Sunteți pe pagina 1din 182

3.

60MLDMEGHNAGAR(INDUSTRIALAREA)WATERSUPPLY
PROJECT
DISTRICT:JHABUA
INDEX
General Report
Page No.
Chapter : 1 : Sector Background Context & Rationale
1.0 District Profile 1
1.1 Introduction 2
1.2 Town Profile 3
1.3 Topography 4
1.4 Climate & Rainfall 4
1.5 Educational Facility 4
1.6 Business & Economy 4
1.7 Water Resources 5
1.8 Existing Water Supply Scheme 6


Chapter : 2 : Project Definition Concept & Scope
2.0 Proposed Project 10
2.1 Sources 10
2.2 Rate of Water Supply 11
2.3 Design criteria 11
2.4 Proposed Component 12
2.4.1 Rising Main 12
2.4.2 Pumping Machinery 13
2.4.3 Pump House 13
2.4.4 Clear Water Sump 14
2.4.5 Elevated Storage Reservoir 14
2.4.6 Distribution System 14



3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 1
Final Project Report For Meghnagar Water Supply
Chapter : 3 : Project Cost
3.1 Component wise project cost is detailed as under 15
3.2 SOR Adopted 15


Chapter : 4 : Project Financial Structuring
4.1 Cost of Project 16

Chapter : 5 : Project Financial Viability & Sustainability 17



Chapter : 6 : Project Benefit Assessment 24



CONCLUSION 25

Design

(1) Designs of Pumping Machineries 37
(2) Capacity of Clear Water Sump 39
(3) Design of Sump of 6,00,000 Litre Capacity 44
(4) Design Of Intze TANK OF 4,00,00 Litre 50
(5) Design of Barrage 67
(6)
(7)
Design of Pump House.
Design of Distribution System
95
110

Estimates

(1) Estimate of Sump 118
(2) Estimate of Intze Tyoe Tank 122
(3) Estimate of Barrage Type Structure 129
(4) Estimate of Intake Well 134
(5) Estimate of Intake Well Connecting Bridge 137
(6) Estimate Of Pumping Machinery 141
(7) Estimate of Pump House 143
(8) Estimate of Rising main From Intake Well to Existing Pipe line

152
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 2
Final Project Report For Meghnagar Water Supply
9) Distribution System 156


10) Compound Wall 164
Drawings

(i) India Showing Madhya Pradesh 169
(ii) Madhya Pradesh Map 170
(iii) Jhabua District Map 171
(iv) Sump 172
(v) Intze Type Tank 173
(vi) Barrage Type Structure 175
(vii) Intake Well With Bridge 176
(ix)
(x)
(xi)
Pump House 177
Distribution System 178
Flow Diagram 179




3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 3


Final Project Report For Meghnagar Water Supply

CHAPTER : 1

SECTOR BACKGROUND CONTEXT & RATIONALE

1.0 District Profile :
Jhabua district lies in the western part of Madhya Pradesh. It is surrounded by
Panchmahal and Baroda districts of Gujarat, Banswara district of Rajasthan, and
Alirajpur, Dhar and Ratlam districts of Madhya Pradesh.

It has an area of 3,782 sq km. The terrain is hilly and undulating. Average rainfall in the
district is about 800 mm. The district is divided into five tehsils and six community
development blocks.

Jhabua district was divided into two parts in May 2008,
namely Alirajpur and Jhabua. Aliarajpur, Jobat,
Udaigarh, Bhabra, Sondawa and Katthiwada are the 6
blocks of new district, Alirajpur. Jhabua district now
consists of Habua, Meghnagar, Ranapur, Rama,
Thandla and Petlawad blocks.

Cultural Profile
Inhabited by the tenacious and hardworking tribes -
the Bhils and Bhilalas, the district is highly drought-
prone and degraded waste lands form the face for Jhabua. Although almost half of the
population lives below the poverty line, the tribals still revel in their traditional colorful
festivities and continue to make merry on the occasions like "Bhagoriya". The women
make lovely ethnic items including bamboo products, doll, bead-jewellery and other
items that have for long decorated the living rooms all over the country. The men have
since ages adorned "Teer-Kamthi", the bow and arrow, which has been their symbol of
chivalry and self defence.




3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 1
Final Project Report For Meghnagar Water Supply


1.1 Introduction:
Availability of adequate potable water has always been the prime consideration for
human settlement. Due to absence of proper vision and judicious planning, this gift of
nature has become a scare commodity, over a period of time.
Following are the benefit by supplying water to industrial area, Employment generation
due to development of industries and industrial production due to availability of additional
water will give boost to the economic development, increase productivity, and increase
the income level and affordability for the purpose of full cost recovery.

Madhya Pradesh Audhyogik Kendra Vikas Nigam (Indore) Limited, was incorporated as
a Public Limited Company on 16th November ,1981 under the companies act, 1956 as a
wholly owned subsidiary of Madhaya Pradesh Audyogik Vikas Nigam Ltd (MPAVN), now
called MPSIDC.

MPSIDC is the state Industrial development corporation and is working as an apex
organization for various industrial development and promotional activities in the state.
The State Government has developed six corporations for specialized industrial activities
relating to promotion and development of industrial estates, basic infrastructure facilities
and for the regular maintenance, administration and management of such development.

MPAKVN (Indore) Ltd is one among the six. M.P. Audhyogik Kendra Vikas Nigam
(Indore) Ltd. has its corporate head office at Indore and has developmental activities in
surrounding districts of western Madhya Pradesh.

Following are some of the development activities of M.P. AKVN

- Growth Centre, Pithampur, Dist.Dhar.
- Growth Centre, Kheda, Dist. Dhar.
- Growth Centre, Meghnagar, Dist.Jhabua.
- Growth Centre, Maksi, Dist. Shajapur.
- Industrial Area, Dewas, Dist. Dewas.
One of the Industrial Development Area in Meghnagar (Dist. Jhabua). In this Industrial
area, development work have been started, following is the Area Statement total land
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 2
Final Project Report For Meghnagar Water Supply

223.75 hect. Road 29.03 hect. Amenities 10.00 hect. Park 4.50 hect. Open 7.80 hect
plantation 18 hect. Plots 144.42 hect. Total number of plots 172 of different size

M.P Audyogik Kendra Vikas Nigam (Indore) LTD. Of Madhya Pradesh has assign the
work of Preparation of DPR for 3.60 MLD Water Supply Project at I/A Meghnagar to
WAPCOS under Work Order No. AKVN/IND/ACCTTS/10-11/1486 dated 27.1.2011.


1.2 Town Profile :


Meghnagar is a Industrial place 17 km away from Jhabua city, located at 22
0
5414N
Latitude and 74
0
3236E Longitude. It is located on Delhi-Mumbai BG Railway line.
Meghnagar is a Industrial development area in Jhabua District. And Meghnagar is 17k.m
away from Jhabua and is connected through SH 39.

Meghnagar is 170 Km away from Indore and 85 Km away from Dahod (Gujarat) Rail
head BG (WR) and located on state hightway River Anas is flowing near by the town
which is approximately 8 Km away from the Meghnagar Industrial Area. Meghnagar is a
developing industrial area of the district. Nearset Airport is 170 Km away in Indore.

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 3
Final Project Report For Meghnagar Water Supply


The main crops of the area are Maize, Jowar, Bajra, Cotton, Wheat, Urad, Arhar,
Groundnut and Gram. The Meghnagar is the rapid growing industrial area in the Madhya
Pradesh State several industries have established here in meghnagar and provided
Employment for the people in this region.

1.3 Topography :
The topography of the terrain is hilly, undulating typically. A Anas river is passing near by
the Industrial Area and meghnagar village which is the main source of water supply.
.
1.4 Climate & Rainfall :
Climate is generally moderate and seasons are well defined. The summers are hot,
winters are short and the monsoon season is generally pleasant. The average rainfall in
the district is about 800mm. Most of the rainfall occurs in monsoon season while there is
also a little of rainfall in winter season. Maximum Temperature 42
0
C in summer and
Minimum Temperature 10.6
0
C in winter.


1.5 Educational Facility :

The district is served well with several educational institutes, comprising both the private
and government sectors. There is a government degree college, Girls Degree College,
Govt. polytechnic college, Govt. college in Petlawad, Govt. college in Thandla along with
several English- and Hindi-medium schools. Technical training institute located in nearby
area by the name of ITI Pithampur.

1.6 Business & Economy :

The district has an agriculture based economy. The women make lovely ethnic items
including bamboo products, doll, bead-jewellery and other items that have for long
decorated the living rooms all over the country. The main crops of the area are Maize,
Jowar, Bajra, Cotton, Wheat, Urad, Arhar, Groundnut and Gram. Limestone Dolomite,
Calside etc. Meghnagar is a developing industrial area of the district.






3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 4
Final Project Report For Meghnagar Water Supply


1.7 Water Resources :

1. The Mahi
It forms the north-eastern and east-northern boundaries of the District in Petlawad
Tahsil. The pampawati of Petlawad, combined with the Ladki, joins it near
Bhairongarh Railway Station.
2. The Anas
The Anas is a large tributary of the Mahi. It rises from the south-eastern part of
Jhabua tahsil. The northern off shoot of the Vindhyachal range bifurcates at
Phurtalao hill (1770 ft. ) into the northern and western branches. The Anas flows
to the north for about 37 kms, 9 kms to the west and towards the north-west for
another 44 kms within the District. Most of the later course lies Gujarat. The Anas
maintains this direction in Kushalgarh Tehsil for 4 kms but turns to the west and
joins the left bank of the Mahi, 25 kms beyond. River Negri is meeting to the Anas
near Jhabua Meghnagar on upstream of bridge on SH 39.
3. Kunda
There is a scared Kunda at Devjhiri 6 kms. East of Jhabua on Dhar road. A
certain sadhu lived here and used to bath in the Anas every day. In his old age he
prayed the mother goddess Anas and created this Kunda which is believed to be
equally sacred.
4. Tank
A very old tank exists in village Bhagore. An inscribed victory pillar on its bank is
dated V.S.1336 (A.D. 1279). It is said that a Bhairava, named Bagga got the tank
dug with the assistance of a nimph, on the occasion of a famine. The head of a
broken image is believed to be that of Bagga. Some other temples of Antiquity,
dedicated to Lord Shiva, Ram and Hanuman are located on the bank of the tank.












3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 5
Final Project Report For Meghnagar Water Supply


1.8 Existing Water Supply Scheme :

1.8.1 Source:-
River Anas is Passing by approximately 8 km from Meghnagar Industrial Area, at present
AKVN is withdrawing water from Anas River as per requirement of existing established
Industries approximately 3.6 MLD. Details regarding source is given in table I.
Table I
Sr.
no
Location DUG WELL Type of
Structure
Remarks
Dia Depth
1 Anas river Harshwardhan stop
dam
5m 3m RCC Running
Condition
2 Anas River Amarpura Site 5m 3m Brick Masonry Not working

1.8.2 Check Dam / Barrage:-
Details Regarding Check dam is Shown in Table II
Table II
Sr.
No.
Location Type of structure

Live Capacity in
Mcumec
1. Anas River Harshwardan Stop
Dam
Shear Masonry 0.431

There is one Stop dam Across Anas river constructed by M/ S Harshwardhan
chemicals and fertilizers, having capacity of 15.21 MCFT


1.8.3 Storage:-
There is one underground sump near Anas river Amarpura site which is not currently
working and one sump at Water Treatment Plant and one ESR for Meghnagar Gram
Panchayat and Details of sump, and ESR are given in table III.




3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 6
Final Project Report For Meghnagar Water Supply


Table III
Sr.
No.
Location Size

Capacity in
Liters
Remark
1. Anas River Amarpura site 7.5mX4m 1,50,000 ltr Not in
Working
Condition

2. AT Water Treatment Plant 4mX4m 80,000 ltr Working
Condition
3. OHT Tank at Meghnagar
village
7.8mX4.3m 2,00,000 ltr Working
Condition

RCC Tank Capacity 1,50,000 liters is constructed on bank of River Anas to
collect water, but right now, not in a working condition.
Water Pumped from River Anas is collected in RCC sump of capacity 80,000 liter
at the water treatment plant by rising main of 150mm dia. GI pipe 170m and
300mm dia. CI Pipe class LA 6500m respectively.
To distribute water in Meghnagar town one Elevated Reservoir capacity 2,00,000
liters and height 12m RCC structure. Water is collected in this Elevated Reservoir
and distributed to town by DI pressure pipes.

1.8.4 Pumping Machinery:-
Details of location of pump and pumping machineries are showing in Table IV.
Table IV
Sr.
No
Location Type &
Make
Head
in m
HP Discharge
in LPM
Hours of
Pumping
Remarks
1 Anas River

Wet
(CRI
MAKE)
54 to
85m
20 660 to 960 10 2 no. working
at a time and
one standby
2 At Water
treatment
plant
Wet
(CRI
Make)
25 to
36m
10 700 to 900 5 2 no.

In River Anas two numbers of wet type Pump of 20 HP is operating for 10 hours
per day having discharge of 660 to 960 LPM.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 7
Final Project Report For Meghnagar Water Supply


Pump of 10HP in Pump House Near Site office AKVN is operating for 5 hours per
day having Discharge of 700 to 900 LPM.
There are total two(2) no. of pump at pump house for the Distribution, one for the
Industrial Area and one for the Meghnagar town.



1.8.5 Rising Main:-
Details of location of Rising Main are given in below Table V.
Table V
Sr.
no
Location Type and class of
pipes
Dia in
mm
Length in
m
1 Anas river Harshwardhan Stop
Dam
GI Pipe 150mm 170m
2 From Pump House to
Meghnagar I/A
CI Pipe Class LA 300mm 6500m
3 From WTP to Gram panchayat
OHT
PVC 6 kg/cm
2
110mm 400m
4 Amarpura Site to I./A
Meghnagar
CI Pipe
Class LA
300mm 8000m

Rising main from Anas river Harshwardhan stop dam to pump house is of GI Pipe
of 150mm dia. and 170m dia. in length.
Rising main from Pump House to Meghnagar I/A is of CI Pipe of 300mm dia. and
6500m in length.
Rising main from WTP to Gram Panchayat OHT is of PVC Pipe of 110mm dia.
and 400m in length.

1.8.6 Water Treatment Plant:-
Details Regarding the Water Treatment Plant are given in below Table VI.
Table VI
Sr.
no
Location Type of WTP Design Capacity
in MLD
Year of
Construction
1 Meghnagar AKVN
Site Office
Rapid Sand
Gravity Filter
3.6 MLD 2010


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 8
Final Project Report For Meghnagar Water Supply


1.8.7 Distribution Lines:-
Details of the Distribution line are given below Table VII.
Table VII
Sr.
No.
Location Type and Class
of pipes
Dia in mm Length in m
1. From front of Mahavir
Beverage
AC Pressure Pipe 100mm 400m
2. From Mahavir Beverage to
other Industries
PVC Pipe 6
kg/cm
2

160mm 2000m
3 From Mahavir Beverages to
other Industries
PVC Pipe 6
Kg/cm
2

110mm 3000m
4 From OHT to Meghnagar
Gram panchayat
PVC, GI, AC
Pressure
75,100 & 110
mm
----

Distribution Line from Front of Mahavir Beverage is of AC Pressure Pipe 100mm
dia. And 400m length.
From Mahavir Beverages to Other Industry PVC Pipe 6 Kg/cm
2
of 160mm dia and
2000m length.
From Mahavir Beverages to Other Industry PVC Pipe 6 Kg/cm
2
of 110mm dia and
3000m length.
From OHT to Meghnagar Town with PVC, GI, AC pressure pipes of different size

1.9 Water supply facility in Meghnagar Village:-
As per agreement between AKVN and Gram Panchayat provision of two lakhs liter
supply of water per day is to be supplied to Meghnagar Gram Panchayat up to in existing
OHT at Meghnagar and distribution of water to the people will be made by Meghnagar
Gram Panchayat.
As per norms of water supply to villages 40 LPCD and accordingly water requirement in
Meghnagar village is calculated in Annexure IV attached here with.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 9
Final Project Report For Meghnagar Water Supply


CHAPTER: 2

PROJECT DEFINITION, CONCEPT AND SCOPE

2.0 Proposed Project :
Madhya Pradesh, the second largest Indian State covering 9.5% of the country's area is
endowed with rich natural resources, salubrious climate and fertile agro-climatic
conditions. The economy of the state is largely agrarian, employing 77% of the total
work force and contributing 40% to the State Domestic Product. Continuous efforts have
been made towards industrialization of the state. The industrial sector contributes only
8% to employment of the state work force and 23% to state GDP. The rate of annual
Industrial growth in the recent past has varied from 4% to 6%. In the short to medium
term, the state needs to concentrate on industrial development as a source for value
generation along with agriculture, before services can start playing a pre-dominant role
in the State's Economy.

MPSIDC is the state Industrial development corporation and is working as an apex
organization for various industrial development and promotional activities in the state.
The State Government has developed six corporations for specialized industrial
activities relating to promotion and development of industrial estates, basic infrastructure
facilities and for the regular maintenance, administration and management of such
development.

The main Objective to propose this project is to provide Basic Water Infrastructer Facility
to the industries for the development of the industries and Following are the benefit by
supplying water to industrial area, Employment generation due to development of
industries and industrial production due to availability of additional water will give boost
to the economic development, increase productivity, and increase the income level and
affordability for the purpose of full cost recovery.

2.1 Sources:
The only source is the Anas river flowing near by the Industrial area. Anas River is
approximately 8 Km away from the industrial area. Anas River, a large tributary of the
Mahi River, originates from the south-eastern part of Jhabua in Madhya Pradesh.

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 10
Final Project Report For Meghnagar Water Supply


The river flows 37 km to the north, 9 km to the west and the north-west for about 44 km
within Jhabua District. Kushalgarh is the place, where the Anas River joins the left bank
of the Mahi.

Kali (of Guwali) and Khan rivers, two famous rivers flowing mostly in Panchmahals
District of Gujrat, join the Anas in Jhabua near Guwali village.

For Industrial Area necessary provision is made from Anas, Water for drinking purpose
and requirement of Industrial Area 3.60 MLD.

It is proposed to obtain water from Anas River. Near bridge and bring the water, directly
in the existing water treatment plant of 3.60 MLD through Rising main of 300 mm dia
D.I. Pipe line having length of 8000 m.

The treated water will be collected in the proposed Clear Water sump of 12 Lacs liters
capacity. The water from this sump will be pumped with the use of pumping machinery
having 45 LPS discharge against 36 m head into the ESR of Capacity 4,00,000,
Water collected in the ESR will be supplied in various industries, through Distribution
System. Designs of Rising mains, Pumping machineries, Distribution System, Clear
Water Sump, ESR are made as per requirement.

2.2 Rate of Water Supply:
Requirement of water supply is 40 LPCD for Drinking Purpose Only.

2.3 Design Criteria:
Rural Area :- 40 LPCD for Drinking Purpose only.
Rising Main :- DI. K-9 Pipelines.
Storage at HW :- Maximum 24hours storage for ultimate demand is Proposed
in form of RCC ESR & Sump .
Distribution System :- Design for ultimate population considering peak factor 3.0
DI (K-7))Pipes in all sections maximum
head loss 0.01m/1000m.




3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 11
Final Project Report For Meghnagar Water Supply


2.4 Proposed Components:
2.4.1 Rising Main:
Rising main of 200 mm dia D.I pipes (k-9) of length 200m from ntake well to
Existing pipe line . Details of Rising Main are Shown Table V.
Table V.
Sr.
No.
Location Type and
Class of
pipes
Dia in mm Length in
m
Discharging
Capacity in
MLD
1. From ntake well
To Existing Pipe
/LQH
DI (K-9) 20mm m 3.60

Rising Main From Intake Well to the Water Works Near AKVN office is Proposed
to be utilized of existing pipe of CI of 300mm dia. Having discharge capacity of
3.60 MLD.
Rising Main from Intake well to the Existing pipe line is Proposed of DI Pipe of
200mm dia. Having length of 200m and having Discharge Capacity of 3.60 MLD.

2.4.2 Pumping Machineries:
Submersible Pumps with motor capable of discharging 63 lps against 57 m head. 2 sets
(1 Stand bye) of pump for pumping water into water treatment plant and Submersible
Pumps of with capable of discharging 34 lps against 36 m head 2 Sets (1 Stand bye) on
clear water sump for pumping water from clear water sump to ESR and Submersible
Pumps of with capable of discharging 31 lps against 29 m head 2 Sets (1 Stand bye) on
clear water sump for pumping water from clear water sump to Meghnagar village ESR.
Details Regarding Pumping Machineries is shown in Table VI.
Table VI
Sr.
No.
Location Discharge
(LPS)
Head
(m)
HP of
Pump
Pumping
Hours
1. On Intake Well 63 57 75 HP 16 Hrs.
2. On Clear Water Sump 34 36 25 HP 22 Hrs.

Two Submersible Pumps (One Stand By) of 75 HP on Intake Well is Proposed
which will be Operating for 16 hours per day.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 12
Final Project Report For Meghnagar Water Supply


Two Submersible pumps (One Stand By) of 26 HP on Clear Water Sump is
Proposed which will be Operating for 22 hours per day.

2.4.3 Pump House:
Pump house of 7.5 m X 5.0 m size is proposed to construct on bank of river Anas to
install pumping machineries. Details are shown in Table VII.
Table VII
Sr.
No.
Location Size

Remark
1. At Anas River Bank 7.5 X 5.00 RCC Structure


2.4.4 Clear Water Sump:
One Clear Water Sump of Capacity 12.00 lacs litre is to be constructed near WTP For
Pumping of Water from Sump to ESR. Details Regarding Storage is shown in Table VIII.

2.4.5 Elevated Storage Reservoir:
One RCC ESR capacity 4.00 lacs litre having height of 12m is proposed. Details
Regarding Storage is Shown in Table VIII.
Table VIII
Sr.
No.
Location Size
Dia. X H
Capacity in
Litres
Remark
1. Clear Water Sump Near WTP 15.0 X 7.0 12,00,000 ltr RCC
2. Elevated Storage Reservoir (ESR)
At Water Works Near Cold Storage
10.0 X 5.0 4,00,000 ltr RCC

Underground Clear Water Sump of Capacity 12,00,000 litres is Proposed Near
Water Treatment Plant to collect water, from Water Treatment Plant.

To distribute water in Industrial Area of Meghnagar one Elevated Reservoir
capacity 4,00,000 liters and height 12m of RCC Structure is Proposed Water will
be collected in this Elevated Reservoir and distributed to industries by 200mm
and 150mm dia. DI (Class k-7) Pipes Respectively.


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 13
Final Project Report For Meghnagar Water Supply


2.4.6 Distribution System
To distribute Water From ESR to the Industrial Area is Proposed of DI Pipes of
Class k-7 of 250mm, 200mm, 100mm, dia of Different Length, and Details Regarding
Distribution Lines is Shown in Table IX.
Table IX
Sr. No. Name of Zone
D.I (k-7)
250 200 100
1 Distribution System 1150 1000 2875
Total
1150 1000 2875
(Length in Metre)




















3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 14
Final Project Report For Meghnagar Water Supply


CHAPTER: 3

PROJECT COST

3.1 Component wise project cost is detailed as under:-



Sr.No Description Estimated Cost
(Rs. In lacs)
1 Barrage 1185.66
2 Pumping Machinery On intake and
On Clean Water Sump
21.26
3 Pump House 7.50 m X 5.00 m size
Near Anas Bank
7.42
4 RCC Clear Water Sump Capacity 6
lac litre
30.91
5 Rising Main From Intake well to
Existing pipe line
6.31
6 RCC ESR Capacity 4 lac litre 36.
7 Distribution System 83.50
8
INTAKE WELL WITH APPROACH BRIDGE
52.74
9
COMPOUND WALL
27.82

Total Rs. 1452.

Total Gross Rs. 1452.


1.5 % Third Party Inspection 21.7
DPR Preparation 16.50
2.5 % PMC 36.3

Total Cost 152






3.2 SOR ADOPTED: - M.P. Public Works Department and Public health Engineering
Department SOR 2009,MP PWD,Electrical,PWD Road Bridges Work.

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 15


Final Project Report For Meghnagar Water Supply


CHAPTER: 4

PROJECT FINANCIAL STRUCTURING

Financial Aspect:

4.1 Cost of Project :
a. Net Cost Rs. 1452.Lacs
b. Gross Cost Rs. 1452.Lacs
c. Cost for Approval Rs. 152 Lacs

























3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 16
Final Project Report For Meghnagar Water Supply


CHAPTER: 5


















PROJECT FINANCIAL VIABILITY AND SUSTAINABILITY



















3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 17
Final Project Report For Meghnagar Water Supply
]
(A) Direct Charges
Sr.
No.
Details Amount (Rs.)
1 Establishment Charges 396000.00
2 Energy Charges 3335570.00
3 Annual M&R 754000.00
TOTAL 4485570.00
Say Rs. 4486000.00
(B) Indirect Charges
1 Annual Depriciation Charges 2394000.00
Total A + B = Rs. 6880000.00
ANNEXURE - II - A
STATEMENT SHOWING THE ANNUAL BURDEN
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 18
Final Project Report For Meghnagar Water Supply
(A)
(1) Establishment Charges
Sr.
No.
Description No Total Per
Month
Total per
year (Rs.)
1 Pump Operator 4 5000.00 240000.00
2 Line man cum Valveman 2 3500.00 84000.00
3 Chowkidar 2 3000.00 72000.00
Total = 396000.00
(2) Energy Charges
Pumping Machinery HP Hours Sets Total HP
On Intake Well 75.0 16 1 1200.00
On Clear Water Sump to ESR 25 22 1 550.00
Total = 1750.00
Yearly Electrical Consumption
1750 X 0.746 X 365 = 476510.00 Units
Considering Rs. 5.00 per Unit
Rs. 7.00 X 476510 = 3335570.00
Say = 33.36 Lacs
Year Increase in
price by
every 3
years
7%
1 2012 476510.00 7 3335570 33.36 Lacs
2 2013 476510.00 7 3335570 33.36 Lacs
3 2014 476510.00 7.0 3335570 33.36 Lacs
4 2015 476510.00 7.5 3569059.9 35.69 Lacs
5 2016 476510.00 7.5 3569059.9 35.69 Lacs
6 2017 476510.00 7.5 3569059.9 35.69 Lacs
7 2018 476510.00 8.0 3818894.093 38.19 Lacs
8 2019 476510.00 8.0 3818894.093 38.19 Lacs
9 2020 476510.00 8.0 3818894.093 38.19 Lacs
10 2021 476510.00 8.6 4086216.68 40.86 Lacs
11 2022 476510.00 8.6 4086216.68 40.86 Lacs
12 2023 476510.00 8.6 4086216.68 40.86 Lacs
STATEMENT SHOWING ANNUAL M&R CHARGES
ANNEXURE - II - B
Direct Charges
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 19
Final Project Report For Meghnagar Water Supply
13 2024 476510.00 9.2 4372251.847 43.72 Lacs
14 2025 476510.00 9.2 4372251.847 43.72 Lacs
15 2026 476510.00 9.2 4372251.847 43.72 Lacs
16 2027 476510.00 9.8 4678309.476 46.78 Lacs
17 2028 476510.00 9.8 4678309.476 46.78 Lacs
18 2029 476510.00 9.8 4678309.476 46.78 Lacs
19 2030 476510.00 10.5 5005791.14 50.06 Lacs
20 2031 476510.00 10.5 5005791.14 50.06 Lacs
21 2032 476510.00 10.5 5005791.14 50.06 Lacs
22 2033 476510.00 11.2 5356196.519 53.56 Lacs
23 2034 476510.00 11.2 5356196.519 53.56 Lacs
24 2035 476510.00 11.2 5356196.519 53.56 Lacs
25 2036 476510.00 12.0 5731130.276 57.31 Lacs
26 2037 476510.00 12.0 5731130.276 57.31 Lacs
27 2038 476510.00 12.0 5731130.276 57.31 Lacs
28 2039 476510.00 12.9 6132309.395 61.32 Lacs
29 2040 476510.00 12.9 6132309.395 61.32 Lacs
30 2041 476510.00 12.9 6132309.395 61.32 Lacs
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 20
Final Project Report For Meghnagar Water Supply
%age Total Life Factor of
Depriciation
1 Rising Main From Intake well to Existing Pipe line 6.31 6.50 0.50 0.0325 5.85 30 0.0181 0.106
2 Pumping Machinery On intake and On Clean Water Sump 21.26 21.90 2.50 0.5474 19.71 30 0.0302 0.595
3 Pump House 7.50 m X 5.00 m size Near Anas Bank 7.42 7.64 1.00 0.0764 6.88 30 0.118 0.812
4 RCC Clear Water Sump Capacity 6 lac litre 30.91 31.84 0.50 0.1592 28.65 15 0.0181 0.519
5 RCC ESR Capacity 4 lac litre 36 37.64 0.50 0.1882 33.87 30 0.0181 0.613
6 Distribution System 83.50 86.01 0.50 0.4300 77.40 30 0.0181 1.401
7 Barrage 1185.66 1221.23 0.50 6.1061 1099.11 30 0.0181 19.894
8 Intake well with approach Bridge 52.74 54.32 0.50 0.2716 48.89 30 0.0181 0.885
9 COMPOUND WALL 27.82 28.65 0.50 0.1433 25.79 30 0.0181 0.467
1452. 7.5399 23.939
1452.0 7.54 23.94
Total
Say
STATEMENT SHOWING THE DETAILS OF ANNUAL M&R CHARGES AND DEPRICIATION COST
Est.
No.
Particulars Net Cost
(Rs. In
lacs)
Gross
Cost
(Rs. In
M&R to civil works 90% of
gross Cost
(Rs. In lacs)
(B) Indirect Charges
ANNEXURE - III - A
Annaul Depriciation Total
Depriciation
(Rs. In Lacs)
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 21
Final Project Report For Meghnagar Water Supply
(A) Direct Charges
Sr. No. Details Year 2011
(Base Year)
1 Establishment Charges 396000.00
2 Energy Charges 3335570.00
3 Annual M&R 754000.00
TOTAL OPERATIONAL COST (Present Stage) 4485570.00
Annual Depreciation Charges 2394000.00
Total Annual Operational Cost =Direct Charges +
Indirect Charges
6880000.00
M&R Cost at intermediate stage will be
4485570 X 1.25 5606963.00
Annual Depreciation Charges 2394000.00
M&R Cost with depreciation at intermediate stage 8001000.00
M&R Cost at Ultimate stage will be
4485570 X 1.5 6728355.00
Annual Depreciation Charges 2394000.00
M&R Cost with depreciation at Ultimate Stage 9123000.00
M&R Cost as Per Statement Rupees
Total M&R Cost at Present Stage 6880000.00
Total M&R Cost at Intermediate Stage 8001000.00
Total M&R Cost at Ultimate Stage 9123000.00
ANNEXURE - III - B
STATEMENT SHOWING THE OPERATIONAL COST
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 22
Final Project Report For Meghnagar Water Supply
(1) Anticipated Income at Present Stage - 2011 (after Completion of Project)
Sr.
No.
Size of
Connection
Water
Required in
Kilo litre
Rate per
Year (Rs.)
Amount in
Rs.
New
Connection
Charges
Total
(Rs.)
Old
Connection
New
Connection
Cummulative
1 Commercial
Connection
------
40 40 5 20 1460000.00 1500.00 1520000.00
2 Commercial
Connections
------
32 32 9 20 2102400.00 2000.00 2166400.00
3 1Commercial
Connection
-------
25 25 11 20 2007500.00 2500.00 2070000.00
97 5756400.00
(2) Anticipated Income at Intermediate Stage - 2026
Sr.
No.
Size of
Connection
Water
Required in
Kilo litre
Rate per
Year (Rs.)
Amount in
Rs.
New
Connection
Charges
Total
(Rs.)
Old
Connection
New
Connection
Cummulative
1 Commercial
Connection
40 35 75 5 20 2737500.00 1500.00 2790000.00
2 Commercial
Connections
32 15 47 9 20 3087900.00 2000.00 3117900.00
3 1Commercial
Connection
25 15 40 11 20 3212000.00 2500.00 3249500.00
162 9157400.00
(3) Anticipated Income at Intermediate Stage - 2041
Sr.
No.
Size of
Connection
Water
Required in
Kilo litre
Rate per
Year (Rs.)
Amount in
Rs.
New
Connection
Charges
Total
(Rs.)
Old
Connection
New
Connection
Cummulative
1 Commercial
Connection
75 25 100 5 20 3650000.00 1500.00 3687500.00
2 Commercial
Connections
47 20 67 9 20 4401900.00 2000.00 4441900.00
3 1Commercial
Connection
40 12 52 11 20 4175600.00 2500.00 4205600.00
219 12335000.00
M&R Cost and Annual Revenue as Per Statement Expenditure Revenue
Total M&R Cost at Present Stage 6880000.00 5757000.00
Total M&R Cost at Intermediate Stage 8001000.00 9158000.00
Total M&R Cost at Ultimate Stage 9123000.00 12335000.00
Total No. of Plots =
Total No. of Plots =
Total No. of Plots =
ANNEXURE - III -C
STATEMENT SHOWING THE PROPOSED ANNUAL REVENUE OF INDUSTRIAL AREA MEGHNAGAR
No. of Connection
No. of Connection
No. of Connection
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 23
Final Project Report For Meghnagar Water Supply


CHAPTER: 6

PROJECT BENEFIT ASSESSMENT


Water is prime need of human life and without water developments in society,
town, city or state or country is not possible.
In development of area or industrial zones sufficient potable and wholesome
water is required. In this proposed project we have proposed Rising Mains, And
Distribution System and WTP already exist for standard quality of water for
industries and drinking purpose for employees and staffs.
Water will improve the health of people and will develop the industries in
Meghnagar Industrial Area.
Through help of standard quality and in sufficient Quantity rate of growth of
income will be increased in social life will improve the living standard of people in
vicinity.



















