Date January 16,2010
Ref # FWZ/2851/1O
To M/s. Advanced Vision Co.
Attn Mr. Satish K. Gupta
Sub Cooling Towers for Jabal Omar Project - Makkah
Sir,
Reference to the above subject and your revised enquiry for Cooling Tower, we are
pleased to submit our technical offer as follows : -
Shinwa Counter Flow (SCC) Design Cooling Tower ( Design # TEC07-10-005,006)
HDG steel structure &FRP panels, FRP water basin.
SCC-4800ABT ( 1 cell )
Capacity 30267 KW
In-Oct-WB 42.8-35.0-30.0 deg C
water flow rate 55620 l/min ( 927 I/s )
Dimension L 12400 X W 12000 X H9600 + h 2600 mm
Case-] 3 sets join L 12400 XW 36400 X H9600 + h 2600 mm
Case-2 2 sets join L 12400 X W 24400 X H9600 + h 2600 mm
Motor 150 kw, 4P. 480V/60 HZ Xl
Fan 7030 mm dia ( 9 blades) X 1 c/w shaft drive
Quantity 8 sets
Remarks: -
1] Ebara Shinwa's standard design & material specification
2] Scope of supply: -
A] Cooling Tower design & manufacturing
B) Supply, delivery and transportation to Jeddah international seaport by
container for all of cooling tower parts include fan drive ( fan, gear drive,
shaft motor etc. j, structure frame work, fan cylinder. in-fills, ladder and
assembly bolts & nuts.
2] Out of scope: -
a] cooling tower and it's related site assembly work and commissioning
assernbly men power for only reference ( approx ) 8 men x 40 days/set X8
= 2560 rnen day.
B] supervising fees for assembly work and cornmissioning / operation.
( however, we can prepare to send one engineer with the following
conditions: -
HEAD OFFICE DAMMAM JUBAIL ALHASSA RIYADH TAKHASUSSI MAKKAH MEDINAH YANBU
AI-Khobar P.O. Box 1189 P.O. Box 8S123
P.O. Box 1189 Tel:. 03-8598666 Tel:. 03-3614203 Tel:. 03-5863400 Tel:. 01-4794499 Tel:. 01-4617584 Tel:. 02-5470954 Tel:. 04-8382475 Tel:. 04-3905877
Tel:. 03-8952323 Fax:. 03-8598510 Fax:. 033614203 Fax:. 035863400 Fax:. 01-4785354 Fax:. 01-4617584 Fax:. 025490642 Fax:. 04-8382560 Fax:. 04-3905877
Fax:. 03-8949076
JPYEN 80,000/- per one engineer/day, airfare, hotel accommodation,
meals (to be discussed later).
C] Foundation
DJ Electric wiring & piping work out side of towers
3J Delivery time: 10 months ex-factory.
Best Regards,
Faisal Ali
Division Sales Manager
Mobile # 0505599133
TEC07-10-005
, Cooling Tower Design Specifications
MODEL SCC-4800ABT x 2
JABAL OMAR DEVELOPMENT
2010. 1. 15
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
Kikuchi Ihaya Ihaya
/ COOLING TOWER DESIGN SPECIFICATION

COOlING TOWER
/ FOR CONTRACTOR Doc. No, TEC07-10-005
DATE 2010. 1. 15
iIIJ{'l;:fflJt / FOR ;flI1'<t1litt fr!iJ{V:'---ry
/ EBARA SHINWA LTD.
JABAL OMAR DEVELOPMENT
ll1lJll,l', il'<1lE/APPROVED I lIlIJIt/CHECKED
l'FgJ(/DRAWN
Iil>ilJ1HI'1';: / COOLING TOWER MODEL
I
SCC-4800ABT X2
I
I Mechanical draft counter flow type Ihara Ih"ra Komori
/ Design condition
/ Capaci ty (kW) j 60535 / Evaporation loss (%)
,
1. 30
,
/ Water flow (L!min)l 111240 I Drift loss (%)
,
0.02
,

At:lf1il!.OC / Inlet Temp, ("c)


,
42.8 / Seismic
,

,
ttl OmJ.& / Outlet Temp. ("c)
,
35 I Horizontal (m/5
2
) !
,
3.92 ,
/ w. B. ("c)
,
30 J'dJa / Vertical (m/5
2
) i 1. 96

/ Dimension detail I Wind load (mls) i 60


* / Length: L
(mm)
,
12400 I Tower pump head (m)
,
10 (EL+)
, ,
* I Length: Lj (mm)
,
/ Noise level (dB[A]) : 812 ,
*g I Wide ,W (mm)
,
24400 1II!iJVII (m) EL+1. 5(m)
,
, ,
IEJ I Height: H (mm)
,
9600 , ,
I Fan casing height; h (mm)
,
2600
,
, ,
I Overall height: HT (mm) 12200 I Piping size :4-500(A)

I Number of cell
( )
i
2
,
,
,
I Shipping weight (kg)
,
131000 I Code Standard iJIS
,
I Operating weight
(kg)
,
231000 !Manufacturer std.
,

I Mechanical equipment / Material of construction


I Drive method IShaft drive I Structure HOG. STEEL*"
I Motor 71-1ll!/:t!i I Side panel FRP
%)0\': I Type r,ijJj1!'1-!'I-", / TEFC tttu:t!i I Partition FRP
:<:E:t&tl:1.1J, I Rated out put, Pole 150 kW 6P I Fan deck HDG. STEEL""
Vol t, Cycle, Phase 480 V 60 Hz 3 Phas !It-I'' - I Louver FRP
I Protection IPS5 'IiS,Ut / Fill PVC
i*J!W!t I Fan :r.9 Jj I Eliminator PVC
I Model 7030-9-36N/Gl.5T I Fan casing HOG. STEEL""
I Type flbmcm AXIAL / Distribution header HOG. STEEL""
11"1"t! I Material 7"=9
1 Aluminium no' J\! I Nozzle
paM
I[f I diameter
(mm)
,
7030 I Branch Pipes PVC ,
I Number of blade
( )
i
9 I Cold water basin FRP
,
[]4'i:J& I Fan speed (min-
l
)! 126 / Suction tank HDG. STEEL""
I Reducer I strainer HOG. STEEL""
1':1)0\': I Model SFC-60-9 I Lower frame HDG. STEEL""
iI;\,m
I Ratio
9.176 : 1
t-t' 'A77?lJ I SF 2.00 I Assembly Bolts,nuts St. STEEL
I Coupling / Anchor Bolts, nuts St. STEEL
I Model AS-45NN-85/60-3235
I Type Form Flex Coupling

Non-lubricated type St. STEEL: AT/vAm (SIlS301) Stainress steel
tift I Material 5U5304,316,630 DG STEEL' mi12i11'O',i/i)..., '" li'l (]IS HDZ45) Hot dip galvanize
lIOM / REMARKS !ftMi&. / Accessories
55620Llmin/cell Staircase (HoG Steel)
*HDG STEEL+Epoxy Paint
Hand rail (HOG Steel)
Lubricant Oil &Grease for Motor &Reduction Gear
(for initial fill)
/ Spare parts
24400

OI$CRIPT1ON MiHERtAL
I
Q' t Y I REMARKS I
1Il0TOR
'FAN 'AlUMINIUM
'FAN CASING SS
T
2 THOT DIP GUV.
-GEAR REDUCER
'SHAFT -SUS
SPRAY NOZZLE POM 2uI
T,OP PLATE
,
.. 2s'O t I HOT DIP GALV.
'SIOE PANEL 'FR? 20 'de
PARTITION -FRP
,
'LOUVER HP 2! 'de
HANORA I L '55, STK 1 9!1 THOi alP GAlV.
-SUCTION TANK SS 4 I 1I0T DIP GAlV.
WATER BASIN FRP
WATER BASIN FRAME SS
,
2 I HOT DIP GALV.
'*
"
"
"
"
No
i ' ,
-i---
J
,-
+
I _ ~
I' 'I
.1 I 'I I , 'I I I I
o
o
I', "00 , 10'00,1, '000 ,bJ, 0700 J
r
l ~
fi
WATER INLET 4-500,01.
WATER OUTLET 4-500,01.
12
109 II goOD:: I2'000; Ilooo:: IfOOD: 11
000
:: IJOOO;: IJOOO:: 11
000
:: I I ~ o O 109 111000:: IJOOO; I1
000
; I]ODD:: 1120

~
Itit"li 1iJjj{ ~ :" 'J
TEC07-10-00S
TEC07-10-006
Cooling Tower Design Specificat.ions
MODEL SCC-4800ABT X 3
JABAL OMAR DEVELOPMENT
2010. 1. 15
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
Kikuchi Ihara Ihara
I COOLING TOWER DESIGN SPECIFICATION

EiIAilA

COOUNG TOWER
/ FOR CONTRACTOR Doc. No, TEC07-10-006
Ill:
DATE 2010. 1. 15
/ FOR j}Jj(::'--:-''7 / EBARA SHINWA LTD.
JABAL OMAR DEVELOPMENT
Ill: _JfH"1l *Ml/APPROVED I If!IJ!</CHECKED tFl'lt/DRAWN
I COOLING roWER MODEL SCC-4800ABT x3
I
I Mechanical draft counter flow type
Kikuchi Ihara Ihara Komori
!Desigri coridition
I Capacity (kW)
,
90803 / Evaporation loss (%)
,
1. 30

{lBreJf<. I Water flow (L/min)! 166860 1ffi7*m$lc / Drift loss (%)
:
0.02

A (:l t1iil.1t ! Inlet Temp. ("CJ


,
42.8 I Seismic
,
, ,
til 0 ra!.f / Outlet Temp. ("CJ
,
35 / Horizontal (m/5
2
) ! 3.92
,
,
1ll.,*1!l.1lt / w. B.
(OC)
,
30 i'aI[ / Vertical (m/5
2
) : 1. 96
,
! Dimension detail IOO.Jm / Wind load (m/s) I 60
I Length: L (rom)
,
12400 I Tower pump head (m)
,
10 (EL+)

,
:[ I Length: LI (rom)
,
I Noise level (dB[A]): 822 ,
I Wide
:W (rom)
,
36400 1lI!1JIIl(m) , EL+1. 5(m)
,
, ,
rEi I Height: H (mm)
,
9600
,

,
77,/!J-';'/1j'rl'il I Fan casing height: h (mm)
,
2600
,
, ,
I Overall height: HT (rom)
,
12200 I Piping size :6-500 (A) ,
I Number of cell (-)
i
3
i
,
,

I Shipping weight (kg)


I
195000 m.ft I Code Standard HIS ,
I Operating weight (kg)

345000 :Manufacturer std.
,
/ Mechanical equipment / Material of construction
I Drive method drive I Structure HDG. STEEL*
f4!!lttJt!.l I Motor 9f.iltIJ-tii I Side panel FRP
I Type 1':1'I1)l;;'\.;'\.!il / TEFC ttto-tii I Partition FRP
iE.ftIl.1J, mii& I Rated out put. Pole 150 kW 6 P ::Rt.& I Fan deck HDG.STEEL*
Volt, Cycle, Phase 480 V 60 Hz 3 Phas
- I Louver FRP
I Protection IP55 J'f"'t;! / Fill
PVC
Ji$ffi.lmt '/ 'Farl I ElimInator PVC
/ Model 7030-9-36N/Gl.5T / Fan casing HDG. STEEL",
/ Type AXIAL I Distribution header HDG. STEEL*
f.1jt I Material 7',*,
Aluminium )7,:}V / Nozzle POM
I diameter (mm) 7030 I Branch Pipes PVC

I Number of blade (-)


,
9 / Cold water basin FRP
,
/ Fan speed (min-I): 126 / Suction tank
HDG. STEEL",
I Reducer I strainer HOG. STEEL",
/ Model
SFC-60-9 I Lower frame HOG. STEEL",
ilJOittl I Ratio
9.176:1
t-l:' I SF 2. 00 m:ftit' t, I Assembly Bol ts, nuts St. STEEL
J:j:lFEl'JliIIJ I Coupling / Anchor Bolts,nuts St. STEEL
/ Model A5 45NN-85/60 3235
/ Type Form Flex Coupling
mi**nlllli!
Non lubricated type St. STEEL: xt,/jlXWi (SUS304) StClinress steel
1-j1f I Material SUS304,316,630 ""G HOZ45) Hot dip galvanize
1Ii'll! / REMARKS / Accessories
55620L/min/cell StaircQDo (HOG Steel)
STEEL+Epoxy Paint
Hand rai I (HDG Steel)
Lubricant Oil &Grease for Motor &Reduction Gear
(for initial fill)
7-mi& / Spare parts
*
gg
,
*
g
, g
g
0 0 0 ;;

0
. .

