 6,275.70 965.00 3,315.77 4,129.18 4,129.18 4,129.18 11.10 80.88 80.89 15.88 281,767.12 65,792.27 4,750.00 38,824.19 331,812.37 244,032.44 182,091.69 85,200.69 141,989.11 140,869.79 240,482.66 139,511.64 349,770.95 Total Amount 2,041,649.58 32,348.45 60,451.26 58,751.73 426,560.18 14,109.94 304,977.07 2,203.32 375,091.49 477,738.75 26,590.50 403.53 252,921.31 9,502.05 49,579.40 24,497.53 9,677.84 15,404.03 3,793,531.79 372,823.74 47,960.50 149,981.25 209,651.60 74,912.60 119,976.94 5,547.18 8,637.46 58,092.20 115,183.10 138,998.65 56,337.36 705.00 1,676.80 112,962.60 17,370.00 185,683.12 231,234.08 49,550.16 16,516.72 524,531.56 157,836.42 516,723.45 620,639.30 2,793,440.47 281,767.12 65,792.27 4,750.00 38,824.19 331,812.37 244,032.44 182,091.69 85,200.69 141,989.11 140,869.79 240,482.66 139,511.64 349,770.95
6 de 26

1 1.1 1.2 1.3 1.4 1.5 1.6 1.8 1.9 1.1 1.11 1.13 1.14 1.16 3 3.1 3.1 3.1 4 4.12 4.12 4.13 4.14 4.14 4.14 4.14 4.14 4.15 4.15 4.15 4.15 4.16 4.16 4.18 4.19 4.2 4.21 4.21 4.21 4.23 4.24 4.25 4.26 5 5.1 5.1 5.2 5.2 5.3 5.3 5.4 5.4 5.6 5.6 5.7 5.7 5.9

210.01 210.02 210.03 210.04

civil civil civil civil

excavacin excavacin excavacin concreto concreto concreto relleno concreto cerco varias concreto relleno relleno concreto concreto concreto inst. tuber. 2 inst. tuber. 1 inst. tuber. 2 inst. tuber. 2 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 inst. tuber. 2 inst. tuber. 2 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 varias varias concreto concreto concreto concreto excavacin relleno relleno relleno grounding grounding montaje eq montaje eq concreto concreto montaje eq montaje eq MV MV LV LV alumbrado

210.05 civil 210.06 civil 210.08 civil 210.09 210.1 210.11 210.13 210.14 210.16 215.01.02 215.01.03 215.01.05 250.12.02 250.12.02 250.13.02 250.14.02 250.14.02 250.14.02 250.14.02 250.14.02 250.15.02 250.15.02 250.15.02 250.15.02 250.16.03 250.16.03 250.18.02 250.19.02 250.2 250.21.01 250.21.02 250.21.03 250.23 250.24 250.25 250.26 265.01.01 265.01.02 265.02.01 265.02.02 265.03.01 265.03.02 265.04.01 265.04.02 265.06.01 265.06.02 265.07.01 265.07.02 265.09.01 civil civil civil civil civil civil civil civil civil piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping piping electricas electricas electricas electricas electricas electricas electricas electricas electricas electricas electricas electricas electricas

OBRAS CIVILES Y MOVIMIENTO DE TIERRA Remocin de Top Soil Excavacin Estructural Excavacin de Canaletas y Canales Mampostera Concreto (fc=9.8 Mpa) Concreto (fc=27.4 Mpa)