3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 24
Final Project Report For Meghnagar Water Supply


Conclusion:
(1) Short Term Project: - At present there are only few industries established and
has started producing their products and limited employees and staffs are working in the
existing industries. There is limited requirement of water for drinking and construction
activities hence existing facilities available in water supply project is more than sufficient
nothing is required to improve at present in existing water supply components except to
provide distribution lines as per requirements.

(2) Long Term Project: - As per TOR long term project is prepared for 3.60 MLD
water requirements. In this project Intake Well with Ramp, Pump House, Rising Main,
Clear Water Sump, RCC ESR, Distribution Lines are proposed and detailed estimates
and drawings are included in the project.

It is very necessary to implement this project as earliest for better development of area
by industries and to provide more employment to local people and uplift of life standard
of people residing in vicinity.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 25
Final Project Report For Meghnagar Water Supply










Annexure IV

1.0 POPULATION
This project is proposed to provide water supply for the Meghnagar I/A and for
Meghnagar Gram Panchayat. The design period for the proposed system is
considered from the base year of 2011 AD.

1.1 Population Forecast
The future population forecasted as per norms of CPHEEO manual is
as under.

Population Forecast for Meghnagar Town

Sr.
No.
Particulars Population in souls
1 As per census 2001 10,316
2 Base Year 2011 12,895
3 Intermediate stage 2026 17,730
4 Ultimate stage 2041 24,380

2.0 WATER REQUIREMENT:-
Water Requirement of the town will be as under :-
Sr.
No.
Year
Population
in Souls
Daily
Requirement of
W/S @40 Lpcd
Total
Requirement

Qty in
MLD
1 As per 2001 10,316 412640.00 412640.00 0.41
2 Base Year 2011 12,895 515600.00 515600.00 0.52
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 26
Final Project Report For Meghnagar Water Supply


3
Intermediate
Stage 2026
17730 709200.00 709200.00 0.71
4 Ultimate Stage 2041 24380 975200.00 975200.00 0.98


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 27
Final Project Report For Meghnagar Water Supply


Annexure IV



Note:- Water Requirement for the Meghnagar village for different year is shown in
table above but as per the agreement between M.P AKVN and Meghnagar
Gram Panchayat done on 9
th
May 2009. AKVN will Provide 2 lakh liters of
water per day.
WATER REQUIREMENT
0.41
0.52
0.71
0.98
0.00
0.20
0.40
0.60
0.80
1.00


2001 2011 2026 2041
Year




W
a
t
e
r

D
e
m
a
n
d


(
i
n

M
L
D
)

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 28
Final Project Report For Meghnagar Water Supply




3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 29
Final Project Report For Meghnagar Water Supply


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 30
Final Project Report For Meghnagar Water Supply


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 31
Final Project Report For Meghnagar Water Supply


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 32
Final Project Report For Meghnagar Water Supply


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 33
Final Project Report For Meghnagar Water Supply


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 34
Final Project Report For Meghnagar Water Supply



3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 35
Final Project Report For Meghnagar Water Supply

DESIGN
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 36
Final Project Report For Meghnagar Water Supply


DESIGN OF PUMPING MACHINERY ON INTAKE WELL

Intermediate Demand (2026) = 3600000 lpcd


Hours of Pumping

= 16.00 hrs.


Rate of Pumping

= 225000 LPH


Discharge (W)

= 63.00 LPS







Ground level of
Intake

= 278.00 m


Ground level of WTP

= 322.00 m


FSL of Intake

= 283.00 m


FSL of WTP

= 324.50 m


Lowest suction level at source = 277.50 m


Head

= 47.00 m


Residual Head

= 5.50 m


Misc. Losses

= 1.50 m


Friction losses in Rising Main = 2.50 m


Total Static Head for Pump (H) = 56.5 m


Say = 57.00 m



Considering 10% over loading and 70% efficiency of pump

B.H.P. required =


= 63 X 57 X 1.1
75 X 0.7

= 75.24 HP

Say
= 75.00 HP

However Provide 1 Nos. of 75 HP submerssible pump in working and 1 no. of 75 HP
pump as stand by unit having discharging capacity of 63 lps.









n
H w


75
10 . 1
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 37
Final Project Report For Meghnagar Water Supply


DESIGN OF PUMPING MACHINERYON CLEAR WATER SUMP

Intermediate Demand (2026) = 3600000 lpcd


Hours of Pumping

= 22.00 hrs.


Rate of Pumping

= 163636.4 LPH


Discharge (W)

= 45.00 LPS







Ground level of ESR

= 324.27 m


Proposed Height of
ESR

= 12.00 m


Assumed Water column height = 4.00 m


FSL R.L. of ESR

= 340.27 m


Lowest suction level at Sump = 320.27 m


Full supply level

= 323.97 m


Residual Head

= 3.70 m


Head

= 20.00 m


Misc. Losses

= 1.00 m


Friction losses in Rising Main = 24.70 m


Total Static Head for Pump (H) = 25.00 m



Considering 10% over loading and 70% efficiency of pump

B.H.P. required =


= 45 X 25 X 1.1
75 X 0.7

= 23.57 HP

Say
= 25.00 HP

However Provide 25 HP Submersible pump discharging capacity of 45 LPS against 25
m head (One Standby)


n
H w


75
10 . 1
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 38
Final Project Report For Meghnagar Water Supply


CALCULATION OF CAPACITY OF CLEAR WATER SUMP AT
INDUSTRIAL AREA MEGHNAGAR
DEMAND = 3.600 MLD
* Water requirement 2041 AD considering 16 hours pumping
from 5 AM to 8 PM)
* Incoming flow : 3.600 MLD in 16 Hours
> Flow / Hour = 3.6000 = 0.2250
16
Considering water supply from
* Outgoing flow : 3.600 MLD in 22 Hours
( 6 AM to 3 AM,)
> Flow / Hour = 3.6000 = 0.1636
22
Table 1 and show the compilation a for arriving at the capacity of the service reservoir
Capacity of service reservoir = maximum cumulative surplus + maximum cumulative deficiate
Maximum Surplus = 1.140 MLD
Maximum Deficiate = -0.008 MLD
Required capacity of = 1.148 MLD
Service reservoir
Require capacity of U/G Sump = 1.148 MLD
Capacity of Existing Sump = 0.00 MLD
Proposed capacity of U/G Sump = 1.148 MLD
Say = 1148000 Litre
RCC Underground Sump of 12.00 lacs litre capacity is proposed.


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 39
Final Project Report For Meghnagar Water Supply


TABLE - 1
SHOWING COMPUTATION FOR CAPACITY OF CLEAR WATER SUMP AT
INDUSTRIAL AREA MEGHNAGAR
> Incoming flow per hour = 0.225 MLD
> Outgoing flow per hour = 0.1640 MLD
Period in
Hrs.
Water Outflow Water Inflow Cum.
Deficiate /
Surplus
Hourly
Demand
Cum.
Demand
Hourly
Pumping
Cum.
Pumping
5:00 AM 0.000 0.225 0.225 0.225
6:00 AM 0.164 0.164 0.225 0.450 0.286
7:00 AM 0.164 0.328 0.225 0.675 0.347
8:00 AM 0.164 0.492 0.225 0.900 0.408
9:00 AM 0.164 0.656 0.225 1.125 0.469
10:00 AM 0.164 0.820 0.225 1.350 0.530
11:00 AM 0.164 0.984 0.225 1.575 0.591
12:00 PM 0.164 1.148 0.225 1.800 0.652
1:00 PM 0.164 1.312 0.225 2.025 0.713
2:00 PM 0.164 1.476 0.225 2.250 0.774
3:00 PM 0.164 1.640 0.225 2.475 0.835
4:00 PM 0.164 1.804 0.225 2.700 0.896
5:00 PM 0.164 1.968 0.225 2.925 0.957
6:00 PM 0.164 2.132 0.225 3.150 1.018
7:00 PM 0.164 2.296 0.225 3.375 1.079
8:00 PM 0.164 2.460 0.225 3.600 1.140
9:00 PM 0.164 2.624 3.600 0.976
10:00 PM 0.164 2.788 3.600 0.812
11:00 PM 0.164 2.952 3.600 0.648
12:00 AM 0.164 3.116 3.600 0.484
1:00 AM 0.164 3.280 3.600 0.320
2:00 AM 0.164 3.444 3.600 0.156
3:00 AM 0.164 3.608 3.600 -0.008
4:00 AM 3.608 3.600 -0.008


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 40
Final Project Report For Meghnagar Water Supply



CALCULATION OF CAPACITY OF ESR AT INDUSTRIAL AREA HEAD WORK
DEMAND : = 3.6000 MLD
* Water requirement 2041 AD considering 12
hours
pumping
from 6 AM to 3 AM(Next Day)
* Incoming flow : 3.6000 MLD in 22 Hours
> Flow / Hour = 3.6000 = 0.1636
22
Considering water supply from
* Outgoing flow : 3.6000 MLD in 20 Hours
( 6 AM to 1 AM,)
> Flow / Hour = 3.6000 = 0.1800
20
Table 1 and show the compilation a for arriving at the capacity of the service reservoir
Capacity of service reservoir = maximum cumulative surplus + maximum cumulative deficiate
Maximum Surplus = 0.008 MLD
Maximum Deficiate = -0.320 MLD
Required capacity
of = 0.328 MLD
Service reservoir
Require capacity of ESR = 0.328 MLD
Capacity of Existing ESR = 0.00 MLD
Proposed capacity of ESR = 0.328 MLD
Say = 328000 Litre
A RCC ESR of 4.00 lacs litre capacity is proposed


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 41
Final Project Report For Meghnagar Water Supply


TABLE - 1
CALCULATION OF CAPACITY OF ESR AT INDUSTRIAL AREA HEAD WORK
> Incoming flow per hour = 0.164 MLD
> Outgoing flow per hour = 0.1800 MLD
Period in
Hrs.
Water Outflow Water Inflow Cum.
Deficiate /
Surplus
Hourly
Demand
Cum.
Demand
Hourly
Pumping
Cum.
Pumping
5:00 AM 0.000 0.000 0.000
6:00 AM 0.18 0.180 0.164 0.164 -0.016
7:00 AM 0.18 0.360 0.164 0.328 -0.032
8:00 AM 0.18 0.540 0.164 0.492 -0.048
9:00 AM 0.18 0.720 0.164 0.656 -0.064
10:00 AM 0.18 0.900 0.164 0.820 -0.080
11:00 AM 0.18 1.080 0.164 0.984 -0.096
12:00 PM 0.18 1.260 0.164 1.148 -0.112
1:00 PM 0.18 1.440 0.164 1.312 -0.128
2:00 PM 0.18 1.620 0.164 1.476 -0.144
3:00 PM 0.18 1.800 0.164 1.640 -0.160
4:00 PM 0.18 1.980 0.164 1.804 -0.176
5:00 PM 0.18 2.160 0.164 1.968 -0.192
6:00 PM 0.18 2.340 0.164 2.132 -0.208
7:00 PM 0.18 2.520 0.164 2.296 -0.224
8:00 PM 0.18 2.700 0.164 2.460 -0.240
9:00 PM 0.18 2.880 0.164 2.624 -0.256
10:00 PM 0.18 3.060 0.164 2.788 -0.272
11:00 PM 0.18 3.240 0.164 2.952 -0.288
12:00 AM 0.18 3.420 0.164 3.116 -0.304
1:00 AM 0.18 3.600 0.164 3.280 -0.320
2:00 AM 3.600 0.164 3.444 -0.156
3:00 AM 3.600 0.164 3.608 0.008
4:00 AM 3.600 3.608 0.008


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 42
Final Project Report For Meghnagar Water Supply



3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 43
Final Project Report For Meghnagar Water Supply
DESIGN OF SUMP FOR 600000 LAKH CAPACITY:-
1.0 GENERAL DATA
1.1 Data Given by Owners :
Capacity : 6.00 Lac Litres
Ground Level : 0.00 m
S.B.C. of Soil : 2.50 Kg/cm2
Type of Soil : Rock
Soil Investigation Report : By
Location of Site : NIMRANI
1.2 Design Considerations :
CONTAINER : As per IS:3370(I & II) - 2002
STAGING : As per IS 456:2000 & IS 11682: 1985
DEAD LOAD : IS:875 (Part - I),1987
LIVE LOAD : IS:875 (Part - II),1987
WIND LOAD : IS:875 (Part - III),1987
SEISMIC LOAD : IS:1893 (Part - I),2002
IS:1893 (Part - II), Proposed draft cod
IS 4326: 1993
1.3 Permissible Stresses :
Grade of Concrete : M 300
Grade of Steel : Fe 500
For calcualtions related to resistance to cracking (IS:3370)
Per. Stress in Concrete due to Direct tension = 15 Kg/cm2
Per. Stress in Concrete due to Bending = 20 Kg/cm2
For calcualtions related to Strength Calculations (IS:456)
Per. Stress in Concrete due to Direct tension, ct = 80 Kg/cm2
Per. Stress in Concrete due to Bending, cb = 100 Kg/cm2
Per. Stress in Steel due to Direct tension, st = 1300 Kg/cm2
Per. Stress in Steel due to Bending :
On liquid retaining face of members = 1300 Kg/cm2
On-face away from liquid for member less then 225 mm = 1300 Kg/cm2
On-face away from liquid for member 225 mm or more = 1300 Kg/cm2
Modular Ratio = 280/ (3 x cb) = 9.4
Density of liquid = 1000 Kg/m3
Density of R/f Concrete = 2500 Kg/m3
Density of Soil = 1800 Kg/m3
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 44
Final Project Report For Meghnagar Water Supply
Design of Top Dome:-
Internal Dia. Of top dome = 15.0 m
Height of top dome, H = 1.8 m
Dia. Of Openning at Top = 1.2 m
Assume Thk. Of Dome = 120 mm
Assume Live Load = 75 Kg/cm2
Assume Dead Wt. Of lentern at top (Point Load) = 650 Kg
Thickness of Plaster = 2.0 cm
Self wt. of Dome =120/1000)*2500) = 300 Kg/m2
Surface Area, A = 2RH = 186.9 m2
Surface Area of open part, a = 2Rh = 1.1 m2
Total U.D.L. Load = 375 Kg/m2
((186.9-1.1)*375)= 69661 Kg
Wt. of open portion = 424.3 Kg
Radious of Dome at Support " R " = 16.53 m
=(((15.0/2)^2)+(1.8^2))/(2*1.8)
sin = ((15.0/2)/16.53)= 0.454
= 26.99*
sin = 0.036
= 2.08*
Cos = 0.999
Rise of Portion of Cut-off at Dome top " h " = 33.0 m OR 0.01 m
=((2*16.53)+(SQRT((4*16.53^2)-((4*((1.2^2)/4))))))/2)
Hoop Compression due to U.D.L. = WR(-1+cos+cos
2
)/(1+cos)
Hoop Tension due to Point Load = W/(2rsin
2
)
Meridional Thrust due to U.D.L. = WR/(1+cos)
Meridional Thrust due to Point Load = W/(2rsin
2
)
Hoop & Meridional Thrust due to Combine loads.
Degree Kg Kg Kg Kg Kg Kg
2.08 3093.3 -4748.7 -1655 3099.5 4748.7 7848
10.00 2980.6 -207.6 2773 3122.2 207.6 3330
20.00 2628.4 -53.5 2575 3194.8 53.5 3248
30.00 2045.8 -25.0 2021 3320.9 25.0 3346
26.99 2245.0 -30.4 2215 3276.9 30.4 3307
Hoop ten. Due
to P.L.
Total Total
Meri.Thrust
due to U.D.L.
Meri.Thrust
due to P.L.
Angle
Hoop Comp.
Due to U.D.L.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 45
Final Project Report For Meghnagar Water Supply
Hoop Stress Without Live Load:-
Degree Kg Kg Kg
2.08 2474.7 -4748.7 -2274
20.00 2102.7 -53.5 2049
30.00 1636.6 -25.0 1612
26.99 1796.0 -30.4 1766
Max.Maridonal thrust = 7848 Kg/m Length of the latitude
Max.Hoop Tension = 2274 Kg
Unit Compressive stress = 6.54
Kg/cm
2
Safe
=7,848/(120*100/10)
Area of steel Reqd. for hoop tension = 1.75 cm
2
=2,274/1300
0.15% steel add for temp. etc = 1.80 cm
2
Total steel reqd for hoop tension = 3.55
cm
2
Provided dia. Of bar = 10 mm
Required spacing = 221 mm C/C
Max. Spacing = 250 mm C/C
Provided 10 mm at 180 mm C/C on both direction
Total Wt. of dome = 64181 Kg
=((186.9-1.1)*(120/1000)*2500)+((186.9-1.1)*(2/100)*2100)+650
Total Angle
Hoop Comp.
Due to U.D.L.
Hoop ten. Due
to P.L.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 46
Final Project Report For Meghnagar Water Supply
Design of Top Ring Beam:-
Depth of Beam = 40 cm
Width of beam = 40 cm
Plaster Thickness = 2.0 cm
Internal Dia of Beam = 15.0 m
Mean Dia. = 15.2 m
Max.Thrust at spring of the dome = 3307.3 Kg/m
Angle of thrust with horizontal = 26.99*
Horizontal Component of Thrust, P = 2947.0 Kg/m
=3,307.3*COS(26.99*3.14/180)
Vertical Component of Thrust = 1501.0 Kg/m
=3,307.3*SIN(26.99*3.14/180)
Hoop tension coused by Thrust = P x r = 22398 Kg
=2,947.0*(15.2/2)
Area of Steel Required = (22,398/1300)= 17.23 cm
2
Provided 16 mm 10 Nos steel bars
Area of Steel Provided = 20.11 cm
2
=3.14*(16/10)^2*10/4
Stress in Concrete = 12.52 Kg/cm
2
Safe
Wt. of Concrete = 19101 Kg
=((40/100)*(40/100)*2500*(2*3.14*15.2/2))
Wt. of Plaster = 802 Kg
Total Wt. of Beam = 19903 Kg
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 47
Final Project Report For Meghnagar Water Supply
Design of Cylindrical Container :-
Ht. of Cylindrical Wall = 3.5 m
Internal Dia. of Cylinder = 15.0 m
Plaster Thickness = 2.0 cm
Perm. Stress in Steel = 1300 Kg/cm
2
Density of Liquid = 1000 Kg/m
3
Pressure on wall, P = w x h
Hoop Tenson on Wall, T = P x r
Required Area of Steel, A
st
= T / Stress
Tensile Stress in Concrete, tc = T / (A
c
+ M A
st
)
Calculation of Forces & Steel
Bar dia. Spacing
m Kg/m
2
Kg/m cm
2
/m Ht. mm cm/m cm/m cm
2
/m Ht cm Kg/cm
2
1 0.5 500 3750 2.88 10 27.2 8 9.82 20 1.79
2 1.5 1500 11250 8.65 10 9.1 8 9.82 20 5.38
3 2.5 2500 18750 14.42 12 7.8 5 22.62 20 8.47
4 3.5 m 3500 26250 20.19 12 5.6 5 22.62 20 11.86
Safe
Min. Steel Required = 0.27% of C/s Area = 5.43 cm
2
/m Safe
=(0.27/100)*20*100
Sample Calculation :
Calculation for Segmnt No. 2
Pressure on wall, P=1000*1.5= 1500 Kg/m
2
Hoop Tension, T=1500*15.0/2= 11250 Kg/m
Required Steel Area, Ast =11,250/1300= 8.65 cm
2
/m Ht.
Req. Steel Spacing =3.14*((10/10)^2)/4)*100/(8.65)= 9.1 cm/m
Provided Seel Area =(3.14*(10/10)^2/4)*100/8= 9.82 cm
2
/m Ht.
Tensile stress in concrete =(11,250/((20*100)+(9.4*9.82))) 5.38 Kg/cm
2
Avg. Thickness of wall = 20 cm
Mean Dia. = 15.10 m
Vol. of Concrete = (ht. x thk.x peri.) = 33.24 m3
Plaster Surface Area (One Face) = 167.13 m
2
Total Wt. = 90115 Kg
Tensile stress
in concrete
Required Steel Ht.of
Wall
Seg.
No.
Provided
Spacing
Thick.
of Wall
Provided
Steel
Pressure
P
Hoop
Tension,T
Steel
Reqd.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 48
Final Project Report For Meghnagar Water Supply
Design of Raft :-
Depth of Beam = 40 cm
Width of Beam = 60 cm
Plaster Thickness = 2.0 cm
Internal Dia. Of Beam = 15.0 m Ref. 5
Mean Dia. = 15.3 m
Modular Ratio = 9.4 Ref. 1.3
Vertical Component of Top Dome = 1501 Kg/Unit Length Ref. 3
=3,307*SIN(26.99*3.14/180)
Self Wt. Of R.B.at Top of Cylindrical Container = 417 Kg/Unit Length Ref. 4
=(19,903)/(2*3.14*15.2/2)
Load due to Cylindrical wall = 1900 Kg/Unit Length Ref. 5.2
=(90,115)/(2*3.14*15.10/2)
Self Wt. of Ring Beam = 1050 Kg/Unit Length
=(40/100)*(60/100)*2500
Total Vertical Load ,W = 4867 Kg/Unit Length
2950 Kg/m2 = 2.95 T/m2
1 T.M
Perm. Stress in Steel = 1300 Kg/cm
2
Ref. 1.3
3 cm2
Provided steel 10mm dia @ 150mm c/c
BAS EPRESSURE
BENDING MOMENT =
Area of steel requird =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 49
Final Project Report For Meghnagar Water Supply
1.1
4 Lac litres
25 T/m
2
1.2
Design is based on provision of IS:3370 (I and II)-1965
STAGING :
39 m/sec
1
1 for level site
k1.k2.k3.Vb as tabulated below
k2 Vz P
m m m/sec kN/m^2
0 to 10 1.00 39.00 912.60 987.86
10 to 15 1.05 40.95 1006.14
15 to 20 1.07 41.73 1044.84
20 to 30 1.12 43.68 1144.77
30 to 50 1.17 45.63 1249.26
III
1.3
Container Shape : Intze
Capacity of container 4 Lac litre
400 cum
Enter Dia of cylindrical part D 9.90 m
Enter the height of cylinder h 4.10 m
enter the depth of conical dome ho 2.00 m
Dia of bottom dome Do 5.00 m
Enter rise of top dome h1 1.30 m
Enter the rise of bottom dome h2 0.50 m
capacity of tank v1 405.93
DESIGN OF INTZE TANK 400000 LAKH LITRES
Design p
average
Height
SEISMIC ZONE :
TYPE OF FOUNDATION : SOLID / ANNULAR RAFT
GENERAL DIMENSIONS :
LIVE LOADS :
WIND LOADS :
k1 Risk Factor =
IS : 875-(Part II), 1987
IS : 875-(Part III), 1987
S.B.C. of Soil :
Soil - Investigation Report :
DESIGN CONSIDERATIONS :
Staging and foundations are designed as per provisions of
IS:456 and SP-16.
IS : 875-(Part I), 1987
1.0 GENERAL DATA
DATA Supplied by the Owners:
CAPACITY :
DEAD LOADS :
CONTAINER :
Design wind pressure P = 0.6 X Vz
2
kN/m
2
= as listed below
Vz Design velocity =
IS : 1893 - 1975
for 50 Year Life-Span Table I
k2 Terrain Factor for Terrain Cat. 2A as tabulated below Table 2
k3 Topography Factor =
SEISMIC LOADS :
WIND LOADS :
Basic wind speed Vb =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 50
Final Project Report For Meghnagar Water Supply
3.1
w = DL+LL 366.60 kg/m2
R = 10.07 m
h = 0.40 m
r = 4.95 m
cot 1.77
cot 1.7675
Tension T = w R h (cot+ cot ) = 6256.09 kg
As 417.07 mm2
dia. 16 mm
no. 12
Ast prov 2412.74 mm2
Concrete area Ac = T/12 - 12 As 231.81 cm2 W2 9484.275 Kg
req depth 152.2536 mm
provided depth 300 mm
width 400 mm
dia of stirrups 10 mm spacing 200 mm c/c Asv 89 mm
2
Provide10 mm 2 legged stirrups at 200 mm c/c
3.2
Outer radius ro 5.05 m
thickness of wall t 20 cm
projection of beam along width 200.00 mm
projection of beam laong dpeth 100.00 mm
Radius @centre of projection 4.95
rc = ro - t/2 4.95 m
Vol.of concrete = 2rcbd 3.73 cum
Vol.of water displaced 3.73 cum
Plaster area on ring ri =2rm.a 4.40 m
rm = ri +b sin/2 4.47 m
Plaster on face of ring
Area = 2rm.b 11.24 m2
3.3
Provide concrete : M 30 mix
Overall size of beam width 400 mm
depth 300 mm
Reinforcement : Hoop reinforcement = 16 mm dia. 12 nos.
Stirrups 10 mm dia bars at 200 mm c/c
Summary : Roof ring beam
(1- 0.018833 r cot )
Displacement of water by rings
Hoop tension in ring beam :
Design of Roof Ring beam
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 51
Final Project Report For Meghnagar Water Supply
4.1
Radius of cylindrical part = 5.05 m rob = 5.05 m
angle of inclination = 90.00 ro = rob +(H-h)cot 5.050062832
cot 0.0000 rm = ro - t cosec200
cosec 1
height of cylindrical part = 4.10 m
segment no. height h dh try t radius Total Reqd As provide dia no. area reqd Ac reqd t
rm T1 T2 T
m m cm m kg kg kg cm2 mm cm2 cm2 cm m3 m2
1 0.5 1.0 20.00 4.96 2480.00 0.04 2480.04 1.65 12 2 2.26 179.53 20.00 6.23 30.35
2 1.5 1.0 20.00 4.96 7440.00 0.04 7440.04 4.96 12 5 5.65 552.15 20.00 6.23 30.35
3 2.5 1.0 20.00 4.96 12400.00 0.04 12400.04 8.27 12 8 9.05 924.76 20.00 6.23 30.35
4 3.5 1.0 20.00 4.96 17360.00 0.04 17360.04 11.57 12 11 12.44 1297.38 20.00 6.23 30.35
5 4.5 1.0 20.00 4.95 22275.00 0.04 22275.04 14.85 12 14 15.83 1666.25 20.00 6.22 30.35
Total volume of concrete 31.15
Total area of plaster 151.74
Sample calculation :
Take segment no.2 located between levels 1.0 m and 2.0 m from FSL
t = 20.0 cm
ro = rob +(H-h).cot/2
rm = ro - t cosec200 4.96 m
T1 = 1000.h.r.cosec
2
7440 kg
T2 = 2500.t.r.cot.cosec 0.0433 kg
Total hoop tension = T1 + T2 7440.04 kg
Area of hoop Reinf. Reqd. = T/1500 4.96 kg
Provide 12 dia bars 5 nos. Area 5.65 cm2
Ac = T/12 - 12.As 552.15 cm2
t reqd. = Ac / 100. cosec 20.00 cm
Concrete volume = 2..dh.t,rm.cosec 6.23 cum
Plaster area = 2..ri.dh.cosec 30.35 sq.m
4.2
t = thickness of the section 20.00 cm
p = % reinforcement required for tor steel it is = (115-t)/437.5
Ast = p.b.t where b = 2rm, Ast = 6.28 rm t.(115-t)/437.5
d = dia.of bar
N = no.of bar = 400 As/d^2
for section thicker than 45 cm, p = 0.8 x 0.2
seg. t p rm b As dia no. req no.prov. spacing Ast.prov.
No cm % m m cm2 mm Nos Nos mm cm
2
1 20.00 0.22 4.96 31.16 135.34 10 172 180 340 141.37
2 20.00 0.22 4.96 31.16 135.34 10 172 180 340 141.37
3 20.00 0.22 4.96 31.16 135.34 10 172 180 340 141.37
4 20.00 0.22 4.96 31.16 135.34 10 172 180 340 141.37
5 20.00 0.22 4.95 31.10 135.07 10 172 180 340 141.37
4.3
1 Weight of concrete of container :
Wt.of concrete of Vol.= vol.of conc x 2500 77880.08 kg
2 Weight of plaster on water face :
Unit wt. Of plaster 2 cm thick = 0.02 * 2080 41.60 kg/m2
Weight of plaster = area of plaster x unit wt 6312.34 kg
3 Weight of water on inner face of container :
External dim.of cylinder ro 5.05 m
Height H 4.10 m
Volume of cylinder = r^2*H 328.49 cum
Deductions:
vol.of concrete 31.15 cum
vol.of plaster 3.03 cum
vol.of ring beam 3.73 cum
Total deductions 37.92 cum
Net vol.of water on intrados : 290.57 cum
CYLINDRICAL WALL
Design of cylindrical wall
Meridional stresses :
Area pf
plaster vol. Concrete
hoop Tension
Temperature and shrinkage reinforcement
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 52
Final Project Report For Meghnagar Water Supply
4.4 Vertical loads transferred through wall:
W1 = Wt. Of roof dome 23980.82 kg
W2 = wt.of roof ring 9330.53 kg
W3 = wt.of container concrete 77880.08 kg
W4 = wt.of container plaster 6312.34 kg
W5 = wt.of water 290566.69 kg
W = Total weight at bottom section 408070.46 kg
Meridianal stress :
rmb = mean radius @ bottom = rob - t cosec 4.97 m
V = vert. Load per unit perimeter = W/2rmb 13054.56 kg/m
F = meridianal thrust = V cosec 13054.56 kg/m
fc = meridianal comp. Stress = F/100t 6.53 kg/cm
2
Fc = permissible comp stress for M200 concrete = 50
OK
4.5
Dimensions:
Outer radius at top 5.05 m
Outer radius at bottom 5.05 m
Thickness and reiforcement :
seg. No h top thickness
m cm dia. no. dia. no.
1 1 20 10 2 10 180
2 2 20 10 5 10 180
3 3 20 10 8 10 180
4 4 20 10 11 10 180
5 5 20 10 14 10 180
hoop reinforcement Meri. Reinforcement
Summary
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 53
Final Project Report For Meghnagar Water Supply
5.1 Loads on ring beam
1 Load due to top dome = Meridional thrust x sin 9.4 kN/m
2 Load due to top ring beam = bd*25 3 kN/m
3 Load due to cylindrical wall = 10.25 kN/m
4 Self weight of ring beam
Assuming size of beam b = 0.4 m
d = 0.6 m 6 kN/m
Total vertical load = 28.65 kN/m
Horizontal force H = V cot 35.1 kN
Hoop tension due to vertical loads = Hg = H.D/2 71.955 kN
Hoop tension due to water pressure = Hw = h d D/2 121.77 kN
Total hoop tension = Ht = Hg+Hw 193.725 kN
Ast = Ht/150 1291.5 mm2
Enter the dia.of bars 20 mm
No. of bars 5 no.
Ast provided = 1571 mm2
Stirrups: dia = 10 mm spacing = 200 mm c/c
Asv = 88.63 mm2
Area of concrete required = T/1.2 - 12 Ast 142585.5 mm2
Ac provided = 240000 mm2 Ok
5.2
Outer radius ro = 5.05 m
thickness of wall t = 20.00 cm
projection of beam along width = b-t 0.20 m
Radius @centre of projection = ro-t/2 = 4.85 m
Vol.of concrete = 2rcbd 7.32 cum
Vol.of water displaced = 7.32 cum
Plaster area on ring ri = 4.65 m
rm = ri +b/2 4.85 m
Plaster on face of ring 6.1 m2
5.3 Summary: Bottom ring beam:
Provide concrete : M 30 mix
Overall size of beam width 400 mm
depth 600 mm
Reinforcement : Hoop reinforcement = 20 mm dia 5 nos.
Stirrups 10 mm dia at 200 mm c/c
Displacement of water by rings
Design of bottom ring beam
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 54
Final Project Report For Meghnagar Water Supply
6.1 Geometry
Let r = Mean radius of the staging 2.725 m
Outer radius of conical part at bottom =rob = 3 m
at the level of finished tank bottom
tw = thickness of container wall at bottom 22.50 cm
h = rise of bottom dome w.r.t. plane of intersection 0.50 m
tb = thickness of bottom-dome 15 cm
other dimensions are derived either geometrically or graphically
6.2 Levels: G.L. = 0 m
Low Supply Level L.S.L. = 15.65 m
Staging-Container junction = = 15.08 m
Roof-Container juction and FSL = = 21.75 m
Staging -Bottom dome juction = 15.08 m
6.3 List of Radii(r), Relative rise (h) and spherical Radii of various surfaces
of the bottom dome are listed below:
S.N. Description r h R unit
1 Dome Center-line 2.725 0.50 7.68 m
2 Water-face of dome 2.725 0.43 8.95
3 Dome Soffit 2.725 0.58 6.74
6.4 Properties of Centroidal surface :
a) Radius of springing circle r1 = 2.7 m
b) Rise of dome w.r.t.intersection h1 = 1.75 m
c) Spherical rad. R = h/2 + r^2/2h
= 2.00/2 + (4.05^2/2*2.00)
d) Sinr1/R1 = 4.05 / 5.10 = 0.36
e) Angle 1 = 20.79 deg.
f) Tan1 = 0.38 Cot1 = 2.6333
g) x = Angle at junction of shaft intrados = sin
-1
[(r1-ts/2)/R1]
sin
-1
[(4.05-0.075)/5.10] 20.00 deg.
h) A1 = Area of dome at C/L = 2R1
2
(1-cosx) - (1.12)
2
A1 = 2 (5.10)
2
(1-cos 51.2) -(1.12)
2
18.38 sq.m
I) Wt.of concrete of bot. Dome W8 = 25 x 15 x 57.09 6892.37 kg
6.5 Properties of water-face
a) Dist.from Centroidal surface = tb/2 + 2cm 9.5 cm
b) Spherical Radiuas at water-face = R1+0.095 = R2 = 7.77 m
c) Let distance of waterface from pt. Of intersection be = 35.33 cm
d) Effective rise of waterface = h2 = h1+ 0.095 - 0.113 0.24 m
e) Rad.of circle of waterface = sqrt(h2.(2R2 - h2))
1.92 m
f) Vol.of water displaced by bottom dome = h2.(3r2
2
+h2
2
)/6
22.93 cum
g) A2 = plaster area = 2.R2.h2 - (1.02)
2
8.53 m2
h) Wt.of plaster W9 = 0.02x2080(53.59) 354.94 kg
6.6 Determination of dead storage :
Dead storage is formed in the annular space between LSL and bottom of
the tank fromed by combination of horz.conical & spherical faces.
Various dimensions are determined graphically as under :
a) Width at bottom b1 = 0.38 m
width at top b2 = 1.02 m
b) Height of trapazoidal area = 0.3 m
c) Approx. radius of Trap. CG. 4.07 m
d) Volume of water : Average width = 0.70 m
Radius at mid of avg. W = 4.07 m
Volume = 2rbh 5.37 cum
Design of Bottom Dome
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 55
Final Project Report For Meghnagar Water Supply
6.7 Water load on bottom dome :
Water in cylinder of radius r2 = .r2
2
H =
3.14 x 4.05
2
x 8.61 394.33026 cum
Deduct : Water displaced by the stair shaft = 0.39 cum
Water displaced by the bottom dome = 22.93 cum
Net volume of water = 371.01 cum
Water load on bottom dome = 1000 x volume 371008.45 kg
6.8 Loads on bottom dome :
A. U.D.L. : 1. Self wt. = 25 x 15 = 375 + fin. 41.6 416.60 kg/cm2
2. Water 371008.45 kg
Effective area of dome = Total dome area - Area under shaft
Area = 8.53 sqm
Intensity of water loading = W / Area 43482.74 kg/m2
3 Udl when the tank is full = SW +water load 43899.34 kg/m2
4 Total udl = w.A 374563.01 kg
B Concentrated load
Conc. Load due to stair shaft = 1033.08 kg
Add incidental load , ladder = 500.00 kg
Total concentrated load = 1533.08 kg
C Total laod on Bottom - dome
Concentrated W = 1533.08 kg
UDL = 374563.01 kg
Total Load = 376096.09 kg
6.90 Membrane stresses :
A Meridianal Comp. Stress : fM
fM1 due to UDL = w.r / ((1+cos))100.t)
w at tank full = 43899.34 kg/m2
B Hoop stress:
T1 = Hoop Tension due to Concentrated Load W = W/ [2..R.sin
2
]
T2 = Hoop Comp.due to udl = [w.R.( -1+cos + cos
2
)] / (1 + cos)
6.1 Design for Hoop Tension for Tank Empty condition : ( w = 416.60 kg/m2)
seg r sin cos Tension Comp. Resultant Avg.T As=F/1500 Provide Hoop Reinf. Area
r/R T1 T2 T=T1-T2 x width cm2 dia no. cm2
m kg/m kg/m kg
1 1.02 0.1313 0.9913 1822.39 1583.58 238.81
2 1.17 0.1506 0.9886 1385.06 1572.44 -187.37 7.72 0.01 8 10 5.03
3 2.46 0.3166 0.9486 313.31 1409.40 -1096.09 -192.52 -0.13 8 CompressioCompression
4 3.75 0.4826 0.8758 134.83 1109.58 -974.76 -310.63 -0.21 8 CompressioCompression
6.11 Design for Hoop Force for Tank Full condition : (w = 12966.41 kg/m2)
r Tension Comp. Net Comp. Avg. C Stress =
T1 T2 T2 -T1 x width C/100.b.t
m kg/m kg/m kg kg kg/cm2
1 1.02 1822.39 166870 165047.59
2 1.17 1385.06 165696 164310.91 49403.78 32.94
3 2.46 313.31 148515.5 148202.15 46876.96 31.25
4 3.75 134.83 116922.8 116787.95 39748.51 26.50
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 56
Final Project Report For Meghnagar Water Supply
6.12 Reactions on circular ring :
a) Vertical reaction V = W8/2..r1
21966.07 kg/m
b) Horiz. Reaction H = V.cot1 = 31991.77 x 0.7656 57842.32 kg/m
c) Hoop Tension F2 due to H = H x r1 = 157620.31 kg
d) Hoop Comp. F1 due to Conical dome = 93123.655 kg
e) Resultant Hoop Force is compressive C = -64496.657 kg
6.13 Reinforcement in Bottom - Dome :
Provide Temp. & Shrinkage reinf.
pt = 0.23
As required = 3.43 cm
2
Provied 10 mm dia bars at 220 mm c/c
Ast provided = 3.57 cm
2
6.14 Formwork for Botom-Dome :
Level at which spherical forms starts : 15.045 m
6.15 Summary
Provide concrete : M 300 mix
Thickness = 15 cm
Reinforcement 10 mm dia bars at 200 mm c/c both ways
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 57
Final Project Report For Meghnagar Water Supply
7.1 T1 = Mreidianal compressive stress from cone = 27.73 kg/cm2
T2 = Maximum meridianal stress of bottom dome = 32.94 kg/cm2
u = Angle of cone = 39.23 deg.
= Angle of bottom dome = 20.79 deg.
0.774661
Horizontal thrust on circular girder = f1.t cosu -f2.t cos
H = -3221.93 kg/m
Vertical load on beam per meter run = f1.t.sin u +f2.sin
V = 52611.67 kg/m
Section of 60 cm x 75 cm is assumed for the beam
width = 45 cm
depth = 100 cm
Self weight of beam = 1125 kg
Total load per meter run = w = 53736.67 kg
No. of columns for support = 8 nos.
Col. Dia = 45 cm
r = 2.725 m
o = Half the angle subtended by consecutive columns at centre of trestle = t /N
o = t/12 = 0.39 22.5 deg.
cos o = 0.9239
sin o = 0.3827
tan o = 0.4142
Udl w = W / 2.t.r = w= 3138.52 kg/m
7.2 Moments:
B.M. at support Mo = -w.r
2
.(1 - o.cot o)
Mo = -1210.5 kgm
B.M. at mid span Mo = w.r
2
.(o /sin o - 1)
Mo = 609.95 kgm
Maximum torsional moment occurs at point of contraflexure, which is given by
sin| = (1/o) (sin
2
o + coso.sqrt.(o
2
sin
2
o ))
sin| =(1/0.39)*((0.3827)
2
+ 0.9239xsqrt((0.39)
2
-(0.3827)
2
0.58 |1 = 0.62 35.47
0.17 |2 = 0.17 9.53
T| = Maximum Torsional Moment = w.r
2.
( | - o +o.cos| o.coto.sin|)
T|1 = -91.9572 kgm
T|2 = 91.96 kgm
S.F.at support = 0.5 x 2412.75 x 4 x t/4 4929.97 kg
Effective depth required = sqrt(2055 x 100)/(50 x14.11) 51.95 cm
Provide overall depth t = 100 cm
Effective depth = 96 cm
Area of steel required = 2055.55 x 100 33.36 cm2
0.84 x 94 x 50
Provide dia.of bars = 25 mm No. of bars = 7
Area of steel provided = 34.36 cm2
Area of steel at center = 1035.77 x 100 16.42 cm2
0.86 x 94 x 50
Provide dia.of bars = 20 mm No.of bars = 6
Shear stress at support = 3789.94 1.33 kg/cm2
0.86 x 94 x 50
Design of bottom circular girder
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 58
Final Project Report For Meghnagar Water Supply
8.1 Vertical loads :
S.N. Tank Element Load
W1 Roof Dome 23980.82 kg
W2 Roof Ring (Deduct 160 for plaster) 9330.53 kg
W3 Container Concrete (cylindrical part) 77880.08 kg
W4 Cylindical part plaster 6312.34 kg
W5 Conical wall concrete 290566.69 kg
W6 Conical wall plaster 607.10 kg
W7 Bottom ring beam 15448.80 kg
W8 Bottom dome concrete 3554.562309 kg
W9 Bottom dome plaster 527.4376908 kg
W10 Stair shaft (Conc. + plaster ) 22630.00 kg
Less stair cut - out 416.6 x .r
2
0.00 kg
W11 Bottom Ring 17662.50 kg
W12 Total Wt.of container 468500.86 kg
W13 Water gross capacity 405931.21 kg
W14 Total wt. Container full 874432.07 kg
W15 Self weight of column-bracing = 92106.30 kg
W16 Total load at staging bottom
Tank Empty 560607.16 kg
Tank Full 966538.37 kg
8.2 Design of column :
Assuming size of column 45 cm dia.
Height of column = 16 m
no. of columns = 8
Self weight of one column = 6361.73 kg
Assuming size of bracing b = 35 cm
depth d = 60 cm
no. of bracing = 3 intervals= 5 m
loads of brace on column = 4 x 0.35x 0.6 x/12 x 2500 8242.50 kg
Total load of all columns and bracing = 92106.30 kg
Load on each column when the tank is empty: 73166.83 kg
Load on each column when the tank is full : 87473.56397 kg
c.g.of container =
Element Area Dist.fromAY
Dia of cylindrical part D 9.90 m bottom
Height of cylinder h 4.10 m top dome 8.78 7.53 66.11
Depth of conical dome ho 2.00 m Cyl. Wall 40.59 5.05 204.98
Dia of bottom dome Do 5.00 m Cone 22.35 1.66 37.20
Rise of top dome h1 1.30 m sum A = Sum AY =
Rise of bottom dome h2 0.50 m 71.72 308.28
Height of staging 16.00 m Y = Sum AY/ Sum A = 4.30 m
Bottom circular girder
width b 0.45 m
depth d 1.00 m
c.g. of container = 4.30 m
depth of foundation 3 m
8.3 Wind load analysis:
Intensity of wind = 150 kg/m2
Reduction factor = 0.7
Wind forces on different elements
Element wind force distance Moment at the base of
kg from base column due to wind
m loads kgm
dome and cylindrical wall 4937.63 20.70 102208.84
Conical dome 1564.50 17.00 26596.50
Bottom circular girder 525.00 16.50 8662.50
Columns 6048.00 8.00 48384.00
Bracing 787.50 8.00 6300.00
Total horizontal wind force = 13862.63 192151.84
Assuming contraflexure points at mid height of columns and fixity at the base due to raft
foundations, the moment at the base of column is computed as :
Design of staging
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 59
Final Project Report For Meghnagar Water Supply
M = Total horizontal wind force x height of column betn braces /2
M = 14294.89 x 4 / 2 = 34656.56 kgm
Moment in each column at base = 28589.78 / 12 = 4332.07 kgm
Vertical load in column due to wind is given by Mr
r
2
r
2
= 31.66 kg
Max. vertical load in remotest column due to wind = 154950.18 x 6.5/56.41
V1 = 15172.82 kg
Max. vertical load in column 2 = 154950.18 x 6.50
sqrt (2) x 56.41
V2 = 10728.80 kg
Max. vertical load in column due to dead load and wind load =
V = 136235.11 + 8927.22 = 102646.38 kg
Axial laod = 102646.38 kg 1026.46 kN
Moment = 4332.07 kgm 43.32 kNm
8.4 Analysis for seismic loads :
1 Seismic co-efficients:
Using IS 1893 : 1984 , and adopting Response spectrum method
Seismic Zone Factor for zone 3 0.08 from table 2 IS 1893
Importance Factor 1.5 from table 4 IS 1893
Soil foundation factor 1 from table 3 IS 1893
Horizontal seismic co-eff.
o
= F
o
.I..Sa/g