. .
.. : .
-
-
. .
"
-- -
-

'0
-f----
!
, I
----r---l-
,
'_:,"'..;-'
. ,
-I . ' , ,
,
-- L. _ 1___ _ __
: .L.
--I - 1
, I I
-- --j--r--
J
--'I',
"'__ oa
rt- ootz I
'"
o
o
"
<
Don
006t
0096
oos
Door
<
,
0"
00'
o
o
o
o
o
o
,
o
,
,
o
o
"
"
..
SHINWA HIGH CAPACITY
SL . .COOLING TOWER
C...SS Flow model
Slf'Dng,'
"
R
"'"

_0 '"
.:'
.')
Big radIus fan
Mede Irom FRPmalerlal.

Gear reducer
quality
Lower waler tank frt>i'n FRP tlCcetlanl

LouYlIr Not only prellel)ttng WlII&r bUlalao beautiM .


",
eElImlnalor
. Preventing wa!lIr m.ade (rom PVC.
, .. _" - -.- '. ..
tank and sprlrJlde equipment
. couble lr.IeIJf
llnll. Il'Jl;I Sll'111de IMQS lhe tower

We help in creating amenity environment both
for district air and heat center and industrial factory
Cross flow type
Wann water that flows back to cooling tower
will naturally flows from upper warm water tank
to the fill material parts by sprinkle. This warm
water wfll contact at right angle with the air which
is suck in by a fan through louver. Part of the water
will evaporate and loss its lateJ:}t heat. The water
which is cool down in this way will again be supplied
to each equipment from the lower part of cooling
tower. Wann air will flow up and out to the atmosphere
by the fan.
4. It Is ease to be used as a district air and
heat center or industrial factory cooling tower.
3. When equip with adry resin heat exchanger
in the tower enable it to act as an auto smoke
preventing tower.
2. Succeed In new design make the equipment'
lighter, t:esln Is used In some parts including
anti rust treatment making the life last longer.
Distinctive features
1. By using newly developed fill material,
which Is a life of a cooling tower,in this model
process water volume increase dramatically
and equipment space is also reducing.
'''''.'.-,
,_..."---,... .. ...
. ...

Mede of PVCfor streDglh end'
_Louver
Made,ol FRP. special elr Inlet design t1ueureelhe unit the
water QUlsld.e
Motor &Coupling
Highly flft'io::\ent rnotDrwlth simple construellon coupling yet
high enwre ,eltebUity end long lIle.
Eliminator i
Made 01 PVC. designed 10 reduce weIer splashing. I
Ills an opllon In this des1gn.