m3 m3 m3 m2 m3 m3

2,914.27 5,446.06 5,292.95 11,597.61 59.12 492.35 103.20 4,395.26 2,175.00 90.00 7.35 10,264.66 1,154.56 33.87 13.19 24.84 2,082.00 386.00 625.00 1,016.00 733.00 1,646.00 118.00 239.00 284.00 838.00 2,045.00 1,146.00 5.00 16.00 18.00 18.00 56.00 56.00 12.00 4.00 47,255.10 1,951.49 6,387.98 39,083.08 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Badenes m2 Cunetas Revestidas (fc=27.4 Mpa) m Cercos m Seales c/u Base de Apoyo de Badenes m3 Carpeta de Rodado m3 Berma de Seguridad en Caminos m3 OBRAS DE CONCRETO Suministro y colocacin de concreto cimentaciones Sala de Bombas Incendio m3 Suministro y colocacin de concreto Planta Elevadora Aguas Servidas m3 Suministro y colocacin de concreto cimentaciones generadores y transformadores generadores. m3 OBRAS DE TUBERAS Instalacin tuberas y fittings material LUFC, D=8 m Instalacin tuberas y fittings material LUFC, D=6 m Instalacin tuberas y fittings material LUF6, D=10 m Instalacin tuberas y fittings material LUF4, D=10 m Instalacin tuberas y fittings material LUF4, D=6 m Instalacin tuberas y fittings material LUF4, D=4 m Instalacin tuberas y fittings material LUF4, D=3 m Instalacin tuberas y fittings material LUF4, D=2 m Instalacin tuberas y fittings material LUP, D=12 m Instalacin tuberas y fittings material LUP, D=10 m Instalacin tuberas y fittings material LUP, D=6 m Instalacin tuberas y fittings material LUP, D=4 m Instalacin vlvula mariposa 6 B-03, instalada en tubera de HDPE C/U Instalacin vlvula mariposa 4 B-03, instalada en tubera de HDPE C/U Instalacin de Hidrantes, D=6 C/U Instalacin de vlvulas con poste indicador, D=6 C/U Cmaras de concreto para Vlvulas C/U Cmaras Inspeccin Alcantarillado Aguas Servidas, altura igual o menor de 2.0 m C/U Cmaras Inspeccin Alcantarillado Aguas Servidas, altura mayor de 2.0 m e igual o inferior a 3.0 m C/U Cmaras Inspeccin Alcantarillado Aguas Servidas, altura mayor de 3.0 m C/U 3 Excavaciones en zanja para tuberas m Cama de apoyo para tuberas m3 Relleno seleccionado para tuberas m3 Relleno corriente para tuberas, compactado m3 OBRAS DE ELECTRICIDAD Suministro de materiales para malla de puesta a tierra Gl Ejecucin malla de puesta a tierra Gl Suministro generadores, transformadores, switchgear de 22.9 kV y materiales Gl Instalacin de generadores, transformadores, switchgear y conexionados. Gl Suministro de materiales bancos de ductos y canalizaciones enterradas Gl Ejecucin bancos de ductos, canalizaciones enterradas y cmaras elctricas Gl Suministro de subestaciones y materiales para la partida Gl Montaje de subestaciones Gl Suministro de materiales para la partida Gl Ejecucin lnea area 22.9 kV Gl Suministro de materiales para la partida Gl Ejecucin distribucin en 400 V Gl Suministro de materiales para la partida Gl

5.9 5.1 5.1 6 6.1 6.1

265.09.02 265.10.01 265.10.02 270.01.01 270.01.02

electricas electricas electricas electricas electricas

alumbrado litghning litghning instrumentacin instrumentacin excavacin relleno varias varias inst. tuber. 3 inst. tuber. 3 concreto concreto inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 inst. tuber. 2 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 inst. tuber. 1 concreto concreto concreto cerco reclamacin

210.02 civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil civil

Ejecucin del alumbrado exterior Gl Suministro de materiales para la partida Gl Ejecucin de la proteccin contra tormentas Gl OBRAS DE INSTRUMENTACIN Suministro de materiales para la partida Gl Montaje transmisor de nivel Gl OBRAS VARIAS CIVILES (Partidas adicionales) Excavacin Estructural m3 Relleno material prestamo m3 Geotextil 400 gr/m2 m2 Geomembrana HdPE 2.0mm m2 Tuberia HDPE Estructural, D=1.20m m Tuberia HDPE Estructural, D=0.90m m Caja domic. Agua potaple Und Caja domic. Alcantarillado Und Instalacin tuberas y fittings material LUF3, D=4 m Instalacin vlvula mariposa 3 B-03, instalada en tubera de HDPE C/U Instalacin vlvula mariposa 2 B-03, instalada en tubera de HDPE C/U Instalacin vlvula compuerta 8 G-10, instalada en tubera de HDPE C/U Instalacin vlvula compuerta 6 G-10, instalada en tubera de HDPE C/U Instalacin vlvula bola 2 A-08, instalada en tubera de HDPE C/U Instalacin vlvula bola 4 A-08, instalada en tubera de HDPE C/U Instalacin vlvula venteo 2, instalada en tubera de HDPE C/U Caseta de Bombeo de Efluentes PTAS, machones de concreto, capatacion efluentes en PTAPm3 Radier e=0.15m m2 Drenaje de aguas de lluvia de los edificios Glb Porton de Ingreso princial en la Garita de Control Glb Proteccion de Taludes Glb Total Table B - MEASURED WORKS

1.00 1.00 1.00 1.00 1.00 475.63 5,426.45 2,805.80 2,805.80 158.52 100.73 53.00 257.00 1,833.00 15.00 5.00 3.00 10.00 20.00 1.00 2.00 21.73 7,260.00 1.00 1.00 1.00