0.3.Sa/g
2 Stiffness of column-bracings :
The horizontal force due to earthquake is assumed to be acting
at the c.g. of the container. The columns act as elastic cantilever.
K = 3 E.I / L
3
E = 5700 x sqrt(fck) where fck = 30 N/mm
2
E = 312201.8578 kg/cm
2
I of column = .d
4
/64 201288.959 cm
4
I of all the columns = no.of col.x I of 1col.= 1610311.672 cm
4
I of bracinng =n. b.d^3/12 15120000 cm^4
L for col.= 16 m L for brace = 2.09 m
K = 3 E.I / L3 of col. 368.22 kg/cm K of brace = 112918815.9 kg/cm
K total = 112919184.08 kg/cm
3 Period of vibration T :
T = 2..sqrt(W/k.g) = sqrt(W) /((sqrt(k.g)/2.)
sqrt.(k.g)/2.sqrt(24899681.27 x 981)/(2 x 3.14) 52971.04
sqrt(W)/278.16
4 Seismic forces : Tank full unit Tank empty
1 Weight of container 468500.86 kg 468500.86
2 Wt.of column bracing = 1/3 of total wt of 30702.10 kg 30702.10
column and bracing
3 Weight of water = 405931.21
4 Total equivalent load = 905134.17 kg 499202.96
5 sqrt (W) 951.39 706.54
6 T = sqrt(W/24874.34) 0.02 sec. 0.01
7 From fig. 2 of IS, Sa/g 0.25 0.25
8 Seismic co-efficient = 0.3 x Sa/g 0.075 0.075
9 Horizontal force = W x co-eff. 67885.06 kg 37440.22
10 Moment about top of
Raft distance = 23.30 m 1581636.899 kg-m 872310.26
P.C.C. distance = 24.10 m 1635944.949 kg-m 902262.44
8.5 Design for combined vertical and horizontal froces :
Design forces : Tank full Tank empty
1) Vertical Loads 966538.37 kg 560607.16
2) Horz.force Wind 13862.63 kg 13862.63
Earthquake 67885.06 kg 37440.22
Design H , greater of WL / El 67885.06 kg 37440.22
3) Moment Wind 192151.84 kg-m 192151.84
Earthquake 1581636.899 kg-m 872310.26
Design M, greater of WL / EL 1581636.90 kg-m 872310.26
15816.37 kNm 8723.102588
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 60
Final Project Report For Meghnagar Water Supply
Axial load on one column = 1026.46 kN
Moment = 43.32 kNm
Design of coluumn and bracing is done as per limit state method
so multiplying the load and moment by factor of safety = 1.5
Design axial load = Pu =1.5 x 505.73 1539.70 kN
Design moment =Mu = 1.5 x 32.46 64.98 kNm
Dia of column = 450 mm fck = 30 N/mm
2
Assuming 50 mm cover and 25 mm dia bars
d' = 50 +12.5 = 62.5 mm
d'/D = 62.5 / 450 = 0.14
Pu/fckD
2
= 505.73 x 10
3
/ 30 x 450
2
= 0.25
Mu/fck D
3
= 66.6 x 10
6
/(30 x 450
3
) = 0.0238
Reffer chart 61 of SP 16, value of p/fck = 0.02
p = 0.1 x fck = 0.1 x 30 = 0.6
As = p D
2
/4 = 1.64x 3.14 x 600
2
/400 = 954.3 mm
2
Enter the dia of bars to be provided = 25 mm
No.of bars = 12
stirrups :
Dia.of stirrups = 10 mm
spacing = 200 mm
Asv = 99.71 mm
2
8.6 Design of bracings
1
Moment in brace = 2 x moment in column x cos 15
= 2 x 66.6 x cos 15 120.07 kNm
Section of brace
width b = 350 mm
depth D = 600 mm
Effective depth = D -cover cover = 50 mm
d = 550 mm
Moment of resistance of the section = 0.138.fck.b.d
2
fck = 30 N/mm
2
M.R. = 0.138 x 30 x 350x (550)
2
= 438.3225 Nmm
Mu/bd
2
= 193.0 x 10
6
/ 600 x (550)
2
= 1.13
Enter the value of pt from SP:16 table 4 0.303
Area of steel required = pt x b x d /100 583.28 mm
2
Ast reqd. = 0.314 x 600 x 550 /100
Enter the dia of bars to be provided = 20
No. of bars required = 6
Actual area of steel = 1884.96 mm
2
Provide 4 bars of 20 mm dia at top.
2 Shear design :
Length of brace = L = 2 x mean radius of staging x sin 15
L = 2 x 4.05 x sin 15 = 2.09 m
Maximum shear force in brace = M /(L/2)
Max. S.F. Vu = 193 /(2.91/2) = 115.14 kN
v = Vu / bd = 184.12 x 10
3
/ 600 x 550 0.60 N/mm
2
pt = 100 As / bd = 100 x 1206.37/ 600 x 550 =
0.98
c from IS 456 table 19 = 0.456 N/mm
2
Vus = (v -c) x bd = (0.56 -0.37)x600x550 = 27.36 kN
Assume dia.of stirrups = 10 mm
leg = 2 Asv = 157.1 mm
2
Spacing of stirrups = sv = 0.87 fy Asv d/Vus
sv = 0.87 x 415 x 100.5 x 550 / 33.64 x 10
3
180 mm
Provide spacing = 180 mm
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 61
Final Project Report For Meghnagar Water Supply
8.7 Summary: staging
Columns:
No. of column: 8
Dia.of column: 0.45 m
Bar dia. = 25 No.of bars = 12
Stirrups dia = 10
Spacing of stirrups = 200 mm
Bracings :
No.of brace = 24
Length of one brace = 2.09 m
Dia.of bars = 20 mm
No.of bars = 6
Dia.of stirrups = 10 mm
Spacing = 180
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 62
Final Project Report For Meghnagar Water Supply
9.1 Preliminary design :
Total load on raft = 966538.37 kg = 966.54 T
SBC = 25 T/m
2
Area of footing required = 38.66 m
2
A = D
2
/ 4 so, dia required = 7.02 m
Provide dia of raft = 12 m
9.2 Dimensions :
Outer radius a = 6 m
Mean radius b = 2.725 m
Inner radius c = 0 m
Area of raft = .(a
2
- c
2
) = (5-0) = 113.10 m
2
Distance of C.G.from center = x' = 2.(a
3
-c
3
)
3.(a
2
-c
2
)
x' = 2.(5.0-0) 4.00 m
3.(5.0-0)
I = (a
4
-c
4
)/4 = (5-0)/4 = 1017.88 m
4
Z = (a
4
-c
4
)/4a = (5-0)/4*5 = 169.646 m
3
9.3 Design loads : Tank full Tank Empty
1 Dead Loads 966.54 T 560.6072
2 Add self weight
Assume thickness of raft = 1 m
s.w. = A*t*(2.5-1.5) =132.72 x 0.6 x(2.5 - 1.5) 113.10 T 113.10
3 Total load on bedding concrete = 1079.64 T 673.70
4 Design moment = 1581.64 Tm 872.31
9.4 Check pressure on bedding concrete :
1 p1, due to W = W/A 9.55 T/m
2
5.96
Permissible = 25 T/m
2
25
2 p2, due to M = M/Z 9.32 T/m
2
5.14
3 Max. pressure = p1+p2 = 18.87 T/m
2
11.10
Permissible = 1.5 x 15 = 37.5 T/m
2
O.K
4 Min. presssure = p1-p2 = 0.22 T/m
2
0.81
No Tension
9.5 Stability checks :
1 Check for overturning : Tank Empty
1) Overturning Moment at bedding concrete M = 902.26 Tm
2) Critical Overturning moment = 1.4 M 1263.17 Tm
3) Stabilising force = Dead weight of tank empty = 560.6072 T
4) Lever arm for stabilising force = radius 'a' of raft = 6 m
Design of Annular raft :
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 63
Final Project Report For Meghnagar Water Supply
5) Critical stabilising moment = 0.9.dead wt.x a = 3027.279 Tm
should be gretater than 1.4 M O.K.
This satisfies Clause No.20.1 of IS:456-2000.
2 Check for sliding : Tank Empty
1) Horizontal force causing sliding H = 37.44 T
2) Stabilising Vertical force = W = 560.61 T
3) Co-efficient of friction = = 0.5
4) Critical stabilising force = 0.9. .W = 252.27 T
5) Factor pf safety against Sliding = 0.9. .W / H should be > 1.4 6.74 O.K.
6) This satisfies clause No.20.2 of IS:456-2000.
a= 6 b= 2.725
k = r/a B = b/a = 4.05 / 6.5 = 0.45
p = 9.55
q = 9.32
9.6 Moment calculation :
Mr,M Radial B.M. For R<b (Effect of W)
Mr = (W/8*)*(2*ln(a/b)+1-(b/a)^2)+(3*p/16(r^2-a^2)), where p=(w/( a^2))
Mr = c1 ( k
2
- c2)
where c1 = 3 W / 16 3 x 1615.15 / (16 x 3.14) = c1= 57.69
c2 = ( 4 ln B + 2B
2
+1) / 3 c2 = -0.58
M = (W/8*)*(2*ln(a/b)+1-(b/a)^2)+((p/16)*(r^2-3*a^2)), where p=(w/( a^2))
M c1 (k
2
- c5)/3
where c5 = 3 + 4.0 ln b/a -2 + 2 b
2
/a
2
c5 = -1.74
Mr,M Radial B.M. For R>b (Effect of W)
Mr = (W/8*)*(2*ln(a/r)+(b/r)^2-(b/a)^2)+(3*p/16(r^2-a^2)), where p=(w/( a^2))
Mr = c1 ( k
2
+ 2B
2
/3k
2
- 4lnk/3 - c3 )
where c3 = 1+2B
2
/3 = 1 + c4 = c3 = 1.14
c4 = 2B
2
/ 3 = c4 = 0.14
M = (W/8*)*(2*ln(a/r)+2-(b/a)^2-(b/r)^2)+((p/16)*(r^2-3*a^2)), where p=(w/( a^2))
M = c1 ( k
2
- 2B
2
/k
2
- 4 ln k + c6) /3
where c6 = 1 - 2 B
2
= c6 = 0.59
Mr,M Radial B.M. For R<b (Effect of M)
Mr =((-5*p*a^2)/48)*(k-k^3)-(q*a/8)*(B^4+B^2*2-3)*k, where p=(4*M/( a^3)),q = M/(pi()*b^2)
Mr = -c7 ( k - k
3
) - c8.c9.k
where c7 = 5 p a
2
/ 48 = c7 = 34.96 p = 9.32
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 64
Final Project Report For Meghnagar Water Supply
c8 = q a / 8 = c8 = 50.85 q = 67.80
c9 = B
4
+2 B
2
-3 = c9 = -2.54
M=((p*a^2)/48)*(k^3-(5/3)k^2)-(q*a/8)*(B^4+B^2*2-3)*k/3, where p=(4*M/( a^3)),q = M/(pi()*b^2)
M = -c7.k
2
(1-0.6k)/3 -c8.c9.k/3
Mr,M Radial B.M. For R>b (Effect of M)
Mr =(-(c7)*(k(1-k^2)-(q*a/8*k^3)*(B^4(k^4-1)+B^2*2(k^2-1)*k^2), where p=(4*M/( a^3)),q = M/(pi()*b^2)
Mr = -c7.k(1-k
2
) - c8( k (c9+3) - 2B
2
/k - B
4
/k
3
)
M =(-(c7)*(k^2(1-0.6*k)/3-(c8*(k*(c9+3/3)-2*B^2/k+B^4/k^3), where p=(4*M/( a^3)),q = M/(pi()*b^2)
Mq = -c7.k2(1-0.6k)/3 - c8.(k(c9+3)/3 - 2.B2/k + B4/k3)
Radius k = r/a Effect of W Effect of M 3/4(Mrw+Mrm) Design Mr 3/4(M + Mm) Design M
r Mr M Mr M
for r<b
0 0 33.55 33.55 0 0 25.16 33.55 25.16 33.55
0.25 0.04 33.65 33.58 3.94 1.78 28.19 33.65 26.52 33.58
0.5 0.08 33.95 33.68 7.89 3.52 31.38 33.95 27.90 33.68
0.75 0.13 34.45 33.85 11.87 5.22 34.74 34.74 29.30 33.85
1.25 0.21 36.05 34.38 19.99 8.54 42.03 42.03 32.19 34.38
1.5 0.25 37.15 34.75 24.16 10.16 45.98 45.98 33.69 34.75
2 0.33 39.96 35.68 32.78 13.34 54.55 54.55 36.77 36.77
2.1 0.35 40.61 35.90 34.55 13.97 56.38 56.38 37.40 37.40
2.6 0.43 44.38 37.16 43.77 17.07 66.11 66.11 40.67 40.67
2.725 0.45 45.45 37.51 46.17 17.84 68.71 68.71 41.52 41.52
for r>b 0.00
2.725 0.45 45.45 37.51 46.17 17.84 68.71 68.71 41.52 41.52
3.225 0.54 26.26 37.15 27.16 18.67 40.06 40.06 41.86 41.86
3.725 0.62 13.86 34.79 15.12 17.14 21.74 21.74 38.95 38.95
4.225 0.70 5.96 31.81 7.28 14.83 9.93 9.93 34.98 34.98
4.725 0.79 1.32 28.80 2.39 12.32 2.78 2.78 30.84 30.84
5.225 0.87 -0.77 26.06 -0.14 9.88 -0.69 -0.69 26.95 26.95
5.725 0.95 -0.78 23.70 -0.59 7.60 -1.03 -0.78 23.47 23.70
6 1.00 0.00 22.59 0.00 6.44 0.00 0.00 21.77
9.7 Design for radial moment Mr:
1 Maximum Design value of Mr = 68.71 Tm 68711.16 kgm
2 Depth of section required = 88.87 cm
3 Select overall depth = 100 cm
Effective depth = D - 6 cm = 94 cm
4 Total width B at the section = 2..r = 17.12 m
Total As required = Mr. B/(2300x0.9xde) = 35.31 cm
2
/m 604.61 cm
2
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 65
Final Project Report For Meghnagar Water Supply
Provide dia.of bars = 20 mm
no. of bars = 193
Ast provided = 606.33 cm
2
spacing required = 89 cm
Provide 20 mm dia bars at 85 mm c/c nos. 200
9.8 Design for circumferential B.M. M :
from width Design M Avg. Avg. As Provide
to (-ve) (+ve) depth reqd. dia no. Area At spacing
1 1.725 0 33.68 37.60 94 33.33 20 11 34.56 Bot. 100
2.725 0 41.52
2.725 3.775 0 41.52 38.79 94 75.26 20 24 75.40 Bot. 50
6.5 0 36.07 Total Ast 109.96
cross section area of footing = 11309.73 cm
2
Area of reinforcement = 109.96 cm
2
Percenage of reinf. Provided = 1.03 %
Min. area of reinforcement req = 0.12 % O.K
Total Conc.vol = 113.10 m
3
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 66
Final Project Report For Meghnagar Water Supply
Design of Barrage And intake well of 3.6 MLD at industrial area Meghnaga, District
J habaua, M.P. (reference I S 6966 Part I , 1989)

Data

Design discharge = 4065 cumecs (1.43 lac cusecs)
Length of Bairrage = 212.8 m
River bed level (u/s) = 275.15 m
Height of crest from river bed = 1.35 m
Crest level = 275.15 + 1.35 = 276.50 m
Width of river at d/s of weir = 220 m

For various discharge the corresponding water levels are as below
(As per hydraulic jump calculation)

Discharge
In cumecs
D/S water
level
In m
U/S water
level
In m
Required
energy
dissipation
Height of
Basin
Block
Length of
basin
required
4065.00(100%) 278.79 282.50 Basing Type 1 1.83 m 25.34 m
3048.75(75%) 278.19 282.50 Basing Type 1 1.37 m 28.77 m
2032.50(50%) 277.50 282.50 Basing Type 1 1.05 m 28.42 m
1016.25(25%) 276.69 282.50 Basin type 2 0.61 m 12.51 m
406.50(10%) 275.98 282.50 Basin type 2 0.25 m 6.86 m

Provide basin length of 29.0 m.

Scour depth calculation (clause 19.1, I S 6966 Part I , 1989)

q = Q/width = 4065 / 190 = 21.39 cumecs/m
f = silt factor = 2.0 (from soil data)
R = 1.35 x (q
2
/ f)
1/3
= 1.35 x ( 21.39
2
/ 2.0 )
1/3
= 8.24 m (from HFL)

Level of u/s cut off required = 280.50 8.24 = 272.26 m > 275.15 m (river bed level)
Provided minimum u/s cut off upto 3.0 m from top of floor however rock is available at
shallow depth, cut off is to be extended 0.5 m in rock.


Level of d/s cut off required = 278.79 (1.25 x 8.25) = 268.48 m
Depth of d/s cut off river bed D = 275.15 268.48 = 6.67 m

Calculation of floor thickness as Rock is encountered at bottom

Total length of floor provided b = 35.00 m
Maximum water head in no flow condition = 5.0 m

For d/s end cut off wall d = 3.5 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 67
Final Project Report For Meghnagar Water Supply
29.0m.
35.00 m.
7.5 m.
5.35 m.
25 m.
275 m.
282.5 m
1 / = d / b = 3.5 / 40.85 = 0.1468

Provide thickness of floor at 29.0 m from d/s end =3.0 m












Pressure head diagram

Thickness read at 10 m D/S of floor apron.
Thickness required =5.35/2.9 =2.25 m
Thickness can be reduced from 2.25 meter at 10 m D/S to 0.5 m at 35 m D/S

Design of block protection (clause 20.1, 20.2, I S 6966 Part I , 1989)

Provide cement concrete block of size 1500 x 1500 x 900 mm. with gaps of 75 mm width
packed with gravel.

Minimum length of u/s block protection = design depth of scour below floor level
= in this case 0.0m.
Provide minimum u/s block protection 3.0 m length

Minimum length of d/s block protection = 1.5 x design depth of scour below floor level
= 1.5 x 3.0 m.
= 4.5 m.
Provide minimum d/s block protection 5 m length

Design of launching apron (clause 20.3, I S 6966 Part I , 1989)

Bed slope of river = 2.5 m/km (1:400)
Considering river bed material coarse sand at top and rock at shallow depth.
Provide u/s length of launching apron =5.0 m
Quantity of stone = (1.25 x ) x 5 = 6.25 cmt/m
R = 1.35 x (q
2
/ f)
1/3
= 1.35 x ( 21.39
2
/ 2.0 )
1/3
= 8.24 m (from HFL)
Depth of scour = 280.50 1.5 x 8.24 = 268.14 m
Depth of scour below floor level D = 268.14 -275.15 = 7.01 m
Provide stone thickness at inner edge =1600 mm
Provide stone thickness at outer edge =2400 mm
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 68
Final Project Report For Meghnagar Water Supply

Considering river bed material medium sand the value of = 1.0
Provide d/s length of launching apron =10.0 m
Quantity of stone = (1.25 x ) x 10.0 = 12.5 cmt/m
R = 1.35 x (q
2
/ f)
1/3
= 1.35 x ( 21.39
2
/ 2.0 )
1/3
= 8.24 m (from HFL)
Depth of scour = 278.79 2.0 x 8.24 = 262.31 m
Depth of scour below floor level D = 280 -262.31 = 17.69 m
However rock is available at shallow depth, scour is restricted to rock level.
Provide stone thickness at inner edge =1600 mm
Provide stone thickness at outer edge =2400 mm


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 69
Final Project Report For Meghnagar Water Supply
CHAINGE = Barrage
H.F.L @ U/S = 282.500 R.L.
DISCHARGE = 406.500 m
3
/sec
LENGTH OF WEIR = 212.800 m
CREST LEVEL = 276.500 m
WIDHT OF RIVER = 220.000 m
SIDE SLOPE OF RIVER.= 1.500
D/S BED LVL OF RIVER = 275.000 m
Crest RL = 276.50 m
INPUT DATA : for 10% discharge
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 70
Final Project Report For Meghnagar Water Supply
HYDRAULIC JUMP TYPE STILLING BASIN WITH HORIZONTAL APRON
DETERMINE ENERGY DESIPATION ARRANGEMENT

(1) For 10 % Discharge 406.50 Cumecs
Water depth at U/S crest = Crest RL + water depth over crest

= 276.500 + 1.081
= 277.581 m
Here , Lt = Effective waterway in m.