! The outer cuiqg

Spallydmgll8dwftll gear pa,rb.
Less resources, Ie. ss 10.w..maintenance,
Shinwa thinks everybody.
Watering & FlU
Nozzle made of Polyesler Resin, which was designed and
develC>ped to a>:ellenl performance whkh gives the
constant we!ef:spray and requires lower preltlwe fCH'Ce.
I .
flowtyPll
Wannwaterc!l"C\.llated,back Into the e:ooling
toWer come nozZlewhich located on the top of
DFiIl
n
create the constant-cooling water f1ow.The
warm water will miXwith the counter-direction
airflowwhich was drawn by the cooli1g fan from
the lower louver. The evaported water dUring the
process takes the heat away then the coofed water
is circulated into the cool water tank in the lower
section of the tower which will be supplied to each
unit required in,the,System.
featllres
1. Space saving : unlike oonventbnal Cress-
flowtype. thaSC.cmodal does not require space
In the, fans'.eetion.
2. Cbuntet,l.Ffo'W'water and air deSign Increase
the heatoonduc)ivityeffJi:lency thus ra.duc9 the
POWe,ool)sumP!ion.
3. Fiber Relnftirced Plastic (FRP) construction
fortha. water basin part for durability and eesy
to malntanal)oe.
4. The Outer Casing material made of PVC
for durability yet enhances the appeefing exterior
look.
5. Partect for Industrial factol)' and District
air and Heat center system;
JABAL OMAR DEVElOPMENT PROJECT
SECTION 15640 - PACKAGED COOLING TOWERS" COMPLIANCE STATEMENT"
SPECIFICATIONS COMPLIANCE
1.2 SUMMARY
A. This section includes factory fabricated, mechanical draft
coolina towers OK
1.3 DESIGN CRITERIA:
A. Free water drift loss shall not be greater than five hundredths
of one percent of the water circulated to tower. OK
B. Cooling tower selection and sizing shall be based on listed WB :30DEGC
ASHRAE design ambient temperature.
C. Sound levels at 15 meters [ fifty feet) in any direction from OK- BELOW
the tower shall not exceed 90 dB(A). Provide sound 90 DIA B[A)
attenuators if necessary to meet the noise criteria.
D. Performance criteria:
1. Cooling tower institute (CFI) certified towers: These towers JCL.
shall have been tested, rated, and certified in Certification
accordance with cooling tower institute (CTI) standard label
201, and shall bear the CTI certification label, and shall be
listed in the CTI directory of certified cooling tower models
by manufacturers.
E. Exposed moving parts, parts that produce high operating Safety device
temperature, parts which may be electrically energized, provided
and parts that may be a hazard to operating personnel (details to be
shall be insulated, fully enclosed guarded, or fitted with considered)
other types of safety devices. Safety devices shall be
installed so that proper operation of equipment is not
according to
impaired. Welding and cutting safety requirements shall Japanese
be in accordance with AWS Z49.1 .
Standard
1.4 SUBMITIALS
A.
Product Data: Include rated capacities, pressure drop, fan
performance, sound level rating, rating curves with selected Refer to our
points indicated, startup instructions, furnished specialties, Attachment
and accessories for each model indicated.
1. Sample Warranty: Copy of manufacturer's proposed
Warranty
warranty, stating obligations, remedies, limitations, and
Draft no ESS-
exclusions.
001
B.
Shop drawings: Certified by a qualified professional
Refer to
engineer. Detail equipment assemblies and indicate
Attachment
dimensions, weights, loads, required clearances, method of
(TEC07-10-006
field assembly, components, and location and size of each
& TEC07-10-
field connection.
005)
1. Design Calculations: Calculate requirements for selection
isolators and seismic restraints and for designing vibration
isolation bases.
2. VIBRATION Isolation Base Details: Detail fabrication, Vibration
including anchorages and attachments to structure and isolator to be
to Supported equipment. optional item
3. Wiring Diagrams: Detail wiring for power, signal, and
control systems and differentiate between manufacture
installed and field installed wiring. To be
discussed, but
C. Coordination Drawing: Show structural supports, piping Control system
roughing-in requirements, wiring roughing-in requirements [ By others
determine spaces reserved for electrical equipment), and
access requirements for service and maintenance.
D. Product Certificates: Signed by manufacturers of cooling OK, to be
towers to include certified pertormance curves plotting submitted
leaving-water temperature against wet-bulb-temperature. later.
E. Field test and commissioning reports: As specified in " Field Refer no.
Quality Control' and" Commissioning" Articles in part 3 of ESS-002
the section. Indicate and interpret test results for
compliance with performance requirements.
F.
Maintenance Agreement: As specified in this section
G. Maintenance Data: For each cooling tower to include in
To be supplied
maintenance manuals specified in Division 1. Include part
With the unit
lists for tower fill, water distribution system, fans, bearings, fan
drives, vibration isolators, controls, basin heaters, and
accessories.
H. Warranties: Warranties specified in this section.
OK-to be
SUbmitted
Manufacturer's certification: certify cooling tower's thermal
later
Performance according to CTI 201.
to be
Electrical components, devices, and accessories, listed and
SUbmitted later
labeled as defined in NFPA 70, article 100, by a testing
-drive fan
agency acceptable to engineer.
-gear reducer
-shaft coupling
-vibration
Switch model
1500A.
[ motor
drawing shall
be sent later)
1.5 QUALITY ASSURANCE
A. Manufacturer's Certificafion : Certify cooling tower's thermal JIS8609
performance according to CTI 201.
B. Electrical Components, Devices, and accessories: Listed
and labeled as defined in NFPA 70, Article 100, by a testing
aqency acceptable to enqineer.
1.6 WARRANTY
A. Manutacturer's warranty: Provide written warranty, signed
by manufacturer agreeing to repair or replace components
oK
at packaged cooling towers that fail in materials or
workmanship within specified warranty period.
B. Warranty period: one year from date of substantial
completion.
1.7 MAINTENANCE SERVICE
A. Maintenance: submit four copies of manufacturer's"
Agreement for continue service and maintenance ", before
substantial completion, for employer's acceptance. Offer
terms and conditions for furnishing consumables and
providing continued testing, maintenance and servicing to
include replacing materials and components. Include one-
year term of agreement, commencing at date of substantial
completion, with option for one-year renewal.
1.8 COORDINATION
A. Coordinate size and location of concrete bases. Cast Drawing of
anchor bolt inserts into bases. Concrete, reinforcement, and Concrete
Formwork requirements are specified in division 3, section" foundation
Cast-in-place Concrete ". base shall be
submitted later
B. Coordinate installation of roof curbs, equipment supports,
and roof penetrations. These items are specified in division 7
Section" Roof Accessories".
1.9 DELIVERY, STORAGE, AND HANDLING
Deliver cooling tower as a factory-assembled unit with To be
protective creating covering.
discussed later
Stage as the
Rig units for unloading and moving as recommended by
cooling tower
equipment manufacturer.
shall be
delivered in
CKD&
assemble at
site.
PART 2 - PRODUCTS
2.1
MANUFACTURERS
A Materials and equipment shall be standard products of a To be
manufacturer regularly engaged in the manufacturing of discussed
such products, which are of a similar material, design and
workmanship. The standard products shall have been in
satisfactory commercial or industrial use for 5 years prior to
Bid opening. The 5 year use shall include applications of
equipment and materials under similar circumstances and of
similar size. The 5 years experience shall be satisfactorily
completed by a product that has been sold or is offered for
sales on the commercial market through advertisements,
manufacturer's catalogues, or brochures. Products having
less than a 5 year field service record shall not be
acceptable. Products shall be supported by a service
organization. System components shall be environmentally
Suitable for the indicated locations.
B Available manufacturers: Subject to compliance with
requirements, manufacturers offering products that may be
incorporated into the work include, but are not limited to the
following:
1] Balimore Aircoil CO.
2J Ceramic Cooling Tower Co; an affiliated company of Ebara Shinwa
Baltimore company. Ltd., Japan
3] Evapco Inc. (Shinwa
4] Marley Cooling Tower Co. Cooling
51 Thermal Care I Maver Towers)
2.4 INDUCED DRAFT, COUNTERFLOW COOLING TOWERS
Description: Induced-draft, counter-flow cooling tower that
Is factory fabricated and assembled.
FAN:
1] Cast aluminum, propeller with maximum tip speed of 55 OK
meter per second (ll ,000 fpm), fan blade assembly shall 52.6 MIS
be both statically and dynamically balanced after
assembly of the cooling tower.
2] Fan hub shall be constructed of cast aluminum with HDG Steel
adequate surface protection against corrosion.
3J
Complete fan assembly (fan & mounting) shall be
designed to give maximum fan efficiency and long life OK
when handlinq saturated air at hiqh velocities.
4] Each cooling tower fan shall be provided with a ball and
pedestal type vibration limit switch, which shall stop the OK
corresponding fan motor in the event of sensing
excessive fan vibration.
5] Tower fan for induced draft towers of 350 kw [100 tons) Not apply
And less shall be belt driven.
6] For induced draft towers larger than 350 kw (100 tons), OK
Fan shall be driven through gear reducer.
C. Fan: ABS plastic, propeller:
1] Drive: Gear, with speed reducer
2] Drive: Belt
3] Bearing: Self-aligning ball bearing or bronze sleeve
bearings Not apply
4] Vibration cutout switch: De-energize fan motors if
excessive vibration occurs.
5] Protective cladding: Fiber glass reinforced, chemical
resistant, air-leak proof plastic panels, attached to
structure with galvanized steel fasteners.
D. Speed Reducers Gears and Drive Shaft :
Ok, but oil
level sight
1] Speed reducer gears shall be rated in accordance with glass without
CTI Std-1I1.
Level switch
2] Gear reducers shall be of the spiral or helical. double
Reduction type, reducer shall be mounted in
accordance with manufacturer's recommendations.
Each reducer shall be provided with an oil level cutoff
switch interlocked to the fan motor. Each reducer shall OK
be prOVided with an oil level sight glass, fill, drain, and
event lines located in a readily accessible position.
3]
Drive shafts shall be the full floating type with flexible
Couplings at both ends and have a service factor of
1.0 or greater. Drive shafts shall be of stainless steel, fitted
each end with flexible coupling (st. steel plate type).
Each drive shaft shall be provided with a galvanized steel OK
guard, to prevent damage to surrounding equipment in
case of shaft failure. Provision shall be made for
lubrication of all bearings. Bearings shall be accessible to
the extent that each bearing can be lubricated without
dismantling fan.
4] Gear reducer drive: Specially designed for cooling tower
operation, with dynamically balanced drive shaft
assembly or shock absorbent flexible coupling requiring
OK
no lubrication, cast iron case with readily accessible oil
drum and fill. and self-contained oil reservoir sealed
against water entrance.
E. Fan Deck and Cylinder:
1] Each fan shall be mounted in a cylinder (or stack) to
OK
Elevate fhe fan discharge air. Tofal exfension heighf shall
Not exceed fhe fan diamefer.
2] Each fan cylinder shall be provided with a PVC coaled
HOG steel fan
steel 2.75 mm (12 gage) wire mesh securely mounted to
Guard to be
the top of the cylinder in accordance with optional
manufacturer's recommendations.
3] Fan decks shall be designed to withstand a live load of OK
not less than 2.9 kpa (60 pst) in addition to the
concentrated or distributed loads of equipment mounted
on the fan decks.
4] Fan deck shall be consfructed of FRP (fiber reinforced HOG sfeel (FRP
polymer) material, in mUltiple secfions, forming a as option)
complete, vibration-free base for mounfing fan, speed
reducer, drive, shaft, mofor and fan stacks. Fan cylinders
(or stacks) shall be constructed of precast, reinforced light
Weight concrefe in mulfiple sections, constrained wifh
bands of sinc-coafed steel conforming to ASTM A 1231A
123M, not less than 3 x 75 mm (118 X3 inches), and bolted
To form a compressive load on stack perimeter. Fan
cylinder shall be secured in place on the fan deck with
class A mofor.
Hof water distribution system: Water distribution shall be Sprinkler piping
gravity-flow type sysfem fhat distribufes waters evenly over Sysfem clw
the enfire fill surface. Each tower cell shall be designed so Supply nozzle
thaf a water flow of 140 percent capacity will nof cause
overflowing or splashing. The distribution system for each cell
shall include adjusfable flow control. The enfire disfribution
system shall be self-draining and non-clogging.
Main header:
1] Pipe material: schedule 40 PVC HOG sf. pipe
2] Pipe maferial : stainless steel Br.pipe:PVC 40
3] Nozzles: Removable plasfic, brass or ceramic nozzle ROM material
4] Maximum pressure drop: 83 kpa (12 psig) OK
5] Gravify flow system: system shall be prOVided with open Not apply as
Basins which include a splash box or baffles to minimize Using sprinker
splashing of incoming hot water and holes that evenly Piping system
distribute the water over the entire decking area. Holes For counter-
used in a water basin shall be provided with ceramic or flow
plastic orifice inserts.
6] Basin cover: Hot water distribution basins shall be Not apply as
provided with the tower manufacturer's standard Counter-flow
removable (zinc coated steel) (stainless steel) (FRP)
covers shall be prevent airborne debris from enfering the
basin.
G Casing: Hot dip galv. Steel with corrosion resistant polymer Not apply as
coatinQ. it's in FRP
H Casing: Gaiv. Steel compiying with ASTM A 653/A 653M,
Not apply as
Z600 1(;2101 coatina desianation.
its in FRP
I Casing: Fiber glass reinforced polyester with UV inhibitors:
OK- FRP
cvlindricallv formed with bolted sections.
J Casing: stainless steel
1] Fasteners: corrosion resistance equal to or better than
Not apply as
the materials being fastened.
it's FRP
2] Joints: Scaled water-tight
3] Welded connections: continuous and water-tight
4] Rigging supports: For handling cooling towers at
construction site.
K Collecting Basin: Galv. Steei complying with ASTM A 653/ A
Not apply.
653M, Z600 iG2101 coatina desianation.
Material
L Collecting Basin: Hot drip galv. Steel with corrosion resistant cold water
nolvmer coatinn. basin = FRP
M Collecting Basin: Fiber glass reinforced plastic with integral Suction Basin:
sump and mounting feet. with openings for supply water, HDG steel
return water with strainer, overflow, makeup water, and C/W basin
drain. frame
Supporting wor
- HDG steel
N Collection basin: Stainless steel
1] Removable strainer with openings smaller than nozzle
Orifices
2] Overflow connection
3] Makeup water connection Not apply
4] Depressed center
5] Drain connection: side
6) Anti-vortex side outlet, depressed sump
7i Plenum located, leak-oroof access door
0 Fill Material: PVC: resistant to rot, decay, and biological
attacks, with maximum flame-spread rating of five OK
according to ASTM E84 : and fabricated, formed, and
installed by manufacturer to ensure that water breakers up
Into droolets.
P Fill Material: CPVC; resistant to rot, decay, and biological
attack: with maximum flame spread rating of five according Not apply
to ASTM E84.
Q
Fill Material: Fiber glass reinforced plastic; resistant to rot, Notapply
decaY, and bioloaical attack.
R Drift-eliminator material; Eliminators shall be provided in the
tower outlet to limit drift ioss to not over ( 0.02) [0.005)
percent of the circuiating water rate. Eliminators shall be Ok
constructed or not less than 10 mm (3/8 inch) PVC; resistant
to rot, decay and biological attack, with maximum flame
smead ratina of five accordina to ASTM E84.
S Drift Eliminator material: stainless steel Not applv
T Louver material: fiberalass reinforced plastic OK
U Louver material: stainless steel Not applv
V Louver material: PVC; resistant to rot. decay and biological
attack, with maximum flame spread rating of five according Not apply
to ASTM E84. Provide 25.4 mm [one inch) hot dip galvanized
steel or conner air-inlet screens. Attach screen securelv to
air-intakes.
W Water-Level control: Manufacturer's standard mechanical OK
makeup water valve, and plastic or bronze float with an
adiustable Iinkaqe.
X Water-Level control: Electric float switch and solenoid Not apply
ooerated, makeuo water valve.
y
Ladder, Safety cage and handrails: factory fabricated and HDG steel
supplied, for field assembly and installation. Ladders ladder
installed inside the cooling tower basin shall be of stainless
steel construction.
Z Fixing hardware used inside the cooling towers shall be in Assembly bolts
stainless steel. & nuts to be sl.
steel
EBARASHINWALTD.
8-2-16 Ohmori kita, Ohta-ku, 'lbkyo 148-0016, Japan
Phone: 81-8-6384-8800
Fax 81-8-5488'0630
WARRANTY
SHINWA Cooling 1bwers
S I ~ l n W R
COOLING TOWER
EBARA SAHINWA LTD., warrants products to be fi:ee trom factoJ;Y def8cts both in
I11B.terial and workmanship UIlder normal use and service ibr a period of 18 months
trom date of Shipment and/or 12monthstrominstallation date whichever comes first
Our obligetion sha11 be limited to the repair or replacement of parts, based on
Ex-iilctmy which may prove detective under normal use and service during the warranty
period and confirmed by our examination that they are defective.
The w8lTanty will be nuD and void should the product be used in any application
not approved by EBARA SHINWA LTD. This war.rnnty sha11 not apply to any parts
which has been subject to accident, alteration, abuse, misuse, damage by Rood, fire or
Act of God or where the product has been improperly instslled, maintained or subject
to improper water treatment or other system additives.
EBARA SHINWA LTD sha11 not be liable ibr service, labour or transportation charge or
for damages for delay caused by defective material or workmanship or ibr personal
injuries or damage to property caused directly or indirectly by aDY EBARA SHINWA
Product or its use of operation.
The above war.rnnties are in lieu of a11 other w8lTanties expressed or implied.
No representative or other person is authorized or permitted to make 8Jly wazrnnty or
assume for us any liability not strictly in accordance with the foregoing.
In the C8$e of components purchased by EBARA SHINWA LTD., such as controls, mottn;
etc., the W8.lTanty of that manufacture will be expected to the pWYJhaser in lieu of 8Jly
war.rnnty by us.
Faith1iJlly l&urs
Ebara Shinwa Ltd.
S.Suzuki,
GeneralM8JJB.ger
Overseas SalesDept.
., ."
COOLING TOWER
PERFORMANOE TEST
MEASUREMENT PROCEDURE
J
Feb. 2001
EBARA SHINWA LTD.
.... ,';
1. Scope of application
This regulation is provided for the performance test procedure and judgement for induced
draft; crossflow type cooling towers installed at site.
2. Cooling tower circulating water system drawing
. .'
,------
I '
It,
I ., I
I ~ I
I . ~ I
I " I
I
L I
(
)0
o
3. Test/measurement condition
a) Cooling tower nshould be operated at design conditions (inlet/water
/hz) especially; circulating water flow rate should be kept within
water flow rate
flow rate/voltage
20% of design
b) Inlet water temp. should be kept within at design inlet water temp.
c) preliminary operation is needed before start testing to be water stream in the fills
stable/constantly
4. Measurement
4-1 Measuring item
(1) circulating water temp. (lnlet/outlet water temp.)
(2) wet bulb temp. (WB) at air inlet
(3) circulating water flow rate
1/3
EBARA SIITNWA LTD.
4-2 measuring instrument
(1) circulating water temp.
glass stick fluid type thermometer accuracy O.1 "C
(2) wet bulb temp. at air inlet (outside wet bulb temp.)
......... -.- . -accuracy
4-3 measurement procedure
(1) inlet water temp. measurement
Start measuring of inlet/outlet water temp. after inlet water temp. is stable/constant
Reading. every l(one) minute and 10(ten) times continuously.
(2) WB temp. at air inlet
measuring WB temp. at air inlet louver face at the same time as measuring of
inlet/outlet water temp measuring
(3) circulating water flow rate.
Reading water flow rate from the flow meter which is installed in the piping line.
If not installed, measuring water pressure from the pump infout pressure with pressure
gage and reading water flow rate from pump performance curve.
Note. Allowance fluctuation
Inlet water temp.
Outside WB temp
value at normal
OA "C
l.O "C
operation
in case of excessive fluctuation of these value then measuring value is
considered as reference on).y
2/3
EBARA SIDNWA LTD.
: ;
5. Evaluation of performance
Calculate average value of each measuring value and then reading range (difference of
inlet-outlet water temp) from cooling tower performance curve against WB temp and
inlet water temp. at water flow rate actual measured. Then, calculate ratio between
range on cooling tower performance ctL-rveand range actual measured.
: :
/'
Perfurmance =
Range actual measured
Range on performance curve
(In theory)
x 100 (%)
=
Inlet water temp.
actual measured
Inlet water temp.
actual measured
outlet water temp.
actual measured
outlet water temp.
on performance cu..-ve
(In theory)
x 100 (%)
Judgement
For the evaluation ofperformance, performance value should be 95 % and above.
3/3
EBARA SIDNWA LTD.
COOLING TOWER OPERATION AND MAINTENANCE MANUAL
EBARA SHINWA LTD.
I &. CAUTION
Read this operation and maintenance manual before performing operation,
and o the cooling
Carefully store this manual so t.hai: it can be to at any time ti'han
performing operation
1
n\.aintananoa. and. inspection of t:he e:oQling tower.
teo a1.l who oarry out equipment worl<)
Be SUre to hand over this manua.1 t.Q the Olotet:.omer who perform ope;t;ation
t
maintenance and inspection of the cooling tower.
10 the oustomeJ:!
Be sure to hail.d over this manual to the person in charge of operation,
maintenance and inspection or the cooling tower if changed.
...
,
1.
2.
3.
4.
5.
6.
7.
Cont.ents
Product specifications
1-1 Tower body
1-2 Upper distribution basin
1-3 Louvers
1-4 E'illing
1-5 E'an
1-6 Speed reducer
1-7 Drive shaft
Electrical wiring
preparations for operation
3-1 Cleaning
3-2 Passing water
3-3 Inspection
Starting operation
4-1 Driving the pump
4-2 Driving the fan
Precautions in operation
5-1 performance
5-2 E'unction
Maintenance and control
6-1 Drive section
6-2 Upper distribution basins
6-3 E'an
6-4 FUling
6-5 Eliminator
6-6 Casing and louvers
6-7 Casing framework
6-8 Circulating water
6-9 Water quality control
Troubleshooting
7-1 Cooling tower body
7-2 Drive section
1
1
1
1
2
2
2
2
3
4
4
4
4
7
7
7
a
8
8
9
9
10
10
10
10
11
11
11
11
15
15
16
,
Fig. 1-1 Construction of the cooling tower
111110_",",",
_.._.. _--.......,.
. ,- "'*'"
. _:'\
."
.,- -r_
.- _..-._.. _--
./0.................
/ ,
/ .
'---._--
/
. ,