0.00 227,947.54 0.00 5,250.00 0.00 1.95 4.74 2.40 4.50 190.00 135.00 238.15 238.15 15.60 50.40 36.00 1,950.66 477.02 123.71 300.00 6,000.00 438.43 33.64 0.00 0.00 0.00

206,085.88 0.00 112,512.13 0.00 2,962.90 9.15 14.81 1.60 3.00 0.00 0.00 248.07 248.07 62.35 33.00 32.00 1,215.00 315.00 165.00 215.00 2,315.00 476.79 30.14 250,000.00 60,000.00 100,000.00

206,085.88 227,947.54 112,512.13 8,212.90 0.00 11.10 19.55 4.00 7.50 190.00 135.00 486.22 486.22 77.95 83.40 68.00 3,165.66 792.02 288.71 515.00 8,315.00 915.22 63.78 250,000.00 60,000.00 100,000.00

206,085.88 227,947.54 112,512.13 8,212.90 5,250.00 2,962.90 1,415,814.47 5,279.45 106,087.09 11,223.20 21,043.50 30,118.80 13,598.55 25,769.66 124,958.54 142,882.35 1,251.00 340.00 9,496.98 7,920.20 5,774.20 515.00 16,630.00 19,883.15 463,042.80 250,000.00 60,000.00 100,000.00 10,102,228.61

No se incluye las rejillas de tapas de canaletas, no hay planos de detalle. Los metrados de la partida 210.14 Carpeta de rodado incluyen los parqueos interiores No se incluye cerco de la piscina V=2700m3 No se considera ningun cerramiento de la piscina de V=2,700 m3 No se incluye el movimiento de tierras para plataforma de la piscina de V=2,700 m3 No se incluyen trabajos en parqueos Todas las excavaciones se has presupuestado en terreno comun. Se considera solo la construccion de los los radieres de concreto en los corredores peatonales, no se incluye la estructura metalica ni la cimentacion de la misma. La distancia de la obra al botadero de top soil es de 3 km La distancia de la obra al botadero de material excedente es de 3 km La distancia de la obra a las canteras es de 3 km El material que el cliente suministrara en obra son: Afirmado, material estructural, material para cama de arena de tuberias. El material suministrado por el cliente sera puesto en cantera y que cumple con las especificaciones del proyecto. No se considera trabajos de extraccion y preparacion de material en cantera, solo se incluye el carguio y transporte. No se considera mantenimientom de canteras. En los botaderos se considera conformacion e material con un tractor D6, no incluye transporte adicional a los 3km. Los agregados para para preparacion de concreto seran suministrados por un proveedor local, el costo esta incluido en el Presupuesto. Las canaletas perimetrales del sistema de drenaje se han presupuestando como estructuras de concreto simple si refuerzo. Para acometidas de la conexin domiciliaria a la red de alcantarillado de aguas servidas se considera una tuberia de 4". El concreto considerado para las cunetas es mamposteria segn planos de detalle. Consideraciones Electricas: En el alcance de GyM NO considera el conexionado electrico de las bombas de la planta Elevadora de Aguas Servidas Iluminacion Ferreteria de Procedencia Nacional Se ha considerado un solo panel de alumbrado de 40 KW Puesta a tierra y Proteccion contra Tormentas Los pararrayos de procedencia Nacional Banco de Ductos Para efectos de excavacion se ha considerado un terreno suelto Se considerado un botadero ubicado a X Km Linea y Subestaciones

2,801,653.37 7,300,575.24

7 de 26

Se ha considerado un ramal en 22.9 KV para alimetar la Planta Elevadora de Aguas Servidas La ferreteria de la Linea en 22.9 KV es de procedencia Nacional Los aisladores de la Linea en 22.9 KV son de La Marca Santa Teresinha - Brazil El alcance de Gym es hasta los tableros del Campamento.