= length of weir

= 212.8 m
Q = Discharge in river at 25 % Discharge = 406.500 Cumecs
Solving this eq. by trial & error method
Q = CL(H)
3/2
Drowing ratio = d/s head over crest / u/s head over crest
where , = free flow
C = 1.7 from graph page 5 IS 6966(part-I)
Lt= 212.8 m
H = 1.081
Q= 406.5 (by trial error)
Finding depth ,velocity & froude No. at crest :-

Velocity at gateopening V1 = Q/A

Q
= --------------
H x Lt

406.5
= --------------
1.081 x 212.8
= 1.767 m/sec
V1
Froude no. at crest F1 = -------------------
(g x H)^0.5
1.767
(9.81 x 1.081)^0.5
= 0.543
=
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 71
Final Project Report For Meghnagar Water Supply
Finding Normal Depth YN(1) in river : -
For 10 % discharge :-

Now, Q = A x V

5/3
A 1/2
= ----------- x (SO)
2/3
n x P

Where,
d = Depth of water assumed 0.9760 m
P = Perimeter of river section 220 + 2d

A = Area of river 220 x d m

SO = Bed gradient of river = 0.002500
n = Manning's Roughness Co.eff. = 0.026

YN(1) = Normal Depth in river for 10% Discharge
((B x YN(1) )
1.666
x (So)
1/2
Q = --------------------------------------------------------------------
n(B + 2 YN(1) )
0.666
where, Q(1) = 406.5 cumecs cumecs & SO = 0.002500
Solving this equ. by trial & error.
(220 x d)^1.666 x 0.002500^0.5
0.026(220 + 2d)^0.666
387.862
0.95415
= 406.5 = 406.500 O.K.
we get

YN(1) = 0.97601 m
Velocity in river = Q/(BxYN1)
= 1.89314
ENERGY AT D/S OF WEIR = YN1 + V/2g
E1 = 1.158682
406.500 =
=
=
0.026 x (220+2 x 0.976012017762937) ^ 0.666
(220 x 0.976012017762937))^1.666 x 0.002500^0.5
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 72
Final Project Report For Meghnagar Water Supply
TOTAL ENERGY IN D/S OF WEIR = RBL D/S + E1
= 276.1587
HEAD LOSS (HL) = HFL @ U/S-TOTAL ENERGY IN D/S
= 6.50 m
Dc = Critical Depth
= (q/g)
1/3
= ((Q/L)/g)
1/3
= 0.71941
HL/Dc = 9.03585
Now, from graph for horizontal appron for HL/Dc = 9.0358
D1/Dc = 0.235
D2/D1 = 14.50
D1 = 0.16906 m
D2 = 2.45141 m
V1
(gD1)^0.5
V1 = Q/(LxD1)
= 11.299
F1 = 8.77371
Fround no. < 4.5 then Basin Type-1
Fround no. > 4.5 then Basin Type-2
Basin Type-2
Basin Length and Depth
From Graph , Lb/D2 = 2.80
There fore, Length of Basin = 6.86 m
Basin Appurtenances
Chute Block:-
Ht. Of Chute Block = 0.169063 m
Width of Chute Block = 0.169063 m
Spacing of Chute Block = 0.169063 m
Fround No. F1 =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 73
Final Project Report For Meghnagar Water Supply
Basin Block:-
F1 = 8.77371
From graph
hb/D1 = 1.50
Therefore, Hb = 0.25359 m
Width = 0.75 x Hb
= 0.1902 m
Spacing = 0.1902 m
Dist. from Chute Block = 1.961 m
End Sill :-
Height of end sill = 0.2 x D2
= 0.490 m
Width of Dents = 0.490 m
Spacing of Dents = 0.490 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 74
Final Project Report For Meghnagar Water Supply
CHAINGE = Barrage
H.F.L @ U/S = 282.500 R.L.
DISCHARGE = 1016.250 m
3
/sec
LENGTH OF WEIR = 212.800 m
CREST LEVEL = 276.500 m
WIDHT OF RIVER = 220.000 m
SIDE SLOPE OF RIVER.= 1.500
D/S BED LVL OF RIVER = 275.000 m
Crest RL = 276.50 m
INPUT DATA : for 25% discharge
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 75
Final Project Report For Meghnagar Water Supply
HYDRAULIC JUMP TYPE STILLING BASIN WITH HORIZONTAL APRON
DETERMINE ENERGY DESIPATION ARRANGEMENT

(1) For 25 % Discharge 1016.25 Cumecs
Water depth at U/S crest = Crest RL + water depth over crest

= 276.500 + 1.953
= 278.453 m
Here , Lt = Effective waterway in m.

= length of weir

= 212.8 m
Q = Discharge in river at 25 % Discharge = 1016.250 Cumecs
Solving this eq. by trial & error method
Q = CL(H)
3/2
Drowing ratio = d/s head over crest / u/s head over crest
where , = free flow
C = 1.75 from graph page 5 IS 6966(part-I)
Lt= 212.8 m
H = 1.953
Q= 1016.3 (by trial error)
Finding depth ,velocity & froude No. at crest :-

Velocity at gateopening V1 = Q/A

Q
= --------------
H x Lt

1016.3
= --------------
1.953 x 212.8
= 2.446 m/sec
V1
Froude no. at crest F1 = -------------------
(g x H)^0.5
2.446
(9.81 x 1.953)^0.5
= 0.559
=
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 76
Final Project Report For Meghnagar Water Supply
Finding Normal Depth YN(1) in river : -
For 25 % discharge :-

Now, Q = A x V

5/3
A 1/2
= ----------- x (SO)
2/3
n x P

Where,
d = Depth of water assumed 1.6912 m
P = Perimeter of river section 220 + 2d

A = Area of river 220 x d m

SO = Bed gradient of river = 0.002500
n = Manning's Roughness Co.eff. = 0.026

YN(1) = Normal Depth in river for 10% Discharge
((B x YN(1) )
1.666
x (So)
1/2
Q = --------------------------------------------------------------------
n(B + 2 YN(1) )
0.666
where, Q(1) = 1016.3 cumecs cumecs & SO = 0.002500
Solving this equ. by trial & error.
(220 x d)^1.666 x 0.002500^0.5
0.026(220 + 2d)^0.666
977.092
0.96147
= 1016.3 = 1016.250 O.K.
we get

YN(1) = 1.69125 m
Velocity in river = Q/(BxYN1)
= 2.731306
ENERGY AT D/S OF WEIR = YN1 + V/2g
E1 = 2.071475
1016.250 =
=
=
0.026 x (220+2 x 1.69124873455681) ^ 0.666
(220 x 1.69124873455681))^1.666 x 0.002500^0.5
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 77
Final Project Report For Meghnagar Water Supply
TOTAL ENERGY IN D/S OF WEIR = RBL D/S + E1
= 277.0715
HEAD LOSS (HL) = HFL @ U/S-TOTAL ENERGY IN D/S
= 5.73 m
Dc = Critical Depth
= (q/g)
1/3
= ((Q/L)/g)
1/3
= 1.32436
HL/Dc = 4.32913
Now, from graph for horizontal appron for HL/Dc = 4.3291
D1/Dc = 0.355
D2/D1 = 9.50
D1 = 0.47015 m
D2 = 4.46642 m
V1
(gD1)^0.5
V1 = Q/(LxD1)
= 10.1576
F1 = 4.72978
Fround no. < 4.5 then Basin Type-1
Fround no. > 4.5 then Basin Type-2
Basin Type-2
Basin Length and Depth
From Graph , Lb/D2 = 2.80
There fore, Length of Basin = 12.51 m
Basin Appurtenances
Chute Block:-
Ht. Of Chute Block = 0.470149 m
Width of Chute Block = 0.470149 m
Spacing of Chute Block = 0.470149 m
Fround No. F1 =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 78
Final Project Report For Meghnagar Water Supply
Basin Block:-
F1 = 4.72978
From graph
hb/D1 = 1.30
Therefore, Hb = 0.61119 m
Width = 0.75 x Hb
= 0.4584 m
Spacing = 0.4584 m
Dist. from Chute Block = 3.573 m
End Sill :-
Height of end sill = 0.2 x D2
= 0.893 m
Width of Dents = 0.893 m
Spacing of Dents = 0.893 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 79
Final Project Report For Meghnagar Water Supply
CHAINGE = Barrage
H.F.L @ U/S = 282.500 R.L.
DISCHARGE = 2032.500 m
3
/sec
LENGTH OF WEIR = 212.800 m
CREST LEVEL = 276.500 m
WIDHT OF RIVER = 220.000 m
SIDE SLOPE OF RIVER.= 1.500
D/S BED LVL OF RIVER = 275.000 m
Crest RL = 276.50 m
INPUT DATA : for 50 % discharge
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 80
Final Project Report For Meghnagar Water Supply
HYDRAULIC JUMP TYPE STILLING BASIN WITH HORIZONTAL APRON
DETERMINE ENERGY DESIPATION ARRANGEMENT

(1) For 50 % Discharge 2032.50 Cumecs
Water depth at U/S crest = Crest RL + water depth over crest

= 276.500 + 3.100
= 279.600 m
Here , Lt = Effective waterway in m.

= length of weir

= 212.8 m
Q = Discharge in river at 100 % Discharge = 2032.500 Cumecs
Solving this eq. by trial & error method
Q = CL(H)
3/2
Drowing ratio = d/s head over crest / u/s head over crest
where , = -0.8054
C = 1.75 from graph page 5 IS 6966(part-I)
Lt= 212.8 m
H = 3.100
Q= 2032.5 (by trial error)
Finding depth ,velocity & froude No. at crest :-

Velocity at gateopening V1 = Q/A

Q
= --------------
H x Lt

2032.5
= --------------
3.100 x 212.8
= 3.081 m/sec
V1
Froude no. at crest F1 = -------------------
(g x H)^0.5
3.081
(9.81 x 3.100)^0.5
= 0.559
=
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 81
Final Project Report For Meghnagar Water Supply
Finding Normal Depth YN(1) in river : -
For 50% discharge :-

Now, Q = A x V

5/3
A 1/2
= ----------- x (SO)
2/3
n x P

Where,
d = Depth of water assumed 2.5034 m
P = Perimeter of river section 220 + 2d

A = Area of river 220 x d m

SO = Bed gradient of river = 0.002500
n = Manning's Roughness Co.eff. = 0.025

YN(1) = Normal Depth in river for 10% Discharge
((B x YN(1) )
1.666
x (So)
1/2
Q = --------------------------------------------------------------------
n(B + 2 YN(1) )
0.666
where, Q(1) = 2032.5 cumecs cumecs & SO = 0.002500
Solving this equ. by trial & error.
(220 x d)^1.666 x 0.002500^0.5
0.025(220 + 2d)^0.666
1895.2
0.93245
= 2032.5 = 2032.500 O.K.
we get

YN(1) = 2.50344 m
Velocity in river = Q/(BxYN1)
= 3.69038009
ENERGY AT D/S OF WEIR = YN1 + V/2g
E1 = 3.19757143
2032.500 =
=
=
0.025 x (220+2 x 2.5034376234948) ^ 0.666
(220 x 2.5034376234948))^1.666 x 0.002500^0.5
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 82
Final Project Report For Meghnagar Water Supply
TOTAL ENERGY IN D/S OF WEIR = RBL D/S + E1
= 278.1976
HEAD LOSS (HL) = HFL @ U/S-TOTAL ENERGY IN D/S
= 4.79 m
Dc = Critical Depth
= (q/g)
1/3
= ((Q/L)/g)
1/3
= 2.10133
HL/Dc = 2.27775
Now, from graph for horizontal appron for HL/Dc = 2.2777
As flow is submerged and depth is subcritical hence energy disipation arrangement is not required
D1/Dc = 0.42
D2/D1 = 7.00
D1 = 0.88256 m
D2 = 6.1779 m
V1
(gD1)^0.5
V1 = Q/(LxD1)
= 10.8222
F1 = 3.67799
Fround no. < 4.5 then Basin Type-1
Fround no. > 4.5 then Basin Type-2
Basin Type-1
Basin Length and Depth
From Graph , Lb/D2 = 4.60
There fore, Length of Basin = 28.42 m
Basin Appurtenances
Chute Block:-
Ht. Of Chute Block = 0.88255699 m
Fround No. F1 =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 83
Final Project Report For Meghnagar Water Supply
Width of Chute Block = 0.88255699 m
Spacing of Chute Block = 0.88255699 m
Basin Block:-
F1 = 3.67799
From graph
hb/D1 = 1.20
Therefore, Hb = 1.05907 m
Width = 0.75 x Hb
= 0.7943 m
Spacing = 0.7943 m
Dist. from Chute Block = 4.942 m
End Sill :-
Height of end sill = 0.2 x D2
= 1.236 m
Width of Dents = 1.236 m
Spacing of Dents = 1.236 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 84
Final Project Report For Meghnagar Water Supply
CHAINGE = Barrage
H.F.L @ U/S = 282.500 R.L.
DISCHARGE = 3048.750 m
3
/sec
LENGTH OF WEIR = 212.800 m
CREST LEVEL = 276.500 m
WIDHT OF RIVER = 220.000 m
SIDE SLOPE OF RIVER.= 1.500
D/S BED LVL OF RIVER = 275.000 m
Crest RL = 276.50 m
INPUT DATA : for 75% discharge
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 85
Final Project Report For Meghnagar Water Supply
HYDRAULIC JUMP TYPE STILLING BASIN WITH HORIZONTAL APRON
DETERMINE ENERGY DESIPATION ARRANGEMENT

(1) For 75 % Discharge 3048.75 Cumecs
Water depth at U/S crest = Crest RL + water depth over crest

= 276.500 + 4.062
= 280.562 m
Here , Lt = Effective waterway in m.

= length of weir

= 212.8 m
Q = Discharge in river at 100 % Discharge = 3048.750 Cumecs
Solving this eq. by trial & error method
Q = CL(H)
3/2
Drowing ratio = d/s head over crest / u/s head over crest
where , = -0.4450
C = 1.75 from graph page 5 IS 6966(part-I)
Lt= 212.8 m
H = 4.062
Q= 3048.8 (by trial error)
Finding depth ,velocity & froude No. at crest :-

Velocity at gateopening V1 = Q/A

Q
= --------------
H x Lt

3048.8
= --------------
4.062 x 212.8
= 3.527 m/sec
V1
Froude no. at crest F1 = -------------------
(g x H)^0.5
3.527
(9.81 x 4.062)^0.5
= 0.559
=
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 86
Final Project Report For Meghnagar Water Supply
Finding Normal Depth YN(1) in river : -
For 75 % discharge :-

Now, Q = A x V

5/3
A 1/2
= ----------- x (SO)
2/3
n x P

Where,
d = Depth of water assumed 3.1923 m
P = Perimeter of river section 220 + 2d

A = Area of river 220 x d m

SO = Bed gradient of river = 0.002500
n = Manning's Roughness Co.eff. = 0.025

YN(1) = Normal Depth in river for 10% Discharge
((B x YN(1) )
1.666
x (So)
1/2
Q = --------------------------------------------------------------------
n(B + 2 YN(1) )
0.666
where, Q(1) = 3048.8 cumecs cumecs & SO = 0.002500
Solving this equ. by trial & error.
(220 x d)^1.666 x 0.002500^0.5
0.025(220 + 2d)^0.666
2863.29
0.93917
= 3048.8 = 3048.750 O.K.
we get

YN(1) = 3.19231 m
Velocity in river = Q/(BxYN1)
= 4.34103823
ENERGY AT D/S OF WEIR = YN1 + V/2g
E1 = 4.15279317
3048.750 =
=
=
0.025 x (220+2 x 3.19231341025668) ^ 0.666
(220 x 3.19231341025668))^1.666 x 0.002500^0.5
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 87
Final Project Report For Meghnagar Water Supply
TOTAL ENERGY IN D/S OF WEIR = RBL D/S + E1
= 279.1528
HEAD LOSS (HL) = HFL @ U/S-TOTAL ENERGY IN D/S
= 3.98 m
Dc = Critical Depth
= (q/g)
1/3
= ((Q/L)/g)
1/3
= 2.75277
HL/Dc = 1.44627
Now, from graph for horizontal appron for HL/Dc = 1.4463
As flow is submerged and depth is subcritical hence energy disipation arrangement is not required
D1/Dc = 0.5
D2/D1 = 5.50
D1 = 1.37639 m
D2 = 7.57012 m
V1
(gD1)^0.5
V1 = Q/(LxD1)
= 10.409
F1 = 2.83273
Fround no. < 4.5 then Basin Type-1
Fround no. > 4.5 then Basin Type-2
Basin Type-1
Basin Length and Depth
From Graph , Lb/D2 = 3.80
There fore, Length of Basin = 28.77 m
Basin Appurtenances
Chute Block:-
Ht. Of Chute Block = 1.37638601 m
Fround No. F1 =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 88
Final Project Report For Meghnagar Water Supply
Width of Chute Block = 1.37638601 m
Spacing of Chute Block = 1.37638601 m
Basin Block:-
F1 = 2.83273
From graph
hb/D1 = 1.00
Therefore, Hb = 1.37639 m
Width = 0.75 x Hb
= 1.03229 m
Spacing = 1.03229 m
Dist. from Chute Block = 6.056 m
End Sill :-
Height of end sill = 0.2 x D2
= 1.514 m
Width of Dents = 1.514 m
Spacing of Dents = 1.514 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 89
Final Project Report For Meghnagar Water Supply
CHAINGE = Barrage
H.F.L @ U/S = 282.500 R.L.
DISCHARGE = 4065.000 m
3
/sec
LENGTH OF WEIR = 212.800 m
CREST LEVEL = 276.500 m
WIDHT OF RIVER = 220.000 m
SIDE SLOPE OF RIVER.= 1.500
D/S BED LVL OF RIVER = 275.000 m
Crest RL = 276.50 m
INPUT DATA : for 100 % discharge
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 90
Final Project Report For Meghnagar Water Supply
HYDRAULIC JUMP TYPE STILLING BASIN WITH HORIZONTAL APRON
DETERMINE ENERGY DESIPATION ARRANGEMENT

(1) For 100 % Discharge 4065.00 Cumecs
Water depth at U/S crest = Crest RL + water depth over crest

= 276.500 + 4.921
= 281.421 m
Here , Lt = Effective waterway in m.

= length of weir

= 212.8 m
Q = Discharge in river at 100 % Discharge = 4065.000 Cumecs
Solving this eq. by trial & error method
Q = CL(H)
3/2
Drowing ratio = d/s head over crest / u/s head over crest
where , = -0.2453
C = 1.75 from graph page 5 IS 6966(part-I)
Lt= 212.8 m
H = 4.921
Q= 4065.0 (by trial error)
Finding depth ,velocity & froude No. at crest :-

Velocity at gateopening V1 = Q/A

Q
= --------------
H x Lt

4065.0
= --------------
4.921 x 212.8
= 3.882 m/sec
V1
Froude no. at crest F1 = -------------------
(g x H)^0.5
3.882
(9.81 x 4.921)^0.5
= 0.559
=
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 91
Final Project Report For Meghnagar Water Supply
Finding Normal Depth YN(1) in river : -
For 100 % discharge :-

Now, Q = A x V

5/3
A 1/2
= ----------- x (SO)
2/3
n x P

Where,
d = Depth of water assumed 3.7930 m
P = Perimeter of river section 220 + 2d

A = Area of river 220 x d m

SO = Bed gradient of river = 0.002500
n = Manning's Roughness Co.eff. = 0.025

YN(1) = Normal Depth in river for 10% Discharge
((B x YN(1) )
1.666
x (So)
1/2
Q = --------------------------------------------------------------------
n(B + 2 YN(1) )
0.666
where, Q(1) = 4065.0 cumecs cumecs & SO = 0.002500
Solving this equ. by trial & error.
(220 x d)^1.666 x 0.002500^0.5
0.025(220 + 2d)^0.666
3841.47
0.94501
= 4065.0 = 4065.000 O.K.
we get

YN(1) = 3.79296 m
Velocity in river = Q/(BxYN1)
= 4.87146734
ENERGY AT D/S OF WEIR = YN1 + V/2g
E1 = 5.00249933
4065.000 =
=
=
0.025 x (220+2 x 3.79295835237678) ^ 0.666
(220 x 3.79295835237678))^1.666 x 0.002500^0.5
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 92
Final Project Report For Meghnagar Water Supply
TOTAL ENERGY IN D/S OF WEIR = RBL D/S + E1
= 280.0025
HEAD LOSS (HL) = HFL @ U/S-TOTAL ENERGY IN D/S
= 3.27 m
Dc = Critical Depth
= (q/g)
1/3
= ((Q/L)/g)
1/3
= 3.33411
HL/Dc = 0.97945
Now, from graph for horizontal appron for HL/Dc = 0.9794
As flow is submerged and depth is subcritical hence energy disipation arrangement is not required
D1/Dc = 0.5
D2/D1 = 4.00
D1 = 1.66705 m
D2 = 6.66821 m
V1
(gD1)^0.5
V1 = Q/(LxD1)
= 11.4588
F1 = 2.83355
Fround no. < 4.5 then Basin Type-1
Fround no. > 4.5 then Basin Type-2
Basin Type-1
Basin Length and Depth
From Graph , Lb/D2 = 3.80
There fore, Length of Basin = 25.34 m
Basin Appurtenances
Chute Block:-
Ht. Of Chute Block = 1.66705316 m
Fround No. F1 =
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 93
Final Project Report For Meghnagar Water Supply
Width of Chute Block = 1.66705316 m
Spacing of Chute Block = 1.66705316 m
Basin Block:-
F1 = 2.83355
From graph
hb/D1 = 1.10
Therefore, Hb = 1.83376 m
Width = 0.75 x Hb
= 1.37532 m
Spacing = 1.37532 m
Dist. from Chute Block = 5.335 m
End Sill :-
Height of end sill = 0.2 x D2
= 1.334 m
Width of Dents = 1.334 m
Spacing of Dents = 1.334 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 94
Final Project Report For Meghnagar Water Supply
STAADFILEFORPUMPHOUSE

STARTJOBINFORMATION
ENGINEERDATE15May12
ENDJOBINFORMATION
INPUTWIDTH79
UNITMETERKN
JOINTCOORDINATES
100.580;25.70.580;300.588.2;45.70.588.2;503.020;
65.73.020;75.73.028.2;803.028.2;901.380;105.71.380;
1101.388.2;125.71.388.2;135.73.024.1;1403.024.1;
1500.584.1;165.70.584.1;1701.384.1;185.71.384.1;
MEMBERINCIDENCES
112;2216;3115;434;556;6613;7514;887;915;1038;
1147;1226;1391;14102;15124;16113;17137;18148;191413;
20153;21164;221514;231613;241715;251816;261516;
DEFINEMATERIALSTART
ISOTROPICCONCRETE
E2.17185e+007
POISSON0.17
DENSITY23.5616
ALPHA1e005
DAMP0.05
ENDDEFINEMATERIAL
MEMBERPROPERTY
1TO817TO2126PRISYD0.35ZD0.5
9TO1622TO25PRISYD0.35ZD0.45
CONSTANTS
MATERIALCONCRETEALL
SUPPORTS
9TO121718PINNED
LOAD1LOADTYPEDeadTITLELOADCASE1
SELFWEIGHTY1LIST1TO26
MEMBERLOAD
1TO4202126UNIGY25.2
FLOORLOAD
YRANGE3.023.02FLOAD5.75GY
FINISH

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 95


Final Project Report For Meghnagar Water Supply
Max: -29.148
Max: 18.631
Max: 18.631
Max: -49.811
Max: 18.631
Max: 18.631
Max: -29.148
BENDING MOMENT FOR TOP SLAB
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 96
Final Project Report For Meghnagar Water Supply
Max: 33.26
Max: 22.99
Max: 22.99
Max: 54.78
Max: -22.99
Max: -22.99
Max: 33.26
SHEAR FORCE FOR TOP SLAB
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 97
Final Project Report For Meghnagar Water Supply
Max: 71.580
Max: 46.972
Max: 46.972
Max: 72.327
Max: 46.972
Max: 46.972
Max: 71.580
Bending Z Load 1 :
Moment - kNm
X
Y
Z
BENDING MOMENT FOR PLINTH BEAM
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 98
Final Project Report For Meghnagar Water Supply
Max: 83.57
Max: 64.72
Max: 64.72
Max: 83.57
Max: -64.72
Max: -64.72
Max: 83.57
Shear Y Load 1 :
Force - kN
X
Y
Z
SHEAR FORCE FOR PLINTH BEAM
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 99
Final Project Report For Meghnagar Water Supply
Max: -43.559
Max: -29.264
Max: 43.559
Max: -40.267
Max: 29.264
Max: -42.066
Max: 40.267
Max: -43.559
Max: 42.066
Max: -29.264
Max: 43.559
Max: 29.264
Bending Z Load 1 :
Moment - kNm
X
Y
Z
BENDING MOMENT FOR COLUMN
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 100
Final Project Report For Meghnagar Water Supply
Max: 54.45
Max: 15.84
Max: -54.45
Max: 50.33
Max: -15.84
Max: 20.73
Max: -50.33
Max: 54.45
Max: -20.73
Max: 15.84
Max: -54.45
Max: -15.84
Shear Y Load 1 :
Force - kN
X
Y
Z
SHEAR FORCE FOR COLUMN
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 101
Final Project Report For Meghnagar Water Supply
X = -54.45
Y = 206.75
Z = 23.06
MX = FREE
MY = FREE
MZ = FREE
X = 54.45
Y = 206.75
Z = 23.06
MX = FREE
MY = FREE
MZ = FREE
X = -50.33
Y = 330.08
Z = -0.00
MX = FREE
MY = FREE
MZ = FREE
X = 50.33
Y = 330.08
Z = -0.00
MX = FREE
MY = FREE
MZ = FREE
X = -54.45
Y = 206.75
Z = -23.06
MX = FREE
MY = FREE
MZ = FREE
X = 54.45
Y = 206.75
Z = -23.06
MX = FREE
MY = FREE
MZ = FREE
Load 1
Moment - kNm : Force - k
X
Y
Z
REACTION FOR COLUMN
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 102
Final Project Report For Meghnagar Water Supply
Maximum & Minimum Bending Moment Summary
Support Centre(mid)
1 50 47
Maximum & Minimum Shear Force Summary
1
Material property
Concrete Mix Grade = M20
Main Steel Grade = Fe500
Design Constants
Permissible stress in steel (
st
) = 500 N/mm
Permissible stress in coincrete (
cbc
) = 6.7 N/mm
Modular ratio (m) = 13.9303
Factor for neutral axis depth n = 1 / ( 1 + (
st
/ (m.
cbc
)))
= 0.1573
Factor of lever arm (j) = 1-n / 3
= 0.9476
Q = 1 / 2 x
cbc
x j x n
= 0.4993 N / mm
Main Reinforcement Summary Table (without seismic)
Componen
t
Design
BM
Depth Required Depth
Provided
Cover
Provided
Ast
required
Diameter
of Steel
Nos
required
Nos
Provided
Ast
Provided
Pt
KN.m mm mm mm mm mm mm mm mm %
Beam mid
span
47 518.58 500.00 30 322 16 1.6 2 402.1239 0.229785
Beam
support
50 534.88 500.00 30 343 16 1.71 3 603.1858 0.344678
Shear Reinforcement Summary Table
Componen
t
Design SF Nominal Shear Stress (

Permissi
ble Shear
Stress
(
c
)
Design
Shear
No. of
Legs
Diameter
of Steel
Spacing
required
Spacing
Provided
Ast
Provided
KN (N/mm) (N/mm) KN mm mm mm mm
Beam
support
55 0.4490 0.3100 0.00 2 10 405.097* 200 179.14
FROM STAAD
PUMP HOUSE SLAB BEAM (AS PER LIMIT STATE METHOD)
Load Case Shear Force in Beam (KN)
Load Case Moments in Beam (KN.m)
FROM STAAD
Design of SLAB BEAM For Pump House 7.50 m x 5.0 m
Support
55
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 103
Final Project Report For Meghnagar Water Supply
Maximum & Minimum Bending Moment Summary
Support Centre(mid)
1 73 48
Maximum & Minimum Shear Force Summary
1
Material property
Concrete Mix Grade = M20
Main Steel Grade = Fe500
Design Constants
Permissible stress in steel (
st
) = 500 N/mm
Permissible stress in coincrete (
cbc
) = 6.77 N/mm
Modular ratio (m) = 13.7863
Factor for neutral axis depth n = 1 / ( 1 + (
st
/ (m.
cbc
)))
= 0.1573
Factor of lever arm (j) = 1-n / 3
= 0.9476
Q = 1 / 2 x
cbc
x j x n
= 0.5046 N / mm
Load Case Moments in Beam (KN.m)
Support
84
Design of PLINTH BEAM For Pump House 7.50 m x 5.0 m
FROM STAAD
FROM STAAD
PUMP HOUSE PLINTH BEAM (AS PER LIMIT STATE METHOD)
Load Case Shear Force in Beam (KN)
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 104
Final Project Report For Meghnagar Water Supply
Main Reinforcement Summary Table (without seismic)
Componen
t
Design
BM
Depth Required Depth
Provided
Cover
Provided
Ast
required
Diameter
of Steel
Nos
required
Nos
Provided
Ast
Provided
Pt
KN.m mm mm mm mm mm mm mm mm %
Beam mid
span
48 521.36 500.00 30 329 16 1.64 2 402.1239 0.229785
Beam
support
73 642.95 500.00 30 500 16 2.49 3 603.1858 0.344678
Shear Reinforcement Summary Table
Componen
t
Design SF Nominal Shear Stress (

Permissi
ble Shear
Stress
(
c
)
Design
Shear
No. of
Legs
Diameter
of Steel
Spacing
required
Spacing
Provided
Ast
Provided
KN (N/mm) (N/mm) KN mm mm mm mm
Beam
support
84 0.6857 0.3100 0.00 2 10 405.097* 200 179.14
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 105
Final Project Report For Meghnagar Water Supply
DESIGN OF AXIAL LOADED ISOLATED RCC FOOTING (IS 456, 2000)
COLUMN
Length (l, dim. || Z axis ) = 450 mm
Breadth (b, dim. || X axis) = 350 mm
Breadth 1.65 m
FOOTING
Foot length (L, dim. || Z axis) = 1.75 m
Foot Breadth (B, dim. || X axis) = 1.65 m
Thickness of footing (t) = 150 mm
Clear cover of footing = 50 mm
Main bar dia of footing = 12 mm
Effective depth of footing = 94 mm Length 1.75 m
Selfweight of the footing = 10.83 KN
Area of Footing(A) = 2.89 m
2
Sect mod of foot about Z axis (Zz) = 0.79 m
3
Sec mod of foot about X axis (Zx) = 0.84 m
3
MATERIALS OF CONSTRUCTION
Grade of concrete f
ck
= 20
N/mm
2
Grade of steel f
y
= 500
N/mm
2
CHECK FOR BEARING PRESSURE
Safe bearing pressure = 1200 KN/m
2
Unfactored load case number = 215
Axial load from output (P1) = 330 KN
Moment about Z axis (M
z
) = 0 KN-m
Moment about X axis (M
x
) = 0 KN-m
Depth of top of foot. from ground = 0 m
Unit wt of soil = 18 KN/m
3
Weight of soil retained above foot = 0.00 KN
P = (P1+soil+foot self wt) = 340.83 KN
Maximum bearing pressure = 118.04 KN/m
2
Minimum bearing pressure = 118.04 KN/m
2
Hence footing is safe against max bearing pressure.
DESIGN FORCES
Axial load:(P
u
) = 330 KN
Moment about Z axis (M
uz
) = 0 KN-m
Moment about X axis (M
ux
) = 0 KN-m
Maximum effective soil pressure p
e max
( Pu/Area+ Muz/Zz + Mux/Zx) = 114.29 KN/m
2
Minimum effective soil pressure p
e min
( Pu/Area - Muz/Zz - Mux/Zx) = 114.29 KN/m
2
Design of footing is done using above maximum effective soil pressure
DESIGN OF FOOTING FOR PUMP HOUSE
global
Z
x
x
y
y
Z
M
Z
M
A
P

global
X
global
X
global
Z
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 106
Final Project Report For Meghnagar Water Supply
CALCULATION FOR BOTTOM STEEL
Mu about X1 X1 = ( pe max x length
2
/2)= 24.14 KN-m per meter
Hence, Ast = 734.026 mm
2
Min Ast = 112.800 mm
2
(0.12 % for slab, cl 26.5.2.1)
Spacing = 154.08 mm (considering max of above two calculated values of Ast)
pt provided = 0.78 %
Hence provide 12 mm dia bar @ 154 mm c/c parellel to length of footing ( || to Z)
Mu about N1 N1 = ( pe max x length
2
/2)= 24.14 KN-m per meter
Calc. Ast = 734.026 mm
2
Min Ast = 112.8 mm
2
(0.12 % for slab, cl 26.5.2.1)
Spacing = 154.08 mm (considering max of above two calculated values of Ast)
pt provided = 0.78087838 %
Hence provide 12 mm dia bar @ 154 mm c/c parellel to breadth of footing ( || to X)
But provided 12 mm dia @ 150 mm c/c
But provided 12 mm dia @ 150 mm c/c
bd
bd f
M
f
f
A
ck
u
y
ck
st
(
(