.........,.. ...
--..,.........--_.
1 . Product specifications
Dtstinctivefeatures
1. SpaoeIa'Mg':unlikec:onWlllloRalCf'o55-
lbwlype.1ho $CC!'lOdoI doee/lOt
In tIla fa:uedlon..
2. CounllJr.f:IQII.;WiIIef end aIllfeslgq Int:tasc
fie IIe:Ii CllTIIfuclivIty d"od4Incylltus r..sllce Ih.-
--
3. R8Re1nl'ateedPllslli:(FRf')CDI\Iltut;tiOft
fcrlhe wa!llI'basln part fordurabilly aIlCI easy
to r'naIntenance. .
4. TheOulerCasltlgma\eriill mada 01 PVC

loot.
S. Pedec:I for JndllSlriBl faclary Md Oil;1rict
n andHnt CIl'\ta' S)'SIem.
Counterflowtype .
WarmwaterM:ullled' bade IRll)
towercome nomo wllldIlocated01' Ole top or
"FIr >;wale the eonstarlt CODIn; WlIIarDaw.Tha
WlI'll'I walerwil mb!: wIll1 till! WIIlIler-dlredioll
afrllowwhlth_ 'llrev.n by the COOIi1g fan ftom
the IowIIr Iouwr. Tho ewporied-wduring th9
IlltMlIle fNla1_yllMn COCIlId wat-r
11 drc:IllatedInIothe ClKll WIlerlanlc In lhlllowel'

UI'Ilt requited In Ihe
1-1 Tower body
The casing made of rust- and shock-resistant riqid FRP
excels in weather resistance. Steel prodUct parts sucn as posts and beams
are hot-dip zinc-coated.
1-2 Upper distribution basin
Basins are made of qlass fiber reinforced polyester resin,
and will not rust Or corrode.
Also, since they are provided with four water level requlating valves per
cell, water level balance can be structurally adjusted.
1-3 Louver"
, .
The louvers made oJ: rigid FRP t>revent external splashes of water drops and
regulate the flow oJ: air.
1
:1.-4 lrilling
The newly developed filling for the cross-flow type cooling tower is membrane
filling having excellent performance, and can withstands many years of
service because of the use of rigid PVC excelling in weather resistance.
1-5 Fait
The alumioum-made axial fan has a variable structure whereby the angle
can be freely adjusted. It is extremely lightweight, and excels in corrosion
resistance.
'It is made with highly waterproof specifications 'for the cooling tower.
:I. -5 Speed ",,,duoer
The two-stage type designed and manufactured exclusively
for the cooling tower has been adopted. All gears in use are helical gears
and spiral bevel gears with hardened tooth flanks, heeding adequate strength
and quiet operation.
In addition, due to the original oil dam structure adopted at the top of
the housing. the upper bearing is also lubricated with oil, requiring no
grease filling, so that maintenance man-hour'! are reduced.
1-7 Drive shaft
:rhe drive shaft that transmits rotations of the motor to the speed reducer
has an extremely simple structure, in which two hubs, one center ring and
two pairs of disk packs are coupled with several reamer bolts, requiring
no lubrication because the components have no friction parts.
Also, since each member is made of SUS, it withstands continuous use "vep
in a lOot hUmidity atmosphere.
2
2. Electrical wiring
& WARNING
SinC!e wiring works, grounding (earthing), or the by
unqual.,ified personnel .is not; only illegal but also extremely
dangerous', never do this.
In order to prevent electric shocks and users are legally
O1)ligeo. to install earth leakage breakers and protective
devices.
2-1 Carry out power supply and wiring works of the motor in accordance with
tec!lnical standards of electrical equipment and indoor wiring regUlations
and, furthermore, with explosion-proof gUidelines for electrical factory
equipment in explosion-proOf atmospheres.
2 ... 2 Wiri.ng to the moco%' te.rminal.
Lead in external conductors referring to terminal details in Fig. 4-1.
"

lOilV
k
i

..

...

..
H

-Il
..


L
.lI

;{
..

"
"
a
"
Fig. 2-1 Detailed drawing of motor terminals (Mitsubishi-manufactured motor)
3
3. Preparations for operation
3-1 Cleaning
Open the drain at the bottom of the water basin, and wash away dust and
the like having accumulated in the water basin during brushing. At this
t;i.me, remove contamination to the strainer and louvers,. such
as dust, scales and algae.
3-2 Rassing water
Start the ci:r:culating pump to adequately wash contamination off the inside
of the towe:r: and water passing pipe system, and replace the water witn new
circulating water.
a. Tower body
Check that the inspection doors inside and outside of tne tower are
closed.
b. Drive section
1) Check to see if the lubricating oil of the speed reducer is at the
regular oil level position,'and check the oil for contamination.
To check the oil level, open the oil level check valve of the oil
gauge. After checking, close the valve.

Spa-clCi I
J_
LubdcatiM

(lCl"guhz: oil.
level Q;:d.t.1on
Oil level chock valvo
(Norlll.lIl.ly clClsed,
open a1: chck tin!!:)
s
o
IRM liM\
oil dischal:ge vAlve
cloaaQ)
Fig. 3-1 Oil gauge and valve
4
2) Rotate the fan by hand to check for smooth l:otation, and also check
the clearance condition between the blade tips and fan casing.
Check the blade appearance for abnormalities and adhesion of foreign
matter, and also check for the presence or absence of soH.ds sucked
up by rotation.
3) Rotate the fan for a short time, and check that air is discharged
upward.
4) Measure the supply voltage, and check that the power supply is normaL
5) Run the fan for two to three hours to check for vibrations and abnormal
sounds, and if there is any abnormality, see Section 7
"TrouJ:>leshooting" .
Fan
Kot:o:r
Fig. 3-2 around the'drive section
c. Distribution device
1) Check the spray holes of the upper distribution basins for clogging
by foreign matter, and perform cleaning 1f clogged.
2) FUlly open the water level regulating valve of each
basin.
d. Louvers and eliminator
1) Check the louvers for adhesion of matter that obstructs ventilation,
and remove it if any.
2) Check toe eliminator section for dropout and deformation.
5
e. Circulating water and supply water
Check that tohe valves related to the circulating water pump are fUlly
open.
6
I
4. starting operation
&CAUTION I
Avoid. carrying out operation with any of the water level regulating
. valves closed. thei distribution box may ri.se, resulting
in breakage.
4-1 Driving the
a. Fully open the air vent valve of each piping section to remove air having
accumulated in the piping so that the whole circulating water system
is adequately filled with water.
b. After starting operation, gradually open the circulating water valve
ana make adjustments so that the rated water flow is reached.
c. Since the upper distribution basins available at four places per cell
are provided with water level valves, open and close the
butterfly valves and make adjustments so that the water levels of the
upper distribution basins at the four places become uniform.
(The water levels of the upper distribution basins should be approx.
70rnm at the. rated water flow.)
4-2 Priving the fan
I /f\\ CAUTION
When st:arting the fan, carafully check around the watsr inlet and
outlet of the cooling towar for foreign macter. Be aware that if forei.gn
lIIatte.l: remains aroUnd the ontlet, it may drop in the tOlfer
due to vibrations of the fan, etc./ and be shot by the fan, or the
fan'lIIaY be damaged.
Istart the fans one by one.
When steady operation begins, measure each phase current, and check to see
i.f operation is performed within the range of the rated current value on
the nameplate of the motor.
1
I
,
5. Precautions in operation
5-1 Perfoxmance
Since the performance of the cooling tower is affected by fluctuations in
the circulating water flow, always keep the rated water flow.
Be to prevent occurrences of algae
r
scales, in the tower.
5-2 E'unction
Be extremely careful with vibrations, sounds, cooling water temperature
and electrical current during operation, and always check that there is
nO abnormality.
Since vibration and noise sOurces are mainly a result of the drive section
consisting of the speed reducer, motor aild fan, do not overlook even a triVial
abnor,!,ality.
8
6. Maintenance and control
6 CAUTION
1. When inspecting the motor, be Suxe to turn off the power. Since
. t:1l.e_ fan may start sUddenly dua to automatic operation oJ: the like
even if it is stopped, be sure to check that the power i.s off.
2. If an antifree2:ing hellte:/: is. attached, ,,3.so turn off the power
of the heater when performing inspecti.on.
3. Fox work at high elevations use safety. equ.ipment such as a helmet.
6-1 DriVG section
a. Check for the presence or absence of abnormal sounds and vibrations, .
and the oil level every day.
b. Replace all speed reducer oil 500 hours after starting operation, and
then replace it again 2500 hours after that.
Then, replace used oil with new oil every 5000 hours.
When injecting oil, be extra careful not to mix impurities and foreign
matter, and the like.
c. HOW to replace oil
i. Place an oil pan (to be prepared by you) under the oil discharge
valve, and fully open the oil level check valve and oil discharge
valve to drain the oil.
ii. After that, close the 011 discharge valve, and remove the cap from
the lubricating opening, and slowly fifl new oil.
iii. Fill up to the regular oil level position, put the cap back, and
close the oil level check valve for completion.
9