8 de 26

PROYECTO: FRENTES
CDIGO 01 02 03 04 95 98 99

1740 - CONGA - K12 - CAMPAMENTO 3600 PERSONAS

DESCRIPCIN OBRAS CIVILES Y CONCRETO OBRAS ELCTRICAS OBRAS DE TUBERA PARTIDAS DE TRABAJOS ADICIONALES PARTIDAS INTERMEDIAS GASTOS FINANCIEROS GASTOS GENERALES

PARTIDAS DE CONTROL COSTO DIRECTO


PC 100 DESCRIPCIN TRABAJOS DE EXCAVACIN

200

TRABAJOS DE RELLENO

300

TRABAJOS DE CONCRETO

400

FABRICACIN Y MONTAJE DE CERCO

500

TRABAJOS VARIOS

600 700

RECLAMACIN INSTALACIN DE TUNERAS Y ACCESORIOS DE D =< 6"

800

INSTALACIN DE TUNERAS Y ACCESORIOS DE 6" < D < 12"

900 1000 1100 1200 1300 1400 1500

INSTALACIN DE TUBERA HSPE ESTRUCTURAL TRABAJOS DE ATERRAMIENTO TENDIDO DE CABLE DE BAJA TENSIN TENDIDO DE CABLE DE MEDIA TENSIN TRABAJOS DE ALUMBRADO INSTALACIN DE PARARRAYOS MONTAJE DE EQUIPOS ELCTRICOS

1600 1700 1800 1900 2000 2100 K82A K82B K82C

INSTRUMENTACIN Stand By por proceso de reclutamiento Costos por stand-by StandBy por Huelgas o Paralizaciones StandBy por Lluvias Trabajos Medio Ambientales F1-P1601 (K82) Instalacin de tubera HDPE para alcantarillas F1-P1701 (K82) Trabajos de concreto para alcantarillas F1-P1702 (K82) - Excavacin y relleno para alcantarillas

DETALLE Remocin de Top Soil Excavacin Estructural Excavacin de Canaletas y Canales Excavaciones en zanja para tuberas Relleno material prestamo Carpeta de Rodado Cama de apoyo para tuberas Relleno corriente para tuberas, compactado Relleno seleccionado para tuberas Berma de Seguridad en Caminos Badenes Mampostera Concreto (fc=9.8 Mpa) Concreto (fc=27.4 Mpa) Cunetas Revestidas (fc=27.4 Mpa) Base de Apoyo de Badenes Suministro y colocacin de concreto cimentaciones Sala de Bombas Incendio Suministro y colocacin de concreto Planta Elevadora Aguas Servidas Suministro y colocacin de concreto cimentaciones generadores y transformadores generadores. Caja domiciliaria, agua potaple Caja domiciliaria, alcantarillado Caseta de Bombeo de Efluentes PTAS, machones de concreto, capatacion efluentes en PTAP Radier e=0.15m Drenaje de aguas de lluvia de los edificios Cmaras de concreto para Vlvulas Cmaras Inspeccin Alcantarillado Aguas Servidas, altura igual o menor de 2.0 m Cmaras Inspeccin Alcantarillado Aguas Servidas, altura mayor de 2.0 m e igual o inferior a 3.0 m Cmaras Inspeccin Alcantarillado Aguas Servidas, altura mayor de 3.0 m Suministro de materiales bancos de ductos y canalizaciones enterradas Ejecucin bancos de ductos, canalizaciones enterradas y cmaras elctricas Porton de Ingreso princial en la Garita de Control y Cercos

Seales Instalacin de Hidrantes, D=6 Instalacin de vlvulas con poste indicador, D=6 Geotextil 400 gr/m2 Geomembrana HdPE 2.0mm Proteccion de Taludes Instalacin tuberas y fittings material LUFC, D=6 Instalacin tuberas y fittings material LUF4, D=6, 4", 3", 2" Instalacin tuberas y fittings material LUP, D=6, 4" Instalacin tuberas y fittings material LUF3, D=4 Instalacin vlvula mariposa 6, 4", 3", 2" B-03, instalada en tubera de HDPE Instalacin vlvula compuerta 6 G-10, instalada en tubera de HDPE Instalacin vlvula bola 2, 4" A-08, instalada en tubera de HDPE Instalacin vlvula venteo 2, instalada en tubera de HDPE Instalacin tuberas y fittings material LUFC, D=8 Instalacin tuberas y fittings material LUF6, D=10 Instalacin tuberas y fittings material LUF4, D=10 Instalacin tuberas y fittings material LUP, D=12, 10" Instalacin vlvula compuerta 8 G-10, instalada en tubera de HDPE Tuberia HDPE Estructural, D=1.20m Tuberia HDPE Estructural, D=0.90m Suministro de materiales para malla de puesta a tierra Ejecucin malla de puesta a tierra Suministro y Ejecucin distribucin en 400 V Suministro y Ejecucin lnea area 22.9 kV Suministro y Ejecucin del alumbrado exterior Suministro y Ejecucin de la proteccin contra tormentas Suministro generadores, transformadores, switchgear de 22.9 kV y materiales Instalacin de generadores, transformadores, switchgear y conexionados. Suministro y montaje de subestaciones Trabajos de Instrumentacin elctrica. Montaje transmisor de nivel Costos por proceso regular posterior al ingreso de personal obrero al proyecto: examen mdico, fotocheck, etc. Costos por stand-by de mano de obra y equipos en el frente de trabajo Costos por stand-by de mano de obra y equipos por huelgas o paralizaciones. Costos por stand-by de mano de obra y equipos por lluvias o alerta de tormentas Costos asociados a los trabajos medio ambientales en el campamento Costos de personal obrero en planilla 1740, que sern trasladados al proyecto 1702 Costos de personal obrero en planilla 1740, que sern trasladados al proyecto 1702 Costos de personal obrero en planilla 1740, que sern trasladados al proyecto 1702