=
2
6 . 4
1 1
5 . 0
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 107
Final Project Report For Meghnagar Water Supply
CHECK FOR ONE WAY SHEAR :
One way shear at critical section L1- L1
Distance of critical sec. from edge of footing = 0.556 m
Shear force Vs =pe max x 0.556 x 1m width of footing = 63.543 KN
Shear stress t
v
= Vs/d = 0.127
N/mm
2
t
c
= 0.20
N/mm
2
tv < tc hence O.K.
One way shear at critical section L2- L2
Distance of critical sec. from edge of footing = 0.556 m
Shear force Vs =pe max x 0.556 x 1m width of footing = 63.54 KN
Shear stress t
v
= Vs/d = 0.098
N/mm
2
t
c
= 0.20
N/mm
2
tv < tc hence O.K.
CHECK FOR TWO WAY SHEAR
Ref. Cl.31.6.3 of IS 456 : 2000
Allowable shear stress t
v allowable
= k
s
t
c
k
s
= ( 0.5 + bc) = 1.56061 >1
Hence, k
s
= 1
t
c
= 0.25 (fck)
0.5
= 1.11803
N/mm
2
t
v allowable
= k
s
x t
c
= 1.11803
N/mm
2
Shear force Vs = 114.285 ( 1.75 x 1.65 - 0.544 x 0.444) = 302.40 KN
Length of critical section = 2 x ( 544 + 444) = 1976 mm
Area of the critical section (length of critical sec x eff. d ) = 1501760 mm
2
Hence shear stress t
v
=
0.201
N/mm
2
tv < allowable hence O.K.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 108
Final Project Report For Meghnagar Water Supply
Fy 500
Fck 20
Lx(mm) 5000
Ly(mm) 5000
Ly/Lx 1
Slab thickness (MM) 150
Selfwt (Kn/m2) 3.75 Clear cover 20 mm
LL (KN/M2) 1.5 deffX 125 mm
Partions (Kn/m2) 0 deffY 115 mm
Finishes (Kn/m2)-50thk 1.5
0
6.75
Short Span pt(%)
alphax(-Ve ) 0.047 11.9 Kn.m 0.18 225 mm2 150 mm2
alphax(+Ve) 0.035 8.86 Kn.m 0.13 149.5 mm2 150 mm2
long Span pt(%)
alphay(-Ve ) 0.047 11.9 Kn.m 0.22 253 mm2 138 mm2
alphay(+Ve) 0.035 8.86 Kn.m 0.16 184 mm2 138 mm2
Short Span (-Ve ) (+Ve ) Long Span (-Ve ) (+Ve )
Assume Bar Dia 10 10 mm Assume Bar Dia 10 10 mm
Ast Requred 225 150 mm2 Ast Requred 253 184 mm2
spacing req. 340 520 mm c/c spacing req. 310 420 mm c/c
provide 200 200 mm c/c provide 200 200 mm c/c
OK OK OK OK
Facter Moment Ast(mm2) Minimum Ast
Total load (kn/m2)
Facter Moment Ast(mm2) Minimum Ast
Two Way Slab
Services (Kn/m2)
Design of Slab For Pump House 7.50 m x 5.0 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 109
Final Project Report For Meghnagar Water Supply


























L O O P

Ver si on 4. 0


Looped Wat er Di st r i but i on Net wor k Desi gn Pr ogr am





























Echoi ng I nput Var i abl es
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 110
Final Project Report For Meghnagar Water Supply


- - - - - - - - - - - - - - - - - - - - - - - -

Ti t l e of t he Pr oj ect : MEGHNAGAR WATER SUPPLY
Name of t he User : WAPCOS
Number of Pi pes : 27
Number of Nodes : 27
Type of Pi pe Mat er i al s Used : PV/ DI /
Number of Commer ci al Di a per Mat er i al : 6/ 5/
Peak Desi gn Fact or : 2
Newt on- Raphson St oppi ng Cr i t er i on l ps : . 001
Mi ni mumPr essur e m : 6
Maxi mumPr essur e m : 40
Desi gn Hydr aul i c Gr adi ent mi n km : 1. 5
Si mul at e or Desi gn? ( S/ D) : D
No. of Res. Nodes wi t h Fi xed HGL : 1
No. of Res. Nodes wi t h Var i abl e HGL : 0
No. of Boost er Pumps : 0
No. of Pr essur e Reduci ng Val ves : 0
No. of Check Val ves : 0
Type of For mul a : Hazen' s


Pi pe Dat a
- - - - - - - - - - - -

===================================================================
Pi pe Fr om To Lengt h Di amet er Hazen' s Pi pe St at us
No. Node Node m mm Const Mat er i al ( E/ P)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 1 2 250. 00 350. 0 130. 00000 DI
2 2 3 180. 00 250. 0 130. 00000 DI
3 3 4 140. 00 250. 0 130. 00000 DI
4 4 5 300. 00 166. 9 140. 00000 PV
5 2 6 615. 00 166. 9 140. 00000 PV
6 3 7 660. 00 129. 7 140. 00000 PV
7 4 8 400. 00 166. 9 140. 00000 PV
8 8 9 300. 00 102. 0 140. 00000 PV
9 8 10 350. 00 102. 0 140. 00000 PV
10 5 11 430. 00 129. 7 140. 00000 PV
11 5 12 460. 00 102. 0 140. 00000 PV
12 6 13 140. 00 148. 4 140. 00000 PV
13 13 14 180. 00 83. 0 140. 00000 PV
14 13 15 450. 00 102. 0 140. 00000 PV
15 2 16 750. 00 300. 0 130. 00000 DI
16 16 17 150. 00 250. 0 130. 00000 DI
17 17 18 140. 00 250. 0 130. 00000 DI
18 18 19 1500. 00 185. 5 140. 00000 PV
19 18 20 160. 00 185. 5 140. 00000 PV
20 20 21 1000. 00 185. 5 140. 00000 PV
21 21 22 150. 00 83. 0 140. 00000 PV
22 21 23 85. 00 102. 0 140. 00000 PV







===================================================================
Pi pe Fr om To Lengt h Di amet er Hazen' s Pi pe St at us
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 111
Final Project Report For Meghnagar Water Supply


No. Node Node m mm Const Mat er i al ( E/ P)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
23 23 24 45. 00 102. 0 140. 00000 PV
24 24 25 90. 00 83. 0 140. 00000 PV
25 24 26 160. 00 83. 0 140. 00000 PV
26 16 27 250. 00 83. 0 140. 00000 PV
27 10 11 150. 00 83. 0 140. 00000 PV
===================================================================


Node Dat a
- - - - - - - - - - -

=============================================================
Node Peak Fl ow El evat i on Mi n Pr ess Max Pr ess
No. l ps m m m
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 2. 00 0. 000 324. 27 6. 00 40. 00
2 2. 00 - 1. 098 325. 82 6. 00 40. 00
3 2. 00 - 0. 791 327. 53 6. 00 40. 00
4 2. 00 - 0. 615 327. 25 6. 00 40. 00
5 2. 00 - 1. 318 328. 32 6. 00 40. 00
6 2. 00 - 2. 701 322. 18 6. 00 40. 00
7 2. 00 - 2. 899 322. 64 6. 00 40. 00
8 2. 00 - 1. 757 325. 85 6. 00 40. 00
9 2. 00 - 1. 318 323. 63 6. 00 40. 00
10 2. 00 - 1. 537 326. 98 6. 00 40. 00
11 2. 00 - 2. 548 327. 80 6. 00 40. 00
12 2. 00 - 2. 021 326. 10 6. 00 40. 00
13 2. 00 - 0. 615 321. 24 6. 00 40. 00
14 2. 00 - 0. 791 318. 90 6. 00 40. 00
15 2. 00 - 1. 977 317. 92 6. 00 40. 00
16 2. 00 - 3. 294 319. 18 6. 00 40. 00
17 2. 00 - 0. 659 320. 16 6. 00 40. 00
18 2. 00 - 0. 615 321. 70 6. 00 40. 00
19 2. 00 - 6. 589 325. 46 6. 00 40. 00
20 2. 00 - 0. 703 321. 97 6. 00 40. 00
21 2. 00 - 4. 392 323. 43 6. 00 40. 00
22 2. 00 - 0. 659 325. 02 6. 00 40. 00
23 2. 00 - 0. 374 323. 82 6. 00 40. 00
24 2. 00 - 0. 198 324. 58 6. 00 40. 00
25 2. 00 - 0. 396 325. 34 6. 00 40. 00
26 2. 00 - 0. 703 325. 10 6. 00 40. 00
27 2. 00 - 0. 659 317. 10 6. 00 40. 00
=============================================================








3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 112
Final Project Report For Meghnagar Water Supply


Fi xed Head Reser voi r Dat a
- - - - - - - - - - - - - - - - - - - - - - - - - - -

=============================
Sour ce Head Ref Res?
Node m ( R)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 337. 00 R
=============================


Commer ci al Di amet er Dat a
- - - - - - - - - - - - - - - - - - - - - - - - - -

=========================================================
Pi pe Di a. Hazen' s Uni t Cost Al l ow Pr ess Pi pe
I nt . ( mm) Const Rs / m l engt h m Mat er i al
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
83. 0 140. 00000 73. 00 0. 00 PV
102. 0 140. 00000 103. 00 0. 00 PV
129. 7 140. 00000 170. 00 0. 00 PV
148. 4 140. 00000 199. 00 0. 00 PV
166. 9 140. 00000 269. 00 0. 00 PV
185. 5 140. 00000 345. 00 0. 00 PV
250. 0 130. 00000 2343. 00 0. 00 DI
300. 0 130. 00000 2952. 00 0. 00 DI
350. 0 130. 00000 3694. 00 0. 00 DI
400. 0 130. 00000 4410. 00 0. 00 DI
450. 0 130. 00000 5237. 00 0. 00 DI
=========================================================


Looped Wat er Di st r i but i on Net wor k Desi gn Out Put
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
BandWi dt h = 1
Number of Loops = 1
Newt on Raphson I t er at i ons = 2
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -



















Pi pe Det ai l s
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 113
Final Project Report For Meghnagar Water Supply


- - - - - - - - - - - - - - -

=======================================================================
Pi pe Fr om To Fl ow Di a HL HL/ 1000m Lengt h Vel oci t y
No. Node Node ( l ps) ( mm) ( m) ( m) ( m) ( m/ s )
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 1 2 82. 454 350. 0 0. 53 2. 12 250. 00 0. 86
2 2 3 29. 608 250. 0 0. 30 1. 64 180. 00 0. 60
3 3 4 22. 228 250. 0 0. 14 0. 97 140. 00 0. 45
4 4 5 11. 685 166. 9 0. 55 1. 83 300. 00 0. 53
5 2 6 12. 168 166. 9 1. 21 1. 97 615. 00 0. 56
6 3 7 5. 798 129. 7 1. 13 1. 71 660. 00 0. 44
7 4 8 9. 313 166. 9 0. 48 1. 20 400. 00 0. 43
8 8 9 2. 636 102. 0 0. 38 1. 28 300. 00 0. 32
9 8 10 3. 163 102. 0 0. 63 1. 79 350. 00 0. 39
10 5 11 5. 007 129. 7 0. 56 1. 30 430. 00 0. 38
11 5 12 4. 042 102. 0 1. 30 2. 82 460. 00 0. 49
12 6 13 6. 766 148. 4 0. 17 1. 18 140. 00 0. 39
13 13 14 1. 582 83. 0 0. 24 1. 36 180. 00 0. 29
14 13 15 3. 954 102. 0 1. 22 2. 71 450. 00 0. 48
15 2 16 38. 482 300. 0 0. 82 1. 10 750. 00 0. 54
16 16 17 30. 576 250. 0 0. 26 1. 74 150. 00 0. 62
17 17 18 29. 258 250. 0 0. 22 1. 61 140. 00 0. 60
18 18 19 13. 178 185. 5 2. 05 1. 37 1500. 00 0. 49
19 18 20 14. 850 185. 5 0. 27 1. 71 160. 00 0. 55
20 20 21 13. 444 185. 5 1. 42 1. 42 1000. 00 0. 50
21 21 22 1. 318 83. 0 0. 14 0. 97 150. 00 0. 24
22 21 23 3. 342 102. 0 0. 17 1. 98 85. 00 0. 41
23 23 24 2. 594 102. 0 0. 06 1. 24 45. 00 0. 32
24 24 25 0. 792 83. 0 0. 03 0. 38 90. 00 0. 15
25 24 26 1. 406 83. 0 0. 17 1. 09 160. 00 0. 26
26 16 27 1. 318 83. 0 0. 24 0. 97 250. 00 0. 24
27 10 11 0. 089 83. 0 0. 00 0. 01 150. 00 0. 02

Not e: Negat i ve val ue i ndi cat es t he f l ow i n r ever se di r ect i on i n t hat Pi pe
=======================================================================




















Pi pe Pr essur e Det ai l s
- - - - - - - - - - - - - - - - - - - - - - -

=======================================================================
Pi pe Fr om To Di a Hazen' s Pi pe Max Pr ess Al l ow Pr ess St at us
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 114
Final Project Report For Meghnagar Water Supply


No. Node Node ( mm) Const Mat er i al ( m ) ( m ) ( E/ P)
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 1 2 350. 0 130. 00000 DI 12. 73 HI 0. 00
2 2 3 250. 0 130. 00000 DI 10. 65 HI 0. 00
3 3 4 250. 0 130. 00000 DI 8. 79 HI 0. 00
4 4 5 166. 9 140. 00000 PV 8. 79 HI 0. 00
5 2 6 166. 9 140. 00000 PV 13. 08 HI 0. 00
6 3 7 129. 7 140. 00000 PV 12. 41 HI 0. 00
7 4 8 166. 9 140. 00000 PV 9. 71 HI 0. 00
8 8 9 102. 0 140. 00000 PV 11. 54 HI 0. 00
9 8 10 102. 0 140. 00000 PV 9. 71 HI 0. 00
10 5 11 129. 7 140. 00000 PV 7. 17 HI 0. 00
11 5 12 102. 0 140. 00000 PV 8. 09 HI 0. 00
12 6 13 148. 4 140. 00000 PV 13. 85 HI 0. 00
13 13 14 83. 0 140. 00000 PV 15. 95 HI 0. 00
14 13 15 102. 0 140. 00000 PV 15. 95 HI 0. 00
15 2 16 300. 0 130. 00000 DI 16. 47 HI 0. 00
16 16 17 250. 0 130. 00000 DI 16. 47 HI 0. 00
17 17 18 250. 0 130. 00000 DI 15. 22 HI 0. 00
18 18 19 185. 5 140. 00000 PV 13. 46 HI 0. 00
19 18 20 185. 5 140. 00000 PV 13. 46 HI 0. 00
20 20 21 185. 5 140. 00000 PV 12. 92 HI 0. 00
21 21 22 83. 0 140. 00000 PV 10. 04 HI 0. 00
22 21 23 102. 0 140. 00000 PV 10. 04 HI 0. 00
23 23 24 102. 0 140. 00000 PV 9. 48 HI 0. 00
24 24 25 83. 0 140. 00000 PV 8. 66 HI 0. 00
25 24 26 83. 0 140. 00000 PV 8. 66 HI 0. 00
26 16 27 83. 0 140. 00000 PV 18. 30 HI 0. 00
27 10 11 83. 0 140. 00000 PV 7. 95 HI 0. 00
=======================================================================


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 115
Final Project Report For Meghnagar Water Supply


Node Det ai l s
- - - - - - - - - - - - - -

=======================================================
Node Fl ow El ev. H G L Pr essur e
No. ( l ps) ( m) ( m) ( m )
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1 S 82. 454 324. 27 337. 00 12. 73
2 - 2. 196 325. 82 336. 47 10. 65
3 - 1. 582 327. 53 336. 17 8. 64
4 - 1. 230 327. 25 336. 04 8. 79
5 - 2. 636 328. 32 335. 49 7. 17
6 - 5. 402 322. 18 335. 26 13. 08
7 - 5. 798 322. 64 335. 05 12. 41
8 - 3. 514 325. 85 335. 56 9. 71
9 - 2. 636 323. 63 335. 17 11. 54
10 - 3. 074 326. 98 334. 93 7. 95
11 - 5. 096 327. 80 334. 93 7. 13
12 - 4. 042 326. 10 334. 19 8. 09
13 - 1. 230 321. 24 335. 09 13. 85
14 - 1. 582 318. 90 334. 85 15. 95
15 - 3. 954 317. 92 333. 87 15. 95
16 - 6. 588 319. 18 335. 65 16. 47
17 - 1. 318 320. 16 335. 38 15. 22
18 - 1. 230 321. 70 335. 16 13. 46
19 - 13. 178 325. 46 333. 11 7. 65
20 - 1. 406 321. 97 334. 89 12. 92
21 - 8. 784 323. 43 333. 47 10. 04
22 - 1. 318 325. 02 333. 32 8. 30
23 - 0. 748 323. 82 333. 30 9. 48
24 - 0. 396 324. 58 333. 24 8. 66
25 - 0. 792 325. 34 333. 21 7. 87
26 - 1. 406 325. 10 333. 07 7. 97
27 - 1. 318 317. 10 335. 40 18. 30
=======================================================


Pi pe Cost Summar y
- - - - - - - - - - - - - - - - - - -

=========================================================
Di amet er Pi pe Lengt h Cost Cum. Cost
( mm) Mat er i al ( m) ( 1000 Rs ) ( 1000 Rs )
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
83. 0 PV 980. 00 71. 54 71. 54
102. 0 PV 1690. 00 174. 07 245. 61
129. 7 PV 1090. 00 185. 30 430. 91
148. 4 PV 140. 00 27. 86 458. 77
166. 9 PV 1315. 00 353. 73 812. 51
185. 5 PV 2660. 00 917. 70 1730. 20
250. 0 DI 610. 00 1429. 23 3159. 44
300. 0 DI 750. 00 2214. 00 5373. 44
350. 0 DI 250. 00 923. 50 6296. 94
=========================================================

3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 116
Final Project Report For Meghnagar Water Supply

ESTIMATES
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 117
Final Project Report For Meghnagar Water Supply
All Soil PWD SOR pg no 4 item no 2.6
163 2 Earth work in Excavation by mechanical or
manual means including dressing of sides
and ramming of bottoms lift upto 1.5 m
including getting out excavated soil and
disposal of surplus excavated material and
disposal of the same upto a lead of 50 m.
Cum 419.00 68297.00
Hard Rock (Blasting Prohibited )PWD SOR pg
no 4 item no 2.7
22 3 Providing and laying in position cement
concrete below foundation of grade M 15 and
curing complete,excluding cost of centering
and shuttering All work up to plinth level with
40 mm size aggregates
Cum 4189.00 92158.00
PWD SOR pg no 15 item no 4.2
32.00 4 Providing and laying in position machine
batched, machine mixed and
machine vibrated design mix cement concrete
of specified grade for
reinforced cement concrete work including all
lift of concrete to si te of laying
but excluding the cost of centering, shuttering,
finishing and reinforcement,
including admixtures in recommended
proportions as per IS 9103........
RAFT footing of grade M30
Cum 5603.00 179296.00
4.1 Centering and shuttering inlcuding strutting,
rotting etc. And removal form for
50.00 foundation, footings cl. 5.9.1 Sq.m 146.00 7300.00
335.00 beams, gurders columns, cylindrical wall
cl.5.9.3
Sq.m 274.80 92058.00
185.00 domes cl. 5.9.5 Sq.m 795.00 147075.00
2219.00 5 Providing Reinforcement HYSD TMT using
Fe 500 in base slab
kg 48.00 106512.00
PWD SOR pg no 22 item no 5.16
163.00 1.0 Earth work in Excavation by mechanical or
manual means including dressing of sides
and ramming of bottoms lift upto 1.5 m
including getting out excavated soil and
disposal of surplus excavated material and
disposal of the same upto a lead of 50 m.
cum 123.00 20049.00
ESTIMATE OF SUMP
ABSTRACT
Quantity Item
No.
Description Unit Rate per
Unit
Amount
in Rs.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 118
Final Project Report For Meghnagar Water Supply
Quantity Item
No.
Description Unit Rate per
Unit
Amount
in Rs.
8.00 6 Providing and laying in position cement
concrete for 400 x 400 beam of sump of
grade M 30 and curing complete,including
cost of shuttering, centering, finishing etc but
excluding the cost of reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
300 =Rs. 6292)
cum 5603.00 44824.00
765.00 7 Providing Reinforcement HYSD TMT using
Fe 500 in beam of 400x400mm etc complete.
kg 48.00 36720.00
PWD SOR pg no 22 item no 5.16
26.00 8 Providing and laying dome slab in M-30
grade of concrete including cost of shuttering,
centering, finishing etc but excluding the cost
of reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
300 =Rs. 6292)
LS 5603.00 145678.00
1545.00 9 Providing Reinforcemet using Fe 500 in dome
100mm thick etc complete.
kg 48.00 74160.00
PWD SOR pg no 22 item no 5.16
168.00 10 Providing and laying in position cement
concrete for wall of grade M 30 and curing
complete,including cost of centering and
shuttering but excluding the cost of
reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
300 =Rs. 6292)
cum 5603.00 941304.00
13371.00 11 Providing Reinforcement HYSD TMT using
Fe 500 in wall 200mm thick etc complete.
kg 48.00 641808.00
PWD SOR pg no 22 item no 5.16
12.00 12 Providing and fixing 50 cm wide M.S. ladder
fabricated from M.S. Flats 10 mm x 60 mm with 20
mm dia steel bar steps, @ 30 cm C/C. The item
include stays of 10 mm x 50 mm flats fixed at 3
meter C/CFor landing inside
Rmt 1000.00 12000.00
341.63 13 18 mm cement plaster in 2 coats under layer 12
mm CM 1:5 and top layer 6 mm thick cement
plaster 1:3 finished even,smooth and curing
including cost of form work complete in upper part
and bottom part of dome (inner side excluding top
dome)
sq m 152.00 51927.00
PWD SOR Page no 99 sr no 13.7
4.00 14 Providing C. I. Cowl Type ventilator with air filter &
J ali etc. complete
Nos 900.00 3600.00
100 mm Dia. (80 Kg.)
2664766.00
425829.61
3090595.61
Add 15.98 % as prevailling rates
Total Amount
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 119
Final Project Report For Meghnagar Water Supply
Item
No.
Description
No. Length
m
Breadth
m
Height
m
Quantity Total
Quantity
Units
1 Earth work in Excavation by mechanical or
manual means including dressing of sides
and ramming of bottoms lift upto 1.5 m
including getting out excavated soil and
disposal of surplus excavated material and
disposal of the same upto a lead of 50 m.
1 0.75 162.32 162.32 Cum
2 Earth work in Excavation by mechanical or
manual means including dressing of sides
and ramming of bottoms lift upto 1.5 m
including getting out excavated soil and
disposal of surplus excavated material and
disposal of the same upto a lead of 50 m.
1 0.75 162.32 162.32 Cum
3 Providing and laying in position cement
concrete below foundation of grade M 15
and curing complete,excluding cost of
centering and shuttering All work up to plinth
level with 40 mm size aggregates
1 0.10 21.64 21.64 Cum
4 Providing and laying in position machine
batched, machine mixed and
machine vibrated design mix cement
concrete of specified grade for
reinforced cement concrete work including all
lift of concrete to si te of laying
but excluding the cost of centering,
shuttering, finishing and reinforcement,
including admixtures in recommended
proportions as per IS 9103........
RAFT footing of grade M30
31.69 Cum
PWD SOR Page no 23 Sr. No. 5.27 1 0.15 31.69 31.69 Cum
Total 31.69
5 Providing Reinforcement HYSD TMT using
Fe 500 in base slab
31.69 2218.03 2218.03 kg
6 Providing and laying in position cement
concrete for 400 x 400 beam of sump of
grade M 30 and curing complete,including
cost of shuttering, centering, finishing etc but
excluding the cost of reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
1 47.752 0.40 0.40 7.64 7.64 Cum
7 Providing Reinforcement HYSD TMT using
Fe 500 in beam of 400x400mm etc
complete.
1 7.64 764.0 764.0 kg
ESTIMATE OF SUMP
MEASUREMENTS
216.42
(Area)
216.42
x 100 kg/cum
x 70 kg/cum
216.42
211.24
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 120
Final Project Report For Meghnagar Water Supply
Item
No.
Description
No. Length
m
Breadth
m
Height
m
Quantity Total
Quantity
Units
8 Providing and laying dome slab in M-30
grade of concrete including cost of shuttering,
centering, finishing etc but excluding the cost
of reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
300 =Rs. 6292)
1 0.12 25.74 25.74 cum
9 Providing Reinforcemet using Fe 500 in
dome 100mm thick etc complete.
25.74 1544.2 1544.2 kg
10 Providing and laying in position cement
concrete for wall of grade M 30 and curing
complete,including cost of centering and
shuttering but excluding the cost of
reinforcement.
(M25 rates Rs, 59992 +! bag of cement Rs.
300 =Rs. 6292)
167.13 cum
Wall 1 47.75 0.20 3.50 167.13 167.13 cum
11 Providing Reinforcement HYSD TMT using
Fe 500 in wall 200mm thick etc complete.
167.13 13370.6 13370.6 kg
12 Providing and fixing 50 cmwide M.S. ladder
fabricated from M.S. Flats 10 mm x 60 mm
with 20 mm dia steel bar steps, @ 30 cm
C/C. The item include stays of 10 mm x 50
mm flats fixed at 3 meter C/C.For landing
2 6.000 12.00 12.0 Rmt
13 18 mmcement plaster in 2 coats under layer
12 mm CM 1:5 and top layer 6 mm thick
cement plaster 1:3 finished even,smooth and
curing including cost of form work complete
in upper part and bottompart of dome (inner
side excluding top dome)
1 47.100 3.50 164.85 164.9 sqm
15.000 15.00 176.6 sqm
14 Providing C. I. Cowl Type ventilator with air filter &
J ali etc. complete
4 4.00 NOS
100 mm Dia. (80 Kg.)
15 Cenering and shutteirng
dome 185.00 sqm
Raft 51.50 sqm
Cylindrical wall 338.49 sqm
x 80kg/cum
x 60 kg/cum
214.47
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 121
Final Project Report For Meghnagar Water Supply
400,000 LITERS CAPACITY
:: ABSTRACT ::
QTY. UNIT PARTICULARS RATE PER AMOUNT
ITEM NO :: 1 ::
Excavation for foundatiion for structures as per
drawing and technical specification including setting
out,construction of shoring and bracing,removal of
stumps and other deleterious mater,dressing of sides
and bottom and backfilling with approved materials
etc
PWD SOR Page no 4 sr no 2.6
(I) For depth 0.0 mt to 1.5 mt
169.65 Cu.M. (A) All soil 123.00 Cu.M. 20866.46
PWD SOR Page no 4 sr no 2.7
(II ) For Depth 1.5 mt to 3.0 mt.
169.65 (B) Hard rock 419.00 Cu.M. 71081.68
ITEM NO :: 2 ::
Providing and layingin position cement concrete
below Raft foundation of grade M 15 with 20
mm nominal size graded stone agregate and
curing complete,excluding cost of centering and
shuttering
16.96 Cu.M. PWD SOR Page no 15 sr no 4.1.1.3
3926.00 Cu.M. 66603.02
ITEM NO :: 3 ::
Providing and laying in position machine
batched, machine mixed and
machine vibrated design mix cement concrete
of specified grade for
reinforced cement concrete work including all lift
of concrete to si te of laying
but excluding the cost of centering, shuttering,
finishing and reinforcement,
including admixtures in recommended
proportions as per IS 9103........
RAFT footing of grade M30
PWD SOR Page no 23 sr no 5.26
113.10 Cu.M. 5083.00 Cu.M. 574873.76
ITEM NO :: 4 ::
Providing Reinforcement HYSD TMT using Fe
500 in Raft Foundation.
PWD SOR pg no 15 item no 5.16.6
10.18 MT 48000.00 MT 488580.49
NAME OF WORKS :-CONSTRUCTION OF RCC ELEVATED SERVICE RESERVOIR.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 122
Final Project Report For Meghnagar Water Supply
ITEM NO :: 5::
Providing and laying in position machine
batched, machine mixed and
machine vibrated design mix cement concrete
of specified grade for
reinforced cement concrete work including all lift
of concrete to si te of laying
but excluding the cost of centering, shuttering,
finishing and reinforcement,
including admixtures in recommended
proportions as per IS 9103........
super structure and Substructure of grade M30
PWD SOR Page no 23 sr no 5.27
Up to 3.00 Mts. Depth
4.04 Cu.M. (a) Column for Stair case upto GL and stair
5603.00
Cu.M.
22650.13
4.03 Cu.M. (b) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
Up to 3.00 Mts. Height from GL.
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
4.03 Cu.M. (B) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
3.50 Cu.M. Beam -Tie Beam above GL 5603.00 Cu.M. 19632.07
3.00 to 6.00 Mts. height
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
4.03 Cu.M. (B) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
3.50 Cu.M. (C) Beam -Tie Beam 5603.00 Cu.M. 19632.07
6.00 to 9.00 Mts. height
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
4.03 Cu.M. (B) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
3.50 Cu.M. (C) Beam -Tie Beam 5603.00 Cu.M. 19632.07
9.00 to 12.00 Mts. height
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
4.03 Cu.M. (B) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
12.00 to 15.00 Mts. height
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
4.03 Cu.M. (B) COLUMN FOR TANK 5603.00 Cu.M. 22575.01
2.45 Cu.M. (D) Bottom Dome 5603.00 Cu.M. 41013.96
7.70 Cu.M. (E) Bottom ring Beam 5603.00 Cu.M. 97381.35
15.00 to 18.00 Mts. height
7.32 Cu.M. (B) Middle Ring Beam 5603.00 Cu.M. 22650.13
17.38 Cu.M. C) Conical wall 5603.00 Cu.M. 20911.58
18.00 to top of Tank
4.04 Cu.M. (a) Column for Stair case upto GL and stair 5603.00 Cu.M. 22650.13
3.73 Cu.M. (B) Top Ring Beam 5603.00 Cu.M. 20911.58
7.69 Cu.M. (C) Top dome 5603.00 Cu.M. 43108.28
ITEM NO :: 5.1
Centering and shuttering inlcuding strutting, rotting
etc. And removal form for
37.70 Sq.m foundation, footings cl. 5.9.1 146.00 Sq.m 5504.20
261.35 Sq.m beams, gurders columns, cylindrical wall cl.5.9.3 274.80 Sq.m 71818.98
107.00 Sq.m domes cl. 5.9.5 795.00 Sq.m 85065.00
268.43 Sq.m Stagging column 274.80 Sq.m 73764.56
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 123
Final Project Report For Meghnagar Water Supply
ITEM NO :: 6
Providing Reinforcement HYSD TMT using Fe
500 in Raft Foundation.
PWD SOR pg no 15 item no 4.2
1.94 MT
(a) Column for Stair case upto GL and stair
48000.00 MT 93139.20
6.37 MT (B) Column for Tank 48000.00 MT 305947.65
0.63 MT (C) Beam -Tie Beam 48000.00 MT 30273.26
2.41 MT (d) Bottom ring Beam 48000.00 MT 115630.24
1.12 MT (e) Bottom Dome 48000.00 MT 53656.97
2.81 MT f) Conical wall 48000.00 MT 134880.00
0.72 MT (g) Middle Ring Beam 48000.00 MT 34614.53
0.03 MT (h) Top Ring Beam 48000.00 MT 1440.00
0.12 MT (i) Top dome 48000.00 MT 5760.00
ITEM NO :: 7 ::
157.33 Sq.M. 18 mm cement plaster in 2 coats under layer 12 mm
CM 1:5 and top layer 6 mm thick cement plaster 1:3
finished even,smooth and curing including cost of
form work complete in upper part and bottom part of
dome (inner side )
152.00 Sq.M. 23914.64
PWD SOR Page no 99 sr no 13.7
ITEM NO :: 8 ::
Providing C. I. Cowl Type ventilator with air filter &
J ali etc. complete
2.00 Nos. 100 mm Dia. (80 Kg.) 900.00 Nos. 1800.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 124
Final Project Report For Meghnagar Water Supply
ITEM NO :: 10 ::
Fixing C. I. cowl type ventilator in C. C. 1:2:4 with
bolts and nuts etc. complete including cost of
jointing materials.
2.00 No. 100 mm dia. 200.00 No. 400.00
ITEM NO :: 11 ::
7.40 R.Mt. Providing and fixing 50 cm wide M.S. ladder
fabricated from M.S. Flats 10 mm x 60 mm with 20
mm dia steel bar steps, @ 30 cm C/C. The item
include stays of 10 mm x 50 mm flats fixed at 3
meter C/C.For landing inside
1000.00 R.Mt. 7400.00
ITEM NO :: 12 ::
31.09 R.Mt. Providing and fixing 25 mm dia. G. I. pipes railing
with three horizontal rows of pipes and posts of
angle iron of size 65 mm x 65 mm x 8 mm and 1.15
metre hight and placed at 1.85 M C/C. including
painting two coats and anchorage in C.C. etc.
complete At Top Dome
600.00 R.Mt. 18651.60
ITEM NO :: 13 ::
Providing ,fixing following double flanged cast iron
pipe as per IS 7181 Including labour cost.
75.00 R.Mt. (A) 100 mm Dia. Pipe - Inlet pipe, Outlet pipe &
Over Flowpipe
1531.00 R.Mt. 114825.00
MP PHED SOR item no.3.1, 3.2 pg no. 34
ITEM NO :: 14 ::
Providing flanged joints to following double cast iron
pipes and specials class A and B including labour and
cost of joints material (i.e bolts ,nuts and rubber
insertions ) including labour cost
25.00 Nos. (A) 80 mm Dia. Pipe - Inlet pipe, Outlet pipe & Over
Flowpipe
124.00 Nos. 3100.00
MP PHED SOR item no.3.7, 3.8 pg no. 36
ITEM NO :: 15 ::
Providing and supplying ISI mark CI D/F Sluice
valves , butterfly valves & Reflux valves of following
class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. Fixing
also including labour cost of class PN 1.0
Sluice valves as per IS - 14846:2000
Multi door reflux valves IS :5312
Butterfly valves as per IS 13095
3.00 No. (A) 100 mm Dia Butterfly valves 2785.00 No. 8355.00
3.00 No. (b) 100 mm Dia sluice valves 3020 No. 9060.00
3.00 No. 100 MM Dia Reflux valves 2646 No. 7938.00
MP PHED SOR item no.8.1, 8.4a, 8.6 pg no.
103,105,106 respectively
ITEM NO :: 16 ::
Construction of valves chambers in brick or bela
stone masonary, locally available in C. M.
1:6.Foundation concrete 150 mm thick in C. C.
1:4:8of trap metal size 25 mm to 40 mm thick,
inside cement plaster in C. M. 1:3 and cement
pointing outside in C. M. 1:3 and top cover of
precast RCC slab 100 mm thick (with key hole in
two parts, each with handles or MS Bar etc.
complete as give size)
PWD SOR Page no 158 sr no 18.34
9.00 NoS. Size of chamber 0.90m x 0.90 m and 1.0 mt. deep
7070.00 No. 63630.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 125
Final Project Report For Meghnagar Water Supply
ITEM NO :: 17::
1.00 No. Providing and fixing depth guage painted on TW
plank 25 mm / MS plate 4 mm thick with float, level
indicator sliding wire on standard pullies incl.
necessary arrangement to prevent the swining etc.
complete with caliberation upto 5 mt height.
10000.00 No. 10000.00
ITEM NO :: 18 ::
Providing and fixing water tight construction or
expansion joints.
30.00 R.Mt. Made of G. I. plain sheet of 16 to 18 gauge 3o cms.
wide.
220.00 R.Mt. 6600.00
ITEM NO :: 19 ::
19.00 Kg. Providing and fixing copper lightening arrestor incl.
copper strip and earthing plate etc. complete (incl.
cost of excavation for earthing plate etc. reate per
kgs of copper).1200 High lighting
600.00 Kg. 11400.00
ITEM NO :: 20::
Filling available excavated earth in trenches and side
of foundation in layer and depositing each layer by
ramming and watering with lead upto 50m
209.23 Cu.M. 56.00 Cu.M. 11716.88
MP PWD SOR pg no 7 item no 2.24
ITEM NO :: 21 ::
214.57 Sq.Mt. Distempering with dry distemper approved brand
and manuffacture (Two or more coats) and of
required shade on new work over and including
priming coat of whiting to give even shade
52.00 Sq.Mt. 11157.80
MP PWD SOR Pg no 101 item no 13.30.1
ITEM NO :: 22 ::
50.00 No. Painting letters with enamelled paint for "Capacity of
tank" the size of letters will be 45 cm height and 50
mm width.
50.00 No. 2500.00
ITEM NO :: 23 ::
Providing and fixing1 mm thick MS sheet door with
frame of 40x40x6 angle iron and 3 mm MS gusset
plates at the junctions and corners,all necessary
fittings complete,include applying a priming coat of
approved steelprimer.
3.49 Sqmt (For two doors each of 100 kg.Size.0.75 x 2.00 Mts
and 0.95x2.1 Mts)
2053.00 Nos. 7164.97
MP PWD SOR item no 10.5 pg no 71
ITEM NO :: 24 ::
Manhole construction in brick masonary in cm 1:5
RCC top slab 1:2:4 foundation concrete 1:4:8 in side
plastering ............
1.00 Nos. manhol incl ci cover 500 mm id with weight of cover
and frame 116 Kg (58 kg cover + 58 kg frame)
item 11.2.3 page 138 PHE SOR 2009
16537.00 Nos. 16537.00
3168525
32785
511569
3680094
TOTAL Rs.
Add 15.98 % of preveliing rates
TOTAL Rs.
Add 15.00 % of SOR rates of PHED based on 2009
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 126
Final Project Report For Meghnagar Water Supply
Dia.of bars
8 10 12 16 20 25 32
1 Roof dome mm mm mm mm mm mm mm
Ast provided = 393 mm
2
0.03927 m
2
- 122.7430067
Spacing provided = 200 mm 0.2 m
Dia.of bars = 10 mm
Wt.of bar =dia
2
/160 0.63 kg/m
Total weight of steel in roof dome = 122.74
2 Roof ring beam
Ast No.of bars Dia.of bars Wt.of bars
mm
2
mm kg/m