Speed f
z:educt);. I .
. Lubricating
opening
Regular 011.
level podtion
lRrtd linn\
011
(Normally
{Normally
open at check timo)
0111ove1 check valve.
Fig. 9-1 Oil replacement
6-2 di.tribUt..ton bas.ina
a. Check every day to see if the water levels of the upper distribution
basins are proper.
b. l?erforRl cleaning every 6 months to prevent clogging of the spray holes
of the upper distribution basins.
6-3 Fa.n
a. Check the blades for deformation, flaws, and adhesion of dust and scales..
b. Check to see if the clearance between the inner surfacEl of the fan casing
and blade tips are uniform, and also check for other abnormalities.
6-4 .Filling
a. If water quality is adequately controlled, speci.al CarEl is not needed.
b. If a great amount of scales and/or slime is adherEld, rElmove i.t out an<;l
cleaning as necessary.
6-5 Eliminator
a. Visually check for the presence or absence' of an increase in carry-
b. If a great amount Of scales and/or slime is adhered, remove it out and
perform cleaning as necessary.
10

6-5 Casing and louvers


a. Check from the outside for adhesion of dust and foreign matter once a
month, and remove it if any.
b. Perform cleaning by showering from, the outside.
6-7 Casing rameii(ork
Since the corrosion conditions of the casing framework vary depending on
the check for the presence or absence of rust once a year.'
6-8 Circulating wAter
a. Since the circula ting water should basically be pH6. 5 - 8.2, check Eor
mixing of matter that adversely affects the water quality of the
water once a month, and immediately remove it if any.
b. Check every day to $ee if the amount of supply water is proper when also
checking the water basin.
6-9 Water quality ,
Maintenance is indispensable in the ability of the cooling tower to
perform water quality control, inclUding U$e of water treating agents
in cooling water and blow-down as measures to prevent adhesion of scales
and slime to the filling surface, which can be the main factors in
performance deterioration of the cooling tower.
Since the heat exchange in the cooling tower by direct contact between
the air and hot water cleans the air conversely, the water quality of
the circulating wateJ: is gJ:eatly affected by the air around the installed
coolioq tower.
For the cooling water system, total water treatment is required because
problems of scales, slime and corrosion do not ocem: separately but occur
in connection with each other.
If the water contains iron, total hardness components, silica, organic
substances, etc., hard scales of carbonate and silica adhere to the
surface of the heat exchanger due to concentration, reSUlting in
deterioration of the thermal efficiencies of the refrigerator and
condenser.

9-1 shows the proper water quality control standards of


water.
Fig. 9-2 shows the relationship between the rate of concentration, amount
of supply water and amount of
If the water is not treated with use of Chemical agents, control the
blow-down in the'concentration range of 3 - 4 under general working
conditions.
51--1----;-----+-----1---,.----;.-----;.------;
f
'.
'.
".
':

; 4 l-::t--l-----i--.:---t-----t---;:==::t==::;--1
,!; I
:':. \ !
I _+\_-t +-__-+_--.:-__-+-_:i.=..=..
1l'3 r
i.
'----
".
1 4 5 3
.. 't,
........
-'40 ..
................. .. .
o'- --' --J. ..... ..L-__..;..;.....;.;.'"""" ..;.;;.;.;; ....:.; ....:.; ..:.; =..
I
Fig. 6-2 Relationship between the rate of concentration, amount 'of supply water
and amount of
12
,
Table 6-1 Water quality standards of circulating water and supply water
Standar<:l valve Ten<:lency
rtem
Circu-
supply
l.ating Corrosion Scale
water
water
pH (2SCI 6.,5-8.2 6-8
0 0
Conductivity (2S'C) ().w/cmJ
SOO or 300 or
0 0
less less
Ions of chloride Cl- (mgll]
200 or 50 or
0
Standard less less
item. Ions of sulfuric acid SO;- 200 Or 50 or
0
[mqllJ less less
Acid consumption (pH4.8) 100 or 50 or
0
[me/l] less less
Total hardness (CaCO,) ZOO Or 70 or
0
[mqlll less less
Iron Fe .[mgll]
1.0 or 0.3 or
0 0
less less
Reference
Ions of sulfide
S,
rmq/l) Not to be detected 0
item
Ions of ammonium NH:rmqllJ
1.0 or 0.2 or
0
les$ less
Ion-form silica SiO,[mg/l]
50 or 30 or
0
leo"
less
Circles indicate factors that relate to the tendency to corrode or form scales.
&CAUTXON
Perform cleaning in the cooling tower. Otherw;lse, bacteria may
increase, or the equipment, p;lping, etc., may be damaged.
13

Table 6-2 Descriptions of maintenance and control and frequency of inspection

j
,
...
eyel.! of
Check point Check (work) iteJn Day 1f02.lJ; ",.th
PlOn;h$ booth"
\'u["

riiplaet-

Check for flaws, wear,
Fan
deformation, deterIoration and
0
adhesion of foreiqn matter .
.'Looseness of mountinn- bolts.
Fan casing
rust,
0
clearance ol the fan.
Baar:inqs of
Presence or a.bsence of abnormal
the motor and
0 2 years
speed reducer
sounas (rul1lblingl.
the of oil (oil
0 *1
Speed reducer level) t and for abnormal sounds
0
5000
and vibrations.
hours
Drive shaft,
Deformation or the flexible.
plate, cracks, retiqhtenlng of
0
coupling
bolts
ChecJc for abnorllLal sounds end
Motor
vibrations.
0
Greasing, and oneck for
0
corrosion.
Casing
Check fOr deformal:.1on
0
and contamination.
Check the water levelsJ and the
Oppel::' spray boles for cloqging.
0
distribur:ion Check for breakag and
0
basins *2
de:formaelon, and perform
elep;nJ.nn.
Check tor adherents.
0
Louvers Check for breakage, deformation
0
and
CheCk tor Ae:thesion of sca.lea: a.nd
Filling
slime. 0
Check for clogqinll1, and perform.
0
cleaninn.
Check for adhesion of scales and
Eliminator
slime.
0
Check for clogging, and perform
0
cleaninG.
Water basin
Check the level and supply
watar.
0 0
*2
Check for wa.ter leaks, and
J nertorm clean1nN.
Stra1ner cJ,ogging
0
*2
Cleaning
0
Casing Check fot' rust and loo.senes3 Of
0
framewol:'k boHs.
Note) The circles show visual checks.
Replace 500 hours after starting operation for the first time, and then
replace it 2500 hours after that.
*2: Clean the water basin, upper distribution basins and strainer in accordance
with the conditions of adherents and mud accumulation.
14

7.
Cooling to...er body
Problems Causes Remedies
(j)
Excesslshortag-e in the amount of (j)
1\djust to the aD\OUJ'lt of water in the
circulating water. design specifications.

Drift of suction airflow.



!!'t'Ipt'Qve the ventilating en\tirollIlent.
<3> Re-clrculatlQn of air
<3> Improve the venti-latinq envirol1ll1ent.
(short .circuit,..,
@ clogging, of the spray holes of @
Remove dust, scales and foreign
Rise itt cooling
the upper-distribution ba6ins. matter.
water temperature
@ Check the current value, and 1: the
Sho.t'"tag'e of air flOW of the fan. current is than the ratinq,
check the blade angle.
@
CloggiAg of the filling and/o" @ Rework and clean the clogging
eliminator. location.
<i>
N'onun1torm watar levels of the
<i> Adjust the water level of each
basin with the
upper distribution basins.
recrulatina valv-e.
(j)
clogging or the 6l:1'ray holes of (j) dust, 5cales and foreign
.
Decrease in
the upper distr-.1bution ba5!ns. matter.
cooling wa.ter

ClOCJa1ntl or the strainer. Ql Remove: dust and clean.


(j) Unbalance of-the fan blade (j)
Investigate and adjust the blade
angles. 81:'1o;11e.
Adjust th4 6ccentricity, ani.1. check
Eccentricityot the driVe shaft: the pre$ence absence of
iractures in the disk
@ Looseness af t1ghteninq bolts.
@
Check the bolts tor looseness, And
rel:iqhten them.
Abnormal sound.s
@"
ShortaO'e of oil for the speed @ Add oil to the regular level
and vibrations reducer.

Damaqe to the spe4d reducer


@
Inve3tiqate and replace by
gears and/Qr bearings. the speed reducer.
@ Breakage of the external fan fOl:
Replace the external tan.
cooling the
<i>
Shol"ta,ge of motor bearing
<Zl
Fill qrea:.e.
grease.

Darnaq6 to the motor bear1nq.s. @


the beaX'Aa.
(j) Drop in voltage. (j)
Measure the su.pply voltaqe.. aAd
irtvest1qate the power $upply.
!:xcessive
Ql in tan blade angle. (2J
Adjust the blade angle.
operating
@ Motor failure.
@
Ask the m.anufac!:\u:et: for repair and
investigation.
@ overl.oad due to excess In air
@ Adjust the fan blade
flow.
(j)
Excess amount of circulating (j) Adjust the altl.ount of water with the
water. valve.
Carry-over

flow. (2J
Adj ust thQ tan blade angle.
@
Oefor.rn.ation and/o%;' clogging of
Repl.ace the defomed part, and claan
the eliminator. the cloaainq location.
15