RUBRO MO

MO

MO

MO

MO

MO

MO

MO

MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO

PROYECTO: FRENTES
CDIGO 01 02 03 04 95 98 99

1740 - CONGA - K12 - CAMPAMENTO 3600 PERSONAS

DESCRIPCIN OBRAS CIVILES Y CONCRETO OBRAS ELCTRICAS OBRAS DE TUBERA PARTIDAS DE TRABAJOS ADICIONALES PARTIDAS INTERMEDIAS GASTOS FINANCIEROS GASTOS GENERALES

PARTIDAS DE CONTROL COSTO DIRECTO


CDIGO 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 DESCRIPCIN TRABAJOS DE EXCAVACIN TRABAJOS DE RELLENO TRABAJOS DE CONCRETO FABRICACIN Y MONTAJE DE CERCO TRABAJOS VARIOS RECLAMACIN INSTALACIN DE TUBERAS Y ACCESORIOS DE D =< 6" INSTALACIN DE TUBERAS Y ACCESORIOS DE 6" < D < 12" INSTALACIN DE TUBERA HDPE ESTRUCTURAL TRABAJOS DE ATERRAMIENTO TENDIDO DE CABLE DE BAJA TENSIN TENDIDO DE CABLE DE MEDIA TENSIN TRABAJOS DE ALUMBRADO INSTALACIN DE PARARRAYOS MONTAJE DE EQUIPOS ELCTRICOS INSTRUMENTACIN

COSTO INDIRECTO 99 - GASTOS GENERALES


9101 9102 9103 9104 9201 9202 9203 9204 9205 9206 Personal de Direccin Personal de Apoyo Sistemas y Comunicaciones Gastos de Oficina Principal Equipos y Vehculos de apoyo Alojamiento y alimentacin Gastos Personal Infraestructura de operacin Gastos de operacin Control de Calidad

9207 9208

Prevencin de Riesgos y Medio Ambiente Topografa

98 - GASTOS FINANCIEROS
9501 9502 9503 9504 9505 Costos de Financiamiento Garantas y Fianzas Seguros ITF SENCICO

95 - PARTIDAS INTERMEDIAS
SC01 SC02 SC03 CEQ SMI EMSA

REPORTE DIARIO DE PRODUCCIN 1702 - 1732 Minas Conga

FRENTE (*) PROGRESIVA INGENIERO/CAPATAZ (RESPONSABLE DEL FRENTE)

ACTIVIDAD Excavacin de Top-Soil (m3) Excavacin de Suelo Comn (m3) Excavacin de Roca Escarificable (m3) Excavacin de roca volada (m3) Perforacin (m3) Voladura (m3) Relleno Masivo (m3) Relleno Estructural (m3) Lastre (m3)

CANTIDAD

CANTIDAD

CANTIDAD

Alcantarilla
Excavacin (m3) Tubera (ml) Relleno (m3) Concreto (m3)

EQUIPOS Cargador Frontal Minicargador Excavadora 330 Retroexcavadora Tractor D6 Tractor D8 Motoniveladora 140 h

Cantidad (und)

Horas

Horas

Rodillo Liso Vibratorio 1-3 ton Rodillo Liso CS 533 (10-12 ton) Camin Cisterna de Agua 4000 gln Camin Volquete 15 m3 Zaranda de Gravedad Esttica Zaranda Vibratoria 100-300 ton/hr Grupo Electrgeno 100 kw Torre de Iluminacin 04x500kw-15kw Camin Cisterna D2 Perforadora Sobre Orugas Perforadora RockDrill

OBSERVACIONES:

(*) FRENTE 1: (6+520 - 10+420) FRENTE 2: (13+929 - 10+420)

FIRMA INGENIERO RESPONSABLE

CIN
FECHA: ________________

CANTIDAD

CANTIDAD

CANTIDAD

Horas

Horas

Horas

S-ar putea să vă placă și