At bottom 2412.74 12 16 1.6 597.15
Mean dia.of roof ring beam= 9.9 m
Total wt.of bars =no.of bars x wt.per mof bar x x d
Total weight of main steel in roof ring beam = 0.00
Stirrups:
Dia.of stirrups = 10 mm
Spacing = 200 mm 0.2 m
Asv = 89 mm
2
0.01 m
2
Wt.of bar =dia
2
/160 0.63 kg/m
Wt.of stirrups =((1000/s)+1)xAsv*wt.of stirrups per m 27.70253428
Total weight of stirrups in roof ring beam = 27.70
Total weight of total reinforcement in roof ring beam = 27.70
3 Cylindrical wall
Hoop reinforcement :
Cover = 35 mm
Wt.of bars =no.of bars x length x wt.of bar per kg
h top hoop reinforcement Outer dia. Length of wt per m
m dia. no. m bar m kg/m
1 10 2 10.1 31.48 0.625 39.34844799
2 10 5 10.1 31.48 0.625 98.37111997
3 10 8 10.1 31.48 0.625 157.3937919
4 10 11 10.1 31.48 0.63 216.42
5 10 14 10.1 31.48 0.63 275.44
Total wt.of hoop reinforcement in cylindrical wall = 0.00 786.9689597
Meridianal reinforcement :
h top Meri. Reinforcement Ast prov. wt.per m
m dia. spacing mm
2
kg/m
1 10 340 14137.17 0.625 34.82316857
2 10 340 14137.17 0.625 34.82316857
3 10 340 14137.17 0.625 34.82316857
4 10 340 14137.17 0.625 34.82316857
5 10 340 14137.17 0.625 34.82
Total wt.of hoop reinforcement in cyl. wall = 0.00 174.12
Wt.of total reinforcement in cylindrical wall = 961.08
4 Conical wall :
cover = 35 mm
Hoop reinforcement:
h top hoop reinforcement Outer dia. Length of wt per m
m dia. no. m bar m kg/m
4.10 16 20 10.1 31.46 1.6 1006.72
4.60 16 20 9.46 29.46 1.6 942.65
5.10 16 10 8.21 25.52 1.6 408.29
5.60 16 9 8.10 25.18 1.6 362.54
Total wt.of hoop reinforcement in conical wall = 2720.20
Meridional Reinforcemement :
h top Meri. Reinforcement Ast prov. wt.per m
m dia. spacing mm
2
kg/m
4.10 12 740 15833.63 0.90 33.50737816
4.60 12 850 13571.68 0.90 26.58452663
5.10 12 1290 9047.787 0.90 14.45541758
5.60 12 1510 7916.813 0.90 11.84376269
Total wt.of meridianal reinf. in conical wall = 86.39
Wt.of hoop and meridianal reinforcement in conical wall = 2806.59
5 Bottomring beam: Ref.6.1
Ast No.of bars Dia.of bars Wt.of bars
mm
2
mm kg/m

At bottom 1571 5 20 2.5 388.77
Mean dia.of bot. ring beam= 9.7 m
Total wt.of bars =no.of bars x wt.per mof bar x x d
Total wt.of main reinforcement in bottom ring beam = 388.77
Stirrups:
Dia.of stirrups = 10 mm
Spacing = 200 mm
Asv = 88.63
Wt.of bar =dia
2
/160 0.625
Wt.of stirrups =((1000/s)+1)xAsv*wt.of stirrups per m 332.3639385
Total wt.of stirrups in bottom ring beam =
Wt.of main reinf.and stirrups in bottom ring beam = 721.14
Reinforcement :(KG)
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 127
Final Project Report For Meghnagar Water Supply
6 Bottomdome :
Ast provided = 357.00 mm
2
0.0357 - 1117.853636
Spacing provided = 200 mm 2
Dia.of bars = 10 mm
Wt.of bar =dia
2
/160 0.625 kg/m
wt.of steel in bottomdome =
Total weight of steel in bottom dome = 1117.85
7 Bottomcircular girder :
Ast No.of bars Dia.of bars Wt.of bars
mm
2
mm kg/m
At top 34.36 7 25 3.90625 468.17
At bottom 34.36 7 25 3.90625 468.17
Mean dia of bot. Girder = 5.45
Stirrups :
Dia.of stirrups = 10
Spacing = 200
Asv = 392.70 mm2 1472.62 936.34
Total weight of steel in circular girder = 1472.62 936.34
SUM = 2408.96
8 Staging :
Columns :
No.of columns = 8
Dia.of columns = 0.45 m
Height of column bar = 16.00 m
Dia.of col. Bars = 25 mm
No.of bars = 12
Wt.of bar per m= 3.91 kg/m
Total wt.of column bars =no.of columns x no.of bars x length x wt.of bar/ m= 6000
Stirrups :
Dia.of stirrups = 10
Spacing = 200
Asv = 99.71
Wt.of bar =dia
2
/160 0.625
Wt.of stirrups =((1000/s)+1)xAsv*wt.of stirrups per m 373.9094308
Total reinforcement in columns = 6373.909431
Bracings :
No.of brace = 24
Length of one brace = 2.09 m
Dia.of bars = 20
No.of bars = 10
Wt.per m= 2.50 1251.374824
Total wt.of bracing bars =no.of columns x no.of bars x length x wt.of bar/ m
Stirrups:
Dia.of stirrups = 10
Spacing = 180
Asv = 157.0796
Wt.of bar =dia
2
/160 0.625
Wt.of stirrups =((1000/s)+1)xAsv*wt.of stirrups per m 643.5901617
Total reinforcement in brace = 1894.96
Centering for dome top and bottom 106 Sq.mtr
Centering for cylindrical wall 261.3422 Sq.mtr
Centering for raft 37.68 Sq.mtr
cnetering for stagging 268.428
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 128
Final Project Report For Meghnagar Water Supply
SR NO. DESCRIPTION OF ITEM UNIT RATE QUANTITY AMOUNT
1
Earth work in Excavation by mechanical or manual
means including dressing of sides and ramming of
bottoms lift upto 1.5 m including getting out excavated
soil and disposal of surplus excavated material and
disposal of the same upto a lead of 50 m.
PWD SOR pg no 4 item no 2.6
(I) For depth 0.0 mt to 1.5 mt
(A) Ordinary Soil m
3
107 8394.86 898250.02
PWD SOR pg no 4 item no 2.7
(II) For Depth 1.5 mt to 3.0 mt.
(A) ordinary rock m
3
171 1569.00 268299.00
PWD SOR pg no 4 item no 2.7
(II) For Depth 1.5 mt to 3.0 mt.
(A) ordinary rock m
3
364 900.00 327600.00
2 BACK FILLING
Providing & laying granular earth filling behind abutment in
controlled lift thickness at OMC to 95% proctor density
m
3
50 11619.20 580960.00
3 MASS CONCRETE IN OGEE AND APPROAN
Providing and laying M-10 plum concrete below ogee and
approan portion with 20 mm size graded stone aggregate
as shown in the drawing m
3
3140.00 9719.790 30520139.03
PWD SOR pg no 15 item no 4.2
4 R.C.C. WORK
Providing and laying M-20 concrete for various structural
members including shuttering etc. complete.
PWD SOR pg no 20 item no 5.2
4.1 bottom slab and skin concrete m
3
4.2 piers and return walls m
3
4.3 bridge and hoisting platform m
3
4.4 miscellaneous m
3
5 REINFORCEMENT WORK
Providing and fixing HYSD TMT Fe500 reinforcement as
per the drawing tone 42000 513.553 21569232.75
PWD SOR pg no 22 item no 5.16
6 STEEL RAILING
providing and fixing steel railing on bridge and hoisting
platform consisting of 75x75x6 angle post at 2.0m c/c and
40 NB GI pipe in three rows. rmt 400.00 1014.000 405600.00
7 PVC WATERSTOP 250MM WIDE
Providing and fixing PVC waterstop in joints conforming to
IS 12200 as per Drawing rmt 202.500 395.00 79987.50
PWD SOR pg no 187 item no 22.4
8 DRAINAGE ARRANGEMENT WITH 100MM PVC PIPE
Providing and laying 100mm dia PVC pipe for under
drainage in appron at 3.0m c/c with no fine concrete
drainage trench including labour cost Rmt 202.500 156.00 31590.00
PHED SOR pg no 98 item no 7.1 (10kg/cm2)
9 PITCHING
Providing and fixing 300 mm thick pitching on side slope m
2
1400 1140.00 1596000.00
10 Curtain grouting
Curtain grouting below barrage upto a depth of 7.0m beow
bed level and in a width of 135.6m m
2
220 1631.00 358820.00
11 Fixing of anchor bars
Providing and fixing 20mm dia anchor bars by drilling
75mm hole in rock up to a depth of 3.0m and grouting the
same with resin grout with cement at 3.0m c/c below the
appron. nos 1500 624.00 936000.00
12
Providng and fixing of MS Radial Gate of size 9.5 x6
meter including stiffners, rubber seals, embeded parts
as shown in drawing including cost of materials,
fabrication, painting, erection in position with all
accessories for operation of gate and stop log.
ABSTRACT SHEET
ESTIMATION OF BARRAGE AT MEGHNAAGR
6454.616 4321.00 27890395.79
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 129
Final Project Report For Meghnagar Water Supply
Motors nos 70000.00 20 1400000.00
Chain & gear mechanisam nos 100000.00 40 4000000.00
Gate skin Plate (10mm thk) KG 42 86664 3639888.00
PWD SOR pg no 22 item no 5.16
Gate assembly including fabrication cost KG 85 216660 18416100.00
TOTAL- 112918862.09
Add 5%
charges extra 118564805.2
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 130
Final Project Report For Meghnagar Water Supply

Curtain grouting
SR NO. ITEM WIDTH(m) DEPTH(m) AREA(m
2
) QTY(m
2
)
1 Curtain grouting below barrage upto
a depth of 7.0m beow bed level and
in a width of 233m
233 7 1631 1631
TOTAL- 1631.000
Fixing of anchor bars
SR NO. ITEM WIDTH(m) LENGTH(m) NOS QTY(NOS)
1 Providing and fixing 20mm dia
anchor bars by drilling 75mm hole in
rock up to a depth of 3.0m and
grouting the same with resin grout
with cement at 3.0m c/c below the
appron.
233 22 624 624
TOTAL- 624.000
EXCAVATION WORK
SR NO. ITEM WIDTH(m) LENGTH(m) AREA(m
2
) DEPTH(m) QTY(m
3
)
1 Below Ogee portion central 223.0 1.0 223.0 1.0 223.000
Below Ogee portion end 223.0 8.1 1806.3 1.0 1806.300
U/S Below Ogee portion 223.0 1.4 301.1 1.0 301.050
2 Below approan 223.0 22.0 4906.0 1.0 4906.000
3 u/s approan 223.0 2.4 528.5 1.0 528.510
4 upstream cutoff 223.0 0.5 3.0 334.500
down stream cutoff 223.0 0.5 3.0 334.500
5 excavation for squre return wall left 10 18 5 900.000
excavation for squre return wall right 10 18 5 900.000
6 excavation for return wall right 70 6 1.5 630.000
TOTAL- 10863.860
BACK FILLING
SR NO. ITEM WIDTH(m) LENGTH(m) AREA(m
2
) DEPTH(m) QTY(m
3
)
1 Behind abutment 70.0 5.0 350.0 8.0 5600.000
1 Square Return Wall 15.2 18.0 273.6 11.0 6019.200
TOTAL- 11619.200
MASS CONCRETE IN OGEE AND APPROAN
SR
NO. ITEM LENGTH(m) WIDTH(m) height
TOTAL
QTY(m
3
)
QTY(m
3
)
1 Below Ogee portion central 223.0 1.0 223.0 4.1 903.150
Below Ogee portion end 223.0 8.1 1806.3 2.4 4289.963
U/S Below Ogee portion 223.0 1.4 301.1 2.4 722.520
2 Below approan 223.0 22.0 4906.0 0.7 3434.200
3 u/s approan 223.0 2.4 528.5 0.7 369.957
TOTAL- 9719.790
MEASUREMENT SHEET FOR BARRAGE AT MEGHNAGAR
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 131
Final Project Report For Meghnagar Water Supply
R.C.C. WORK
SR
NO. ITEM NOS LENGTH(m) WIDTH(m) height
TOTAL
QTY(m
3
)
1 bottom slab as skin concrete
ogee, u/s & d/s approan, cutoff 1 223.000 35.000 0.300 2341.500
2 pier u/s 19.000 5.100 1.200 11.000 1279.080
pier d/s 19.000 4.100 1.200 12.500 1168.500
3 d/s return wall stem 2.000 35.000 0.500 3.500 122.500
d/s return wall bottom slab 2.000 35.000 3.000 0.500 105.000
4 squre return wall base 4.000 18.000 1.500 0.300 32.400
squre return wall side wall 4.000 18.000 0.250 11.000 198.000
Tie Wall 12.000 8.500 0.250 10.000 255.000
5 chute block 97.000 1.150 1.150 0.760 48.775
basin block 124.000 0.900 1.100 0.640 46.426
end sill 1.000 223.000 1.000 1.100 122.650
6 top slab of bridge 1.000 223.000 3.500 0.300 234.150
beam 2.000 223.000 0.400 0.700 124.880
7 top slab of hoist 1.000 223.000 3.750 0.300 250.875
beam 2.000 223.000 0.400 0.700 124.880
TOTAL- 6454.616
REINFORCEMENT WORK
SR
NO. ITEM
TOTAL
(CONC.)
(m
3
)
REINF.
(Kg/Cmt)
TOTAL
STEEL(Kg)
1 bottom slab as skin concrete
ogee, u/s & d/s approan, cutoff 2341.500 40.000 93660.000
2 pier u/s height 16.5m 1279.080 120.000 153489.600
pier d/s height 13.0m 1168.500 120.000 140220.000
3 d/s return wall stem 122.500 60.000 7350.000
d/s return wall bottom slab 105.000 60.000 6300.000
4 squre return wall base 32.400 50.000 1620.000
squre return wall side wall 198.000 60.000 11880.000
5 chute block 48.775 60.000 2926.525
basin block 46.426 60.000 2785.536
end sill 122.650 60.000 7359.000
6 top slab of bridge 234.150 100.000 23415.000
beam 124.880 125.000 15610.000
7 top slab of hoist 250.875 100.000 25087.500
beam 124.880 125.000 15610.000
8 dowell bars from mass conc 624.000 4.000 6240.000
TOTAL 513553.161
STEEL RAILING
SR
NO. ITEM LENGTH(m) NO.s
QUANTITY
(Rmt)
TOTAL
QTY(Rmt)
1 providing and fixing steel railing on
bridge and hoisting platform
consisting of 75x75x6 angle post at
2.0m c/c and 40 NB MS pipe in three
rows.
1014.000 1.000 1014.000 1014.000
TOTAL 1014.000
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 132
Final Project Report For Meghnagar Water Supply
PVC WATERSTOP 250MM WIDE
SR
NO. ITEM LENGTH(m) NO.s
QUANTITY
(Rmt)
TOTAL
QTY(Rmt)
1 Providing and fixing PVC waterstop
in joints
520.333 1.000 520.333 520.333
TOTAL 520.333
DRAINAGE ARRANGEMENT WITH 100MM PVC PIPE
SR
NO. ITEM LENGTH(m) NO.s
QUANTITY
(Rmt)
TOTAL
QTY(Rmt)
1 Providing and laying 100mm dia PVC
pipe for under drainage in appron at
3.0m c/c with no fine concrete
drainage trench.
1.500 135.000 202.500 202.500
TOTAL 202.500
PITCHING
SR NO. ITEM WIDTH(m) LENGTH(m) AREA(m
2
) QTY(m
2
)
1 Providing and fixing 300 mm thick
pitching on side slope
u/s slope 36 15 540 540
d/s slope 24 25 600 600
TOTAL- 1140.000
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 133
Final Project Report For Meghnagar Water Supply
1
:: ABSTRACT :: ESTIMATES
QTY. UNIT PARTICULARS RATE PER AMOUNT
ITEM NO :: 1 ::
Excavation for foundatiion for structures as per drawing and technical specification
including setting out,construction of shoring and bracing,removal of stumps and
other deleterious mater,dressing of sides and bottom and backfilling with approved
materials etc.
(I) For depth 0.0 mt to 3.0mt
30.14 Cu.M. (A) Ordinary rock 197.00 Cu.M. 5936.98
30.14 (B) Hard rock (Blasting Prohitbited) 419.00 Cu.M. 12627.39
PWD SOR Page no 4 sr no 2.6
PWD SOR Page no 4 sr no 2.7
ITEM NO :: 2 ::
Providing and casting mechanically mixed cement concrete(M15 ) 20 mm maximum
size graded crushed stone including cost of centering & shuttering
14.32 Cu.M. In foundation 3926.00 Cu.M. 56211.27
PWD SOR Page no 15 sr no 4.1.13
ITEM NO :: 3 ::
Providing & placing in position cold twisted or un-coated TMT FE 500 steel bar and
hot rolled deformed steel reinforcement for RCC work i/c sutting,bending,binding
etc.complete i/c cost of binding wire and wastage
TMT Bars
PWD SOR pg no 22 item no 5.16
6.16 Mtonne 48000.00 Mt 295613.93
ITEM NO :: 4 ::
Providing and laying Plain/Reinforcemnet cement concrete in substructure or
complete section including cost of form work staging/bracing and shuttering
complete as per drawing and technical specifications.
PWD SOR pg no 15 item no 4.2.1.1
14.11 Cu.M. (A) For foundation 5992.00 Cu.M. 84559.10
61.98 Cu.M. (B) For superstructure 5992.00 Cu.M. 371387.78
ITEM NO :: 4.1 ::
Centering and shuttering inlcuding strutting, rotting etc. And removal form for
9.42 Sqm foundation, footings cl. 5.9.1 146.00 Sqm 1375.32
399.40 Sqm beams, gurders columns, cylindrical wall cl.5.9.3 274.80 Sqm 109755.12
39.25 Sqm Slab 229.00 Sqm 8988.25
109.90 Sq.M. 18 mm cement plaster in 2 coats under layer 12 mm CM 1:5 and top layer 6 mm
thick cement plaster 1:3 finished even,smooth and curing including cost of form
work complete
152.00 Sq.M. 16704.80
PWD SOR Page no 99 sr no 13.7
ITEM NO :: 6 ::
2.10 Sq.M. Providing C. I. Door frame and door
ITEM NO :: 7 ::
2.00 NO Providing C. I. Cowl Type ventilator with air filter & J ali etc. complete 900.00 Sq.M. 1800.00
ITEM NO :: 8 ::
12.00 R.Mt. Providing and fixing 50 cm wide M.S. ladder fabricated from M.S. Flats 10 mm x 60
mm with 20 mm dia steel bar steps, @ 30 cm C/C. The item include stays of 10 mm
x 50 mm flats fixed at 3 meter C/C.For landing inside
1000.00 R.Mt. 12000.00
ITEM NO :: 9 ::
92.64 kg
Structural steel work for all type of secctions including cutting,hoisting fixing in
position and applying a priming coat of approved steel primer all complete. 51.00 kg 4724.64
MP PWD SOR Pg no 71 Itemno 10.2
ITEM NO :: 10 ::
Hoisting equipment of Capacity 5 ton including all fixtures 30000.00
1011685
161667
1173352
NAME OF WORKS :-CONSTRUCTION OF INTAKE WELL
TOTAL Rs.
Add 15.98 as prevelling rates Rs.
TOTAL Rs.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 134
Final Project Report For Meghnagar Water Supply
D1 D2 Area Height Quantiy steel
mm mm mm
2
mm m
3
Kg
5400 5000 3261440 3500 11.41504 913.2032
5400 4800 4798080 8500 40.78368 3262.694
Total 52.19872 4175.898
D1 Area Thickness Quantiy Steel
mm mm
2
mm m
3
Kg
5400 22861440 150 3.429216
Top slab 5400 22861440 200 4.572288
Bottom slab 6000 28224000 500 14.112
D1 Area Thickness Quantiy
mm mm
2
mm m
3
6200 30136960 100 3.013696
11.304 14.317696
L
Length of
member
Steel
mm mm Kg
4800 4800 92.64
Nos Length Width Depth Quantiy steel
mm mm mm m
3
Kg
3 2119.5 300 600 1.14453 137.3436
Nos Length Width Depth Quantiy steel
mm mm mm m
3
Kg
2 2119.5 500 300 0.63585 76.302
2
Providing and laying
Plain/Reinforcemnet cement
concrete in substructure or
complete section including
cost of form work
staging/bracing and shuttering
complete as per drawing and
technical specifications.
ISMB 175 FOR
HOISTING
PLATFORM
Providing and laying
Plain/Reinforcemnet cement
concrete in substructure or
complete section including
cost of form work
staging/bracing and shuttering
complete as per drawing and
technical specifications.
Chaja
Providing and laying
Plain/Reinforcemnet cement
concrete in substructure or
complete section including
cost of form work
staging/bracing and shuttering
complete as per drawing and
technical specifications.
Corbel
Intermediate slab
NAME OF WORKS :-CONSTRUCTION OF INTAKE WELL
:: MEASUREMENT ::
weight kg/m
19.3
4
Structural steel work for all
type of secctions including
cutting,hoisting fixing in
position and applying a
priming coat of approved steel
primer all complete.
WALL 1
Providing and laying
Plain/Reinforcemnet cement
concrete in substructure or
complete section including
cost of form work
staging/bracing and shuttering
complete as per drawing and
technical specifications.
3
Providing and laying
Plain/Reinforcemnet cement
concrete in substructure or
complete section including
cost of form work
staging/bracing and shuttering
complete as per drawing and
technical specifications.
5
6
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 135
Final Project Report For Meghnagar Water Supply
Depth Diameter Quantiy
mm mm m
3
1000 6200 30.13696
Soil 1000 6200 30.13696
Nos Height Width Sq Meter
mm mm m2
1 2100 1000 2.1
Internal Dia Height Area
mm mm mm2
5000 3500 109.9
Centering and shuttering
inlcuding strutting, rotting etc.
And removal form for
foundation, footings cl. 5.9.1 6000 500
9.42
beams, gurders columns,
cylindrical wall cl.5.9.3
5300 12000
399.408
Slab 5000 5000 39.25
18 mm cement plaster in 2
coats under layer 12 mm CM
1:5 and top layer 6 mm thick
cement plaster 1:3 finished
even,smooth and curing
including cost of form work
complete
8
9
Providing C. I. Door frame and
door
7
Rock
Excavation for foundation for
structures as per drawing and
technical specification
including setting
out,construction of shoring and
bracing,removal of stumps
and other deleterious
mater,dressing of sides and
bottom and backfilling with
approved materials etc. and as
per relevant clause of section
300 & 2100
Hoisting equipment of
Capacity 5 ton including all
fixtures
10
1 Nos
11
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 136
Final Project Report For Meghnagar Water Supply
SR NO PARTICULARS QUANTITY UNIT RATE TOTAL
1 Exavation for foundation including struting
and dewatering as necessary and
dispossing of the excavated stuff as
directed As per MOST section 304
As per PWD for Bridges pg no 42 Clause
1.1 a and 1.1 a(ii) respectively
In soil & murrum. 120.00 Cum 94 11280.00
In hard rock/soft rock 120.00 Cum 333 39960.00
2 Providing & filling in foundation with
ordinary cement concerete M 15 mix as
per MOST section 1700,1500. 12.00 Cum 31117 373404.00
As per PWD for Bridges pg no 47 Clause
2.5(a)
3 Prividng & Casting in situ controlled
cement concrete M 25 for RCC work in
SUBSTRUCTURE .As per MOST
technical specification 1700, 1500 and
2200 156.57 Cum 3981 623305.17
As per PWD for Bridges pg no 47 Clause
2.5(F)
4 Providing and placing in position high yield
strength deformed bars for
SUBSTRUCTURE as per detailed
drawings As per MOST technical
specification 1600. 13.43 M.T. 44344 595371.41
As per PWD for Bridges pg no 47 Clause
2.6
TOTAL
1643320.58
1 Providing and casting in situ controlled
cement concrete M-30 for Super Structure
as per Drawing and technical specification
and as per relevant clause of sections
1500,1700 and 2300
As per PWD for Bridges pg no 50 Clause
3.1
For solid Slab Super Structure 42.00 Cum 4835 203070.00
As per PWD for Bridges pg no 47 Clause
2.6
For Box Girder 55.88 Cum 5724 240408.00
2 Providng and costing in situ controlled
cement concrete M-20 for kerb/kerb block
including formwork. Curing and finishing
complete. MOST Section:408 15.00 Cum 3567 53505.00
3
Providng Drainage Spout complete as per
Drawing and Technical specification and
as per clause 2705 of specifications. 24.00 No 722 17328.00
As per PWD for Bridges pg no 52 Clause
3.9
ABSTRACT SHEET FOR BRIDGE CONECTING INTAKE WELL
FOUNDATION AND SUBSTRUCTURE
SUPER STRUCTURE
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 137
Final Project Report For Meghnagar Water Supply
4 Reinforced cement concrete M-25
approach slab including reinforcement and
form work complete as per drawing and
technical specification. As per
Section:2704,1500,1600,1700 2.10 Cum 6059 12723.90
As per PWD for Bridges pg no 53 Clause
3.11
5 Providing and laying in position high yield
strength deformed bar renforcement as
per detailed drawings 15.38 Ton 44967 691592.46
As per PWD for Bridges pg no 51 Clause
3.2
6 Construction of RCC Railing of M30 grade
in situ with 12 mmnominal size aggregate
as per relevant clause of section
1500,1600,1700 and clause 2703
120.00 Rmt 1167 140040.00
As per PWD for Bridges pg no 52 Clause
3.7
TOTAL 1358667.36
1 Providing and fixing in position strip seal
expansion joint as per MOST specification
Section:2600 14.00 Rmt 6657 93198.00
As per PWD for Bridges pg no 54 Clause
3.18
2 Supplying, fitting and fixing in position
Elastomeric Neoprene Bearing as per
MOST specification 2005 74880.00 Sqcm 0.7 52416.00
3147601.94
944280.5828
4091882.53
SAY RS. 4,100,000.00
GRAND TOTAL COST IN RS.
TOTAL COST IN RS.
Add 30 % of increasing rates and prevelling rates
MISCELLENEOUS
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 138
Final Project Report For Meghnagar Water Supply
Sr. Description Unit No. L B D Quantity
No.
1 Exavation for foundation including struting
and dewatering as necessary and
dispossing of the excavated stuff as
directed As per MOST section 304
in soil cum 4.00 5.000 4.00 1.50 120.00
in hard rock/soft rock cum 4.00 5.000 4.00 1.50 120.00
2 Providing & filling in foundation with
ordinary cement concerete M 15 mix as
per MOST section 1700,1500.
cum 4.00 5.000 4.00 0.15 12.00
3 Prividng & Casting in situ controlled
cement concrete M 25 for RCC work in
SUBSTRUCTURE .As per MOST
technical specification 1700, 1500 and
2200
Stem of Pier cum 4.00 3.000 1.20 7.00 100.80
Footing of Pier (Rectangle part) cum 4.00 4.700 3.70 0.50 34.78
Triangle part -1 cum 4.00 17.390 3.60 0.50 20.99
4 Providing and placing in position high yield
strength deformed bars for
SUBSTRUCTURE as per detailed
drawings As per MOST technical
specification 1600.
Stem of Pier (100 kg/cum) MT
10.08
Footing of Pier (60 kg/cum) MT 3.35
Sr. Description Unit No. L B D Quantity
No.
1 Providing and casting in situ controlled
cement concrete M-30 for Super Structure
as per Drawing and technical specification
and as per relevant clause of sections
1500,1700 and 2300
Girders
cum 8.00 15.00 0.40 1.10 52.80
Deck Slab
cum 4.00 15.00 3.50 0.200 42.00
Diaphram cum 2.00 3.50 0.40 1.10 3.08
2 Providng and costing in situ controlled
cement concrete M-20 for kerb/kerb block
including formwork. Curing and finishing
complete. MOST Section:408
cum 10.00 20.00 0.25 0.30 15.00
3 Providng Drainage Spout complete as per
Drawing and Technical specification and
as per clause 2705 of specifications.
No 24.00 24.00
3.35
Section - B (Super Strucutre)
MEASUREMENT SHEET FOR BRIDGE CONECTING INTAKE WELL
Section - A ( Foundation & Sub-Structure)
10.08
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 139
Final Project Report For Meghnagar Water Supply
4 Reinforced cement concrete M-25
approach slab including reinforcement and
form work complete as per drawing and
technical specification. As per
cum 1.00 3.500 3.00 0.20 2.10
5 Providing and laying in position high yield
strength deformed bar renforcement as
per detailed drawings
Girders =200 kg/cum
Ton 11.18
Deck Slab =100 kg/cum
Ton 4.20
6 Construction of RCC Railing of M30 grade
in situ with 12 mmnominal size aggregate
as per relevant clause of section Rmt 120 1.00 1 1 120.00
Sr. Description Unit No. L B D Quantity
No.
1 Providing and fixing in position strip seal
expansion joint as per MOST specification
Section:2600
Rmt 4.00 3.50 14.00
2 Supplying, fitting and fixing in position
Elastomeric Neoprene Bearing as per
MOST specification 2005
cucm 8.00 30.00 40.00 7.80 74880.00
Section - C (Miscellaneous)
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 140
Final Project Report For Meghnagar Water Supply
Quantity Item No. Description Unit Rate per
Unit
Amount
in Rs.
1 Providing and installation of 75 HP submerssible pumps of
approved make of ISI make only, with suitable power
pannel in intake well including all fixure fastner, including
trial run and operation for 3 months
2 On Intake well No. 750000 1500000
Providing and installation of 25 HP submerssible pumps of
approved make of ISI make only, with suitable power
pannel in clear water under ground sump including all
fixure fastner, including trial run and operation for 3
months
2 2 On U/G Sump No. 250000 500000
4 3 Pipe type earthing having 150 cm long and 2.5 cm dia
galvanised iron pipe with coupling and buch breeid in
specially prepared earth pit complete with necessary 8
SWG earth wire including necessary excavation and
refilling
No. 1500 6000
4 4 Approved mke irod clad or metal clad four pole change
over switch 415 V confirming to ISS of 63 A cat.II
No. 4500 18000
400 5 Flat cable for pump, detail technical specification m 97 38800
8 6 Approved make TP metal clad switch fuse unit 415/500V
with HRC fuse and neutral link confirming to ISS to be
erected on angle iron frame.
No. 1600 12800
4 7 Providing chain pully block with tripple gear arrangement,
lifting hook, load chain and hand chain and locking device
with necessary mounting girder/structure, spur gear
travelling trolly and all accessaries, 1 Tonne capacity.
No. 8704 34816
SLUICE VALVES
Providing and supplying ISI mark CI D/F sluice valve of
PN-1 with hand wheel/cap operated (PD type short body)
and diameter including all taxes, insurance, transportation,
freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking
etc. complete.
80 mm size
Pressure Guage
Providing, erecting bourden type glycerine filled pressure
gauge complete with syphon tube with isolating cock
having range of 0 to 20 Kg/cm
2
as per IS 8793 including
fixing.
(b) Pressure gauge (100 mm dia)
Total 2125876
PUMPING MACHINERIES
ABSTRACT
4 8 No. 2665 10660
4 9 No. 1200
4800
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 141
Final Project Report For Meghnagar Water Supply