7-2 Driva section


Problems Cause Remedies
1. Power failure. 1. Invest.igat.e the powet supply.
2. fUse blown due to 2. Replace with a specifie6 one.
insufficient capacity.
'l'he motor does not rotate. 3. St.JJ.teh having an 3. Repl.ace with- a .
capacity.
4. switch having a contact q. Adjust the contact part.
failure.
Rotations ot the motor
1. One-pl1ase: sho,rt circuit of 1. Investiqate the power supply and
the poWer supply
.
w1rln9"
drop suddenly
2. Voltac;)'e drop. 2. Inv$sciaate the power :moplv.
1. Connection failure between 1. the manufacturer for
Rotations of the motor do
the rotor and stator. investiqatton and repair.
not rise
2. one-phase short circuIt of 2. Ask the manufaeturer for
the winding of or invest iqatioD, and investigate
power sUDoly. the ,,1rincr.
l. Defective bearing. 1. Replace the bearinq.
The tan does not rotate 2. FClIl.eture in coupling ot the 2. Replace the coupling, and adjust
drive. shaft. the centering- of the dtlve shaft.
Bearlnqs produce
l. lubrication l. Replace with normalqrease.
<;Trease.
sounds or
2. Mixinq Qf dust or foreiqn 2. Clean the bearinq and fill with
irreqular metal sounds
matter in beaeiM'. new qrease.
l. LoosenesS of each tightening L Tiqhten 1n
bOlt.
other vibrations and
2. Breakage of the external fan 2. Replace the external fan for
noises
tor cooling the motor. cooling the motor.
3. Unbalance of the fan. 3. the balance, and rem.Ove
adherents,
4. IrreCl\!lar1tv in fan anqle.. 4. Ad1ust the ancrle.
l, Eccentriclty of the drive 1- Adjust the centering of the drive
snatt. shaft.
Ri.5e in motor pllirt
2. Voltage drop. 2.
3. Contact between thl! rotor and. 3. Ask the manufacturer for
temperature
st.ator. it\\lest.iqat.lon.
4. Flaw in or shortage 4. Replace the bearing, Or till wi.tb
of grease. qrease. .
Others
since mounting bolts may become loose due to minute Vibrations Caused
bv l.oad fluctua tians and from the ta.n, check them. t::ler.i.odically.
If' you have any difficulties questions concerning use of the cooling
contact the Shinwa Cooling Tower Service' Network or us.
pri.or to contacting us, confirm the warranty description and/or nameplate
descriptions affixed to the cooling to"er body and motor and then inform us.
16
...' espond to the needs "safe and comfol1Jble"
Vibro-Switch
Model-i500A
)
Detects unusually great vibrations and gives an alarm signal.
Sensor, alarm setting and alarm contact are entirely united ill
one body for ease of operation.
Compact design, lowprice and accurate vibration monitoring at 2 upper limits.
Vibration modes for acceleration, velocity and displacement are selectable with internal switch
Dripproofaluminum housing connectable with flexible conduits.
Alarm level setting at a step of 1% from 1 to 99% with internal digital switch
.Two different alarming steps, one for self-holding operation and the other for automatic
resetting operation are provided.
Alarm delay ofup to 60 seconds can be set to prevent misfunction.
Lowpower consumption of 12mA(Typ) at 24VDC.
Usable for monitoring vibrations in motors, fans, piping,etc.
Vibro-Switch Model-1500A
;D ..
..
IlIlIcatfl.ll of
d,leet.,.c 'lnetla.
CDllftecl,r
ul-rn
..
._-

---
--
.outlP&' holt
-4-.7
DIMENSIONS
1-99mls'(p)
1-99mm/s(p)
0,01-0.99mm(P-P)
5-500Hz
10-500Hz
5-500Hz
CD Acceleration:
Velocity:
@ Displacement:
Acceleration:
VelocitY:
Displacement:
Within 5% (25C, 80Hz, 1Omls')
measurement of sinusoidal wave)
Within 1% offull scale
DC24V0.5V, 12mA(Typ), 20mA(max)
Delay 0 to 60 sec variable
Self-holding operation and automatic
resetting operation, make contact by MOSFET.
(Resetting by turning off driving power supply)
Contact rating AC/DC 125V, D.5A :;
Material Aluminium(with neoprene packing)
Protection IP-64
lOOmis' for vibration, 1DDOmls' for shock
1500VAC between relay contact and
housing for f minute
l500V AC between relay contact and
power supply (24V) for 1 minute
Power line is connected to housing at 0.1 J1 F.

Flexible conduit, 16mm 10, 22mm 00
Brand name: VF-Q4
made by NIPPON FEX CO.,LTO
SPECIFICATIONS
Alarm setting range:
(Select 1,2 or 3.)
Accuracy:
Unearity:
Driving power supply:
Relay operation:
Housing construction:
Vibration resistance:
Dielectric strength:
Frequency characteristics:
.(+5%, -10%)
Applicable electric wire:
Applicable conduit
)
SUPPLY

(2Hlarn level setilncOlI
Ext_I Ccnneotioo
Ii>! RyOUT
oft
N
..
,.
t HH
. -
I
! (,-..--}@Relayout/ll)Mto-resetlllCtJpe
}GJReIOY outOlll Self-h,ddilll type
!. )@
:
! 0 Power ----"1'-- AC line
I
I
, .
l Install" .....at owitch Cor brook oont:ect)
------------------------------------
l2J Alone level .ettincOllll
<D Yibr"ti ... lIIlde settlllJ
Cl:Jleloy tilllC 8ettlncOlll
t;3Jllolay ti...
.sf-/DWA
SHOWA SOKKI CORPORATION
JiHadOffice :
1-5-9. KandaI1um1-dlo, CI'li)'oda-ku, Tokyo. 101-OO24JAPAN.
Phone: 03-GB68--!2to Fax: 03-3866-3060
.Facloty:
'541-1 T_"''''/o)i. Tokyo.I93-<Jl144
Phone: 0428-64-3232 Fax; 0426-64-3276
/rM. showasokkl. co. JpJ E-tlall :olsyo@sJJowa$(lkkl.co. Jp
Agent:
)
VIBROSWITCH MODELI500A
INSTRUCTION MANUAL
.
I. Setling And Connection
Remove 4 screws and then remove the cover.
Setting switches and connections as show below appear.
@Oelay time Setting (H) /" (2)Arorm level setting (H)
/ IExternal ConnectionI
.. I X H "'" HRyout :. Jr Self-holding twe
HHR )
w <.
+-:MY SOPPl..Y I. Power 0.\ :: AC Line
llQ t tS' (I HK..,.... -) : - Q reset switch
I t> I to PRESE'\,,1 l (or break contact).
""- Alorm level
@Delay time Setting (HH)
<DVlbratlon mode setting
CD Vibration /dode. Setting
Turn on one of switches I to 3.
Numbers I to 3 correspond to the following respective modes.
. Switch Vibration Mode Full Sca.le
J ACC (Acceteratlon) IOOm/s'....
2 VEL (Vetoci ty) 100m/s
PEAK
3 DISP (Displacement) IIIlIIIp_p
Alarm Level Setting
Set two limit positions (II and HH) of level with the presel swllch.
It can he set at I !o of full scale value in a vibration mode which is selected
in accordance with step <D. When two limit positions of alarming level are nol required.
eJ tber one of Hand llll can be used.
Delay Time Setting
Set delay time to prevenl a malfunctinn with the potentiometer.
Turning Hor HH fUlly counterclockwise will give an instantaneous operalion,
turning it fully clockwise will give a delay lime of about 60 seconds aud turning
it. half wil 1 give a delay lime of about 30 seconds.
(Note) LED located on the side of the alarm level swi lch indicales the relay' s operation.
1t is provided to 'check the relay's operation on the VIBROSWITCH side.
0-605 (1/3)
..+.itJWA SHOWA SOKKI CORP.
.'
VIBROSWITCH MODELl500A
INSTRUCTION MANUAL
Connecting power supply
Rating of connectable wire is Ii. 2-2. 5mm' (AWG24-l2). Strip the end of wire by
ahout insert it into the termiual hole aud clamp with the screw.
Thisconuecting terminal is agaiusi vibrations. a power unit capable
of supplying DC24VO. 5V 20mA is required. Current consumption is about l2mA.
When a reset switch is provided between the power circuit and AC the hold
status of the relay coutacl can be released.
<Note> Diagram of wire inside lhe VIBROSWITCH is shown below. The housing
is connected to the internal common terminal at O.ltLF for. shielding,
,-------------tV
+24V
"\
Voltage Regulator
:L Internal
Common
./
I
O.ltLF
OV
y
-V
Housing
Connecting Relay Output
When a vibration exceeding Ihe rated value is prodnced for more than the preset
time (delay time). outpul is turned on. Acontrol of 12SV O. SA is available for
both AC and DC.
<Note> VIBROSWTCH is designed to withstand an instantaneous voltage of up to
However. take proper measures against surge using surge absorbers (Diode etc.)
according to the type of load and power
Completion of connection
After completion of connection, reri t the cover. When connection cable may be
subiect to vihration, put sponge rubber into such part and press with the cover.
2. Installation
Check the direction of detecting vibrations and fix VIBROSWIl'CJ! with 4 bolls (M6l.
The brand name of flexible conduits is NIPOREX
(Produc I No. VF-04. made hy NIPPON FLEX CO.. LTD.)
0-605 (2/3)
.EJ+lDWA SHOWA SOKKI CORP.
}
VIBROSWITCH MODEL1500A
INSTRUCTION MANUAL
3. Operation
When VIBROSWITH is properly connected and it will be normally operated.
When a vibration exceeding the alarming level continues for more than the preset
delay time. the relay is turned on and this status will be held uutil the next
resetting Is done.
To reset tbe switch, tnrn off power supply once by means of the reset switch as
shown in the No malfunction will occur even if power turned on
once again.
4. Maintenance
No consumable parts are provided, eliminating the need for daily maintenance.
To check the function of VIBROSWITCH. set alarming level below the current
vibration setting or remove the VIBROSWITCH and then give a vibration over
the alarming level.
0-605 (3/3)
..s+Ii:JWA SHOWA SOKKI CORP.
TEG05-10-002
Cooling Tower Noise Level
MODEL SCC-4800ABTX2
JABAL OMAR DEVELOPMENT
2010.1.19
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
0 ~ 8
___________R_
- - - - - ~ - - - - - - - -------------
Kikuchi Ihara Komori
1. DESIGN SPECIFICATION
TYPE SCC-4800ABT x 2
Air Flow [m
3
/min]
23562
Fan Dia Df [mm] 7100
Motor 150kW - 6P
Fan Number 9
Reducing Type GEAR REDUCER
L 12400
Dimensions
W 12000
[mm/cell]
H 9600 + 2600
2. MEASURING POINTS
Measuring PointGD [Fan 45" Df Point] is at 45" angle and fan blade
dimension(Df) away from the surface of casing.
Measuring P o i n t ~ [R[m] Point on the Louver Side] is at R[m] extended
along the center line of the absorption louver surface at a height of
T[mJ. (Remarks: R= 1. 0 [mL T = 1. 5 [m])
- 1 -
3. EVALUATED
Point dB CA) dB ce)
(j)
85.5 95. 5
~
81. 0 84.0
OCTAVE ANALYSIS
100
90
80
70
""
:':'.
'"
60
>
'"
...J
'"
=>
w
w
50
'"
Co.
-0
"
=>
0
'"
40
30
20
!-e--Measuring PointeD .. - Measuring Point(g) I
------.,
r------,
~
t - - - - ~
l- ___
~ - - -
t----
~ ~
",
---
........... ',..,
......,
"'
10
31.5 63 125 250 500 1000 2000 4000 8000
Octaveband Center Frequency [Hz]
[dB (C)]
Hz 31.5 63 125 250 500 1000 2000 4000 8000 O.A
(j) 88.5 90. 5 90.5 86.5 83. 5 80. 5 72.5 68. 5 64.5 95.5
~
73. 5 75.0 76.5 75. 5 75.5 75.5 75. 5 70.5 63.0 84.0
- 2 -
TEC19-10-013
Shaft Power Calculation data
MODEL SCC-4800ABT
JABAL OMAR DEVELOPMENT
2010.1.19
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
0
C@ ({[5)
------------- -------._---- -------------
Kikuchi Ihara Komori
Shaft Power calcuration data
Specification
Model SCC-4800ABT
Inlet water temp. tWl 42.8C
outlet water temp. tW2 35C
wet bulb t'1 30C
water flow L 55620 Llmin
air flow
Q
23562 m'/min
static pressure Ps 196.8 Pa
fan diameter D 7030 mm
number of blade Z
fan speed n 126 min-
t
fan casing dismeter Ds 7100 mm
outlet air verocity V 9.919 m/s
air density
r
1.124 kg/m'
velocity pressure Pd 55.3 Pa
then seek air power
(Ps) x (Q)
air power(Ma) =
total pressure Ps= 252.1 Pa
:. A- 99.00 kW
then seek shaft power
shaft power(M) air power(Ma) (kW)
static efficiency ( T] )
(kW) =
total efficiency MODEL(Cofimco) 7030-9-36N/G1.5T
T/ = 78.5 (%)
M= _9",9",.0:;0_
0.785
126.11
and then shaft power is 138.7kW as marjin(10%)
motor output (power) is made (choice) 150kW (load 92.5%: r=1.124kg/m')
1) STATIC PRESSURE I VOLUME CURVE
2) TORQUE CURVE
3) CAMBELL DIAGRAM
<Cooling Tower Design Specifications: TEC07-1 0-005)
<Cooling Tower Design Specifications:TEC07-1Q-006>

