Sunteți pe pagina 1din 10

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time

: Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

1 a)

Lighting HPSV (middle)*

Length : Height : 22 cm

160 cm

Width : b) Ballast Details(pic)*

32 cm c) Bulb/Lamp Details(pic)*

photo

photo

Brand : Made : Voltage : Ampere : Watt :

Brand : Made : Watt : Units : * no result due to closed tunnel

d)

Lighting Units `

*Refer Lighting Arrangement

*Take photo for any damage and bad performance of lighting.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

1 a)

Lighting HPSV interior (middle)*

Length : Height :

Width : b) Ballast Details(pic)* c) Bulb/Lamp Details(pic)*

photo

photo

Brand : Made : Voltage : Ampere : Watt :

Brand : Made : Watt : Units : * no result due to closed tunnel

d)

Lighting Units

*Refer Lighting Arrangement

*Take photo for any damage and bad performance of lighting.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

1 a)

Lighting HPSV interior (middle)*

Length : Height :

Width : b) Ballast Details(pic)* c) Bulb/Lamp Details(pic)*

photo

photo

Brand : Made : Voltage : Ampere : Watt :

Brand : Made : Watt : Units : * no result due to closed tunnel

d)

Lighting Units

*Refer Lighting Arrangement

*Take photo for any damage and bad performance of lighting.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

1 a)

Lighting Sodium (middle)*

Length : Height :

Width : b) Ballast Details(pic)* c) Bulb/Lamp Details(pic)*

photo

photo

Brand : Made : Voltage : Ampere : Watt :

Brand : Made : Watt : Units : * no result due to closed tunnel

d)

Lighting Units

*Refer Lighting Arrangement

*Take photo for any damage and bad performance of lighting.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

1 a)

Lighting Fluorescent (middle)*

Length : Height : 20 cm

160 cm

Width : b) Ballast Details(pic)*

43 cm c) Bulb/Lamp Details(pic)*

photo

photo

Brand : Made : Voltage : Ampere : Watt :

Parmar England 220 V 0.41 A 65 W

Brand : Made : Watt : Units :

Osram Gt. Britain 65 W 2

d)

Lighting Units

*Refer Lighting Arrangement

*Take photo for any damage and bad performance of lighting.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : 4 Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

Lux Meter Measurement


Threshold Transition 1 Transition 2 Interior Zone TUNNEL Exit Zone

a)

L20 20m from portal (outside) Threshold 1m from portal (inside) Transition 1 16m from portal (inside) Transition 2 42m from portal (inside) Interior 100m from portal 1 2 3 4 5 6 Average Exit 1m from exit portal (inside)

Day lux Day lux Day lux Day lux Day lux lux lux lux lux lux lux lux Day lux

Night lux Night lux Night lux Night lux Night lux lux lux lux lux lux lux lux Night lux

b)

c)

d)

e)

g)

* no result due to closed tunnel

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

F-65W - 2 lamps (196 units) S-N/A W - 2 bulbs (38 units) S-N/A W - 2 bulbs (79 units)

S-N/A W - 2 bulbs (79 units) S-N/A W - 2 bulbs (38 units) F-65W - 2 lamps (196 units)

* no lamp watt due to closed tunnel

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : 5 a) Ventilation Jet Fan Parameters Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

127 cm

73 cm

73 cm

65 cm A B C

b) c)

Jet fan units : Vibration Test

4 unit

b.1) On condition

b.2) Off condition N/A mm/s

0.2

mm/s

N/A

mm/s

0.2

mm/s

N/A

mm/s

0.3

mm/s

*Notes - Can't control the swtich ON & OFF jet fan inside tunnel. Need to control from Control Room.

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : 5 d) Ventilation Jet Fan Name Plate Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

No plate

Brand : Diameter : Voltage : Power : Current : RPM : Frequency : Type of Phases : Pitch angle : Reference :

VOITH 380 18500 1465 50 3 40 mm V W A rpm Hz Phase


o

Feasibility Testing Of Lighting and Ventilation Systems Condition Testing Form Tunnel Name : Tunnel Code : Date : Time : e) Pressure test 1m entrance Interior (under Jet fan) 1 2 3 4 5 6 7 1m exit f) Velocity test/ Temperature 1m entrance Interior (under Jet fan) 1 2 3 4 5 6 7 1m exit m/s C Pa Pa Al-Muaissim (Vehicle) 5B 19-May-10 8:30 AM

Pa Pa Pa Pa Pa Pa Pa Pa

Pa Pa Pa Pa Pa Pa Pa Pa

m/s m/s m/s m/s m/s m/s m/s m/s * no result due to closed tunnel

C C C C C C C C

S-ar putea să vă placă și