Quantity Item
No.
Description Unit Rate per
Unit
Amount in Rs.
40.00 10 Cement concrete flooring 1:2:4 (1 cement : 2 sand : 4 graded
stone aggregate ) finished with a floating coat of neat cement
including cement slurry, but excluding the cost of nosing of
steps etc. complete. (Area of panels not exceeding 2 sqm.)
M.P. Public works department S.O.R-2009, Chapter 11, Item
No. 11.1, Page No. 79.
Sq.m 208.00 8320.00
94.20 11 Distempering with dry distemper of appproved brand and
manufacture (Two or more coats) and of required shade on
new work,over and including priming coat of whiting to give
an even shade
M.P. Public works department S.O.R-2009, Chapter 13, Item
No. 13.29, Page No. 101.
Sq.m 28.00 2637.60
126.00 12 Distempering with dry distemper of appproved brand and
manufacture (Two or more coats) and of required shade on
new work,over and including priming coat of whiting to give
an even shade
M.P. Public works department S.O.R-2009, Chapter 13, Item
No. 13.29, Page No. 101.
Sq.m 28.00 3528.00
308.00 13 a Providing and fixing M.S Tubular frames for doors, windows,
ventilators and cupboard with rectangular section made of
1.60mm thick M.S sheet, joints miltred and welded and
grinded finish profiles required size with 15x3 mm lugs 10cm
long embedded in cement concrete blocks 15x10x10 cm of
1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 20mm
nominal size) or with wooden plug sand screws or rawl plugs
and screws or with ficing clips or with bolts and nuts as
required including fixing of necessary butt hinges and screws
and applying a priming coat of approved steel primers.
M.P. Public works department S.O.R-2009, Chapter 10, Item
No. 10.14, Page No. 73.
Kg. 87.00 26796.00
13b Providing and fixing panneleed or pannedled & glass
shutters for doors,windows,ventilators, and cleare story
windows including ISI marked black enamelled MS butt
hinges with necessary screws excluding pannelling which
willbe paid separately M.P. Public works department S.O.R-
2009, Chapter 9, Item No. 9.5, Page No. 41.
Killn seasoned and chemically treated hollock wood
35 mm thick shutters
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 142
Final Project Report For Meghnagar Water Supply
Quantity Item
No.
Description Unit Rate per
Unit
Amount in Rs.
22.00 1 Earth work in excavationnot exceeding150cmin depthbut
not exceeding 10 sqm on plan including disposal of
excavatedearth upto 50m and lift upto 1.5m, disposedsoil
to be levelled and neatly dressed
M.P. Public works departmentS.O.R-2009, Chapter 2, Item
No.2.6 , Page No. 4.
Cum 123.00 2706.00
8.40 2 Providingand layinginposition cement concrete of gradeM
10 and curing complete,excluding cost of centering and
shuttering All work up to plinth level M.P. Public works
departmentS.O.R-2009, Chapter 4, ItemNo.4.2.1.4 , Page
No. 15.
Cum 3611.00 30332.40
3.00 3 Providing and laying in position M20 grade of reinforced
cement concrete (with 20mm nominal size graded stone
aggregate) excluding the cost of centering, shuttering,
finishing and reinforcement work in Footing M.P. Public
works department S.O.R-2009, Chapter 5, Item No.5.1 ,
Page No. 20.
Cum 4526.00 13578.00
21.80 4 Providing and laying in position M20 grade of reinforced
cement concrete (with 20mm nominal size graded stone
aggregate) excluding the cost of centering, shuttering,
finishing and reinforcement, for reinforced
concrete work in (B) slabs, landing, shelves, balconies,
lintels, beams.
M.P. Public works departmentS.O.R-2009, Chapter 5, Item
No.5.1 , Page No. 20.
Cum 4526.00 98666.80
4.1
Centering and shuttering inlcuding strutting, rotting etc. And
removal form for
56.22 foundation, footings cl. 5.9.1 sqm 222.00 12480.84
65.7 beams, gurders columns, cylindrical wall cl.5.9.3 sqm 229.00 15045.30
37.5 Slab sqm 229.00 8587.50
1144.00 5 Reinforcement for R.C.C. work including strainghtening,
cutting bending , placing in position and binding including
cost of binding wire up to floor two level including all
wastage etc. complete
M.P. Public works department S.O.R-2009, Chapter 5, Item
No.5.16 , Page No. 22.
Kg. 48.00 54912.00
22.30 6 Supplying and filling in plinth with crusher stone dust
/coarse sand under floors incl watering, ramming,
consolidating in layers not execcind 20 cm in depth etc.
complete
M.P. Public works departmentS.O.R-2009, Chapter 2, Item
No. 2.26, Page No. 7.
Cum 610.00 13603.00
31.30 7 Brick work with well burnt chimney bricks in bulls patent
trench kiln crushing strength not less than 25 kg/sqcmand
water absorptionnot more than 20%in superstructure bove
floor level for each additional floor or part there of.
M.P. Public works departmentS.O.R-2009, Chapter 6, Item
No. 6.2, Page No.27.
Cum 2708.00 84760.40
ABSTRACT
PUMP HOUSE 7.50 m X 5.00 m
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 143
Final Project Report For Meghnagar Water Supply
Quantity Item
No.
Description Unit Rate per
Unit
Amount in Rs.
94.20 8 Providing 12 mm th. Cement plaster in single coat for
interior plasteringon wall upto floor two level finished even
and smooth in cement mortar 1:4 (1cement : 4 sand).
M.P. Public works department S.O.R-2009, Chapter 13,
Item No. 13.1, Page No. 99.
Sq.m 104.00 9796.80
126.00 9 Providing 18 mm th. Cement plaster in two coaT under
layer 12 mm thich cement plaster 1:5 in top layer 6 mm
thick cement plaster 1:3 finished ruffed with spung.
M.P. Public works department S.O.R-2009, Chapter 13,
Item No. 13.7, Page No. 99.
Sq.m 152.00 19152.00
40.00 10 Cement concrete flooring 1:2:4 (1 cement : 2 sand : 4
graded stone aggregate ) finished with a floating coat of
neat cement including cement slurry, but excludingthe cost
of nosing of steps etc. complete. (Area of panels not
exceeding 2 sqm.)
M.P. Public works department S.O.R-2009, Chapter 11,
Item No. 11.1, Page No. 79.
Sq.m 239.00 9560.00
94.20 11 Distempering with dry distemper of appproved brand and
manufacture (Two or more coats) and of requiredshade on
newwork,over and including priming coat of whiting to give
an even shade
M.P. Public works department S.O.R-2009, Chapter 13,
Item No. 13.29, Page No. 101.
Sq.m 32.00 3014.40
126.00 12 Finishing walls with water proofingcement paint of required
shade for new work.
M.P. Public works department S.O.R-2009, Chapter 13,
Item No. 13.33.1, Page No. 101.
Sq.m 36.00 4536.00
465.00 13 a Providing and fixing M.S Tubular frames for doors,
windows, ventilators and cupboardwith rectangular section
made of 1.60mmthick M.S sheet, joints miltred andwelded
and grindedfinish profiles requiredsize with 15x3 mmlugs
10cm long embeddedin cement concrete blocks 15x10x10
cmof 1:3:6 (1 cement : 3 sand : 6 gradedstone aggregate
20mm nominal size) or with wooden plug sand screws or
rawl plugs and screws or with ficing clips or with bolts and
nuts as required including fixing of necessary butt hinges
and screws and applying a priming coat of approvedsteel
primers. M.P. Public works
departmentS.O.R-2009, Chapter 10, ItemNo. 10.14, Page
No. 73.
Kg. 100.00 46500.00
13b Providing and fixing panneleed or pannedled & glass
shutters for doors,windows,ventilators, and cleare story
windows including ISI marked black enamelled MS butt
hinges with necessary screws excluding pannelling which
willbe paidseparatelyM.P. Public works departmentS.O.R-
2009, Chapter 9, Item No. 9.5, Page No. 41.
Killn seasoned and chemically treated hollock wood
35 mm thick shutters
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 144
Final Project Report For Meghnagar Water Supply
Quantity Item
No.
Description Unit Rate per
Unit
Amount in Rs.
2.10 Door - D1 Sqm 1126.00 2364.60
7.20 Window Sqm 1126.00 8107.20
7.20 14 Supplying and fixing rolling shutters of approved make,
made of required size M.S laths interlocked together
throughtheir entire lengthandjointedtogether at the endby
end locks mounted on specially designed pipe shaft with
brackets, side guides and arrangemnts for inside and
outside locking with push and pull operation com[lete
including the cost of providingandficing necessary27.5cm
longwire springs gradeNo. 2 andM.S topcover of required
thicknes s for rolling shutters.
(A) Shutter havingwidth bellow3.5 m (B) Providingand
fixing ball bearing for rolling shutters.
(C) Extra for providing mechanical device and crank
operaion for operating rolling shutters
M.P. Public works department S.O.R-2009, Chapter 10,
Item No. 10.14, Page No. 71 & 72.
Sq.m 1926.00 13867.20
20.00 15 Point wiring including metallic switch
box,sheet,switches,sockets for 3 pin 6 amp.Socket outlet
point with 1.5 sqmm PVC insulated cable FR with copper
multi strand conductor with ISI markedin surface rigidPVC
conduit(MMS) ISI marked of sutable size and 1.5 sq mm
PVC insulated copper earth continuity conductor of green
colour inside conduit with required materials as per
specification on same board MP UAAD SOR Volume 4
page no. 16 Item no. 1.1.5
No. 128.00 2560.00
25.00 16 Plinth Protection using Providing and layingin position
cement concrete of grade M10 and curing
complete,excludingcost of centeringandshuttering All work
up to plinth level M.P. Public works department S.O.R-
2009, Chapter 4, Item No.4.1 , Page No. 15.
Cum 3335.00 83375.00
37.50 17 Providing and lyaing ingral cement based water proofing
treatment including preparation of surface as required for
treatment of roorfs,balconies,trerraces,etc consisting of
following operations a) Applying a slurry coat of neat
cement using 2.75 kg/sqm. of cement admixedwith w2ater
proofing compound conforming IS 2645 & approved by
Engineer in charge over the RCC slab including adjoining
walls upto 300 mm height including cleaning the surface
before treatment b.) laying brick bats with mortar using
broken brikcks/brick bats 25 mmto 115 mmsize with 50%
of cement mortar (1:5) admixed with water proofing
compoundconforming to IS :2645 andapprovedbyenginer
in charge to required slope and treating simillarly the
adjoining walls upto 300 mm height including rounding of
junctions of walls and slabs c.) After two days of proper
curing applying a second coat of cement slurry using 2.75
kg/sqm of cement admixed with water proffing compound
conforming to IS 2645 and approvedby engineer in charge
including laying glass fibre cloth type II grade tissue
reinfored fo approvedulaityin toplayer of plaster andfinally
finnishing the surface with trowel with neat cement slurrry
andmaking pattern of 300 x300mmsquare 3 mmdeep.e)
the whole terrace so finished shall be floodedwith water for
a minimum period of two weeeks for curing and for final
test.All above operations to be done in order and as
direacted & specified by engieer in charge
PWD SOr 2009 item 22.7.1, page no. 188
Sqm 856.00 32100.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 145
Final Project Report For Meghnagar Water Supply
Quantity Item
No.
Description Unit Rate per
Unit
Amount in Rs.
1
18
Provision of 2 nos of ceiling fan,6 nos of tubelights CFL
type,one no of MCB etc fixing completed
Nos 50000 50000
1 19 Provision of street light 4 nos at pump house Nos 20000 20000
Total Cost of Pump House 639605.44
102208.95
Total Amount 741814.39
742000
Add 15.98 % of prevelling rates
SAY Rs.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 146
Final Project Report For Meghnagar Water Supply
Item
No.
Description No. Length
(m)
Breadth
(m)
Depth
(m)
Quantity Total
Quantity
Earth workin excavationnot exceeding150cmin
depthbutnot exceeding10 sqmon planincluding
disposalof excavatedearthupto50mandlift upto
1.5m, disposed soil to be levelled and neatly
dressed
M.P. Public works department S.O.R-2009,
Chapter 2, Item No.2.6 , Page No. 4.
Long Wall 2 8.65 0.80 1.00 13.84 13.84
Shortwall 2 4.55 0.80 1.00 7.28 7.28
For Ramp 1 2.20 1.40 0.20 0.62 0.62
For Steps 1 1.20 1.00 0.20 0.24 0.24
21.98 21.98
cu.m.
Providing and layingin position cement concrete
of grade M 10 and curing complete,excluding
cost of centering and shuttering All work up to
plinth level M.P. Public works department
S.O.R-2009, Chapter 4, ItemNo.4.1 , Page No.
15.
Long Wall 2 8.65 0.80 0.20 2.77 2.77
Shortwall 2 4.55 0.80 0.20 1.46 1.46
For Ramp 1 2.20 1.40 0.10 0.31 0.31
For Steps 1 1.20 1.00 0.10 0.12 0.12
For Flooring 1 7.50 5.00 0.10 3.75 3.75
8.40 8.40
cu.m.
Providing and laying in position M20 grade of
reinforced cement concrete (with 20mmnominal
size gradedstone aggregate) excluding the cost
of centering, shuttering, finishing and
reinforcementwork in FootingM.P. Public works
departmentS.O.R-2009, Chapter 5, ItemNo.5.1,
Page No. 20.
6 1.15 1.65 0.23 2.56 2.56
2.56 2.56
cu.m.
4 Providing and laying in position M20 grade of
reinforced cement concrete (with 20mmnominal
size gradedstone aggregate) excluding the cost
of centering, shuttering, finishing and
reinforcement, for reinforced
concrete work in (B) slabs, landing, shelves,
balconies, lintels, beams.
M.P. Public works department S.O.R-2009,
Chapter 5, Item No.5.1 , Page No. 20.
Plinth Beam
Long wall 2 7.5 0.35 0.45 2.36 2.36
Short wall 3 5 0.35 0.45 2.36 2.36
Beam
Long wall 2 7.5 0.35 0.5 2.63 2.63
Short wall 3 5 0.35 0.5 2.63 2.63
Column 6 1.65 1.75 0.225 3.90 3.90
Slab 1 7.50 5.00 0.15 5.63 5.63
Coping
Long wall 2 8.30 0.35 0.10 0.58 0.58
Short wall 2 4.90 0.35 0.10 0.34 0.34
PUMP HOUSE 7.50 m X 5.00 m
1
2
3
MEASUREMENTS
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 147
Final Project Report For Meghnagar Water Supply
Item
No.
Description No. Length
(m)
Breadth
(m)
Depth
(m)
Quantity Total
Quantity
For Ramp 1 1.60 1.40 0.10 0.22 0.22
Lintel
Long wall 2 8.20 0.35 0.10 0.57 0.57
Short wall 2 5.00 0.35 0.10 0.35 0.35
Chhaja 4 1.20 0.45 0.10 0.22 0.22
21.79 21.79
Cum
4.1 Centering and shuttering inlcuding strutting,
rotting etc. And removal form for
foundation, footings cl. 5.9.1 56.22 56.22 Sqm
beams, gurders columns, cylindrical wall
cl.5.9.3 65.7 65.70 Sqm
Slab 37.5 37.50 Sqm
5 Reinforcement for R.C.C. work including
strainghtening, cutting bending , placing in
position and binding including cost of binding wire
up to floor two level including all wastage etc.
complete
M.P. Public works department S.O.R-2009,
Chapter 5, Item No.5.16 , Page No. 22.
Qty steel =Qty conc. X % steel X density
steel/100
a. For slab in C.C. (1:1.5:3) 253.13
b. For lintel in C.C. (1:1.5:3) 23.10
c Plinth Beam 236.25
d Beam 262.50
e Column 253.38
f Footing 115.27
1143.63 1143.63
Kg
Supplying and filling in plinth with crusher stone
dust /coarse sand under floors incl watering,
ramming, consolidatingin layers not execcind20
cm in depth etc. complete
M.P. Public works department S.O.R-2009,
Chapter 2, Item No. 2.26, Page No. 7.
For Room 1 7.40 4.90 0.60 21.76 21.76
For Ramp 1 1.60 1.40 0.25 0.56 0.56
22.32 22.32
Cum
Brick workwithwell burnt chimneybricks in bulls
patenttrench kiln crushing strengthnot less than
25 kg/sqcmand water absorptionnot more than
20% in superstructure bove floor level for each
additional floor or part there of.
M.P. Public works department S.O.R-2009,
Chapter 6, Item No. 6.2, Page No.27.
Long wall 2 8.20 0.35 3.60 20.66 20.66
Short wall 2 5.00 0.35 3.60 12.60 12.60
Parapet wall
Long wall 2 8.20 0.23 0.30 1.13 1.13
Short wall 2 5.00 0.23 0.30 0.69 0.69
Deduction
Door - D1 1 1.00 0.35 2.00 -0.70 -0.70
Door - D2 1 2.00 0.35 2.00 -1.40 -1.40
Window 4 1.00 0.35 1.20 -1.68 -1.68
31.31 31.31
7
6
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 148
Final Project Report For Meghnagar Water Supply
Item
No.
Description No. Length
(m)
Breadth
(m)
Depth
(m)
Quantity Total
Quantity
Cum
Providing12mmth. Cementplasterin singlecoat
for interior plasteringon wall upto floor twolevel
finished even and smooth in cement mortar 1:4
(1cement : 4 sand).
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.1, Page No. 99.
Long Wall 2 7.50 3.60 54.00 54.00
Short Wall 2 5.00 3.60 36.00 36.00
Inside Parapet
Long Wall 2 7.60 0.45 6.84 6.84
Short Wall 2 5.10 0.45 4.59 4.59
Deduction
Door 2 1.00 2.00 -4.00 -4.00
Window 3 0.90 1.20 -3.24 -3.24
94.19 94.19
sq.m.
Providing18 mmth. Cement plaster in two coaT
under layer 12mmthichcementplaster1:5 intop
layer 6 mm thick cement plaster 1:3 finished
ruffed with spung.
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.7, Page No. 99.
Out side Plinth
Long Wall 2 8.30 0.65 - 10.79 10.79
Short Wall 2 4.90 0.65 - 6.37 6.37
Above Plinth
Long Wall 2 8.20 4.17 - 68.39 68.39
Short Wall 2 5.70 4.17 - 47.54 47.54
Deduction
Door 2 1.00 2.00 - -4.00 -4.00
Window 3 0.90 1.20 - -3.24 -3.24
125.85 125.85
Sq.m
Cement concrete flooring 1:2:4 (1 cement : 2
sand : 4 gradedstone aggregate) finishedwitha
floating coat of neat cement including cement
slurry, but excluding the cost of nosing of steps
etc. complete. (Area of panels not exceeding 2
sqm.)
M.P. Public works department S.O.R-2009,
Chapter 11, Item No. 11.1, Page No. 79.
Room 1 7.50 5.00 - 37.50 37.50
Ramp 1 2.00 1.00 - 2.00 2.00
39.50 39.50
Sq.m
Distempering with dry distemper of appproved
brandand manufacture(Two or more coats) and
of requiredshadeon newwork,overandincluding
priming coat of whiting to give an even shade
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.29, Page No. 101.
Quantity is same as per Item No.7 94.19 94.19
Sq.m
Finishing walls with water proofing cement paint
of required shade for new work.
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.33.1, Page No. 101.
Quantity is same as per Item No.8 125.85 125.85
9
12
10
11
8
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 149
Final Project Report For Meghnagar Water Supply
Item
No.
Description No. Length
(m)
Breadth
(m)
Depth
(m)
Quantity Total
Quantity
Sq.m
13 a Providing and fixing M.S Tubular frames for
doors, windows, ventilators and cupboard with
rectangular section made of 1.60mm thick M.S
sheet, joints miltred and welded and grinded finis
profiles required size with 15x3 mm lugs 10cm
long embedded in cement concrete blocks
15x10x10 cm of 1:3:6 (1 cement : 3 sand : 6
graded stone aggregate 20mm nominal size) or
with wooden plug sand screws or rawl plugs and
screws or with ficing clips or with bolts and nuts
as required including fixing of necessary butt
hinges and screws and applying a priming coat of
approved steel primers.
M.P. Public works department S.O.R-2009,
Chapter 10, Item No. 10.14, Page No. 73.
Door - D1 1 2.10 - 1.00 2.10 2.10
Window 4 1.50 - 1.20 7.20 7.20
9.30 9.30
Avg. weight per Sq.m 50 kg 465.00
Kg.
13 b Providing and fixing panneleed or pannedled &
glass shutters for doors,windows,ventilators, and
cleare story windows including ISI marked black
enamelled MS butt hinges with necessary screws
excluding pannelling which willbe paid separately
M.P. Public works department S.O.R-2009,
Chapter 9, Item No. 9.5, Page No. 41.
Killn seasoned and chemically treated hollock
wood
35 mm thick shutters
Door - D1 1 2.10 - 1.00 2.10 2.10
Window 4 1.50 - 1.20 7.20 7.20
Total Sqm 9.30
Supplying and fixing rolling shutters of approved
make, made of required size M.S laths
interlocked together through their entire length
and jointed together at the end by end locks
mounted on specially designed pipe shaft with
brackets, side guides and arrangemnts for inside
and outside locking with push and pull operation
com[lete including the cost of providing and ficing
necessary 27.5cm long wire springs grade No. 2
and M.S top cover of required thicknes s for
rolling shutters.
(A) Shutter having width bellow 3.5 m (B)
Providing and fixing ball bearing for rolling
shutters. (C) Extra for
providing mechanical device and crank operaion
for operating rolling shutters
M.P. Public works department S.O.R-2009,
Chapter 10, Item No. 10.14, Page No. 71 & 72.
1 3.00 2.40 7.20 7.20
Sq.m
No.
14
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 150
Final Project Report For Meghnagar Water Supply
Item
No.
Description No. Length
(m)
Breadth
(m)
Depth
(m)
Quantity Total
Quantity
Point wiring including metallic switch
box,sheet,switches,sockets for 3 pin 6
amp.Socket outlet point with 1.5 sqmm PVC
insulated cable FR with copper multi strand
conductor with ISI marked in surface rigid PVC
conduit(MMS) ISI marked of sutable size and 1.5
sq mm PVC insulated copper earth continuity
conductor of green colour inside conduit with
required materials as per specification on same
board MP UAAD SOR Volume 4 page no. 16
Item no. 1.1.5
20 - - - 20.00 20.00
No.
16
Plinth Protection using Providing and layingin
position cement concrete of grade M10 and
curing complete,excluding cost of centering and
shuttering All work up to plinth level M.P.
Public works department S.O.R-2009, Chapter 4,
Item No.4.1 , Page No. 15.
2 1.00 5.00 0.00 10.00
2 1.00 7.50 15.00
Total 25.00
17 proofing treatment including preparation of
surface as required for treatment of
roorfs,balconies,trerraces,etc consisting of
following operations a) Applying a slurry coat of
neat cement using 2.75 kg/sqm. of cement
admixed with w2ater proofing compound
conforming IS 2645 & approved by Engineer in
charge over the RCC slab including adjoining
walls upto 300 mm height including cleaning the
surface before treatment b.) laying brick bats with
mortar using broken brikcks/brick bats 25 mm to
115 mm size with 50% of cement mortar (1:5)
admixed with water proofing compound
conforming to IS :2645 and approved by enginer
in charge to required slope and treating simillarly
the adjoining walls upto 300 mm height including
rounding of junctions of walls and slabs c.) After
two days of proper curing applying a second coat
of cement slurry using 2.75 kg/sqm of cement
admixed with water proffing compound
conforming to IS 2645 and approved by engineer
in charge including laying glass fibre cloth type II
grade tissue reinfored fo approved ulaity in top
layer of plaster and finally finnishing the surface
with trowel with neat cement slurrry and making
pattern of 300 x300 mm square 3 mm deep.e)
the whole terrace so finished shall be flooded with
water for a minimum period of two weeeks for
curing and for final test.All above operations to be
done in order and as direacted & specified by
engieer in charge
PWD SOr 2009 item 22.7.1, page no. 188
0.00 0.00
1 7.50 5.00 37.50
Total 37.50
18
Provision of 2 nos of ceiling fan,6 nos of
tubelights CFL type,one no of MCB etc fixing
completed 1 1
19 Provision of street light 4 nos at pump house 1 1
15
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 151
Final Project Report For Meghnagar Water Supply
Amount
in Rs.
Earth work in Excavation for pipe trench in all kinds of soil
and WBM in area including dressing, watering and
ramming and disposal of Excavated Earth lead upto 50
meters and lift upto 1.5m, disposal earth to be leveled,
neatly dressed.
up to 1.5 m depth.
Public Health Engineering Department S.O.R pg no. 154
item no 12.1
Providing, laying and jointing following socket & spigot
centrifugally cast (Spun) Ductile Iron pressure pipes with
inside cement mortar lining (class K-9) conforming to IS
8329/2000 with suitable Rubber Gasket(push on) joints as
per IS: 5382/85 including Labour cost
MP PHE S.O.R. pg no. 54 item no. 4.3,4.4
With 5% for Wastage
250 mm dia DI-K-9 Pipe
Providing & fixing of following Cast iron double flanged
sluice valves as per I.S.:14846-2000 fitted with cast iron
cap including jointing & testing with cost of jointing
material such as bolts, nuts, rubber insertions etc. all
complete including Labour Cost.
MP PHE S.O.R. pg no. 103 item no 8.1,8.3 (PN-1.6)
250mm (PN 1.6)
4 Providing & fixing of following Cast iron double air valves
as per I.S.:14845-2000 including jointing & testing with
cost of jointing mterial and rubber insertion all complete
as per IS 13095-1991 including labour cost.
No. 2 8766 17532
5 Special like T-Bend , Reducers Providing & supplying at
store or site of work incl. freight, loading, unloading,
stacking insu. & all taxes etc. comp.2.5 % of Item No.2
m 1 51927.8 51927.75
Constructing masonry chamber 60X60X75 cm. with brick
inside of crushing strength not less than 25kg/sq cm and
water absorpation not more than 20% class designation
brick work in cement mortar 1:4 (1 cement : 4 sand) for
sluice valve, with C.I. surface box 100mm. top diameter,
160mm bottom diameter and 180mm deep ( inside ) with
chained lid and RCC top slab 1:2:4 mix (1cement : 2 sand
: 4 graded stone aggregate 20mm nominal size) Including
necessary excavation foundation concrete 1:5:10
(1cement : s fine sand: 10 graded stone aggregate 40mm
nominal size) and inside plastering with cement mortar 1:3
(1 cement : 3 sand) 12mm thick finished with a floating
coat of neat cement complete as per standard design :
Public Works Department S.O.R pg no. 158 item no.
18.33
7 RCC precast M.H.Frame & cover manufactured,supply &
Delivery at store or at site of work precast RCC M.200
Frame & cover suitable to drainage M.H. and as per type
design & drawing including cost of reinforcement
M.S.Angles or Flate ,curing mold work etc.
1. Cover suitable for 50 cm opening of M.H. No. 3 778 2334
8 Filling available excavated earth in trenches, lead up to
50m and lift up to 1.5m in all kind of soil excluding
watering and ramming MP Public Health Engineering
Department Pg no. 154 item no. 12.7(b)
Cum 336 17 7029.33
2253286
Total Amount Say 2253300
672 1 Cum 107 71904
ESTIMATE OF RISING MAIN FROM CLEAR WATER SUMP TO ESR
ABSTRACT
Quantity Item No. Description Unit
Rate per
Unit
1 3 No. 14663.5 14663.5
735 2 m 2826 2077110
3 6 No. 3595 10785
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 152
Final Project Report For Meghnagar Water Supply
Amount
in Rs.
Earth work in Excavation for pipe trench in all kinds of soil
and WBM in area including dressing, watering and
ramming and disposal of Excavated Earth lead upto 50
meters and lift upto 1.5m, disposal earth to be leveled,
neatly dressed.
up to 1.5 m depth.
Public Health Engineering Department S.O.R pg no. 154
item no 12.1
Providing, laying and jointing following socket & spigot
centrifugally cast (Spun) Ductile Iron pressure pipes with
inside cement mortar lining (class K-9) conforming to IS
8329/2000 with suitable Rubber Gasket(push on) joints as
per IS: 5382/85 including Labour cost
MP PHE S.O.R. pg no. 54 item no. 4.3,4.6
With 5% for Wastage
200 mm dia DI-K-9 Pipe
Providing & fixing of following Cast iron double flanged
sluice valves as per I.S.:14846-2000 fitted with cast iron
cap including jointing & testing with cost of jointing
material such as bolts, nuts, rubber insertions etc. all
complete including Labour Cost.
MP PHE S.O.R. pg no. 103 item no 8.1,8.3 (PN-1.6)
200mm (PN 1.6)
4 Special like T-Bend , Reducers Providing & supplying at
store or site of work incl. freight, loading, unloading,
stacking insu. & all taxes etc. comp.2.5 % of Item No.2
m 1 10885 10885
Constructing masonry chamber 60X60X75 cm. with brick
inside of crushing strength not less than 25kg/sq cm and
water absorpation not more than 20% class designation
brick work in cement mortar 1:4 (1 cement : 4 sand) for
sluice valve, with C.I. surface box 100mm. top diameter,
160mm bottom diameter and 180mm deep ( inside ) with
chained lid and RCC top slab 1:2:4 mix (1cement : 2 sand
: 4 graded stone aggregate 20mm nominal size) Including
necessary excavation foundation concrete 1:5:10
(1cement : s fine sand: 10 graded stone aggregate 40mm
nominal size) and inside plastering with cement mortar 1:3
(1 cement : 3 sand) 12mm thick finished with a floating
coat of neat cement complete as per standard design :
Public Works Department S.O.R pg no. 158 item no.
18.33
6 RCC precast M.H.Frame & cover manufactured,supply &
Delivery at store or at site of work precast RCC M.200
Frame & cover suitable to drainage M.H. and as per type
design & drawing including cost of reinforcement
M.S.Angles or Flate ,curing mold work etc.
1. Cover suitable for 50 cm opening of M.H. No. 1 778 778
7 Filling available excavated earth in trenches, lead up to
50m and lift up to 1.5m in all kind of soil excluding
watering and ramming MP Public Health Engineering
Department Pg no. 154 item no. 12.7(b)
Cum 57.6 17 7029.33
485164
145549
630713
Total Amount Say 630800
Add 30 % of increasing of rates as on today
Total of Rs.
1 5 No. 4134 4134
200 2 m 2177 435400
1 3 No. 14611.5 14611.5
115.2 1 Cum 107 12326.4
ESTIMATE OF RISING MAIN FROM INTEKE WELL TO CONNECTING WITH EXISTING PIPE
ESTIMATES
Quantity Item No. Description Unit
Rate per
Unit
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 153
Final Project Report For Meghnagar Water Supply
Length Breadth Height Total
m m m Quantity
Earth work in Excavation for pipe trench in all
kinds of soil and WBM in area including
dressing, watering and ramming and disposal of
Excavated Earth lead upto 50 meters and lift
upto 1.5m, disposal earth to be leveled, neatly
dressed.
up to 1.5 m depth.
Public Health Engineering Department S.O.R pg
no. 154 item no 12.1
Cu m.
Providing, laying and jointing following socket &
spigot centrifugally cast (Spun) Ductile Iron
pressure pipes with inside cement mortar lining
(class K-9) conforming to IS 8329/2000 with
suitable Rubber Gasket(push on) joints as per
IS: 5382/85 including Labour cost
With 5% for Wastage
200 mm dia DI-K-9 Pipe 1 200 - - 200 200
m.
Providing & fixing of following Cast iron double
flanged sluice valves as per I.S.:14846-2000
fitted with cast iron cap including jointing &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete
including Labour Cost.
MP PHE S.O.R. pg no. 103 itemno 8.1,8.3 (PN-
1.6)
200 mm dia DI-K-9 Pipe 1 No.
4 Special like T-Bend , Reducers Providing &
supplying at store or site of work incl. freight,
loading, unloading, stacking insu. &all taxes etc.
comp.2.5 % of Item No.2
1 - - - -
1 1
115.2 1 1 120 0.8 1.2 115.2
2
ESTIMATE OF RISING MAIN FROM INTEKE WELL TO CONNECTING WITH EXISTING PIPE
MEASUREMENTS
Item No. Description
No. Quantity
3 1 - - - 1 1
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 154
Final Project Report For Meghnagar Water Supply
Constructing masonry chamber 60X60X75 cm.
with brick inside of crushing strength not less
than 25kg/sq cmand water absorpation not more
than 20%class designation brick work in cement
mortar 1:4 (1 cement : 4 sand) for sluice valve,
with C.I. surface box 100mm. top diameter,
160mm bottom diameter and 180mm deep (
inside ) with chained lid and RCC top slab 1:2:4
mix (1cement : 2 sand : 4 graded stone
aggregate 20mm nominal size) Including
necessary excavation foundation concrete
1:5:10 (1cement : s fine sand: 10 graded stone
aggregate 40mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement : 3
sand) 12mmthick finished with a floating coat of
neat cement complete as per standard design :
Public Works Department S.O.R pg no. 158 item
no. 18.33
1 1
6 RCC precast M.H.Frame & cover
manufactured,supply & Delivery at store or at
site of work precast RCC M.200 Frame & cover
suitable to drainage M.H. and as per type design
& drawing including cost of reinforcement
M.S.Angles or Flate ,curing mold work etc.
1 - - - 1
1. Cover suitable for 50 cm opening of M.H. 1 - - - 1 1
7 Filling available excavated earth in trenches,
lead up to 50mand lift up to 1.5min all kind of
soil excluding watering and ramming Public
Health Engineering Department Pg no. 154
item no. 12.7(b)
1 57.6 57.6 639.03
Cu m.
1 1 5 1 - - -
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 155
Final Project Report For Meghnagar Water Supply
Estimate for Providing & Fixing Duckle I ron (K-7) Pipe Line at I /A
Meghnagar