Via Gramsci, 62 - 28050 Pombia (NO) -ITALY Tel. +39.0321.968311 - Fax +39.0321.958992 - E-mail info@cofimco.com
4035 Holland Boulevard-P.D.Box 6127Chesapeake, Virginia 23323 Tel.{757)485-5798 Fax (757)485-7021 E-mail cofimco@cofimcousa.com
Rue Severino Tescarollo, 880-CEP 13255-410 Itatiba, SP BRASIL T81. +55-11-4534-9999 Fax +55-11-4534-1410 E-mail cofimco@cofimco.com.br
Customer Name A Job Name A
Job Reference A Item Number A
Date 19/01/2010
STATIC PRESSURE vs VOLUME CURVE
_ I.. _ -.l _ .J -.l l- _ .. _ .L _ -l - - - _1- ADt
I I f l I I I I 'I
600 750
Volume [m3fsec]
300
- -,- -\- - r - T -
_ .1__ l.- _ I\.. _ J. _
1 I I I
- -\- -,- - i" -7-
- -,- -:- - r -,.-
I I f I
- -1- - r - I" - T -
__1__ I.- _,- _
I I I I
- -\- - i - i-
--1--1--,,"_+_
I I I I
- -1- -,- i-
I 1 I I
- -,- -l'" - F - T -
_1 __ I". _ t. _ J. _
1 I I I
I--j--r-I-
--1-_1-_+_

-1'-7-
450
-r-T-'-\----r-r-T-'-
_
I I I I I I 1 I
-j-j-j-l----l-j-j-l-
-
150
I I I I ....
-'1-"--;--1 -
_ J._..1_..J __1_
! I I I
; , - :t.:l..::..l,:::.:';:"'"'<"\J
- - 4" - -I - ""9Jf'l._
24
o
6
18
12
30
St.Pr.
[mmH20
Inlet Air Density 1.124 kg/m3
RPM 126.0 rpm
Blade Tip Speed 46.4 mlsec
Pressure recovery 0.00 mmH20
Rotor shaft power 126.1 kW
PWL ( } 2) 102.2 dB(A)
ROTOR MODEL 7030- 9-36N/G1.5T
All data must be approved by Cofimco
FanTastic V1R6.1

X ) f l m r ~
~
Via Gramsci, 62 ~ 28050 Pombia (NO) - ITALY Tel. +39.0321.968311 - Fax +39.0321.958992 - E-mail info@cofimco.com
4035 Holland Boulevard-P.O.Box 6127-Chesapeake, Virginia 23323 Tel.(757)485-5798 Fax (757)485-7021 E-mail cofimco@cofimcousa.com
Rua Severino Tescarollo, 880-CEP 13255-410 ltatiba, SP BRASIL T81 +55-11-4534-9999 Fax +55-11-4534-1410 E-mail cofimco@cofimco com.br
Customer Name A Job Name A
Job Reference A Item Number A
Date 19/01/2010
TORQUE CURVE
o 30 60 90 120 150
FAN SPEED (RPM)
ROTOR MODEL
Rotor shaft power
RPM
Torque@
7030- 9-36N/G1.5T
126.1
126.0
126.0
kW
rpm
rpm = 975 kgm
All data must be approved by Cofimco
FanTastic V1R6.1
Customer Name A Job Name A
Job Reference A Item Number A
Date 19/01/2010
CAMPBELL DIAGRAM
9xREV
1000
, "I" "I" , 1'/ I
CPM
Blade natural frequency 1 0%
800
/
/
600
I-
-
400 I-
-
200
-
1xREV
I I
0 30 60 90 120 150
FAN RPM
N (blades
9
RPM 126.0 rpm
Blade Tip Speed 46.4 m/sec
Number of disturbances 1
ROTOR MODEL 7030- 9-36N/G1.5T
All data must be approved by Cofimco FanTastic V1R6.1

Via Gramsci, 62 - 28050 Pombia (NO) -ITALY Tel. +39.0321.968311 - Fax +39.0321.958992 - E-mail info@cofimco.com
4035 Holland Boulevard-P,O.Box 6127-Chesapeake, Virginia 23323 Fax (757)485-7021 E-mail cofimco@cofimcousa.com
RUB Severino Tescarollo 880-CEP 13255-410 ltatiba SP BRASIL Tel +55-11-4534-9999 Fax +55-11-4534-1410 E-mail cofimco@cofimco com.br
TEC05-10-003
Cooling Tower Noise Level
MODEL SCC-4800ABT X3
JABAL OMAR DEVELOPMENT
2010. 1. 19
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
0 ~ 8
1------------- - - - - - - ~ - - - - - - -------------
Kikuchi Ihara Komori
1. DESIGN SPECIFICATION
TYPE SCC-4800ABT x3
Ai r Flow [m
3
/mi n]
23562
Fan Dia Df [nun] 7100
Motor 150kW - 6P
Fan Number 9
Reducing Type GEAR REDUCER
L 12400
Dimensions
W 12000
[mm/cell]
H
9600 + 2600
2. MEASURING POINTS
Measuring PointGD [Fan 45" Df Point] is at 45" angle and fan blade
dimension(Df) away from the surface of casing.
Measuring P o i n t ~ [R[m] Point on the Louver Side] is at R[m] extended
along the center line of the absorption louver surface at a height of
T[m]. (Remarks: R= 1. 0 [mL T = 1. 5 [m])
- 1 -
3. EVALUATED
Point dB CAl dB CCl
CD
87.0 97. 0
~
82.0 85.0
OCTAVE ANALYSIS
100
90
80
70
0>
:3
'"
60
>
'"
...J
'"
=>
'"
'"
50
"
c..
."
<=
=>
0
'"
40
30
20
I__Measuring PointeD - .. - Measuring Point I
........
..........
'-----..,
r----.
"-
... ---
l----
... --- ... ---
... ~ ~ ,
i----
r-:::.::."
~
"
10
31.5 63 125 250 500 1000 2000 4000 8000
Octaveband Center Frequency [Hz]
[dB CCl]
Hz 31.5 63 125 250 500 1000 2000 4000 8000 O.A
CD
90. 0 92. 0 92.0 88.0 85. 0 82.0 74.0 70.0 66.0 97.0
~
74.0 75.5 77.0 76.5 76.5 76. 5 76. 5 71. 5 64.0 85.0
- 2 -
co
O'
LOADING DATA
90'
unit ( kg)

1 2 3 4 5 6 7 8 9 10 11 12 13
180'
A 2300 3500 3500 3500 5200 3500 3500 3500 5200 3500 3500 3500 2300
B 3500 5900 BODO 5900 6300 5900 BOOO 5900 6300 5900 8000 5900 3500
C 3500 5900 12000 5900 6300 5900 12000 5900 6300 5900 12000 5900 3500
0 3500 5900 8000 5900 6300 5900 BODO 5900 6300 5900 BODO 5900 3500
E 2300 3500 4600 3500 5200 3500 4600 3500 5200 3500 4600 3500 2300
OP. Weight, 345300 (kg)
I I I 1 I I I 1 I, I I I I
A __
I I I I I I I I I I I I I
iii iii iii iii i
B
.-l._._..J. ..!-._._. ..t::::."'-.J.._._..J._.-
! y' !'1!.k 1"1! J/ !'i!
! i! ! !\ r i! ! r\ ! i! ! .\ !
I i I I I ' I i I I I ' I i I I I ... I
c
--r--\1___!_.._..-H-"-r-"i-r"-"-"I-"--r+--r--",r--T--I+-'-"-r-"-
, '. ._-1-_. . ._.1._. . I , '. ._l_. ' ._1_. 'I " ._.1_. ' ._-l-., ,: .
I \1 I 1/ I \1 ..+-'-I 1/ I \1 ..+-'- I ..+-'- 1/ I
0<> i i /1' i I A i i b=j=; A i
D
_.., .. _.. _-;::O'"O:-f:.. :::O..L....r-_.. _..;--_.. _..t .."'r..7 -r-.. _..-r-_..- .. r"'-.:--::-..:..f-::-:... .L,.. _.. _..-;_..-
I I -- I I I . I I I . I I
,
.._-t"--"-j"---I-.._ ..- ..t--.. _t-.. _ ..--t.. _ .. _ .. -t.. _.. _-t---t-.. _ .. _ ..t-.. _ ..-.-t-.. -._.-t"-'-"-j"-"-
iii i ! iii iii i i
'''0
>0"
"lOD
3000
""
3000 300D 3000 >000 3,000 >000 'OOD
, , ,

5 5 7

,
" "
"
"
FOR COfjTlUCTOR ,.
JABAL OMAR DEVELOPMENT
lIESCltIPTICIII ...
COOLING TOWER LOADING DATA SCC-4800AB1X3
"",PROVEn CHECKED DESIGNEe DRAWN DATE UNI

JOII 19. '10 1
I
ORAWING No.
1/1 CARRER I
EBARA SH1NWA LTD. DE100004
TEC01-10-003
Cooling Tower Performance Curve
MODEL SCC-4800ABT
JABAL OMAR DEVELOPMENT
2010. 1. 19
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
~ ~ 8
. ~ ~ - - - - - - - . - -
___________M_
-------------
Kikuchi Ihara Komori
Model: SCC-4800ABT
Cool ing Tower Performance Curve
40
35
JJ
30
s:i
E
Q)
I-
.....
Q)
.....
:::>
25
0
~
Q)
;=
0
I-
bD
<::
0
20 0
Q
!/1/
~
,
~
"
A
~
-'
....
.....
"
....
..... v
....
....
"'"
-
,.......
./
-
I-"'"
./
r-
lv
,.
-"
-"
.....
lv
./
~
15
10
5 10 15 20 25
Ambient Wet Bulb Temp. c
30 35
1. Design Value
Water flow :
Air flow
55620.0 [L/min]
23562.0 [m' / min]
Inlet water temperature 42.8 rOC]
Outlet water temperature 35.0 rOC]
Wet bulb temperature 30.0 rOC]
2. Explanation for Performance Curve
A: Cooling water inlet temp. 42.8 C constant
B: Cooling water temp. difference 7.8 C

OR
,.
90'
,,,.
703li-9-36N/61.51 om
SHAFT DRIVE
90303
166860 Vmln
42.0 'tl
" ,
;0 ,
480 V 60 HZ
150tW SP )($
500,1. x5
500,1. )(6

345000 IS
'" 'DiilVE TYPE
riPENS SI2E
INLET
0iiTLET
iiiEiGiiTiiET(DRY)
WEIGHT OPERATING
CAPAClT.

INLET TENP.
OUTLET TENP.
WET BUl.B
"iJTiLiTY
WiOR
No. DISCRIPTION IMTERIAL O'TVl REM:ARKS
,
.,TOR 0
,
'"
ALlJ/dINIlIM 0
0 FAN CASING
.,
0 IHOT SALVo

GHR REDUCER 0
; SHAFT
'"'
0

SPRAY "'OZZtE eo 350t


,
TOP PlATE
.,
3Ht j,HO.T DIP GALv.
,
SlOE PANEL FOP 2slde
"
PARTITION
'"'
,
'"
LOUVER
'"
2Sld!
"
HANDRAIL S5.STK 1 sel HOT DIP DAlV.
"
SUCTION TANK
.,