S.no. Particular of Item

Unit Qty. Rate Amount
1 Earth work in Excavation for pipe trench in all kinds
of soil and WBM in areas including dressing,
watering and ramming and disposal of Excavated
earth lead up to 50 meters and lift up to 1.5m,
disposal earth to be leveled, neatly dressed.
[SOR I-12.1 P-154]
250 mm dia- 1150x0.75x1.0 =862.50 cum
200 mm dia- 1000x0.70x1.0=700.00 cum
100 mm dia- 2875x0.60x1.0=1725.00 cum
Total - =3287.50 cum
Cum 3287.50 107/- 351763.00
2 Earth work in excavation for pipe trench in all
kinds of rocks in areas including dressing, stacking
of useful material and disposal of unserviceable one
up to 50 m lead and lift upto 1.5m.
[SOR I-12.3 P-154]
710x0.60x1.0=426 cum
Cum 426.00 263/- 112038.00
3 Providing, laying and jointing following socket &
spigot centifugally cast (Spun) Ductile Iron
pressure pipes with inside cement mortar lining
(class K-7) conforming to IS 8329/2000 with
suitable Rubber Gasket (Push on) joints as per
IS:5382/85 including.
[SOR I-4.1 P-53]

250 mm dia- 1150 Rmt
Rmt
1150.00 2343/- 2694450.00
200 mm dia- 1000 Rmt
Rmt
1000.00 1808/- 1808000.00
100 mm dia- 2875 Rmt
Rmt
2875.00 962/- 2765750.00
4 Providing and Laying ductile iron PN-16 type
flanged sockets conforming to IS-9523/2000
having dimension as per table 23 of IS-
9523/2000 in the following nominal
diameter/sizes with external bitumen coating and
internal cement mortar lining with finishing as
per clause 13 of IS-9523/2000.
[SOR I-4.7 P-56]


250 mm dia- 3 Nos.
Nos.
3 2794/- 8382.00
200 mm dia- 2 Nos.
Nos.
2 2088/- 4176.00
100 mm dia- 12 Nos.
Nos.
12 897/- 10764.00
5 Providing and Laying ductile PN-16 type iron
flanged spigot conforming to IS- 9523/2000
having dimension as per table 24 of IS-9523/2000
in the following nominal diameter/sizes with
external bitumen coating and internal cement
mortar lining with finishing as per clause 13 of IS-
9523/2000.
[SOR I-4.9 P-57]

250 mm dia- 3 Nos.
Nos.
3 3426/- 10278.00
200 mm dia- 2 Nos.
Nos.
2 2304/- 4608.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 156
Final Project Report For Meghnagar Water Supply
100 mm dia- 12 Nos.
Nos.
12 1000/- 12000.00
6 Providing and Laying Ductile iron Mechanical joint
collar with follower glands conforming to IS
9523/2000 having dimension as per table 24 of
IS-9523/2000 in the following nominal
diameter/sizes with external bitumen and internal
cement mortar
lining.
[SOR I-4.11 P-59]


250 mm dia- 2 Nos.
Nos.
2 6325/- 12650.00
200 mm dia- 2 Nos.
Nos.
2 4534/- 9068.00
100 mm dia- 10 Nos.
Nos.
10 2222/- 22220.00
7 Providing and laying Ductile Iron Double Socket 90
Bends conforming to IS-9523/2000 having
dimension as per table 15 of IS- 9523/2000
in the following nominal diameter/sizes with
external bitumen coating and internal cement mortar
lining.
[SOR I-4.13 P-60]


250 mm dia- 3 Nos.
Nos.
3 4526/- 13578.00
200 mm dia- 2 Nos.
Nos.
2 3107/- 6214.00
100 mm dia- 2 Nos.
Nos.
2 1068/- 2136.00
8 Providing and laying Ductile Iron Double Socket 45
Bends conforming to IS-9523/2000 having
dimension as per table 16 of IS-
9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining.
[SOR I-4.15 P-61]


250 mm dia- 2 Nos.
Nos.
2 3519/- 7038.00
200 mm dia- 2 Nos.
Nos.
2 2526/- 5052.00
100 mm dia- 2 Nos.
Nos.
2 971/- 1942.00
9 Providing and Laying Ductile Iron Double
Socket 22.5 Bends conforming to IS-
9523/2000 having dimension as per table 17 of
IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating and
internal cement mortar lining.
[SOR I-4.17 P-62]


250 mm dia- 1 Nos.
Nos.
1 3018/- 3018.00
200 mm dia- 2 Nos.
Nos.
2 2234/- 4468.00
100 mm dia- 2 Nos.
Nos.
2 874/- 1748.00
10 Providing and Laying Ductile Iron Double
Socket 11.25 bends conforming to IS-
9523/2000 having dimension as per table 18 of IS-
9523/2000 in the following nominal
diameter/ sizes with external bitumen coating and
internal cement mortar lining.
[SOR I-4.19 P-63]


250 mm dia- 1 Nos.
Nos.
1 2817/- 2817.00
200 mm dia- 1 Nos.
Nos.
1 2039/- 2039.00
100 mm dia- 1Nos.
Nos.
1 680/- 680.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 157
Final Project Report For Meghnagar Water Supply
11 Providing and Laying Ductile Iron All socket Tees
conforming to IS-9523/2000 having dimension as
per table 21 of IS-9523/2000 in the following
nominal diameter/sizes with external bitumen
coating and internal cement
mortar lining with finishing as per clause 13 of IS-
9523/2000.
[SOR I-4.21 P-65]


250 mmx250 mm dia- 2 Nos.
Nos.
2 5774/- 11548.00
200 mmx100 mm dia- 2 Nos.
Nos.
2 3116/- 6232.00
150 mmx100 mm dia- 2 Nos.
Nos.
2 2228/- 4456.00
100 mmx100 mm dia- 5 Nos.
Nos.
5 1501/- 7505.00
12 Providing and Laying Ductile Iron Double
Socket branch flange Tee conforming to IS-
9523/2000 having dimension as per table 21 of IS-
9523/2000 in the following nominal
diameter/sizes with external bitumen coating and
internal cement mortar lining with finishing as
per clause 13 of IS-9523/2000.
[SOR I-4.23 P-66]


250 mmx100 mm dia- 2 Nos.
Nos.
2 3882/- 7764.00
200 mmx100 mm dia- 3 Nos.
Nos.
3 3077/- 9231.00
100 mmx80 mm dia- 10 Nos.
Nos.
10 1495/- 14950.00
13 Providing and Laying Ductile Iron Double
Socket Reducer conforming to IS-9523/2000
having dimension as per table 21 of IS-
9523/2000 in the following nominal
diameter/sizes with external bitumen coating and
internal cement mortar lining with finishing as
per clause 13 of IS-9523/2000.
[SOR I-4.25 P-68]


250 mmx100 mm dia- 2 Nos.
Nos.
2 2817/- 5634.00
250 mmx150 mm dia- 2 Nos.
Nos.
2 2817/- 5634.00
250 mmx200 mm dia- 2 Nos.
Nos.
2 2817/- 5634.00
200 mmx100 mm dia- 2 Nos.
Nos.
2 1942/- 3884.00
14 Providing detachable joints to following asbestos
cement pressure pipes and fittings including
C.I. detachable joints confirming to IS/8794/1988
with bolts, nuts and rubber rings confirming to
IS- 5382/85 & IS- 10292/88
[SOR I-5.4 P-81]



200 mm dia- 2 Nos. Nos.
2 614/- 1228.00

150 mm dia- 3 Nos. Nos.
3 465/- 1395.00

100 mm dia- 5 Nos. Nos.
5 271/- 1355.00
15 Providing & fixing of following Cast iron double
flanged sluice valves as per
I.S.:14846-2000 fitted with cast iron cap
including jointing & testing with cost of jointing
material such as bolts, nuts, rubber insertions
etc. all complete
[SOR I-8.1 P-103]



250 mm dia- 4 Nos. Nos.
4 18698/- 74792.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 158
Final Project Report For Meghnagar Water Supply

200 mm dia- 2 Nos. Nos.
2 10361/- 20722.00

100 mm dia- 8 Nos. Nos.
8 3892/- 31136.00
16 Providing & fixing following cast iron double air
valves, flanged without
in-built isolating valve as per IS :
14845-2000 including jointing & testing with cost
material insertion all of
and jointing rubber complete as per IS :13095-1991
[SOR I-8.12 P-108]



80 mm dia- 6 Nos. Nos.
6 2594/- 15564.00

100 mm dia- 5 Nos. Nos.
5 3320/- 16600.00
17
Labour
only for cutting following Ductile Iron pipes of
any type and class.
[SOR I-13.4 P-164]


250 mm dia- 10 Nos.
Nos.
10 69/- 690.00
200 mm dia- 12 Nos.
Nos.
12 55/- 660.00
100 mm dia- 20 Nos.
Nos.
20 22/- 440.00
18
Labour for cutting following P. V. C. Pipes of any
type and class.
[SOR I-13.3 P-164]


150 mm dia- 10 Nos.
Nos.
10 11/- 110.00
100 mm dia- 15 Nos.
Nos.
15 6/- 90.00
19 Chamfering cast iron pipes of all types and classes
to make suitable for tyton joints. Up To150 mm
dia.
[SOR I-13.6 P-165]



250 mm dia- 8 Nos. Nos.
8 480/- 3840.00

200 mm dia- 10 Nos. Nos.
10 437/- 4370.00

100 mm dia- 15 Nos. Nos.
15 349/- 5235.00
20 Manufacturing and supply of specials made out
of M.S. steel plates as per design to
approved Charge, required by
in by the Engineer shapes site and be in conditions
including cost of steel plates & other electrical
& mechanical material complete.
Tail plece, flange, J ali etc.
[SOR I-13.8 P-166]
Kg.
500 69/- 34500.00
21
Filling available excavated earth in trenches, lead up
to 50m and lift up to 1.5m in all kind of soil
excluding watering and ramming.
[SOR I-12.7 P-154]



3700 cum
Cum
3700 11/- 40843.00

Construction of Chamber:


22 Earth work in Excavation for pipe trench in all kinds
of soil and WBM in areas including dressing,
watering and ramming and disposal of Excavated
earth lead up to 50 meters and lift up to 1.5m,
disposal earth to be leveled, neatly dressed.
Cum
96.00 107/- 10272.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 159
Final Project Report For Meghnagar Water Supply
[SOR I-12.1 P-154]
25No.x2.0x1.60x1.20=96 cum
23 Providing and laying mechanically mixed cement
concrete with crushed stone aggregate excluding
centering and shuttering (with 40mm nominal size
graded stone aggregate)
[SOR I-12.16a(iii) P-156]
(a) In foundation and plinth 1:3:6
25No.x2.0x1.60x0.10=8 cum
Cum
8.00 1835/- 14680.00
24 Brick work with well burnt chimney bricks
having crushing strength not less than 25 kg/cm and
water absorption not more than 20% in
foundation & plinth.
[SOR I-12.21a(iv) P-158]
(iv) In Cement Mortar 1:6
25No.x2x1.60x0.20x1.40 =22.40 cum
25No.x0.90x0.20x1.40 =12.60 cum
Total =35.00 cum
Cum
35.00 2259/- 79065.00
25 Providing and fixing form work i/c centering,
shuttering, strutting, staging, propping, bracing
etc. complete and i/c removal of Form work.
(i) Foundation/ footing/ column base/ plinth beam/
slabs of any shape and size up to plinth level.
Coping: 25x(1.20x2+0.9x2)/4.20x0.10 =10.50 sqm
25x(1.60x2+1.30x2)/5.80x0.10 =14.50 sqm
Total =25.00 sqm
Sqm
25.00 78/- 1950.00
26 Providing & laying mechanically mixed cement
concrete 20mm nominal size graded crushed stone
excluding cost of centering & shuttering.
(a) In Plinth & foundation 1:1:3
[SOR I-12.17a(iii) P-156]
(1.60x2+0.9x2)/9.0x0.20x0.10=2.50 cum
Cum
2.50 3025/- 7563.00
27 12mm thick cement plaster in single including
finishing even, smooth and curing complete.
(iv) 1:6(Cement 1: Sand 6)
[SOR I-12.22a(iv) P-159]
Inside: (1.20x2+0.90x2)x1.40 =147.00 sqm
Outside: (1.60x2+1.30x2)x0.30 =43.50 sqm
Top : (1.60x2+0.90x2)x0.20 =25.00 sqm
Total = 215.50 sqm
Sqm
215.50 64/- 13792.00
28 Steel work in single section including cutting,
hoisting, fixing in position and applying a
primary coat of lead paint.
In R.S. Joint in flat iron/angle/
tee/channel/ square/round bar.
[SOR I-12.19(b) P-157]
Kg.
200.00 60/- 12000.00
Total

8352241.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 160
Final Project Report For Meghnagar Water Supply

Quantity Item.
No.
Description
Unit Rate per
unit
Amount in Rs.
390.96 1 Earth work in excavaton by mechanical means
not exceeding 1.5 m in depth or 10 sqm in plan
including disposal of excavated earth upto 50m
and lift upto 1.5m, disposed soil to be levelled
and neatly dressed
All kinds of soil.
M.P. Public works department S.O.R-2009,
Chapter 2, Item No.2.6.1 , Page No. 4.
cu.m. 123.00 48088.08
69.46 2 Providing and layingin position cement concrete
of grade M 10 and curing complete,excluding
cost of centering and shuttering All work up to
plinth level M.P. Public works department
S.O.R-2009, Chapter 4, Item No.4.11.4 , Page
No. 15.
cu.m. 3335.00 231649.10
89.23 3 Providing and layingin position cement concrete
of grade M 20 and curing complete,excluding
cost of centering and shuttering All work up to
plinth levelfor footing M.P. Public works
department S.O.R-2009, Chapter 5, Item
No.5.2.1, Page No. 20.
cu.m. 4969.00 443366.98
740.23 3.1 Centering and shuttering including strutting,
propping etc.and removal of form for plinth
beams and string courses etc.
M.P. Public works department S.O.R-2009,
Chapter 5, Item No.5.9.2, Page No. 21.
Sq.m 222.00 164331.50
5172.46 4 Reinforcement for RCC work incl.statening,
cutting , bending, placing in positioin and binding
incl cost of binding wire up to floor two level incl
all wastages.(TMT)
M.P. Public works department S.O.R-2009,
Chapter 5, Item No.5.16.6 Page No. 22.
Kg. 48.00 248278.18
31.85 5 Providing and layingin position cement concrete
of grade M 20 and curing complete,excluding
cost of centering and shuttering All work up to
plinth levelfor footing M.P. Public works
department S.O.R-2009, Chapter 4, Item
No.4.2.1.2 , Page No. 15.
cu.m. 4645.00 147955.79
170.55 6 Brick work with well burnt open bhatta, bricks,
crushing strength not less than 25kg/sq cm and
water absorption not more than 20% in
foundation and plinth
M.P. Public works department S.O.R-2009,
Chapter 6, Item No.6.3 , Page No. 27.
cu.m. 2708.00 461842.09
232.27 7 Filling available excavated earth (excluding rock)
in trenches, plinth, sides of foundations etc. in
layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming
and watering, lead up to 50 m and lift upto 1.5 m
M.P. Public works department S.O.R-2009,
Chapter 2, Item No. 2.24, Page No. 7.
cu.m. 56.00 13007.31
1052.00 8 Provdg. 12 mm th. Cement plaster in single coat
for interior plastering on wall upto floor two
level finished even and smooth in cement
mortar 1:4 (1cement : 4 sand).
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.1.1, Page No. 99.
cu.m. 104.00 109408.00
ABSTRACT COMPOUND WALL
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 161
Final Project Report For Meghnagar Water Supply

Quantity Item.
No.
Description
Unit Rate per
unit
Amount in Rs.
960.00 8.1 18 mm cement plaster in two coats under layer
12 mm thick cement plaster
1:5 (1 cement: 5 sand) finished with a top layer
6mm thick cement plaster 1:6
(1 cement: 6 fine sand).
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.1, Page No. 99.
cu.m. 135.00 129600.00
2012.00 9 Finishing walls with waterproofing cement paint
of required shade.
M.P. Public works department S.O.R-2009,
Chapter 13, Item No. 13.33.1, Page No. 102.
sq.m. 36.00 72432.00
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 162
Final Project Report For Meghnagar Water Supply

Quantity Item.
No.
Description
Unit Rate per
unit
Amount in Rs.
2800.00 10 Fencing with ahgle iron poost at required
dsitance embedded in cement blocks every 15th
post, last but one end post and comer post shall
be strutted on both sided and end post on one
side only and provided with horizontal lines and
two disgonal........1029.2 with barbed wire (7
strancd 16 gauge)
M.P. Public works department S.O.R-2009,
Chapter 10, Item No. 10.28.2, Page No. 75.
Kg. 24.00 67200.00
400.00 10.1 Razor wire fencing as per standard specification Rmt 250.00 100000.00
2518.00 11 Steel work welded in buillt up sections framed
work including cutting, hoisting, fixing in position
and applying a priming coat of aproved steel
primer using structural steel etc.as required
hoisitng fixing in position.......in gratings, frames,
guard bar, ladder, ratings, brackets, gates and
similar works
M.P. Public works department S.O.R-2009,
Chapter 10, Item No. 10.23.2, Page No. 74.
Kg 64.00 161152.00
Total Cost 2398311.03
as per prevelling rate 383250.10
2781561.13
15.98%
SAY TOTAL Rs.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 163
Final Project Report For Meghnagar Water Supply
Item.
No.
Description
No. Length
(m)
Breadth
(m)
Height
(m)
Quantity Total
Quantity
1 Earth work in excavaton by
mechanical means not exceeding 1.5
m in depth or 10 sqm in plan including
disposal of excavated earth upto 50m
and lift upto 1.5m, disposed soil to be
levelled and neatly dressed
All kinds of soil.
M.P. Public works department S.O.R-
2009, Chapter 2, Item No.2.6.1 , Page
No. 4.
for column 134 1.5 1.3 1.2 313.56
Plinth Beam 1 400 0.43 0.45 77.40 390.96
cu.m.
2 Providing and layingin position cement
concrete of grade M 10 and curing
complete,excluding cost of centering
and shuttering All work up to plinth
level M.P. Public works
department S.O.R-2009, Chapter 4,
Item No.4.11.4 , Page No. 15.
for column 134 1.5 1.3 0.2 52.26
Plinth Beam 1 400 0.43 0.1 17.20 69.46
cu.m.
3 Providing and layingin position cement
concrete of grade M 20 and curing
complete,excluding cost of centering
and shuttering All work up to plinth
levelfor footing M.P. Public works
department S.O.R-2009, Chapter 5,
Item No.5.2.1, Page No. 20.
for column footing 134 1.2 1 0.15 24.12
for column footing 134 1.2 0.15 0.2 18.09
for column 134 0.35 0.23 1.8 19.42
Plinth Beam 1 400 0.23 0.3 27.60 89.23
cu.m.
3.1 Centering and shuttering including
strutting, propping etc.and removal of
form for plinth beams and string
courses etc.
M.P. Public works department S.O.R-
2009, Chapter 5, Item No.5.9.2, Page
No. 21.
for column footing 134 4.4 0.15 88.44
for column 134 1.16 1.8 279.79
Plinth Beam 1 400 0.93 372.00
740.23
Sq.m
MEASUREMENT COMPOUND WALL
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 164
Final Project Report For Meghnagar Water Supply
Item.
No.
Description
No. Length
(m)
Breadth
(m)
Height
(m)
Quantity Total
Quantity
4 Reinforcement for RCC work
incl.statening, cutting , bending,
placing in positioin and binding incl
cost of binding wire up to floor two
level incl all wastages.(TMT)
M.P. Public works department S.O.R-
2009, Chapter 5, Item No.5.16.6 Page
No. 22.
for footing 42.21 30 1266.30
for column 19.42 70 1359.16
for beam 27.60 70 1932.00
For coping 12.30 50 615.00
5172.46
Kg.
5 Providing and layingin position cement
concrete of grade M 20 and curing
complete,excluding cost of centering
and shuttering All work up to plinth
levelfor footing M.P. Public works
department S.O.R-2009, Chapter 4,
Item No.4.2.1.2 , Page No. 15.
for column 134.00 0.35 0.23 2.1 22.65
for coping 1.00 400 0.23 0.1 9.20
31.85
cu.m.
6 Brick work with well burnt open bhatta,
bricks, crushing strength not less than
25kg/sq cm and water absorption not
more than 20% in foundation and
plinth
M.P. Public works department S.O.R-
2009, Chapter 6, Item No.6.3 , Page
No. 27.
above ground level 1 353.1 0.23 2.1 170.55
170.55
cu.m.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 165
Final Project Report For Meghnagar Water Supply
Item.
No.
Description
No. Length
(m)
Breadth
(m)
Height
(m)
Quantity Total
Quantity
7 Filling available excavated earth
(excluding rock) in trenches, plinth,
sides of foundations etc. in layers not
exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering, lead up to 50
m and lift upto 1.5 m
M.P. Public works department S.O.R-
2009, Chapter 2, Item No. 2.24, Page
No. 7.
Qty=Qty1-(Qty2+Qty3) 232.27 232.27
cu.m.
8 Provdg. 12 mm th. Cement plaster in
single coat for interior plastering on
wall upto floor two level finished even
and smooth in cement mortar 1:4
(1cement : 4 sand).
M.P. Public works department S.O.R-
2009, Chapter 13, Item No. 13.1.1,
Page No. 99.
for wall above G.L 1 400 2.63 1052.00
1052.00
sq.m
8.1 18 mm cement plaster in two coats
under layer 12 mm thick cement
plaster
1:5 (1 cement: 5 sand) finished with a
top layer 6mm thick cement plaster 1:6
(1 cement: 6 fine sand).
M.P. Public works department S.O.R-
2009, Chapter 13, Item No. 13.1,
Page No. 99.
for wall above G.L 1 400 2.4 960.00
960.00
sq.m
9 Finishing walls with waterproofing
cement paint of required shade.
M.P. Public works department S.O.R-
2009, Chapter 13, Item No. 13.33.1,
Page No. 102.
Qty is same as item no.6 2012.00 2012.00
sq.m
10 Fencing with ahgle iron poost at
required dsitance embedded in
cement blocks every 15th post, last
but one end post and comer post shall
be strutted on both sided and end post
on one side only and provided with
horizontal lines and two
disgonal........1029.2 with barbed wire
(7 strancd 16 gauge)
M.P. Public works department S.O.R-
2009, Chapter 10, Item No. 10.28.2,
Page No. 75.
1 400 7 2800.00 2800.00
Kg.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 166
Final Project Report For Meghnagar Water Supply
Item.
No.
Description
No. Length
(m)
Breadth
(m)
Height
(m)
Quantity Total
Quantity
10.1 Razor wire fencing as per standard
specification
1 400 400.00
Rmt
11 Steel work welded in buillt up sections
framed work including cutting,
hoisting, fixing in position and applying
a priming coat of aproved steel primer
using structural steel etc.as required
hoisitng fixing in position.......in
gratings, frames, guard bar, ladder,
ratings, brackets, gates and similar
works
M.P. Public works department S.O.R-
2009, Chapter 10, Item No. 10.23.2,
Page No. 74.
Main Gate ( 6 m x 1.5 m ) size 1 9 70 630.00
Wicket ( 0.9 m x 1.5 m ) size 1 1.35 80 108.00
Post for barbed wire fencing 178 10 1780.00
2518.00
Kg
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 167
Final Project Report For Meghnagar Water Supply

DRAWINGS
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 168
Final Project Report For Meghnagar Water Supply

MAP OF I NDI A
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 169
Final Project Report For Meghnagar Water Supply

MAP OF MADHYA PRADESH


3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 170
Final Project Report For Meghnagar Water Supply



MAP OF J HABUA DI STRI CT
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 171
Final Project Report For Meghnagar Water Supply
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
WATER SUPPLY PROJ ECT
DRG.NO:
AT INDUSTRIAL AREA NIMRANI, DIST KARGAON M.P.
M.P. AUDYOGIK KENDRA VIKAS NIGAM (INDORE) LTD.
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/GSR/01/13
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 172
Final Project Report For Meghnagar Water Supply
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
DRG.NO:
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/ESR/02/11
ESR 4LAKH CAPACITY FOR WATER SUPPLY PROJ ECT
AT INDUSTRIAL AREA MEGHNAGAR, DIST KARGAON M.P.
M.P. AUDYOGIK KENDRA VIKASNIGAM (INDORE) LTD.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 173
Final Project Report For Meghnagar Water Supply
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
ESR 4LAKH CAPACITY FOR WATER SUPPLY PROJ ECT
DRG.NO:
AT INDUSTRIAL AREA MEGHNAGAR, DIST KARGAON M.P.
M.P. AUDYOGIK KENDRA VIKAS NIGAM (INDORE) LTD.
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/ESR/04/11
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 174
Final Project Report For Meghnagar Water Supply
(1) All Dimentions are in MM and levels are in meter unless
NOTE :
otherwise specifide.
cement slurry of 1:3 and first layer on Masonary/conc. shall be
(2) The foundation should be cleaned,moistoned and coated with
placed in rich mortar of 50 to 75mm in thickness.
(3) Zoning or materials liner should not be treated on construction.
(4) While filling the crevices in the foundation care shall be taken
to ensure that surfase thus obtained is not smooth.
(5) Suitable admixture of approved make and quality may be used
to reduce shrinkage in concrete.
(6) Min clear cover to main reinforcement shall be 75mm unless
otherwise specifide.
(7) All reinforcement shall be tor steel confirming to IS 1786-1979.
(8) The lap/anchorage length shall be as per IS 456-1978.
(9) Reinforcement shall be bent and fixed in accordance to
procedure specifide in IS 2502-1963.
(10) Adequated no.of dowel bars shall be provieded in first stage
concrete for effective bond in two different construction
material layers.
(11) All foundation excavation,stripping,trimming operations shall
conform to standard specifications and procedures.
(12) The road bridge/Road top has been kept at EL 435.60m to
match local adjoining road.
(13) Service gate hoist,hoist bridge,stop log,hoist,gantry details
are tentative and have to be suitabily modified as per actual
requirement.
(14) Distance of groove embeded parts and second stage concreting
are not shown in details and indicative and tentative.
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
BARRAGE ANDINTAKE WELL AT 3.60MLDWATER SUPPLY
DRG.NO:
AT INDUSTRIAL AREA MEGHNAGAR, DIST J HABUA, M.P.
M.P. AUDYOGIK KENDRA VIKASNIGAM (INDORE) LTD.
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/ESR/02/11
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 175
Final Project Report For Meghnagar Water Supply
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
INTAKE WELL FOR WATER SUPPLY PROJ ECT
DRG.NO:
AT INDUSTRIAL AREA MEGHNAGAR, DIST KARGAON M.P.
M.P. AUDYOGIK KENDRA VIKASNIGAM (INDORE) LTD.
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/INTAKE WELL/15/13
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 176
Final Project Report For Meghnagar Water Supply
W
D1
W
EARTH FILLING
G.L. R
A
M
P
C.C. 1:2:4 FLOORING
10 Cm Th.
SECTION A - A
G.L.
BEAM 350x500
PLINTH BEAM
350x500
Y Y
K K
FOUNDATION PLAN
P
B
-
1
P
B
-
1
P
B
-
1
P
B
-
1
PB-2
PB-2
PB-2
PLINTH BEAM DETAIL PB-1
PLINTH BEAM DETAIL PB-2
A
A
SLAB AND BEAM AT TERRACE LVL PLAN
B
-
1
B
-
1
B
-
1
B
-
1
B-2
B-2
B-2
A
A
BEAM DETAIL B-1
BEAM DETAIL B-2
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
DRG.NO:
PUMP HOUSE
M.P. AUDYOGIK KENDRA VIKAS NIGAM (INDORE) LTD.
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
Consultant:
MINI RATNA
WAPCOS/02/12
3.60MLD MEGHNAGAR WATER SUPPLY
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 177
Final Project Report For Meghnagar Water Supply
N
A
.
B

R
O
A
D
10
1
2
3 4 5 6
7
8
9
10
11 12
13
14
15
16
17
19
20
21
22
24
23
25
Consultants
3.60 MLD MEGHNAGAR WATER SUPPLY
MINI RATNA
Project
Title
Client
W A P C O S (I) LTD.
( A GOVT. OF INDIA UNDERTAKING)
DISTRIBUTION SYSTEM
M.P. AKVN (INDORE)
ESR
Height: 12.0 m
Proposed Underground sump of 6.00 lac litres
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 178
Final Project Report For Meghnagar Water Supply
Consultant :-
DPR FOR MEGHNAGAR I/A
DIST:- J HABUA STATE:- M.P.
Project
Title
Client
WAPCOS LIMITED
( A GOVT. OF INDIA UNDERTAKING)
FLOW DIAGRAM
M.P. AKVN (INDORE) LTD.
3.60 MLD WATER SUPPLY PROJECT AT INDUSTRIAL AREA MEGHNAGAR 179
Final Project Report For Meghnagar Water Supply

S-ar putea să vă placă și