HOT DIP GALV


"
WATER BASIN
'"
,
"
'II,l.TERBASIN FRAME
., ,
HOT DIP GALV.
COlliNG ToWER SPECIFICATlONS
i ! !

i
-i-
i

I' ",,' [:J' 'c:J' 'W '"" 'I

g
;;

,
"
WATER INLET 6-500,1.
WATER CURET 6-500,1.
625(l
200 II 3000 I 3000 I 3000 \ 5000 II 200
fOR CONTRACTOR 'OR
JABAL OIAAR DEVELOPMENT
NOTE
OEseRIPT I ON
COOLING TOWER
t.\:IDEL
SCC-4800A8TX5
EBARA SHINWA LTD.
CARRER
BASE SHllULO BE Olt HllRIZONTAL LEVEL.
2.FOUNDATION BOLTS SHOULO BE COl/NECTEO ONTO THE
REINFORCEI,NT ON THE BUILOIItG SlOE.
iI.CooLING WATER PIPING ARE JIS 10K RF-FLf.llGE.
APPROVED
X_I
llRAII'H I DATE I UNIT lI1IIl
Ohlt\ IJon 19. '10 3RO ANGL
PROJECT
DRAWING Ne.
DE2100003
CAPACI1Y 60535 tW
WATER HOW 111240 VlIlln
INLET IENP. 42.8 'I:
OUTLET TENP.
"
,
WET BULB
"
,
UTILITY 480 V 60 Hz
I,(ITOR 150kW 61'
"
'"
lIWI
ORIVE TYPE SHAFT ORIVE
PIPENG S12E
INLET 30DA X4
OUTtET 500A x4
NET (DRY) 129000 III
WEIGHT OPERATII;G 229000 l!I
COLLING TOWER SPECIFICATIONS
I' ",,' c:J' ,:,. 'bi '",. 'I

No. OISCRIPTION MATERIAL Q'TY I REMARKS


,
INJTQR ,
"
,
""
AlWIHIU!,l ,
,.
,
FAN CASING
"
,
IH:lT DIP GALV.
270.-Efr 90'

GEAR REOUCER ,
;
""n
""
,

SPRAY OOZZLE
""
2set lBo'
,
TOP PLATE ;; 2set I HOT OIP CALVo
,
SIDE PANEL
'"
2slde
24400
,
PARTITIOn
'"
,
I,
!I
"
LOUVER
'"
2slde
"
HANDRAIL SS.STK 1 set 1101 DIP GAtv.

, , ,
---n "
SUCTION ;;

I10T DIP DALv


! ! ! ! ! ! !
"
WATER BASIN
'"
,
"
WATER BASIN FRME 55
,
1101 DIP GALV.

"
"
o
&
r I
I I I
WATER INLET 4-500Jl
WATER OUTlET 4-500"
200 II 3000 I 3000 I 3000 I 3000 l\ 200
FOR COIiTRACTOR
"R
JABAL OMAR DEVELOPMENT
NOTE ;
DESCllIPTIDN
COOLING TOWER
.""
SCC-4800ABTX2
DRAWN 1 I UNIT lMI
B IJon 19. "0 3RO
I PROJECl
No.
EBARA SHINWA LTD. I DE21DOOOI
Ifi\

""'PROVED
1.FOlMOATlON BASE SHOULD BE ON IlORIZONTN.. LEVEL.
2,FOUHD,I,TlON BOLTS SHOULD BE ClIllSCTED ONTO THE
ON THE BUILDING SIDE.
3.C00l.1NG WATER PIPIIlG ARE JIS 10K RF-HANGE.
CARRER
-
.
'"
LOADING DATA
0-
un i t (k g)
90'

I 2 3 4 5 6 7 8 9
180'
A 2300 3500 3500 3500 5200 3500 3500 3500 2300
8 3500 5900 8000 5900 6300 5900 8000 5900 3500
C 3500 5900 12000 5900 6300 5900 12000 5900 3500
D 3500 5900 8000 5900 6300 5900 8000 5900 3500
E 2300 3500 4600 3500 5200 3500 4600 3500 2300
DP_ Weight: 23D5DD (kg)
! ! ! ! ! ! ! ! !
A
-i----l-------t----j------I-----t----t---i------t---

iii iii iii


B
-J.-----j-7'o::::=t::::::::,.-L.---.L.-__ ______L __

! y- !'-{! y- !'}!
! /! ! !\ ! /! ! \ ! .
I i I I I' I i I I I' I
c
-T--tl-----r----rt---r-----j-r-----T------r+--l---
. ....... ' .: , \. __ 1_. . ,.!._ .. : ,

I \1 I 1/ I \1 I 1/ I
i __ '''1''' i ''i''' _-{ i "h_ "f" i "f" A i
D

I i --- -- i 11---- I I
,
-+-----+----+----t------\------+------t---+----+---
! ! ! ! ! ! ! ! !
'""
5000
'""
5"0
'"" '""
''''
5000
I 2
,
4 5 5
,
B 9
FMtolITRAe:ICIl ,.
JABAL OIAAR DEVELOPMENT
OESaIIPllttI
"" COOLING TOWER LOADING DATA SCC-4800A8Tx2
APPROVED CHECKED DllAWN OAT UNIT I'IIl
,ft, I I IQJ!,
Jon 19.' 10
I
DRAWING No.
1/1 CARRER I I
EBARA SHINWA LTD. DE21QOOO2
TEC07-10-008
Heat Exchange Calculation data
MODEL SCC-4800ABT
JABAL OMAR DEVELOPMENT
2010.1.19
EBARA SHINWA ltd.
APPROVED CHECKED DESIGNED
C 1 j ~
@
8
------------- ----------.-- ---------.---
Kikuchi Ihara Komori
1.1le %
L [m'/h]
Cooling tower design account
(Counter flow type)
Specification circulation - amount of water
tWI [OC] Inlet water temperature of Cooling tower
tW2 [OC] Outlet water temperature of Cooling tower
t'l [OC] Wet bulb temperature
Q [m'/min] The amount of air
do [m] Filler depth
Wo [m] Filler width
ho [m] Filler height
A [m'] Filler area right-angled with the flow of water
Aa [m'] Filler area right-angled with the flow of air
V [m'] Filler capacity
U
[-]
Exchange coefficient
N
[-]
Water air ratio (L/G)
L [kg/h] Flux of water (mass)
G [kg/h] Flux of air (mass)
h [kJ/kg] Enthalpy of air
hI [kJ/kg] Enthalpy of specification wet bulb temperature
hw [kJ/kg] Enthalpy of saturation air equal to water temperature tw
t
[OC] Temperature afwater
Ka [kJ/m3-h-dh] The enthalpy standard total rate of capacity heat transfer
Kao [kJ/m3-h-dh]
The enthalpy standard total rate of capacity heat transfer
obtained from the empirical formula of a filler
'Y
[kg/m'] Density of air
Cw [kJ/kg-K] Specific Heat of water (4.18605kJ/kg-K)
- 1 -
2 . The theoretical formula of a cooling tower
All the intermediary quantity of heat accompanied by substance movement between the water
and air in a cooling tower is proportional to an Enthalpy difference, and is expressed as follows.
Gdh= Ka (hw-h) dY
If movement of all intermediary quantity of heat shall be performed only in tbe evaporation
latent heat of water
-db/Cwo dtw=L/G=N
The following formula is obtained from (l) and (2) formulas.
Ka'Y = fl dh
G , hw-h
Ka'Y 1 --{;wdtw
L = f, hw-h
(2)
(3)
(4)
Here,
U
= fl db
, hw-h
1 -Cw'dtw
N' f, hw-h
(5)
It is if it sets.
Ka'Y
L
Ka
U 1 -Cw'dtw 1
= N = f, hw-h "" CW(twl-tW2)( hw-h )m",
(U/N) 'L
=
Y
3.Quantity-of-heat calculation of a cooling tower
Flux of water L and air flux From G to a water air ratio It asks for N and is numerical
integration. It asks for U/N or U. Next, the filler capacity of a cooling tower is decided
arbitrarily, and if it substitutes for (8) formulas, a required Ka value can be found. Filler
performance formula obtained by this required Ka value and experiment Kao is compared,
and if set to Kao/Ka >= 1, specification will be satisfied on quantity-of-heat calculation.
Here,
L[kg/h] = Um'/h] X 1000
(8)
G = QX60X 'Y (9)
N = Ukg/h]/G (10)
Ka
(UIN) L[kg/hI -.JL:Q...
(11)
Y Y
U =L
dh
(12)
hw-h
(U/N)c =L
Cwdtw
(13)
hw-h
Ah = CW'dtwXN (14)
h = hi +L Ah
(15)
Next, a calculation result is shown.
- 2 -
Calculation of Thermal Capacity for Cooling Tower
( 1) Specification of Tower model
SCC-4800ABT
(2) Specification of Thermal Capacity
(2 - 1) Customer's Specification
L 3337.2 [m'/h]
twl
42.80 [OC]
tw2 35. 00 ["C]
t'l 30.00 ["C]
(2 - 2) Tower's Specification
Q 23562 [m'/min]
do 12. 000 Em]
Wo 12. 000 Em]
ho L 800 Em]
A 144. 000 Em']
Aa 144. 000 Em']
V 259. 200 Em']
( 3) Calculation of Thermal Capaci ty
(3 - 1) Calculation of U /N
L 3337200 [kg/h]
G 1588996 [kg/h]
N 2. lOa [-]
U 2.868 [-]
COIN) L 366 [-]
Notice: Watch next page about U/N
( 3 - 2) Calculation of Ka Ratio
Ka
Kao
Kao/Ka
17581.9 [kJ/m3'h'dh]
17669.8 [kJ/m3hdh]
L 005 [-]
(4) Calculation result
From the above-mentioned calculation result, I am satisfied [ with the cooling
tower capacity concerned] of a specification performance.
- 3 -
Culculation of (UIN)
tWl
tW2
tw dtw hw h hw-h (hw-h)m
Cwdtw
(hw-h)m
42.80 190.89 168.20 22.69
t 0.78
i
22.47 0.145
42.02 183.59 161. 34 22.25
t O. 78
i
22. 16 O. 147
41. 24 176.56 154.49 22.08
t O. 78
i
22.12 O. 148
40.46 169.80 147.63 22.17
t 0.78
i
22.34 O. 146
39.68 163.29 140. 77 22.52
t O. 78
i
22. 81 O. 143
38.90 157.02 133.91 23. 10
t O. 78
i
23.51 O. 139
38. 12 150.97 127.06 23.92
t 0.78
i
24.44 O. 134
37.34 145. 15 120.20 24.96
t O. 78
i
25.58 O. 128
36.56 139. 55 113.34 26.20
t O. 78
i
26.93 O. 121
35. 78 134. 14 106.48 27.66
t
O. 78
i
28.48 0.115
35.00 128.93 99.63 29.30
t' 1"""'i' 30.0c (U/N) - 1. 366
hw: Enthalpy of saturation air equal to water temperature [kJ/kg]
h: (Heat exchange is carried out) Enthalpy of air [kJ/kg]
Cw: Specific Heat of water[= 4.18605 kJ/kg K]
[CulculationJ Enthalpy of the 30'C air which touches 35'C water 99.63
35.8'C --> hi= 99.63 + CwdtwXN = 106.48
36.6'C --> hi= 106.48 + CwdtwXN = 113.34
t t t
42.8'C --> hi= 161. 34 + CwdtwXN = 168.20
[Enthalpy of exit air]
Water Flow L= 3337200 kg/h
Air Flow G= 1588996 kg/h
L/G=N= 2. 100
- 4 -